VILLAS HOA IMPROVEMENTS 2019/2020 Villas Monument Agave flowered and died summer 2019. Stucco painted in HOA colors by HOA volunteers. New planting in Spring 2020 Xeriscape design with locally grown certificated Saguaro, donated Golden Barrels and Desert Spoons. Phase 2 of Landscaping Improvements to mail box area on Arnold Palmer Overgrown cactus and dying trees removed. Common Areas Replanted with native trees and shrubs River Rock and boulders added to define space and improve look. Swimming Pool Refurbished New plaster / Pebble Tec and waterline tiling – all to current code. Pool deck resurfaced Cool Deck and new signage installed with current Pool Rules

VILLAS HOA IMPROVEMENTS 2019/2020VILLAS HOA IMPROVEMENTS 2019/2020 Villas Monument Agave flowered and died summer 2019. Stucco painted in HOA colors by HOA volunteers. New planting

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: VILLAS HOA IMPROVEMENTS 2019/2020VILLAS HOA IMPROVEMENTS 2019/2020 Villas Monument Agave flowered and died summer 2019. Stucco painted in HOA colors by HOA volunteers. New planting

VILLAS HOA IMPROVEMENTS 2019/2020

Villas Monument Agave flowered and died summer 2019.

Stucco painted in HOA colors by HOA volunteers.

New planting in Spring 2020 Xeriscape design with locally grown certificated Saguaro, donated Golden

Barrels and Desert Spoons.

Phase 2 of Landscaping Improvements to mail box area on Arnold Palmer

Overgrown cactus and dying trees removed.

Common AreasReplanted with native trees and shrubs

River Rock and boulders added to define space and improve look.

Swimming Pool Refurbished New plaster / Pebble Tec and waterline tiling –

all to current code.

Pool deck resurfaced Cool Deck and new signage installed with

current Pool Rules

Page 2: VILLAS HOA IMPROVEMENTS 2019/2020VILLAS HOA IMPROVEMENTS 2019/2020 Villas Monument Agave flowered and died summer 2019. Stucco painted in HOA colors by HOA volunteers. New planting

Spa Completely Refurbished New tiling, Pebble Tec coating and new gratings

Pony Wall Patched and painted in current HOA colors.

Pool Bathroom Remodeled Tile grout cleaned. New faucet, pedestal basin,

mirror, lighting and paper towel holder. Walls and door painted in HOA colors.

New external sconce. Art work sourced fromconsignment store.

Uneven Pathways In Common Areas Were identified and repaired.

Specialist company hired to grind down edges to remove trip hazards