Ministry of Railways
RFD 2011-12 draft:
Section 1:
Ministry’s Vision, mission, objectives and targets.
Vision Statement
Indian Railways shall provide safe, efficient, affordable, customer-
focussed and environmentally sustainable integrated transportation
solutions. It shall be a modern vehicle of inclusive growth, connecting
regions, communities, ports and centres of industry, commerce, tourism
and pilgrimage across the country.
2
The mission areas identified for realizing the main objectives stated in the Vision
are the following:
1. To augment the capacity to handle freight services by constructing new lines,
laying double lines where necessary and through signaling improvements.
2. To take up necessary works to ease bottlenecks in the transportation network so
as to achieve higher speed and throughput.
3 To induct modern rolling stock to derive the benefit of upto date technology.
4. To monitor the system of grievance redressal so that the level of satisfaction
among rail users improves.
5. To monitor closely all aspects earnings and expenditure so that the organisation
functions in an efficient and cost effective manner.
6. To constantly upgrade the facilities extended to passengers and to minimize the
adverse environmental impact of the organisation’s activities .
7. To constantly strive to improve the working and living conditions of our
employees.
8. To continuously innovate and stay up to date in terms of technological
advancement and to achieve the best possible standards of safety in train
operations at all times.
3
Function:-
1. Government Railways- All matters, including those relating to Railway
revenues and expenditure, but excluding Railway Inspectorate and Railway
Audit.
2. Non-Government Railways – Matters in so far as provision for control by the
Ministry of Railways, Railway Board as provided in the Railways Act, 1989
(24 of 1989) or in the contracts between the Government and Railways, or in
any other statutory enactments, namely, regulations in respect of safety,
maximum and minimum rates and fares etc. excluding the item of work
allocated to the Department of Urban Development.
3. Parliament questions/matters regarding offences relating to pilferage of railway
property and offences relating to crime on Government Railways and non-
Government Railways.
4. Administration of pension rules applicable to Railway employees.
4
Section 2: Key objectives, success indicators and targets:
1 2 3 4 5 6 7 8 9 10 11
Obje
ctiv
e
Wei
ght
Act
ion
Su
cces
s
ind
icat
or
Unit
Wei
ght Target criteria Value.
Excellent
100%
Very
good
90%
Good
80%
Fair
70%
Poor
60%
Freight
Services- Growth and
Improvement
in quality
20%
Volumes
Originating
loading Million
Tonnes 5 1000 993 975 950 924
Net
transportation
Billion
NTKm 7 665 658 640 620 600
Speedy
delivery
Avg.speed of
Goods trains Kmph 2 26.8 26.4 26.0 25.6 25.2
Improved quality
and efficient
utilization
Complaints per
Billion NTKm Number
2
The ATF had suggested this but these statistics are not
being maintained and hence difficult to monitor. Also the
number of complaints is very small as compared to
Passenger segment. Hence omitted for the time being.
Productive
utilization of
available wagons
NTKms per
wagon-day
(BG 8-Wh) 9500 9400 9270 9140 9000
Market Share in
competitive
segments
Finished Steel % 2 47.0 46.75 46.25 45.75 45.25
Cement % 2 47.25 47.0 46.0 45.0 44.0
Passenger
Services- Growth and
Improvement
in quality
10%
Volumes
Non-suburban Billion PKms 3 1100 1085 1020 950 870
Suburban Billion PKms 2 152 150 147 144 140
Improved
quality
Punctuality1 Percent 2 74 72 70 68 66
Complaints per
billion P.kms. Number 3 21.0 21.5 22.0 22.5 23.0
Third Party
Evaluation Grade
The ATF had suggested this but this would be difficult to
measure on a pan India level, hence omitted for the time
being. It will be explored from next year
1 Modified Definition of Punctuality. Details in Sec.4
5
Investments-
Mobilisation
and asset
creation
17%
Capacity
augmentation and
Asset
creation
New lines Kms. 2 1100 1075 560 420 280
Doubling Kms. 3 1000 867 667 464 260
Flagship Projects
Achievement as
per list--
Numbers
5 6 5 4 3 2
Loco manufacture Equated
Numbers2 2 590 580 570 560 550
Wagon mfg. Equated Number3 2 19000 18000 16600 15300 14000
Coach mfg. Numbers 2 4000 3780 3690 3600 3500
Investment
Through PPP Value of Projects Rs. Crores 1 2000 1776 1600 1500 1400
Performance
- monitoring and
improvement
12%
Control working
expenditure and
boost
earnings
Operating ratio Percent 8 90 91.1 92 93 94
Progress in
Critical Projects
(>Rs 150 crores)
Number as per list Number 4 9 7 6 5 4
Productivity
- monitoring and
improvement
5%
Improvement in
productivity of
staff
Workshop
(Including PU)
Staff
Turnover per
employee- lakhs
of Rs.per
employee per
annum
2 11.00 10.64 10.37 10.10 9.90
All staff
Gross earnings
in lakhs of
Rs.per
employee per
annum
3 8.40 8.06 7.80 7.60 7.40
Amenities for
rail users
5%
Amenities
Improvement at
stations and on-
board
IT in passenger
reservations
e-tickets, i-
tickets sold
(in lakhs Nos.)
1 1025 1008 990 970 950
Facility for
differently- abled
Stations covered
2 560 550 545 540 530
On-board facilities
Number of
Trains under
OBHS
1 310 300 290 280 270
2 Based on Tractive Effort
3 Based on Pay-to-tare Ratio
6
Provision of
superior Toilets on
trains
Number of
toilets 1 510 500 250 200 150
Improvement
of
Environment
and Energy
Management
8%
Improvement in
fuel efficiency
SFC Diesel(goods) Ltrs /1000
GTKm 2 2.14 2.18 2.20 2.22 2.25
SEC Electrical
(goods)
KWH/ 1000
GTKm. 2 6.9 7.1 7.3 7.5 7.7
Shunting Ltrs
/1000GTKM 1 2.36 2.43 2.47 2.51 2.55
Afforestation Trees planted Numbers
(lakhs) 1 102 99 96 93 90
Non-conventional
Energy and
environment
improvement
initiatives
Number of
new initiatives Numbers 2 2+ 1 Pilot 2 1 Pilot
1
concept Nil
Safety : Enhancement
initiatives
8%
Initiatives to
reduce
accidents
On Board
Installations
including VCD
Number
(Avg.score as
per list
2 9 7 6 5 4
Fixed Installations
Number
(Avg.score as
per list
3 9 7 6 5 4
Elimination of LC
gates(level
crossing gates)
Completed in the
year Numbers 3 325 300 275 250 225
7
Mandatory success indicators :
1.Efficient
Functioning of
the RFD
System
Timely sub-
mission of Draft for
Approval
On-Time
Submission Date 2%
May 20,
2011
May 23,
2011
May 25,
2011
May 26,
2011
June 3,
2011
Timely submission of Results On-time submission Date 1% May 2, 2012 May 3,
2012
May 4,
2012
May 5,
2012
May 6,
2012
Finalize a Strategic Plan (after
meeting all intermediate
deadlines)
Finalize the Strategic
Plan for next 5 years
Date
2%
Dec.10,
2011
Dec.
15,
2011
Dec.
20, 2011
Dec.
24, 2011
Dec.
31,2011
2. Improving
Internal
Efficiency/
Responsiveness/
Service delivery
of Ministry/
Department
Develop RFDs for all
Responsibility Centres
(Subordinate Offices,
Attached Offices, Autonomous
Bodies
Percentage of
RCs covered % 2% 100 95 90 85 80
Implementa-tion of
Savottam
Create a Sevottam
Compliant System to
Implement, Monitor and
Review
Citizen’s/Client’s
Charter
Date
1%
Dec. 10,
2011
Dec.
15, 2011
Dec.
20,
2011
Dec.
24,
2011
Dec.
31, 2011
Create a Sevottam
Compliant system To
redsress and Monitor
public
Grievances
Date
1%
Dec. 10,
2011
Dec.
15, 2011
Dec.
20,
2011
Dec.
24,
2011
Dec.
31,
2011
3. Ensuring
Compliance
To the
Financial
Accountability
Framework
Timely sub-
mission of
ATN on
Audit Paras
of C&AG
Percentage of ATNS
submitted Within due
date
(4 months) from Date of
presentation of Report to
Parliament by CAG
during the Year
% 0.5% 100 90 80 70 60
Timely submission of ATRs to
the PAC Sectt on PAC Reports
Percentage of ATRs
submitted within due
date
(6 months) from date of
presentation of Report to
Parliament by PAC
during the year
% 0.5% 100 90 80 70 60
8
Early disposal of pending ATNs
on Audit Paras of C&AG
Report presented to Parliament
before 31.3.2011
Percentage of
outstanding ATNs
disposed off during the
year
% 0.5% 100 90 80 70 60
Early disposal of pending ATRs on
PAC report presented to Parliament
before 31.3.2011
Percentage of
outstanding ATRs
disposed off during the
year
%
0.5%
100
90
80
70
60
4. Administrative
Reforms Identify potential areas
of corruption related to
organization activities
and develop an action
plan to mitigate them
Develop an action plan
for e-office
Implementation in the
department /ministry
Finaliz
e an
action
plan to
mitigat
e
potenti
al areas
of
corrupti
on
Finaliz
e an
action
plan for
e-office
%
Date
2%
2%
Dec.10,
2011
Dec.10,
2011
Dec.15,
2011
Dec. 15,
2011
Dec.
20, 2011
Dec.
20,
2011
Dec.
24,
2011
Dec.
24,
2011
9
Lists of Flagship projects , Critical projects and Safety initiatives:
I. Flagship projects II. Critical projects III. Safety initiatives
Name of the
project
Target Name of the
project
Target On-board: 1. TPWS : >210=2 , 160-
209=1.
2. ACD/TCAS: 4-5 divns=2, 1-3
divns=1.
3. VCD: >6000 =2 , 4500-6000
=1.
4.FogSafe: >80 = 2 , 60-80
=1
5. GSMR: >230 kms=2, 150-
229=1.
Fixed installations:
1. Centralised i’locking: 200
stns(min)=1
2.MACLS with LED lamps: 140 (min)
=1
3.Complete track circuiting of station
sections: 700 locations (min)= 2
4.Block proving by axle counters: 200
(min) =2
5.Interlocking and provision of
telephones at LCs:
250 min=2
6.Isolation in old crossing stations:
40 stations (min) =2
1. Udhampur-
Srinagar-Baramula
(New Rail line)
Completion of tunnel
(T-80 – longest ever)
1. Kosi Bridge To be
completed
2. Harmuti –
Naharlagun
(New Line)
Work to complete 2. Banspani-
Jaroli (9 km)
doubling
To be
completed
3. Rangia –
Murkongselek
(Gauge conversion)
First section 127 km i.e.
Rangia – Rangpara north
3. Bimlagarh-
Dumitra doubling
To be
completed
4. Rae bareily
Coach Factory
Furnishing Shop, Finishing
Shop, Train Lighting shop,
Furnishing and Finishing
stores, Residential units-
200 unit, Two Sub stations
of 11 KVA , Compressor
room
4. Gorakhpur
Cantt-Baitalpur
doubling (34.13
km)
To be
completed
5. Dedicated Freight
Corridor
Corporation of India
Limited
Award of Civil Contract for
Khurja-Kanpur section of
Eastern DFC & package
1&2 of Western DFC phase
1.
5. Gorakhpur-
Sahjanwa
doubling (17.7
km)
To be
completed
6. High Speed Rail
corridors
Four prefeasibility studies
to be completed
6. Jakhal-Mansa-
Doubling on SPR
section
To be
completed
10
7. Railway
Electrification
projects-
Muradabad-
Lucknow-Gonda,
Tiruchirapally-
Madurai, Mumbai
Suburban DC to
AC(WR)
To be completed 7. Jharsuguda-
Rengali doubling
(25.6 km)
To be
completed
8. Connectivity to
Barang Projects
(Cuttack-Barang,
Barang-Khurda
Road. And
Rajatgarh-
Barang)
Bhubneshwar-
Barang to be
completed
9. Anuppur-
Bilaspur doubling
Chhulha-
Jaithari-
Nigora
doubling to be
completed
10. Udhna-
Jalgaon with
electrification
85 kms
cumulative to
be completed
11
Section 3: Trend values of the success indicators:
2009-10 2010-11 2011-12(tgt) 2012-13 (Projection) 2013-14 (Projection)
Originating loading Million tonnes 888 924 993 1070 1150
Net Transporotation
Billion NTKM 601 612 658 700 750
Avg speed of goods trains KMPH 25.8 26 26.4 26.8 27.2
Non suburban Billion PKMs 772
867.962 1085 1180 1260
Suburban Billion PKMs 130.917
139.219 150 158 167
Punctuality ( M/E) % 74 69 72 74 76
Complaints per billion Pkms. Nos. 26.26 22.3 21.5 21.0 20.5
New Lines KMS 258 700 700 1000 1200
Doubling KMS 448 700 867 1000 1050
Electrification (RKm) KMS 1117 975 1110 1500 1500
Signaling improvements
Value of works ( in Rs. s) 1055 972 1100 1850 2000
Loco mfg(DSL-Elc) nos 498 527 580 630 675
Wagon mfg nos 13068 14703 18000 19000 20000
Coach mfg nos 3494 36561 3780 3900 4000
Operating ratio % 95.3 92.3 91.1 90.0 89.0
12
Manpower productivity
Gross earning in lakhs of Rs per employee/pa 6.38 7.20 8.06 8.86 9.50
892292900000.00 655134.2878 54594.52
Plan expenditure on staff quarters, staff amenities and passenger amentities Rs(crs) 1474.15
1520.86 1645 1720 1790
1362 1000 1362000
Trees planted
nos( in lacs) 95.1 94.38 99 100 102
Non conventional energy and environment improvement initiatives Number of new intiatives
Nos
- - 1 1 1 Expenditure on ACD Rs( crs) 28.3 11.4 28 150 150 Closure of LC gate
(level crossing gates) nos 192 363 300 330 360
New initiative launch in the year nos - - 1 1 1
13
Section 4: Description and definition of success indicators and measurement methodology: Freight services constitute the most important segment of activity of railway business. The earnings from freight account for more than two-thirds of the total earnings. Accordingly, the weightage has been fixed at 25%. As visualized in the Vision 2020 Document, increase in volumes as well as increase in speed is the objective of improving the services. The success indicators identified are:
i) Originating Traffic ii) Net transportation iii) Average speed of goods trains
These are described below: i) Originating Loading
At every loading point, individual wagon of the rake are subjected to weighment and record of loading is usually available on a computerized electronic weighing machine. This loading is authentically declared, documented and used as the basis for billing. Accumulated data of originating loading is reported to the division, zone and Railway Board. Hence, this improved index of success indicator is adopted in the RFD.
ii) Net Transportation The total quantum of transportation is expressed in GTKMs (Gross Tonne Kilometres) and NTKM (Net Tonne Kilometres). The NTKM is the product of net weight of the commodity loaded and the distance in kilometers over which it is moved. This is the better index of customer interest as compared to GTKM because GTKM includes the dead weight of the wagon also, which is of no interest to the customer. Systematic records exist in the railway system to capture and measure the NTKMs. iii) Average speed of goods trains The speed in kmph of goods train is routinely monitored and documented over clearly demarcated sections of railway divisions. In fact, it is an important index of the level of congestion, optimum utilization of available paths and many other operational variables. It, therefore, embodies a number of situational factors – both controllable and extraneous. The organizational goal is to eliminate the
14
known causes of congestion so as to improve the average speed of trains. Hence, it qualifies as an important parameter of performance and thus, included in the RFD.
iv) Passenger Kilometres: The passenger kms is the most commonly used index of the quantum of passenger transportation. It is arrived at by statistics of ticket sales and is compiled in a systematic manner at all levels in railway system. Improvment or deterioration of the punctuality of that train. Elaborate exercise of time-tabling is undertaken and sufficient allowances are also provided for recovery on engineering account, traffic account and loco account. Once the time-table is framed, it becomes the reference for deciding whether a particular train is running punctually or not. v) Punctuality: At present a train is treated as punctual if it reaches its destination within 15 minutes of its scheduled arrival time. The current computerized monitoring system has been introduced in 2009 under ICMS (Integrated Coaching Management System) which is linked to COA (Control Office Application). This methodology is based on the customer’s perception and not based on zone wise statistical performance which was the case earlier. vi) Flagship projects: For the purpose of RFD 10 projects have been selected based on their impact on the Railways image and Financial Health in the long run. vii) Critical Projects For the purpose of the RFD these projects are selected which are critical to immediate operational needs of the Railways and also included in the list of projects monitored by Ministry of Statistics and Programme Implementation. viii) Loco Manufacturing Since variety of loco manufacture with different hp ranges these have been indexed on the basis of standard locomotive of --------- HP. ix) Wagon Manufacturing
15
Since variety of wagons is manufactured every year and their payload to tare ratio is different these have been index on the basis of standard wagon. Higher payload to tare ratio is advantages to railways for efficient transportation. Technology also plays important roll in maximizing the pay to tare ratio. x) Operating ratio It means number of rupees spent to earn Rs. 100 lesser the operating ratio better is the financial health of the Railways. xi) Productivity A productivity of railway staff is expressed in terms of gross earnings per employee on roll. For workshop staff it is expressed as total credits (in Rs.) per employee working in either workshops or production units. xii) The no. of stations on which all the essential prescribed amenities for
differently abled persons is provided. xiii) (On Board House Keeping Services) OBHS: It is scheme to provide certain
prescribed services through a contract by staff travelling on board in order to enhance the level of passenger satisfaction.
xiv) SFC Diesel: - Specific fuel consumption is a measure of the fuel efficiency of
diesel locomotives xv) SEC Elecectrical: - Specific energy consumption is a measure of the energy
efficiency of electric locomotives xvi) VCD: - Vigilance Control Device: Design to stop a train if the driver is not
vigilant for a specific duration. Section 5: Specific performance requirements from other departments that are critical for delivering agreed results.
1. Budgetary Support: Indian Railways is a Ministry of the Government of India.
The tariff structure is, therefore, a matter of Government policy decided, taking into
account not only the commercial considerations of operating the service but also of
social and people oriented objectives of the Government of India. The internal
16
resources, therefore, are constrained by the overall view taken by the Government as a
whole. Under these circumstances, it is imperative that adequate budgetary support is
extended to the infrastructure development plans drafted to create the necessary
infrastructure for sustaining the growth. Hence, budgetary support from Government
of India (Finance Ministry ) in the right proportion is essentially required.
2. Law & Order: Indian Railways traverses through the individual States in its
day to day operations. It is also highly vulnerable to disturbances due to agitations and
vandalism. Therefore, there is heavy dependency on the State Government’s support
and adequate empowerment of the Government Railway Police (GRP) to ensure
freedom from obstruction and vandalism.
17
Section 6: Outcome/activities of department/ministry
1 2 3 4 5 6 7 8 9
S. No.
Outcome/ Impact
Jointly responsible for influencing this outcome/impact with the following organisation (s)/ Department/ministry (ies)
Success Indicator(s)
2009-10 2010-11 2011-12 2012-13 2013-14
1 Freight services
State Governments for law and order
Net transportation in billion NTKms
601 612 658 700 750
2. Passenger services
State Governments for law and order
Punctuality in percentage
74 69 72 74 76
3. Investment for improvement of infrastructure
Finance Ministry and Planning Commission for Budgetary support
Total Plan outlay (in crores of Rs.)
39672 40315 57630 77000 100000