20
Friday, May 27, 2016 Volume 21-16 News Total projects received at MBEX from 5/16/16 – 5/20/16: 80 Total project leads reported on at MBEX from 5/16/16 – 5/20/16: 28 Total active projects received/reported on at MBEX as of 5/24/16: 318 Project Update With the help of The Builders Group (TBG), our donating partner, the Minnesota Builders Exchange (MBEX) will award multiple scholarships, totaling $20,000, with a top award amount of $5,000, to qualifying students. Information about these scholarships, including requirements and application, can be found online at mbex.org/scholarship. Information requests can be made to Tom Getzke at 612-381-2625. Applications must be postmarked by May 31, 2016. 2016-2017 Scholarship DEADLINE 5/31 News Continued - Please visit page 2 of this bulletin for more news. Classifieds Bald Eagle Erectors Inc has an immediate opening for a project manager. Individual must excel in communication, time management, safety, problem resolution, budgeting and client satisfaction. Job responsibilities include, but are not limited to the review, analysis, interpretation, recommendations and coordination of bid procedures via take-offs, RFPs, specifications, proposals and other documentation. Desired candidates will have a college degree in Construction Management or related field, or a minimum of two years of experience as a Construction Project Manager. Knowledge of structural steel, miscellaneous metals, rebar, post tension and precast stone along with experience in job costs and construction. Please visit mbex.org/baldeagle for the complete job posting, including where to submit resume. Project Manager Wanted New 2015 GMC Sierra 2500HD Crew Cab. Runs on Compressed Natural Gas (CNG) and gasoline. Range estimated to be 650 miles. Only one of two in the US Contact Don Rutman, Arrow Commercial Vehicles, email [email protected] or 651-755-7130 for very special pricing. CNG Pickup Truck for Sale American Artstone Company is currently seeking a Director of Sales and Marketing to join its management team. The individual will be responsible for all aspects of American Artstone’s sales, marketing and business development. The applicant must have a two or four year post-secondary degree, preferably in sales or marketing plus 5-7 years of sales experience. In addition, the applicant must also possess excellent verbal and written skills and knowledge in the construction industry. Understanding of concrete products is highly desirable. Please send resume along with a cover letter to [email protected] or mail to: American Artstone Company, 2025 N Broadway, New Ulm MN, 56073. For a complete job description please email [email protected]. Director of Sales and Marketing Wanted BL Dalsin Roofing, a leading Minneapolis commercial roofing and sheet metal contractor since 1944, is looking for experienced Estimators/Project Managers in our Production and Service Departments. Successful candidates will have experience in BUR & single-ply systems, excellent communication and job management skills. Knowledge of the Edge estimating system is a plus. We offer an excellent compensation package including outstanding salaries and benefits. Qualified candidates should email a resume including references to [email protected]. Seeking Estimators/Project Managers Page 1 The information in this bulletin was obtained from sources deemed reliable. The Minnesota Builders Exchange (MBEX) does not assume responsibility for its completeness or accuracy You are urged to check your own sources in addition to the information contained in this publication. This issue contains plans and other bidding information received prior to and including the date noted above the page. 2016 BOARD OF DIRECTORS President: Russ Reger - Veit Companies, Vice President: Jake Bauer - Carciofini Company, Treasurer: Malia Oesterreich - R M S Rentals, Past President: Chuck Anderson - Northern Star Metal Buildings LLC. Directors: Danielle Dziedzic - Dziedzic Caulking, Nick Frattalone - Frattalone Companies, Wally Peterson - Cemstone Products Co, Beth Nde - Adolfson & Peterson Construction, Patrick Sims - Adolfson & Peterson Construction, Ben N ewlin - Terra General Contractors, Erik Molin - Molin Concrete Products Co. Executive Director: Tom Getzke. Office Staff: Sharon Fiscus, Julie Miller, Jill Gerwig, Chris Geiser, Jeff Boelter, Ka Yang, Shauna Baska, Peggy Esboldt, Janet Margheim.

Volume 21-16 Friday, May 27, 2016ipin.mbex.org/downloads/bulletin/1-475310.pdfconstruction industry. Understanding of concrete products is hi ghly desirable. Please send resume along

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Volume 21-16 Friday, May 27, 2016ipin.mbex.org/downloads/bulletin/1-475310.pdfconstruction industry. Understanding of concrete products is hi ghly desirable. Please send resume along

Friday, May 27, 2016Volume 21-16

News

Total projects received at MBEX from 5/16/16 – 5/20/16: 80Total project leads reported on at MBEX from 5/16/16 – 5/20/16: 28Total active projects received/reported on at MBEX as of 5/24/16: 318

Project Update

With the help of The Builders Group (TBG), our donating partner, the Minnesota Builders Exchange (MBEX) will award multiple scholarships, totaling $20,000, with a top award amount of $5,000, to qualifying students. Information about these scholarships, including requirements and application, can be found online at mbex.org/scholarship. Information requests can be made to Tom Getzke at 612-381-2625. Applications must be postmarked by May 31, 2016.

2016-2017 Scholarship DEADLINE 5/31

News Continued - Please visit page 2 of this bulletin for more news.

Classifieds

Bald Eagle Erectors Inc has an immediate opening for a project manager. Individual must excel in communication, time management, safety, problem resolution, budgeting and client satisfaction. Job responsibilities include, but are not limited to the review, analysis, interpretation, recommendations and coordination of bid procedures via take-offs, RFPs, specifications, proposals and other documentation. Desired candidates will have a college degree in Construction Management or related field, or a minimum of two years of experience as a Construction Project Manager. Knowledge of structural steel, miscellaneous metals, rebar, post tension and precast stone along with experience in job costs and construction. Please visit mbex.org/baldeagle for the complete job posting, including where to submit resume.

Project Manager Wanted

New 2015 GMC Sierra 2500HD Crew Cab. Runs on Compressed Natural Gas (CNG) and gasoline. Range estimated to be 650 miles. Only one of two in the US Contact Don Rutman, Arrow Commercial Vehicles, email [email protected] or 651-755-7130 for very special pricing.

CNG Pickup Truck for Sale

American Artstone Company is currently seeking a Director of Sales and Marketing to join its management team. The individual will be responsible for all aspects of American Artstone’s sales, marketing and business development. The applicant must have a two or four year post-secondary degree, preferably in sales or marketing plus 5-7 years of sales experience. In addition, the applicant must also possess excellent verbal and written skills and knowledge in the construction industry. Understanding of concrete products is highly desirable. Please send resume along with a cover letterto [email protected] or mail to: American Artstone Company, 2025 N Broadway, New Ulm MN, 56073. For a complete job description please email [email protected].

Director of Sales and Marketing Wanted

BL Dalsin Roofing, a leading Minneapolis commercial roofing and sheet metal contractor since 1944, is looking for experienced Estimators/Project Managers in our Production and Service Departments. Successful candidates will have experience in BUR & single-ply systems, excellent communication and job management skills. Knowledge of the Edge estimating system is a plus. We offer an excellent compensation package including outstanding salaries and benefits. Qualified candidates should email a resume including references to [email protected].

Seeking Estimators/Project Managers

Page 1

The information in this bulletin was obtained from sources deemed reliable. The Minnesota Builders Exchange (MBEX) does not assume responsibility for its completeness or accuracyYou are urged to check your own sources in addition to the information contained in this publication. This issue contains plans and other bidding information received prior to and including the date noted above the page. 2016 BOARD OF DIRECTORS President: Russ Reger - Veit Companies, Vice President: Jake Bauer - Carciofini Company, Treasurer: Malia Oesterreich - R M S Rentals, Past President: Chuck Anderson - Northern Star Metal Buildings LLC. Directors: Danielle Dziedzic - Dziedzic Caulking, Nick Frattalone - Frattalone Companies, Wally Peterson - Cemstone Products Co, Beth Nde - Adolfson & Peterson Construction, Patrick Sims - Adolfson & Peterson Construction, Ben N ewlin - Terra General Contractors, Erik Molin - Molin Concrete Products Co. Executive Director: Tom Getzke. Office Staff: Sharon Fiscus, Julie Miller, Jill Gerwig, Chris Geiser, Jeff Boelter, Ka Yang, ShaunaBaska, Peggy Esboldt, Janet Margheim.

Page 2: Volume 21-16 Friday, May 27, 2016ipin.mbex.org/downloads/bulletin/1-475310.pdfconstruction industry. Understanding of concrete products is hi ghly desirable. Please send resume along

NEWS continued...

MBEX ClosedMBEX will be closed Monday, May 30, 2016 in observance of Memorial Day. The plan room will reopen at 7:00 a.m. on Tuesday, May 31, 2016.

2016 Member Appreciation BBQ!On Wednesday, June 8 from 11:00 a.m. to 1:00 p.m., the Minnesota Builders Exchange will host the 2016 Member Appreciation BBQ. This event allows the MBEX board and staff to thank members for their continued support of our organization. RSVP for 2 complimentary tickets using the form on page 4 of this bulletin or visit mbex.org/bbq.

Annual Golf TournamentThe MBEX 2016 Golf Tournament has been scheduled for Wednesday, June 22 at the Majestic Oaks Golf Club in Ham Lake, MN. Take advantage of this excellent opportunity to mingle with friends and others involved in the construction industry. Reserve your spot today using the form on page 5 of this bulletin or at mbex.org/golf.

Golf Tournament Sponsorship OpportunitiesThe Minnesota Builders Exchange offers many opportunities for member companies to further involve themselves in the construction industry. Become a sponsor of our 2016 Golf Tournament to gain recognition for your company and show support for the industry. Visit mbex.org/golfsponsor to learn about the many sponsorship opportunities. Then, show your support by completing the golf tournament registration form available at mbex.org/golf.

New IPIN Database Coming Soon!In a few weeks, members will notice a new and exciting change when logging on to mbex.org! For a period of time, members will have the option to test out a new version of our online plan room database before it goes live permanently. The new version will run on the latest versions of all web browsers, function on multiple platforms (desktop, mobile devices), retain current tracked projects/filters and include many other useful updates and improvements to make our online plan room even more user-friendly.

The Builders Group Announces Election ResultsThe Builders Group (TBG) held its Annual Meeting on May 19, 2016. During the meeting, TBG announced that Tom Corrigan of Midwest Fence & Manufacturing Company will serve as Chairman; Lowell Pratt of Pratt Construction will serve as Vice Chair; Craig Plekkenpol of Plekkenpol Builders Inc will serve as Treasurer; Dennis Chartrand of Steel Structures will serve as Secretary. After eight years as Chairperson, Carol Nelson of New Spaces, retired from the TBG board. There are two new TBG board members including Kris Scherer of Scherer Brothers Lumber and Tom Solberg of Marshall Concrete Products Inc. TBG noted that 2015 was a solid year for the self-insured workers’ compensation company with positive advances in safety training, accident prevention and member payroll.

County Materials Celebrates 70 Years2016 marks the 70th year of business for MBEX member company County Materials. The company is commemorating the milestone by planning social events in select markets and by launching a 70th anniversary web site and video dedicated to the company’s history.

Got News?We’d love to hear it! Please send your company hires, news, events and press releases to [email protected].

Minority NoticesPlease visit page 3 of this bulletin for this week’s minority notices.

Page 3: Volume 21-16 Friday, May 27, 2016ipin.mbex.org/downloads/bulletin/1-475310.pdfconstruction industry. Understanding of concrete products is hi ghly desirable. Please send resume along

Seeking MBE/WBE Minority QuotationsEligible subcontractors and supplies must be certified by Minnesota Unified Certification Program (MnUCP). Magney Construction Inc intends to bid on the following projects as a Prime Contractor and would appreciate receiving a proposal from your company to furnish labor and/or materials for:

Sherburn, MN – Water Treatment Facility Improvements. Bid date: June 2, 2016 at 11:00 a.m.

Kasson, MN – Wastewater Treatment Facility Improvements. Bid date: June 6, 2016 at 2:00 p.m.

Crystal, MN – Lift Station Improvements – L-30 and Meters 113A & 113B. Bid date: June 7, 2016 at 2:00 p.m.

Cologne, MN – Water Treatment Facility. Bid date: June 9, 2016 at 2:00 p.m.

Submit your quote to: [email protected] or fax 952-474-1679. For more information contact: Sue at 952-474-1674 x 308. Magney Construction Inc, 1401 Park Rd, Chanhassen MN, 55317.

Attention MBE/WBE Subcontractors & SuppliersMorcon Construction Co Inc will be submitting a bid on the following project and invites you to submit your subcontractor and/or supplier quotations to us:

Minneapolis Public Schools Andersen United Community School Renovation (OP# 2818). Bid closes June 7, 2016 at 2:00 p.m. CST. Email bids to: [email protected]. Contact Jeff Roerick at 763-546-6066 for additional info & assistance.

City of Minneapolis – Hamilton School Renovation Project (OP # 8298). Bid closes May 31, 2016 at 10:00 a.m. CST. Email bids to: [email protected]. Contact Jeff Roerick at 763-546-6066 for additional info & assistance.

Wading Pool Improvements at Powderhorn & Matthews Park (OP #8295) Minneapolis Park & Recreation Board. Bid closes June 2, 2016 at 10:00 a.m. CST. Email bids to: [email protected]. Contact Carl Hoikka at 763-546-6066 for additional info & assistance.

Morcon Construction Co Inc, 5905 Golden Valley Rd, Golden Valley MN, 55422; phone: 763-546-6066, fax: 763-546-3129. An Equal Opportunity/Affirmative Action Employer.

Attention TGB Subcontractors & SuppliersMorcon Construction Co Inc will be submitting a bid on the following project and invites you to submit your subcontractor and/or supplier quotations to us:

Centennial Office Building – Repair of Entry Plaza, Terraces, & Stairway (State of Minnesota Project # 02CO0029). Bid closes June 1, 2016 at 3:00 p.m. CST. Bids can be emailed to: [email protected]. Contact Jason Preusser at 763-546- 6066 for additional information & assistance.

MAC T1 – Parking Expansion PMB & Revenue Control System (Contract # 106-3-524). Bid closes June 21, 2016 at 2:00 p.m. CST. Bids can be emailed to: [email protected] . Contact Jason Preusser at 763-546-6066 for additional information & assistance.

For information regarding any of our current projects, please contact our main office at 763-546-6066 or visit our plan room at www.morcon.com.

Notice of Minority ParticipationRoss & Associates Ltd will be bidding on the following project: Exterior/Interior Doors Replacement, Sports and Fitness Center- University of Wisconsin Stout, Menomonie WI. Bid Date: June 16, 2016 at 2:00 p.m. Ross & Associates, Ltd. is an equal opportunity employer and requests subcontractor and supplier bids from minority, women owned, disadvantaged, disabled owned veteran and small businesses (MBE/WBE/DBE/SBE). Please submit bids via email, mail or fax to: Ross & Associates Ltd, Attn: Robert Duffy, 246 Summit, River Falls WI, 54022; Phone: 715-425-9011, cell: 715-760-2735, fax: 715-425-5159, email: [email protected]. www.rosscm.com.

NEWS continued...

Page 4: Volume 21-16 Friday, May 27, 2016ipin.mbex.org/downloads/bulletin/1-475310.pdfconstruction industry. Understanding of concrete products is hi ghly desirable. Please send resume along

Minnesota Builders Exchange

2016 Member Appreciation BBQWEDNESDAY, JUNE 8, 2016M B E X P A R K I N G L O T1 1 : 0 0 A M - 1 : 0 0 P M

2 FREE TICKETS FOR REGISTERED COMPANIES ADDITIONAL TICKETS AVAILABLE FOR $15 EACH

IN ORDER TO ENSURE THE HIGHEST QUALITY OF SERVICE FOR ALL OF OUR MEMBERS DURING THIS EVENT, PLEASE RSVP BY FRIDAY, JUNE 3, 2016.

Comp. tickets (2 max.) = $ FREE

WRITE 1 or 2 free tickets (please do not mark with an “x”)

Add’l tickets @ $15 each = $

MBEX Scholarship Fund donation = $

TOTAL = $

All monies raised at MBEX events donated to MBEX Scholarship Fund.

M m m . . . M E N U : St Louis ribs, bbq chicken, corn on the cob, baked beans, corn bread and beverages.

The Minnesota Builders Exchange, along with the The Builders Group (TBG), our events co-host, will host a celebration of our membership. Catered by Famous Dave’s and complete with door prizes and networking, members are sure to enjoy an afternoon at MBEX!

PRIZES! 3 CHANCES TO WIN

• $300 cash- instructions for entry provided prior to event

• $100 cash- purchase additional ticket(s) for automatic entry

• Famous Dave’s gift card- all participants automatically entered

Contact to receive registration confirmation via email. Tickets + door prize info mailed to contact’s attention at address listed above prior to event.

Return this form and payment by 1:00 p.m., Friday, June 3, 2016 to:Minnesota Builders Exchange- 1123 Glenwood Ave • Mpls, MN 55405 | Fax: 612-381-2621 | email: [email protected]

FOOD • NETWORKING • FREE PARKING

Company:

Address:

City: State: Zip:

Contact: E-mail:

Payment:

check (enclosed)

credit card (VISA or Mastercard)

Card number:

Cardholder:

Exp. date:

Ticket orders placed after May 31, 2016 will be available for pick-up at the event.

Page 5: Volume 21-16 Friday, May 27, 2016ipin.mbex.org/downloads/bulletin/1-475310.pdfconstruction industry. Understanding of concrete products is hi ghly desirable. Please send resume along

Payment:

check (enclosed)

credit card (VISA/Mastercard)

Minnesota Builders Exchange

2016 Golf Tournament

Cardholder :

Card number :

Exp. date :

SCHEDULE

Lunch/range: 11:00 a.m.Shotgun: 1:00 p.m.Buffet + Social: 6:00 p.m. Program 7:00 p.m.

Golf package includes lunch, cart, golf and dinner. Singles and doubles will be filled in. Members allowed two foursomes. Third foursome available after June 1. Select in advance to play either team scramble or play your own ball. Tee assignments given in advance, drink and dinner tickets placed on your cart. Enjoy golf prizes, including cash raffles and many door prizes!

WEDNESDAY, JUNE 22, 2016MAJESTIC OAKS GOLF CLUBHAM LAKE, MN

THE BUILDERS EXCHANGE GOLF EVENT OF THE YEAR.

DOUBLE SHOTGUN- 288 GOLFERS!

Registration Form

Company:

Address:

Contact: Email:

Golf packages @ $125/each = $

Lunch only @ $15/each = $

Social hour & dinner only @ $30/each = $

Total = $

Names of golfers (please print legibly). Use second registration form for additional foursome.

Cart A:

Cart A:

SPONSORS + VOLUNTEERS W I L L B E R E C O G N I Z E D

at the event, on mbex.org, in our Weekly Bulletin and in our quarterly newsletter. Donate cash for door prizes and/or be a hole sponsor.

Thank you in advance!

Play your own ball

Scramble

Scoring format (check one)

$150 golf hole sponsor = $____I will sit at my hole, no extra charge; no games

$200 + keg cost: beer hole sponsor (4 avail.) = $keg must be purchased by company from Majestic Oaks

$250 drink ticket sponsor = $company name imprinted on event drink tickets

Contact listed will receive an email confirmation of reservation and tee assignments prior to event.

City: State: Zip:

Will donate cash for door prizes ($30 min.) = $

Individual Mulligans @ $5/each = $

Cart B:

Cart B:

Return this form and payment by 1:00 p.m., Friday, June 17, 2016 to:Minnesota Builders Exchange- 1123 Glenwood Ave • Mpls, MN 55405 | Fax: 612-381-2621 | email: [email protected]

Page 6: Volume 21-16 Friday, May 27, 2016ipin.mbex.org/downloads/bulletin/1-475310.pdfconstruction industry. Understanding of concrete products is hi ghly desirable. Please send resume along

Project Data

PROJECTS ACTIVE AS OF: Tuesday, May 24, 2016MBE# PROJECT BID TIME BIN # EST COSTDIVISIONSADDENDA

Wednesday, May 25, 2016

BELGIUM, WIONLINEUNHEATED STORAGE BUILDING- HARRINGTON BEACH 2:00 PM 1-3, 6, 13, 26,

31-32Yes2016-0038+

Est Cost: OWNER** - $320,000.00

BLUE EARTH, MNONLINECITY OF BLUE EARTH - AG-CENTER AND FITNESS CENT 11:00 am 1-2No2016-0288

Est Cost: REQUESTED** - $0.00

BRAINERD, MNONLINECENTRAL LAKES COLLEGE BRAINERD, EAST PARKING 10:00 AM 1-3, 32Yes2016-0256+

Est Cost: REQUESTED** - $0.00

BROOKLYN PARK, MNONLINENORTH HENNEPIN COMMUNITY COLLEGE SCIENCE CE 2:00 PM 1, 23Yes2016-02AB+

Est Cost: REQUESTED** - $0.00

CLOQUET, MNONLINE2017 CLOQUET NEW MIDDLE SCHOOL BID PACKAGE 2- 1:00 PM 1-14, 21-23, 25-

28, 33Yes2016-0205+

Est Cost: NOT RELEASED** - $0.00

HASTINGS, MNONLINEHASTINGS PUBLIC SCHOOLS ISD 200 - 2016 DISTRICT L 2:00 PM 1, 32No2016-02E2

Est Cost: REQUESTED** - $0.00

INTERNATIONAL FALLS, MNONLINEAIRLINE TERMINAL REHABILITATION AND EXPANSION P 2:00 PM 1-3, 5-12, 14, 21-

23, 26-28, 31-33Yes2016-006B+

Est Cost: REQUESTED** - $0.00

ONLINEAIRLINE TERMINAL REHABILITATION AND EXPANSION P 2:00 PM 1-3, 5-12, 14, 21-23, 26-28, 31-33

Yes2016-021F+Est Cost: NOT RELEASED** - $0.00

MADISON, WIONLINECOMPUTER SCIENCE AND STATISTICS ROOF REPLACE 2:00 PM 1-5, 7-9, 22, 32No2014-79812

Est Cost: - $359,000.00

MANKATO, MNONLINEREPOINTING AND SEALING OF THE MANKATO MN NATI 3:00 PM 1, 4, 7, 9, 32Yes2016-0277+

Est Cost: OWNER LOW** - $700,000.00

Est Cost: OWNER HIGH** - $800,000.00

MONTEVIDEO, MNONLINEREPLACEMENT OF MONTEVIDEO MN NATIONAL GUARD 2:00 PM 1-2, 6-7, 23, 26Yes2016-025A+

Est Cost: OWNER LOW** - $175,000.00

Est Cost: OWNER HIGH** - $200,000.00

MOUNTAIN IRON, MNONLINEWOODLAND ESTATES RESIDENTIAL DEVELOPMENT PH 10:00 AM NOT SPECIFIEDYes2016-021B+

Est Cost: REQUESTED** - $0.00

PIPESTONE, MNONLINECITY OF PIPESTONE WATER TREATMENT FACILITY IMP 5:30 PM 1-16Yes2016-017F+

SIOUX FALLS, SDONLINEMINNEHAHA COUNTY ADMINISTRATION BUILDING ROO 10:30 AM 1-2, 7Yes2016-02DC+

Est Cost: REQUESTED** - $0.00

For up-to-date bidder and addenda information visit mbex.orgPage 6

# Denotes New Date; * Denotes New Plan Listed ; + Denotes New Addenda; NOS = Plan Not On Site

Page 7: Volume 21-16 Friday, May 27, 2016ipin.mbex.org/downloads/bulletin/1-475310.pdfconstruction industry. Understanding of concrete products is hi ghly desirable. Please send resume along

MBE# PROJECT BID TIME BIN # EST COSTDIVISIONSADDENDA

ST PAUL, MNONLINEST PAUL POLICE DEPARTMENT COMMUNICATION SERV 2:00 PM 1No2016-0164

Est Cost: REQUESTED** - $0.00

ONLINEBELTLINE & BATTLE CREEK- REPAIR PROJECT- RAMSE 2:00 PM CDT 1-3, 31, 33Yes2016-01E3

Est Cost: REQUESTED - $0.00

UNION GROVE, WIONLINEWALL LOUVERS AND ROOF SYSTEMS REPAIRS- CLEVE 2:00 PM 1-2, 4, 6-7, 23No2016-0247

Est Cost: OWNER** - $80,000.00

VALLEY CITY, NDONLINEVALLEY CITY STATE UNIVERSITY - VCSU CENTRAL BOI 2:00 PM 1-10, 12-13, 21-

23, 25-28, 31-33Yes2016-02B7+

Est Cost: REQUESTED - $0.00

WEST DES MOINES, IAONLINECITY OF WEST DES MOINES 98TH STREET IMPROVEME 2:00 PM NOT SPECIFIEDNo2016-0301*

Est Cost: REQUESTED** - $0.00

Thursday, May 26, 2016

ABERDEEN, SDONLINERUNWAY 17/35 DECOUPLING- ABERDEEN REGIONAL AI 3:30 PM NOT SPECIFIEDYes2016-02D0+

Est Cost: REQUESTED** - $0.00

AUSTIN, MNONLINEMOWER COUNTY RECYCLING CENTER- 2016 BUILDING 2:00 PM 1-10, 13, 15-16Yes2016-02C9+

Est Cost: REQUESTED** - $0.00

BEACH, NDONLINEBEACH AIRPORT- CONSTRUCT NEW HANGAR TAXILAN 2:00 PM NOT SPECIFIEDNo2016-0254

Est Cost: REQUESTED** - $0.00

BISMARCK, ND259CIBEW OFFICE BUILDNG ADDITION- 1601 3:00 PM 1-3, 5-10, 13, 22-

23, 25-28Yes2016-023D+

Est Cost: REQUESTED** - $0.00

ONLINEFIRST INTERNATIONAL BANK AND TRUST BID PACKAG 2:00 PM 1, 3-8, 14No2016-0274

Est Cost: REQUESTED - $0.00

BROOKINGS, SDONLINECMP- CAMPUS MASONRY REPAIRS 16-101605, R0314--26 3:00 PM 1-2, 4, 7Yes2016-0273

Est Cost: REQUESTED** - $0.00

BROOKLYN, IAONLINECITY OF BROOKLYN 2016 WASTEWATER TREATMENT P 2:00 PM 1-9, 11, 13, 22-

23, 26-27, 31-32, 40, 46

Yes2016-00A8+Est Cost: OWNER** - $3,500,000.00

CHIPPEWA FALLS, WIONLINEPUBLIC ENTRANCE AND VISITOR STATION- LAKE WISS 2:00 PM 1-4, 6-10, 12, 22-

23, 26-27, 31-33Yes2016-0080+

Est Cost: OWNER** - $1,136,000.00

COTTAGE GROVE, MNONLINECITY OF COTTAGE GROVE BUSINESS PARK GRADING- 11:00 AM 1-2, 31-32Yes2016-0297+

Est Cost: REQUESTED** - $0.00

ONLINECITY OF COTTAGE GROVE - HADLEY AVENUE & 9TH ST 10:00 am 1-2, 31-34Yes2016-02A6* +Est Cost: NOT RELEASED** - $0.00

ONLINECITY OF COTTAGE GROVE - 80TH STREET QUADRANT P 10:30 AM 1-2No2016-02A7

Est Cost: NOT RELEASED** - $0.00

DETROIT LAKES, MNONLINEREQUEST FOR BIDS-PARTIAL ROOF REPLACEMENT DE 2:00 PM 1-3, 5-7, 32Yes2016-0283+

Est Cost: OWNER LOW** - $150,000.00

Est Cost: OWNER HIGH** - $175,000.00

For up-to-date bidder and addenda information visit mbex.orgPage 7

# Denotes New Date; * Denotes New Plan Listed ; + Denotes New Addenda; NOS = Plan Not On Site

Page 8: Volume 21-16 Friday, May 27, 2016ipin.mbex.org/downloads/bulletin/1-475310.pdfconstruction industry. Understanding of concrete products is hi ghly desirable. Please send resume along

MBE# PROJECT BID TIME BIN # EST COSTDIVISIONSADDENDA

DULUTH, MNONLINEROAD AND PARKING LOT IMPROVEMENTS- LAKE SUPE 1:00 PM 1, 3, 31-33Yes2016-0290+

Est Cost: REQUESTED** - $0.00

EAGAN, MNONLINECITY OF EAGAN - CITYWIDE TRAIL & PARKING LOT IMP 10:30 am NOT SPECIFIEDNo2016-029F*

Est Cost: NOT RELEASED** - $0.00

EDINA, MNONLINECITY OF EDINA - 2016 SIDEWALK IMPROVEMENTS 2:00 pm NOT SPECIFIEDYes2016-029D+

Est Cost: NOT RELEASED** - $0.00

FARGO, NDONLINECITY OF FARGO - NEW FARGO CITY HALL 2015-49 2:30 PM 1-10, 12, 14, 21-

23, 25-28, 31-33Yes2016-014F+

Est Cost: REQUESTED** - $0.00ONLINEFARGO PUBLIC SCHOOLS - OPERATIONS CENTER - LAN 2:00 PM 1, 29No2016-021C

Est Cost: NOT RELEASED** - $0.00

FOREST LAKE, MNONLINE2016 PARKING LOT IMPROVEMENTS FOREST LAKE SPO 3:00 PM 1-2, 31-33No2016-027D

Est Cost: REQUESTED** - $0.00

GLENCOE, MNONLINE2017 ADDITIONS AND ALTERATIONS TO GLENCOE-SILV 2:00 PM 1-12, 14, 21-23,

25-28, 31Yes2016-024C+

Est Cost: NOT RELEASED** - $0.00

HAMEL, MNONLINEMAXXON CORPORATION INTERIOR REMODEL- A1543 4:00 PM 1-3, 5-6, 8-10No2016-026F

Est Cost: REQUESTED** - $0.00

HECTOR, MNONLINECITY OF HECTOR - FUELING SYSTEM, ELECTRICAL MOD 11:00 AM NOT SPECIFIEDYes2016-012C+

Est Cost: REQUESTED** - $0.00

HINCKLEY, MNONLINECITY OF HINCKLEY LIFT STATION 3 AND 8 IMPROVEMEN 10:30 AM 1-2, 11, 16Yes2016-02B5+

Est Cost: REQUESTED** - $0.00ONLINECITY OF HINCKLEY WATER TREATMENT PLANT IMPROV 11:00 AM 1-2, 11Yes2016-02CB+

Est Cost: REQUESTED** - $0.00

HUDSON, WIONLINEST CROIX COUNTY JAIL HUBER CENTER VISITATION AR 2:00 PM 1-9, 11, 21-23,

26Yes2016-01B7+

Est Cost: REQUESTED** - $0.00

INVER GROVE HEIGHTS, MNF435CITY OF INVER GROVE HEIGHTS CLEANING, REPAIRING 2:00 PM NOT SPECIFIEDNo2016-0250

Est Cost: REQUESTED** - $0.00

IOWA CITY, IA258CCHRONIC PAIN CLINIC AND BREAST IMAGING CENTER 2:00 PM 1-3, 6-10, 21-23,

26-28No2016-0248

Est Cost: REQUESTED** - $0.00

ONLINEIOWA GEOLOGICAL SURVEY- OAKDALE - INSTALL FIRE 2:00 PM 1, 7, 26-28Yes2016-0265

Est Cost: OWNER - $70,000.00

LA CROSSE, WIONLINESKYLIGHT REPLACEMENT- CENTER FOR THE ARTS- UN 2:00 PM 1-2, 5-9No2016-0219

Est Cost: OWNER** - $50,000.00

LISBON, NDONLINELISBON TRACK AND FIELD LANDSCAPING 16022 - LISB 3:00 PM 1, 31-32No2016-02FF*

Est Cost: NOT RELEASED** - $0.00

For up-to-date bidder and addenda information visit mbex.orgPage 8

# Denotes New Date; * Denotes New Plan Listed ; + Denotes New Addenda; NOS = Plan Not On Site

Page 9: Volume 21-16 Friday, May 27, 2016ipin.mbex.org/downloads/bulletin/1-475310.pdfconstruction industry. Understanding of concrete products is hi ghly desirable. Please send resume along

MBE# PROJECT BID TIME BIN # EST COSTDIVISIONSADDENDA

MADISON, WIONLINELIFE SAFETY REPAIRS- FIELD HOUSE UNIVERSITY OF W 2:00 PM 2, 5-6, 9No2016-01D8

Est Cost: OWNER** - $165,000.00

MANKATO, MNONLINEFORD HALL EXHAUST FAN ISOLATION- MINNESOTA STA 2:00 PM 1, 23Yes2016-0295+

Est Cost: OWNER** - $125,000.00

MILWAUKEE, WIONLINEMILWAUKEE BUCKS TRAINING CENTER - BID PACKAGE 2:00 PM 1-3, 7, 11, 14,

31-33Yes2016-029C+

Est Cost: NOT RELEASED** - $0.00

MINNEAPOLIS, MNONLINEPIPE REPLACEMENT AND ASSOCIATED UNIT REMODELI 2:00 PM 1-2, 6-9, 12, 22-

23Yes2016-01FA+

Est Cost: NOT RELEASED** - $0.00ONLINEDESIGN-BUILD REQUEST FOR PROPOSAL (RFP) FOR A 2:00 PM NOT SPECIFIEDYes2016-028D+

Est Cost: OWNER - $280,000.00

ONLINECONSTRUCTION OF REMEDIAL TREATMENT SYSTEM - F 2:30 PM 1Yes2016-0298+Est Cost: OWNER LOW** - $400,000.00

Est Cost: OWNER HIGH** - $450,000.00

MONONA COUNTY, IAONLINELEWIS AND CLARK STATE PARK- WATER TREATMENT B 11:00 AM 1-2, 15-16No2016-0228

Est Cost: REQUESTED** - $0.00

OWATONNA, MNONLINESTRAIGHT RIVER NORTHBOUND REST AREA BUILDING 1:30 PM 1, 3-10, 12, 22-

23, 25-26, 31-33, 40

Yes2016-0230+Est Cost: OWNER LOW** - $4,000,000.00

Est Cost: OWNER HIGH** - $5,000,000.00

PEQUOT LAKES, MNONLINEPEQUOT LAKES HIGH SCHOOL PARKING LOT EXPANSI 2:00 PM 1-2, 31-33No2016-029A

Est Cost: APPROXIMATE** - $285,500.00

PERHAM, MNONLINEHEART OF THE LAKES ELEMENTARY SCHOOL ADDITIO 4:00 PM 1-11, 21-23, 25-

28Yes2016-027B+

Est Cost: NOT RELEASED** - $0.00

RACINE, WIONLINECITY OF RACINE ZOO HEATING PLANT MODIFICATIONS 2:00 PM 22-23, 26No2016-02AD

Est Cost: REQUESTED** - $0.00

RED WING, MNONLINERED WING MIDDLE SCHOOL POOL UNIT REPLACEMENT 2:00 PM 1-2, 7, 22-23, 26Yes2016-0289+

Est Cost: NOT RELEASED - $0.00

RICHFIELD, MNONLINECITY OF RICHFIELD COMMUNITY CENTER 2016 MECHAN 2:00 PM 1-3, 7, 9, 22-23,

26, 28, 32Yes2016-023B+

Est Cost: OWNER - $400,000.00

ROCHESTER, MNONLINECITY OF ROCHESTER 2016 SANITARY SEWER REPAIR C 11:00 AM NOT SPECIFIEDNo2016-02AE

Est Cost: REQUESTED** - $0.00

SIOUX FALLS, SDONLINECITY OF SIOUX FALLS CONVENTION CENTER ROOF DE 2:00 PM 1-2, 7, 9Yes2016-025D

Est Cost: OWNER** - $535,000.00

ONLINECITY OF SIOUX FALLS ADA CURB RAMP IMPROVEMENT 2:00 PM NOT SPECIFIEDNo2016-025E

Est Cost: OWNER** - $133,136.00

ONLINECITY OF SIOUX FALLS WASHINGTON PAVILION BUILDIN 2:00 PM 1, 21-23, 26, 28No2016-025F

Est Cost: OWNER** - $596,500.00

For up-to-date bidder and addenda information visit mbex.orgPage 9

# Denotes New Date; * Denotes New Plan Listed ; + Denotes New Addenda; NOS = Plan Not On Site

Page 10: Volume 21-16 Friday, May 27, 2016ipin.mbex.org/downloads/bulletin/1-475310.pdfconstruction industry. Understanding of concrete products is hi ghly desirable. Please send resume along

MBE# PROJECT BID TIME BIN # EST COSTDIVISIONSADDENDA

ST PAUL, MNONLINEDATA CENTER DISTRIBUTION PANEL FOR MINNESOTA 3:00 PM 1, 26Yes2016-02BC+

Est Cost: OWNER LOW** - $70,000.00

Est Cost: OWNER HIGH** - $80,000.00

WILLMAR, MNONLINE2017 NEW WILLMAR ELEMENTARY SCHOOL BID PACKA 2:00 PM 1-2, 31, 33Yes2016-026A+

Est Cost: NOT RELEASED** - $0.00

WINONA, MNONLINECITY OF WINONA PLEASANT VALLEY RESERVOIR- 1938 10:00 AM 1, 3, 5, 7, 9, 23,

26, 31-33, 40Yes2016-0225+

Est Cost: REQUESTED** - $0.00

WORTHINGTON, MNONLINEGRAND TERRACE APARTMENTS NEW BUILDING- 13-160 2:00 PM 1, 3-12, 14, 21-

23, 26-28, 31-33Yes2016-02C2

Est Cost: REQUESTED** - $0.00

Friday, May 27, 2016

AMES, IAONLINEATHLETIC FACILITIES- VARIOUS CONCRETE REPLACEM 4:00 PM NOT SPECIFIEDNo2016-02E4

Est Cost: NOT RELEASED** - $0.00

MINNEAPOLIS, MNONLINE1205 IRVING AVE NORTH - NEW RESIDENTIAL HOME EOD NOT SPECIFIEDNo2016-034E*

Est Cost: REQUESTED - $0.00

MOTT, NDONLINEINSTALL NEW BEACON AND REPLACE WINDCONE- MOT 2:00 PM NOT SPECIFIEDNo2016-026D

Est Cost: REQUESTED - $0.00

PLYMOUTH, MNONLINE2016 PAVEMENT REHABILITATION- INTERMEDIATE DIST 2:00 PM 1, 10, 31-32No2016-0227

Est Cost: REQUESTED** - $0.00

WHITE EARTH, MNONLINENAYTAHWAUSH WATER SYSTEM IMPROVEMENT- WHIT 10:00 AM 1-3Yes2016-021D+

Est Cost: REQUESTED** - $0.00

Tuesday, May 31, 2016

ANKENY, IAONLINENORTHEAST ELEMENTARY GREASE INTERCEPTOR IMP 2:00 PM 2Yes2016-0302* +

Est Cost: REQUESTED** - $0.00

MADISON, WIONLINEKOHL CENTER PARTIAL ROOF REPLACEMENT- UNIVER 2:00 PM 1-2, 6-7, 9No2015-81758

Est Cost: - $2,986,000.00

MOUND, MNONLINEGRANDVIEW MIDDLE SCHOOL 2016 WINDOW FASCIA R 2:00 PM 1-2, 5-7No2016-02DD

Est Cost: APPROXIMATE** - $140,000.00

OSSEO, MNONLINEFIVE BELOW RETAIL STORE, SPACE 14C - MAPLE GROV 5:00 PM NOT SPECIFIEDYes2016-0306* +

Est Cost: NOT RELEASED** - $0.00

ST CLOUD, MNONLINEKENNEDY COMMUNITY SCHOOL ENTRANCE UPGRADE 10:00 AM 26No2016-02FD*

Est Cost: NOT RELEASED** - $0.00

Wednesday, June 01, 2016

APPLE VALLEY, MNONLINEPHS ORCHARD PATH SENIOR HOUSING- 72535-16024 4:00 PM 1, 3-12, 14, 32-

33No2016-02BB

Est Cost: NOT RELEASED** - $0.00

For up-to-date bidder and addenda information visit mbex.orgPage 10

# Denotes New Date; * Denotes New Plan Listed ; + Denotes New Addenda; NOS = Plan Not On Site

Page 11: Volume 21-16 Friday, May 27, 2016ipin.mbex.org/downloads/bulletin/1-475310.pdfconstruction industry. Understanding of concrete products is hi ghly desirable. Please send resume along

MBE# PROJECT BID TIME BIN # EST COSTDIVISIONSADDENDA

ARLINGTON, SDONLINEARLINGTON COMUNNITY DEVELOPMENT CORPORATIO 11:00 AM 1, 31-33No2016-0304*

Est Cost: REQUESTED** - $0.00

BENSON, MNONLINE2016 BITUMINOUS PAVEMENT REHABILITATION AT THE 11:00 AM NOT SPECIFIEDNo2016-02B9

Est Cost: REQUESTED** - $0.00

BLUE EARTH, MNONLINECITY OF BLUE EARTH AIRPORT SNOW REMOVAL EQUIP 2:00 pm 1, 3-8, 22-23, 26No2016-02CC*

Est Cost: NOT RELEASED** - $0.00

CARRINGTON, NDONLINEPAVEMENT REJUVENATION- CARRINGTON MUNICIPAL 2:00 PM NOT SPECIFIEDNo2016-02B0

Est Cost: REQUESTED** - $0.00

CHETEK, WIONLINECHETECK- WEYERHAUSER ROSELAWN ELEMENTARY S 3:00 PM 1-10, 12, 22-23,

26, 28, 31-33Yes2016-02DE+

Est Cost: NOT RELEASED** - $0.00

CHISAGO CITY, MNONLINECHISAGO CITY FIRE STATION-14-016 2:00 PM 1, 3-10, 12, 22-

23, 26No2016-0253

Est Cost: NOT RELEASED** - $0.00

DULUTH, MNONLINECITY OF DULUTH MILLER CREEK BANK STABILIZATION 2:00 PM 1-2, 31-32, 35No2016-02B1

Est Cost: REQUESTED** - $0.00

ONLINECITY OF DULUTH 18TH AVENUE EAST GAS MAIN TO UM 2:00 PM NOT SPECIFIEDNo2016-0310*Est Cost: REQUESTED - $0.00

FALCON HEIGHTS, MNONLINELUMP SUM REQUEST FOR PROPOSAL (RFP) FOR COMM 2:00 PM 1-3Yes2016-02C4+

Est Cost: OWNER** - $767,863.00

HERON LAKE, MNONLINECITY HERON LAKE WATER TREATMENT PLANT DEMOLI 9:00 AM 1-2Yes2016-0291+

Est Cost: REQUESTED** - $0.00ONLINECITY OF HERON LAKE 2016 WASTEWATER IMPROVEME 9:00 AM 1-3, 10-11, 13,

15 & 16No2016-02C8*

Est Cost: NOT RELEASED** - $0.00

IOWA CITY, IAONLINEPARKING LOTS AND RAMPS 2016 SURFACE PARKING L 2:00 PM 1, 32No2016-02D6

Est Cost: OWNER** - $315,000.00

ONLINESTRUCTURE DEMOLITION - THE UNIVERSITY OF IOWA 0 2:00 PM 1-2, 31-32No2016-02F4*Est Cost: REQUESTED** - $0.00

JAMESTOWN, NDONLINESTUTSMAN RURAL WATER DISTRICT - RWD PHASE 5 W 1:30 pm 1-3, 7, 9, 15-16No2016-02E5

Est Cost: NOT RELEASED** - $0.00

RIVER FALLS, WIONLINEMULTI-BUILDING EMERGENCY GENERATOR UPGRADE - 2:00 PM 1, 3-4, 7, 26, 31-

32Yes2015-82406+

Est Cost: OWNER** - $980,000.00

ROCHESTER, MNONLINEJOHN ADAMS MIDDLE SCHOOL CLASSROOM REMODEL 2:00 PM 1-2, 4, 6-10, 26No2016-02D2

Est Cost: REQUESTED** - $0.00

ONLINEJOHN MARSHALL HIGH SCHOOL SPECIAL ED CLASSRO 2:00 PM 1-2, 6-10, 21-26No2016-02D3

Est Cost: REQUESTED** - $0.00

For up-to-date bidder and addenda information visit mbex.orgPage 11

# Denotes New Date; * Denotes New Plan Listed ; + Denotes New Addenda; NOS = Plan Not On Site

Page 12: Volume 21-16 Friday, May 27, 2016ipin.mbex.org/downloads/bulletin/1-475310.pdfconstruction industry. Understanding of concrete products is hi ghly desirable. Please send resume along

MBE# PROJECT BID TIME BIN # EST COSTDIVISIONSADDENDA

SARTELL, MNONLINECITY OF SARTELL NEW FACILITY COMMUNITY CENTER 2:30 PM CDT 1-12, 14, 21-23,

26-28, 31-33Yes2016-86760+

Est Cost: OWNER** - $11,000,000.00

SAVAGE, MNONLINECITY OF SAVAGE WATER TREATMENT PLANT NO 2 IMP 2:00 PM 1-10, 12, 21-23,

26, 28, 31-33, 40, 43-44

Yes2016-019D+Est Cost: REQUESTED** - $0.00

ST PAUL, MNONLINEREPAIR OF ENTRY PLAZA, TERRACES, AND STAIRWAY - 3:00 PM 1-5, 7-9, 31Yes2016-0299

Est Cost: OWNER LOW** - $500,000.00

Est Cost: OWNER HIGH** - $600,000.00

STANLEY, WIONLINECITY OF STANLEY WASTEWATER TREATMENT PLANT M 2:00 PM 110, 13, 21-23,

26, 31-33, 35, 40, 43, 46

Yes2016-01A9+Est Cost: REQUESTED** - $0.00

VIRGINIA, MNONLINESPECTRUM CAREFREE LIVING SITE WORK- 136990 2:00 PM 1-2, 31-33Yes2016-02EA+

Est Cost: NOT RELEASED** - $0.00

WAUPUN, WIONLINEGLYCOL SYSTEM UPGRADES- FOOD SERVICE BUILDIN 2:00 PM 1, 7, 23Yes2016-01C0

Est Cost: OWNER** - $105,000.00

WILLMAR, MNONLINEWILLMAR HYDRANT RELOCATION- MINNESOTA DEPAR 2:00 PM 1, 33Yes2016-0303* +

Est Cost: OWNER LOW** - $50,000.00

Est Cost: OWNER HIGH** - $60,000.00

Thursday, June 02, 2016

AITKIN, MNONLINECITY OF AITKIN JET A FUEL FACILITY CONSTRUCTION- 2:00 PM NOT SPECIFIEDNo2016-0271

Est Cost: REQUESTED** - $0.00

ALEXANDRIA, MNONLINEELECTRIC DISTRIBUTION IMPROVEMENTS 2016 - ALEXA 1:00 PM 1, 3, 31-33No2016-028A

Est Cost: APPROXIMATE** - $800,000.00

BARRETT, MNONLINEWEST CENTRAL PARKING LOT IMPROVEMENTS- ISD 23 2:30 PM NOT SPECIFIEDNo2016-0305*

Est Cost: REQUESTED** - $0.00

BROOKINGS, SDONLINEPLANT SCIENCE RESEARCH SUPPORT FACILITY-SOUTH 3:00 PM 1, 3-10, 12, 21-

23, 26-28, 31-33Yes2016-027C+

Est Cost: NOT RELEASED** - $0.00

COLUMBIA HEIGHTS, MNONLINEWHITE CASTLE RESTAURANT- COLUMBIA HEIGHTS 12:00 PM 1-9, 15-16No2016-033B*

Est Cost: NOT RELEASED** - $0.00

COLUMBUS, MNONLINECITY OF COLUMBUS - ZIEGLER TANK CONVERSION PR 2:00 pm 1-2, 9, 26, 31-

33, 40, 43No2016-02EB*

Est Cost: NOT RELEASED** - $0.00

DETROIT LAKES, MNONLINEDETROIT LAKES SCHOOL DISTRICT - PARKING LOT & SI 2:00 pm 1-2, 16, 32No2016-02F3*

Est Cost: NOT RELEASED** - $0.00

EAST GRAND FORKS, MNONLINECITY OF EAST GRAND FORKS 2016 ASSESSMENT JOB N 10:00 AM 1-2, 31-33No2016-023E

Est Cost: REQUESTED** - $0.00

For up-to-date bidder and addenda information visit mbex.orgPage 12

# Denotes New Date; * Denotes New Plan Listed ; + Denotes New Addenda; NOS = Plan Not On Site

Page 13: Volume 21-16 Friday, May 27, 2016ipin.mbex.org/downloads/bulletin/1-475310.pdfconstruction industry. Understanding of concrete products is hi ghly desirable. Please send resume along

MBE# PROJECT BID TIME BIN # EST COSTDIVISIONSADDENDA

EDGEMONT, SDONLINECITY OF EDGEMONT WATER WELL REHABILITATION FO 10:00 am 1, 31-33, 46No2016-02B8*

Est Cost: REQUESTED** - $0.00

FINLAND, MNONLINEFINLAND STATE FOREST HOCKAMIN & HEFFLEFINGER 3:00 PM 2, 10, 31-33No2016-0349*

Est Cost: OWNER LOW** - $125,000.00

Est Cost: OWNER HIGH** - $150,000.00

GLENWOOD, MNONLINEGLACIAL RIDGE HEALTH SYSTEM PATIENT CARE ADDIT 2:00 PM 1, 3-12, 14, 21-

23, 26-28, 31-33Yes2016-024F+

Est Cost: NOT RELEASED** - $0.00

GREEN BAY, WIONLINENORTHEAST WISCONSIN TECHNICAL COLLEGE BUILDI 2:00 PM 1-10, 22-23, 26-

28No2016-031B*

Est Cost: REQUESTED** - $0.00

JAMESTOWN, NDONLINEHEATING PLANT AND VEHICLE STORAGE BUILDINGS R 2:00 PM 1-2, 6-7Yes2016-024E+

Est Cost: REQUESTED** - $0.00

LITTLE FALLS, MNONLINEAREA 5 NATURAL GAS LINE RELOCATION- CAMP RIPLE 2:00 PM 1, 31, 33No2016-02D1

Est Cost: OWNER LOW** - $150,000.00

Est Cost: OWNER HIGH** - $175,000.00

MENOMONIE, WIONLINESPORTS AND FITNESS CENTER EXTERIOR DOORS REP 2:00 PM 1-3, 5-9, 23, 26,

31-32Yes2015-82479+

Est Cost: OWNER** - $760,000.00

MINNEAPOLIS, MNONLINECORRIDOR LIGHTING REPLACEMENT- LAKE HARRIET U 2:00 pm 1, 7, 9, 26No2016-0232

Est Cost: REQUESTED** - $0.00

ONLINEWADING POOL IMPROVEMENTS AT POWDERHORN AND 10:00 AM 1-2, 12-13, 22, 26, 31-33

No2016-023F

Est Cost: REQUESTED** - $0.00

ONLINECITY OF MINNEAPOLIS, HAMILTON SCHOOL RENOVATI 10:00 AM 1-10, 12, 21-23, 26, 32

Yes2016-0287+Est Cost: NOT RELEASED** - $0.00

ONLINEASBESTOS ABATEMENT AND DEMO/CARPENTRY/DRYW 2:00 PM 1-2, 6-9, 12No2016-030A*Est Cost: NOT RELEASED** - $0.00

OWATONNA, MNONLINESTRAIGHT RIVER NORTHBOUND REST AREA BUILDING 3:00 PM 1, 3-10, 12, 22-

23, 25-26, 31-33, 40

Yes2016-0230+Est Cost: OWNER LOW** - $4,000,000.00

Est Cost: OWNER HIGH** - $5,000,000.00

PLYMOUTH, MNONLINECITY OF PLYMOUTH-TOWN SQUARE WINDOW & SIDING 2:00 pm 1-2, 6-9No2016-02D7*

Est Cost: NOT RELEASED** - $0.00

ROSEAU, MNONLINEROSEAU COMMUNITY SCHOOL BOILER UPGRADE- 2015 3:00 PM 1, 23, 25-26No2016-02C6

Est Cost: REQUESTED** - $0.00

SHELL LAKE, WIONLINECITY OF SHELL LAKE - WWTF EFFLUENT LIFT STATION 2:00 pm 1, 3, 5, 8-9, 26,

31-33, 44No2016-0336*

Est Cost: NOT RELEASED** - $0.00

SHERBURN, MNONLINECITY OF SHERBURN WATER TREATMENT FACILITY IMP 11:00 AM 1-11, 13, 15 & 16No2016-02AA

Est Cost: REQUESTED** - $0.00

For up-to-date bidder and addenda information visit mbex.orgPage 13

# Denotes New Date; * Denotes New Plan Listed ; + Denotes New Addenda; NOS = Plan Not On Site

Page 14: Volume 21-16 Friday, May 27, 2016ipin.mbex.org/downloads/bulletin/1-475310.pdfconstruction industry. Understanding of concrete products is hi ghly desirable. Please send resume along

MBE# PROJECT BID TIME BIN # EST COSTDIVISIONSADDENDA

SIOUX FALLS, SDONLINECITY OF SIOUX FALLS EAST 26TH STREET CLEVELAND 2:00 PM NOT SPECIFIEDNo2016-02D4

Est Cost: OWNER** - $225,000.00

ONLINECITY OF SIOUX FALLS EQUIPMENT STORAGE BUILDING 2:00 PM 1-3, 5-10, 13, 21-23, 26, 28

No2016-02D5

Est Cost: OWNER** - $714,139.00

ONLINEPLAYGROUND IMPROVEMENTS- EMBE, 1552 2:00 PM 1, 31-32No2016-0312*Est Cost: REQUESTED** - $0.00

ONLINECITY OF SIOUX FALLS - SANFORD SPORTS COMPLEX R 2:00 PM 1, 3-10, 12, 15, 26, 31

No2016-032B*Est Cost: OWNER** - $583,000.00

ST PAUL, MNONLINELEAGUE OF MINNESOTA CITIES CURTAINWALL REPLAC 2:00 PM 1-2, 6-10, 12Yes2016-0315* +

Est Cost: REQUESTED** - $0.00

VIRGINIA, MNONLINENATURAL HARVEST FOOD CO-OP 150631 2:00 PM CST 1, 3-12, 21-23,

26-28, 31No2016-02CD

Est Cost: REQUESTED** - $0.00

WADENA, MNONLINECITY OF WADENA COMMUNITY CENTER DRIVE IMPROV 4:30 PM 1-2No2016-02E0

Est Cost: NOT RELEASED** - $0.00

WASHBURN, NDONLINECITY OF WASHBURN 2016 SEAL COAT IMPROVEMENTS 2:00 PM CDT 1-2No2016-02BA*

Est Cost: REQUESTED** - $0.00

Friday, June 03, 2016

BROOKLYN CENTER, MNONLINE2016 PAVEMENT REHABILITATION- BROOKLYN CENTER 2:00 PM 1-2, 31-32No2016-031C*

Est Cost: REQUESTED** - $0.00

DE FOREST, WIONLINEVILLAGE OF DE FOREST - TID 6 NORTH BUSINESS PAR 9:00 AM 1, 3, 31-33No2016-034A*

Est Cost: NOT RELEASED** - $0.00

DICKINSON, NDONLINECITY OF DICKINSON - WEST GRAVITY SEWER III, WATER 10:00 am MDT 1-3, 7, 31-34No2016-02EF*

Est Cost: NOT RELEASED** - $0.00

MANTORVILLE, MNONLINECITY OF MANTORVILLE - SANITARY SEWER FORCEMAI 11:00 am 2, 11, 16No2016-02FB*

Est Cost: NOT RELEASED** - $0.00

MINNEAPOLIS, MNONLINEVETERANS HOME DEEP TUNNEL REPAIRS-MINNESOTA 1:30 PM 1, 3, 22-23, 26-

27, 31, 33Yes2016-01D7+

Est Cost: OWNER LOW** - $500,000.00

Est Cost: OWNER HI - $600,000.00

ORONOCO, MNONLINEORONCO TOWNSHIP CEDAR BEACH COMMUNITY WAST 2:00 PM 1, 3, 26, 31-33No2016-02DF

Est Cost: NOT RELEASED** - $0.00

ST ANTHONY VILLAGE, MNONLINEVILLAGE OF ST ANTHONY VILLAGE HIGHWAY SAFETY I 10:00 AM NOT SPECIFIEDNo2016-0338*

Est Cost: REQUESTED** - $0.00

STANLEY, NDONLINETAXIWAY IMPROVEMENTS- STANLEY MUNICIPAL AIRPO 3:00 PM NOT SPECIFIEDYes2016-02C7

Est Cost: REQUESTED** - $0.00

For up-to-date bidder and addenda information visit mbex.orgPage 14

# Denotes New Date; * Denotes New Plan Listed ; + Denotes New Addenda; NOS = Plan Not On Site

Page 15: Volume 21-16 Friday, May 27, 2016ipin.mbex.org/downloads/bulletin/1-475310.pdfconstruction industry. Understanding of concrete products is hi ghly desirable. Please send resume along

MBE# PROJECT BID TIME BIN # EST COSTDIVISIONSADDENDA

WINONA, MNONLINECITY OF WINONA CONCRETE PAVED DOCK AND HEAVY 10:00 AM NOT SPECIFIEDNo2016-0241

Est Cost: REQUESTED** - $0.00

Monday, June 06, 2016

BISMARCK, NDONLINEBISMARCK AIRPORT MAVERICK AVENUE RECONSTRUC 3:00 PM CT NOT SPECIFIEDNo2016-02CF

Est Cost: REQUESTED** - $0.00

KASSON, MNONLINECITY OF KASSON WASTEWATER TREATMENT FACILITY 2:00 PM 1-3, 9, 11, 13,

15-16No2016-0270

Est Cost: OWNER - $0.00

MANKATO, MNONLINECITY OF MANKATO - 2016 TAXIWAY GUIDANCE SIGN RE 11:00 am NOT SPECIFIEDNo2016-02FE*

Est Cost: OWNER** - $150,000.00

Tuesday, June 07, 2016

AMES, IAONLINEFOOD SCIENCES BUILDING ROOM 2384 REMODEL- IOW 2:00 PM 1-12, 21-23, 25-

28No2015-83218

Est Cost: OWNER** - $432,500.00

CHIPPEWA COUNTY, WIONLINECOURTYARDS SITEWORK AND DRAINAGE REPAIRS- WI 2:00 PM 2-3, 30-33No2016-0246

Est Cost: OWNER** - $87,000.00

DES MOINES, IAONLINECITY OF DES MOINES WRA FOUR MILE CREEK IMPROV 11:00 AM NOT SPECIFIEDNo2016-0311*

Est Cost: OWNER** - $1,064,602.00

GLENWOOD, MNONLINEMINNEWASKA AREA ELEMENTARY SCHOOL PARKING- I 2:00 PM 1-2, 31-33No2016-0323*

Est Cost: REQUESTED** - $0.00

GRAND FORKS, NDONLINENORTH DAKOTA MILL AND ELEVATOR EXPANSION- FIR 3:00 PM 1, 21No2016-02F8*

Est Cost: REQUESTED** - $0.00

GREENBUSH, WIONLINENEW EQUIPMENT STORAGE BUILDING- SHEBOYGAN M 2:00 PM 1-3, 13, 26, 30-

32No2014-79868

Est Cost: OWNER** - $400,000.00

HENNEPIN COUNTY, MNONLINELIFT STATION IMPROVEMENTS - LIFT STATION L-30, ME 2:00 PM 1-11, 13, 15-16No2016-0213

Est Cost: REQUESTED** - $0.00

IRONTON, MNONLINEBEST VALUE REQUEST FOR PROPOSALS FOR CUYUNA 3:00 PM 1, 11, 31-33No2016-02BD

Est Cost: OWNER LOW** - $250,000.00

Est Cost: OWNER HIGH - $300,000.00

KING, WIONLINEBOILER REPLACEMENT AND REPAIRS - WISCONSIN VE 2:00 PM 1-9, 22-23, 26-

28, 30-32No2013-74874

Est Cost: OWNER** - $3,100,000.00

MADISON, WIONLINECONCRETE REPLACEMENT- PHASE 1- KOHL CENTER- U 2:00 PM 1-3, 30-32No2016-0260

Est Cost: OWNER - $88,000.00

ONLINEBUILDING 5 LIFE SAFETY RENOVATIONS- CENTRAL WIS 2:00 PM 1-2, 4-12, 21-23, 26-28

Yes2016-0278

Est Cost: OWNER** - $2,450,000.00

For up-to-date bidder and addenda information visit mbex.orgPage 15

# Denotes New Date; * Denotes New Plan Listed ; + Denotes New Addenda; NOS = Plan Not On Site

Page 16: Volume 21-16 Friday, May 27, 2016ipin.mbex.org/downloads/bulletin/1-475310.pdfconstruction industry. Understanding of concrete products is hi ghly desirable. Please send resume along

MBE# PROJECT BID TIME BIN # EST COSTDIVISIONSADDENDA

MINNEAPOLIS, MNONLINEREQUEST FOR PRPOSALS (RFP) - TARGET CENTER RE 2:00 PM 1-15, 21-23, 26-

28, 31-33No2016-009F

Est Cost: ENTIRE PROJECT** - $129,000,000.00

ONLINEANDERSEN UNITED COMMUNITY SCHOOL RENOVATION 2:00 PM 1-12, 14, 21-23, 26-28, 31-33

Yes2016-024A+Est Cost: REQUESTED** - $0.00

NEW TOWN, NDONLINETHREE AFFILIATED TRIBES - SECTION 17 CORPORATIO 1:30 pm 1, 3, 5, 31-33,

40-41, 45No2016-0328*

Est Cost: NOT RELEASED** - $0.00

PLYMOUTH, MNONLINEPILGRIM LANE ELEMENTARY SCHOOL ADDITIONS AND 2:00 PM 1-12, 21-23, 26-

28, 31-33Yes2016-0267+

Est Cost: REQUESTED** - $0.00

RICHLAND COUNTY, NDONLINEMILLING, HOT BITUMINOUS OVERLAY AND INCIDENTAL 9:00 AM NOT SPECIFIEDNo2016-02E3

Est Cost: REQUESTED** - $0.00

ST PAUL, MNONLINEREPOINTING AND SEALING OF THE ST PAUL CEDAR ST 2:00 PM 1, 4, 7, 9, 32No2016-0317*

Est Cost: REQUESTED** - $0.00

STRATFORD, IAONLINECITY OF STRATFORD COMMERCIAL STREET IMPROVEM 2:00 PM NOT SPECIFIEDNo2016-0321*

Est Cost: REQUESTED** - $0.00

TAYLOR, NDONLINERICHARDTON-TAYLOR - TAYLOR ELEMENTARY SCHOO 10:00 MST 1, 20, 22-23, 26No2016-0331*

Est Cost: REQUESTED** - $0.00

Wednesday, June 08, 2016

DULUTH, MNONLINEWRENSHALL PUMP STATION UPGRADE-WESTERN LAK 1:00 PM 1-2, 5, 8, 11, 15-

17No2016-01A4

Est Cost: REQUESTED** - $0.00

INTERNATIONAL FALLS, MNONLINEAIRLINE TERMINAL REHABILITATION AND EXPANSION P 2:00 PM 1-3, 5-12, 14, 21-

23, 26-28, 31-33Yes2016-006B+

Est Cost: REQUESTED** - $0.00

ONLINEAIRLINE TERMINAL REHABILITATION AND EXPANSION P 2:00 PM 1-3, 5-12, 14, 21-23, 26-28, 31-33

Yes2016-021F+Est Cost: NOT RELEASED** - $0.00

KENYON, MNONLINECITY OF KENYON - VOLUNTEER FIRE DEPARTMENT, 148 2:00 PM TBD1-10, 12, 14, 21-

23, 26-28Yes2010-61013* +

Est Cost: NOT RELEASED** - $0.00

LAKE GENEVA, WIONLINEPORCH REHABILITATION- BLACK POINT HISTORIC PRE 2:00 PM 1-7, 9, 31-32No2016-0261

Est Cost: OWNER** - $369,100.00

MADISON, MNONLINE2016 PAVEMENT REHABILITATION - LAC QUI PARLE CO 1:30 PM 1No2016-0309*

Est Cost: REQUESTED** - $0.00

MINNEAPOLIS, MNONLINEREQUEST FOR PROPOSAL BEST VALUE PROCUREMEN 12:00 PM 1-2, 22-23, 31-33No2016-02F5*

Est Cost: OWNER** - $1,200,000.00

ONLINEHENNEPIN COUNTY REQ FOR PROPOSAL BEST VALUE 12:00 PM NOT SPECIFIEDNo2016-030D*Est Cost: OWNER** - $1,250,000.00

OTSEGO, MNONLINECITY OF OTSEGO IMPROVEMENT PROJECT NO 16-02, Q 2:00 PM 1-3No2016-030B*

Est Cost: REQUESTED** - $0.00

For up-to-date bidder and addenda information visit mbex.orgPage 16

# Denotes New Date; * Denotes New Plan Listed ; + Denotes New Addenda; NOS = Plan Not On Site

Page 17: Volume 21-16 Friday, May 27, 2016ipin.mbex.org/downloads/bulletin/1-475310.pdfconstruction industry. Understanding of concrete products is hi ghly desirable. Please send resume along

MBE# PROJECT BID TIME BIN # EST COSTDIVISIONSADDENDA

ST CROIX FALLS, WIONLINESTATE PARK DEVELOPMENT PHASE I - STRAIGHT LAKE 2:00 PM 1-3, 6-10, 12-13,

22, 26, 31-32No2012-67597

Est Cost: OWNER** - $947,600.00

Thursday, June 09, 2016

AMES, IAONLINE2016 FACILITIES MANAGEMENT AND BUS STORAGE- AM 2:00 PM 1, 3, 5-10, 12-

13, 21-23, 26-28, 31-33

No2016-02F9*Est Cost: REQUESTED** - $0.00

AUDUBON, IAONLINEMOTOR VEHICLE COMPOUND IMPROVEMENTS- 1908170 2:00 PM NOT SPECIFIEDNo2016-02FA*

Est Cost: REQUESTED** - $0.00

BRANDON, SDONLINECITY OF BRANDON LIFT STATION WASTEWATER TREAT 10:30 AM 11, 15, 22-23, 26No2016-033A*

Est Cost: REQUESTED** - $0.00

CHIPPEWA FALLS, WIONLINEBATHROOM HEATING IMPROVEMENT- WISCONSIN VET 1-2, 7, 9, 23, 26No2015-82420

Est Cost: OWNER** - $550,000.00

COLOGNE, MNONLINECITY OF COLOGNE WATER TREATMENT FACILITY- C12. 2:00 PM 1-13, 15-16No2016-02F7*

Est Cost: REQUESTED** - $0.00

DAYTON, MNONLINECITY OF DAYTON STORM SHELTER - TORNADO STORM 4:00 PM 1, 7-9No2016-034C*

Est Cost: REQUESTED** - $0.00

DULUTH, MNONLINECITY OF DULUTH RETAINING WALL REPLACEMENT AND 2:00 PM NOT SPECIFIEDNo2016-032E*

Est Cost: REQUESTED** - $0.00

FOREST LAKE, MNONLINEFOREST LAKE HIGH SCHOOL BID PACKAGE NO 1E- ELE 2:00 PM 1, 26No2016-0347*

Est Cost: REQUESTED** - $0.00

HANCOCK COUNTY, IAONLINEUPPER MAIN OPEN DITCH REPAIRS- DRAINAGE DISTRIC 10:00 AM 1, 3, 31-33No2016-02FC*

Est Cost: REQUESTED - $0.00

HAYWARD, WIONLINELAC COURT OREILLES HOUSING AUTHORITY LED STRE 2:00 PM 1, 26, 31-32No2016-0325*

Est Cost: REQUESTED** - $0.00

HINCKLEY, MNONLINECITY OF HINCKLEY 2016 LINING IMPROVEMENTS- N15-1 10:00 AM 1-2No2016-0307*

Est Cost: REQUESTED** - $0.00

JEFFERS, MNONLINEHERON LAKE CONNECTION SCHEDULE 1 DISTRIBUTION 1:00 PM 1-2, 15 & 16No2016-0344*

Est Cost: REQUESTED** - $0.00

MADISON, WIONLINECOMPUTER SCIENCE AND STATISTICS ROOF REPLACE 2:00 PM 1-5, 7-9, 22, 32No2014-79812

Est Cost: - $359,000.00

MENOMONIE, WIONLINEROOF REPAIRS JARVIS HALL- UNIVERSITY OF WISCON 2:00 PM 2, 7-8No2016-0279

Est Cost: OWNER** - $55,000.00

MINNEAPOLIS, MNONLINETRACTION POWER ENERGY STORAGE SYSTEM- CONTR 5:00 PM 1, 26, 34Yes2016-86552+

Est Cost: REQUESTED** - $0.00

For up-to-date bidder and addenda information visit mbex.orgPage 17

# Denotes New Date; * Denotes New Plan Listed ; + Denotes New Addenda; NOS = Plan Not On Site

Page 18: Volume 21-16 Friday, May 27, 2016ipin.mbex.org/downloads/bulletin/1-475310.pdfconstruction industry. Understanding of concrete products is hi ghly desirable. Please send resume along

MBE# PROJECT BID TIME BIN # EST COSTDIVISIONSADDENDA

OWATONNA, MNONLINEOWATONNA SECURITY AND TECHNOLOGY UPGRADES- 2:00 PM 1, 28No2016-0318*

Est Cost: REQUESTED** - $0.00

SIOUX FALLS, SDONLINECITY OF SIOUX FALLS TOMAR COURT DRAINAGEWAY A 2:00 PM NOT SPECIFIEDNo2016-032C*

Est Cost: REQUESTED** - $0.00

Various, MNONLINEMETROPOLITAN COUNCIL - 2016/2017 BUS STOP SIGN I 2:00 pm CDT 1, 10Yes2016-02DB* +

Est Cost: NOT RELEASED** - $0.00

WEST FARGO, NDONLINECITY OF STORM LIFT STATION (SM71) 8TH AVENUE NOR 10:00 AM 1, 3-9, 16, 22-

23, 31-33, 40Yes2016-003F+

Est Cost: NOT RELEASED** - $0.00ONLINECITY OF WEST FARGO SEWER, WATER, STORM AND ST 10:00 AM 1, 3, 31-33Yes2016-02AC* +

Est Cost: OWNER** - $1,900,000.00

Friday, June 10, 2016

MINNEAPOLIS, MNONLINEVETERANS HOME DEEP TUNNEL REPAIRS-MINNESOTA 3:00 PM 1, 3, 22-23, 26-

27, 31, 33Yes2016-01D7+

Est Cost: OWNER LOW** - $500,000.00

Est Cost: OWNER HI - $600,000.00

ST PETER, MNONLINEREQUEST FOR QUALIFICATIONS-CONSTRUCTION MANA 2:00 PM 1-12, 21-23, 26-

28, 31-33No2012-69323*

Est Cost: - $67,000,000.00

Monday, June 13, 2016

MINNEAPOLIS, MNONLINECONSTRUCTION MANAGER AT RISK (RFP) FOR ACADE 2:00 PM NOT SPECIFIEDNo2016-033D*

Est Cost: OWNER - $77,800,000.00

Tuesday, June 14, 2016

ABERDEEN, SDONLINECITY OF ABERDEEN WATER RECLAMATION FACILITY IM 2:00 PM 1, 9, 44No2016-0332*

Est Cost: ENGINEER LOW** - $1,200,000.00

Est Cost: ENGINEER HIGH** - $1,400,000.00

CLOQUET, MNONLINECITY OF CLOQUET VETERANS PARK AND FAULEY PAR 2:00 PM 1, 3No2016-0339*

Est Cost: REQUESTED - $0.00

MPLS/ST PAUL, MN250C2016 TELECOM RELOCATION AND DECOMMISSIONING ( 2:00 PM 1-2, 5-10, 15-17No2016-0345*

Est Cost: REQUESTED** - $0.00

OTSEGO, MNONLINECITY OF OTSEGO REPAIRING AND PAINTING OF 400,000 2:00 PM CST NOT SPECIFIEDNo2016-02F2*

Est Cost: REQUESTED** - $0.00

REDWOOD FALLS, MNONLINECITY OF REDWOOD FALLS - HYDROELECTRIC PROJECT 1:30 PM 1-3, 5No2016-0320*

Est Cost: REQUESTED** - $0.00

RICHLAND COUNTY, NDONLINERICHLAND CONTY MILLING, HOT BITUMINOUS OVERLA 10:00 AM NOT SPECIFIEDNo2016-033F*

Est Cost: REQUESTED** - $0.00

SAUK CENTRE, MNONLINERUNWAY 14/32 RECONSTRUCTION - SAUK CENTRE MU 10:00 AM NOT SPECIFIEDNo2016-0348*

Est Cost: NOT RELEASED** - $0.00

For up-to-date bidder and addenda information visit mbex.orgPage 18

# Denotes New Date; * Denotes New Plan Listed ; + Denotes New Addenda; NOS = Plan Not On Site

Page 19: Volume 21-16 Friday, May 27, 2016ipin.mbex.org/downloads/bulletin/1-475310.pdfconstruction industry. Understanding of concrete products is hi ghly desirable. Please send resume along

MBE# PROJECT BID TIME BIN # EST COSTDIVISIONSADDENDA

SOUTH ST PAUL, MNONLINECITY OF SOUTH ST PAUL - POLICE STORAGE BUILDING- 2:00 PM 1, 3-9, 31No2016-031F*

Est Cost: REQUESTED** - $0.00

ONLINECITY OF SOUTH ST PAUL SANITARY SEWER SYSTEM IM 2:00 PM 1-2, 11, 16No2016-033E*Est Cost: REQUESTED** - $0.00

ST CLOUD, MNONLINECITY OF ST CLOUD-12TH STREET NORTH/NORTHWAY D 11:00 am NOT SPECIFIEDYes2016-0266+

Est Cost: NOT RELEASED** - $0.00

WINONA, MNONLINEMCCOWN GYM UPGRADES- WINONA STATE UNIVERSIT 1:00 PM CST 1-2, 5-9, 11-12,

26, 31-32Yes2016-0316* +

Est Cost: REQUESTED** - $0.00

Wednesday, June 15, 2016

ARVILLA, NDONLINECHALET RENOVATION- TURTLE RIVER STATE PARK- NO 2:00 PM 1, 4, 6-9, 31-32No2016-032F*

Est Cost: ENGINEER** - $75,000.00

FITCHBURG, WIONLINECITY OF FITCHBURG NEW FIRE STATION, 132596 10:00 AM 1, 3-10, 12, 21-

23, 26-28, 31-33No2016-0313*

Est Cost: NOT RELEASED** - $0.00

OWATONNA, MNONLINECITY OF OWATONNA REGIONAL STORMWATER POND- 1 10:00 AM 1, 31-33No2016-032A*

Est Cost: NOT RELEASED** - $0.00

RIVER FALLS, WIONLINEMULTI-BUILDING EMERGENCY GENERATOR UPGRADE - 2:00 PM 1, 3-4, 7, 26, 31-

32Yes2015-82406+

Est Cost: OWNER** - $980,000.00

ST PAUL, MNONLINECITY OF ST PAUL LILYDALE REGIONAL PARK PHASE III 2:00 PM 1, 5, 7, 9, 26, 30-

33No2016-030E*

Est Cost: REQUESTED** - $0.00

Thursday, June 16, 2016

AMES, IAONLINEUTILITIES POWER PLANT DA VENT STEAM HEAT RECOV 2:00 PM 1, 23, 26, 40No2016-0342*

Est Cost: OWNER - $150,000.00

BLOOMINGTON, MNONLINEBLOOMINGTON INTERCEPTOR REHABILITATION- METR 2:00 PM 1-3, 5, 11No2016-0333*

Est Cost: REQUESTED** - $0.00

BROOKLYN CENTER, MNONLINECITY OF BROOKLYN CENTER NORTHPORT PARK SHELT 10:00 AM 2-7, 9-10, 26No2016-034D*

Est Cost: REQUESTED** - $0.00

DULUTH, MNONLINESCREW PUMP IMPROVEMENTS- WESTERN LAKE SUPE 2:00 PM 1, 3, 5, 7-9, 11,

15-16No2016-031D*

Est Cost: REQUESTED** - $0.00

LA PORTE CITY, IAONLINECITY OF LA PORTE CITY - DOWNTOWN REVITILIZATION 2:00 PM 1-9, 34No2016-0335*

Est Cost: REQUESTED** - $0.00

MENOMONIE, WIONLINESPORTS AND FITNESS CENTER EXTERIOR DOORS REP 2:00 PM 1-3, 5-9, 23, 26,

31-32Yes2015-82479+

Est Cost: OWNER** - $760,000.00

ROBBINSDALE, MNONLINECITY OF ROBBINSDALE 2016 PARTIAL ROOF REPLACE 1:00 PM 1, 6-7, 9, 22No2016-0337*

Est Cost: REQUESTED** - $0.00

For up-to-date bidder and addenda information visit mbex.orgPage 19

# Denotes New Date; * Denotes New Plan Listed ; + Denotes New Addenda; NOS = Plan Not On Site

Page 20: Volume 21-16 Friday, May 27, 2016ipin.mbex.org/downloads/bulletin/1-475310.pdfconstruction industry. Understanding of concrete products is hi ghly desirable. Please send resume along

MBE# PROJECT BID TIME BIN # EST COSTDIVISIONSADDENDA

ST PAUL, MNONLINEOHB GARAGE TRASH COMPACTOR REPLACEMENT- ME 2:00 PM 1, 3, 11, 26No2016-030F*

Est Cost: REQUESTED** - $0.00

Friday, June 17, 2016

WILDROSE, NDONLINECITY OF WILDROSE WASTEWATER IMPROVEMENTS PR 2:00 PM 1-3No2016-0326*

Est Cost: REQUESTED** - $0.00

Tuesday, June 21, 2016

GREENBUSH, WIONLINENEW EQUIPMENT STORAGE BUILDING- SHEBOYGAN M 2:00 PM 1-3, 13, 26, 30-

32No2014-79868

Est Cost: OWNER** - $400,000.00

KING, WIONLINEBOILER REPLACEMENT AND REPAIRS - WISCONSIN VE 2:00 PM 1-9, 22-23, 26-

28, 30-32No2013-74874

Est Cost: OWNER** - $3,100,000.00

LA CROSSE, WIONLINEROOSEVELT SCHOOL APARTMENTS, 14ROOS-00-01 2:00 PM 1-4, 6-12, 21-23,

26-28, 31-33No2016-0319*

Est Cost: REQUESTED** - $0.00

MADISON, WIONLINEBUILDING 5 LIFE SAFETY RENOVATIONS- CENTRAL WIS 2:00 PM 1-2, 4-12, 21-23,

26-28Yes2016-0278

Est Cost: OWNER** - $2,450,000.00

Wednesday, June 22, 2016

ST CROIX FALLS, WIONLINESTATE PARK DEVELOPMENT PHASE I - STRAIGHT LAKE 2:00 PM 1-3, 6-10, 12-13,

22, 26, 31-32No2012-67597

Est Cost: OWNER** - $947,600.00

Thursday, June 23, 2016

ARLINGTON, SDONLINEKINGBROOK DISTRIBUTION IMPROVEMENTS SINAI PRO 2:00 PM 1-2, 15No2016-0341*

Est Cost: REQUESTED** - $0.00

CHIPPEWA FALLS, WIONLINEBATHROOM HEATING IMPROVEMENT- WISCONSIN VET 2:00 pm 1-2, 7, 9, 23, 26No2015-82420

Est Cost: OWNER** - $550,000.00

Tuesday, June 28, 2016

DES MOINES, IAONLINEPOLK COUNTY CRIMINAL COURTS- 14.8160.00. 468-1516 2:00 PM 10, 12, 14, 21-

23, 26-28, 31-33No2016-02A8

Est Cost: REQUESTED** - $0.00

Wednesday, June 29, 2016

OSHKOSH, WIONLINECAMPUS SERVICES CENTER WASTE HEAT CONNECTIO 2:00 PM 1-3, 7, 23, 26,

31-33No2016-0263

Est Cost: OWNER** - $120,000.00

Thursday, June 30, 2016

PLATTEVILLE, WIONLINESWINE CENTER REPAIRS- PIONEER FARM, UNIVERSITY 2:00 PM 2, 5-7, 9No2016-025B

Est Cost: OWNER - $125,000.00

For up-to-date bidder and addenda information visit mbex.orgPage 20

# Denotes New Date; * Denotes New Plan Listed ; + Denotes New Addenda; NOS = Plan Not On Site