WestCommercialMultiModalCorridor&MartinsPointSharedUsePathStudies
PublicWorkshopJune11,2015
TonightsAgenda WelcomeandIntroductions MeetingOverviewCompleteStreets101W.CommercialPurpose&Need W.CommercialIssues&Options MartinsPointPurpose&Need MartinsPointIssues&Options NextSteps Questions Workshop
6/11/2015
2
ProjectSchedule AprilMay:Fieldwork,siteanalysis
andStakeholdermeetings June:PublicWorkshop#1 JuneAugust:Developmentand
RefinementofAlternatives September:PublicWorkshop#2 SeptOctober:Recommendations
andCostEstimates NovDecember:FinalReport JuneDecember:UrbanInteractive
platform/website
Context: MultimodalTransportationConnectionsandGaps
6/11/2015
3
CompleteStreets101
WhatareCompleteStreets?SafeComfortableConvenient
6/11/2015
4
IncompleteStreetsareUnsafe
Morethan40% ofpedestriandeathsin2007and2008occurredwherenocrosswalkwasavailable.
andInadequateNosidewalksorcrosswalksforwalkers Unsafe forpeopleonbicycles
Uninvitingforbusriders Inaccessibleforwheelchairusers
6/11/2015
5
CompleteStreetsinCommercial/IndustrialCorridors: MaintainRoadwayCapacity AccommodateTrucksandEmergencyVehicles ImproveSafetyforAllUsers ImproveAccessibilityforAllUsers EncourageHealthierLifestyles ReduceAirandWaterPollution ReducePersonalTransportationCosts ImproveQualityofLife Provideamoregreen,attractivestreetscape
IndustrialCompleteStreetsStrategiestomaintaintruckaccessandimprovewalking& bicyclingsafety Mountableaprons Maintainsidewalkgrade Hivisibilitycrosswalks
andmedianislands 11travellanesfor
bicycleaccess 3035mphspeedlimits
Crosswalkmedianisland
Mountableapronandraisedcrosswalk
6/11/2015
6
WestCommercialStreetPurposeandNeedSummary
The purpose of the West Commercial Multi-Modal Corridor is to recommend a configuration for the corridor that safely accommodates all modes of transportation and accommodates current land uses and future development projects. Changes proposed along the corridor will create an enhanced gateway to Portlands waterfront.
Goals: Balance truck access and staging with ped/bike safety and mobility Serve divergent land uses and the widest number of roadway users Create an attractive gateway to Portlands waterfront.Needs: Reduce high vehicle speeds Create better defined areas for truck parking and staging Extend the shared-use path network and provide on-road bike
accommodations Enhanced pedestrian accessibility along and across the street
WestCommercialSt.KeyIssues
1.Truckaccessandstaging3.Onstreet
BikeLanes
5.Sidewalks&Crosswalks
2.DevelopmentandParking
4.SharedusePathAlignment
6/11/2015
7
1.TruckAccessandStaging
MaineDOT designforBeachStreetintersection
2.DevelopmentandParking
6/11/2015
8
2.DevelopmentandParkingWhatisthebestroadwaydesigntosupportdevelopment?
WestCommercialStreetcrosssection,westofStarMatchbuilding
Marine Industrial
Zone
Whatisthebestroadwaydesigntosupportdevelopment?
WestofStarMatch:Currentconditions
Marine Industrial Zone
Marine Industrial Zone
6/11/2015
9
Whatisthebestroadwaydesigntosupportdevelopment?
WestofStarMatch:Option1,Parkingon
BothSides,NoHarborSideSidewalk
Marine Industrial Zone
Marine Industrial Zone
Whatisthebestroadwaydesigntosupportdevelopment?
WestofStarMatch:Option2,
Parking/sidewalkonHarborSideOnly
Marine Industrial Zone
Marine Industrial Zone
Potential sidewalk to serve commercial uses along harbor side
6/11/2015
10
Whatisthebestroadwaydesigntosupportdevelopment?
EvaluationMatrixexample
3.OnStreetBicycleAccess
W.CommercialatStarMatch:
6/11/2015
11
3.OnStreetBicycleAccess
W.CommercialatStarMatch:
6/11/2015
12
4.SharedusePathAlignmentPotentialoffroadpathalignment
Useoftunnelforpotentialoffroadalignmentoption
5.SidewalksandCrosswalks
ExistingsidewalksandcrosswalkalongW.Commercial
SidewalkontheapproachtoBeckys
6/11/2015
13
5.SidewalksandCrosswalksKeyLocation:crosswalkfromIMTtoHarborViewMemorialPark
Facingwest
Facingsouth
The primary purpose of the Martins Point Path Study is to recommend short and long-term options for improved non-motorized connections between the Back Cove & East End paths with the Martins Pt. Bridge and points north. Ultimately, the improved links will serve the transportation and recreation needs of the East Deering neighborhood and of people throughout the City.
Goals: Enhance the East Coast Greenway route through Portland to points north Increase pedestrian and bicycle capacity for the route between Tukeys
Bridge and the Martins Point Bridge
Needs: In short-term, enhance bicycle connectivity along the Veranda St. corridor Improve pedestrian crossings at various intersections along the Veranda
Street corridor Increase capacity on the Tukeys Bridge congested pathway Increase safety by reducing vehicle speeds along Route 1
MartinsPointPathPurposeandNeedSummary
6/11/2015
14
MartinsPointKeyIssues
1.EastCoastGreenwayConnectivity
2.PathCongestiononTukeysBridge
4.HCLsatI295On/OffRamps
5.VerandaSt.ShortTerm
3.I295RightofWay
1.EastCoastGreenwayConnectivity
MartinsPoint
Bridge
Downtownviathe
BaysideTrail
BackCoveTrail
6/11/2015
15
2.PathCongestiononTukeys
Walkers,runnersandbicyclistscompeteforspaceonthe810path
Solution:MultipleOptions
Potentialnewshareusepathalignment
Possibleconnectionbelowbridge
6/11/2015
16
ConnectionBelowBridge
WestsideofTukeys bridgelookingsouth
PotentialNewPathAlignmentCurrentConditions
Existing Path
6/11/2015
17
Option1: Cantileveredpathoneastside
PotentialNewPathAlignment
Existing Path
PotentialNewPathAlignmentOption2: Useofbridgestructurefornewpath
Existing Path
6/11/2015
18
PotentialNewPathAlignment
RecentlyattachedpathstructureontoI279bridgeinPittsburgh
PotentialNewPathAlignmentOption3: Separatestructurefornewpath
6/11/2015
19
PotentialNewPathAlignment
EugeneORDesMoinesIA
MinneapolisMN
3.I295ROWAlignment
6/11/2015
20
4:HCLsatI295On/OffRampsPotentialofframplaneconversiontoshareusepathw/barrier
Highspeedtraffictoonramp
Potentialrealignmentofofframp
4a.I295OffRamp
Viewoftwolane,I295northboundofframptoRoute1
6/11/2015
21
4b.I295OnRamp
IntersectionofVerandaStreetandtheI295southboundonramp
5.VerandaStreetShortTerm
CurrentconditionsonVerandaStreetfacingnorthwest
6/11/2015
22
Istherealogicalshorttermimprovementforbicyclists?
VerandaStreet:CurrentConditions
Istherealogicalshorttermimprovementforbicyclists?
VerandaStreet:Option1 Enhanced
SharedLaneMarkings
6/11/2015
23
Istherealogicalshorttermimprovementforbicyclists?
VerandaStreet:Option2 CycleTrack
oneastside
NextSteps Consolidationofcomments Refinementofroutingand
alternativesdesigntreatments PublicWorkshop#2topresent
draftrecommendations PreferredAlternativeswithCost
Estimates TrafficanalysisandInterchange
ModificationReport(ifneeded) Draft/Finalreport
6/11/2015
24
Questions
Workshop
6/11/2015
25
WestCommercialMultiModalCorridor&MartinsPointSharedUsePathStudies
PublicWorkshopJune11,2015