Page 1: Visio Cmts Vsi   Co2 Free Production Plant Spain V1

Dedust

Dedust

Dedust

Bridge crane

Seperation - washing tank

MSW from region Allicante

150.000 ton/year

Organic fraction75,000 ton/year

± 50%

Caloricfraction

Bridge crane

Sand

Organic fraction

Pre digestion

Digestaat

Annual4.9 million m³ biogas

Biogas production60-80 m³/ton

Compost

Waste sorting Plant

Metal

Non ferrous

Loading bunker

Loading bunker

Thermal oil unit

Afterburner

Incinerator 5/6 floors

Afterburner

Incinerator 5/6 floors

3 - 5 ton/hr

3 – 5 ton/hr

17.5 MWth

ScrubberQuench

25% NaOH tank75% water

Fan 100 kW

AlgaeColums

Algae Colums

Algae Colums

Dioxin catalist

57,000 ton CO2± 200 ton NOx

250ºC

Energy converter

75ºC

EffluentHCl / HF, dust, heavy metals

EffluentSO2, dust,

heavy metals

14 MWe

Thermal oil unit

17.5 MWth

ScrubberQuench

25% NaOH tank75% water

Fan100 kW

AlgaeColums

Algae Colums

Algae Colums

Dioxin catalist

48,000 ton CO2± 200 ton NOx

250ºC

Energy converter

75ºC

EffluentHCl / HF, dust, heavy metals

EffluentSO2, dust,

heavy metals

14 MWe

Loading bunker

Afterburner

Incinerator 5/6 floors3 – 5 ton/hr Thermal oil unit

17.5 MWth

ScrubberQuench

25% NaOH tank75% water

Fan 100 kW

AlgaeColums

Algae Colums

Algae Colums

Dioxin catalist

48,000 ton CO2± 200 ton NOx

250ºC

Energy converter

75ºC

EffluentHCl / HF, dust, heavy metals

EffluentSO2, dust,

heavy metals

14 MWe

Specs incinerator

Capacity : 3 - 5 ton/hr

Annual : 8000 hours

Flue gas : 17.5 MWth

Temperature: max. 1500ºC

Econsumption : 100 kWe

Residence time : 2 seconds

2 hydraulic units

6 centrifugal fans

Conveyor with Magnet band

Conveyor

Prepared by

MiVe

Approved by

TvS/ HeSc

Process

CMTS/VSI_CO2 free production plant

Date

10/15/2007

Date

10/17/2007

Page 1 of 1Client

BIO FUEL SYSTEMS S.L.

Page 1

Spain_CO2 free Production Plant

Effluent

Effluent

Effluent

HF : 60 mg/m³

CO : 50 mg/m³

Organics : 10 mg/m³

SO2 : 500 mg/m³

NOx : 500 mg/m³

Sb,Pb,Cr,Cu,Mn,V,Sn,As,Co,

Ni,Se,Te : 40 mg/m³

Cd : 0.5 mg/m³

Hg : 2 mg/m³

PCCD/PCDF’s: 20 ng/TEQ/m³

Emissions for gas cleaning

O2 : 11.3 %wt

CO2 : 7.1 %wt

Particulates: 500 mg/m³

HCl : 1000 mg/m³

HF : < 0.1 mg/m³

CO : 1.0 mg/m³

Organics : < 0.5 mg/m³

SO2 : < 1 mg/m³

NOx : 500 mg/m³

Sb,Pb,Cr,Cu,Mn,V,Sn,As,Co,

Ni,Se,Te : < 0.002 mg/m³

Cd : < 0.007 mg/m³

Hg : 0.001 mg/m³

PCCD/PCDF’s: < 0.0001 ng/TEQ/m³

Emissions after gas cleaning

O2 : 11.3 %wt

CO2 : 7.1 %wt

Particulates: < 0.5 mg/m³

HCl : 0.5 mg/m³

Quench watertank

Quench watertank

Quench watertank

47,500 ton/yearCO2 credits

Turnover € 950,000

12,000 ton/yearBio petroleum

Turnover € 4,320,000

4,900 ton/yearCellulose

Turnover € 2,940,000

40,000 ton/yearCO2 credits

Turnover € 800,000

10,000 ton/yearBio petroleum

Turnover € 3,600,000

4,200 ton/yearCellulose

Turnover € 2,520,000

40,000 ton/yearCO2 credits

Turnover € 800,000

10,000 ton/yearBio petroleum

Turnover € 3,600,000

4,200 ton/yearCellulose

Turnover € 2,520,000

Plastics

Plastics 3,750 ton/year

± 5%

Digestion tanks

Drumscreen

Conveyor

Windshifter

Effluentdust

Effluentdust

Effluentdust

max.18 MJ/kg

3 MWth

Thermal oil unitwith burner

250ºC

Energy converter

75ºC

2.4 MWe

9,000ton CO2

Fan 50 kW