28
Virtualization: Doing it right the first time to avoid costly repeat attempts. Software Licensing, Storage Options, Power and Cooling and Management

Virtualization: Doing it right the first time to avoid costly

Embed Size (px)

Citation preview

Page 1: Virtualization: Doing it right the first time to avoid costly

Virtualization: Doing it right the first time to avoid costly repeat attempts.

Software Licensing, Storage Options, Power and Cooling and Management

Page 2: Virtualization: Doing it right the first time to avoid costly

vSphere 4 Product Licensing

Essentials includes support and Essentials Plus requires support.

Page 3: Virtualization: Doing it right the first time to avoid costly

vSphere 4 Product Licensing

Support is required and sold separately.

vSphere 4 Acceleration Kits/Promotions

Page 4: Virtualization: Doing it right the first time to avoid costly

Microsoft OS Licensing

Operating Systems will need to be licensed Microsoft O/S

Windows Server Standard 1 VM per license

Windows Server Enterprise 4 VM per license

Windows Server Datacenter Unlimited VM – licensed per CPU

Page 5: Virtualization: Doing it right the first time to avoid costly

Storage

Shared Storage Pools Centralized Management Cost and Simplicity

Page 6: Virtualization: Doing it right the first time to avoid costly

Storage Protocols

FC (Fibre Channel) FCoE (Fibre Channel over Ethernet) iSCSI NAS (NFS)

The answer is based on your environment and or application requirements.

http://www.vmware.com/resources/techresources/

What will it be with your VMware environment?

Page 7: Virtualization: Doing it right the first time to avoid costly

VMware Useful Resources

Product Information - http://www.vmware.com/products Events - http://www.vmware.com/events White Papers - http://www.vmware.com/solutions/whitepapers.html Compatibility Guides - http://www.vmware.com/resources/guides.html TCO Calculator - http://www.vmware.com/calculator Success Stories - http://www.vmware.com/customers/ SMB Portal- http://www.vmware.com/smb Product Downloads - http://www.vmware.com/download/ Solution Tracks Online - http://www.solutiontracks.com

Page 8: Virtualization: Doing it right the first time to avoid costly

Zophar SanteNexsan VP Product Marketing

Mike CirrincioneNexsan Sales Manager

8

MicroAge Presents

NexsanStorage Strategies forVMware

Page 9: Virtualization: Doing it right the first time to avoid costly

Agenda for TodayNew Storage TechnologyFor Aligning VMware

Server Cost Reduction Strategies

with

Storage Cost Reduction Strategies• Reducing Storage Power• Reducing Storage Space• Reducing Storage Hardware • Reducing Storage Management

Storage Architectures for VMware• Single ESX Server• Multiple ESX Servers / VMotion• Multiple ESX Servers / VMotion / Disaster Recovery

9

Page 10: Virtualization: Doing it right the first time to avoid costly

New Technology to Reduce Storage POWER

Old MAID Reduces application performance

for energy savings

“On-or-off” approach to energy savings

Usually only supported on SATA drives

Minutes to spin up components to respond to IO requests

Slow response confines use to just a few applications

AutoMAIDBenefits of MAID without the limitations! Energy savings with application performance “Green with

Speed”

Supported on SAS and SATA drives

Three levels of energy savings

– Level 1, up to 20%

– Level 2, up to 40% (SATA only)

– Level 3, up to 60%

Fast response to 1st I/O requests

– Level 1, sub-second

– Level 2, less than 15 seconds

– Level 3, less than 30 seconds

Fast and flexible response broadens use to include a wide range of applications

10

Page 11: Virtualization: Doing it right the first time to avoid costly

LEGACY NEW

T3 Year Power kWhs $17,382$17,382 $6996$6996

The results when you use New Technology to Reduce Storage POWER

Using LEGACY technology compared to NEW technology

$.15 Kilowatt hour cost

3 year period

84TB

Results - 60% less expense (includes CAPEX , OPEX)

Page 12: Virtualization: Doing it right the first time to avoid costly

New Technology to Reduce Storage SPACE

12

Drives are installed back to back to reduce vibration

Drive bottom

Drive bottom

DensitySingle 4U chassisUp to 84TB21TB per USAS and SATA4 FC ports4 iSCSI ports

Performance4 RAID Engines per chassis4 GB cache per chassis1100MBs and 40,000 IOPs

Cooling channel reduce drive heat.

New 4X Enterprise RAID Engines Per Chassis

Page 13: Virtualization: Doing it right the first time to avoid costly

13

42TB in 4 U 42TB in 9 U

The results when you use New technology to Reduce Storage SPACE

LEGACY NEWTBs per U 4 10.5

U per TB .25 .095

Space Cost per TB x 3yr $75$75 $28.5$28.5

Port Cost 12 x $300 = 12 x $300 = $3600 $3600

4 x $300 = 4 x $300 = $1200$1200

Using LEGACY technology compared to NEW technology

$100 per. U per. month

3 year period

FC Ports cost $300 each

84TB SATA (25TB of SAS)

Results - 62% less expense (OPEX) – 85% less expensive (Infrastructure CAPEX)

Page 14: Virtualization: Doing it right the first time to avoid costly

New Technology to Reduce Hardware Components

14

42TB Components LEGACY NEW

Power Supplies 6 2

Cooling Fans 18 7

Controllers 6 2

IO Ports 12 4

Enclosures 3 1

Total Hardware 4545 1616

RACK U 99 44The Results when you use New Technology

to Reduce Hardware Components

65% fewer componentsLess spaceLess powerFewer points of failureFew things to worry about

Page 15: Virtualization: Doing it right the first time to avoid costly

New Technology to Reduce Storage Management

LEGACY NEW

The Results when you use New Technology to Reduce Management

1 thing to manage NOT 3 things to manageLess effort to scaleLess to worry about

Page 16: Virtualization: Doing it right the first time to avoid costly

Single ESX Server

ESX Virtual Server Host

Guests

New Storage Technology forA Single ESX Server

SAS (Speed) and SATA (Capacity)

3TB to 200TB

Dual / Redundant FC / iSCSI connections

Active / Active Data Paths

Host Port Redundancy

Network connection Redundancy

Storage controller Redundancy

3TB to 200TB

16

Page 17: Virtualization: Doing it right the first time to avoid costly

New Storage Technology forSingle Site - Multiple ESX Servers with VMotion

VMotionESX

Virtual Server

Host

Guests Guests

ESX Virtual Server Host

Server Redundancy

SAS (Speed) and SATA (Capacity)

3TB to 200TB

Dual / Redundant FC / iSCSI connections

Active / Active Data Paths

Host Port Redundancy

Network connection Redundancy

Storage controller Redundancy

3TB to 200TB17

Page 18: Virtualization: Doing it right the first time to avoid costly

New Storage Technology for

Multi-Site ESX Servers / VMotion / Disaster Recovery

VMotionESX Virtual Server

Host

Guests Guests

ESX Virtual Server

Host

Server Redundancy, Data Redundancy, Storage Redundancy, Site Redundancy

5 Nines = 99.999 HA

SAS (Speed) and SATA (Capacity)

3TB to 1000TB

Site A Site B

18

Page 19: Virtualization: Doing it right the first time to avoid costly

19

8 white papers 5 - 10 minute briefing papers Value Calculator

Here is some additional Nexsan information available from MicroAge

Page 20: Virtualization: Doing it right the first time to avoid costly

Conclusion

New Storage TechnologyFor Aligning VMware

Server Cost Reduction Strategies

with

Storage Cost Reduction Strategies• Reducing Storage Power – 60%• Reducing Storage Space – 62%• Reducing Storage Hardware – 65%• Reducing Storage Management – 66%

Storage Architectures for VMware• Single ESX - YES• Multiple ESX / Vmotion YES• Multiple ESX / VMotion / Disaster Recovery YES

Contact MicroAge to Learn More

Page 21: Virtualization: Doing it right the first time to avoid costly

21

NexsanWho are We• Nexsan was founded in 1999• Over 24,000 storage systems sold into over 60 countries• We ship nearly 6000TB per month

What do we Do• Provide data storage solutions• SMB to Large Enterprise• All server environments

Page 22: Virtualization: Doing it right the first time to avoid costly

Confidential

Here are some Nexsan Customers

22

Page 23: Virtualization: Doing it right the first time to avoid costly
Page 24: Virtualization: Doing it right the first time to avoid costly

Common Mistake

Failure to adjust your power and cooling for your new infrastructure may

result in decreased efficiency

Page 25: Virtualization: Doing it right the first time to avoid costly

The percent of your input power that gets to the IT loadsThe percent of your input power that gets to the IT loads

=

The rest goes to power, cooling, and lighting equipment

Defining Data Center Infrastructure Efficiency

Page 26: Virtualization: Doing it right the first time to avoid costly

POW

ER

syst

em

POW

ER

syst

em

COOLI

NG

syst

em

COOLI

NG

syst

em

The cooling system uses the most energy in the data center

Data Center Physical Infrastructure

IT

Page 27: Virtualization: Doing it right the first time to avoid costly

GoGo to latest online version of this tool

Click to resume presentation modeDone

Page 28: Virtualization: Doing it right the first time to avoid costly

EFFICIENCY POWER USEAlways goes down with virtualization

Always goes down, UNLESS power/cooling is downsized to match load

AFTER virtualization

ROOM cooling

Non-scalable

UPS

Unused rack space

ServersUnused POWER capacity

Unused COOLING capacity

ROOM cooling

Non-scalable

UPS

BEFORE virtualization

Power useDOWNDue to consolidated servers

Due to losses from excess

capacity

LOW

Due to losses from GREATER excess capacity

LOWER

Right-sizing improves power use AND efficiency

PLUS right-sized power and cooling

Power usedown MOREDue to RIGHT-SIZEDpower/cooling

Scalable ROW

cooling

Due to RIGHT-SIZED

power/cooling

HIGHER

Scalable UPS