APPLICATIONS OF VT

VT for joining processKhurram S Ahmad1CAUTIONNOT to be too stringent to try to find or identify the micro defects by VT for in-servicePut more efforts into finding out those easily visible imperfects. Each method has its limitation of application Usually VT can not find the micro defects PT or MT of other methods can be adopted.

2JOINING PROCESSESMetal joints are formed through the processesSolderingBrazingOxy-fuel gas weldingResistance welding andarc weldingSome other processes, including diffusion bonding and electron beam welding are also widely used in the industry

3JOINING PROCESSESVT at all stages of welding Before welding During welding After welding Soldering45Material examination prior to fabrication can eliminate conditions that tend to cause weld defects.

PRIOR TO WELDINGVisual Testing56Scabs, seams, and scale Proper edge preparation, dimensions and finishClearance dimensions of backing strips, backing rings, and consumable insertsAlignment and fit-up of work piecesVerification of correct materials by check of recordsVerification of cleanliness requirements and condition of tack weldsVerification of welding procedure and performance qualificationPRIOR TO WELDINGVisual Testing67Welding process and conditionsWelding variables Filler metalFlux and protective gasesPreheat and interpass temperaturesDistortion controlInterpass chipping, grinding or gougingInspection intervals (either time or sequence)DURING WELDINGVisual Testing78Dimensional accuracyCompletion of weldingSize of legs and throat of filler weldsContour, reinforcement, and surface finish of weldsDegree of underfill, undercut, and overlapWeld spatter, crater cracks, impression marking, scratches, gouges, and strikes Handling damageCompletion of post weld heat treatmentNondestructive inspective and resultsAFTER WELDINGVisual Testing89Pay Attention To:Visual inspection of welds in all steels may begin immediately after the completed welds have cooled to ambient temperature. Acceptance criteria for certain steels shall be based on visual inspection performed not less than 48 hours after completion of the weld.

Visual Testing910Pay Attention To:Research has shown that delayed cracking can continue for several days after a weld has cooled to room temperatureVisual Testing10