Virtualization for Disaster Recovery Panel Discussion May 19, 2010 Ed Walsh EMC vSpecialist EMC Corporation 518-928-0896 Cell [email protected] Chris Fox Director of Business Development, Data Center Solutions IPLogic, Inc. 585-329-2308 Cell www.iplogic.com Jeff Deal NYS DMV 518-486-4358 [email protected] Business Continuity Work Group

Virtualization for Disaster Recovery Panel Discussion May 19, 2010 Ed Walsh EMC vSpecialist EMC Corporation 518-928-0896 Cell [email protected] Chris Fox

Embed Size (px)

Citation preview

Virtualization for Disaster Recovery Panel Discussion May 19, 2010

Ed WalshEMC vSpecialistEMC Corporation518-928-0896 [email protected]

Chris FoxDirector of Business Development, Data Center SolutionsIPLogic, Inc.585-329-2308 Cellwww.iplogic.com

Jeff DealNYS [email protected]

Business Continuity Work Group

Business Continuity Work Group

Causes of Downtime

Strategy Considerations

•How quickly do I need to recover?-Cost of every hour (minute)

to business ops and reputation

•What level of outage do I need to protect against?

-System outage

-Site within a campus

-Within or across countries

•How does my strategy change with virtualization?

•How do I prove my strategy?-Testing without impacting production

Business Continuity Work Group

Traditional Disaster Recovery

•Involves:-Complex processes and infrastructure-Precise training, documentation and execution

•Requires:-Dedicated identical hardware-Significant consumption of time and resources-2 to 3X the capacity used for production-Unacceptable levels of WAN utilization

•Results in:-Inability to test or often failed tests-Recovery times of days or weeks

Business Continuity Work Group

Which of the following would you consider to be your organization’s top server virtualization initiatives for 2010?

Source: “2010 Spending Intentions”, ESG, March 12, 2010

Percent of respondents, N=515, up to five responses accepted

IT Priority: Server Virtualization

Business Continuity Work Group

Protect

Source and Target based Deduplicated Backup– Keep your backup infrastructure but reduce Cost

– Target Based Dedup90% less capacity10x backup performance

– Backup Built for Vmware– Source based Dedup

95% reduction in backup storage 90-99% less CPU/Memory/Network10x-20x faster backup30-50% increased server consolidation

Replication Functionality– Vmware-Integrated Array Snapshots

– Support for VMFS and NFS– Fastest macro-level, single step restore for a single VM

or an entire datastore

– Optional Database integration

VMware SRM- Array Integration– VMware Site Recovery Manager Integrated with

shared storage at every price point– Every protocol, every scale– Single click automated DR testing and failover– Require vCenter integrated Failback– VMaware Remote Replication

Disaster Recovery

Image R

ecoveryFile

Rec

over

y

Simple

Automated

Application Integrated

Key Data Protection FunctionalityBusiness Continuity Work Group

Automated BC/DR x86

Site Recovery Manager

Storage Based Replication

Servers

Storage FC and/or IP

Production

VMware Infrastructure

SRAvCenter

Virtual Machines

SRM

Servers

Business Continuity

VMware Infrastructure

SRA vCenter

Virtual Machines

SRM

Storage FC and/or IP

• Leverages advanced replication software

• Remove manual recovery complexity through automation

• Provides central management of recovery plans and protection groups

• Simplifies and automates disaster recovery workflows:

• Configuration• Testing• Failover• Failback

Business Continuity Work Group