37
EMC ® VMAX ® Best Practices Guide for AC Power Connections For: VMAX3 Family and VMAX All Flash REVISION 06

VMAX AC Best Practices

Embed Size (px)

Citation preview

Page 1: VMAX AC Best Practices

EMC® VMAX®

Best Practices Guidefor AC Power Connections

For: VMAX3™ Family and VMAX All FlashREVISION 06

Page 2: VMAX AC Best Practices

Copyright © 2014-2017 Dell Inc. or its subsidiaries. All rights reserved.

Published May 2017

Dell believes the information in this publication is accurate as of its publication date. The information is subject to change without notice.

THE INFORMATION IN THIS PUBLICATION IS PROVIDED “AS-IS.“ DELL MAKES NO REPRESENTATIONS OR WARRANTIES OF ANY KIND

WITH RESPECT TO THE INFORMATION IN THIS PUBLICATION, AND SPECIFICALLY DISCLAIMS IMPLIED WARRANTIES OF

MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. USE, COPYING, AND DISTRIBUTION OF ANY DELL SOFTWARE DESCRIBED

IN THIS PUBLICATION REQUIRES AN APPLICABLE SOFTWARE LICENSE.

Dell, EMC, and other trademarks are trademarks of Dell Inc. or its subsidiaries. Other trademarks may be the property of their respective owners.

Published in the USA.

EMC CorporationHopkinton, Massachusetts 01748-91031-508-435-1000 In North America 1-866-464-7381www.EMC.com

2 Best Practices Guide for AC Power Connections For: VMAX3 Family and VMAX All Flash

Page 3: VMAX AC Best Practices

5

7

Preface 9Revision history...........................................................................................12

Best Practices Guide for AC Power Connections 13Best practices overview for AC power connections.................................... 14Selecting the proper AC power connection procedure................................ 15Procedure A: Working with the customer's electrician onsite..................... 16

Procedure A, Task 1: Customer's electrician...................................17Procedure A, Task 2: EMC Customer Engineer ............................. 18Procedure A, Task 2: EMC Customer Engineer (VMAX 250F).......22Procedure A, Task 3: Customer's electrician................................. 26

Procedure B: Verify and connect................................................................ 27Procedure C: Obtain customer verification.................................................28PDU labels.................................................................................................. 28

PDU label part numbers................................................................. 28Applying PDU labels, VMAX 250F .................................................30Applying PDU labels, VMAX3 Family, VMAX 450F, VMAX 850F,VMAX 950F....................................................................................31

Ground the cabinet.....................................................................................33AC power specifications............................................................................. 34

Figures

Tables

Chapter 1

CONTENTS

Best Practices Guide for AC Power Connections For: VMAX3 Family and VMAX All Flash 3

Page 4: VMAX AC Best Practices

CONTENTS

4 Best Practices Guide for AC Power Connections For: VMAX3 Family and VMAX All Flash

Page 5: VMAX AC Best Practices

Two independent customer-supplied PDUs.................................................................14Circuit breakers ON — AC power within specification................................................ 17Circuit breakers OFF — No AC power........................................................................ 17System bay power tee breakers (OFF = pulled out).................................................... 18Connecting AC power, single-phase............................................................................19Connecting AC power, three-phase............................................................................20Power zone connections............................................................................................. 21PDP power switches for Zone A and B ...................................................................... 22Connecting AC power ................................................................................................23Power zone connections.............................................................................................24Customer input power cabling for VMAX 250F...........................................................25Applying the PDU labels .............................................................................................30PDU label , single-phase and three-phase................................................................... 31Label placement— Customer PDU Information...........................................................31Attaching the PDU connection tag, three-phase........................................................ 32Attaching the PDU connection tag, single-phase........................................................32

12345678910111213141516

FIGURES

Best Practices Guide for AC Power Connections For: VMAX3 Family and VMAX All Flash 5

Page 6: VMAX AC Best Practices

FIGURES

6 Best Practices Guide for AC Power Connections For: VMAX3 Family and VMAX All Flash

Page 7: VMAX AC Best Practices

Typographical conventions used in this content..........................................................10Procedure options for AC power connection ..............................................................15VMAX 250F label part numbers.................................................................................. 28VMAX 450F, VMAX 850F, VMAX 950F label part numbers, EMC racks ....................28VMAX 450F, VMAX 850F, VMAX 950F label part numbers, 3rd party racks.............. 29VMAX3 Family label part numbers, EMC racks .......................................................... 29VMAX3 Family label part numbers, 3rd party racks.................................................... 29Input power requirements - single-phase, North American, International, Australian................................................................................................................................... 34Input power requirements - three-phase, North American, International, Australian...................................................................................................................................35

12345678

9

TABLES

Best Practices Guide for AC Power Connections For: VMAX3 Family and VMAX All Flash 7

Page 8: VMAX AC Best Practices

TABLES

8 Best Practices Guide for AC Power Connections For: VMAX3 Family and VMAX All Flash

Page 9: VMAX AC Best Practices

Preface

Contact your EMC technical support professional if a product does not functionproperly or does not function as described in this document.

Note

This document was accurate at publication time. Go to EMC Online Support (https://support.emc.com) to ensure that you are using the latest version of this document.

PurposeThis document describes best practices for connecting AC power to the followingVMAX arrays:

l VMAX3 Family: VMAX 100K, VMAX 200K, VMAX 400K

l VMAX All Flash: VMAX 250F, VMAX 450F, VMAX 850F, VMAX 950F

AudienceThis document is intended for customers who are installing a VMAX3 Family orVMAX All Flash array and must assure that fault tolerant AC power is supplied to thearrays from independent, customer-supplied, power distribution units (PDUs).

Related documentationThe following EMC publications provide additional information:

EMC VMAX3 Family Product Guide for VMAX 100K, VMAX 200K, VMAX 400K withHYPERMAX OS

Provides product information regarding the purchase of a VMAX3 Family 100K,200K, 400K.

EMC VMAX All Flash Product Guide for VMAX 250F, 450F, 850F, 950F with HYPERMAXOS

Provides product information regarding the purchase of a VMAX 250F, 450F,850F, 950F with HYPERMAX OS.

EMC VMAX3 Family Site Planning Guide for VMAX 100K, VMAX 200K, VMAX 400K withHYPERMAX OS

Provides planning information regarding the purchase and installation of a VMAX3Family 100K, 200K, 400K.

EMC VMAX All Flash Site Planning Guide for VMAX 250F, 450F, 850F, 950F withHYPERMAX OS

Provides planning information regarding the purchase and installation of a VMAX250F, 450F, 850F, 950F with HYPERMAX OS.

EMC VMAX Securing Kit Installation Guide

Describes how to install the securing kit on a VMAX3 Family array or VMAX AllFlash array.

EMC VMAX Power-down/Power-up Procedure

Describes how to power-down and power-up a VMAX3 Family array or VMAX AllFlash array.

Preface 9

Page 10: VMAX AC Best Practices

Special notice conventions used in this documentEMC uses the following conventions for special notices:

DANGER

Indicates a hazardous situation which, if not avoided, will result in death orserious injury.

WARNING

Indicates a hazardous situation which, if not avoided, could result in death orserious injury.

CAUTION

Indicates a hazardous situation which, if not avoided, could result in minor ormoderate injury.

NOTICE

Addresses practices not related to personal injury.

Note

Presents information that is important, but not hazard-related.

Typographical conventionsEMC uses the following type style conventions in this document:

Table 1 Typographical conventions used in this content

Bold Used for names of interface elements, such as names of windows,dialog boxes, buttons, fields, tab names, key names, and menu paths(what the user specifically selects or clicks)

Italic Used for full titles of publications referenced in text

Monospace Used for:

l System code

l System output, such as an error message or script

l Pathnames, filenames, prompts, and syntax

l Commands and options

Monospace italic Used for variables

Monospace bold Used for user input

[ ] Square brackets enclose optional values

| Vertical bar indicates alternate selections - the bar means “or”

{ } Braces enclose content that the user must specify, such as x or y orz

... Ellipses indicate nonessential information omitted from the example

Preface

10 Best Practices Guide for AC Power Connections For: VMAX3 Family and VMAX All Flash

Page 11: VMAX AC Best Practices

Where to get helpEMC support, product, and licensing information can be obtained as follows:

Product information

EMC technical support, documentation, release notes, software updates, orinformation about EMC products can be obtained on the https://support.emc.com site (registration required).

Technical support

To open a service request through the https://support.emc.com site, you musthave a valid support agreement. Contact your EMC sales representative fordetails about obtaining a valid support agreement or to answer any questionsabout your account.

eLicensing support

To activate your entitlements and obtain your VMAX license files, visit the ServiceCenter on https://support.EMC.com, as directed on your License AuthorizationCode (LAC) letter emailed to you.

l For help with missing or incorrect entitlements after activation (that is,expected functionality remains unavailable because it is not licensed), contactyour EMC Account Representative or Authorized Reseller.

l For help with any errors applying license files through Solutions Enabler,contact the EMC Customer Support Center.

l If you are missing a LAC letter, or require further instructions on activatingyour licenses through the Online Support site, contact EMC's worldwideLicensing team at [email protected] or call:

n North America, Latin America, APJK, Australia, New Zealand: SVC4EMC(800-782-4362) and follow the voice prompts.

n EMEA: +353 (0) 21 4879862 and follow the voice prompts.

Your commentsYour suggestions help us improve the accuracy, organization, and overall quality of thedocumentation. Send your comments and feedback to: [email protected]

Preface

11

Page 12: VMAX AC Best Practices

Revision historyThe following table presents the revision history of this document:

Revision Description and/orChange

Date

06 l Updated for VMAX950F.

l Added instructionson how to ground thecabinet.

May, 2017

05 Formatting edits forreadability.

September, 2016

04 Updated for VMAX 250F. August, 2016

03 Updated name and docreferences. Minor editsfor readability. Modifiedfront matter.

February, 2016

02 Format change. Nochange in content.

August, 2015

01 Initial release. September, 2014

Preface

12 Best Practices Guide for AC Power Connections For: VMAX3 Family and VMAX All Flash

Page 13: VMAX AC Best Practices

CHAPTER 1

Best Practices Guide for AC PowerConnections

Topics include:

l Best practices overview for AC power connections............................................ 14l Selecting the proper AC power connection procedure........................................15l Procedure A: Working with the customer's electrician onsite............................. 16l Procedure B: Verify and connect........................................................................27l Procedure C: Obtain customer verification........................................................ 28l PDU labels..........................................................................................................28l Ground the cabinet............................................................................................ 33l AC power specifications.....................................................................................34

Best Practices Guide for AC Power Connections 13

Page 14: VMAX AC Best Practices

Best practices overview for AC power connectionsTo assure fault tolerant power, external AC power must be supplied from independent,customer-supplied, power distribution units (PDUs) as shown in Figure 1 on page 14.

NOTICE

For systems operating from three phase AC power, two independent and isolated ACpower sources are recommended for the two individual power zones in each rack ofthe system. This provides for the highest level of redundancy and system availability.If independent AC power is not available, there is a higher risk of data unavailabilityshould a power failure occur, including individual phase loss occurring in both powerzones.

NOTICE

Before connecting external AC power to EMC bays, verify that the bays have beenplaced in their final position as explained in the installation guide.

Figure 1 Two independent customer-supplied PDUs

Customer’sPDU 1

Customer’sPDU 2

Circuit breakerson (|)

Circuit breakerson (|)

Circuit breakers - Numbers

27

28

29

30

Circuit breakers - Numbers

...

8

9

10

11

...

Power feed 1 Power feed 2

Best Practices Guide for AC Power Connections

14 Best Practices Guide for AC Power Connections For: VMAX3 Family and VMAX All Flash

Page 15: VMAX AC Best Practices

Selecting the proper AC power connection procedureThe EMC Customer Engineer must select the proper AC power connection procedure

There are three possible scenarios at the installation site regarding the connection ofcustomer AC power to the EMC array. The EMC Customer Engineer (CE) must selectthe proper AC power connection procedure for the scenario.

1. Refer to table below which summarizes the three possible scenarios at theinstallation site when you are about to connect external AC power to the EMCarray.

2. Select the procedure that applies to your situation and follow the instructions forthat procedure.

Table 2 Procedure options for AC power connection

If the scenario is... then use this procedure:

The customer’s electrician is available at the installation site. Aa, See: Procedure A: Working with the customer's electricianonsite on page 16

Access to customer-supplied, labeled, power cables (beneathraised floor or overhead).

(And the customer’s electrician is NOT available at theinstallation site.)

B, See: Procedure B: Verify and connect on page 27

Customer-supplied PDU source cables are already pluggedinto the EMC PDU (or VMAX 250F PDP) and you have noaccess to the customer-supplied, labeled, power cables(beneath raised floor or overhead).(And the customer’s electrician is NOT available at theinstallation site.)

C, See: Procedure C: Obtain customer verification on page28

a. Procedure A assures fault tolerant power in the EMC array.

Best Practices Guide for AC Power Connections

Selecting the proper AC power connection procedure 15

Page 16: VMAX AC Best Practices

Procedure A: Working with the customer's electrician onsiteUse this procedure if the customer’s electrician is available at the installation site.

This procedure requires three basic tasks that alternate between the customer'selectrician, the EMC CE and back to the customer's electrician.

l Task 1: Customer's electrician

l Task 2: EMC Customer Engineer (CE)

l Task 3: Customer's electrician

Best Practices Guide for AC Power Connections

16 Best Practices Guide for AC Power Connections For: VMAX3 Family and VMAX All Flash

Page 17: VMAX AC Best Practices

Procedure A, Task 1: Customer's electrician

NOTICE

This task is performed by the customer's electrician.

Procedure

1. Verify that the customer-supplied AC source voltage output on each customer-supplied PDU is within the AC power specification shown in AC powerspecifications on page 34. Measure the voltage output of each power cable asshown in Figure 2 on page 17.

2. Turn OFF all the relevant circuit breakers in customer-supplied PDU 1 andcustomer-supplied PDU 2.

3. Verify that the customer-supplied power cables connected to PDU 1 and PDU 2have no power as shown in Figure 3 on page 17.

Figure 2 Circuit breakers ON — AC power within specification

Customer’sPDU 1

Customer’sPDU 2

Circuit breakerson (|)

Circuit breakerson (|)

Circuit breakers - Numbers

27

28

29

30

Circuit breakers - Numbers

...

8

9

10

11

...

Labels on customer power lines

Power feed 1 Power feed 2

PDU 1CB 28

PDU 2

CB 9

Voltmeter

TYPE PM89 CLASS 25 01

0

100 240300V

Voltmeter

TYPE PM89 CLASS 25 01

0

100 240300V

Figure 3 Circuit breakers OFF — No AC power

Customer’sPDU 1

Customer’sPDU 2

Circuit breakeroff (0)

Circuit breakeroff (0)Circuit breakers - Numbers

27

28

29

30

Circuit breakers - Numbers

...

8

9

10

11

...

PDU 2

CB 9

PDU 1CB 28

Labels on customer power lines

Voltmeter

TYPE PM89 CLASS 25 01

0

100 240300V

Voltmeter

TYPE PM89 CLASS 25 01

0

100 240300V

Best Practices Guide for AC Power Connections

Procedure A, Task 1: Customer's electrician 17

Page 18: VMAX AC Best Practices

Procedure A, Task 2: EMC Customer EngineerBefore you begin

Before connecting power to the system, make sure that the power for both zone Aand zone B are turned OFF. This task is performed by the EMC Customer Engineer.

Figure 4 System bay power tee breakers (OFF = pulled out)

2

1

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

PDU PDU

System Bay (rear view)

Zo

ne

B

Zo

ne

A

12

34

56

12

34

56

Power zone B

Left side

Power zone A

Right side1

23

45

6

12

34

56

Zone A

Right side

Zone B

Left side

Power zone B

Left side

Power zone A

Right side

(With

re

ar

do

or

rem

ove

d)

(With

re

ar

do

or

)

ON OFF

12

34

56

12

34

56

Procedure

1. Confirm that the customer-supplied power cables are labeled and that eachlabel contains the relevant customer-supplied PDU and circuit breaker numbers.If power cables are not equipped with labels, alert the customer.

2. Compare the numbers on the customer-supplied power cables for each EMCbay to verify that power zone A and power zone B are powered by a differentcustomer-supplied PDU.

3. Do one of the following to connect power zone A and power zone B in each bay.If necessary, use the 15ft extension cords provided by EMC.

l For single-phase power: Connect customer-supplied PDU power cables tothe EMC bay by connecting to the bay's AC input cables for power zone Aand power zone B as shown below.

Best Practices Guide for AC Power Connections

18 Best Practices Guide for AC Power Connections For: VMAX3 Family and VMAX All Flash

Page 19: VMAX AC Best Practices

Figure 5 Connecting AC power, single-phase

Customer’s PDU 1

Zone B

AC input

cable B

15 ft. extension

cord options

Mating connector or

customer-supplied cable

Customer’s PDU 2

Zone A

AC input

cable A

15 ft. extension

cord options

Mating connector or

customer-supplied cable

EMC-supplied power cable

and connector from the PDUCable connectors are shown

as they exit the bottom rear

of the bay.

Rear viewSystem bay

Zone B PDU

(Left)Zone A PDU

(Right)

EMC-supplied power cable

and connector from the PDU

P1 P2 P3 P1 P2 P3P2 and P3 used

depending on

configuration

l For three-phase power: Connect customer-supplied PDU power cables tothe EMC bay by connecting to the bay's AC input cables for power zone Aand power zone B as shown below.

Best Practices Guide for AC Power Connections

Procedure A, Task 2: EMC Customer Engineer 19

Page 20: VMAX AC Best Practices

Figure 6 Connecting AC power, three-phase

Customer’s PDU 1

Zone B

AC input

cable B

15 ft. extension

cord options

Mating connector or

customer-supplied cable

Customer’s PDU 2

Zone A

AC input

cable A

15 ft. extension

cord options

Mating connector or

customer-supplied cable

EMC-supplied power cable

and connector from the PDU

Rear viewSystem bay

Zone B PDU

(Left)

Zone A PDU

(Right)

EMC-supplied power cable

and connector from the PDU

Zone B PDU

(Left)Zone A PDU

(Right)

Cable connectors are shown

as they exit the bottom rear

of the bay.

NOTICE

Do not connect EMC bay power zone A and power zone B to the samecustomer-supplied PDU. The customer will lose power redundancy and risk DataUnavailability (DU) if the PDU fails or is turned off during a maintenanceprocedure.

Best Practices Guide for AC Power Connections

20 Best Practices Guide for AC Power Connections For: VMAX3 Family and VMAX All Flash

Page 21: VMAX AC Best Practices

Figure 7 Power zone connections

:tnatropmIlaunam noitcurtsni ot refeR

Zone B Zone A

(Rear View)SYSTEM

Customer’s Power

Source 1

Circuit

Breakers

(CBs)

Zone B Zone A

(Rear View)SYSTEM

Customer’s Power

Source 1

Circuit

Breakers

(CBs)

Customer’s Power

Source 2

Circuit

Breakers

(CBs)

:tnatropmIlaunam noitcurtsni ot refeR

Zone B Zone A

(Rear View)SYSTEM

Customer’s Power

Source 1

Circuit

Breakers

(CBs)

Zone B Zone A

(Rear View)SYSTEM

Customer’s Power

Source 1

Circuit

Breakers

(CBs)

Customer’s Power

Source 2

Circuit

Breakers

(CBs)

046-001-749_01

Best Practices Guide for AC Power Connections

Procedure A, Task 2: EMC Customer Engineer 21

Page 22: VMAX AC Best Practices

Procedure A, Task 2: EMC Customer Engineer (VMAX 250F)Before you begin

Before connecting power to the system, make sure that the power for both zone Aand zone B are turned OFF. This task is performed by the EMC Customer Engineer.

Figure 8 PDP power switches for Zone A and B

Rear viewExample shown:

2 V-Bricks

PDP

10

10

A

B

10

10

A

B

ON

I

OFF

O

ON

I

OFF

O

ON

I

OFF

O

ON

I

OFF

O

ON

I

OFF

O

ON

I

OFF

O

PDU

40U rack

PDP

PDU

Power zone A(right, gray)

Power zone B(left, black)

(Power zone B)

(Power zone B) (Power zone A)

(Power zone A)

ON|

OFF

Zone A

Zone A power switch

ON|

OFF

Zone B

Zone B power switch

Power zone B(left, black)

40U rack

Power zone A(right, gray)

Example shown:

2 V-Bricks

PDU(Power zone A)

PDU(Power zone B)

Procedure

1. Confirm that the customer-supplied power cables are labeled and that eachlabel contains the relevant customer-supplied PDU and circuit breaker numbers.If power cables are not equipped with labels, alert the customer.

2. Compare the numbers on the customer-supplied power cables for each EMCbay to verify that power zone A and power zone B are powered by a differentcustomer-supplied PDU.

3. Do the following to connect power zone A and power zone B in each bay. Youmust use the 15ft extension cords provided by EMC. To ensure serviceability,make sure there is 2ft (61cm) of cable slack directly under the bay floor-egress.See VMAX 250F customer AC power feed cabling on page 25 for moredetails.

l For both single-phase and three-phase, connect customer-supplied PDUpower cables to the EMC bay by connecting to the bay's AC input cables forpower zone A and power zone B as shown below:

Best Practices Guide for AC Power Connections

22 Best Practices Guide for AC Power Connections For: VMAX3 Family and VMAX All Flash

Page 23: VMAX AC Best Practices

Figure 9 Connecting AC power

Customer’s PDU 1

Zone B

AC input

cable B

15 ft. extension

cord mandatory with 2ft slack

Mating connector or

customer-supplied cable

Customer’s PDU 2

Zone A

AC input

cable A

15 ft. extension

cord mandatory with 2ft slack

Mating connector or

customer-supplied cable

EMC-supplied power cable

and connector from the PDP

Cable connectors are shown

as they exist near the bottom

of the bay.

Rear view

VMAX 250F bay

EMC-supplied power cable

and connector from the PDP

PDP PDP(Power zone B, left) (Power zone A, right)

NOTICE

Do not connect EMC bay power zone A and power zone B to the samecustomer-supplied PDU. The customer will lose power redundancy and risk DataUnavailability (DU) if the PDU fails or is turned off during a maintenanceprocedure.

Best Practices Guide for AC Power Connections

Procedure A, Task 2: EMC Customer Engineer (VMAX 250F) 23

Page 24: VMAX AC Best Practices

Figure 10 Power zone connections

Best Practices Guide for AC Power Connections

24 Best Practices Guide for AC Power Connections For: VMAX3 Family and VMAX All Flash

Page 25: VMAX AC Best Practices

VMAX 250F customer AC power feed cabling

When connecting customer input power to a VMAX 250F, the EMC-supplied 15ft (4.57m) extension cords must be used andapproximately 24in (61cm) of slack must be left directly under the bay floor egress.

Note

For power zone-A, use the extension cord with gray sleeves at the ends.

Figure 11 Customer input power cabling for VMAX 250F

Rear viewExample shown:

2 V-Bricks

PDPs

Customer’sPDU 2

Power feed 2

Customer’sPDU 1

Circuit breakers - Numbers

27

28

29

30

...

Circuit breakers - Numbers

27

28

29

30

...

Power feed 1

10

10

A

B

10

10

A

B

ON

I

OFF

O

ON

I

OFF

O

ON

I

OFF

O

ON

I

OFF

O

ON

I

OFF

O

ON

I

OFF

O

EMC 15ft (4.57m) Extension Cordwith 24in (61cm) slack under floor egress

Customer power feed

Customer power feed

PDUs

40U rack

PDP

PDU

Power zone A(right, gray)

Power zone B(left, black)

(Power zone B)

(Power zone B) (Power zone A)

(Power zone A)

Data center sub-floor

Data center floor

Best Practices Guide for AC Power Connections

Procedure A, Task 2: EMC Customer Engineer (VMAX 250F) 25

Page 26: VMAX AC Best Practices

Procedure A, Task 3: Customer's electrician

NOTICE

This task is performed by the customer's electrician.

Procedure

1. Working with the EMC Customer Engineer, turn ON all the relevant circuitbreakers in customer-supplied PDU 2.

Verify that only power supply and/or SPS LEDs in power zone A are ON orflashing green in every bay in the array.

Note

If all power supply and/or SPS LEDs in a bay are ON or flashing green, the bayis incorrectly wired because the AC power to both EMC power zones is suppliedby a single PDU, that is, customer-supplied PDU 2. Wiring must be correctedbefore moving on to the next step.

2. Turn OFF the relevant circuit breakers in customer-supplied PDU 2.

Verify that the power supply and/or SPS LEDs that turned green in theprevious step changed from green to OFF and/or flashing yellow. The yellowSPS lights flash for a maximum of 5 minutes.

Note

Note that power supplies connected to an SPS continue to have green lightsON while the SPS yellow light continues to flash indicating the SPS is providingon-battery power.

3. Repeat step 1 and step 2 for power zone B and customer-supplied PDU 1.

4. Turn ON all the relevant circuit breakers in customer-supplied PDU 1 andcustomer-supplied PDU 2.

5. Label the PDUs as described in PDU labels on page 28.

Best Practices Guide for AC Power Connections

26 Best Practices Guide for AC Power Connections For: VMAX3 Family and VMAX All Flash

Page 27: VMAX AC Best Practices

Procedure B: Verify and connectPerform this procedure if the two conditions listed below are true:

l Access to customer-supplied, labeled, power cables (beneath raised floor oroverhead).

l The customer's electrician is not available at the installation site.

This procedure requires the EMC Customer Engineer to verify that the customer'selectrician has complied with power specifications. Once verified, the EMC CustomerEngineer makes the required power connections overhead or under the floor.

Procedure

1. Have the customer verify that their electrician has complied with powerspecifications for voltage levels and redundancy. If the customer cannot verifythis, provide them with a copy of Procedure A. Inform the customer that theirarray may prematurely shut down in the event of a site power issue.

2. Access the labeled, power cables (beneath raised floor or overhead) to verifythat the customer-supplied power cables are properly labeled as shown in Figure 3 on page 17 and described in Procedure A, Task 2.

3. Compare the numbers on the customer-supplied power cables for each EMCbay to verify that power zone A and power zone B are powered by a differentcustomer-supplied PDU.

4. If power extension cables are required, connect them to power zone A andpower zone B in each bay.

5. Connect the customer-supplied power cables to EMC power zones as describedin Procedure A, Task 2.

6. Record the customer-supplied PDU information as described in Procedure A,Task 2.

7. Label the PDUs as described in PDU labels on page 28.

Best Practices Guide for AC Power Connections

Procedure B: Verify and connect 27

Page 28: VMAX AC Best Practices

Procedure C: Obtain customer verificationPerform this procedure if the three conditions listed below are true:

l The customer-supplied PDU source cables are already plugged into the EMC PDU.

l You have no access to the area below the raised floor.

l The customer's electrician is not available at the installation site.

Procedure

1. Have the customer verify that their electrician has complied with powerspecifications for voltage levels and redundancy. If the customer cannot verifythis, provide them with a copy of Procedure A. Inform the customer that theirarray may prematurely shut down in the event of a site power issue.

2. Record the customer-supplied PDU information (AC source voltage) asdescribed in step 1 of Procedure A, Task 1: Customer's electrician on page 17and label the PDUs as described in PDU labels on page 28.

PDU labelsBefore applying labels to the PDUs, one of the following procedures must have beencompleted:

l Procedure A: Working with the customer's electrician onsite on page 16

l Procedure B: Verify and connect on page 27

l Procedure C: Obtain customer verification on page 28

If necessary, see Selecting the proper AC power connection procedure on page 15 toselect the correct procedure.

PDU label part numbers

VMAX 250F

Table 3 VMAX 250F label part numbers

PN Description Location

PN 046-003-593 LABEL: CUSTOMER PDU INFORMATION OPEN ME FIRST KIT, PN 106-887-093

VMAX 450F, VMAX 850F, VMAX 950F

Table 4 VMAX 450F, VMAX 850F, VMAX 950F label part numbers, EMC racks

For... Use PN Description Location

All bays PN 046-001-750 LABEL: CUSTOMER 1P 3P PDU INFOWRITEABLE

OPEN ME FIRST, KIT, PN 106-887-026

Best Practices Guide for AC Power Connections

28 Best Practices Guide for AC Power Connections For: VMAX3 Family and VMAX All Flash

Page 29: VMAX AC Best Practices

Table 5 VMAX 450F, VMAX 850F, VMAX 950F label part numbers, 3rd party racks

For... Use PN Description Location

System bay1

PN 046-001-750 LABEL: CUSTOMER 1P 3P PDU INFOWRITEABLE

VMAX AFA EVEREST SB-1 KIT 3RD PARTY,106-887-171

PN 046-001-749 PDU Connection Tag

Systembays 2-8

PN 046-001-750 LABEL: CUSTOMER 1P 3P PDU INFOWRITEABLE

VMAX AFA EVEREST SB-1 KIT 3RD PARTY,106-887-175

PN 046-001-749 PDU Connection Tag

VMAX3 Family

Table 6 VMAX3 Family label part numbers, EMC racks

For... Use PN Description Location

All bays PN 046-001-750 LABEL: CUSTOMER 1P 3P PDU INFOWRITEABLE

OPEN ME FIRST, KIT, PN 106-887-026

Table 7 VMAX3 Family label part numbers, 3rd party racks

For... Use PN Description Location

System bay1

PN 046-001-750 LABEL: CUSTOMER 1P 3P PDU INFOWRITEABLE

Sys Bay 1 Kit, 106-887-149

PN 046-001-749 PDU Connection Tag

Systembays 2-8

PN 046-001-750 LABEL: CUSTOMER 1P 3P PDU INFOWRITEABLE

Sys Bay 2-8 Kit, 106-887-150

PN 046-001-749 PDU Connection Tag

Best Practices Guide for AC Power Connections

PDU label part numbers 29

Page 30: VMAX AC Best Practices

Applying PDU labels, VMAX 250FProcedure

1. Locate and complete the PDU label.

2. Place the label on the bottom, inner surface of the PDU enclosure for side A andB.

Figure 12 Applying the PDU labels

Rear viewExample shown:

2 V-Bricks

PDP

10

10

A

B

10

10

A

B

ONI

OFFO

ONI

OFFO

ONI

OFFO

ONI

OFFO

ONI

OFFO

ONI

OFFO

PDU

40U rack

PDP

PDU

Power zone A(right, gray)

Power zone B(left, black)

(Power zone B)

(Power zone B) (Power zone A)

(Power zone A)

046-003-593_A02

Power Zone B Power Zone A

Customer PDU

Information

PDU

Panel

CB’s

PDU

Panel

CB’s

(Add label to bottom,inside surface of PDU)

(Add label to bottom,inside surface of PDU)

PDU label(not to scale)

Best Practices Guide for AC Power Connections

30 Best Practices Guide for AC Power Connections For: VMAX3 Family and VMAX All Flash

Page 31: VMAX AC Best Practices

Applying PDU labels, VMAX3 Family, VMAX 450F, VMAX 850F, VMAX 950FProcedure

1. For each bay, locate and complete the PDU label.

Note

For three-phase power, enter data only in the P1 column.

2. Place the label on the top surface of the PDU enclosure for side A and B.

Figure 13 PDU label , single-phase and three-phase

Customer PDU Information

Power Zone B

PDU

Panel

CB(s)

P1 P2 P3

Power Zone A

PDU

Panel

CB(s)

P1 P2 P3

Figure 14 Label placement— Customer PDU Information

Rear View

Zone A PDU labelZone B PDU label

3. For 3rd party racks, do one of the following:

l For three-phase power: Using plastic ties, attach the PDU connection tag tothe main AC power cable connected to zone A and B. Place the label close tothe plug but on the side of the rack where it will not interfere with any rails.

Best Practices Guide for AC Power Connections

Applying PDU labels, VMAX3 Family, VMAX 450F, VMAX 850F, VMAX 950F 31

Page 32: VMAX AC Best Practices

Figure 15 Attaching the PDU connection tag, three-phase

PN 046-001-749

Zone B PDU connection tag

Zone A PDU connection tag

Plastic tie Plastic tieRear View

l For single-phase power: Using plastic ties, attach the PDU connection tag tothe P1 AC power cable connected to zone A and B. Place the label close tothe plug but on the side of the rack where it will not interfere with any rails.Figure 16 Attaching the PDU connection tag, single-phase

PN 046-001-749

Zone B PDU connection tag

Zone A PDU connection tag

Plastic tie Plastic tieRear View

P1 P1P2 P2

P3 P3

Best Practices Guide for AC Power Connections

32 Best Practices Guide for AC Power Connections For: VMAX3 Family and VMAX All Flash

Page 33: VMAX AC Best Practices

Ground the cabinetEquipment correctly installed within the cabinet is grounded through the AC powercables and connectors. In general, supplemental grounding is not required.

If your site requires external grounding (for example, to a common grounding networkbeneath the site floor), you can use the grounding lugs provided on each of thecabinet’s bottom supports.

CL4827

046-003-3

50

Best Practices Guide for AC Power Connections

Ground the cabinet 33

Page 34: VMAX AC Best Practices

AC power specifications

Table 8 Input power requirements - single-phase, North American, International, Australian

Specification North American 3-wireconnection(2 L & 1 G)a

International andAustralian 3-wireconnection(1 L & 1 N & 1 G)a

Input nominal voltage 200–240 VAC ± 10% L- Lnom

220–240 VAC ± 10% L- Nnom

Frequency 50–60 Hz 50–60 Hz

Circuit breakers 30 A 32 A

Power zones Two Two

Minimum power requirementsat customer site (VMAX3)

l Three 30 A, single-phase drops per zone.

l Two power zones require 6 drops, each drop rated for 30A.

l PDU A and PDU B require three separate single-phase 30A drops for each PDU.

Minimum power requirementsat customer site(VMAX 250F)

l One 30 A, single phase drop per zone.

l Two power zones require 2 drops, each drop rated for 30A.

l Two systems in an EMC rack require 4 drops, each droprated for 30 A.

Minimum power requirementsat customer site (VMAX450F, VMAX 850F, VMAX950F)

l Three 30 A, single-phase drops per zone.

l Two power zones require 6 drops, each drop rated for 30A.

l PDU A and PDU B require three separate single-phase 30A drops for each.

a. L = line or phase, N = neutral, G = ground

Best Practices Guide for AC Power Connections

34 Best Practices Guide for AC Power Connections For: VMAX3 Family and VMAX All Flash

Page 35: VMAX AC Best Practices

Table 9 Input power requirements - three-phase, North American, International, Australian

Specification North American 4-wireconnection(3 L & 1 G)a

International 5-wireconnection(3 L & 1 N & 1 G)a

Input voltageb 200–240 VAC ± 10% L- Lnom

220–240 VAC ± 10% L- Nnom

Frequency 50–60 Hz 50–60 Hz

Circuit breakers 50 A 32 A

Power zones Two Two

Minimum power requirementsat customer site

l Two 50 A, three-phasedrops per bay.

l PDU A and PDU B requireone separate three-phaseDelta 50 A drops foreach.

Two 32 A, three-phase dropsper bay.

a. L = line or phase, N = neutral, G = groundb. An imbalance of AC input currents may exist on the three-phase power source feeding the

array, depending on the configuration. The customer's electrician must be alerted to thispossible condition to balance the phase-by-phase loading conditions within the customer'sdata center.

Best Practices Guide for AC Power Connections

AC power specifications 35

Page 36: VMAX AC Best Practices

Best Practices Guide for AC Power Connections

36 Best Practices Guide for AC Power Connections For: VMAX3 Family and VMAX All Flash

Page 37: VMAX AC Best Practices

Copyright © 2015 EMC Corporation. All rights reserved. Published in USA. EMC believes the information in this publication is accurate as of its publication date. The information is subject to change without notice. The information in this publication is provided as is. EMC Corporation makes no representations or warranties of any kind with respect to the information in this publication, and specifically disclaims implied warranties of merchantability or fitness for a particular purpose. Use, copying, and distribution of any EMC software described in this publication requires an applicable software license. EMC², EMC, and the EMC logo are registered trademarks or trademarks of EMC Corporation in the United States and other countries. All other trademarks used herein are the property of their respective owners. For the most up-to-date regulatory document for your product line, go to EMC Online Support (https://support.emc.com).