    SARAWAK ENERGY BERHADASTANA-SEJINGKAT 132 kV UNDERGROUND CABLE PROJECTVOLUME 1: PART C: SUMMARY OF PRICE – SECTION 3: CIVIL WORKS SCHEDULE OF RATES

    3! CIVIL WORK SCHEDULE OF RATES

    P"#"$%Rates for driving of precast concrete piles and reinforced concrete lengthened piles shallinclude for the provision of all necessary mechanical plant, rig, temporary works, etc and forthe travelling of pile frame about the site.

    S"&' C#'()($*' A$+ E()&,.)k All rates herein shall be held to include for supply and delivery to site, wastage on materials,carriage and cartage, carrying in and return of empties, hoisting, setting, tting and xing inposition, making good and all other labours and everything else necessary (including anycustom duties, etc.) for the proper completion of each item and for establishment chargesand prot.Rates for site clearance shall includea) !learing all general vegetation, tall grass, creepers, shrubs, bushes and all undergrowth.b) "elling of trees of all si#es including cutting, grubbing up their stumps and rootsc) and dispose o$ site.d) !learing all rubbish, debris and unwanted materials.e) %reaking up and removing disused structures, surface beds and pavings, sewers, drains

    and drain pipes, manholes, underground wells, sumps, fencing, posts, retaining walls andother such like structures, including disconnecting and sealing o$ services, plugging anypipes cut o$ at perimeter of site.

    f) Removing existing tree stumps and grubbing up their roots and disposal o$ site.g) "illing holes and voids caused by removal of trees, tree stumps, roots, existing structures

    or obstructions with hardcore or suitable approved materials.

    E/*(0(&".$&xcavation shall be measured to commence at existing ground level. All excavation andlling shall be measured nett. 'he uantities of excavation and lling shall be measured onthe assumption that the gradient of the existing surfaces between the nearest adacent spotlevels and* or between contours is constant. %oulders not exceeding one cubic metre shallbe deemed to be included in the rates for excavation.Rates for excavation (including excavation of drainage) are to includea) keeping all excavations free from water, mud, etc. by pumping or bailing if reuiredb) planking and strutting, leveling, ramming or preparing bottoms, any double handling

    reuired and for additional excavation for planking, strutting and formwork.c) excavating by hand or mechanical means in various soil strata and water tablesd) multiple handlinge) protection of all services encounteredf) additional excavation and backlling due to !ontractor+s method or process such asg) excavation for working space.h) reinstating to original condition all work disturbed by excavation.i) additional concrete inll where excavated below correct levels

     ) giving all reuired noticek) to ensure safety of excavation and adoining structures

    C.$*)'&' W.)k o allowance shall be made in the weight of steel reinforcement for rolling margin, tryingwires, spacers, chairs and weight of weld etc. !oncrete shall be measured nett withoutdeduction for the volume of reinforcement.Rates for concrete shall be held to includea) forming, leaving or cutting grooves, chases, mortices, holesb) making good and any sundry items of alike nature.c) providing trial mixes, tests on materials and nished product, including non destructive

    test on and o$-sited) hoisting or pumping or placing in positione) compacting by suitable means

    /0-123345 06R*7R*1

  • 8/9/2019 Vol 1 -Part D Section 4-Final

    2/10

    SARAWAK ENERGY BERHADASTANA-SEJINGKAT 132 kV UNDERGROUND CABLE PROJECTVOLUME 1: PART C: SUMMARY OF PRICE – SECTION 3: CIVIL WORKS SCHEDULE OF RATES

    f) laying in bays and associated worksg) curing and protection.

    Rates for precast concrete work shall includea) all reinforcement and mouldsb) lifting hooks, cast-in brackets, dowels and their xing devices

    c) nishing fair on all exposed faces, and other surface treatment to receive other nishesd) holes, sleeve, rates, notchings, sinkings, mortices and the likee) temporary supportsf) hoisting and placing in position8 setting, bedding, ointing and pointing in cement mortar8

    cutting o$ lifting hook.

    Rates for bar reinforcement shall includea) allowance for rolling margin and weight of weldsb) cleaning by wire brushing or sand blastingc) cutting to length and fabricating including bending to various bend and radiid) providing and tying with galvani#ed steel wire at all intersectionse) providing seating or spacer blocks and chairsf) providing all necessary laps and anchoragesg) 0ubmitting manufacturers+ mill and test certicate.

    Rates for fabric reinforcement shall includea) allowance for rolling margin and weight of weldsb) cleaning by wire brushing or sand blastingc) cutting to length and fabricating including bending to various bend and radiid) providing and tying with galvani#ed steel wire at all intersectionse) providing seating or spacer blocks and chairsf) providing all necessary laps and anchoragesg) submitting manufacturers+ mill and test certicate.h) straight, circular or raking cutting and notching.

    90awn formwork: shall mean formwork to produce concrete surfaces suitable for plasteringor tiling. 9;rot formwork: shall means formwork to produce fair face concrete surfacessuitable for direct application of decorations. "ormwork shall be deducted for openings overone suare metres.Rates for formwork shall be held to includea) for erection, raking and circular cutting, splayed edges, notchings,b) allowance for overlaps and passing at angles, battens, strutting, bolting,c) wedging,d) easing, striking and removal.e) batten framingf) stopping all holes, cracks and crevicesg) mould oil

    T)$% A$+ T)'' P#($&"$%Rates for seeding and turng shall include

    a) !arry out the work in such seuence or section as directed.b) reparatory work in forking and loosening ground surface including riding all weed, roots

    and debris.c) 7ressing with fertili#er, tending, watering and covering with wet sacking, moving and

    protection of newly seeded*turfed area.d)

  • 8/9/2019 Vol 1 -Part D Section 4-Final

    3/10

    SARAWAK ENERGY BERHADASTANA-SEJINGKAT 132 kV UNDERGROUND CABLE PROJECTVOLUME 1: PART C: SUMMARY OF PRICE – SECTION 3: CIVIL WORKS SCHEDULE OF RATES

    d) =rrigation, pruning and trimming.e) lant replacement.f) 0praying or other disease control operation.g) rotection.h)

  • 8/9/2019 Vol 1 -Part D Section 4-Final

    4/10

    SARAWAK ENERGY BERHADASTANA-SEJINGKAT 132 kV UNDERGROUND CABLE PROJECTVOLUME 1: PART C: SUMMARY OF PRICE – SECTION 3: CIVIL WORKS SCHEDULE OF RATES

    1! GENERAL SITE CLEARING AND EARTHWORKS

    I&'4 D'4*)"5&".$ U$"&R(&'6RM7

    11 G'$')(# S"&' C#'()($*'  

    1.1.1 !learing and grubbing within the 0ite of all trees, bushes,etc. ?a

     

    1.1.2 0tripping top soil to 1@3mm thick m2  

    1.1.> 7emolition and removal of existing pavement. m2  

    1.1. 0carify and remove existing pavement to the reuired level. m2  

    12 R.(+(8 E/*(0(&".$  

    1.2.1 Roadway excavation in all materials other than rock including

    stockpiling aside for embankment construction.

    m> 

    1.2.2 Roadway excavation in all materials other than rock includingcart away from site.

    m> 

    1.2.> 0upply, lay, grade and compact in layers imported suitablell material to formation level.

    m> 

    1.2. 'ake from stockpile on site, lay, grade and compact in layerssuitable excavated ll material to formation level. m

    1.2.@ 0upply and lay onwoven Beotextile with the following

    specication

    m2  

    a) hysical !haracteristic !ontinuous lament, nonwovenneedle punched.

     

    b) olymer 133C polypropylene, DE stabili#ed.  

    c) 15

    f) 'ensile &longation (15  

    g) !%R uncture 0trength >>33 , =06 122>G

    h) &$ective 6pening 0i#e (653) 3.35 mm, =06 125@G  

    i) Eertical ;ater "low @3mm head G@ l*m2*s, =06 113@F

     ) ?ori#ontal ;ater "low under 23 ka 1 l*m.h, =06 125@F  ote !haracteristic denotes the value within the 5@Ccondence level

     

    1.2.G 0upply and lay geogrid 'ype 1 and 'ype 2 with the followingcharacteristicreuirements

     

    /0-123345 06R*7R*

  • 8/9/2019 Vol 1 -Part D Section 4-Final

    5/10

  • 8/9/2019 Vol 1 -Part D Section 4-Final

    6/10

    SARAWAK ENERGY BERHADASTANA-SEJINGKAT 132 kV UNDERGROUND CABLE PROJECTVOLUME 1: PART C: SUMMARY OF PRICE – SECTION 3: CIVIL WORKS SCHEDULE OF RATES

     

    2! DRAINAGE WORKS

    I&'4 D'4*)"5&".$ U$"&R(&'6RM7

    21 C.$4&*& S)9(*' D)("$4  

    2.1.1 &mbankment toe drain m

    2.1.2 Roadside earth drain m

    22 0upply and =nstall @33mm 'hick gabion mattress laid onground including rockll and laying at slope. m2  

    23 "illing of existing stream*drain using imported suitable llmaterial includingcompaction. %orrow pitH1@km.

    m>  

    /0-123345 06R*7R*G

  • 8/9/2019 Vol 1 -Part D Section 4-Final

    7/10

    SARAWAK ENERGY BERHADASTANA-SEJINGKAT 132 kV UNDERGROUND CABLE PROJECTVOLUME 1: PART C: SUMMARY OF PRICE – SECTION 3: CIVIL WORKS SCHEDULE OF RATES

    3! S&)*&)(# W.)k4

    I&'4 D'4*)"5&".$ U$"&R(&'6RM7

     

    31 S55#8 ($+ I$4&(## C.$*)'&' W.)k4 9.) S&)*&)(#W.)k4

     

    >.1.1 @3mm thick lean concrete Brade 1@*23 as blinding m2  

    0upply and =nstall Reinforced !oncrete of the following

    grades for 0tructural ;orks ;orks

     

    >.1.2 Brade 23*23. m>  

    >.1.> Brade 2@*23. m>  

    >.1. Brade >3*23. m>  

    0upply and =nstall "ormwork as described to !lass "1 I D1"inish type

     

    >.1.@ 'o sides of foundation and beams m2  

    >.1.G  'o sides of !olumns m2  

    >.1.4  'o soJt of Koor slab and beams m2  

    0upply and =nstall ?igh Lield 7eformed 0teel Reinforcement%ars as described

     

    >.1.F 13mm 7iameter tonne

    >.1.5 12mm 7iameter tonne

    >.1.13 1Gmm 7iameter tonne

    >.1.11 23mm 7iameter tonne

    >.1.12 2@mm 7iameter tonne

    0upply and =nstall ;ire .1.1> 'ype AF (minimum >.@@kg*m2). m2  

    /0-123345 06R*7R*4

  • 8/9/2019 Vol 1 -Part D Section 4-Final

    8/10

    SARAWAK ENERGY BERHADASTANA-SEJINGKAT 132 kV UNDERGROUND CABLE PROJECTVOLUME 1: PART C: SUMMARY OF PRICE – SECTION 3: CIVIL WORKS SCHEDULE OF RATES

    >.1.1 'ype A4 (minimum >.32kg*m2). m2  

    >.1.1@ 'ype AG (minimum 2.22 kg*m2). m2  

    I&'4 D'4*)"5&".$ U$"&R(&'6RM7

     

    32 S&''# ($+ I).$.)k')  

    >.2.1 Rolled mild steel in roof trusses, braces gusset plates,bearing plates etc.

     

    including rivetting, welding, bolting, hoisting and xing. MB

    >.2.2 Rolled mild steel in angles, oists, channels, plates, etc.including cutting, drilling, assembling, welding, rivetting,bolting etc.

    MB

    >.2.> .2.0upply and x the following mild steel bolts complete withnuts and washers-

     

    a) 15mm - 2@mm 7iameter bolts. MB

    b) 1>mm - 1Gmm 7iameter bolts. MB

    c) 5mm 7iameter bolts. MB

    d) Fmm 7iameter bolts. MB

    e) Gmm 7iameer bolts. MB

    /0-123345 06R*7R*F

  • 8/9/2019 Vol 1 -Part D Section 4-Final

    9/10

    SARAWAK ENERGY BERHADASTANA-SEJINGKAT 132 kV UNDERGROUND CABLE PROJECTVOLUME 1: PART C: SUMMARY OF PRICE – SECTION 3: CIVIL WORKS SCHEDULE OF RATES

    ! P"5'.)k4

    I&'4 D'4*)"5&".$ U$"&R(&'6RM7

     

    1 H"%, D'$4"&8 P.#8'&,8#'$' F"&&"$%4 *.5#8"$% &. MS1!;< : 2!!2

     

    &lbow* bend to any degree  

    1 53 mm 7iameter, F.6

    2 113 mm 7iameer, ditto 6

    > 12@ mm 7iameter, ditto 6

    1G3 mm 7iameter, ditto  6

    @ 1F3 mm 7iameter, ditto 6

    G 22@ mm 7iameter, ditto 6

    4 53 mm 7iameter, 13. 6

    F 113 mm 7iameter, ditto 6

    5 12@ mm 7iameter, ditto 6

    13 12@ mm 7iameter, ditto 6

    11 1G3 mm 7iameter, ditto 6

    2 H($+#'= >."$& ($+ #(8 "$ &)'$*,= 9.) &,' 9.##."$% P"5'"$*#+"$% &&"$%4= 0(#0'4= 45'*"(#= ,8+)($&4 '&*

     

    H"%, D'$4"&8 P.#84&,8#'$' 6HDPE7 P"5'  

    1 113 mm* 12@mm 67 <

    2 1G3 mm * 1F3 mm 67 <

    > 22@ mm 67 <

    /0-123345 06R*7R*5

  • 8/9/2019 Vol 1 -Part D Section 4-Final

    10/10

    SARAWAK ENERGY BERHADASTANA-SEJINGKAT 132 kV UNDERGROUND CABLE PROJECTVOLUME 1: PART C: SUMMARY OF PRICE – SECTION 3: CIVIL WORKS SCHEDULE OF RATES

     

    /0-123345 06R*7R*13