Visco-elastic WrapidBond® System PROJECT TRACK RECORD
2
CANUSA-CPS WRAPIDBOND® SUCCESS: OMAN
Integrity PDO Project
Project Name Integrity PDO Project
Year 2019
Contractor Al Haditha Petroleum Services S.A.O.C
Market Onshore
Country or Location Oman
Scope WRB = 18,500 Rolls; WRC = 7,450 Rolls
Diameter 8” - 24” OD
Product WrapidBond® & WrapidCoat PVC
3
CANUSA-CPS WRAPIDBND® SUCCESS: OMAN
Fahud-PDO Rehab Project
Project Name Fahud - PDO Rehab Project
Year 2019
Contractor Seeh Al Sarya Engg LLC
Market Onshore
Country or Location Oman
Scope WRB = 4,385 Rolls; WRC = 4,100 Rolls
Diameter 8” OD
Product WrapidBond & WrapidCoat PVC
4
CANUSA-CPS WRAPIDBND® SUCCESS: OMAN
Occidental Oman Project
Project Name Occidental Oman Project
Year 2019
Contractor Seeh Al Sarya Engg LLC / Al Haditha Petroleum Services S.A.O.C
Market Onshore
Country or Location Oman
Scope WRB = 540 Rolls; WRC = 240 Rolls
Diameter 6” OD
Product WrapidBond & WrapidCoat PVC
5
CANUSA-CPS WRAPIDBND® SUCCESS: OMAN
Construction of YRP Work - PDO
Project Name Construction of YRP Work
Year 2018/2019
Contractor Special Technical Services & Tebodin LLC
Market Onshore
Country or Location Oman
Scope WRB = 8,150 Rolls; WRC = 7,000 Rolls
Diameter 6” OD
Product WrapidBond & WrapidCoat PVC
6
CANUSA-CPS PROJECT SUCCESS: KSA
North Gas Compression Plant PipelinesProject Name North Gas Compression Plant Pipelines Project (NGCP), Onshore
Contractor / Client CPP / Saudi Aramco
Market Onshore
Year 2019-2020
Country or Location KSA
Scope Supply of WrapidBond-HT & WrapidCoat-HT for 72,000 Joints, 927 Kms
Diameter 6.625” – 48”
ProductWRB-HT-B 200-20 BL - Qty : 18,514 & WRC-HT-B 150-30 BK - Qty :
30,159
7
CANUSA-CPS PROJECT SUCCESS: KSA
South Gas Compression Plant Pipelines
Project Name South Gas Compression Plant Pipelines Project (SGCP), Onshore
Contractor / Client SAIPEM, NBC / Saudi Aramco
Market Onshore
Year 2019-2020
Country or Location KSA
Scope Supply of WrapidBond-HT & WrapidCoat-HT for 66,000 Joints, 813 Kms
Diameter 6.625” – 48”
ProductWRB-HT-B 200-20 BL - Qty : 6,100 & WRC-HT-B 150-30 BK - Qty :
11,300
8
CANUSA-CPS PROJECT SUCCESS: KSA
Satellite Gas Compression Plant Pipelines
Project Name Satellite Gas Compression Plant Pipelines Project (SAGCP), Onshore
Contractor / Client TEKFEN / Saudi Aramco
Market Onshore
Year 2019-2020
Country or Location KSA
Scope Supply of WrapidBond-HT & WrapidCoat-HT for 91,000 Joints, 1100 Kms
Diameter 6.625” – 48”
ProductWRB-HT-B 200-20 BL - Qty : 19,200 & WRC-HT-B 150-30 BK - Qty :
33,750
9
CANUSA-CPS WRAPIDBND® SUCCESS: KSA
SWCC Central & Western Region Pipeline Rehab
Project Name SWCC Central & Western Region Pipeline Rehab
Year 2016 - 2018
Market Onshore (Water)
Country or Location Saudi Arabia
Scope 200 km (in sections)
Diameter 42” – 80”
Product WrapidBond® & WrapidCoat PVC
10
CANUSA-CPS WRAPIDBND® SUCCESS:
SWCC RWTS Rehab Pipeline Project
Project Name RWTS (North & Eastern) Rehab Pipeline Project
Year 2012
Market Onshore (Water)
Country or Location Saudi Arabia
Scope 100 Km (in sections)
Diameter 30” – 60”
Product WrapidBond® & WrapidCoat PVC
11
CANUSA-CPS PROJECT SUCCESS: KSA
Project Name LTA-35 Marjan Increment Water Injection System Subsea
Contractor / Client SAIPEM / Saudi Aramco
Market Offshore
Year 2020
Country or Location KSA
Scope Supply of WrapidBond-HT & WrapidCoat-PE for 11,264 Joints, 940 Kms
Diameter 6.625" to 36"
ProductWRB-HT-B 200-20 BL –Qty 4,329 Rolls : & WRC-PE-B 150-30 BK – Qty :
7,437 Rolls
Project Name LTA-34 Berri Offshore Pipeline & Cables
Contractor / Client SAIPEM / Saudi Aramco
Market Offshore
Year 2020
Country or Location KSA
Scope Supply of WrapidBond-HT & WrapidCoat-PE for 3,702 Joints, 310 Kms
Diameter 8.625" to 36"
ProductWRB-HT-B 200-20 BL–Qty : 900 Rolls & WRC-PE-B 150-30 BK– Qty :
1,512 Rolls
12
CANUSA-CPS PROJECT SUCCESS: OMAN AND KSA
Year Project Name Contractor Field ClientOuter
DiameterScope / Rolls
2020Marjan Increment Water Injection
System SubseaSAIPEM Offshore Saudi Aramco 6.625" to 36" 11,264 Joints
2020 Berri Offshore Pipeline & Cables SAIPEM Offshore Saudi Aramco 8.625" to 36" 3,702 Joints
2019Satellite Gas Compression Plants
Pipelines ProjectTekfen Onshore Saudi Aramco 6.625”– 48" 91,000 Joints
2019South Gas Compression Plants
Pipelines ProjectSAIPEM Onshore Saudi Aramco 6.625”– 48" 66,000 Joints
2019North Gas Compression Plant
Pipelines ProjectCPP Onshore Saudi Aramco 6.625”– 48” 72,000 Joints
2019Safaniya Pipeline Project – LTA,
OffshoreNPCC Offshore Saudi Aramco 8.625”–30” 9,000 Joints
2019 Fahud-PDO Rehab ProjectSeeh Al Sarya Engg
LLCOnshore PDO 8”
WRB = 4,385 Rolls;
WRC = 4,100 Rolls
2018 /
2019Construction of YRP Work
Special Technical
Services LLCOnshore PDO 6”
WRB = 8,150 Rolls;
WRC = 7,000 Rolls
2019 Occidental Oman Project
Seeh Al Sarya
Engg. LLC/Al
Haditha Petroleum
Services
OnshoreOccidental
Oman 6”
WRB = 540 Rolls;
WRC = 240 Rolls
2018 &
20192018 & 2019 Integrity Projects
Al Haditha
Petroleum Services
S.A.O.C
Onshore PDO 8” - 24”WRB = 18,500 Rolls;
WRC = 7,450 Rolls
2018Arabian Heavy Delivery Pipeline
JuaymahCPP Onshore Saudi Aramco 40”–48” 7,500 Joints
2018Re-route Pipelines In Ras Tanura
Area ProjectCPP Onshore Saudi Aramco 42” 5,600 Joints
2018 KJO Project, Offshore SAIPEM Offshore Saudi Aramco 20” 3,400 Joints
2018Manifa Water Inj. System Upgrade,
OffshoreSAIPEM Offshore Saudi Aramco 16”–42” 5,000 Joints
2017 Marjan & Zulf Project, Offshore SAIPEM Offshore Saudi Aramco 16” 600 Joints
2017Jazan Refinery And Terminal Project
Package 14,HANWHA E&C Offshore Saudi Aramco 48” 2,000 Joints