18
VISION PLAN PRESENTATION - SEPTEMBER 28, 2013 A POOL HOUSE POOL DECK B MAIN BUILDING UPPER PLAZAS C MAJOR BLEACHERS DUGOUTS FIELD MAIN COURTYARD D REGGIE PARK E SPORT COURT ADA RAMP F TENNIS COURTS KITCHENETTE FIELD SEATING G BELVEDERE ENTRY H MINOR DUGOUTS BLEACHERS FIELD AREAS OF IMPROVEMENT A B C D E F G H

VISION PLAN PRESENTATION - SEPTEMBER 28, 2013 · 2018-05-29 · vision plan presentation - september 28, 2013 a pool house pool deck b main building upper plazas c major bleachers

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: VISION PLAN PRESENTATION - SEPTEMBER 28, 2013 · 2018-05-29 · vision plan presentation - september 28, 2013 a pool house pool deck b main building upper plazas c major bleachers

VISION PLAN PRESENTATION - SEPTEMBER 28, 2013

A POOL HOUSEPOOL DECK

B MAIN BUILDINGUPPER PLAZAS

C MAJOR BLEACHERSDUGOUTSFIELDMAIN COURTYARD

D REGGIE PARK

E SPORT COURT ADA RAMP

F TENNIS COURTSKITCHENETTEFIELD SEATING

G BELVEDERE ENTRY

H MINOR DUGOUTSBLEACHERSFIELD

AREAS OF IMPROVEMENT

A

B

C

D

E

F G

H

Page 2: VISION PLAN PRESENTATION - SEPTEMBER 28, 2013 · 2018-05-29 · vision plan presentation - september 28, 2013 a pool house pool deck b main building upper plazas c major bleachers

VISION PLAN PRESENTATION - SEPTEMBER 28, 2013

PROPOSED POOL HOUSE SITE PLAN

NEW POOL HOUSE- 3615 SQ FT- PROGRAM LOCKER ROOMS RECEPTION RESTROOM FAMILY CHANGING ROOM LOUNGE PARTY ROOM MEETING ROOMS/ EVENT SPACE CONCESSIONS/ KITCHEN

CABANAS

OUTDOOR SHOWER

HILLSIDE SLIDE

EXPANDED POOL DECK

EXISTING POOL HOUSE

Page 3: VISION PLAN PRESENTATION - SEPTEMBER 28, 2013 · 2018-05-29 · vision plan presentation - september 28, 2013 a pool house pool deck b main building upper plazas c major bleachers

VISION PLAN PRESENTATION - SEPTEMBER 28, 2013

POOL HOUSE - FIRST FLOOR PLANMEETING ROOM / EVENT SPACE

KITCHEN

ENTRY

OFFICE

RESTROOM

LOCKER ROOM

POOL HOUSE - FIRST FLOOR PLAN

UTILITY ROOM

OUTDOOR SHOWER

Page 4: VISION PLAN PRESENTATION - SEPTEMBER 28, 2013 · 2018-05-29 · vision plan presentation - september 28, 2013 a pool house pool deck b main building upper plazas c major bleachers

VISION PLAN PRESENTATION - SEPTEMBER 28, 2013

POOL HOUSE - SECOND FLOOR PLAN

MEETING ROOM / EVENT SPACEKITCHEN

STORAGE

DECK

Page 5: VISION PLAN PRESENTATION - SEPTEMBER 28, 2013 · 2018-05-29 · vision plan presentation - september 28, 2013 a pool house pool deck b main building upper plazas c major bleachers

VISION PLAN PRESENTATION - SEPTEMBER 28, 2013

SYNTHETIC WOOD

STANDING SEAM METAL ROOF

GLASS RAILING

CONCRETESLATS

WOOD PLANK DECKING

Page 6: VISION PLAN PRESENTATION - SEPTEMBER 28, 2013 · 2018-05-29 · vision plan presentation - september 28, 2013 a pool house pool deck b main building upper plazas c major bleachers

VISION PLAN PRESENTATION - SEPTEMBER 28, 2013

PROPOSED MAIN BUILDING SITE PLANMAIN BUILDING

NEW ELEVATOR FORACCESSIBILITY

NEW AMPHITHEATRESEATING

NEW BENCH SEATING

NEW POOL HOUSE

Page 7: VISION PLAN PRESENTATION - SEPTEMBER 28, 2013 · 2018-05-29 · vision plan presentation - september 28, 2013 a pool house pool deck b main building upper plazas c major bleachers

VISION PLAN PRESENTATION - SEPTEMBER 28, 2013

MAIN BUILDING - FIRST FLOOR PLAN

MEETING ROOM / EVENT SPACE

KITCHEN

ENTRY

OFFICE

RESTROOM

AREA OF EXPANSION

UTILITY ROOM

STORAGE

Page 8: VISION PLAN PRESENTATION - SEPTEMBER 28, 2013 · 2018-05-29 · vision plan presentation - september 28, 2013 a pool house pool deck b main building upper plazas c major bleachers

VISION PLAN PRESENTATION - SEPTEMBER 28, 2013

MAIN BUILDING - SECOND FLOOR PLAN

MEETING ROOM / EVENT SPACE

KITCHEN

DECK

RESTROOM

STORAGE

NEW ELEVATOR FORACCESSIBILITY

Page 9: VISION PLAN PRESENTATION - SEPTEMBER 28, 2013 · 2018-05-29 · vision plan presentation - september 28, 2013 a pool house pool deck b main building upper plazas c major bleachers

VISION PLAN PRESENTATION - SEPTEMBER 28, 2013

MAIN BUILDING - THIRD FLOOR PLAN

MEETING ROOM / EVENT SPACE

KITCHEN

STORAGE

RESTROOM

NEW ELEVATOR FORACCESSIBILITY

Page 10: VISION PLAN PRESENTATION - SEPTEMBER 28, 2013 · 2018-05-29 · vision plan presentation - september 28, 2013 a pool house pool deck b main building upper plazas c major bleachers

VISION PLAN PRESENTATION - SEPTEMBER 28, 2013

WOOD PLANKDECKING & FLOORING

GLASS RAILING

CONCRETESLATS

WOOD SLATCEILING

Page 11: VISION PLAN PRESENTATION - SEPTEMBER 28, 2013 · 2018-05-29 · vision plan presentation - september 28, 2013 a pool house pool deck b main building upper plazas c major bleachers

VISION PLAN PRESENTATION - SEPTEMBER 28, 2013

Page 12: VISION PLAN PRESENTATION - SEPTEMBER 28, 2013 · 2018-05-29 · vision plan presentation - september 28, 2013 a pool house pool deck b main building upper plazas c major bleachers

VISION PLAN PRESENTATION - SEPTEMBER 28, 2013

SYNTHETIC WOOD

STAINLESS STEELRAILING

CONCRETETURF

MAJOR BLEACHERS, DUGOUTS & MAIN COURTYARD

- RECONSTRUCTED BLEACHERS WITH ACCESSIBLE SEATING

- NEW EQUIPMENT STORAGE AND SEATING IN DUGOUTS

- NEW SCOREBOARD

- TURF INSTALLED ON FIELD FOR EASY MAINTENANCE

- NEW BENCH SEATING ELEMENT WITHIN MAIN COURTYARD

- EXPANDED GRASS AREA AT COURTYARD FOR INCREASED PLAY SPACE

IMPROVEMENTS

Page 13: VISION PLAN PRESENTATION - SEPTEMBER 28, 2013 · 2018-05-29 · vision plan presentation - september 28, 2013 a pool house pool deck b main building upper plazas c major bleachers

VISION PLAN PRESENTATION - SEPTEMBER 28, 2013

SYNTHETIC WOOD

STAINLESS STEELRAILING

CONCRETE

REGGIE PARK PLAYGROUND

- NEW PICNIC AREA WITH ADDITIONAL PICNIC TABLES AND SUN SHADING

- ADDITIONAL PLAYGROUND EQUIPMENT FOR A WIDER AGE RANGE

- CLIMBING WALL AND SLIDE BUILT INTO THE HILLSIDE

- BENCH SEATING AND SMALL TABLES AT THE PERIMETER OF THE PLAYGROUND

IMPROVEMENTS

Page 14: VISION PLAN PRESENTATION - SEPTEMBER 28, 2013 · 2018-05-29 · vision plan presentation - september 28, 2013 a pool house pool deck b main building upper plazas c major bleachers

VISION PLAN PRESENTATION - SEPTEMBER 28, 2013

OUTDOOR MODULAR FLOORING OR PAINTED CONCRETE

STAINLESS STEELRAILING

CONCRETE

SPORT COURT & ADA RAMP

- NEW SPORT COURT FOR VARIOUS ATHLETICS THAT APPEAL TO A DIVERSE AGE RANGE

- UPGRADED RAMP FOR ADA ACCESS FROM RICARDO ROAD

IMPROVEMENTS

Page 15: VISION PLAN PRESENTATION - SEPTEMBER 28, 2013 · 2018-05-29 · vision plan presentation - september 28, 2013 a pool house pool deck b main building upper plazas c major bleachers

VISION PLAN PRESENTATION - SEPTEMBER 28, 2013

Page 16: VISION PLAN PRESENTATION - SEPTEMBER 28, 2013 · 2018-05-29 · vision plan presentation - september 28, 2013 a pool house pool deck b main building upper plazas c major bleachers

VISION PLAN PRESENTATION - SEPTEMBER 28, 2013

SYNTHETIC WOOD

STAINLESS STEELRAILING

CONCRETESTONE COUNTER-TOP

TENNIS COURTS, OUTDOOR KITCHENETTE & FIELD SEATING

- NEW KITCHENETTE BETWEEN TENNIS COURTS

- TRELLIS ABOVE KITCHENETTE FOR SUN SHADING

- SEATING AT FIELD LEVEL FOR SOCCER AND PRACTICE FIELD

- EXPANDED AND RE-STRIPED TENNIS COURTS

- BENCH SEATING ON TENNIS COURTS

- REPAVED PATHWAY

IMPROVEMENTS

Page 17: VISION PLAN PRESENTATION - SEPTEMBER 28, 2013 · 2018-05-29 · vision plan presentation - september 28, 2013 a pool house pool deck b main building upper plazas c major bleachers

VISION PLAN PRESENTATION - SEPTEMBER 28, 2013

SYNTHETIC WOOD

CONCRETE

BELVEDERE ENTRY

- NEW SIGNAGE AND SEATING ELEMENT AT ENTRY TO SITE

- EXPANDED CONCRETE PAD TO CREATE A STAGING AND SIGN-IN AREA FOR TENNIS AND FIELD PROGRAMS

- NEW PLANTING ALONG BELVEDERE TO CREATE A SOFT BARRIER TO THE SITE

- ENLARGED CURB AT PATHWAY TO ACT AS SEATING FOR PRACTICE FIELD

IMPROVEMENTS

Page 18: VISION PLAN PRESENTATION - SEPTEMBER 28, 2013 · 2018-05-29 · vision plan presentation - september 28, 2013 a pool house pool deck b main building upper plazas c major bleachers

VISION PLAN PRESENTATION - SEPTEMBER 28, 2013

SYNTHETIC WOOD

TURF ALUMINUMBLEACHERS

WOOD SLATS

MINOR SEATING & DUGOUTS

- NEW WOOD SLAT DUGOUTS FOR THE MINOR BASEBALL PLAYERS, WITH EXTRA EQUIPMENT STORAGE AND SUN SHADING

- NEW ALUMINUM BLEACHERS - NEW PICNIC AREA

- TURF INSTALLED ON FIELD FOR EASY MAINTENANCE

IMPROVEMENTS