37
GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz| Risk Management: Requirements, Challenges and Impact on GMP Qualification ACHEMA | VTU Engineering GmbH | Brigitte Gübitz |

Vortrag BGü Bucaresti 2015 02 Brigitte - TARUS Media · GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz| Risk Management: Requirements, Challenges and ... (Lab) I: Product-Development

Embed Size (px)

Citation preview

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Risk Management: Requirements, Challenges and Impact on GMP Qualification

ACHEMA | VTU Engineering GmbH | Brigitte Gübitz |

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Content

§ Requirements for Quality Risk Management § Risk Management Process and Risk Analysis Tools§ GMP conform Qualification an Validation

₋ Impact of Risk Management § Status Quo in Risk Management § Future Challenges in Risk Management

₋ Object Oriented Risk Management₋ Knowledge-Based Risk Management à

REXS as best practice tool used by VTU

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Content

§ Requirements for Quality Risk Management § Risk Management Process and Risk Analysis Tools§ GMP conform Qualification an Validation

₋ Impact of Risk Management § Status Quo in Risk Management § Future Challenges in Risk Management

₋ Object Oriented Risk Management₋ Knowledge-Based Risk Management à

REXS as best practice tool used by VTU

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Requirements for Quality Risk Management

§ Risk management is required by lawover the entire life cycle of drugs, API´s, medical devices − Medical devices

ISO 13485 – Section 7.1 planning of product realization:the organization shall establish documented requirements for risk management throughout product realization à reference to ISO 14971: RM-standard

− Drugs and drug ingredientsPart III EU-GMP guideline / ICHQ9- Quality Risk Management:implementation of risk management is required over the whole life-cycle of drugs and API´s resp. across the whole enterprise

− ISO 9001:2015 (publication expected end of 2015):one of the key changes in the 2015 revisionà establishment of a systematic enterprise-wide risk-based approach

à including the entire supply chain

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Potential Risks in Distribution

§ As global production grows, so does the risk§ Significant impact on the distribution

− longer supply chains

− seasonal temperature variations

− distribution network is complex and involves many players

§ Differences between countries / continents− availability of expertise, infrastructure and equipment

− for temperature-controlled storage, transport and distribution

à these variables increase quality and safety risks

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Risk Management for Distribution

§ EU GDP Guidelines− medicinal products for human use:

2013/C 343/01 Guidelines on Good Distribution Practice of medicinal products for human use

− API´s for medicinal products: 2015/C 95/01 Guidelines on principles of Good Distribution Practice of active substances for medicinal products for human use

§ US GDP Guidelines− 21CFR211 Subpart H – Holding and Distribution Management

à a risk based approach for wholesale distribution of medicinal products

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Content

§ Requirements for Quality Risk Management § Risk Management Process and Risk Analysis Tools§ GMP conform Qualification an Validation

₋ Impact of Risk Management § Status Quo in Risk Management § Future Challenges in Risk Management

₋ Object Oriented Risk Management₋ Knowledge-Based Risk Management à

REXS as best practice tool used by VTU

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Risk Management Modelaccording to ISO 14971 / ICHQ9

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

§ Tabular form − Failure Mode and Effects Analysis (FMEA)

− Hazard Analysis and Critical Control Point (HACCP)

− Hazard Operability Analysis (HAZOP)

§ Graphical methods− Cause-and-effect-diagram /

Ishikawa Diagram

− Fault Tree Analysis (FTA)

Conventional risk analysis techniques

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

§ Conventional risk analysis techniques − cover risk assessment and risk control§ Risk Review

− continuous review of risk assessments

− based on knowledge from product life cycle and actual risk knowledge

§ Risk communication− Sharing / reuse of risk knowledge

− key factor for successful risk review and for an effective risk management process

− barely exist in most organizations

Risk Analysis Methods

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Content

§ Requirements for Quality Risk Management § Risk Management Process and Risk Analysis Tools§ GMP conform Qualification an Validation

₋ Impact of Risk Management § Status Quo in Risk Management § Future Challenges in Risk Management

₋ Object Oriented Risk Management₋ Knowledge-Based Risk Management à

REXS as best practice tool used by VTU

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Risk Management in Qualification & Validation

§ Risk management is required by law§ EU-GMP guideline annex 15: qualification and

validationDeadline for coming into operation: 1 October 2015

1) scope and extent of qualification and validationshould be based on risk assessments of the facilities, equipment, utilities and processes

2) a quality risk management approach should be applied throughout the lifecycle of a medicinal product.

à NEW

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Risk Management in Qualification & Validation

§ Risk management is required by law§ EU-GMP guideline annex 15: qualification and

validationDeadline for coming into operation: 1 October 2015

1) scope and extent of qualification and validationshould be based on risk assessments of the facilities, equipment, utilities and processes

2) a quality risk management approach should be applied throughout the lifecycle of a medicinal product.

à NEW

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Scope and Extend of Qualification

Validation MasterplanVMP

ValidationPlanning

Process Validation Cleaning Validation

Validation of Analytical Methods

Master Validation ReportValidation

MonitoringMaintenance

Change- Control

Re-ValidationCont. VerificationDQ

IQ

OQ

PQ

Qualification Master Report

URSQualification

Impact Assessment

Scope of Qualification

RA Testing:Extend of

Qualification

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Scope of Qualification: Impact Assessment

§ Definition according ISPEInternational Society for Pharmaceutical Engineering)− Impact assessment is the process by which the impact of a system on

product quality is evaluated and the critical components within those systems are identified.

§ Is system GMP / GDP critical?− system has direct contact with the product / product components?− system can be a source of contamination?− system can affect cleaning-, sterilization process?− system maintain the correct temperature conditions?− system can affect adequate turnover?− system assures a safe and secure storage?− …….

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Impact Assessment

§ Impact AssessmentA. system has direct contact with the product / product components ?B. system can be a source of contamination?C. system can affect cleaning-, sterilization process?D. system assures a safe and secure storage / transport

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Extend of Qualification: FMEA

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Risk Management in Qualification & Validation

§ Risk management is required by law§ EU-GMP guideline annex 15: qualification and

validationDeadline for coming into operation: 1 October 2015

1) scope and extent of qualification and validationshould be based on risk assessments of the facilities, equipment, utilities and processes

2) a quality risk management approach should be applied throughout the lifecycle of a medicinal product.

à NEW

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Activities in Risk Management

1. Step

Risk Identification

3. Step

Risk Evaluation

4. Step

Risk Control; Risk Acceptance

5. Step

Risk Review

2. Step

Risk Analysis

V

V

VV

V

V

Process-Development

Product-Development

Process-Engineering

Scale Up & Process Optimization

Implementation in production

Manufacturing & Application

à over the whole Product Life Cycle

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Status Quo in Risk Management

§ Risk Management = performing risk assessments and implementing defined measures

§ Risk assessments are performed „isolated“

§ Efficient risk communication is still a challenge

§ Lifecycle-based risk management is required but rarely implemented in daily practice

− lifecycle-approach for risk management is hardly described in the literature

− there are barely any lifecycle-oriented reference-models for risk management in GMP- environment

à Future Challenges: Implementation of Lifecycle-RM and Risk Communication

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Content

§ Requirements for Quality Risk Management § Risk Management Process and Risk Analysis Tools§ GMP conform Qualification an Validation

₋ Impact of Risk Management § Status Quo in Risk Management § Future Challenges in Risk Management

₋ Object Oriented Risk Management₋ Knowledge-Based Risk Management à

REXS as best practice tool used by VTU

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Implementation of Lifecycle-RM:Easy by using existing Object

§ Risk assessments are always performed for products, equipment and processes or their combinations

à Object Oriented Risk Assessments

§ Products are − Final drug products, medical devices, intermediates− Row materials, product components, process media, packaging material§ Processes are

− Production processes− Associated processes (change management, supplier selection, maintenance,

qualification/validation, …)§ Equipment is

− Production facilities, laboratory equipment, IT-systems, …

FFF

FU

Lifecycle of Objects defines à Lifecycle of Risk Management

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Lifecycle Phases of Objects

§ Phases in the lifecycle of a drug / a medical device

I.Product-Development

II:Process-Development Laboratory-scale

III:Process-Engineering (Prototype I)

IV:Scale Up & Process-Optimization (Prototype II)

V:Implementation in Production

VI:Manufacturing/ Application

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Lifecycle of Objects

I: Product-Development

II: Process-Development (Lab)

IV: Scale Up & Process-Optimization (PT II)

VI: Manufacturing / Application

V: Implementation in Production

III: Process-Engineering ng(Prototyp I)

Goods Receipt

Manu-facturing

Quality-Control

Transport / StorageApplication

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Lifecycle of Objects

I: Product-Development

II: Process-Development (Lab)

IV: Scale Up & Process-Optimization (PT II)

VI: Manufacturing / Application

V: Implementation in Production

III: Process-Engineering ng(Prototyp I)

Goods Receipt

Manu-facturing

Quality-Control

Transport / StorageApplication

Lifecycle of Objects defines the

Lifecycle of Risk Assessments

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Lifecycle of Risk Analysis

I: Product- DevelopmentII: Process- Development (Lab)

IV: Scale Up & Process-Optimization (PT II)

VI: Manufacturing / Distribution/ Application V: Implementation in Production

III: Process-Engineering (Prototyp I)

Manu-facturing

Quality-ControlDistributionApplication

RA

RARA

RARA

RA RA

RA

RA

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Lifecycle of Risk Analysis

I: Product- DevelopmentII: Process- Development (Lab)

IV: Scale Up & Process-Optimization (PT II)

VI: Manufacturing / Distribution/ Application V: Implementation in Production

III: Process-Engineering (Prototyp I)

Manu-facturing

Quality-ControlDistributionApplication

RA

RARA

RARA

RA RA

RA

RA

Continuous Improvement Change Control, Deviation Management, New Products,…..

From Risk Analysis to Life Cycle Risk Management

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Extension of Model to Risk Management

Object Level

Improvement Level

Compliance-/ Regulatory-Impact Assessment

Change: manufacturing process 1

Re-Qualification/ Re-Validation

CAPARA route cause

analyses

complaint product 1

• RA Product 1• RA Product 2

Phase I:• RA Equipment 1 & 2• RA Process 1 & 2• RA Safety

Phase IV:• RA Qual. Equipment 1 & 2• RA Val. Process 1 & 2

Phase V:

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Extension of Model to Risk Management

Object Level

Improvement Level

Compliance-/ Regulatory-Impact Assessment

Change: manufacturing process 1

Re-Qualification/ Re-Validation

CAPARA route cause

analyses

complaint product 1

• RA Product 1• RA Product 2

Phase I:• RA Equipment 1 & 2• RA Process 1 & 2• RA Safety

Phase IV:• RA Qual. Equipment 1 & 2• RA Val. Process 1 & 2

Phase V:

Regulatory(RA´s Regulatory)

Quality Management

QM / GxP Level

Technik• RA Maintenance

Equipment 1 & 2

QM• RA Change

Process 1 & 2

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Content

§ Requirements for Quality Risk Management § Risk Management Process and Risk Analysis Tools§ GMP conform Qualification an Validation

₋ Impact of Risk Management § Status Quo in Risk Management § Future Challenges in Risk Management

₋ Object Oriented Risk Management₋ Knowledge-Based Risk Management à

REXS as best practice tool used by VTU

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Path to Knowledge-Based Risk Management at VTU

§ primary barrier to risk management = ineffective risk communication

§ effective risk communication :

1. implementation of a Life-Cycle risk management process

2. Innovative Software for risk managementREXS

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Queries

§ Customized search queries − Sites− Risks− RA-Documents− Actions

§ Question of the experts: − which risk assessements

for a „clean room“ were already performed?

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Suggestions during risk analysis

§ Question of the experts:− Which failures can occur in a production room with fermentation of cell

cultures?F

FF

FU

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Suggestions for risk evaluation

§ Question of the experts: − How is the probabiltiy of

occurence?

§ Former ratings are indicatedü Less time is required for discussionü Consistent results

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Benefit with REXS at VTU

§ Faster preparation of risk analyses§ Consistency across departments and sites§ Easy management of action§ “getting the right information to the right people at the right

time”

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Content

§ Requirements for Quality Risk Management § Risk Management Process and Risk Analysis Tools§ GMP conform Qualification an Validation

₋ Impact of Risk Management § Status Quo in Risk Management § Future Challenges in Risk Management

₋ Object Oriented Risk Management₋ Knowledge-Based Risk Management à

REXS as best practice tool used by VTU

GDP & GMP 2015 | VTU Engineering GmbH | Brigitte Gübitz|

Any Questions?