ADDENDUM NO. 1 DATE: January 22, 2019 REQUEST FOR PROPOSAL RFP #: M190011228 DATED: January 18, 2019 PROPOSAL DUE DATE: Friday, March 1, 2019 at 2:30 p.m. EST SUBJECT: Question #1 – Clarification & Response Ladies/Gentlemen: Please take note of the following: Please take note of the following question and clarification for questions #1 through #31 in the matrix below: Questions, Responses and Clarifications
1). Question #1: This solicitation document references a Library Facilities Master Plan, adopted by Richmond’s City Council in 2008. Would you kindly provide a web-link or a pdf copy of this Plan to help us better understand the City’s approach and expectations.
Response: Yes. A copy is provided within Addendum #1.
Note: RFI Log attached, dated January 22, 2019. Refer to Addendum #1, Attachment #1. Vendor must take due notice and be governed accordingly. This addendum must be acknowledged and included with the bid (s) submission as indicated in the bid or your response may not be considered. Sincerely,
V{tÜÄxá `A Â`|~xÊ ZtÜtáv|t Charles M. “Mike” Garascia Contracting Officer RESPECTFULLY SUBMITTED: Company BY: PRINT ____________________________________________________________ Signature Title Date
June 2009
RICHMOND PUBLIC LIBRARYFACILITY MASTER PLAN
Inform, Enrich, Empower
A. EXECUTIVE SUMMARY
B. COMMUNITY OVERVIEW/DEMOGRAPHICS
C. MASTER PLAN PROCESS
D. EXISTING CONDITIONS
E. NEEDS ASSESSMENT
F. MAIN LIBRARY
G. RECOMMENDATIONS
TABLE OF CONTENTS
A. EXECUTIVE SUMMARY
A - 1
Since its creation in 1924, the Richmond Public Library System has
provided the citizens of Richmond with access to a broad range
of resources for education, socialization, job development, and
research. Today, the system serves 200,128 residents through the
Main Library and eight branch libraries located throughout the city.
As part of the Capital Infrastructure Improvement Program, and in
an effort to align library service programs with community needs,
the library commissioned the Richmond-based firm of Rawlings
Wilson & Associates, and the national planning and design firm of
Fanning Howey, to conduct technology and infrastructure upgrades
to the branch libraries. As this effort progressed, it quickly became
apparent that the library required a long-range plan for addressing
the changing needs of residents, shifting demographics, and new
trends in library service.
This Master Plan is meant to provide a potential roadmap for the
future. While the city has dramatically changed over the past few
decades, library facilities have remained essentially the same. The
goal of this Master Plan is to establish a plan of action for redefining
the role of libraries in Richmond, Virginia, and creating a sustainable,
cost-effective model for future service and growth.
A TWO-PRONGED APPROACH
The library system is undertaking a two-pronged approach to
reinvigorating its facilities.
Phase One, initiated in the fall of 2008, is currently in the early
phases of design and is funded through the Capital Infrastructure
Improvement Program. This effort includes technology and
infrastructure upgrades that are addressing immediate and critical
needs at the branch libraries.
Phase Two represents a long-range approach to meeting space needs
and the needs of residents. It provides a plan which will guide the
library system through 2031.
The two efforts are being undertaken simultaneously to ensure that
current renovations are made with an emphasis on the best use of
valuable construction dollars. For example, many of the investments
made in Phase One will be able to be transferred to the Phase Two
portion of the project.
A. EXECUTIVE SUMMARY
A - 2
ANALYSIS TOOLS
The findings and recommendations outlined in this document are
based on accurate data and significant input from the Library Board
and the community. The planning team used the following tools as a
source of information:
• Benchmarking – The Richmond Public Library System was compared to twelve other library systems from peer cities across the country. Comparing library systems based on key criteria provides a valuable context for decision-making.
• Life-Style Analysis – A life-style analysis based on GIS information tried to answer the question, “Who are the residents of Richmond?” Sample information gathered includes education levels, housing costs, family makeup, and population trends in various geographic areas.
• Community/Staff Meetings – The planning and design team held a staff/community meeting in each branch library. This forum provided residents with an important opportunity to provide input and feedback and highlight the library services that are important to them.
• Facility Assessment – A team of architects and engineers examined each building for inadequate conditions and necessary upgrades. It is important to note that this assessment takes into account existing conditions, as well as conditions as they will exist after the renovations program.
GUIDING PRINCIPLES
The master planning process began with the Library Board
establishing clear goals and objectives, which took the form of three
impact statements:
• Children will enter school ready to learn, and will succeed academically through resources and programs offered for them, their parents, and caregivers at Richmond Public Library.
• Richmond residents of all ages will thrive and realize success in academic, professional, personal, cultural, and economic pursuits, enhanced by relevant services and resources at Richmond Public Library.
• Richmond residents will increase their technological knowledge, skill, and competencies from technology, programs, and resources available at Richmond Public Library.
These impact statements are the guiding principles for both the
immediate renovation projects and the Master Plan. Information
gained during user surveys, as well as the Library Board’s long-
standing relationship with the community, shaped the development
of the statements.
A - 3
RECOMMENDATIONS
• Create three branch library service models: Borrower’s Library, Information Library, Balanced Library to meet the needs of each service area.
• Borrower’s Library – Program will place an emphasis on collections and a broader representation of the works of popular authors, recordings, and series. Computing resources are provided at an appropriate level. Service Areas: West End, Belmont, Westover Hills
• Information Library – Program will focus on providing extensive computing resources. Collections will be focused on high demand, popular materials. Nonfiction collections may emphasize titles dealing with specific skills and processes. Service Areas: East End, Hull Street, North Avenue
• Balanced Library – Program will focus on creating an equilibrium among collections and technology. Service Areas: Broad Rock, Ginter Park
• Reduce the overall collection from approximately 800,000 volumes to 575,000 volumes.
• Further analyze conditions at the Main Library to examine the potential repurposing of existing space.
• DO NOT consolidate branch libraries into three or four regional libraries. Instead, establish branch libraries in their current service area locations using the following square footage templates:
• 8,000 square feet
• 10,000 square feet
• 13,000 square feet
KEY FINDINGS
• Richmond’s branch libraries have evolved over time to become an integral part of their communities. This is a unique trait, and one that should be encouraged.
• While there are commonalities, which span all communities within Richmond, each service area population has specific needs that are driven by mobility, access to technology resources, borrowing habits, and other issues.
• Based on the current population of 195,000, the branch libraries are undersized by 49%.
• Based on a projected 5% increase in population by 2031, the branch libraries are undersized by 60% and will require an additional 32,000 square feet of space.
• The size of the Main Library is out of proportion with its service area population and circulation. Yet the building’s value as a public and civic space remains undeniable.
• The library’s holdings (books, media, publications) per capita ratio is 4.14, the highest of any of the benchmarked library systems.
• Current conditions in the branch libraries require immediate attention to improve life-safety and maintenance issues.
• The lack of available land will complicate the future renovation and expansion of the branch libraries.
A - 4
THANKS AND ACKNOWLEDGMENTS
The Richmond Public Library System would like to recognize the
following groups and individuals whose contributions to this process
were invaluable.
Library Director
Mrs. Harriet H. Coalter
Library Board
Mr. Gregory A. Forman, Chair
Mrs. Clare Osdene Schapiro, Vice Chair
Mr. Peter Blake
Mrs. Elizabeth S. Bolin
Mr. Shennen L. Dean
Mrs. Brenda Drew, Ed. D
Mr. Benjamin J. Lambert, IV
Mrs. Kathryn J. Monday
Mr. John E. Ulmschneider
Planning/Design Team
Rawlings Wilson & Associates
Fanning Howey
George Lawson Library Planning
Dynamix Engineering, Ltd.
Riemenschneider Design Associates
William Spell
• Engage in a construction program which would create the following branch libraries:
• Belmont: 13,000-square-foot Borrower’s Library
• Broad Rock: 13,000-square-foot Balanced Library
• East End: 10,000-square-foot Information Library
• Ginter Park: 8,000-square-foot Balanced Library
• Hull Street: 8,000-square-foot Information Library
• North Avenue: 10,000-square-foot Information Library
• West End: 13,000-square-foot Borrower’s Library
• Westover Hills: 13,000-square-foot Borrower’s Library
MOVING FORWARD
Based on the findings of this Master Plan, Phase One renovations
should move forward on the current schedule. The investigations
into the Main Library should be expanded through a more detailed
feasibility study conducted as a separate initiative. As the plan for
Phase Two moves forward, a strategy must be developed for future
land acquisitions. In addition, a corresponding funding plan must be
put into place to ensure that the library system’s vision can become
a reality. Given the overall scope, the Master Plan will need to be
executed in a phased manner after the completion of Phase One.
The first level of funding appropriations should be aimed toward
site selection so that over the next several years action can be taken
when opportunities are presented.
B. COMMUNITY OVERVIEW/DEMOGRAPHICS
B - 1
UNDERSTANDING THE COMMUNITY
One goal of the study was to gain a sense of understanding about
the residents of the Richmond area and what they need. During
our discussions we were often told, “That is so Richmond.” We think
this speaks volumes about the identity that threads through all
the neighborhoods, but the key to that expression is the diversity
which exists; essentially, it means different things to different people
depending on the library service area in which one lives. The design
team experienced a commonality that crossed all neighborhoods,
which speaks highly of residents of Richmond. Some members of
our team were not from the immediate area and were essentially
guests of your community. Our job was to gather data, analyze the
data, and make recommendations based on library practices and
the “personality” of each neighborhood. We equate this to being
an invited guest coming into your house and going through all
the rooms; it can be a very personal experience. To that end, the
graciousness, hospitality, and openness that our team experienced
during our travels and community meetings speaks volumes about
the true character of this area.
As part of our evaluation, the team created what is called a “life-style
analysis.” This analysis examined a wide-range of characteristics
that make up a community. A very brief overview of this is shown
in the chart found on page B2. A sampling of the information which
comprised the life-style analysis includes the following:
• Education levels broken out by high school, secondary degrees, and post graduate degrees
• Average cost of housing
• Car and house ownership
• Family make-up by age group and quantity
• Religious preferences
• Population trends by age, race, religion, and education
B. COMMUNITY OVERVIEW/DEMOGRAPHICS
B - 2
Area 2007 Estimated Population
Median Family Income
Caucasian African American
Asian/Other Latino Families Below Poverty (%)
Richmond, City of 193,090 $49,739 42.7% 52.2% 5.1% 4.1% 16.93%
Service Area
A. Ginter Park 7,744 $72,925 72.7% 24.4% 2.9% 1.4% 7.59%
B. North Avenue 15,945 $37,879 8.9% 88.4% 2.7% 1.6% 25.20%
C. East End 28,049 $31,571 19.4% 78.1% 2.5% 1.4% 33.19%
D. Downtown 3,999 $31,448 40.8% 45.9% 13.3% 3.0% 28.52%
E. Belmont 31,658 $56,506 64.3% 29.4% 6.3% 3.3% 11.65%
F. West End 13,598 $120,837 93.3% 4.1% 2.6% 2.0% 0.87%
G. Service from Chesterfield Bon Air 8,845 $87,665 73.0% 22.5% 4.4% 3.4% 0.88%
H. Westover Hills 27,620 $52,410 46.5% 47.8% 5.7% 4.4% 13.06%
I. Broad Rock 26,669 $44,134 27.0% 62.9% 10.1% 12.3% 15.46%
J. Hull Street 14,119 $32,377 20.9% 74.6% 4.5% 4.1% 29.96%
This report is only part of the available data. This information is
much too cumbersome to be directly included in this written
document, but by no means is it confidential. This information
can be made available for public consumption and utilization,
although the details of how to make the information available
have not been established.
The information gathered through the life-style analysis helps
quantify statistical characteristics of a library service area, which is
essential. A broad look at the community shows a median income
of $49,739 and a community that is 52.2% African-American,
42.7% Caucasian, 5.1% Asian, and 4.1% Latino. Approximately
17% of the total population falls below the poverty level. But this
overview does not truly represent the diversity that exists within the
Richmond Public Library System. When one looks more closely at the
statistical differences between library service areas, a different picture
emerges. In addition to this statistical overview, there are intangibles
gathered during talks with community residents that really bring the
statistics to life. As mentioned in the process segment of this report,
our team conducted a public focus group meeting at each branch
and had discussions with library staff members. Open dialogue
was also conducted with members of our local partner firm, City of
Richmond personnel, and library administration to help shape the
data. The information gathered helped us form the following three
library service models.
B - 3
meetings who indicated if they really wanted a book, they were
more likely to purchase it rather than wait until it became available.
The make-up of the collections could be slightly different in these
locations, and there was less of a need to direct resources to Latino
or African-American authors or information. Circulation rates had a
tendency to be higher in these locations, not necessarily because
more people were checking out materials, but because the amount of
materials per individual was higher. Computer use was still a demand,
but not to the levels found in the Information Libraries.
Balanced Library Influences – (Ginter, Broad Rock)
Characteristics of the Balanced Library service area are both above
and below the median. Regarding income, Ginter Park is above the
median and Broad Rock is slightly below. Of all the library service
areas, although aggregated into a single type of library, the personalities
of these communities are quite different.
Ginter Park is a more affluent and mobile community. This community
appears to be a significant walking user group due to the younger
families and proximity to the adjacent elderly housing complex.
The environment surrounding the library does not act as a deterrent
to community use. The nature of the user population tends towards
younger, newer families and the older population, with a noticeable
void of teenage users. Programming for both children and adults
appears to be important. Similar to the Borrower’s Library, this group
SERVICE MODEL INFLUENCES
Borrower’s Library Influences - (West End, Westover Hills, Belmont, Bon Air)
Characteristics of the Borrower’s Library service area include an
above average per capita income and significantly fewer residents
below the poverty level. Education levels and access to private
schools, strong-performing public schools, and institutions of higher
education have a bearing. These two factors influence the desire to
access printed material as a first priority and less of a need for access
to technology. It appears that the income level and educational
background allow for technology independence because of resource
availability within the household. Also, one of the significant
contributors to computer use in some locations is the need to fill
out on-line job applications and create resumes. In these areas, it
is likely there is less job relocation that is dependent on the on-line
application experience. This segment of the community appears to
have more mobility due to higher levels of car ownership, resulting
in less dependence on public transportation. Within this grouping,
individuals from West End, Westover Hills, and Bon Air Service Area
were more likely to use either Chesterfield County or Henrico County
libraries to fulfill their borrowing needs. This grouping could be
considered more likely to use the Main Library for specific research
materials. The Belmont borrowers had similar tendencies, but might
be more likely to access information from Virginia Commonwealth
University because of proximity and number of faculty and students
associated with this area. There were representatives at the public
B - 4
Computer use at this location straddles between the Borrower’s
and Information Libraries. The median income is below average,
with a meaningful number of families living below the poverty level.
This influences computer usage. The lack of resources by some segments
of the population could encourage computer use for filling out on-line
job applications and Internet access.
Information Library Influences – (East End, North Avenue, Hull Street)
Information Library service areas have per capita income levels below
the median and a significantly higher number of families below the
poverty level. On average, high school graduation rates are lower, as are
the number of residents with degrees from colleges or universities.
These library service areas showed the highest demand for computer
use. Many residents do not have access to a computer or Internet access
in their homes. Although the entire system showed an additional need
for on-line research and e-mail usage, this need was most evident in the
East End, North Avenue, and Hull Street communities.
The need for resources to conduct job searches is perhaps the greatest
influence on the demand for computer access. Many users come to the
library to fill out on-line job applications and create resumes, a process
which typically exceeds the current one hour limitation on computer
use. In addition, the current economic climate has increased the
probability of job relocation, making users even more dependent
on the library to provide access to on-line job applications.
has the mobility to use Henrico County’s new libraries and the Main
Library with more ease and frequency. This population has the ability
to more readily purchase materials for personal use than is found at
the Information Libraries.
Computer use here straddles between the Borrower’s and
Information Libraries, and might be more discretionary. Residents
within this immediate service area might have more access to in-
home Internet access and personal computers. Proximity to North
Avenue is an influence on computer use in this area. It was
noted in our research that there is a segment of the city that is
located halfway between North Avenue and Ginter Park that
uses both libraries.
Broad Rock is probably the most unique of all the branch libraries
in terms of fitting within a specific library type. Ginter Park and
Broad Rock have similar use patterns, but the residents using each
are quite different. The make-up of this service population has the
largest percentage of Latino and Asian residents found within the
system, which influences the types of collection material to be found.
This appeared to be particularly true for supporting the Latino
population. Residents indicated there were “pockets of different
communities” throughout the library service area. Although this
creates cultural richness, servicing the diverse needs has influences
in defining this as a balanced library. Another unique characteristic is
the high percentage of rental properties, meaning a more transient
population which, in our discussion with residents, appeared to be a
community identifier.
B - 5
Once patrons reach the library, it is imperative to provide them with
the information they desire. Residents in this area want collections
that have a stronger component of African-American authors,
stories, and information. At North Avenue, there appears to be
a growing segment of the population who would like more
information associated with the Muslim faith. Library staff should
invest time in determining interests that should be reflected in the
neighborhood library collections.
In addition to the need for technology, the Information Library
service areas are challenged with how to connect residents to
their public libraries. These challenges lie in three areas: providing
adequate transportation, offering secure environments, and
customizing the make-up of the collections.
Residents in these communities have a greater dependence on
public transportation, which results in less mobility. For example,
in the North Avenue community, where the main bus route and a bus
stop are in close proximity to the library, there is a significant increase
in library use patterns.
While residents must have access to their local library, this access
offers no benefit if an individual or family decides not to use the
library because of concerns over their safety. All three libraries in
these areas provide a place for those without fixed residence to
gather and access resources. This places an increased importance
on internal configuration and supervision strategies. In addition
to safety concerns, both the East End and North Avenue branches
are in close proximity to party stores. Youth have the opportunity
to witness congregating adults using resources from these
establishments and depicting poor role modeling. This was a clear
message from the residents of North Avenue in particular.
C. MASTER PLAN PROCESS
C - 1
INTRODUCTION
Richmond seeks to build upon the possibilities provided by recent
development efforts and channel these resources back into its historic
center, thus legitimizing its title as “Virginia’s Downtown.” Through
its funding and leadership, the Capital Infrastructure Improvement
Program (CIIP) has become a catalyst for this effort, and has led to
crucial upgrades to the Richmond Public Library System.
The residents of Richmond will benefit significantly from the current
Information Technology and Building Renovation program.
The program’s objectives include providing infrastructure and building
improvements that increase the number of computers, refreshing
well worn interiors, addressing ADA concerns, and improving overall
building performance.
Once the scope was established for the Building Renovation program,
it became apparent that such a commitment of resources needed to be
balanced with the long-term expectations for the system as a whole.
The library buildings, particularly the branches, have not received the
improvements to infrastructure needed to properly service today’s
community. Consequently, a plan was developed in which the master
planning and renovation efforts would run on a parallel course with
the Master Plan presented in May 2009 - the same time that schematic
design was concluding on all eight branches and Main Library. This
would allow the City of Richmond and the Library Board to balance
the investment of current funding with long-term investment
expectations, maximizing the utilization of current tax dollars.
To help optimize the current investment, the design team has
identified items that are transferable, such as loose furniture and
technology that can be readily incorporated into future projects when
they become reality.
Master planning outcomes are designed to establish the library’s
needs twenty years into the future. This has proven to be a realistic
time period due to the availability of funding for capital projects. The
challenge of such a timeframe is to make sure that reasonable growth
and population criteria and guidelines are adaptable to change. It
becomes important in this exercise to define clear core values that are
reflective of the community, embrace good library practices, and plan
for change. In master planning a library system, there is not a universal
answer; what works in one community will not necessarily work in
another. However, there are lessons learned that suggested what
would work for the Richmond Public Library System.
This master planning process began with the Library Board
establishing clear goals and objectives, which took the form of
three impact statements:
• Children will enter school ready to learn, and will succeed academically through resources and programs offered for them, their parents, and caregivers at Richmond Public Library.
• Richmond residents of all ages will thrive and realize success in academic, professional, personal, cultural, and economic pursuits, enhanced by relevant services and resources at Richmond Public Library.
• Richmond residents will increase their technological knowledge, skill, and competencies from technology, programs, and resources available at Richmond Public Library.
C. MASTER PLAN PROCESS
C - 2
The twelve municipalities are:
• Des Moines Public Library – Iowa
• Chattahoochee Valley Libraries – Georgia
• Chesapeake Public Library System – Virginia
• Chesterfield County Library System – Virginia
• Durham County Library System – North Carolina
• Frederick County Public Libraries – Maryland
• Hampton Public Library – Virginia
• Henrico County Public Library – Virginia
• Scottsdale Public Library System – Arizona
• Shreve Memorial Library – Louisiana
• Spokane Public Library – Washington
The intent of this process was to provide a framework in which
the Library Board could position the library system in relationship
to comparables. This allows the Board the opportunity to make
decisions with an awareness of the system’s national position.
These impact statements are the guiding principles for both the
immediate renovation projects and decision-making for the Master
Plan. These statements are rooted in user surveys and the Library
Board’s long-standing relationship with the community.
BENCHMARKING
One essential part of re-establishing Richmond as “Virginia’s
Downtown” can be achieved by favorably positioning the library
system amongst peer systems across the country. The Richmond
Public Library System should be a thoughtful, well-managed, and
responsive community asset that will help attract future businesses
and residents.
The Library Board and designers determined twelve comparable
cities from different parts of the country to use as a mechanism for
benchmarking and comparison. These municipalities were selected
based on criteria developed, discussed, and confirmed through a
series of conversations with the designers, library staff, and Library
Board. The selection criteria were intended to help define library
systems that are both similar in structure and that reflect what the
library system might wish to achieve. In a sense, these might be
viewed as potential role models.
C - 3
different users. The staff in each library, because they work with the
users each and every day, also have a sense of who uses the library
and where they are located. This information was verified through
mailing addresses linked to library cards. Physical factors were taken
into consideration as well; there are distinct segments of the system
that are defined by natural features, highways, and distribution of
residential areas that influence service areas. The location of bus
routes, walking distances, and accessibility by car influenced the
boundaries of each service area. It also became apparent that some
libraries had residents who split their time between two libraries, and
this was factored into the equation to avoid skewed data.
LIBRARY SERVICE AREAS
The Richmond Public Library System consists of eight branches and
the Main Library. The branch libraries are distributed equally around
the system, resulting in each branch servicing a particular group of
library users. All facilities are accessible to any person with a library
card, and users are free to use any branch or the Main Library.
In our discussions with staff and
library users from each library,
we found that most people use a
specific branch. This is typical
and this tendency is referred to
as a library service area. A library
service area is the geographic area
that surrounds the library building
in which the users of greatest
frequency are found. Another way
to look at it is the neighborhood of
the library. How many people live in
the neighborhood or library service area has a direct bearing on how
large the library building should be. Simply put, the greater number
of people located in the service area, the larger the building
needs to be.
The size of each service area was established partly through scientific
research and partly through local knowledge from library staff and
residents. An informal survey contained a map of the
city denoting the location of each branch library. Residents were
asked to insert a pushpin on the map indicating where they lived.
This sampling gave the design team a sense of the location of
C - 4
FACILITY ASSESSMENT
A system-wide facility assessment helped define the exact scope
of work for the renovation program, while providing a foundation
for the Master Plan. A team of architects and engineers visited
each building and reviewed plans and specifications to gain an
understanding of the existing conditions for each building.
The design team also spoke with individual branch managers
and held discussions with community members through a public
meeting at each library. During these meetings, the design team
was able to extract an understanding of how the community uses
the building, what services are used, what services are needed,
and the personality of the community. While this was by no means
a comprehensive investigation, it does appear to be adequate to
help shape an understanding of the strengths and weaknesses
of each library. The detailed findings of this effort can be found in
section D - Existing Conditions.
NEEDS ASSESSMENT
The needs assessment is the outcome of combining the impact
statements and library service area populations in the context of
the benchmark communities. This process was conducted in parallel
with the facility assessment and was facilitated by discussions with
community groups and library stakeholders. The goal of this effort
was to establish the overall need and confirm or redefine the delivery
methodology for the system. The objective was to determine if the
library should retain its eight branches and a single Main Library, or if
there should be fewer branch libraries of a larger size.
Once the physical boundary of a service area was established,
the design team used GIS demographic information to establish
the number of people located within that area. This information was
then projected out to the year 2031 to determine the number of
residents per service area.
While this approach is not an exact science, it does give a sense
of the magnitude for determining the size for a future library.
The following table reflects the library service areas to be used
in sizing the libraries.
Library Service Area Populations
Belmont 35,518
Broad Rock 28,629
Downtown 4,238
East End 31,650
Ginter Park 12,063
Hull Street 14,119
North Ave 22,675
West End 16,375
Westover Hills 29,277
C - 5
A service area is defined as that portion of the community which uses
a particular branch library, Main Library, or any combination of the
two. The library posted maps in each library and asked library users
to mark on the map where they lived, which resulted in a relatively
clear view of how users were clustered around each library. It also
helped define the farthest extent that users typically travel.
This information was then meshed with addresses of library
cardholders. It was then necessary to look at the natural and
man-made features that separate service areas. Once these
parameters of the service area for each branch and Main Library
were established, a demographic study was executed to help
determine the number of people per service area. In addition to
quantifying the population, the design team was able to use GIS data
to analyze approximately 25 statistical characteristics that range from
education and home ownership to family size and income, to better
understand the make-up of each service area.
The final piece of information-gathering consisted of meeting with
community members during public meetings held at the library,
as well as spending time observing in each library. Discussions with
the library staff that have a long history with their patrons helped
shape our understandings. Throughout the process, our design team
kept an ongoing dialogue with library staff and the architectural firm
to confirm the formation of our perceptions.
The needs assessment took place over a two-month period and
involved benchmarking the Richmond Public Library System against
other library systems throughout the nation. It was important that
these peer institutions represent a standard of comparison that
reflected the demographics of the Richmond area and provided a
national perspective of library services. These benchmark systems
were broken down into approximately 20 different categories that
define library service and then measured against the Richmond
Public Library System. The profiling provided an objective picture of
the make-up of the system, which then could be analyzed both on
an individual and accumulative basis. From this analysis, the design
team and library were able to discuss and adjust the parameters of
the system to the needs of the community.
The result of this effort suggested that the current configuration
of the system, although not the most financially efficient way of
delivering library services, was consistent with what has been,
and should continue to be, the personality of the Richmond
Public Library System. It was confirmed that the eight branch
libraries and a single Main Library should be retained, but with
modification. The detailed findings of this effort can be found
in section E - Needs Assessment.
SERVICE AREA ASSESSMENT
From the beginning of the process, it was a clearly stated objective
that the outcomes and recommendations should reflect the history,
culture, and personality of the Richmond area. This is the most
subjective aspect of any study and needs to be handled with care
and thoughtfulness.
C - 6
BEYOND THE MASTER PLAN
The Master Plan defines the quantitative aspects of how the
Richmond Public Library System must evolve to reach its full
potential and best benefit the community. The most difficult part
of the Master Plan will be maintaining the diligence and ownership
that will have to transcend City Administrations, Library Boards, and
Library Staff. The Phase Two portion of the plan will most likely take
ten years or more to reach its full realization, but the process needs
to be set in motion today. There needs to be a culture established
that never lets the intent of the Master Plan fade into the background
as time passes. Appropriations for site acquisitions need to be put
on the City Council agenda now so that, as opportunities present
themselves, properties can be acquired at reasonable costs.
There should be a strategy developed that provides opportunities
for fundraising and attracting major donors, including the discussion
on whether naming rights are within the realm of possibility for
donors. Although Phase One is going to proceed, Phase Two should
not be put on the back burner.
EXECUTION OF THE MASTER PLAN
There are multiple segments to the execution of the Master Plan
that will need to happen over an extended period of time. The most
important aspect of achieving the Master Plan is for the community
to have a stake in the process and keep a diligent and watchful eye
on its execution. The plan has been broken into two different phases
that address the immediate needs and establish a framework for
sustaining a viable system for future generations.
Phase One is the execution of the renovation and technology
upgrades that were defined through the Capital Infrastructure
Improvement Plan. This process is already in progress, with the first
two libraries to start construction near the end of 2009. The goal will
be to complete upgrades to all eight branch libraries and a portion of
the Main Library by 2012. Upon completion, the library system will be
prepared to help address some of the system’s current shortcomings
and establish a platform for launching Phase Two.
Phase Two of the Master Plan involves expanding the overall size of
the branch system by approximately 65%. The increase in the sizes
of the libraries will be accomplished by expansion and renovation
of the Ginter Park and Broad Rock Libraries, and replacement of the
Belmont, East End, Hull Street, North Avenue, West End, and Westover
Hills branches. There are a variety of ways to accomplish this and
options are listed in more detail in section G - Recommendations.
What is apparent is that there will need to be an investment in the
acquisition of properties with structures that can be renovated,
or sites that will accommodate the new facilities.
D. EXISTING CONDITIONS
D - 1
INTRODUCTION
The master planning effort for the Richmond Public Library
System has run in parallel with the planning phase for the Capital
Infrastructure Improvement Program (CIIP), Richmond Public
Libraries – Technology Upgrades and Library Renovations projects,
as these efforts have reciprocal influence.
The master planning effort creates a vision for the Library System’s
needs through 2031, while the CIIP Renovation projects attempt
to address both immediate needs and long-term considerations.
The planning team understands that the “existing condition” of
the system’s buildings will remain an ever-changing variable as
proposed renovations are executed over the next three years. Given
this dynamic situation, it is imperative that both the actual existing
conditions and the projected conditions are fully considered in the
execution of the master plan.
PROCESS
As part of the renovation projects, the design team visited
each building to observe and document existing conditions.
This evaluation was not intended to be an exhaustive review,
but rather an assessment of existing drawings and a visual
inventory adequate enough to facilitate the implementation of
proposed renovations. For example, an analysis of the asbestos
content of existing building materials was beyond the expertise of
the team. When circumstances warranted additional investigation,
recommendations were made to the city of Richmond to perform
a more detailed analysis.
For each branch location, the team has identified aspects of the
existing condition that may require correction due to code violations,
maintenance concerns, health and safety concerns, or best practices
for library planning.
From the standpoint of technology services, the complete
technology system was evaluated at each branch, including such
items as cabling infrastructure, computers, printers, wireless access,
network equipment, building security systems, book security
systems, and audio/video systems.
In addition to the documentation visits, the team conducted
information-gathering meetings with city departments such
as Facilities, the Department of Information Technology, and City
Planning. To ensure that all stakeholders were given consideration,
feedback was collected through staff interviews and public input
meetings held at each of the branches.
D. EXISTING CONDITIONS
Assessments provide a “snapshot” of existing conditions and outline how they will change over time.
D - 2
and generate unwanted ambient noise. The location of these servers
makes them too accessible to daily traffic and does not provide
adequate environmental protection.
The department is in the process of updating the phone system in all
city buildings, including the libraries. The new phone system will be
a Cisco VOIP system with true redundant communication managers
located at City Hall. In addition, the library and city are undergoing
an ILS upgrade with server replacements, and are implementing
software updates to improve the library’s database system.
BELMONT
Service Population: 35,518
Site
The Belmont Branch Library is located at the corner of Ellwood
and Belmont Avenues near the urban retail district known as
Carytown. The building as it exists today is the result of two separate
construction projects. The original building, constructed in 1956,
was approximately 4,000 square feet and occupied the area of the
site closest to the corner. In 1966, an addition of approximately 3,450
square feet was completed, for a total branch size of 7,450 square
feet. This library was the first new branch library constructed for the
Richmond Public Library System.
The site provides an opportunity for two public building entrances.
The main entrance is located on Ellwood Street, near the corner.
The back entrance is convenient to the on-site parking, which is
The team consisted of a combination of architects, a landscape
architect, interior designers, technology designers, mechanical
engineers, and electrical engineers. Team members and their
assessment responsibilities were as follows:
Site William Spell and Fanning Howey
Architecture Rawlings Wilson & Associates and Fanning Howey
Technology Fanning Howey
Furnishings Riemenschneider Design Associates
Mechanical Dynamix Engineering, Ltd.
Electrical Dynamix Engineering, Ltd.
Library planning issues were addressed by the Library Planning
Consultant, George Lawson. His findings are included within section
E - Needs Assessment.
Technology: Common Items Across All Locations
All branch libraries are connected by frame relay via T1 leased lines
to the main server farm, which resides in the city building located at
900 Broad Street. The Department of Information Technology (DIT)
is planning to update the existing T1 connections to a MPLS meshed
network. This project will be done in conjunction with updates to
other city and government buildings.
The existing building infrastructure for technology and electrical
systems will not support the proposed increase in technology.
A significant quantity of the current technology hardware is beyond
its life expectancy. Currently, the servers are located in staff areas
D - 3
glass provides natural light to the interior and makes library activities
visible to passers by. Since there was far less concern about energy
conservation when this facility was built, the thermal envelope
of the building is subpar by today’s energy-conscious standards.
For the age of the building,
the exterior is in fair condition,
but there are some areas of
concern that will need to
receive additional consideration.
Diagonal cracking along masonry
joint lines at the northeast
corner of the building has been
tuck-pointed; this area should be inspected periodically as a part
of regular building maintenance. The site investigation was made
after a rainstorm, and it was noted that much of the first two feet of
masonry around the base of the building appeared saturated and
was supporting moss growth. This condition also existed at the top of
the wall beneath some areas of the stone coping. Similar saturation
of the masonry could be found at either side of the canopy over the
staff entrance. These conditions, if left unattended, could lead to
continued deterioration of the mortar and masonry, and have the
potential to become a source of mold. There are indications that
the canopy over the entrance at the corner of Belmont and Ellwood
retains water after storms.
accessible from Belmont Avenue. Library patrons seek out additional
parking in an adjacent lot. There are a total of 20 parking spaces
available. This limited number can be problematic at times.
Although the zoning ordinance would require a total of 28 spaces
for a building of Belmont’s size, the existing condition will be
“grandfathered” because there are no significant increases
proposed to the building’s floor area.
The pedestrian walkways around the building are in reasonable
condition, with some minor deterioration evident. The concrete
walk adjacent to the parking area has a damaged section.
Moderate ponding observed on the brick walkway after a rain
could contribute to future deterioration of that area. The parking
lots are in need of repair. Site lighting is not adequate to provide a
safe and inviting arrival sequence.
Architectural: Exterior
The building is masonry
construction typical of its
time, consisting of 8” wide
concrete block masonry with
4” wide clay brick veneer finish.
The exterior window system
consists of aluminum framing
with a single thickness of clear
glass, expressed either as punched windows or full-height storefront
glass. Located at the corner and along Ellwood Avenue, the storefront
D - 4
that would encourage library use; however, the height of the
existing ceilings will allow a great deal of flexibility and potential
for renovation options.
The public rest rooms do not conform to ADA standards. The staff
areas and program room used for story time and public meetings
are substandard in size and configuration. The relationship between
the circulation desk, program room, and staff area is dysfunctional.
Various aspects of this area will require modification to achieve
ADA compliance.
Furnishings
The existing circulation desk is an assemblage of pieces and parts
and is showing tremendous wear. Tables, chairs, and soft seating
are showing the signs of high use. All walls are maximized with
90” high shelving, without top canopies. Shelving is a combination
of steel and wood shelving; metal shelving is obsolete, due to the
manufacturer, Library Bureau/Inter Royal, no longer being
in business.
The collections are housed as follows:
• Shelving height, single-faced in adult is 90” high, metal
• Shelving height, single-faced in adult and young adult, wood, is 81.25” high
• Shelving height, single-faced in young adult, wood, is 29.75” high
• Shelving height, single-faced in youth, wood, is 29.75” high, 60.25” high, and 41.75” high
• Periodicals are on 41.5” high shelves in the center of the circulating area
There are three building entrances – the two
for the public mentioned previously, and one
dedicated to staff use. The public entrance
that faces Ellwood Avenue meets ADA access
standards. The public entrance that faces
the parking lot does not conform to ADA
standards because of insufficient clearances
adjacent to the door, inadequate wheel chair
turning radius inside the building, and a
nonconforming access ramp.
Architectural: Interior
The primary interior finishes in the building consist of painted concrete
block walls and carpeting throughout the staff and public areas. Rest
rooms have ceramic tile floors with a combination of painted block and
ceramic tiles for the wall finish. The building has two different ceiling
systems, reflecting the two different periods of construction. The original
building had a plaster ceiling; the remainder of the ceiling is an aged
acoustical ceiling tile with substandard acoustical properties. There
are concerns that the plaster ceiling might contain asbestos; tests will
be commissioned by the Owner to verify the ceiling’s composition. If
asbestos is found to be present, it will create an abatement concern
during construction if the ceiling is disturbed. In its current condition,
the ceiling does not present a health and safety issue for the
public or the staff.
Exposed light bulbs, poor lighting levels, and poor acoustical
performance detract from the ambiance of the public spaces.
In short, the existing interior of the building is not an environment
D - 5
modifications will be required. Based on the age of the building,
the design team believes that some level of further investigation
into the condition of ductwork below grade is warranted.
Code deficiencies that will need to be addressed include smoke
detection and shutdown for the air handling units, and verification
that proper air intake exists for the natural gas burning appliances.
Engineering: Electrical
The existing electrical infrastructure remains consistent with the
original components provided during construction. There have been
minor upgrades to address the addition of technology. Light fixtures
are original, but the prismatic lenses have been removed, exposing
the bulbs. In most cases only two of the originally-intended four
bulbs per fixture are currently installed. The lighting system would
not conform to current energy standards. In addition, the current
electrical infrastructure does not meet performance criteria expected
for modern library projects.
Two code items must be addressed. First, emergency lighting with
battery backup is needed to meet the City of Richmond’s required
emergency lighting level of one footcandle at the floor level along
the means of egress. Second, any electrical outlets within six feet of
a sink need to be GFI-type receptacles. In addition to the code items,
the existing electrical service was sized based on pre-technology
standards and will not meet the increased demand generated by
current and future library use.
Engineering: Plumbing
The building does not contain a fire suppression system and one
is not required by code at this time. The plumbing infrastructure is
original and corresponds to the time period in which each portion
of the building was completed. Rest rooms and drinking fountains
fail to conform to ADA standards, and adjustments in plumbing
infrastructure will need to be made. There are no known plumbing
code violations.
Engineering: Mechanical
Existing mechanical systems fall within various ranges of operational
efficiency. The original mechanical system design has changed
from a chilled water system for air conditioning. However, two air
handling units have been changed to direct expansion cooling and
no air conditioning was added to the third unit. There is currently
air conditioning provided for the building. The boiler system has
been recently updated and will accommodate the expected building
modifications. There is asbestos insulation around some of the
piping that will need to be abated if modifications to the piping
system are required, but it does not present a health risk if left in
its current configuration.
The air distribution system is a combination of ductwork located
below the concrete floor slab and enclosed within areas of the
ceiling. The existing air distribution system does not provide an
adequate number of air changes per hour based on current air
quality standards. Although this is typical of a building of this age,
D - 6
Architectural: Exterior
The exterior envelope of the
library consists of cavity wall
construction with 8” concrete
block back-up and split-faced
concrete block veneer.
The roof is a combination of
sloped surfaces with metal
standing seam roof material
and flat roof areas for the mechanical equipment. A band of
clerestory windows provides light into the heart of the building.
At the time of field observation, there were indications of water
penetration through the roof in selected areas with a tarp covering
a portion of the sloped metal roof. The wall construction is typical
for the age of the building and does have some energy efficiency
incorporated into its construction. The windows are a combination
of punched windows around the perimeter and units with floor to
ceiling glass at the corner facing Broad Rock Boulevard. The units are
aluminum frames with tinted insulated glass.
The building exterior is in
overall good condition, but
some masonry joint cracking
at exterior block column
surrounds and diagonally at
one corner of the building
suggests possible minor water
BROAD ROCK
Service Population: 28,629
Site
Broad Rock Branch Library is located at the corner of Warwick Road
and Broad Rock Boulevard near the Broad Rock Sports Complex.
This branch library services the largest geographic area of any
branch in the system, and is centrally located within its service area.
Parking for library patrons is handled by twenty-four parking spots
on library property, with eleven additional overflow parking spaces
off of the connector road. Current zoning ordinances would require
28 spaces to be provided. The building was opened for patron
use in December of 1976 and dedicated April 1977, and contains
approximately 7,390 square feet of building area. There have been
no additions or significant building modifications since it opened.
The site contains some open space that is located between the
building and Warwick Road. This area could offer the opportunity
for future expansion. There are currently two entrances into the
building, one from the parking lot and one that faces Warwick Road.
The site and building entrance lighting does not provide adequate
levels of site illumination. Sidewalks and landscaping are in fair
condition; however, some vertical supports remain from a bike
rack that was removed, creating a potential hazard for users.
D - 7
Furnishings
Shelving is a mixture of wood and metal and appears to be original
to the building. Steel shelving is manufactured by Montel/Aetnastak
and is a current, readily-available style. Lower shelves are being
utilized throughout the building. The teen area has lounge chairs
on casters with tablet arms for group seating. The lounge seating
in the youth area and periodical area is showing signs of wear.
The collections are housed as follows:
Wood
Periodicals 81 7⁄8" high, single-faced
Newspapers, Videos 42" high, single-faced
Books on Tape 60 ¼" high, single-faced
Holiday, J Reference 60 ¼" high, single-faced
Youth 41 ¾" 60 ¼" 82" high, single-faced
Metal
Youth 65 ¾" high, double-faced
Fiction/Non-fiction 90" high, double-faced
Engineering: Plumbing
The existing rest rooms and drinking fountains do not comply with
current ADA standards and will require modifications. The building
does not contain a fire suppression system and one is not required at
this time. There are no known code violations that require correction
at this time.
issues at grade level. The rough and uneven texture of the exterior
masonry units creates maintenance issues with staining and with
different materials and surfaces abutting to it. There appears to be
an ongoing maintenance issue with sealant in some locations.
Architectural: Interior
The building interior is in
relatively good condition.
The primary interior finishes
consist of painted concrete
masonry block, carpet, and
acoustical lay-in ceiling.
Along the main access corridor
that connects the two entrances,
the exterior split-face block material was incorporated around
structural columns and along accent walls. Public rest rooms
are not ADA compliant and will require substantial modifications.
The ceiling area surrounded by the clerestory window is gypsum
board with no acoustical properties. This space adds interest to
the building, but also contributes to an increase in the ambient
noise level. Lower ceiling heights, along with surface-mounted
light fixtures above the tall shelving, make the collection area of the
building feel slightly claustrophobic. The configuration of the existing
shelving does not meet current ADA standards because the aisle
space between ranges and the turning radius at the end of aisles is
not the proper width. This is an issue that will need to be addressed,
resulting in a loss of collections space. Lighting modifications will be
required to adequately service the new layout.
D - 8
with battery back-up is needed to meet the City of Richmond’s
required emergency lighting level of one footcandle at the floor level
along the means of egress. Finally, there are several electrical outlets
within 6’-0” of sinks and water coolers that are not the required
GFI- type receptacles required by the National Electrical Code.
EAST END
Service Population: 31,650
Site
The East End Branch Library was dedicated in November 1965 and is
located at the corner of R Street and North 25th Street. The building
is centrally-located within its geographical library service area,
and contains approximately 6,271 square feet of floor area on one
level. There are 20 parking spaces distributed throughout the L-shaped
parking lot. Access to the parking area is from both R Street and North
25th Street. Current zoning ordinance standards would suggest 24
parking spaces for a building of this size. The site is bound on the east
by a commercial structure that has its dumpster and receiving area
adjacent to the parking lot. Single-family homes lie to the north of the
building and additional commercial establishments are located across
R Street. The site is at maximum capacity and would not allow for the
expansion of the existing building.
The landscaping treatment around
the building is minimal and in
poor condition. The entrance that
faces R Street is not ADA compliant
and has been closed to public
use. The current main entrance is
from North 25th Street and is ADA
Engineering: Mechanical
The mechanical system is an all-air system with air handlers located
in a mechanical space and three condensing units located on the
roof. The three condensing units vary in capacity and all appear to
be in good condition. The mechanical equipment is in fair condition.
All insulation that surrounds piping and ductwork is fiberglass and is
not a health and safety concern.
In order to conform to current codes, recommendations will be
provided for smoke detection and shutdown for the air handling
systems, as well as confirmation of proper draft at the draft hood
of all natural draft, natural gas burning appliances.
Engineering: Electrical
The electrical system appears to be consistent with construction
documents issued in 1975. The electrical panels and distribution
system are consistent with current library design expectations.
The lighting levels are even and adequate for the type of use;
however, the light fixtures themselves are not consistent with
current energy standards. There have been additional power poles
added into the central spaces to provide electrical service and
data connections to computers. The existing electrical service was
sized based on pre-technology requirements and will not meet the
increased demand generated by modern library needs.
Several modifications will be required to comply with current
electrical codes. Panel “A,” currently located below the mechanical
room stair, must be relocated to meet clearance requirements of
the National Electrical Code. Egress lighting and exit signs must be
evaluated for proper function and light output. Emergency lighting
D - 9
Windows are aluminum frames with a
single pane of glass and, while aged, are
generally in good repair. Observation
from both the exterior and interior
revealed some places where window
gaskets are deteriorating or missing,
and several places where the aluminum
frame has been reinforced with screwed
plates and/or angles. Some windows
show minor signs of condensation and/or
limited signs of moisture damage in the CMU surrounds, but none of
these issues appear structurally significant.
Architectural: Interior
The interior of the space is very
pleasant, due in part to the high
ceilings. The interior finishes
consist of painted concrete block
walls and carpet. The exterior
walls in some locations (most
notably the existing program
room) show signs of significant water penetration, which is cause
for both immediate and long-term concern. The penetration
of water over an extended period of time can result in deterioration
in the wall and, more importantly, a potential black mold issue.
The building was tidy in public areas, yet finishes and surfaces
are well-worn and past their life expectancy.
compliant. The staff entrance is
located on the side facing parking
and is not ADA compliant.
The parking lot is in fair condition,
as are the sidewalks leading
to the building. There is some
deterioration in the cast stone
coping of the raised planter areas around the building.
Architectural: Exterior
The building exterior wall consists of 8” wide concrete block with
4” wide clay brick veneer exterior finish. It would be reasonable
to expect a minimal amount of insulation from construction of
this time period. Typical of its era, the wall construction would be
considered lacking in energy performance by today’s standards.
The coping of the building and vertical accents distributed around
the perimeter is precast concrete panel with exposed aggregate.
It is in fair condition, although sealant between the panels has
deteriorated. There are some indications that water has overflowed
the precast fascia in selected areas, which may indicate some concern
about roof drainage.
The roof is considered a “flat” system supported by structural steel
frame, metal joists, and metal decking. Roof access has been removed
from the building and no visual inspection of the condition of roof
membrane was made. There is rooftop equipment located on the roof.
There are internal roof drains, and indications of roof leaks over an
extended period of time, which can eventually lead to deterioration of
the structural integrity of the metal deck.
D - 10
Engineering: Plumbing
With the exception of the hot water tank, the equipment associated
with the plumbing all appears to be original and in poor condition.
The building has a domestic hot water recirculation pump, which
appears to be in poor condition. The gas meter is located on the
exterior of the building adjacent to the parking lot and has no
bollards for protection from vehicles in the lot, which presents a
health and safety issue that should be addressed. The insulation
surrounding the piping does not appear to contain asbestos,
but is in poor condition. There are no known code issues that
need to be addressed.
Engineering: Mechanical
All mechanical equipment in the building appears to be original,
in poor condition, and beyond its reasonable life expectancy. The
mechanical system consists of supply air provided through ductwork
in the ceiling and return air ductwork located beneath the floor slab.
Further investigation of the condition of the below-slab ductwork is
worth consideration. The building is air conditioned, but there are
heating and cooling problems associated with the meeting room.
The cause of this problem has not been determined.
In order to meet current codes, recommendations will be provided
for smoke detection and shutdown for the air handling systems, as
well as confirmation of proper draft at the draft hood of all natural
draft, natural gas burning appliances.
The ceiling is 2’ x 2’ acoustical tile throughout, with noticeable
dust/dirt staining around the mechanical diffusers. Lighting is
surface-mounted 2’ x 4’, and was adequate to supplement the
daylighting coming in from windows during the day; however,
lighting is likely not sufficient in the evening hours. From the
outside, it was observed that a previous ceiling and old fixtures
were left above the dropped ceiling of the corridor adjacent to
the program room. The fixtures may need to be removed from the
cavity in order to comply with current code.
While the public spaces are generally bright and well-maintained,
the staff spaces show some additional signs of wear. Ceilings display
more signs of dirt and damage than those in the public spaces,
and some of the ceiling tiles are missing completely. Whereas paint
finishes in the public areas appear fairly new, some of the paint in the
staff areas is damaged, chipped, or peeling. Public rest rooms are not
ADA compliant.
Furnishings
Furnishings include lavender end panels, with light blue end panels
in some areas. The existing tables, chairs, and soft seating are
showing signs of high use. All walls are maximized with 90” high
shelving, without top canopies. Steel shelving in many areas shows
signs of water damage with rust and corrosion on shelving units.
Shelving is manufactured by Estey (Tennsco). Shelving in youth area
is single-faced along the outside wall. In areas other than preschool,
it is 90” high. Top shelves in youth area are empty. There are no
top canopies for use of display, which makes the shelving look
unfinished. Steel canopies exist on the shortest shelving units and
under the windows.
D - 11
GINTER PARK
Service Population: 12,063
Site
Ginter Park Branch Library, dedicated in May 1964, is located
at the corner of Westbrook Avenue and Brook Road. The parcel
abuts Henrico County to the north. The property adjoining
the library along the perimeter of the parking areas is vacant,
with the exception of the remains of the parking lot associated
with a previous development. The building is located at a distance
from Brook Road, which permits ample space for a few mature
trees and grassy foreground. The property does appear to have
space available for some type of future expansion. There are
currently 22 parking spaces provided on site; the zoning
ordinance would suggest 25 parking spaces should be provided.
The existing parking lot is accessible from both Brook Road and
Westbrook Avenue.
This branch is unique in that it is located
at the very edge of its library service area
and that a portion of the building is not
currently in use. The building was initially
designed to house a bookmobile.
RPL’s bookmobile is no longer in service,
and there are no plans to reinstate the
service. As a result, the portion of the
building designed as a garage and
bookmobile support space has potential
Engineering: Electrical
The electrical layout is largely unchanged from the original 1964
plans and construction. The distribution system is broken into two
panels for distribution to the mechanical, lighting, and plug loads.
There have been new electrical outlets added to provide power to
computers that have been added over time.
Lighting in the building is original and is lamped with T4 bulbs. The
overall lighting plan would produce an acceptable level of lighting,
but the fixtures generate an audible hum and there were multiple
bulbs missing from a number of fixtures. The existing electrical
service was sized based on pre-technology requirements and will not
meet the increased demand generated by modern library needs.
Several modifications will be required to comply with current
electrical codes. Egress lighting and exit signs must be evaluated
for proper function and light output. Emergency lighting with
battery back-up is needed to meet the City of Richmond’s required
emergency lighting level of one footcandle at the floor level along
the means of egress. Finally, there are several electrical outlets within
6’-0” of sinks and water coolers that are not the required GFI- type
receptacles as specified by the National Electrical Code.
D - 12
There are several large areas of
glass window wall constructed of
aluminum frames and non-insulated
glass. The sections of glass are
large and the framing sections are
small in profile, suggesting this
was a state-of-the-art system when
it was new. During a morning visit, the area around the window was
noticeably chilly due to drafts around the window and lack of thermal
performance. Despite their performance deficiencies, the windows
provide needed daylighting and views, and help to make the reading
room a welcoming place.
Architectural: Interior
The primary finishes inside the
building consist of painted concrete
block, carpet, and exposed wood
decking in the primary public
space. The staff areas and meeting
room consist of a similar palette.
The garage area contains the
glue laminated structure with wood decking.
for repurposing. Associated with this space is a truck well and garage
doors on the building exterior. The total building area is 6,515 square
feet, but in its current condition approximately 1,000 square feet is
unusable for library space.
The site has been well-maintained and features some mature
trees. The sidewalks are in reasonable condition. Site lighting
for appearance and user safety should be given consideration.
Architectural: Exterior
The building is constructed of
8” wide concrete masonry block
with a 4” wide exterior clay
brick veneer. Given the time
period, it would be reasonable
to expect a minimal amount of
insulation in the exterior wall.
This construction was typical of its era, but would be considered
inadequate by today’s energy standards. The building is organized
in a “T” configuration, and has a pitched roof with asphalt shingles,
which appear to be in good condition. The main public space is
framed with glued laminated wood columns and exposed wood
decking; this expression is also seen within the bookmobile garage.
D - 13
support areas. In the public service areas the supply air is distributed
through the ceiling drop that runs through the center of the space,
and return air is distributed through floor registers and under the
floor ductwork. The bookmobile garage does not have heat or air
conditioning. The meeting room is heated by a gas-fired unit heater
that is located in the garage and connected through ductwork.
The air distribution system for the building does not meet current
standards for outside ventilation air as outlined in ASHRAE standards.
The existing boiler is thirty years old and has exceeded its
life expectancy.
Two modifications will be required in order to conform to current
codes. Recommendations will be provided for smoke detection
and shutdown for the air handling systems. There is the need for
confirmation of proper draft at the draft hood of all natural draft,
natural gas-burning appliances.
Engineering: Electrical
The electrical system and lighting plans appear to be consistent
with the original plans dated May 1963. There are some concerns
about the overall integrity of the electrical system, and this warrants
additional investigation as the renovation project proceeds.
The existing electrical service was sized based on pre-technology
requirements and will not meet the increased demand generated
by modern library needs.
Furnishings
In several places throughout the library, windows are blocked by
shelving that has been placed in front. Shelving in the youth area
is single-faced along the outside wall, and in areas other than
preschool, is 90” high. There are no top canopies displays in use,
which makes the shelving look unfinished. Steel canopies exist on
the shortest shelving units and under the windows. Lounge seating,
tables, and chairs show the effects of high use. The metal shelving,
manufactured by Estey/Tennsco, is obsolete.
Engineering: Plumbing
The building does not have a fire protection system on the main floor
or the mechanical basement below the staff areas. There is concern
that fire protection in the basement might be required for code
compliance. If fire protection is required, the water service to the
building is inadequate and would need to be upgraded.
The rest rooms and drinking fountains are not ADA compliant
and require modification. The domestic water piping located
in the basement appears to be wrapped in asbestos piping
insulation. (This was noted at the time of this writing but is
scheduled to be abated).
Engineering: Mechanical
The building is heated and cooled through an all-air system using
multi-zone air handling units located in the basement. The supply
and return air is handled through the ceiling spaces in the staff and
D - 14
Site lighting is a combination of
wall-mounted light fixtures and
ambient lighting from street
lighting. The planter spaces
for street trees are all empty
and filled with dirt and mulch.
The brick paving in limited areas
of the front plaza and along the sidewalk is in poor condition and
some edge restraints are missing, creating a disheveled appearance.
Architectural: Exterior
The building exterior is cavity wall construction consisting of
8” wide concrete masonry block with 4” wide brick veneer and
rigid insulation. This is typical construction for the time period,
and the energy envelope is more consistent with current energy
design standards than many of the other branches. The roof
is considered a flat roof and contains no rooftop mechanical
equipment. There are two small roof areas along East 14th Street
that contain sloped, translucent insulated fiberglass panels which
bring natural light into the space. These panels have yellowed over
the years and are in need of replacement. The window system at
the entrance is aluminum framing with tinted insulated glass and is
more consistent with current energy criteria than glazing at other
branches. The coping of the building, accent banding, and detailing
around the front entrance is precast stone.
There appeared to be pieces of cast
stone facing panel near the parapet
in danger of falling. Other pieces may
become cause for concern as the
sealant continues to fail and they push
Several modifications will be required to comply with current
electrical codes. Egress lighting and exit signs must be evaluated
for proper function and light output. Emergency lighting with
battery back-up is needed to meet the City of Richmond’s required
emergency lighting level of one footcandle at the floor level along
the means of egress. Finally, there are several electrical outlets within
6’-0” of sinks and water coolers that are not the required GFI- type
receptacles required by the National Electrical Code.
HULL STREET
Service population: 14,119
Site
The Hull Street Branch Library is
the newest of the existing library
branches, and was dedicated
in January 1987. This branch
is located at the corner of Hull
Street and East 14th Street and
fits within the scale and context
of the Hull Street streetscape. The building is a single-story structure
and is approximately 6,620 square feet. The single entrance to the
building is through a plaza area situated on the corner. Commercial
buildings are sited adjacent to the library and across both Hull and
East 14th Streets. There are eight parking spaces located adjacent to
the library that are designated for library use and have access from
the alley. Parking also can be found on both sides of 14th Street.
The zoning ordinance would require 26 parking spaces.
D - 15
There are areas in the exterior wall visible from the interior that
appear to have cracked in the mortar joints. These areas are
confined mostly to the space around the sloped translucent
panel. There are also signs of minor rust in the steel framing
and roof deck that surrounds the sloped panels. This should
be looked at in more detail.
The size of the existing public rest rooms is adequate to meet
current ADA standards with modifications to interior partitions
and accessories only.
The overall organization of the interior is relatively efficient from
a library service perspective, although there are some areas of
the building that create a supervision problem. The overall feel
of the interior space lacks the ambiance which helps to encourage
patron use.
Furnishings
All walls are maximized with 90” high shelving, without top
canopies. Shelving in the browsing/adult area is not ADA compliant.
Niches are formed by one 36” wide stack on the wall, with stacks
perpendicular. A great deal of shelving is empty in this area.
Shelving in the youth area is single-faced along the outside wall,
and in areas other than preschool, is 90” high. Top shelves in the
youth area are empty. There are no top canopies for display use,
which makes the shelving look unfinished. Steel canopies do
not exist on the shortest shelving units and under the windows.
The shelving manufacturer is Montel Aetnastak.
farther out of plumb with the rest of the wall. Small deposits
of sealant/cement materials on the ground in the entrance area
suggest that deterioration of the precast detailing is ongoing.
Water has been allowed to run down the face of the brick
veneer in the wall areas below the sloped translucent roof
panels. This condition has lead to saturation and staining of
the brick along with deterioration of the mortar joints. It was also
noted that a piece of the metal coping was missing near the front
of the building. This will need to be addressed because the metal
coping protects the top of the wall from moisture infiltration.
Architectural: Interior
The building interior consists
of painted concrete block,
carpeting, and exposed metal
structure. The interior is unique
among the branches in that the
finished ceiling treatment is
exposed painted metal structure
and metal deck. Lighting for the space is handled from a series of
round indirect light fixtures that illuminate the space by bouncing
light off the structure and down to the floor. The lighting levels
generated by this approach leave the interior of the building feeling
lifeless and in need of a “spark.” Staff areas and the meeting room
have acoustical ceiling tile and recessed fluorescent light fixtures.
D - 16
service areas is supplied by round indirect-type fixtures. The lighting
is very inefficient, given the height of the ceiling. This light creates
an environment that is dim and uncomfortable for reading and
computer usage.
Additional electrical power outlets have been provided to support
the computer stations. The existing electrical service was sized based
on pre-technology requirements and will not meet the increased
demand generated by modern library needs.
Several modifications will be required to comply with current
electrical codes. Egress lighting and exit signs must be evaluated
for proper function and light output. Emergency lighting with
battery back-up is needed to meet the City of Richmond’s required
emergency lighting level of one footcandle at the floor level along
the means of egress. Finally, there are several electrical outlets within
6’-0” of sinks and water coolers that are not the required GFI- type
receptacles required by the National Electrical Code.
NORTH AVENUE
Service population: 22,675
Site
North Avenue Branch Library, at the corner of North Avenue and
East Essex Street, is located along one of the city’s major bus routes.
The single-story library was dedicated in July 1983 and is similar
in character to the West End Branch, although slightly smaller in
length. The floor area for the building is 6,543 square feet. There
are 26 parking spaces provided in a single parking lot north of the
building. This is consistent with current zoning ordinance parking
Engineering: Plumbing
The building does not have a fire protection system, and a
system would not be required by current construction standards.
Toilet fixtures and drinking fountains will need to be updated to be
ADA compliant.
The gas meter is located on the back of the building and is not
protected by bollards from damage due to a passing vehicle.
Consideration should be given to correcting this condition.
Engineering: Mechanical
Heating and air conditioning are provided through an air distribution
system. The public spaces have exposed spiral round duct that has
been painted. Paint on the ductwork is flaking and needs to be
repainted. The staff areas and meeting room have ductwork located
above the ceiling. The primary piece of air handling equipment is
located in an outdoor mechanical yard adjacent to the building.
The insulation around the ductwork needs updating, and the
return air duct had standing water on top of it and is showing
signs of rusting.
There is PVC in the return air plenum of the meeting room. To ensure
code compliance, it is recommended that all return air plenum areas
be checked for combustibles and that non-plenum rated materials be
removed or separated from the plenum.
Engineering: Electrical
The installed lighting in the public areas differs greatly from that
shown on the construction documents, while the electrical power
plans are consistent with 1985 drawings. Lighting in the main public
D - 17
Architecture: Exterior
The exterior wall is cavity wall
construction consisting of 8” wide
concrete block masonry units with 4”
wide clay brick veneer. This is typical
construction for the time period, but
may not be consistent with today’s
energy-conscious construction
practices. The single-story building has sloped roofs organized
around a central spine defined by a flat roof. Within the flat roof
area is the rooftop mechanical equipment. The massing of the
sloped roofs provides an opportunity for clerestory windows to
bring natural light into the children’s area and the adult seating area.
The sloped roofs and fascias are wrapped in a bronze-colored standing
seam metal roof. This is a very durable roofing system and appeared
to be in good condition overall, with a few areas of the fascia in need
of trim repair. Soffits at the metal roof are either concrete plaster or an
EFS system.
The walls on either side of each
sloped roof area extend above the
roof. These walls are then capped
with a coping that consists of brick
units positioned on their edges.
Over time, mortar joints between
the brick have started to open
requirements. Lighting in the parking lot has 6 cut-off
style pole-mounted fixtures that provide an average of 2 to 3
footcandles of lighting. There are wall-mounted light fixtures, but
they were not functioning properly, leaving dark areas on the north
side of the building.
The library has a front door that faces North Avenue. The scale
and texture of the building is consistent with adjacent commercial
structures along the street. Directly behind the library is a
single-family residential area, separated by an alley. A second
entrance is located on the north side and is accessible to the
parking lot. The site is at capacity, leaving only smallish areas
for landscaping and plant materials, including raised planters.
Sidewalks surrounding the
building and leading to the
entrances are in fairly good
shape. The sidewalk located
along North Avenue has a
series of “tree grate”-type
spaces which were devoid of
vegetation. There are several brick raised planting areas near the
North Avenue entrance and these are showing signs of deterioration,
but the plant materials in some were mature and in good condition.
D - 18
of the design team that a detailed air quality assessment
be conducted by an independent testing agency.
The building generates a high level of user traffic and, as a result,
the finishes – and in particular the carpeting – are past their useful
life. The rest rooms are not compliant with current ADA standards
and will need to be modified.
There are a limited number of windows that offer a view to the
exterior. The perimeter of the building does have a small band
of glass that allows a minimal amount of natural light. The area
currently dedicated to the computers has the largest area of “view”
windows in the entire library, but the proximity to the glass creates
reflection problems for the computer users.
Furnishings
The library is furnished with a combination of 66” and 90” high
shelving. All walls are maximized with 90” high shelving, without top
canopies. In the youth area the bottom and top shelves of the units
are not currently being used for collection storage. Lounge seating,
tables, and chairs show signs of heavy use and need to be updated.
The shelving manufacturer is Montel Aetnastak. Shelving in the
youth area is single-faced along the outside wall, and in areas other
than preschool, is 90” high. Top shelves in the youth area are empty.
There are no top canopies for display use, which makes the shelving
look unfinished. Steel canopies do not exist on the shortest shelving
units and under the windows.
up and or deteriorate, and have allowed moisture to penetrate the
wall and enter the building. This is a situation that will need to be
corrected to preclude long-term damage to the wall and to minimize
the development of black mold.
Architecture: Interior
The interior finishes primarily consist of painted concrete block
and carpeting throughout the building. In staff areas, the program
room, and the entrance corridor, the ceilings are acoustical tile with
a combination of 2’ x 2’ and 2’ x 4’ fluorescent fixtures with a metal
baffles. In the entrances and surrounding the circulation desk,
the combination of the ceiling height, the type of lighting fixtures,
and the condition of the ceiling tile creates a less than appealing
environment. In the remainder of the public spaces the ceilings are
exposed wood laminated beams and wood decking. Lighting is
supplied by fluorescent light fixtures running perpendicular to the
shelving. The exposed wood structure creates an interesting interior
space, but the lighting levels are low, despite the supplemental
daylight from the clerestory windows.
There are areas of perimeter wall
that appear to have significant
water penetration issues due to
the water infiltration problems
described in the comments
above. It is the recommendation
D - 19
down lighting component with a slight indirect component. Due
to the nature of the wood ceilings, there is very little light bouncing
off the ceiling. In areas of the building where there is an acoustical
ceiling, the fixtures are recessed fluorescent in either a 2’ x 2’ or 2’ x 4’
configuration. The light fixtures have deep cell parabolic lenses,
which were intended to reduce glare on computer screens by
reducing the ceiling brightness, but which leave the ceiling feeling
dark. The lighting consists of T12 type fixtures that emit an audible
hum throughout the building. Light fixtures throughout the building
are lacking relative to our current energy performance expectations.
In order to meet technology needs, additional receptacles and
circuits were added by using power poles and a wire-mold system.
The existing electrical service was sized based on pre-technology
requirements and will not meet the increased demand generated
by modern library needs.
Several modifications will be required to comply with current electrical
codes. Egress lighting and exit signs must be evaluated for proper
function and light output. Emergency lighting with battery back-up is
needed to meet the City of Richmond’s required emergency lighting
level of one footcandle at the floor level along the means of egress.
Finally, there are several electrical outlets within 6’-0” of sinks and
water coolers that are not the required GFI- type receptacles required
by the National Electrical Code.
Engineering: Plumbing
The existing building does not have a fire protection system, which
is still acceptable under current life safety codes. There is a single
sprinkler head located in the attic catwalk above the rest rooms.
The drinking fountains and rest room fixtures are not ADA compliant.
There are no known existing conditions that require correction based
on current codes.
Engineering: Mechanical
The library has an all-air system that provides both heating and air
conditioning. The rooftop unit is located in the center of the building.
In the areas where there are acoustical ceilings, ductwork is located
above the ceiling. In the public areas where there is exposed wood
structure, the ductwork is painted spiral duct. The mechanical
equipment appears to be in reasonably good condition, but should
be examined to confirm proper operations.
In order to conform to current codes, recommendations will be
provided for smoke detection and shutdown for the air handling
systems, as well as confirmation of proper draft at the draft hood of
all natural draft, natural gas-burning appliances.
Engineering: Electrical
The existing electrical plans dated 1982 appear to be consistent with
the actual building construction. The lighting system in the portions
of the building with an exposed wood ceiling and structure is an
8” wide linear fluorescent fixture located approximately 8’ on centers
running perpendicular to the shelving. The fixtures have a primary
D - 20
as an excellent screening device. Areas adjacent to curbing around
the parking lot have settled, forming a place for water to collect and
creating a tripping hazard.
There is no enclosure provided for trash and recyclables.
Architecture: Exterior
The exterior wall is cavity
wall construction consisting
of 8” wide concrete block
masonry units with 4” wide
clay brick veneer. This is typical
construction for the time period,
but may not be consistent with
today’s energy-conscious construction practices. The single-story
building has sloped roofs organized around a central spine defined
by a flat roof. Within the flat roof area is the rooftop mechanical
equipment. The massing of the sloped roofs provides an opportunity
for clerestory windows to bring natural light into the children’s area
and the adult seating area.
The sloped roofs and fascias are wrapped in a bronze-colored
standing seam metal roof. This is a very durable roofing system,
which appeared to be in good condition.
The walls on either side of each sloped roof area extend above the
roof. This wall is then capped with a coping that consists of brick
units positioned on their edges. Over time, mortar joints between the
brick have started to open up and or deteriorate, and have allowed
moisture to penetrate the wall and enter the building. There were
WEST END
Service population: 16,375
Site
The West End Branch Library is located on Patterson Avenue near
Libbie Avenue. Opened in the later part of 1978, this building design
became the model for the North Avenue Branch. The single-story
building contains approximately 7,500 square feet of floor area.
The building is sited parallel to Patterson Avenue. Patterson Avenue
is a boulevard with a narrow concrete median dividing the
ongoing traffic, which makes a left-hand turn into the site a
concern. A residential property and a residential-style building
that houses a commercial building are located adjacent to the
library. A commercial business is located behind the library.
There are two entry drives located at opposite ends of the site.
The parking lot, which is in good condition, provides forty-three
parking spaces. The forty-three spaces are in excess of the
twenty-five required by current zoning ordinance. Parking lot
lighting consists of 2 tall poles in the rear parking area and 2 shorter
poles illuminating the entrance drives. The shorter poles are in poor
condition.
Landscaping on the south and
the sides of the building appears
to have been recently planted
and is in relatively good
condition. An evergreen hedge
delineates the sides and rear
of parking area and functions
D - 21
The building generates a high level of user traffic and, as a result,
the finishes – and in particular the carpeting – are past their useful
life. The rest rooms are not compliant with current ADA standards
and will need to be addressed.
There are a limited number of windows that offer a view to the
exterior. The perimeter of the building does have a small band
of glass that allows a minimal amount of natural light.
Furnishings
All walls are maximized with 90” high shelving, without top canopies.
Shelving in the youth area is single-faced along the outside wall and
is a combination of 60” and 90” high. Top shelves in the youth area
are empty. Lounge seating, tables, and chairs show sign of high use
and need updating. There are no top canopies for display use, which
makes the shelving look unfinished. Steel canopies do not exist on
the shortest shelving units and under the windows. The shelving
manufacturer is Montel Aetnastak.
Engineering: Plumbing
The existing building does not have a fire protection system,
which is allowable under current life safety codes. There is a single
sprinkler head located in the attic catwalk located above the rest
rooms. The drinking fountains and rest room fixtures are not ADA
compliant. There are no known existing conditions that require
correction based on current codes.
portions of the exterior wall
that appear extremely saturated
with water. This is a situation
that will need to be corrected
to preclude long term damage
to the wall and to minimize the
development of black mold.
Architecture: Interior
The interior finishes consist of primarily painted concrete block
and carpeting throughout the building. In staff areas, the program
room, and the entrance corridor, the ceilings are acoustical tile with
a combination of 2’ x 2’ and 2’ x 4’ fluorescent fixtures with a metal
baffles. In the remainder of the public spaces the ceilings are exposed
wood laminated beams with exposed wood decking. Lighting
is supplied by fluorescent light fixtures running perpendicular to
the shelving. The exposed wood structure creates an interesting
interior space, but the lighting levels are low, despite the daylighting
contribution of the clerestory windows.
There are areas of perimeter wall
that appear to have significant
water penetration due to the
envelope issues described earlier.
Staff working in the building
indicated a high level of allergic
reactions, presumably due to poor
indoor air quality. It is the recommendation of the design team that
a detailed air quality assessment be conducted by an independent
testing agency.
D - 22
In order to provide for technology needs, additional receptacles and
circuits were added by using power poles and a wire-mold system.
The existing electrical service was sized based on pre-technology
requirements and will not meet the increased demand generated by
modern library needs.
Several modifications will be required to comply with current
electrical codes. Egress lighting and exit signs must be evaluated for
proper function and light output. Battery back-up ballasts must be
provided where required to meet the City of Richmond code, which
requires a minimum of one footcandle at the floor level along the
means of egress. Finally, there are several electrical outlets within
6’-0” of sinks and water coolers that are not the required GFI- type
receptacles as outlined by the National Electrical Code.
WESTOVER HILLS
Service population: 29,277
Site
The Westover Hills Branch Library is located on Westover Hills
Boulevard at the corner of Devonshire Road, approximately one
block north of Forest Hill Avenue. Between the library and Forest
Hill Avenue is a commercial property. Residential areas surround
the library to the west and north on both sides of Westover Hills
Boulevard. The library faces Westover Hills Boulevard with parking
located behind the building. Access to the parking lot is from both
Devonshire Road and Westover Hills Boulevard. Dedicated in July
1959, this facility replaced the Forest Hill Branch in the Old Stone
House in Forest Hill Park, and is the second oldest branch in the
system. The building contains 5,407 square feet on a single floor,
and is the smallest of all the branches. One of the unique
Engineering: Mechanical
The library has an all-air system that provides both heating and air
conditioning. The rooftop unit is located in the center of the building.
In the areas where there are acoustical ceilings, ductwork is located
above the ceiling. In the public areas where there is exposed wood
structure, the ductwork is painted spiral ductwork. The mechanical
equipment appears to be in reasonably good condition, but should
be examined to confirm proper operations.
In order to conform to current codes, recommendations will be
provided for smoke detection and shutdown for the air handling
systems, as well as confirmation of proper draft at the draft hood of
all natural draft, natural gas burning appliances.
Engineering: Electrical
The existing electrical plans appear to be consistent with the actual
building construction. The lighting system in portions of the building
that have an exposed wood ceiling and structure is a 8” wide linear
fluorescent fixture located approximately 8’ on centers running
perpendicular to the shelving. The fixtures have a primary down
lighting component with a slight indirect component.
Due to the nature of the wood ceilings, there is very little light
bouncing off the ceiling. In areas of the building where there is an
acoustical ceiling, the fixtures are recessed fluorescent in either a
2’ x 2’ or 2’ x 4’ configuration. The light fixtures have deep
cell parabolic lenses which were intended to reduce glare on
computer screens by reducing the ceiling brightness, but which
leave the ceiling feeling dark. The lighting consists of T12 type
fixtures that emit an audible hum throughout the building.
Light fixtures throughout the building do not meet our current
energy performance expectations.
D - 23
Architecture: Exterior
The exterior wall is cavity wall construction consisting of 8” wide
concrete block masonry units and 4” clay brick veneer. This is
typical construction for the time period and most likely indicates an
envelope with no perimeter insulation. The single-story building has
sloped roofs that are supported on glue laminated structure with
wood decking. The roofing material is asphalt shingles and appears
to be at the end of its life expectancy. The roof leaders, which were
formerly all piped below grade, have become clogged with leaves
and debris and in many cases have been re-routed to spill onto
grade, creating a wet condition around the building foundation.
The exterior window system
is aluminum frame with non-
insulated glass and little thermal
insulating value. Exterior soffits
are painted wood, and are
showing signs of deterioration.
Movement of the structure has
opened the sealant joints around some of the windows far enough
to produce a path for drafts and potential moisture infiltration.
Light from the exterior is visible through the cracks in the sealant.
In locations near the entrance and below the windows, ceramic tile
was installed as ornamentation. This detail is deteriorating. Some of
these areas of tile have been replaced in the past. There have been
modifications to the parking lot entrance in order to create an ADA
compliant entrance. The building exterior is dirty and could benefit
from cleaning.
characteristics of this building, particularly for the time period
in which it was constructed, was the incorporation of a drive-up
book return.
The parking lot contains 19 parking spaces, and is organized
around the concept that a car lane was needed near the building
to accommodate the drive-up book return. The recommended
parking count based on the zoning is 21 cars. Lighting for the site
is an assortment of wall-mounted lights on the west side of the
building. They are mounted very low and create a glare that is
disturbing to the eye when in service. The overall lighting for the site
is not sensitive to the neighborhood; light pollution spills off the site.
Preliminary light level readings indicate that light levels range
from too little to too much. This might be due to some fixtures
not being operational.
Landscaping consists of aged
foundation plantings in poor
condition. There are areas where
is it apparent that plant material
is missing. There are two large
willow trees located on the
site - one is in very close
proximity to the building exterior, which is of concern. There is
a portion of the building exterior wall that has shown signs of
movement and cracking, possibly as a result of the root system of
this tree impacting the building foundation. The site contains a
combination of mature shrubs and wood fencing that provides some
separation between the site and adjacent properties. The lawn areas
are in poor condition with a minimal amount of turf present.
D - 24
The staff areas in this building are very crowded and dysfunctional.
There is no space for privacy for the manager and a general lack of
storage and staff work area. Finishes in this area are painted concrete
block and carpeting that is long past its prime.
Furnishings
Furniture appears to be original 1959 vintage with minor changes
to youth seating. The circulation desk is oversized and shows
signs of heavy use, as does lounge seating, tables, and chairs.
Shelving is not ADA compliant in its current floor plan configuration.
The manager does not have a private office space. Top shelves
are not utilized in the adult areas. Lounge seating areas, tables,
and chairs do not optimize traffic flow and views. The staff area
is congested and furniture is a collection of different styles and
types. Metal shelving, manufactured by Estey/Tennsco, is obsolete.
Shelving heights are a mixture of 59.75”, 81.5”, and 89.625”.
Engineering: Plumbing
The existing building does not contain a fire protection system,
which is consistent with current code expectations. There is a
gas meter and regulator located directly below the outside air/
combustion intake, which presents a potential health safety issue
and is a code violation. This vent should be located a minimum of
two feet from such an intake. Bollards should be installed around the
gas meter to protect it from being struck by a vehicle. The existing
hot water tank will need to be replaced in the near future.
Architecture: Interior
Seeing the interior of this
building is like walking back in
time to 1959; there is very little
that appears to have changed.
The cathedral ceiling defined
by the arched wood structure
and wood decking creates a
very pleasant environment. The main reading room is located in this
space and the ceiling is a hybrid solution of exposed wood decking
and a central spine of 12” x 12” adhered acoustic tile. The acoustical
tile spine runs the length of
space and conceals mechanical
ductwork. Lighting at the wood
ceiling is comprised of 1” x 4”
surface-mounted fixtures
with waffle grid diffusers.
At the 12” x 12” acoustic ceiling
area, 1’ x 4’s are recessed at the
edges in two continuous lines from wall-to-wall. Lighting appears
sufficient when supplemented with daylight, but might seem lacking
in evening hours or dark days. Walls are primarily painted concrete
block, with the exception of a gypsum board wall that encloses the
programming room. Acoustically, the space is alive because of the
hard surfaces located at both the ceiling and wall planes. Carpeting is
the floor material throughout, with the exception of the rest rooms,
which were recently remodeled and are ADA compliant.
D - 25
Engineering: Electrical
There were no existing electrical drawings available for review for
the field investigation. The electrical system appears to be a 120/240
volt, 300 amp, three-phase, four-wire system. Electrical distribution
is handled by a larger panel board for mechanical equipment and a
smaller panel board for plug loads and lighting. Recent work adding
receptacles for computers has used all spare capacity at the electrical
panels. The new computers are being fed from a series of surge
protected extension cords. This practice is not consistent with
current electrical codes.
Lighting is provided by linear fluorescent T12 fixtures surface
mounted to sloped wood ceilings. The system provides a relatively
even level of light distribution. There are recessed downlights
located near the south entrance that are in poor condition.
Fixtures appear to be from the original installation and are
not consistent with current energy practices.
Several modifications will be required to comply with current
electrical codes. Egress lighting and exit signs must be evaluated for
proper function and light output. Battery back-up ballasts must be
provided where required to meet the City of Richmond code, which
requires a minimum of one footcandle at the floor level along the
means of egress. Finally, there are several electrical outlets within
6’-0” of sinks and water coolers that are not the required GFI- type
receptacles required by the National Electrical Code.
Engineering: Mechanical
The air distribution system for the building is a combination of
overhead supply air ducts located along the center of building in an
enclosed ceiling drop. The return air ductwork is located in the floor,
with return air grilles located either at the floor or incorporated into
millwork below the window sills. The existing underfloor ductwork
should be cleaned and its location verified prior to construction.
Air handling equipment appears to be relatively new and is in good
condition. The cooling tower, chilled water pump, and piping to
support the air handler appear to have been recently replaced
and are in good condition.
The existing boiler is the original equipment installed in 1959 and has
exceeded its life expectancy. This piece of equipment is in very poor
condition; replacement is recommended. The hot water tank and the
boiler currently share a common flue, which is badly rusted and in
need of replacement. The recommendation is to replace the flue
from the equipment through the roof penetration.
There are various locations within the building where insulation is
not provided on the piping. For energy conservation, these pipes
should be insulated.
In order to conform to current codes, recommendations will be
provided for smoke detection and shutdown for the air handling
systems, as well as confirmation of proper draft at the draft hood
of all natural draft, natural gas burning appliances.
E. NEEDS ASSESSMENT
E - 1
INTRODUCTION
The Richmond Public Library provides service delivery through a
variety of methods: the Main Library, eight branch libraries, outreach
services, and Web-based digital resources. The primary focus of
the study is on the library’s branch services. The Needs Assessment
provides comments and evidence-based recommendations on current
and projected library facility requirements from several perspectives.
It is this study’s findings that the service distribution defined by
the existing branch system is organically attuned to Richmond’s
neighborhoods. Over the years the establishment of neighborhood-
based branch locations has created ready access to library service.
The neighborhoods have, in turn, developed a strong brand
attachment to their branches. These established, branded patterns of
use are a tremendous strength that should be leveraged. It is worth
noting that draft public library standards under development by the
Library of Virginia call for a level of accessibility that Richmond Public
Library’s branch libraries currently offer.
The branches are, however, too small to fully carry-out their mission
and should be increased from the existing 53,249 square feet to
85,094 square feet. The branches should be configured in three sizes:
13,000 square feet, 10,000 square feet, and 8,000 square feet, reflecting
a matrix of four variables. Three service models should be applied
in the planning of the branches, those of a Borrower’s Library, an
Information Library, and a Balanced Library.
The study compiles a great deal of information and covers many
issues. The following summary outline provides the reader with a
quick view of the report’s scope and organization.
Library Profile
A brief overview of the library’s organization, operations, and
recent service trend data.
Benchmark Data
Data representing 11 libraries that provide points of comparison
for Richmond Public Library.
Space Needs Assessment
The community’s library space requirements through
the year 2031.
Service Delivery Methods
How best to deliver the library’s collections and services
to its customers.
Recommended Branch Space and Service Models
The recommended size and service model for each branch.
Planning for Change
Areas of emphasis and best practices for use in the detailed
planning of the branch improvements.
Draft Library of Virginia Standards
A reconciliation of this study’s recommendations
with the draft standards.
E. NEEDS ASSESSMENT
E - 2
Library Board of Trustees
Mr. Gregory A. Forman, Chair
Mrs. Clare Osdene Schapiro, Vice Chair
Mr. Peter Blake
Mrs. Elizabeth S. Bolin
Mr. Shennen L. Dean
Mrs. Brenda Drew, Ed. D
Mr. Benjamin J. Lambert, IV
Mrs. Kathryn J. Monday
Mr. John E. Ulmschneider
The insights and recommendations are a beginning, a road map to
the future. Implementation of these recommendations will require
further planning by architectural, library planning, and interior
design professionals.
LIBRARY PROFILE
The Richmond Public Library is a municipal public library serving a
community of 200,123 residents (2007 Census estimate). The Library
is governed by a nine member Library Board of Trustees. The Friends
of the Richmond Public Library and the Richmond Public Library
Foundation encourage and support library activities.
The Richmond Public Library Board was authorized by ordinance on
July 5, 1923, and on October 13, 1924, the Library formally opened in
the former home of the late Major Lewis Ginter, at 901 West Franklin
Street. The Dooley Library at First and Franklin Streets opened as the
new Main Library on July 19, 1930. The Main Library was significantly
expanded in 1972 and renovated in 2004.
The first branch library opened in 1925 as the Phyllis Wheatley
Branch at the YWCA of 515 North 7th Street to serve African
Americans. Other branches and a bookmobile provided service over
the years. There are currently eight branches. The oldest of the eight,
the Belmont Branch, began service in 1956. The newest, the
Hull Street Branch, began service in 1987.
Inform, Enrich, EmpowerMission Statement
The mission of the Richmond Public Library is to inform, enrich,
and empower Richmond’s residents: to enrich lives and expand
opportunities for all citizens by promoting reading and the
active use of cultural, intellectual, and information resources
through a dedication to excellence and professional service.
E - 3
The Richmond Public Library provides a number of services directed
to special populations and interests:
• Computer instruction classes for all ages.
• Legal research classes for non-lawyers.
• Children’s programming of every description for all ages.
• Art and music programs.
• Adult book discussion groups and a guest author series.
• Cooperative programs with many community agencies and organizations focusing on literacy, parenting, economic development, health, and a host of other issues.
• Unique collections of reading materials targeted to the interests of teens.
• Homework Help programs.
• Family Resource Collections at all locations.
• Outreach programs which bring the library to community service centers.
• Special collections including children’s literature, musical scores and works by Richmond writers.
• Classes in Spanish at Broad Rock Branch, in partnership with other community agencies, for GED preparation, civics, and small business essentials.
Impact Statements
• Children will enter school ready to learn, and will succeed academically through resources and programs offered for them, their parents, and caregivers at Richmond Public Library.
• Richmond residents of all ages will thrive and realize success in academic, professional, personal, cultural, and economic pursuits, enhanced by relevant services and resources at Richmond Public Library.
• Richmond residents will increase their technological knowledge, skill, and competencies from technology, programs, and resources available at Richmond Public Library.
SERVICE AND OPERATIONAL SUMMARY
Library staff includes about 84.42 full-time equivalents or FTE’s.
At the end of FY 2008 the Library’s collections included 786,925
books, 34,446 media items, and 902 periodical subscriptions. Loans
of these materials totaled 730,627 items. The library has 125 public
Internet computer stations. Digital services include on-line catalog
access, Internet access, and general application software such as
word processing. Library-sponsored programs attracted 41,934
participants in FY 2008.
E - 4
SERVICE LOCATIONS
Library services are provided through a Main Library, eight branches,
the library’s Web site, and community outreach programs.
Main Library101 East Franklin StreetRichmond, Virginia 2321961 hours / week
Belmont Branch3100 Ellwood AvenueRichmond, Virginia 2322147 hours / week
Broad Rock Branch4820 Warwick RoadRichmond, Virginia 2322447 hours / week
East End Branch2414 R StreetRichmond, Virginia 2322347 hours / week
Ginter Park Branch1200 Westbrook AvenueRichmond, Virginia 2322747 hours / week
Hull Street Branch1400 Hull StreetRichmond, Virginia 2322447 hours / week
North Avenue Branch2901 North AvenueRichmond, Virginia 2322247 hours / week
West End Branch5420 Patterson AvenueRichmond, Virginia 2322651 hours / week Westover Hills1408 Westover Hill BoulevardRichmond, Virginia 2322547 hours / week
Note: *Main Library hours will be reduced to 51 hours/week in FY 2010
E - 5
RICHMOND PUBLIC LIBRARY SERVICE TREND DATA(Source: Bibliostat Connect per annual report submittals by the Richmond Public Library)
Fiscal Year Population of Legal Service
Area
Registered Borrowers
Service Hours per
Typical Week
Total Operating
Expenditures
FY 2001 197,790 133,473 417 $4,974,179
FY 2002 197,790 115,900 417 $4,863,478
FY 2003 193,000 87,237** 437 $5,093,221
FY 2004 193,000 105,098 437 $5,186,646
FY 2005 195,300 115,429 441 $5,169,317
FY 2006 192,900 131,927 441 $5,524,570
FY 2007 193,300 61,370** 441 $5,953,116
FY 2008 200,123 107,323 441 $6,226,959
Fiscal Year # of Total Paid
Employees FTE
Total Circulation
Reference Transactions
Visits
FY 2001 88.90 735,892 438,501 704,739
FY 2002 89.90 743,141 486,486 741,747
FY 2003 89.90 760,147 549,174 738,701
FY 2004 89.90 682,927 382,249 707,899
FY 2005 85.54 639,493 380,543 674,412
FY 2006 82.55 693,343 252,609 732,658
FY 2007 83.05 690,503 76,700* 730,708
FY 2008 84.42*** 730,627 85,644* 777,098
Fiscal Year Number of Book
Volumes
# of Audio Materials
# of Video
Materials
# of Periodical
Subscriptions
FY 2001 820,703 17,780 6,829 1,547
FY 2002 843,263 18,769 7,688 1,538
FY 2003 831,216 19,079 8,930 1,497
FY 2004 853,183 19,079 8,075 1,482
FY 2005 882,027 21,812 9,019 1,507
FY 2006 823,466 19,549 5,805 1,494
FY 2007 693,897 10,652 8,180 1,496
FY 2008 786,925 21,590 12,876 902
Fiscal Year Total # of Library
Programs
Total Program Attendance
# of Users of Public Access
Computers
FY 2001 Not Reported 48,792 100,304
FY 2002 Not Reported 66,419 127,959
FY 2003 Not Reported 65,444 152,900
FY 2004 Not Reported 65,055 139,111
FY 2005 3,599 63,828 147,133
FY 2006 3,099 59,188 178,265
FY 2007 2,852 45,099 217,772
FY 2008 2,283 41,934 248,713
Notes * change reflects a significant revision in transaction definition ** reflects normal purging of inactive borrower records *** in FY 2010 total library paid staff will be reduced to 79.44 FTE
E - 6
LIBRARY BENCHMARK DATA
A group of 11 libraries has been identified as appropriate to collectively
provide benchmark data for this study. This group includes libraries
selected because of the size of their service population, their regional
relationship to Richmond, and/or their familiarity to Richmond residents.
Some are municipal libraries like Richmond, some are county systems;
others are regional systems.
The bulk of the data is from the 2007 Public Library Data Service Statistical
Report. Data for the Durham Public Library is the most recent available,
2006, again from the Public Library Data Service. All data regarding public
computing is taken from the 2007 Federal-State Cooperative System.
Educational attainment data is from the United States Census Bureau,
American Factfinder. Status of Friend and Foundation organizations was
determined from the libraries’ Web sites or by direct telephone inquiry.
While all of the data are of interest, several key measures stand-out and
are succinctly displayed in the following “Selected” table.
Selected 2007 Benchmark Group Data
Per Capita Measure Richmond Benchmark
Group Mean Benchmark
Group Median
Operating Expenditure 30.48 34.20 37.28
Branch Square Feet 0.27 0.32 0.29
Total Circulation 3.54 7.93 8.12
Total Holdings 4.14 2.58 2.60
Internet Computers per 1,000 Residents
0.59 0.81 0.69
LIBRARY SERVICE ENVIRONMENT
The Richmond Public Library is one provider in a network of area libraries.
Many of these area libraries cooperate on an ad hoc basis. Other area
library service providers in the region include:
Public Libraries• Henrico Public Library
• Chesterfield Public Library
• Pamunkey Regional Library
State of Virginia• The Library of Virginia
School Libraries• Richmond Public Schools: numerous locations
Academic Libraries• Virginia Commonwealth University
• Virginia Union University
• J. Sargeant Reynolds Community College Library
• Union Theological Seminary
• University of Richmond
Special Libraries• Virginia Historical Society
• Valentine Richmond History Center
• Bon Secours Richmond Health System
• Virginia Museum of Fine Arts
• Jenkins Research Library
• Museum of the Confederacy
• Braille Circulating Library
E - 7
2007 Library Benchmark Data
Libraries State Population of The Legal
Service Area
Square Miles
Operating Expenditures
Per Capita
Chattahoochee Valley Regional Library System (Columbus) GA 201,585 1,443 $32.38
Chesapeake Public Library System VA 213,400 353 $39.56
Chesterfield County Public Library VA 306,000 446 $24.73
Des Moines Public Library IA 198,682 90 $37.28
Durham County Library (2006 data) NC 236,789 299 $23.69
Frederick County Public Libraries MD 225,000 663 $40.15
Hampton Public Library VA 145,500 55 $19.90
Henrico County Public Library VA 283,300 251 $39.35
Richmond Public Library VA 195,300 63 $30.48
Scottsdale Public Library System AZ 237,510 182 $40.62
Shreve Memorial Library LA 253,118 882 $41.54
Spokane Public Library WA 202,900 60 $37.00
National Averages
Mean 227,617 429 $34.20
Median 225,000 299 $37.28
75th Percentile 245,314 555 $39.86
80th Percentile 253,118 663 $40.15
85th Percentile 268,209 773 $40.39
90th Percentile 283,300 882 $40.62
Richmond Public Library is approximately 18% below the median and 25% below the 80th percentile.
E - 8
2007 Library Benchmark Data, continued
Libraries Central Library Public Service Hours
Friends of the Library
Library Foundation
Chattahoochee Valley Regional Library System (Columbus) Yes 545 Yes Yes
Chesapeake Public Library System Yes 544 Yes Yes
Chesterfield County Public Library Yes 571 Yes No
Des Moines Public Library Yes 352 Yes Yes
Durham County Library (2006 data) Yes 363 Yes Yes
Frederick County Public Libraries Yes 426 Yes No
Hampton Public Library Yes 316 Yes Yes
Henrico County Public Library No 592 Yes No
Richmond Public Library Yes 441 Yes Yes
Scottsdale Public Library System Yes 262 Yes No
Shreve Memorial Library Yes 695 Yes No
Spokane Public Library Yes 201 Yes Yes
National Averages
Mean 442
Median 426
75th Percentile 558
80th Percentile 571
85th Percentile 581
90th Percentile 592
Richmond Public Library is approximately 3.5% below the median and 24% below the 80th percentile.
E - 9
2007 Library Benchmark Data, continued
Libraries # of Branches, Including
Central Library
# of Bookmobiles
Total # of Service Outlets
Including Bookmobiles
Central Library Square
Footage
Chattahoochee Valley Regional Library System (Columbus) 8 2.00 10 100,000
Chesapeake Public Library System 7 1.00 8 67,838
Chesterfield County Public Library 9 0 9 42,000
Des Moines Public Library 5 0 5 111,000
Durham County Library (2006 data) 7 1.00 8 65,000
Frederick County Public Libraries 7 2.00 9 66,000
Hampton Public Library 3 2.00 5 53,000
Henrico County Public Library 10 1.00 11 0
Richmond Public Library 9 0 9 112,620
Scottsdale Public Library System 3 0 3 105,000
Shreve Memorial Library 20 1.00 21 80,000
Spokane Public Library 5 1.00 6 87,405
National Averages
Mean 7.64 1.00 8.64 70,658
Median 7.00 1.00 8.00 67,838
75th Percentile 8.50 1.50 9.50 93,703
80th Percentile 9.00 2.00 10.00 100,000
85th Percentile 9.50 2.00 10.50 102,500
90th Percentile 10.00 2.00 11.00 105,000
Richmond Public Library has two more branches than the median and the same as the 80th percentile.
The Main Library is 66% larger than the median and 12% larger than the 80th percentile.
E - 10
2007 Library Benchmark Data, continued
Libraries Branch Library Square
Footage
Branch Square Footage Per
Capita
Branch Library Mean Square
Footage
Total Library Square
Footage
Total Library Square Footage
Per Capita
Chattahoochee Valley Regional Library System (Columbus) 49,939 0.25 7,134 149,939 0.74
Chesapeake Public Library System 92,238 0.43 15,373 160,076 0.75
Chesterfield County Public Library 105,600 0.35 13,200 147,600 0.48
Des Moines Public Library 66,650 0.34 16,663 176,650 0.89
Durham County Library (2006 data) 38,865 0.16 6,478 103,865 0.44
Frederick County Public Libraries 41,100 0.18 6,850 107,100 0.48
Hampton Public Library 22,494 0.15 11,247 27,794 0.19
Henrico County Public Library 149,110 0.53 16,568 149,110 0.53
Richmond Public Library 53,249 0.27 6,656 165,869 0.85
Scottsdale Public Library System 58,650 0.25 29,325 103,650 0.44
Shreve Memorial Library 156,943 0.62 8,260 236,943 0.94
Spokane Public Library 58,059 0.29 14,515 145,464 0.72
National Averages
Mean 76,332 0.32 13,237 137,108 0.60
Median 58,650 0.29 13,200 147,600 0.53
75th Percentile 98,919 0.39 15,970 155,008 0.75
80th Percentile 105,600 0.43 16,568 160,076 0.75
85th Percentile 127,355 0.48 16,616 168,363 0.82
90th Percentile 149,110 0.53 16,663 176,650 0.89
Richmond Public Library - Square footage of branch library space is 7% below the median and 38% below the 80th percentile.
Total library square footage for the system per capita is 60% above the median and 13% above the 80th percentile.
E - 11
2007 Library Benchmark Data, continued
Libraries Population Per Staff FTE
Holdings Per Capita
Circulation Per Capita
Collection Turnover
Chattahoochee Valley Regional Library System (Columbus) 1,716 1.82 6.31 3.97
Chesapeake Public Library System 1,642 3.34 8.96 2.97
Chesterfield County Public Library 2,387 2.50 12.6 5.26
Des Moines Public Library 1,823 2.33 7.81 2.51
Durham County Library (2006 data) 2,301 2.20 5.74 2.47
Frederick County Public Libraries 1,771 2.66 8.12 2.86
Hampton Public Library 2,156 2.03 4.19 2.06
Henrico County Public Library 1,330 2.60 9.52 3.83
Richmond Public Library 2,352 4.14 3.54 0.95
Scottsdale Public Library System 1,699 2.89 10.49 3.18
Shreve Memorial Library 1,562 3.35 5.14 1.40
Spokane Public Library 2,178 2.63 8.37 3.64
National Averages
Mean 1,869 2.58 7.93 3.10
Median 1,771 2.60 8.12 2.97
75th Percentile 2,167 2.78 9.24 3.74
80th Percentile 2,178 2.89 9.52 3.83
85th Percentile 2,240 3.12 10.01 3.90
90th Percentile 2,301 3.34 10.49 3.97
For holding per capita, Richmond Public Library is 59% above the median and 43% above the 80th percentile.
For number of items circulated per capita, Richmond Public Library is 57% below the median and 63% below the 80th percentile.
E - 12
2007 Library Benchmark Data, continued
Libraries % of Circulation At
Central Library
% of Circulation At
Branches
Program Attendance Per Capita
Visits Per Capita
Chattahoochee Valley Regional Library System (Columbus) 69.22 30.78 0.30 5.00
Chesapeake Public Library System 35.63 64.37 0.45 7.60
Chesterfield County Public Library 10.77 89.23 0.16 5.81
Des Moines Public Library 32.55 67.45 0.38 6.99
Durham County Library (2006 data) 44.96 55.04 0.28 4.35
Frederick County Public Libraries 55.78 44.22 0.38 3.84
Hampton Public Library N/A N/A 0.14 3.99
Henrico County Public Library N/A N/A 0.19 5.10
Richmond Public Library 31.90 68.10 0.23 3.74
Scottsdale Public Library System 34.19 65.82 0.54 6.13
Shreve Memorial Library 11.39 88.61 0.29 0.62
Spokane Public Library 21.44 78.56 0.21 4.02
National Averages
Mean 35.10 64.90 0.30 4.86
Median 34.19 65.82 0.29 5.00
75th Percentile 44.96 78.56 0.38 5.97
80th Percentile 51.45 80.15 0.39 6.30
85th Percentile 55.24 87.55 0.43 6.69
90th Percentile 58.47 88.73 0.45 6.99
At Richmond Public Library, the percentage of the material circulation provided by the branch libraries is 3.5% greater than the
median and 15% below the 80th percentile.
E - 13
2007 Library Benchmark Data, continued
Libraries Users of Public Internet
Computers
Users of Public Computers per
1,000 Population
Public Internet
Terminals
Public Internet Computers per
1,000 Population
Chattahoochee Valley Regional Library System (Columbus) 413,816 2,053 298 1.48
Chesapeake Public Library System 517,870 2,427 178 0.83
Chesterfield County Public Library 189,607 620 163 0.53
Des Moines Public Library 137,956 694 130 0.65
Durham County Library (2006 data) 205,154 866 105 0.44
Frederick County Public Libraries 194,827 866 120 0.53
Hampton Public Library 170,741 1,173 80 0.55
Henrico County Public Library 171,747 606 224 0.79
Richmond Public Library 178,265 913 116 0.59
Scottsdale Public Library System 441,227 1,858 163 0.69
Shreve Memorial Library 456,375 1,803 433 1.71
Spokane Public Library 121,872 601 150 0.74
National Averages
Mean 274,654 1,233 186 0.81
Median 194,827 866 163 0.69
75th Percentile 427,522 1,830 201 0.81
80th Percentile 441,227 1,858 224 0.83
85th Percentile 448,801 1,956 261 1.16
90th Percentile 456,375 2,053 298 1.48
Richmond Public Library has provided a quantity of public access computers that is 29% below the median and 49% fewer than
the 80th percentile.
E - 14
2007 Library Benchmark Data, continued
Libraries % of Residents with High School Degree or Higher
% of Residents with Bachelor’s
Degree or Higher
Chattahoochee Valley Regional Library System (Columbus) 79.0 20.4
Chesapeake Public Library System 85.1 24.7
Chesterfield County Public Library 88.1 32.6
Des Moines Public Library 83.0 21.8
Durham County Library (2006 data) 83.0 40.1
Frederick County Public Libraries 87.1 30.0
Hampton Public Library 85.5 21.8
Henrico County Public Library 80.6 34.9
Richmond Public Library 75.2 29.5
Scottsdale Public Library System 93.5 44.1
Shreve Memorial Library 79.0 22.2
Spokane Public Library 88.1 25.4
National Averages
Mean 84.7 28.9
Median 85.1 25.4
75th Percentile 86.7 33.8
80th Percentile 87.3 35.9
85th Percentile 87.8 38.3
90th Percentile 88.1 40.1
The number of Richmond Public Library residents with High School degrees is 12% below the median and 14% below the 80th percentile.
E - 15
SERVICE POPULATION
The service population the Richmond Public Library can expect to
serve in 2031 is one important element in developing an accurate
space needs assessment. Richmond has experienced a period of slow
population decline in the past three decades. Looking to the future, it
appears this trend may be changing.
A good source of population projections is the Richmond Regional
Planning District Commission (RRPDC). That agency forecasts a 2031
Richmond population of 205,117 in a study titled 2031 Long-Range
Transportation Plan.
Richmond Population
Year Population
1980 Census Bureau 219,214
1990 Census Bureau 203,056
2000 Census Bureau 197,790
2031 RRPDC 205,117
SPACE NEEDS ASSESSMENT
The space needs assessment process identifies a community’s library
space requirements for an extended planning horizon, typically 20
to 25 years. In this study of Richmond’s library space requirements
a planning horizon of 2031 has been adopted. Minimum space
requirements are developed using population projections, tested
service standards, and nationally accepted space calculation
formulas. The methodology is based on a space needs assessment
process developed, revised, and published by the Wisconsin
Division for Library Services. It is slightly modified as applied by the
library planner. This methodology focuses on seven types of space
utilization commonly found in public libraries:
• Collection Space
• User Seating
• Staff Work Space
• Program Space
• Public Technology
• Special Use Space
• Structure/Support Space
E - 16
A report created in March 2009 revealed the following, even
after setting aside all items published before 1900, all Special
Collections, all discard, withdrawn, lost, and missing items:
Age of Current Holdings
Main All Branches
Published Before 1999 (10 years old or older) 89% 57%
Published Before 1989 (20 years old or older) 72% 29%
The library has undertaken a thorough collection management
program. These efforts include a systematic review of current
holdings in specific collection segments to identify items with little
or no use for de-accessioning as well as identifying critical items
for acquisition. Age is not in itself a criterion for de-accessioning,
but is a reason for a considered re-evaluation. Older materials can
provide unique value if they are related to the specific mission
of the library, provide a contextual understanding of important
issues, or contribute to an understanding of the history of the
library in the community.
PROJECTED COLLECTION SIZE
BOOK AND MEDIA HOLDINGS
A useful method for predicting future collection size is to apply
the per capita total holdings rate of a benchmark group to the
projected municipal population. The 75th percentile total per capita
holdings rate for the 11 library benchmark group identified for this
project is 2.78. That holding’s rate and the projected 2031 municipal
population of 205,117 suggest a total 2031 collection of 570,225
items. This is a smaller collection than the library’s current holdings.
A smaller collection is appropriate because the current collection
includes a number of materials that have been superseded or are
of little interest to the community. The Richmond Public Library
reported in its FY 2008 statistical submittal to the Library of Virginia
that it held a total of 821,391 book and media items. This is a per
capita holdings rate of 4.14 items, significantly higher than the
mean of 2.58 items held by the 11 peer libraries, and even much
higher than the 90% percentile holdings rate of 3.34 items per capita
for that group.
E - 17
PUBLIC TECHNOLOGY
The digital format has become the preferred form for many customers
seeking specific pieces of information, accessing digital information
sources, and for preparing information to be shared with others.
On-line databases, Web access, and sophisticated on-line catalogs
are all important components of today’s library service program. Public
libraries are the technology access point for many in the community.
Even with the falling cost of technology, the public library will continue
to be the one source for data applications for many residents. For those
with their own equipment and access to technology, the public library
will continue to be the provider of electronic services not easily or cost
effectively accessed by individuals.
A good method for estimating the number of public Internet computer
stations that are needed is to provide one station for every 15 to 20
persons who enter the library daily (excludes public catalog stations and
stand-alone computers).
In FY 2008, 863,983 customers entered the library’s 9 locations - a daily
average of about 2,890 customers. The first half of FY 2009 has shown a
significant growth in the number of library visits with 503,636 visits for
an annualized rate of 1,007,272 visits - a daily average of 3,369.
Benchmark Group per Capita Holdings Data
11 Benchmark Libraries Items Per Capita
Mean 2.58
Median 2.60
70th Percentile 2.73
75th Percentile 2.78
80th Percentile 2.89
85th Percentile 3.12
90th Percentile 3.34
Richmond Public Library 4.14
PERIODICAL HOLDINGS
For FY 2007 the Richmond Public Library reported receiving 1,496
subscriptions or 7.66 periodical subscriptions per 1,000 municipal
residents. That number was substantially reduced in FY 2008 to 902
titles. For the purposes of this study the Richmond Public Library’s
FY 2008 holdings rate of 902 titles will be used.
E - 18
At this writing the library has a total of 113 public Internet computer
stations at all locations. That is not enough to meet current demand.
Computer use is in such high demand that use is rationed to one hour
per customer per day, and still there is significant, lengthy queuing.
Using the projected FY 2009 gate count and allowing one computer
for every 15 to 20 customers entering the library suggests providing
between 168 and 225 public Internet computer stations. The 80th
FY 2007 Benchmark Data Public Internet Use/Availability
11 Benchmark Libraries Users of Public Internet Computers
Users of Public Computers per 1,000 Population
Public Internet Terminals
Public Internet Computers per 1,000 Population
Mean 274,654 1,233 186 0.81
Median 194,827 866 163 0.69
75th Percentile 427,522 1,830 201 0.81
80th Percentile 441,227 1,858 224 0.83
85th Percentile 448,801 1,956 261 1.16
90th Percentile 456,375 2,053 298 1.48
Richmond Public Library 178,265 913 116 0.59
percentile of the 11 benchmark libraries reported 224 public Internet
computers or 0.83 Internet computers per 1,000 residents.
Because the Library Board Facilities Committee understands the
importance public technology plays in the community’s future, this
study recommends planning space for no less than 224 public Internet
computers through the year 2031.
E - 19
Projected Program Space/Capacity
Branch Square Feet
Rated Seating Capacity
Main Library
Second Floor Conference Rooms 882 36
Gellman Gallery 975 64
Children’s Program Room 1,320 74
Board Room 472 12
Auditorium (includes support spaces) 4,708 250
Auditorium Annex 700 75
Main Library Subtotal 9,057 511
Belmont Branch 850 60
Broad Rock Branch 850 60
East End Branch 850 60
Ginter Park Branch 850 60
Hull Street Branch 850 60
North Avenue Branch 850 60
West End Branch 850 60
Westover Hills Branch 850 60
Total 15,857 991
PROGRAM SPACE
Public libraries commonly provide spaces to support the library’s
programming for children, adults, and other needs of the community.
The library has an active schedule of library sponsored programs.
In FY 2008 the library sponsored 2,283 programs with about 42,000
participants. Community groups also make heavy use of the library’s
meeting rooms.
Existing Program Space/Capacity
Branch Square Feet
Rated Seating Capacity
Main Library
Second Floor Conference Rooms 882 36
Gellman Gallery 975 64
Children’s Program Room* 1,320 74
Board Room 472 12
Auditorium (includes support spaces) 4,708 250
Auditorium Annex 700 75
Belmont Branch* 240 30
Broad Rock Branch* 550 56
East End Branch* 660 40
Ginter Park Branch* 500 25
Hull Street Branch* 600 36
North Avenue Branch* 550 35
West End Branch* 550 44
Westover Hills Branch* 500 45
Total 13,207 822
* Please note that the square feet are based on rough field estimates and that the seating capacity is as officially and independently determined over many years by code authorities. It is acknowledged that the space and the seating capacities do not always appear to be in harmony.
Based on staff observations, each branch program room should be
sized to seat 60, and provide support spaces for table, chair, media, and
program supply storage to support current program space demands and
anticipate future needs. There are no capacity changes recommended for
the Main Library program spaces.
E - 20
STAFF WORK SPACES
Staff work space is critical to an effective and efficient public library.
Work space is a productivity issue, not a luxury. Staff work space
includes both public service areas such as the check-out desk and
workroom space where staff completes its on-going responsibilities
such as daily financial reports, preparing statistical reports, and
planning and preparing public programs.
The number of workstations is not in a one-to-one relationship to
the number of staff. The number of workstations represents the
number of places where work takes place, not the number of staff.
By example, while there may be only one person using a wood shop,
there are many workstations: table saw, workbench, lathe, and drill
press, each with a specific, dedicated purpose.
No increase in the overall number of staff workstations is proposed.
Branch Workstations
Location Number of Workstations
Belmont Branch 11
Broad Rock Branch 9
East End Branch 8
Ginter Park Branch 8
Hull Street Branch 9
North Avenue Branch 9
West End Branch 9
Westover Hills 9
Main Library 83
Total 155
GENERAL USER SEATING
Projected user seating calculations are based on a sliding scale of
seats per thousand population. The scale was developed by the
state of Wisconsin following studies of actual public libraries and
their use by patrons.
User Seating Calculations
Population Seats per 1,000 Population
1,000 22.50
2,500 14.25
5,000 10.00
10,000 7.00
25,000 4.50
50,000 3.00
100,000 2.25
250,000 1.50
500,000 1.00
The projected municipal population of 205,117 persons suggests
that about 2 seats be allocated for every 1,000 residents or 410
seats. Library seating is typically offered in a wide variety of formats
such as study chairs, task chairs, stools, and lounge chairs to reflect
the different types of library users and their seating preferences.
Each of those seating types has a different space requirement. An
average space requirement of 30 square feet per seat is used in
these preliminary calculations.
E - 21
SPECIAL USE SPACE
Special use space is an umbrella term that encompasses a
variety of public and staff spaces not covered by the preceding
broad categories. Examples of special use space include study
rooms, copiers, files, displays, and storage space. The specific
space requirements for these uses should be detailed in the
building program document. For the purpose of the space
needs assessment, special use space may be expressed as
15% of the preceding spatial needs.
STRUCTURE AND SUPPORT SPACE
Structure and support space includes areas of the building
that are of common utility and do not serve a specific library
purpose. Structure and support space is sometimes referred
to as architectural or unassigned space. Examples of structure
and support space include the entry and foyer, restrooms,
general aisle space throughout the building, stairs, elevators,
mechanical systems, and even walls and partitions. Projects to
expand and renovate libraries typically require 30% of the gross
building area for structure and support space.
2031 Minimum Space Needs Calculations
Richmond Public Library: All Locations
Space Use Category Space Requirement
Collection Space 570,225 book and media items x .10 = 57,023 SF902 current periodicals x 1.3 = 1,172 SF902 back issue periodicals x 3 years avg. x .66 = 1,786 SF
59,981 SF
General User Seating 410 seats x 30 SF / seat
12,300 SF
Public Computer Workstations224 computers x 40 SF / workstation
8,960 SF
Staff Work Space155 staff workstations x 150 SF = 19,375 SF
23,250 SF
Program Space Main Library All existing program spaces = 9,057 SF
All Branches 8 program rooms to seat 60 each = 8 x 850 = 6,800 SF
15,857 SF
Special Use Space15% of running subtotal (120,348)
18,052 SF
Net Subtotal (sum of above) 138,400 SF
Structure/Support Space At 30% of gross space requirement
59,314 SF
Total: Minimum Gross Space Requirement 197,714 SFThe library currently has a total of 166,242 square feet in all locations, 112,620 at the Main Library and 53,622 square feet at all branches, as reported by the 2007 Public Library Data Service Statistical Report and the 2007 Federal-State Cooperative System.
Maintaining the Main Library at its present size suggests that a total of 85,094 square feet is required for Richmond’s 8 branch libraries.
E - 22
Branches
Branches come in a wide range of configurations to meet specific
service area characteristics, community dynamics, and budgetary
considerations.
Full-Service Regional Branch
This is a branch library intended to provide most of the scope of services
found at the Main Library, if not the depth. Common characteristics of a
full-service branch include:
• 25,000 to 50,000 square feet
• collections of 75,000 to 150,000 items
• 2 or 3 public service desks (by example: circulation, reference, youth)
• staff of 15 to 25 fte
• specialized staff such as reference and children’s librarians
• a full programming schedule supported by branch staff
• meeting room(s) and other program spaces
Neighborhood Branch
This is a branch library intended to support the day-to-day service needs
of a defined population. Common characteristics of a neighborhood
branch include:
• 5,000 to 15,000 square feet
• collections of 20,000 to 75,000 items
• a single public service desk
• staff of 5.0 to 10.0 fte
• staff expertise targeted to reflect the branch’s mission and scope programming supported by branch and Main Library staff
• a meeting room
SERVICE DELIVERY METHODSA range of methods are available for the delivery of library
services to Richmond residents. A single Main Library is one
method. Other examples of delivery methods include full-service
regional branches, neighborhood branches, bookmobiles,
Web-based services, and outreach services. Here are summary
descriptions of the common service delivery types.
COMMON DELIVERY METHODS
Main Library
A Main Library provides comprehensive services to the entire
community, commonly including:
• Typically 75,000 - 125,000 square feet for communities the size of Richmond
• collections of 200,000 to 300,000+ items
• 3 or 4 public service desks (by example: circulation, reference, computing help desk, youth)
• staff of 30 to 65 fte
• specialized staff such as reference, children’s, IT librarians
• a full programming schedule
• a suite of meeting rooms
• home for support services for entire library organization such as cataloging, marketing, facility management, administration.
E - 23
• programming limited by space or held in near-by cooperating agency
• requires land-lines to hook-ups at each location or an on-board generator
• stable schedule promotes use
• on-line services for bookmobile are possible (circulation control, customer computing), either through land-lines or wireless connections.
Direct Delivery
Direct delivery typically is a USPS mail-based service using the
library’s on-line system as the “catalog” by which customers remotely
browse and select materials. The library then mails selections directly
to the customer. The customer may return by mail or use remote
returns. Spokane Public Library has offered this service in the past at
a subsidized rate of $2; actual costs may be $3.50 to $4.00.
Reciprocal Services
In this model, services are provided by a group of library entities
to their collective patrons. By example, Richmond Public Library
serves other Richmond area residents that are borrowers of other
area libraries. In turn, those libraries provide service to Richmond
City residents.
Joint-Use Facilities
Public libraries sometimes join with another public service agency
to provide service from a shared facility. The style and level of
this sharing runs the gamut from a fully integrated service to two
agencies operating separately in independent spaces under a shared
roof. Agencies partnering with public libraries include community
Outreach Services
Outreach programs provide library services and materials to
customers at community locations outside of the library. Outreach
programs may serve preschools, senior centers, schools, correction
centers, group-living centers, or homebound individuals. Sometimes
deposit collections of library materials are maintained at community
service centers.
Web-Based Services
The Library’s Web site can offer a wide range of digital resources
provided directly by the library or through portal or gateway
services contracted by the library. Digital branches may provide
access to many resources such as
• the library’s catalog and reserve/delivery functions
• the borrower’s personal library account
• interactive staff expertise
• downloadable materials such as e-books, journal articles, sound files, video files
• databases
• links to other Web sites
Bookmobile Service
Bookmobiles operate as a mobile branch with a special service focus.
Common characteristics include:
• collection of 2,500 to 3,500 items
• staff of 2.5 to 3.0 fte
• available at any single location for a limited time period
E - 24
Outreach Services
Outreach programs include on-site programs at schools, pre-schools,
and community service locations; partnerships by the Early Literacy
Coordinator to reach parents and childcare providers with training
specific to their needs; and library events with neighborhood
partners to showcase related neighborhood resources such as
the North Avenue Branch’s programs with the Partnership for
Families Northside.
Reciprocal Services
Richmond Public Library has ad hoc agreements for reciprocal service
with the adjoining public library systems.
The Main Library
The current Main Library opened for service in 1930 as the Dooley
Library and was significantly expanded and re-configured in 1972.
Contemporary renovations occurred in 2004. The Main Library
includes the fullest array of collections and formats of all service
locations with about 437,000 items. The Main Library offers 48 public
computing stations and additional stations for other technologies.
There are two large public program rooms, The Auditorium seats 250
and the Auditorium Annex seats 75. The Gellman Gallery seats 64, the
Children’s program room 74, Board Room 12, and there are 4 smaller
conference style rooms on the Second Floor.
The library’s administrative, technical services, and technology
services are located at the Main Library, which is open 61 hours,
6 days each week.
centers, city offices, recreation facilities, senior centers, and less
commonly fire and police services. Public libraries sometimes partner
with community colleges, colleges/universities, and public schools.
There are as many unsuccessful partnerings as successful.
A key to success is a well-researched operational agreement
and a commitment to the project’s success by both organizations,
their governing authorities, and their staffs. There are extensive
issues to work through.
Successful partnerings have included those with recreation and
community centers. One of the least successful partnerings is
between public libraries and public schools. Often funding agencies
seek a fuller integration than is practical. In some partnerings
collections do not overlap much, selection criteria often conflict,
customer bases are often at-odds or a safety concern, policies and
practices differ significantly. Sometimes there are unspoken cost-
shifting expectations.
EXISTING RICHMOND PUBLIC LIBRARY DELIVERY METHODS
Web-Based Services
The library’s Web site offers customer access to the library’s catalog,
research databases, access to reference librarians, recommended
reading, the customer’s borrower account, and pre-selected links to
area libraries, city resources, and many useful on-line resources.
E - 25
BRANCH LOCATIONS AND SERVICE AREAS MAP
Branch Characteristics
Richmond’s eight branch libraries are similar in size. The smallest,
Westover Hills has 5,407 square feet, and the largest, West End,
has 7,510 square feet. They have similarly sized meeting rooms
with seating capacities ranging from 25 to 56 persons. Hull Street
is the newest building, opening in 1987, and Belmont is the oldest,
opening in 1956.
The estimated service population that can be attributed to each
branch is more diverse, ranging from Ginter Park with 12,063
residents to Belmont with 35,518 residents. West End and Belmont
have the heaviest door count, Broad Rock and Westover Hills are
close behind in the next bracket.
The branches vary significantly in how their customers utilize
their resources. Every branch has a diverse use of its resources but
there are some recognizable patterns of use among the branches.
Broad Rock, Hull Street, East End, and North Avenue have heavier
computer use. West End, Belmont, and Westover Hills have higher
material circulation rates. It’s not a question of absolutes but
rather the branches finding themselves at different positions on a
continuum of use.
Branch Libraries
Richmond has 8 branch libraries in locations that provide
appropriate access, organically reflect existing neighborhoods,
and respond to natural and man-made barriers such as freeways
and rivers. Many of the branches have a long, continuous history
of service at their location, 30, 40, and even 50 years. The branches
are an important part of the neighborhood, a resource with broad
impact, and a touchstone for area residents.
Belmont Branch3100 Ellwood AvenueRichmond, Virginia 2322147 hours / week
Broad Rock Branch4820 Warwick RoadRichmond, Virginia 2322447 hours / week
East End Branch2414 R StreetRichmond, Virginia 2322347 hours / week
Ginter Park Branch1200 Westbrook AvenueRichmond, Virginia 2322747 hours / week
Hull Street Branch1400 Hull StreetRichmond, Virginia 2322447 hours / week
North Avenue Branch2901 North AvenueRichmond, Virginia 2322247 hours / week
West End Branch5420 Patterson AvenueRichmond, Virginia 2322651 hours / week
Westover Hills1408 Westover Hill BoulevardRichmond, Virginia 2322547 hours / week
E - 26
RICHMOND PUBLIC LIBRARY SYSTEM APPROXIMATE BRANCH SERVICE AREAS
E - 27
2008 Branch Characteristics and Use Data
Branch 2007 Estimated Service Population
Holdings Feb. 2009
Circulation Visits or Door Count
Public Internet Computers
Computer Use
Belmont 35,518 50,000 103,346 88,978 8 20,886
Broad Rock 28,269 38,349 56,082 100,647 10 32,947
East End 31,650 26,616 27,155 76,048 10 24,071
Ginter Park 12,063 33,305 52,412 68,847 7 18,805
Hull Street 14,966 27,803 27,060 58,467 15 27,395
North Avenue 22,675 25,303 27,241 116,267 10 22,396
West End 16,375 64,744 138,367 87,049 9 15,758
Westover Hills 29,277 33,610 98,388 77,265 8 19,676
Main 4,238 436,947 213,978 190,388 48 71,349
Total 195,031 736,677 744,029 863,956 113 253,283
Branch Age of Building
Square Feet
Weekly Hours of Service
Staff Stations
Meeting Room Capacity
Belmont 1956 7,365 47 11 30
Broad Rock 1976 7,391 47 9 56
East End 1965 6,271 47 8 40
Ginter Park 1964 6,515 47 8 25
Hull Street 1987 6,620 47 9 36
North Avenue 1983 6,543 47 9 35
West End 1978 7,510 51 9 44
Westover Hills 1959 5,407 47 9 45
Main Library 1930, 1972 112,620 61 83 511
Total N/A 166,242 N/A 155 822
E - 28
Selected Branch Characteristics and Use Data in Descending Order
Branch Holdings Feb. 2009
Main Library 436,947
West End 64,744
Belmont 50,000
Broad Rock 38,349
Westover Hills 33,610
Ginter Park 33,305
Hull Street 27,803
East End 26,616
North Avenue 25,303
Total 736,677
Branch Visits or Door Count
Main Library 190,388
North Avenue 116,267
Broad Rock 100,647
Belmont 88,978
West End 87,049
Westover Hills 77,265
East End 76,048
Ginter Park 68,847
Hull Street 58,467
Total 863,956
Branch Computer Use
Main Library 71,349
Broad Rock 32,947
Hull Street 27,395
East End 24,071
North Avenue 22,396
Belmont 20,886
Westover Hills 19,676
Ginter Park 18,805
West End 15,758
Total 253,283
Branch Circulation
Main 213,978
West End 138,367
Belmont 103,346
Westover Hills 98,388
Broad Rock 56,082
Ginter Park 52,412
North Avenue 27,241
East End 27,155
Hull Street 27,060
Total 744,029
Branch Service Population
Belmont 35,518
East End 31,650
Westover Hills 29,277
Broad Rock 28,269
North Avenue 22,675
West End 16,375
Hull Street 14,966
Ginter Park 12,063
Main Library 4,238
Total 195,031
Branch Square Feet
Main Library 112,620
West End 7,510
Broad Rock 7,391
Belmont 7,365
Hull Street 6,620
North Avenue 6,543
Ginter Park 6,515
East End 6,271
Westover Hills 5,407
Total 166,242
E - 29
The findings of the Space Needs Assessment are confirmed when
the benchmark peer group data is analyzed. The Space Needs
Assessment estimate of 85,094 square feet falls between the
75th and 80th percentile of the benchmark group's branch library
square feet per capita rates.
Branch Space Requirements per Benchmark Data
2031 Estimated Branch Service Population 200,661
Nth Percentile of Benchmark Libraries’ Square Feet Per Capita
0.39 Per Capita: 75th Percentile 78,258
0.43 Per Capita: 80th Percentile 86,284
0.48 Per Capita: 85th Percentile 96,317
0.53 Per Capita: 90th Percentile 106,350
RECOMMENDED BRANCH SPACE AND SERVICE CONFIGURATIONS
The Space Needs Assessment portion of this study identifies a need for
a total of 197,714 square feet system-wide to provide city-wide public
library service and meet operational needs through the year 2031.
The Main Library requires 112,620 square feet suggesting that 85,094
square feet could be assigned to branch library service points.
The branches currently occupy 53,249 square feet.
The Main Library plays, and will continue to play, a pivotal role in
Richmond’s service delivery model. It is the one location that provides
a critical mass of resources and services to support the broadest and
most far reaching of the community’s library needs. It also plays an
important role in the community’s arts experience that many value.
Space Needs Assessment Summary
Space Use Category Space Requirement
Collection Space 59,981 SF
General User Seating 12,300 SF
Public Computer Workstations 8,960 SF
Staff Work Space 23,250 SF
Program Space 15,857 SF
Special Use Space 18,052 SF
Net Subtotal 138,400 SF
Structure/Support Space 59,314 SF
Minimum Gross Space Requirement 197,714 SF
Main Library 112,620 SF
Branch Libraries 85,094 SF
E - 30
Proposed Allocation of Space by Branch
BranchService Population
ModelVisits or Gate Count Model
Circulation Model
Computer Use Model Mean Space
Proposed Space Allocation
Belmont Branch 15,841 11,241 16,591 9,769 13,361 13,000
Broad Rock Branch 12,608 12,715 9,003 15,410 12,434 13,000
East End Branch 14,116 9,607 4,359 11,258 9,835 10,000
Ginter Park Branch 5,380 8,698 8,414 87,96 7,822 8,000
Hull Street Branch 6,675 7,386 4,344 12,813 7,805 8,000
North Avenue Branch 10,113 14,688 4,373 10,475 9,912 10,000
West End Branch 7,303 10,997 22,213 7,370 11,971 13,000
Westover Hills Branch. 13,058 9,761 15,795 9,203 11,954 13,000
Total 85,094 85,093 85,092 85,094 85,093 88,000
Square FeetBased on Percentage of Total for Each Allocation Model
BRANCH SPACE ALLOCATIONS
A four factor matrix was developed to allocate the increased
recommended space among the branches. The factors include
service population, number of visits, circulation and computer use.
The differences among the branches for each factor directly shape
the space allocations. A Mean Space Allocation reflecting all four
factors was identified for each branch. This mean allocation was
modified by the consultant in the form of a slightly more idealized
Proposed Space Allocation.
The data aggregates to three branch sizes; 13,000 square feet, 10,000
square feet, and 8,000 square feet. All of the branches need a host of
improvements including more public computers, a larger program
room, and more effective staff work space. The Proposed Space
Allocation establishes an 8,000-square-foot minimum for all branches
to support the changes to library services based on projected service
area populations and resident needs.
E - 31
BRANCH SERVICE CONFIGURATION MODELS
The data for Richmond’s branch libraries suggest three broadly
defined service models: Borrower’s Library, Information Library,
and Balanced Library. The differentiation between the service
models is more a matter of degree rather than an absolute. All of
the branches require circulating collections, program/meeting
room space to support both library sponsored and community
group activities, general customer seating, public computers,
service desks, staff work space, and support space for building
systems and operational concerns.
Digital Resources
Borrower’s Library
Circulation data at these branches suggest an emphasis on collections. In addition to
the latest best sellers and high demand materials, broader representations of the works of popular authors, recordings, and series are stocked. Computing resources are provided in the quantity needed to
support customer demand.
Branches that reflect this emphasis are West End, Belmont, and Westover Hills.
Information Library
Customers at these branches place significant demand on in-library computing.
Collections at these branches are more focused on high demand, popular materials and rely more on intra-library loans to support more
detailed requests from customers. Nonfiction collections may have an emphasis on titles dealing with specific skills and processes.
Branches that reflect this emphasis are East End, Hull Street, and North Avenue.
Balanced Library
Demand for collections and technology are more in equilibrium in this model.
Branches that reflect this equilibrium are Broad Rock and Ginter Park.
Circulating Collections
SERVICE MODEL CONTINUUM
It is the emphasis apportioned to each of these functions to reflect the
unique aspects of the branch’s customer base that gives definition to the
branch buildings and services. The following chart describe the three
broad branch types or models.
Service Model Continuum Chart
E - 32
Impact Statements
• Children will enter school ready to learn, and will succeed academically through resources and programs offered for them, their parents, and caregivers at Richmond Public Library.
• Richmond residents of all ages will thrive and realize success in academic, professional, personal, cultural, and economic pursuits, enhanced by relevant services and resources at Richmond Public Library.
• Richmond residents will increase their technological knowledge, skill, and competencies from technology, programs, and resources
available at Richmond Public Library.
BEST PRACTICES
Taking the lead from the Mission and Impact Statements, the
following areas of service are targeted for special attention in the
redevelopment of Richmond’s branch libraries.
Emergent Literacy
The Public Library Association suggests that “Emergent literacy
is what children know about reading and writing before they can
actually read or write. Young children’s emergent literacy skills are
the building blocks for later reading and writing. Children learn these
skills before they start school and this begins in infancy. From birth
throughout the preschool years, children develop knowledge of
spoken language- the sounds that form words, letters, writing and
books. This is the beginning of the abilities that children need to
be able to learn to read and write in school.”
PLANNING FOR CHANGE
Specific building programs and ensuing schematic plans must be
developed for each branch to reflect their service model and space
allocation. The staff and design teams should work together to
develop core characteristics for each branch model and allow for
the specific idiosyncrasies that make each branch special.
In this process it is critical that the planning teams look to other
library systems for best practices to shape Richmond’s path in the
process of developing the core characteristics for each model and a
building program for each branch. Best practices offer a preview of
the impact of specific methods, designs, technologies, furnishings,
and policies. Richmond Public Library’s Mission and Impact
Statements suggest several important areas to focus the pursuit of
best practices.
RICHMOND’S PLANNING DIRECTIVES
Mission Statement
The mission of the Richmond Public Library is to inform, enrich,
and empower Richmond’s residents: to enrich lives and expand
opportunities for all citizens by promoting reading and the active
use of cultural, intellectual, and information resources through
a dedication to excellence and professional service.
E - 33
Two new Omaha Branches (South Omaha Branch and the
Washington Branch) include computing spaces that serve both as
space for instruction and for drop-in public access. Pocket doors
or other demountable wall systems allow for the ready conversion
of an enclosed instructional space into an extension of the public
floor for general public computing.
A recognized leader in computing literacy and technological
competence is the Hennepin County Library, Minnetonka, Minnesota.
The Brookdale Branch and other branches of the Hennepin County
Library offer computer instruction to targeted audiences in several
languages, in several age groupings, and at several skill levels.
Personal Development
Many public libraries work independently and in partnerships with
other community providers to offer classes and tutoring in reading
and English language competency, GED preparation, citizenship, job
search preparation, as well as cultural programs of interest to a broad
segment of the community.
Queens Library, New York City, is a fantastic source of programs for
lifelong and life skills learning. The programs they offer directly or in
association with other community sources are amazing. The Queens
Library offerings include varied adult learner classes, citizenship
classes, genealogy, computer instruction, research instruction, and
health information. A look at their Web page, www.queenslibrary.org,
and clicking of the “Your Community” button, offers an initial view
of this strong program.
Facility planning implications of emergent literacy services include
space for targeted collections, parent/child read together seating,
self-directed discovery areas with manipulatives and other learning
opportunities, and children’s programming space. A recognized
leader in emergent literacy services is the West Bloomfield Township
Public Library, West Bloomfield Township, Michigan.
To implement the emergent literacy concepts, spaces specially
designed for young children should be planned. These spaces can
provide stimulating environments that feature vocabulary, tactile,
dimensional, and auditory interaction. Structures that encourage
motor development and spatial understanding can also be
wonderfully entertaining. The space and equipment that support the
emergent literacy program should be flexible to allow for activities
and enhancements.
Technological Competency
Public libraries, including the Richmond Public Library, offer
instructional programs in basic computing and software applications.
Providing an appropriate learning environment and gearing the
instructional programs to targeted audiences are two factors in
providing a successful program.
Facility planning implications of providing technology instruction
may include spaces that serve both as an instructional environment
and as open access computing stations or as a program room.
E - 34
Young Adult area. Not a separate room, Maplewood is an extensive
alcove that runs along the main circulation spine of the building.
DRAFT LIBRARY OF VIRGINIA STANDARDS
The Library of Virginia promulgates and maintains standards
for public libraries. A working draft of potential revisions to the
standards is currently being developed for consideration.
The following items are excerpted from the working draft to
call to attention those items within the draft that may have some
bearing on the Master Plan under consideration.
A review of these issues suggests that recommendations of the
Master Plan are in compliance with the draft standards.
The following summaries of specific sections illustrate the key issues
of the draft standards that bear on the facility planning envisioned by
this study.
Key Requirements of the Draft Standards
1. Collections
Level Items Per Capita
2031 Projected Population
Required Collection Size
A 2 205,117 410,234
AA 3 205,117 615,351
AAA 4 205,117 820,468
The draft Virginia Standards also requires libraries to weed 5% of their collection annually
Branch planning must include appropriate meeting space
with up-to-date media presentation technologies to provide
the optimum support for these personal development activities.
The meeting spaces must be sized, furnished, and finished in a style
that encourages participation and learning.
Teen or Young Adult Services
Providing services and facilities that attract and engage teen
customers has become a focus for many libraries. Some of the
characteristics that mark successful Young Adult spaces include
contemporary design, fun furnishings, movable furnishings,
technology stations, and media capabilities.
The Omaha Public Library has two new branch projects that have
created exciting teen areas, the South Omaha Branch and the
Washington Branch. Both these Young Adult projects were funded
in part by the Omaha Public Library Foundation. The teen spaces
are highly visible with walls that are all or mostly glass. Computers
are essential to the credibility of any teen space. The teens should
help select their furnishings. The furnishings should be able to be
reconfigured by the teens on an ad hoc basis.
Phoenix Public Library’s Main Library has a well known and
innovative Young Adult department that could offer inspiration.
Phoenix includes small group study spaces and media presentation
capabilities.
The Maplewood branch of the Ramsey County, Minnesota, library
system is a new building that has a very interesting and more modest
E - 35
5. Facilities: Other Requirements
The draft standards include a host of requirements dealing
with facility features such as lighting, aesthetics, signage,
code requirements. These are detailed in items FA1 through
FA22 on pages 18 through 20 of the draft standards.
6. Technology: Number of Public Computers
Level # of Public Computers Per Capita
Richmond’s Projected
2031 Population
Required # of Public Computers
in 2031
A 1 per 3,000 205,117 69
AA 1 per 2,000 205,117 103
AAA 1 per 1,000 205,117 206
7. Technology: Average Wait Time for Public Computers
Level Wait Time
A 30 minutes
AA 20 minutes
AAA 10 minutes
8. Services to Targeted Groups
The library shall provide space for infants, preschool and
elementary school-age children, which includes materials,
computers, adult and child seating, and programs.
The library shall provide separate space for teenagers to
gather and study that has materials, computers, and seating.
2. Facilities: Location
Level RequirementA No more than a 20-minute driving time for residents
as an average of multiple travel time studies from: a) the edges of the service area to the nearest
available library b) between available libraries
AA No more than 15-minute driving time for residents as an average of multiple travel time studies from: a) the edges of the service area to the nearest
available library b) between available libraries
AAA No more than 10-minute driving time for residents as an average of multiple travel time studies from: a) the edges of the service area to the nearest
available library b) between available libraries
3. Facilities: Gross Square Feet of All Buildings
Level Square Feet Per Capita
(Populations of 100,001 – 500,00)
2031 Projected
Population
Required Square
Feet
A 0.6 205,117 123,070
AA 0.7 205,117 143,582
AAA 1.0 205,117 205,117
4. Facilities: Planning
Facility planning to be based on a 20-year population forecast.
F. MAIN LIBRARY
F - 1
configuration is a result of two phases, which were designed and
constructed during two different periods that characterized library
design. The original building constructed in 1920’s has a more
traditional concept of library design and planning. The library was
a gift from Mrs. James H. Dooley in memory of her husband and
erected on the site of the birth place of James Branch Cabell.
The appearance of the original building has been altered along
East Franklin with the addition of the arcade that runs the length of
the building. The exterior was traditional architecture, is consistent
with library and public institutions of its time, and has an “edifice”
orientation. The original building entrance is south of the main
entrance, is concealed behind the arcade, and is not used today as
a public entrance. The interior architecture of the original building
has been preserved and the entry sequence has a wonderful sense
of scale and ambiance - a space that was designed to inspire by its
The Main Library has a unique role to play in the health and
well-being of the overall system. The structure of the Richmond
Public Library System is that all administrative services, material
handling, and specialized collections are consolidated in this single
location. From the early stages of comparisons with benchmarked
communities, it became apparent that the distribution of building
area between the branches and the Main Library was out of balance.
This was confirmed when the service areas were established and
the team evaluated the ratio of population served to the size of the
building. The evaluation shows that, compared to the benchmark
communities, a disproportionately high percentage of the system’s
total building area is concentrated in this one location. This appears
particularly acute given the amount of people in direct proximity
to the building, parking limitations, and transportation challenges.
Discussions with community members located in each branch
library service area revealed a mixed impression of the role the Main
Library plays in the overall system. In the branch libraries that were
classified as Information Libraries, residents used the Main Library
more frequently to obtain additional computer time. At the other
end of the spectrum, the Borrower’s Libraries’ residents used the
main library for its special collections, in-depth research tools, and for
access to a greater depth and breadth of materials. Residents of these
libraries also used Henrico County or Chesterfield County libraries
more frequently.
The Main Library, as a building, is significant and plays an
essential role in the well-being of the system. The current building
F. MAIN LIBRARY
F - 2
The distribution of the collections summarizes the basic
differences in the library planning. Here the collections are
distributed throughout the space with seating integrated
adjacent and in-between the shelving, whereas in the original
building collections are disassociated from the seating areas.
The planning concepts in the 1960’s focused on more flexible
universal spaces that could be reconfigured based on a modularity
defined by the shelving. One can see this modularity expressed most
clearly in the ceiling of the second floor. The interior space of this
section is marvelous, and the natural light that is brought in through
the large windows is a rare treat. In the original design, the second
floor was open to the floor below, but in recent years enclosed study
rooms were added to meet the need for quieter spaces. The first floor
was also renovated and updated with the inclusion of the reference
desk, music collection, and small youth area. The balance of the
youth area is located on the ground floor of the original building.
Master Plan – Phase One
The commonality of all the different phases of construction is that
the technology, mechanical, and electrical infrastructures are not
consistent with the expectations of today’s users. Over the years,
improvements in electrical and mechanical infrastructure have
been threaded through the original building with varying degrees
of success. To meet the needs of the community the technology
infrastructure and supporting electrical systems require special
attention. Phase One of the master plan is trying to address this issue
at the second floor computer area. There is definite need to increase
the quantity of computers available for public use, and the goal is to
address this need within that limited area.
presence. This building was also designed in a time period when
the collections were contained in “back areas” primarily accessible
to the staff. A multi-level, self-supported range of shelving is located
in the center of the library. This shelving is efficient at holding large
quantity of material, but is not “public” friendly. Notable concerns
include its inability to meet ADA requirements, inappropriate lighting
levels, and ventilation concerns.
The 1960’s addition is consistent with best practices of good library
planning and architecture for its time period. The current building
entrance and lobby are the starting point for this addition.
The elevators and stairwells are located within this addition
and provide the vertical circulation that links the old and new.
The interior characteristics of the addition are in complete
opposition to the original building. While the original structure
has a more traditional organization and was designed around a
centralized space, the addition has decentralized the building
volume by moving it toward the exterior walls. The central portion
of the addition is program space with two stories of height located
at the perimeter. Both approaches were meant to bring natural light
into the heart of the building and to create spaces that inspire. Both
spaces try to be monumental, but each accomplishes it successfully
in completely different means.
F - 3
the building will be removed. This is a unique situation and creates
an untapped potential that can be used to deliver a unique form of
library service while remaining respectful of the existing building.
The second recommendation is to take a comprehensive look at
the overall organization of the building. As is typical of library
buildings that have experienced an addition, there are instances
where blending the pieces together creates internal inefficiencies.
Typically, we find people view expansion as additions and do not
invest in reorganization within the existing building to ensure the
two parts work seamlessly together. In our preliminary walk through,
our first impression is that this situation exists here. When you
take into account that two different library planning philosophies,
different architectural concepts, significant reductions in collections,
and the fact that different library service expectations have been
merged, it supports the view that an extensive study be performed.
The third recommendation, given the circumstances surrounding the
collection reduction and the changes in library service expectations,
is that a new vision be created for the Main Library. Richmond is
reestablishing its presence both within the state and nationally. The
library community is experiencing an evolution in how the library
experience is being delivered due to changing technologies and the
expanding role of a library within the community. The improvements
in the branch libraries will allow them to deliver more relevant
library service with greater convenience to each neighborhood.
The Main Library also has one of the larger meeting spaces available
for public use. This auditorium is located on the lowest level of the
building and is accessible from the stair and elevator. This space is
scheduled to undergo a cosmetic upgrade that includes lighting
and technology upgrades, refreshing the finishes, and new
furnishings. This modest investment will create a more pleasant
and usable facility.
Master Plan – Phase Two
The Main Library has a unique place in the Phase Two realization
of the Master Plan. The comprehensive analysis required to realize
the building’s full potential is beyond the scope of this study.
There should be a detailed existing condition study performed, and
the role of this facility should be discussed in great detail because
there is a set of very unique circumstances associated with it.
First, the recommendation of the Master Plan is for an overall
reduction in the collection from approximately 800,000 items to
570,000 items. The intent of this effort correctly supports the notion
that a smaller, higher-quality collection is more accessible to the
public and more cost-effective to maintain. The means and methods
for retaining critical resources and preserving essential references
is a strategic planning issue that the library board and staff have
taken seriously, and in which they are actively engaged. The result is
that there will be vacated space generated within the Main Library,
particularly in the original building, that will need to be repurposed.
The self-supporting shelving system of the original building in its
current configuration is not suitable for repurposing and will need
to be removed from the building. This means that a large cube of
space that was the driver for the orientation and organization of
F - 4
be to create an environment where the learning experience is taken
beyond the traditional classroom environment, and connect learning
with more active participation.
These opportunities are just a reflection of the types of potential
that exist for the Main Library beyond traditional library services.
These are not intended to displace existing critical services, but
rather create a regional draw. The commonality behind it all is to look
for new partnerships with different aspects of the art, educational,
and business communities to improve the overall well-being of the
residents. The uniqueness of this effort does require careful dialogue
and discussions, and needs a very task-specific effort.
The realization of the Phase Two Master Plan will force the Main
Library to reinvent itself in order to support the branches, rather than
competing with them.
The new vision for the Main Library might actually be found in the
roots of its original role in the community. The library as the primary
gathering point for the entire area in support of the cultural arts,
research materials, business resource center, and special collections
could establish its presence as a regional draw. The space vacated by
the antiquated shelving might create a volume within the building
that could be used for performance arts or exhibit space.
Dialogue with the business community to determine what amenities
and resources might support their business training, employee self-
improvement, and meeting facilities needs might provide a source of
income. The new concept of an emerging business center might help
attract and encourage the entrepreneurial spirit within the area. With
the ongoing demands for self-motivated professional development
and the increase in online educational opportunities, this type of
service might be integrated into such an area.
With literacy an important issue within the community, an
opportunity exists to create an experiential literacy environment
that excites children and encourages parents to make the journey
from their neighborhood to the downtown area. This could be a
combination of integrating space for the performing arts, a hands-on
museum, and nontraditional learning experiences. The goal might
Think, Innovate, Do-Library
...an emerging business center to encourage the entrepreneurial spirit
...an experiential literacy environment that excites children and encourages parents
...regional draw to support cultural arts
G. RECOMMENDATIONS
G - 1
The Richmond Public Library System is running two different
programs simultaneously: an initial investment in the branch libraries
and a look to the future with a master plan effort. Traditionally, these
two programs are not run in parallel; therefore, it is important to test
the relationship of one program against the other. It is fortunate that
the same planning and design team is involved with both programs
in order to more effectively assess their mutual impacts.
The master planning recommendations for branch libraries will be
divided into two phases. Phase One will be defined by the current
technology and renovation program using funds from the Capital
Infrastructure Improvement Program. Phase Two highlights master
planning findings that outline additional space allocations as
established by the needs assessment and library service
delivery model.
MASTER PLAN PHASE ONE
Phase One of the master plan, initiated in the fall of 2008, is currently
being executed through the Capital Infrastructure Improvement
Program. This effort focuses on improvements to all eight branch
libraries and is predicated on the need to fulfill the three library
impact statements:
• Children will enter school ready to learn, and will succeed academically through resources and programs offered for them, their parents, and caregivers at Richmond Public Library.
• Richmond residents of all ages will thrive and realize success in academic, professional, personal, cultural, and economic pursuits, enhanced by relevant services and resources at Richmond Public Library.
• Richmond residents will increase their technological knowledge, skill, and competencies from technology, programs, and resources available at Richmond Public Library.
The importance of these statements has become even more
relevant given the substantial changes in the economy and
corresponding need to become a more knowledge-based culture.
Libraries typically see significant increases in their services in times
of recession as people cut personal budgets, seek retraining, or
complete employment applications. This pattern is being repeated
in the Richmond Public Library System with noticeable increases
in computer use, patron use, and circulation. Due to the physical
condition of the existing branches and Main Library, the library
system is having great difficulty fully meeting these needs.
G. RECOMMENDATIONS
G - 2
Community Service Needs
Providing a library environment that says “what happens here is
important” and realizes how library users’ needs have changed is
critical to achieving the impact statements. Through our discussions
with community groups and review of use patterns, it is apparent
that changes in the interior aesthetics, configurations, and quality
of the buildings are essential; therefore, the scope of work for all
the branches will include new floor finishes, repainting, lighting
upgrades, and new furniture. These improvements will make
the libraries more user friendly and more inviting places for the
community to come together.
The expectation for Phase One work will be to bridge the gap
between existing conditions and the realization of Phase Two of the
Master Plan. Through a series of discussions, it was determined that
investments in Phase One would be divided into two categories:
transferable and non-transferable investments. Transferable
investments are those elements that, purchased in Phase One, are
likely to be transferable to Phase Two. These items are primarily
shelving, furniture, and some aspects of technology. It should
be noted that the longer the timeframe to execute Phase Two,
the more the value of these elements diminish. Non-transferable
elements are investments in the buildings, such as infrastructure
improvements, floor finishes, painting, etc. These investments have a
ten- to fifteen-year life expectancy and most likely will have reached
their usefulness by the time Phase Two is executed. Some of these
investments are good for the neighborhood and overall condition of
the built environment, while some will position the buildings to be
converted to alternate uses.
Phase One can be simplified into three overarching scopes of work:
Technology Upgrades
This aspect of the project is directly related to the technology
impact statement. Each branch library will experience an increase in
the number of computer stations and the replacement of existing
equipment. In addition, the buildings will become more laptop
friendly by providing electrical outlets and data connections at all
adult study tables and casual seating areas. A wireless environment
will provide additional Internet opportunities. In order to support this
increased electrical demand, each building will receive infrastructure
improvements.
Facility Improvements
The existing library buildings have experienced high usage with
limited funding for adequate maintenance. Also, in the time since
these buildings were constructed, there have been changes in ADA
requirements and life safety issues. Facility improvement efforts
will concentrate on ensuring that exterior building issues, life safety
issues, and infrastructure issues are strategically addressed, and that
all buildings are ADA compliant. Current funding does not allow the
library system to address all existing issues and concerns. However,
improvements will demonstrate a commitment to having these
buildings be a positive physical presence in the community.
G - 3
As part of the existing condition assessment, the team evaluated
technology conditions at each branch library. The study examined
computers, printers, wireless capabilities, network equipment,
building security systems, book security systems, audio and video
systems, and the cabling plant to support the technology in each
building. In addition to the existing conditions survey, the team
conducted information gathering sessions with city departments
such as Facilities, the Department of Information Technology,
and City Planning. Community input meetings and staff interviews
provided additional information.
As a result of the team’s findings, renovations are replacing the
following items in Phase One:
• Voice, Data, and Video Cabling (Infrastructure Replacement)
• Network Equipment Replacement (Switches)
• Wireless Access Upgrade (Wireless Controller)
• Book Security Replacement (Protection of Collection)
• Computer Replacement (Additional Computers, Public & Staff)
• Printer Replacement (Update of Printers)
• Phone Upgrade (Phone Sets Only for VOIP system)
• New Audio and Video System in Meeting rooms (Projector and Sound System)
• Building Security (Cameras)
The Phase One process is well under way with the schematic design
phase for all facilities to be completed in May 2009. Following the
completion of schematic design, the projects are scheduled to move
forward through the traditional architectural and bidding process.
The projects will be released to the construction industry in four
groups of two buildings, each over a three-year period. The goal is to
package the projects in such a fashion that smaller, local contractors
have an equal opportunity to participate. Libraries that are under
construction will be closed for approximately six months. The library
will strategically select the closings in such a manner that adjacent
libraries can absorb the increased traffic, minimizing disruption
as much as possible.
TECHNOLOGY
Because technology is such an important part of Phase One,
we find it necessary to discuss the current state of the library
system’s infrastructure and the improvements which are occurring.
The branch libraries are currently connected to the main server farm
in the city building via T1 leased lines. The Department of Information
Technology (DIT) is planning to update the T1 connections to a MPLS
meshed network. This project is being completed in conjunction with
other city and government buildings. In addition, the library and city
are in the process of updating the phone systems in all city buildings.
The phone system will be a Cisco VOIP system with true redundant
communication managers located at the city hall. The library and city
are undergoing an ILS upgrade with server replacements and software
updates to help improve the library’s database system.
G - 4
The current population of Richmond is 195,000 persons and the
projected population growth for 2031 is approximately 205,000
persons. This is only a 5% increase in the population. Based on a
population of 205,000 persons, the current branch libraries need
to be increased by 32,000 square feet distributed throughout eight
locations. The space needs for the branches should be increased by
60% to meet this need, but the critical issue is that, based on the
current population of 195,000, the existing branches are already
undersized by 49%. In addition to the necessary Phase One upgrades,
there is also a need for additional building area now. Experience
has shown that in facilities that have undergone a renovation of the
Phase One type, library use will increase by 25%-50%, making this
apparent shortage of space more acute.
What does this mean? It means that library improvements will
allow each branch to service more people, deliver better service,
and become a more integral part of each neighborhood. It will also
result in neighborhoods enjoying these services and increasing
pressures to move forward with achieving the Master Plan due to
significant increase in use. Success breeds success, and Phase One of
the Master Plan will set the stage for Phase Two.
Achieving the space needs for Phase Two of the Master Plan will
require time and discipline. There have been three branch library
sizes developed for Phase 2: 13,000 square feet, 10,000 square feet,
and 8,000 square feet. The current average size of the branches is
6,702 square feet, typically located on sites that are currently at
MASTER PLAN PHASE TWO
Phase Two of the Master Plan is designed to meet the needs of the
Richmond Public Library System through the year 2031 and beyond.
Detailed information about sizing criteria is delineated in the needs
assessment section of this report. Part of the design team’s charge
was to evaluate the system and make recommendations for alternate
ways to provide library service. The current system, which consists of
a Main Library, eight branch libraries, and one area of the community
supported by Chesterfield County, has ten service areas within a
relatively small physical geographic area. This is a less efficient and
costly means of delivering library service and it was our charge to
evaluate and make recommendations to address this concern.
Consolidating the existing eight branches into three or four larger
regional branches, similar to Chesterfield or Henrico Counties, is a
more efficient way to deliver library service. After careful consideration,
this approach does not make sense for the Richmond system for
three reasons:
• The natural and man-made physical divisions have created distinct service areas comprised of different types of neighborhoods;
• The library has grown organically over the years and has become integrated into the fabric of the local communities;
• The library has a brand or identity that is truly Richmond-like and to change that would contradict the personality of Richmond.
Rather than executing changes for the sake of pure efficiency, we are
recommending taking the strength of the system and making it more
efficient and meaningful to the community.
G - 5
accommodate the projected building area size, plus an additional
fifteen percent of landscaping property, excluding setback and
easements. They will also need to provide one parking space for
approximately every three hundred square feet of building area.
Parking spaces will require approximately 450 square feet per
parking space. This amount of square footage would represent the
minimum site area. It would be our recommendation to find a site
that would allow a 50% increase in building area and corresponding
parking for future expansion. This would help ensure that the
needs of future generations could be met without relocation. The
configuration of the site should be a simple rectangle or square;
unusual configurations will increase the amount of site area required.
For buildings of this small size, a two-story building has long-term
operational costs that we recommend avoiding. Also, the small
footprint would add an additional 10% of gross building area to
accomplish the same program in a 2-story building.
maximum capacity. The proposed new branches, although similar
in size, are not intended to represent a cookie cutter approach.
There have been three different library service models developed:
Information Library, Balanced Library, and Borrower’s Library.
These three models were developed based on conversations with
neighborhood groups, demographic evaluations, five year use
patterns, and need. The intent is to capture the personality and need
of the community and establish the right size and type of library in
the correct location.
Finding property for libraries is one of the most difficult and
controversial pieces of executing a Master Plan. Neighborhoods are
comfortable with the current locations and are hesitant to change.
The cost of property can also be a challenge. The first preference
is for libraries to remain in their present locations if possible,
unless there are limitations or a preference of the neighborhood
that preclude this, and suggests land acquisition adjacent to some
current library sites.
The following is a brief assessment of the Master Plan approach
to addressing each individual site location and a list of potential
options for addressing space allocations. New sites would need to
G - 6
Recommended Size for Branches
BranchExisting Size
(In SF)Proposed Size
(in SFParking Needed
(# of Spaces) Total Site Required
(In SF)Suggested Site Area
(In SF)
Belmont 7,365 13,000 46 34,000 50,700
Broad Rock 7,391 13,000 46 34,000 50,700
East End 6,271 10,000 37 26,650 38,500
Ginter Park 6,515 8,000 30 21,500 31,500
Hull Street 6,620 8,000 30 21,500 31,500
North Avenue 6,543 10,000 37 26,650 38,500
West End 7,510 13,000 46 34,000 50,700
Westover Hills 5,407 13,000 46 34,000 50,700
The calculations for the Total Site Required take into account the minimum amount of site space needed to achieve the recommendations of this
master plan. Good library planning practices suggest the need to prepare for future growth. Therefore, this report recommends the acquisition of
enough additional space – shown here as Suggested Site Area – to accommodate a 50% increase in building size and parking in later years.
G - 7
BROAD ROCK
The proposed new library is a 13,000-square-foot Balanced Library.
The existing building is 7,391 square feet and is located on
approximately 55,000 square feet of site with access to parking
associated with the park area. Parking for this size of building
would be 46 spaces. The total site area required would be
approximately 34,000 square feet.
Potential Solution• Retain the existing building and provide an addition of
approximately 6,000 square feet. The addition will trigger renovation and reorganization of the existing building. The reconfiguration of the existing parking and site circulation will be required.
EAST END
The proposed new library is to be a 10,000-square-foot Information
Library. The existing building is 6,271 square feet. Parking for this size
building would be 37 spaces. The total site area required would be
approximately 26,650 square feet. There was some discussion with the
community that a new location should be considered.
A recommended site would accommodate a 50% increase in building
floor area and parking, and would total 38,500 square feet.
BELMONT
The proposed building is a 13,000-square-foot Borrower’s Library.
The existing building is 7,365 square feet. The current library site is at
maximum capacity and will not be able to fulfill the space needs, but
the proximity to Carytown is exceptional. The existing structure, given
its age and nature, most likely would not be a candidate for expansion
if adjoining property was available, but a more detailed evaluation is
warranted. Parking for this size of building would be 46 spaces. The
total site area required without provisions for future expansion would
be approximately 34,000 square feet for a single-story building and
28,000 square feet for a two-story building.
A recommended site would accommodate a 50% increase in building
floor area and parking, and would total 50,700 square feet.
Potential Solutions• Acquire additional property adjacent to the existing library
building of approximately twice the size of the existing building. The most likely scenario would involve replacing the existing building with a single-story structure and additional parking.
• Find a vacant single-story building of 13,000 square feet with adequate parking in a location in close proximity to the current library location.
• Acquire property to construct the new library with parking. This could be either vacant property or existing structures that need replacement.
• Acquire additional property adjacent to the existing building for additional parking, demolish the existing building, and build a two-story new library.
G - 8
is relocated per the master plan recommendation, then the size of
this library may migrate to the 10,000-square-foot model, but remain
an Information Library. The total site area for the 8,000-square-foot
branch would be approximately 21,500 square feet.
A recommended site would accommodate a 50% increase in building
floor area and parking, and would be 31,350 square feet.
Potential Solutions• Acquire additional property adjacent to the existing library
building to expand the building and provide parking for 30 cars.
• Find a vacant single-story building of 8,000-10,000 square feet that is suitable for conversion to a library and has adequate parking.
• Acquire an appropriately-sized property to construct the new library and provide adequate parking. This could be either vacant property or existing structures that need replacement.
NORTH AVENUE LIBRARY
The proposed new library is to be a 10,000-square-foot Information
Library. The existing building is 6,543 square feet and has adequate
parking for its size. The existing site will not provide adequate
space for the necessary building expansion and parking. If property
adjacent to the library would be acquired, the existing building
might not be suitable for expansion. The total site area required
would be approximately 26,650 square feet.
Potential Solutions• Acquire additional property adjacent to the existing library
building of approximately twice the size of the existing parcel of land.
• Acquire a 10,000-square-foot single-story building that is suitable for library use.
• Acquire an appropriately-sized property to construct the new library and provide adequate parking. This could be either vacant property or existing structures that need replacement.
GINTER PARK
The proposed new library is to be an 8,000-square-foot Balanced
Library. The existing building is 6,515 square feet, of which 1,110
square feet is the vacant bookmobile facilities. It is the intent in
Phase One to convert the bookmobile space to a meeting room and
staff area. The existing site and building are acceptable for expansion
to the desired size.
Potential Solution• Provide an addition of approximately 1,500 square feet and
make site adjustments to add parking for five cars.
HULL STREET
The proposed new library is to be an 8,000-square-foot Information
Library. The existing building is 6,620 square feet and has a shortage
of parking. The final size of this library may change depending on the
execution of the Westover Hills solution. If the Westover Hills Library
G - 9
library located to the west in the Stratford Hills neighborhood,
the recommendation would be to locate the library farther to the
west along Forest Hill. Parking for this size of building would be 46
spaces. The total site area required would be approximately 33,700
square feet.
A recommended site would accommodate a 50% increase in building
floor area and parking, and would be 50,700 square feet.
Potential Solutions• Find a vacant single-story building of 13,000 square feet with
adequate parking.
• Acquire an appropriately-sized property to construct the new library and provide adequate parking. This could be either vacant property or existing structures that need replacement.
• The Library Board should consider relocating the current library branch to more adequately serve the community.
TECHNOLOGY
As we look ahead to the technology needs of the Richmond Public
Library System, we can gain insight from the past. In the last several
years, processor speeds have greatly increased, leading to a need for
greater bandwidth and faster network connectivity. The number of
applications running across any network has also grown, as building
systems, security systems, and other applications are now controlled
by computers.
A recommended site would accommodate a 50% increase in building
floor area and parking, and would be 38,500 square feet.
Potential Solutions• Acquire additional property adjacent to the existing library
building to expand the building and provide parking for 37 cars.
• Acquire a single-story 10,000-square-foot building that is suitable for library use and is located near a bus route.
• Acquire an appropriately-sized property to construct the new library and provide adequate parking. This could be either vacant property or existing structures that need replacement.
WEST END
The proposed new library is to be a 13,000-square-foot Borrower’s
Library. The existing building is 7,510 square feet and has adequate
parking. With the recent acquisition of the adjacent property there is
enough site area to satisfy the building and site needs.
Potential Solution• Conduct a detailed study to evaluate whether or not to retain the
existing building. A very preliminary evaluation suggests that a new facility should be constructed.
WESTOVER HILLS
The proposed new library is to be a 13,000-square-foot Borrower’s
Library. The existing building is 5,407 square feet and has adequate
parking, but the current site is unable to meet the requirements of
the Master Plan. Given the nature of the site and the lack of a branch
G - 10
It would be our recommendation to look at this option and
potentially start the planning process for the fiber connections.
The creation of a Wide Area Network sometimes can take a year
or more.
COST
Capital Improvement
The capital improvement costs contained in this master plan assume
that new construction will be approximately $300/SF. For example,
an 8,000-square-foot library would cost approximately $2.5 million.
This number includes:
• Site development costs
• Building construction costs
• Furniture
• Technology and equipment
• Permits
• Engineering fees
This number does not include the cost to acquire the land, inflation,
or the acquisition of a Wide Area Network for the entire system.
Over the next ten to twenty years, technology will continue to evolve
at a rapid pace. It is said that processor speeds double every 3 to 6
months. In this environment, planning for the future is crucial.
Our recommendation includes a plan for technology upgrades every
3 to 5 years. However, we also recommend building a robust wide
area network that the city would own. This network could be a fiber
ring around the city which would connect the library system, as well
as other City facilities.
The existing centralized server farm and network located at the city
offices provide a foundation for this effort. While establishing a fiber
network to provide connectivity within the city would require a
significant amount of effort, the long-range nature of the Master Plan
provides an ideal venue for examining this option.
What would such an option offer the city and the library system?
A robust network would encourage growth and connectivity.
There would also be potential cost savings associated with such
a system. The city currently leases T1 connections from carriers.
After the city-owned network is installed, these monthly lease
costs would be eliminated. Most fiber rings pay for themselves
in 5 to 7 years.
G - 11
Cost Summary
The table below is a summation of the capital improvement costs
for the master plan and a fiber linked Wide Area Network. Costs
are given in 2009 values and will need to be updated for inflation.
Assumptions in site acquisitions will need to be updated based upon
a more detailed survey of property availability and pricing.
Projected Capital Improvement Cost
Branch Site Cost Construction Cost
WAN Cost Total
Belmont $ 350,000 $ 3,900,000 $ 150,000 $ 4,400,000
Broad Rock $ 0 $ 2,000,000 $ 306,000 $ 2,306,000
East End $ 350,000 $ 3,000,000 $ 115,600 $ 3,465,600
Ginter Park $ 0 $ 550,000 $ 272,000 $ 832,000
Hull Street $ 350,000 $ 2,400,000 $ 100,000 $ 2,850,000
North Avenue $ 350,000 $ 3,000,000 $ 136,000 $ 3,486,000
West End $ 360,000 $ 3,900,000 $ 306,000 $ 4,266,000
Westover Hills $ 350,000 $ 3,900,000 $ 204,000 $ 4,454,000
$2,110,000 $22,650,000 $1,589,000 $26,059,600
Operational Costs
Staffing costs represent the most significant long-term expenditure
that the library system will encounter. Based on the projected
size increases for each individual branch, we would not expect
an increase in staffing due to the increase in building size.
The $300/SF figure represents the cost of a practical, functional, and
environmentally-appropriate library that will effectively offer library
service for several generations. The figure is based on 2009 pricing
and will need to be adjusted for inflation, particularly since the start
date for most projects is likely 10 years in the future. It also assumes
that new construction building costs and site development costs
would preclude unusual circumstances such as poor soil conditions.
By providing cost estimates based on new construction, we are not
implying that this is the only option. The renovation of appropriately
located and substantial existing buildings is a highly viable, if not a
preferred, solution.
As mentioned before, land acquisition costs and inflation costs
are not included in the $300/SF estimate. For this study, we have
assumed that land acquisition costs will average $350,000 per site.
This number will vary by location and will require a more detailed
investigation. Inflation will also have an impact on land acquisition
costs, which could rise by up to 3% per year.
Technology Infrastructure
The technology master plan suggests that infrastructure connecting
the system’s Wide Area Network be linked by fiber. The average cost
for a fiber network is approximately $25,000 per mile. Execution of
a fiber network should be coordinated with other city functions to
minimize infrastructure and operational costs.
G - 12
MOVING FORWARD
Phase One of the Master Plan should move forward on the current
schedule with some minor adjustments based on the Phase Two
implications. The investigations into the future of the Main Library are
of a very preliminary nature and this structure is of such importance
that a more detailed feasibility study is warranted. With the reduction
in collections, there will be additional building area that can be
repurposed to better serve the arts community, local business
community, and the City of Richmond.
A strategy should be developed for future land acquisitions.
Experience has shown that site selections, particularly relocating a
library, can be controversial within a community. If the decision is
made to maintain buildings in their current locations, particularly
Belmont, then dialogue with adjacent property owners should
be started. In the case of Westover Hills, the site selection process
could begin at any point in time because it most likely will require
community dialogue. The Westover Hills site selection process does
impact Hull Street’s future location and potential size.
Operational costs would be impacted if the improvements led to
an increase in the number of hours the buildings were open to the
public. In our experience, with each facility improvement there is an
increase in community use, which equates to more materials being
circulated and more programming. We are anticipating a significant
increase in use as the Phase One improvements are made; therefore,
it would be reasonable to expect an additional 20% increase in
community use for each branch library as they come on line.
The current collection for the system is approximately 800,000
volumes, while the Master Plan recommends a smaller collection
of 570,000 volumes that focuses on quality versus quantity.
Expenditures for collections will be less impacted by Phase Two
of the Master Plan than by collection development strategies.
Once Phase Two of the master plan has been realized, there will be
an additional 35,000 square feet of building area, which is a 65%
increase in the amount of building area dedicated to the branches.
The additional floor area and technology will increase operational
costs for each facility, even with higher energy performance practices
integrated into building designs. For conservative budgeting
purposes, we suggest that the library system should anticipate a 65%
increase in the utility costs for the branch libraries.
G - 13
In conjunction with developing a more detailed plan, there will
need to be a corresponding funding plan put into place. With the
Master Plan completed and direction established, there may be more
opportunities for donor participation and fundraising campaigns.
Given the overall dollar scope, the Master Plan will need to be
executed in a phased manner after the completion of Phase One.
The first level of funding appropriations should be aimed toward
site selection so that over the next several years action can be taken
when opportunities are presented.
PHASE II SHORT TERM ACTION PLAN – BRANCH LIBRARIES
• Establish a committee to initiate and execute the site evaluation and selection process
• Engage the services of a real estate expert for consultation purposes
• Develop a list of objectives and priorities for each individual branch location
• Develop a site selection matrix and evaluation process
• Establish site selection boundaries appropriate for each branch library location
• Refine land acquisition costs based on properties within boundaries or specific properties
PHASE II SHORT TERM ACTION PLAN – MAIN LIBRARY
• Commission a feasibility study for the main library
Inform, Enrich, Empower
Bid #:
Question # Received Response
1 1/22/2019 1/22/2019
Attachment #1 - RFP #M190011228 Dated: January 22, 2019
Subject Matter
Requesting copy of Master Plan developed in 2008.
Questions Log
Project: M190011228City of Richmond Library, Library Design / Master Planning