Village of Winthrop Harbor Pavement Management Report Prepared by: www.baxterwoodman.com February 2019

Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

VillageofWinthropHarbor

PavementManagementReport

Preparedby:

www.baxterwoodman.com

February2019

Page 2: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

VillageofWinthropHarbor

PavementManagementReport140407

VillageofWinthropHarborPavementManagementReport

TABLEOFCONTENTS

150268Section PageNo.

EXECUTIVESUMMARY..................................................................................................................................................4 

PURPOSEOFSTUDY........................................................................................................................................................5 

APPROACH PavementConditionIndex............................................................................................................................6 PavementLifeCycle.........................................................................................................................................6 Methodology.......................................................................................................................................................7 

EXISTINGCONDITIONS PavementEvaluation......................................................................................................................................8 PavementInventoryDatabase....................................................................................................................8 PreviousStreetPrograms.............................................................................................................................8 EvaluationResults.........................................................................................................................................10 

PROPOSEDIMPROVEMENTS RecommendedRehabilitationStrategies............................................................................................12 RehabilitationCosts......................................................................................................................................15 

CONCLUSIONS/RECOMMENDATIONS.................................................................................................................17 

LISTOFTABLES

Table PageNo.

1  HistoryofStreetPrograms...........................................................................................................................9 

2  LengthofVillageStreetsPerCondition2006....................................................................................10 

3  LengthofVillageStreetsPerCondition2018....................................................................................10 

LISTOFFIGURES

Figure PageNo.

1  PavementLifeCycle.........................................................................................................................................6 

Page 3: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

TABLEOFCONTENTS Page3

VillageofWinthropHarbor

PavementManagementReport140407

LISTOFAPPENDICES

Appendix1 PhotoExamplesofConditions2 2018PavementManagementSummary

3 2018DetailedCostSummarybyRehabilitationStrategy

4 2018PavementManagementData(Alphabetically)

5 2018PavementManagementData(PASER)

LISTOFEXHIBITS

Exhibit1 2018RecommendedRehabilitationStrategiesforallStreets

2 CurbandGutterMap3 PavementSurfaceEvaluationandRating(PASER)RatingMap

4 YearofLastRepairMap

5 2006RecommendedRehabilitationStrategiesforallStreets

Page 4: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

EXECUTIVESUMMARY Page4

VillageofWinthropHarbor

PavementManagementReport140407

EXECUTIVESUMMARY

TheVillage ofWinthropHarbor has authorized this pavementmanagement report to assess theconditionoftheVillage’sstreetsanddevelopeconomicalandworkablestreetprogramstomaintainthosestreetsoverthenextseveralyears.DatacollectedfrompavementevaluationscompletedinOctober2018ofall thestreetsmaintainedby theVillageofWinthropHarborwasentered intoadatabase. This database, createdwith the use ofMicrosoft Excelwith Geographical InformationSystem software, gives the Village the ability to easily access and update information aswell asproducemeaningful,spatialreportsandmaps.

Pavementconditionwasratedandrehabilitationstrategiesandtotalrepaircostsweredevelopedforthe31milesofstreetscurrentlymaintainedbytheVillage.Ingeneral,thisreportdoesnotaddressstreetsmaintainedby the IllinoisDepartmentofTransportation, LakeCounty,BentonTownship,developers,orprivatecorporations.

ThisstudywascompletedusingthePavementSurfaceEvaluationandRating(PASER)system(0‐10),whichisanobjectiveanalysisofthepavementconditionofeachVillageStreet.IngeneralaPASERratingof6orhigherapavementthatrequireslittleornomaintenancewhileaPASERratingof1representsafailedpavementrequiringcompletereconstruction.Theaverage(PASER)ratingofallVillagestreetsiscurrently4.1.

Theprimarygoalofasuccessfulpavementmanagementplanistorehabilitatestreetsonaschedulethattargetsstreetsjustbeforetheirconditionrapidlydeclinesandbecomesfarmoreexpensive.ThisstrategyisthemosteffectiveuseoftheVillage’sallocatedbudgetregardlessofitsamount.

We recommend that the Village make every effort to increase its annual budget for roadwaymaintenance. Inaneffort to accomplish this, theVillage should consider supplementingexistingfunding with additional corporate funds or other sources to prevent further accelerateddeteriorationofVillageStreets.

Page 5: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

1.PURPOSEOFSTUDY Page5

VillageofWinthropHarbor

PavementManagementReport140407

1.PURPOSEOFSTUDY

TheVillageofWinthropHarborhasexperiencedastablepopulationoverthepasttwodecadeswiththepopulationincreasingfrom6,670in2000to6,742in2010.Thisisafteragrowthperiodfromthe1980’stothe2000’s,asaresultmuchoftheVillage’sinfrastructureisover30yearsoldandinneedofrepair.TheVillageiscommittedtomaintainingitsstreetsinordertoprovideforsafepassageofresidentswithinandthroughtheVillageandprovideadequateridecomfortandreducedvehiclemaintenancecoststoresidentsandthetravelingpublic.Tofulfillthiscommitment,theVillageplanstoundertakeannualstreetimprovementprogramsoverthenextseveralyears.

Tomaintainandimproveitsstreets,theVillagehasdeterminedthatcarefulplanningisneededtoenable the Village to continue maximizing the effectiveness of monies spent for annual streetmaintenanceandrehabilitationprojects. TheVillageofWinthropHarborcommissionedBaxter&Woodman, Inc. to assess the condition of the Village’s street network and update the existingpavementmanagementreportwiththeobjectivesof:

Developingacurrentinventoryofstreetinformationinadatabasethatiseasytoaccessandupdate.

EvaluatingeachstreetsectionandassignaPavementSurfaceEvaluationandRating(PASER)value.

Estimating the costs of improving each street maintained by the Village based on thepavementimprovementstrategiesrecommendedforeachstreetsection.

Analyzing theeffectivenessof theVillage’scurrentroadway improvementsannualbudgetandrecommendinganannualbudgettoeffectivelymaintainVillagestreets.

Page 6: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

2.APPROACH Page6

VillageofWinthropHarbor

PavementManagementReport140407

2.APPROACH

PavementSurfaceEvaluationandRating

ThePavementSurfaceEvaluationandRating(PASER)ratingisanumeralindicatorfrom1to10thatratesthesurfaceconditionofthepavement,basedonthedistressesobservedonthesurfaceofthepavement.APASERof10denotesadistressfreepavement,whereas1indicatesafailedpavement.ThePASER systemdevelopedby theUniversity ofWisconsin‐Madison, is anapprovedpavementmanagementprocessbytheIllinoisDepartmentofTransportation(IDOT),andprovidesarationalbasis for determining maintenance and repair needs and priorities. See Exhibit 1 for detaileddescriptionsofthePASERratingsystemforHot‐MixAsphalt(HMA).

PavementLifeCycle

MostpavementstendtofollowageneralizedpavementconditionlifecycleasseeninFigure1:

FIGURE1

PavementLifeCycle

Ifmaintenanceandrepair isperformedduringtheearlystagesofdeterioration,beforethesharpdeclineinpavementcondition,asignificantcostsavingscanbeshown.Waitingtorepairtheroadpastthispivotpoint,referredtoasthecriticalPASER,canalsorequire longperiodsofclosureordetours.

Page 7: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

2.APPROACH Page7

VillageofWinthropHarbor

PavementManagementReport140407

Methodology

Thechosenmethodologytodevelopthispavementmanagementreportincludesthefollowing:

1. UtilizetheexistingstreetinventorydatabaseofallofthestreetsmaintainedbytheVillagefromVillage/CountyGISdata,updatingasnecessary.

2. Evaluate the streets in the Village’s street network by visual inspection of randomrepresentativesamplesofeachstreetsection,identifyingvariousdistresstypesandassigncorrespondingPASERvalue(1‐10).Alsoincludethefollowingintheevaluation.

a. TypicalCross‐section(1) Rural(withoutcurborcurbandgutter)or(2) Urban(withcurborcurbandgutter)

b. SidewalkLocationsc. Estimated percentages of curb and gutter repairs, pavement surface patches and

pavementbasepatchesd. Approximatenumberofdrainageandutilitystructureadjustments(ifapplicabletothe

rehabilitationstrategyselected)

3. Developpavementrehabilitationstrategiesforeachstreetbasedontheratingofthatstreetsection,andestimatethecurrentcostsforrehabilitatingeachstreet.

Recommendedrehabilitationstrategyforresidentialroadsbasedonrating:9‐10 Excellent‐Nomaintenancerequired.8 VeryGood–MinimalMaintenance‐CrackSeal6‐7 Good–MinimalMaintenance‐SpotPatch,CrackSeal4‐5 Fair–EdgeGrindandResurfacew/minimalpatching&curbrepair3 Poor–MillandResurfacew/minorpatching&curbrepair2 Very Poor – Full‐depth asphalt replacement w/ moderate curb repair or

PulverizationandOverlay1 Failed – Full‐depth asphalt replacement w/ complete curb replacement or

PulverizationandOverlayStreetswithoutcurbwillhaveaggregatewedgeshoulderrepairs.

4. SummarizequantitiesandimprovementcostsfortheVillage’sentireroadnetwork.

5. Meet with Village staff to discuss the results of the field survey, the recommended

rehabilitation strategies, the existing street network and recommended future annualinvestment.

Page 8: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

3.EXISTINGCONDITIONS Page8

VillageofWinthropHarbor

PavementManagementReport140407

3.EXISTINGCONDITIONS

PavementEvaluation

Pavement distress quantities were recorded for random representative samples of each streetsection.Theamountandtypesofpavementdistresses(i.e.cracking,potholes,“alligator”cracking,rutting,etc.)andthe levelsofpavementdeteriorationobservedduringthefieldevaluationswereusedtodeterminetherecommendedpavementrehabilitationstrategy. Alongwithevaluatingtheoverallpavementcondition,theamountofsurfaceandbasepatching,curbandgutterrepairs,anddrainage and utility structure adjustments, was estimated for each street section. This detailedinformation aids inprovidingamoreaccurate cost estimate and in selecting thehighestprioritystreetsectionstobeincludedintherecommendedfuturestreetprograms.

PavementInventoryDatabase

TheexistingbasemapofWinthropHarborcenterlinesand theexistingdatabasewasupdated toincludeanyroadwayadditionstotheVillagesincethepriorevaluation.Thisbasemapofthestreetnetwork,madeupofindividualstreetsegments(dividedasstreetblocks),wasusedtoobtainthelocationsandlengthsofallstreetsintheWinthropHarborstreetnetwork.Withthestreetnetworkbrokendownbyblock, rehabilitation strategies could be tailored to individual segments of eachstreetinsteadofone“blanket”solutionperroadway.Streetwidths,radiiandcul‐de‐sacareas,weremeasured in the fieldwhileperforming thepavementevaluations. This informationwasused tocalculate cost estimates for each street sectionby squareyards,which typicallyprovides amoreaccurate cost estimate than calculating cost by linear foot of roadway. Street cross sectioninformationwasalsoobtainedinthefieldwhileperformingthepavementevaluations,includingcurbandgutterandsidewalklocations.Sidewalklocationswerenotedbutconditionofthesidewalkwasnotevaluated.TheVillagehasaseparatesidewalkimprovementprogramwhichisoutsidethescopeofthisreport.

PreviousStreetPrograms

Ayearoflastrepairexhibit(4)hasbeenincludedinthisreporttoshowroadwayimprovementsthattheVillagehascompletedinthelast15years.Thisexhibittakesintoaccountresurfacings,overlaysand reconstructions. The Village also includes various location patching in the yearly streetimprovements,howeverthesearenotincludedforthisexhibit. Additionally,thestreetprogramsfromthelast10yearswerereviewedforbothtotalcostandcostpersquareyardtoserveasacheckfortheproposedimprovementprogramcostestimates.Table1providesasummaryofthesestreetprogramsandcosts.

Page 9: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

3.EXISTINGCONDITIONS Page9

VillageofWinthropHarbor

PavementManagementReport140407

TABLE1

HistoryofStreetPrograms

Year TypeofImprovementLength(Foot)

Area(SQYD) TotalCost CostPerSQYD

2017FullDepthHMAR&R 2,040 5,332 $200,341.72 $37.57

2”Resurfacing 500 1,167 $33,746.18 $28.922016 NoStreetProgram2015 Reconstruction 607 1,706 $224,900.00 $131.882014 NoStreetProgram2013 NoStreetProgram2012 PulverizationandOverlay 2,931 6,766 $200,950.10 $29.702011 PulverizationandOverlay 1,525 3,614 $95,628.00 $26.46

2010PulverizationandOverlay 2,275 5,540 $127,836.20 $35.38

2”Resurfacing 237 855 $24,911.50 $29.142009 PatchingProgramOnly2008 FullDepthHMAR&R 2,158 5,057 $195,106.79 $38.58

2007FullDepthHMAR&R 1,280 2,683 $74,590.00 $27.80HMAOverlayonGravel 637 921 $24,502.00 $26.60PulverizationandOverlay 6,819 16,814 $366,258.00 $21.78

2006 PulverizationandOverlay 10,031 26,443 $553,539.00 $20.93Totals 31,040 76,898 $2,122,309.49

Page 10: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

3.EXISTINGCONDITIONS Page10

VillageofWinthropHarbor

PavementManagementReport140407

EvaluationResults

Thisreportisanupdatetothereportcompletedin2006.TheconditionoftheroadwayswithintheVillagehavechangedgreatlysincethelastreportwascompleted.Table2showstheconditionofthestreetnetworkat thetimeof the2006reportandTable3showsthecurrent(2018)conditionofVillageStreet.

The2006pavementmanagement reportwas completedusing anolder versionof thePCI ratingsystem. These values have been re‐categorized to best fit into the PASER rating system forcomparisonpurposes.

TABLE2

LengthofVillageStreetsPerCondition2006

Condition PCITotalMiles Percentage

Excellent 1 10.32 29%VeryGoodGood 2‐3 6.85 19%Fair 4‐7 9.87 27%Poor 8‐9 2.00 6%

VeryPoor 10 6.78 19%Failed 11 0.01 0%

TotalMiles 35.83 100%

TABLE3

LengthofVillageStreetsPerCondition2018

Condition PASERTotalMiles Percentage

Excellent 9‐10 0.90 3%VeryGood 8 0.17 1%Good 6‐7 4.33 14%Fair 4‐5 21.80 70%Poor 3 0.65 2%

VeryPoor 2 2.59 8%Failed 1 0.59 2%

TotalMiles 37.03 100%

In2006theVillage’sStreetshadarelativelyevendistributionfromexcellenttopoorconditionedroads.In2018,thedistributionhasbecomemuchmorefocusedattheFaircondition.ThisshowsthattheVillagehasbeenprioritizingtheworstroadsintheVillagewithavailablefunds.ThisstrategyhasreducedtheamountofPoororworsestreetasapercentageoftotal,butitalsogreatlyincreasedtheamountoffairstreetswithintheVillage.

Currentlyover80%oftheVillagestreetsareinneedofresurfacingwithinthenextfiveyearsduetotheir current condition. This provides the Village the opportunity to implement a maintenanceprogramtargetingthesestreetsthatwillincreasetheoverallconditionofthestreetnetworkforacomparativelylowcostascomparedtowaitingandhavingtoreconstructroadsforadramaticcostincrease as shown in Figure 1. Due to the high percentage of Village streets in fair condition,substantialinvestmentwillbeneededinordertopreventthesestreetsfromrequiringreconstructioninthefuture.

Page 11: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

3.EXISTINGCONDITIONS Page11

VillageofWinthropHarbor

PavementManagementReport140407

Thefollowingexhibitsandappendixesareincludedwiththisreporttoprovidedetailedinformationinregardstothestreetevaluationsandresults:

Exhibit 1 – 2018 Recommended Rehabilitation Strategies – Provides a graphicalrepresentationofcurrentstreetrepairstrategies

Exhibit2–CurbandGutterMap–Provideslocationofurbanandruralcrosssectionedstreets

Exhibit 3 – 2018PASERRatingMap–Provides a graphical representationof the currentstreetratingsoftheVillage’sstreetnetwork

Appendix1–PhotoExamplesofConditions‐ProvidesguidelinesusedtoassignPASERratingandexamplesforeachratingfromstreetsincludedinthisreport

Appendix2–2018PavementManagementSummary–Providessummaryofevaluation

Appendix3–2018DetailedCostEstimatebyRehabilitationStrategy

Appendix4–2018PavementManagementData(Alphabetically)–ListofallVillagestreetswithrehabilitationstrategyandcostinalphabeticalorder

Appendix5–2018PavementManagementData (PASER)–Listof allVillage streetswithrehabilitationstrategyandcostinorderofPASERrating

Page 12: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

4.PROPOSEDIMPROVEMENTS Page12

VillageofWinthropHarbor

PavementManagementReport140407

4.PROPOSEDIMPROVEMENTS

RecommendedRehabilitationStrategies

Rehabilitation strategies for each street, based on rating,were selected on overall effectiveness,expectedlifeandindividualbenefitsandcosts.Eachstrategyconsistsofoneormorerehabilitationtechniquesrequiredtoeithermaintainthepavement in itsexistinggoodconditionorto improvepavementsinpoororfairconditiontogoodcondition.Ingeneral,pavementwillcontinuetodegradeover time and consequently, the rehabilitation strategies proposed in this report may not beadequateifrehabilitationispostponedfortoolongaperiodoftime.Less‐costlystrategieswhichareless effective than the recommended strategy can be completed but will have a far shorter lifeexpectancyandwouldnotbeaneffectiveuseofroadfunding.

Werecommendthefollowingpavementratingswithassociatedrehabilitationstrategies:

PASERRating9‐10:Excellent‐Nomaintenancerequired(“Blue”coloronExhibit3)This rating applies to newly constructed roads or roads that have been recentlyreconstructedorrehabilitated.Itisrecommended,however,thatagenciesimplementsometypeof rehabilitationactionon their pavementswithin2‐5years of construction,usuallycrack filling, and the Village should anticipatemaintenancework on these pavements infutureyears.

PASERRating8:VeryGood–MinimalMaintenance ‐CrackSeal(“DarkGreen”color inExhibit3)Thisstrategyinvolvesrepairinglocalizedareasofdistresswithcracksealing.

Cracksealinglimitstheamountofmoistureandincompressiblematerialsthatcaninfiltratethe structure of a pavement,which can prevent further deterioration of the crack edges.Cracksealing involves thoroughcrackpreparationand theplacementofqualitymaterialsinto cracks and joints. Crack sealing isnot crack‐filling,which simplyplacesmaterials inunpreparedcracksasatemporarycure. Therearemanydifferentmaterialsandmethodsavailableforcracksealing,butthemostpopularinvolvesplacingathermoplasticsealantwitha hand‐held wand in prepared cracks (usually routed). Thermoplastic sealants arebituminousmaterialsthatsoftenuponheatingandhardenuponcooling.Rubber‐modifiedasphalthasbecomeanindustrystandardforcracksealinginthepast20years.Cracksealingshouldbeperformedassoonaspossibleafterapavementbeginstocracktoobstructfurthercrackgrowth.

Page 13: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

4.PROPOSEDIMPROVEMENTS Page13

VillageofWinthropHarbor

PavementManagementReport140407

PASERRating6‐7:Good–MinimalMaintenance‐SpotPatch,CrackSeal(“BrightGreen”colorinExhibit3)This strategy involves repairing localized areas of distress with surface and base coursepatches,followedbycracksealing,

Pavementsthathavebeenselectedforpatchingandcracksealinghaveonlysmalllocalizedareasofneededrepair;andreplacementoftheentirepavementwouldnotbecost‐effective.Localized areasof structural failure, such as “alligator” cracking, shouldbe repairedwithsurfaceandbasecoursepatching.Thestructuralpatchinvolvestheremovaloffailedsurfaceandbasematerialandreplacementwithanewasphaltpatch.Astheamountofthesefailedareasincreases(whenpatchingexceeds20percentofthepavementarea),thisrehabilitationoptionbecomeslesscost‐effectiveandotherrehabilitationstrategiesshouldbeutilized.

PASERRating4‐5;Fair–EdgeGrindandResurface(“Yellow”colorinExhibit3)

Thisstrategy isusedonpavementswithmorefrequentsurfacedistressesandpavementswhichgenerallyappearwornandaged.Thisstrategybeginsbygrindingoffonlytheouterportion(typically5’‐7’ fromtheedgeofpavement)of theexistingasphaltsurfacebycoldmillingtoaspecifieddepthattheedgeofpavementandreducingdowntonoremovalattheinsideedgeofpath.

Aftermilling,baseandsurfacepatchesareusedtorepairsurfacedeficienciesandlocalizedareasofdistress. Thisstrategyiscompletedwiththeplacementofanewasphaltwearingsurface(1¾”ormore).

Thisstrategyisonlyeffectiveonstreetswithagoodbase.Ifthereareexcessivesurfaceandbasefailuresinapavementsection,agrindandoverlaywillnotbeeffective.Anoverlayonapavement with a base in poor condition would only cover up a more severe problem.Additionally,thisstrategywillraisethecrownoftheroadway,soanalternatestrategyshouldbeusedonpavementsthatalreadyhaveahighcrossslope.

PASERRating3;Poor–MillandResurface(“Orange”colorinExhibit3)

Thisstrategy isusedonpavementswithmorefrequentsurfacedistressesandpavementswhichgenerallyappearwornandaged.Thisstrategybeginsbyeithergrindingoffthefull‐widthoftheexistingasphaltsurfacetotheedgesofthepavementtoaspecifieddepthbycoldmillingonroadswithurbancrosssections.

Aftermilling,baseandsurfacepatchesareusedtorepairsurfacedeficienciesandlocalizedareas of distress. A thin asphalt leveling course (typically less than1”) is thenplaced toprovideasmoothuniformsurface,eliminatinganysurfaceirregularitiesandcorrectingcrossslopedeficiencies. Crack control is also recommended, and if fabric is used, it should be

Page 14: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

4.PROPOSEDIMPROVEMENTS Page14

VillageofWinthropHarbor

PavementManagementReport140407

placedafterthelevelingcoursebecauseitcannotbeplacedonamilledsurface.Thisstrategyiscompletedwiththeplacementofanewasphaltwearingsurface(1¾”ormore).

Thisstrategyisonlyeffectiveonstreetswithagoodbase.Ifthereareexcessivesurfaceandbasefailuresinapavementsection,agrindandoverlaywillnotbeeffective.Anoverlayonapavementwithabaseinpoorconditionwouldonlycoverupamoresevereproblem.

PASERRating2:VeryPoor–Full‐DepthAsphaltReplacementorPulverizeandOverlay(“Pink”coloronExhibit3)

Thisstrategyisusedonstreetswherethemajorityoftheasphaltsurfacehasfailed,andmorethan 25 percent of the pavement is alligator cracked, but the base aggregate is in goodconditionandthereisadequatedrainage.Thisrehabilitationstrategyinvolvesthecompleteremovaloftheentireexistingasphaltpavement,typically4”ormoreintotalthickness.Theexistingaggregatebaseisthenrepaired,shapedandpreparedforanoverlayofacompletelynewhot‐mixasphaltbinderandsurfacelayers.

Dependingonexistingpavementandbasecondition,asdeterminedbypavementcores,somestreetsmaybecandidatesforFullDepthReclamationorPulverization.Withthisstrategytheexistingpavementmaterialiscrushedandkeptinplaceovertheexistingbasecourse.Theaggregatebaseisthenrepaired,shapedandpreparedforanoverlayofacompletelynewhot‐mixasphaltbinderandsurfacelayers.Whileitisbestsuitedforrural(non‐curbed)typicalsections,FullDepthReclamationcanalsobeappliedinurban(curbed)typicalsections.Inthatcasethestreetiscompletedonehalfatatime,withcrushedreclaimedpavementmaterialbeing temporarily placed on the opposite side such that adjustments canbemade to theexisting aggregate base to maintain the existing curb & gutter elevations. Full DepthReclamation or Pulverization can have a costs savings of up to 15% ‐ 20% over fullreconstruction.

PASERRating1;Failed,ReconstructionorFull‐depthasphaltpavement removalandreplacement(“Red”coloronExhibit3)StreetswithaPASERof1areconsideredtobefailedpavementsandrequiremoreextensiverepairworkorgravelalleysthatwillneedtobereconstructedintoHMAalleys. Sincetheexistingpavementcompositionisoftenunknown,pavementcoresareusefultodeterminewhether the streets require reconstruction or full‐depth asphalt pavement removal andreplacement(previousstrategy).Forexample,astreetwithfailedbituminousmaterialmayhaveasalvageablebasecourse.

Reconstruction should be considered when pavement cores indicate poor base courseconditionsoraruralsectionwillbeurbanizedwithcurbandgutter.Thisworkincludestheremovalanddisposalofthefailedexistingpavementsurfaceandbasecoursesandsub‐gradenecessary to establish a finished sub‐grade elevation. This work may also involve the

Page 15: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

4.PROPOSEDIMPROVEMENTS Page15

VillageofWinthropHarbor

PavementManagementReport140407

removalanddisposalofunsuitablematerial inthesub‐gradeasdeterminedbyboringsorfield inspection at the time of construction, and replacement with a suitable granularmaterial.Oncethefinishedsub‐gradeiscompacted,thebasecourse,hot‐mixasphaltbinderandsurfacecourseareconstructedwithmaterialsandmixturesatthicknessesdeterminedinthedesignengineeringphaseoftheproject.

Thehighcostofreconstructionwarrantsitsuseonlyinthemostseverecasesofpavementstructuralfailure.Pavementreconstructionisverytime‐consumingandaddsconsiderabledelay and inconvenience for local residents. Pavements with large amounts of fatiguecrackingorunstablebase/sub‐gradearegoodcandidatesforthisoption.Astreetselectedforthisstrategyhasseverelevelsofdeteriorationandresurfacingthisstreetwouldactonlyas a temporary repair that will last only a few years, and the true cause of pavementdeteriorationinthesub‐baseorsub‐gradewouldnotbefixed.

Dependingonexistingpavementandbasecondition,asdeterminedbypavementcores,somestreetsmaybecandidatesforFullDepthReclamationorPulverization.Withthisstrategytheexistingpavementmaterialiscrushedandkeptinplaceovertheexistingbasecourse.Theaggregatebaseisthenrepaired,shapedandpreparedforanoverlayofacompletelynewhot‐mixasphaltbinderandsurfacelayers.Whileitisbestsuitedforrural(non‐curbed)typicalsections,FullDepthReclamationcanalsobeappliedinurban(curbed)typicalsections.Inthatcasethestreetiscompletedonehalfatatime,withcrushedreclaimedpavementmaterialbeing temporarily placed on the opposite side such that adjustments canbemade to theexisting aggregate base to maintain the existing curb & gutter elevations. Full DepthReclamation or Pulverization can have a costs savings of up to 15% ‐ 20% over fullreconstruction.

RehabilitationCosts

Thetotalareaofeachstreetsectionwasmultipliedbythesquareyardunitcostfortherehabilitationstrategytodeterminethepavementrepaircostincurrentdollars,basedonthecurrentPASER(asseeninAppendixes3,4and5).Thenadditionalcostswereaddedpersegmentforthepatchingandcurbandgutterrepairamountsdeterminedduringthefieldreview.

The square yard unit cost for each of the different rehabilitation strategies did not account forestimatedpercentagesofsurfaceandbasecoursepatches,approximate lengthofcurbandgutterremovalandreplacement,theestimatednumberofdrainageandutilitystructureadjustments;thesewere instead determined separately to provide a more accurate cost estimate. Additionally,engineeringcostsarenotincludedinthesquareyardunitcost,insteadthiswascalculatedas13%oftheconstructioncostandaddedintothetotalcostoftherepairshownintheappendixes.Appendix3showsadetailedcalculationoftheunitcostsusedtodeterminethesquareyardcosts.

It is understood that when the Village has a street program the approximate budget is at least$500,000.Forthepurposesofthisdocument,allengineeringandconstructionestimationvaluesare

Page 16: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

4.PROPOSEDIMPROVEMENTS Page16

VillageofWinthropHarbor

PavementManagementReport140407

basedonaminimumof$500,000inordertoselectstreetstobeincludedinfuturestreetprogramsandsummarizetheoverallconditionoftheVillage’sstreetnetwork.Theintentofthecostspresentedinthisreportistoprovideaconservativeestimateofstreetrepairswhichcanbeusedtoselectstreetsand develop a budget. More detailed engineering will have to be completed at the time of theindividualstreetprogramstodeterminetheactualestimatedconstructionandengineeringcostsforaparticularstreetsection.

Page 17: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

5.CONCLUSIONS/RECOMMENDATIONS Page17

VillageofWinthropHarbor

PavementManagementReport140407

5.CONCLUSIONS/RECOMMENDATIONS

Theresultsofthispavementmanagementreportshouldbeverybeneficialinassistingtheplanningof theannualstreet improvementprojectsfortheVillageofWinthropHarbor. TheuseofPASERratingsystemandExcelgivestheVillagetheabilitytoeasilyandupdateinformation. TheVillageshouldcontinuetoutilizethePASERratingsystemtoupdatethedatabaseperiodicallytomonitortheprogressoftheVillage’sstreetprogramsandtoincreasetheaccuracyofthepavementlifecyclepredictionmodel.

The cost to complete all roadwaymaintenance on all Village streets in 2018would total to $16million.OuranalysishasdeterminedthattheVillagewillneedtobudgetaround$2millionperyearonroadwaymaintenanceinordertorehabilitateitsstreetsevery30years.AlthoughtheVillagehasindicatedthatthisbudgetisnotrealisticatthistime,itillustratesthepointthattheVillagestreetsaredeterioratingeachyearandthattrendwillbedifficulttoreversewithoutsignificantinvestmentintheVillage'sstreetprogram.

WealsorecommendtheVillagecontinueitsprogramforpreventativemaintenancesuchascracksealing and patching focusing on streets in Good andVeryGood condition (PASER6‐8) to delaystreets from needingmore costly repairs, and further increasing the future annual road budget.Preventativemaintenanceonthesestreetscanbeacosteffectivewaytoincreasethepavementlifeof these streets. We recommend the Village allocate approximately 15% to 20% annually topreventativemaintenanceoveritsfiveyearimprovementplan.ThisamountbalancestheVillage’sneed for continued preventativemaintenance with the significant budgetary needs for roadwayrehabilitation.Thiscosthasbeenincludedintherecommended$2millionaverageannualcost.

It shouldbenoted that recommendationsmade in this report arebasedondata frompavementevaluations performed in October of 2018. Sewer and sidewalk improvements and the costs tochangestreets fromruralcrosssectionstourbancrosssectionswerenot includedinthisreport.Pavementperformanceoveraperiodof timecanbevariable. Inaddition, theestimatedcostsofrehabilitation will become less accurate as time progresses because of variable pavementdeterioration and inflation. Furthermore, increased traffic or new developmentsmay cause therehabilitationneedsofcertainstreetstobecomeahigherprioritythantheywereatthetimeofthisreport.Streetprogramsshouldbecoordinatedwithalldevelopmentsandlocalandprivateutilitiesto minimize future road disruption and to fully capitalize on coinciding construction seasons.Therefore,itisrecommendedthattheinformationcontainedinthepavementinventorydatabasebeupdatedonceeverythreetosixyears.

Page 18: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

Rating pavement surface condition 15

Rating system

Surface rating Visible distress* General condition/treatment measures

None. New construction.10Excellent

None. Recent overlay. Like new.9Excellent

No longitudinal cracks except reflection of paving joints.Occasional transverse cracks, widely spaced (40’ or greater).All cracks sealed or tight (open less than 1⁄4”).

Recent sealcoat or new cold mix.Little or no maintenancerequired.

8Very Good

Very slight or no raveling, surface shows some traffic wear.Longitudinal cracks (open 1⁄4”) due to reflection or paving joints.Transverse cracks (open 1⁄4”) spaced 10’ or more apart, little or slightcrack raveling. No patching or very few patches in excellent condition.

First signs of aging. Maintainwith routine crack filling.7

Good

Slight raveling (loss of fines) and traffic wear. Longitudinal cracks (open 1⁄4”– 1⁄2”). Transverse cracks (open 1⁄4”– 1⁄2”), some spaced less than 10’. First sign of block cracking. Sight to moderate flushing or polishing.Occasional patching in good condition.

Moderate to severe raveling (loss of fine and coarse aggregate).Longitudinal and transverse cracks (open 1⁄ 2” or more) show firstsigns of slight raveling and secondary cracks. First signs of longitudinalcracks near pavement edge. Block cracking up to 50% of surface.Extensive to severe flushing or polishing. Some patching or edgewedging in good condition.

Severe surface raveling. Multiple longitudinal and transverse crackingwith slight raveling. Longitudinal cracking in wheel path. Blockcracking (over 50% of surface). Patching in fair condition.Slight rutting or distortions (1⁄2” deep or less).

Closely spaced longitudinal and transverse cracks often showingraveling and crack erosion. Severe block cracking. Some alligatorcracking (less than 25% of surface). Patches in fair to poor condition.Moderate rutting or distortion (greater than 1⁄2” but less than 2"deep). Occasional potholes.

Alligator cracking (over 25% of surface).Severe rutting or distortions (2” or more deep).Extensive patching in poor condition.Potholes.

Severe distress with extensive loss of surface integrity.

Shows signs of aging. Soundstructural condition. Couldextend life with sealcoat.

Surface aging. Sound structuralcondition. Needs sealcoat or thin non-structural overlay (lessthan 2”)

Significant aging and first signsof need for strengthening. Wouldbenefit from a structural overlay(2” or more).

Needs patching and repair priorto major overlay. Milling andremoval of deterioration extendsthe life of overlay.

Severe deterioration. Needsreconstruction with extensivebase repair. Pulverization of oldpavement is effective.

Failed. Needs totalreconstruction.

6Good

5Fair

4Fair

3Poor

2Very Poor

1Failed

* Individual pavements will not have all of the types of distress listed for any particular rating. They may have only one or two types.

Appendix 1

Page 19: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

APPENDIX1–PHOTOEXAMPLESOFCONDITIONS Page1/5

VillageofWinthropHarbor

PavementManagementReport140407

Excellent–PASERRating10Old Darby Lane (Between Russell Road and Chesapeake Bay)

Excellent–PASERRating9Ellis Avenue (Between 9th Street and 10th Street)

Page 20: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

APPENDIX1–PHOTOEXAMPLESOFCONDITIONS Page2/5

VillageofWinthropHarbor

PavementManagementReport140407

VeryGood–PASERRating8Alley (Aiken Avenue) (Between 11th Street and 12th Street)

Good–PASERRating7Wilson Avenue (Between 4th Street and 3rd Street)

Page 21: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

APPENDIX1–PHOTOEXAMPLESOFCONDITIONS Page3/5

VillageofWinthropHarbor

PavementManagementReport140407

Good–PASERRating6Geddes Avenue (Between 6th Street and 7th Street)

Fair–PASERRating5College Avenue (Between 5th Street and 6th Street)

Page 22: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

APPENDIX1–PHOTOEXAMPLESOFCONDITIONS Page4/5

VillageofWinthropHarbor

PavementManagementReport140407

Fair–PASERRating4Russell Avenue (Between 5th Street and 4th Street)

Poor–PASERRating3Landon Avenue (Between 11th Street and 12th Street)

Page 23: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

APPENDIX1–PHOTOEXAMPLESOFCONDITIONS Page5/5

VillageofWinthropHarbor

PavementManagementReport140407

Failed–PASERRating1East Road (Between 13th Street and South End)

VeryPoor–PASERRating2North Avenue (Between Russell Road and South End)

Page 24: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

Village of Winthrop Harbor, IllinoisAppendix 2 - 2018 Pavement Management Summary

Total Centerline Miles of Streets Maintained by the Village 37.03 Miles(Includes Total Centerline Miles of Alleys Maintained by the Village) (1.77 Miles)

35.8 Miles 96.7%1.23 Miles 3.3%

27.62 Miles 74.6%9.41 Miles 25.4%

Summary of Recommended Rehabilitation StrategiesLength Percentage Project Percentage

PASER Length Cost CostRating Condition Rehabilitation Strategy (Miles) (2019)* (2019)9 & 10 Excellent No Work 0.90 2.4% -$ 0.0%

6 & 7 & 8Very Good

& GoodCrack Sealing with Structural Patching 4.49 12.1% 235,253$ 1.5%

4 & 5 Fair Edge Grind, Patch & Overlay 21.81 58.9% 9,169,809$ 58.5%3 Poor Full Width Grind and Patch or Pulverization & Overlay 6.65 18.0% 3,074,745$ 19.6%

2 Very PoorComplete Bit. Surface Removal, Agg. Base Repair & Install New Bit. Binder & Surface 2.59 7.0% 2,702,244$ 17.2%

1 Failed Complete Pavement Reconstruction 0.59 1.6% 493,082$ 3.1%37.03 Miles 15,675,133$

*Includes Estimated Construction Cost, Design and Construction Engineering for 2019

Total Estimated Cost to Repair Every Street Maintained by the Village in 2018 ~ $16 Million

2018 Totals

Pavement Surface TypesAsphalt

Gravel (Alleys)

Street Cross SectionRural (Streets With No Curb & Gutter)

Urban (Streets With Curb & Gutter)

Appendix 2

Page 25: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

Village of Winthrop Harbor, Illinois

*Base RepairPASER CostRating ($/SQ YD)

10 -$

9 -$

8 1.00$

7 1.50$

6 2.00$

5 19.00$

4 19.00$

3 22.00$

2 $ 70.00

1 126.00$

Crack Sealing $2.00 $/l.f. Pulverize $10.00 $/sq ydPolymerized Leveling Binder $110.00 $/ton Curb Repair: $50.00 $/linear ft

Bituminous Binder $90.00 $/ton Base Patch: $40.00 $/sq ydBituminous Surface $95.00 $/ton Surface Patch: $30.00 $/sq ydBituminous Milling $6.00 $/sq yd Structure Adjustment: $400.00 $/ea

Bituminous Surface Removal (Full Depth) $7.00 $/sq yd Shoulder Repair $40.00 $/tonButt Joint $0.25 $/sq yd Driveway Repair $60.00 $/sq yd

Base Prep. / Repair $8.00 $/sq yd Curb and Gutter $32.00 $/l.f.Pavement Removal $10.00 $/sq yd Traffic Control / Mobilization $1.50 $/sq yd

Geotechnical Fabric $1.25 $/sq yd Parkway Restoration $10.00 $/sq yd12" Aggregate Base $25.00 $/sq yd Ditching $30.00 $/ft

Earth Excavation $50.00 $/cu yd Storm Sewer $150.00 $/ft

Design and Construction Engineering is assumed to be thirteen percent (13%) of the Estimated Construction Cost

Appendix 3

Fair; Edge Grind and Resurface with Leveling Binder, Structural Patching and Curb Repair

Fair; Edge Grind and Resurface with Leveling Binder, Structural Patching and Curb Repair

Poor; Full Width Mill and Resurface, Structural Patching and Curb Repair

Failed; Reconstruct Pavement Including Aggregate Base Course, new Curb and Gutter and Driveway Aprons

Input Values used for Strategy Repair Cost

Appendix 3 - 2018 Pavement Management Cost Estimation Values

All of the below Engineering and Cost Estimation Values are based on a minimum street program of $500,000. These values are specifically provided for the purposes of this Pavement Management Report. More detailed engineering will have to be completed at the time of the street projects to determine the actual construction and engineering costs.

Notes: * Patching, structure adjusts, curb and gutter, and sidewalk repairs are not accounted for in the PASER repair unit cost. Those individual repair costs are added to the total street construction cost on an individual basis as evaluated in the field for each street.

Very Poor; Reconstruct Pavement with new HMA Pavement and Aggregate Base Repairs, or Pulverize and Overlay

Excellent; No Maintenance Required

Excellent; No Maintenance Required

Very Good; Minimal Maintenance - Crack Sealing

Good: Minor Maintenance - Crack Sealing with Structural Patching

Improvement Strategy Description

Good: Minor Maintenance - Crack Sealing with Structural Patching

Page 26: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

Village of Winthrop Harbor, IllinoisAppendix 4 - 2018 Village Street Network (Alphabetical)

Street Name From Street To Street

Length (Feet)

Width (Feet)

Area (S.Y.) Cross Section PASER Number Recommended Rehabilitation Strategy

*2018 Total Project Cost

1st Street Sheridan Rd Oakdale Ave 958 26 2768 Rural 3 Full Width Grind, Patch & Overlay 75,068.16$ 2nd St Holdridge Ave Russell Ave 328.285 22 803 Rural 3 Full Width Grind, Patch & Overlay 25,406.92$ 2nd St Russell Ave Geddes Ave 325.2042 22 795 Rural 3 Full Width Grind, Patch & Overlay 23,357.10$ 2nd St Kirkwod Ave College Ave 321.4336 22 786 Rural 5 Edge Grind, Patch & Overlay 19,984.05$ 2nd St Geddes Ave Kirkwood Ave 337.055 22 824 Rural 3 Full Width Grind, Patch & Overlay 24,209.12$ 2nd St Sheridan Rd End 823.8899 21 1923 Rural 5 Edge Grind, Patch & Overlay 80,985.63$ 2nd St College Ave End 386.9866 21 903 Rural 6 Crak Sealing and Patching 4,591.76$ 2nd St Garnett Ave End 140 18 280 Rural 6 Crak Sealing and Patching 1,898.40$ 2nd St Garnett Ave Calvin Ave 315 22 770 Rural 6 Crak Sealing and Patching 1,653.19$ 3rd St End Garnett Ave 609.6788 21 1423 Rural 5 Edge Grind, Patch & Overlay 35,375.78$ 3rd St Garnett Ave Thompson Ave 327.8066 22 802 Rural 4 Edge Grind, Patch & Overlay 19,937.72$ 3rd St Thompson Ave Holdridge Ave 328.4569 22 803 Rural 4 Edge Grind, Patch & Overlay 21,777.36$ 3rd St Holdridge Ave Russell Ave 326.9948 21 763 Rural 4 Edge Grind, Patch & Overlay 21,144.56$ 3rd St Russell Ave Geddes Ave 326.0673 22 798 Rural 3 Full Width Grind, Patch & Overlay 27,504.20$ 3rd St Kirkwod Ave College Ave 315.9016 21 738 Rural 3 Full Width Grind, Patch & Overlay 26,686.08$ 3rd St Geddes Ave Kirkwood Ave 333.0118 21 778 Rural 4 Edge Grind, Patch & Overlay 21,099.36$ 3rd St Prairie Ave Oak Ln 663.79 23 1697 Rural 4 Edge Grind, Patch & Overlay 46,022.64$ 3rd St Oak Ln End 197.125 23 504 Rural 4 Edge Grind, Patch & Overlay 13,668.48$ 3rd St End Runyard Ave 75 21 175 Rural 3 Full Width Grind, Patch & Overlay 5,932.50$ 3rd St Runyard Ave End 75 21 175 Rural 3 Full Width Grind, Patch & Overlay 5,932.50$ 3rd St Sheridan Rd Oakdale Ave 1104.494 22 3100 Rural 6 Crak Sealing and Patching 9,209.50$ 3rd St Oakdale Ave End 141.2607 22 346 Rural 6 Crak Sealing and Patching 1,881.45$ 4th St North Ave Cavin Ave 315.4275 22 772 Rural 3 Full Width Grind, Patch & Overlay 24,426.08$ 4th St Cavin Ave Garnett Ave 325.128 22 795 Rural 3 Full Width Grind, Patch & Overlay 27,854.50$ 4th St Garnett Ave Thompson Ave 324.1642 22 793 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 62,726.30$ 4th St Thompson Ave Holdridge Ave 325.2263 22 795 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 62,884.50$ 4th St End Russell Ave 153.7709 22 376 Rural 4 Edge Grind, Patch & Overlay 10,197.12$ 4th St Runyard Ave Wilson Ave 299.4086 21 699 Rural 6 Crak Sealing and Patching 4,739.22$ 4th St Wilson Ave Sheridan Rd 277.5128 21 648 Rural 6 Crak Sealing and Patching 2,928.96$ 4th St Prairie Ridge Dr Fossland Ave 464.792 24 1240 Urban 4 Edge Grind, Patch & Overlay 38,880.95$ 4th St Runyard Ave College Ave 316.953 21 740 Rural 6 Crak Sealing and Patching 5,017.20$ 5th St College Ave Whitney Ave 401.1401 23 1026 Rural 4 Edge Grind, Patch & Overlay 27,825.12$ 5th St Holdridge Ave Russell Ave 332.2701 21 776 Rural 5 Edge Grind, Patch & Overlay 19,743.36$ 5th St Thompson Ave Holdridge Ave 317.31 22 776 Rural 4 Edge Grind, Patch & Overlay 30,500.17$ 5th St Garnett Ave Thompson Ave 325.6579 21 760 Rural 4 Edge Grind, Patch & Overlay 19,345.60$ 5th St North Ave Cavin Ave 317.1043 21 740 Rural 4 Edge Grind, Patch & Overlay 18,848.40$ 5th St Cavin Ave Garnett Ave 323.5142 21 755 Rural 4 Edge Grind, Patch & Overlay 22,633.90$ 5th St Kenosha Rd Meadow Ln 755.1526 22 1846 Rural 4 Edge Grind, Patch & Overlay 45,891.56$ 5th St Prairie Ave Subdivision Limit 271.5058 22 664 Rural 4 Edge Grind, Patch & Overlay 16,507.04$ 5th St Meadow Ln Prairie Ave 259.7798 22 636 Rural 5 Edge Grind, Patch & Overlay 15,810.96$ 5th St Roberts Rd North Ave 828.5643 26 2394 Rural 4 Edge Grind, Patch & Overlay 59,514.84$ 5th St Russell Ave Kirkwood Ave 655.6184 21 1530 Rural 4 Edge Grind, Patch & Overlay 38,487.80$ 5th St Kirkwod Ave College Ave 341.8703 22 836 Rural 4 Edge Grind, Patch & Overlay 23,576.32$ 5th St Subdivision Limit Prairie Ridge Dr 238.572 24 637 Urban 4 Edge Grind, Patch & Overlay 22,667.17$ 5th St Prairie Ridge Dr Fossland Ave 475.439 24 1268 Urban 4 Edge Grind, Patch & Overlay 45,133.08$ 5th St Whitney Ave North Park Ave 147.5 23 377 Rural 4 Edge Grind, Patch & Overlay 10,676.24$ 6th St Whitney Ave Sheridan Rd 376.7279 21 880 Rural 4 Edge Grind, Patch & Overlay 24,317.60$ 6th St Cavin Ave Garnett Ave 324.679 21 758 Rural 4 Edge Grind, Patch & Overlay 21,242.19$ 6th St Garnett Ave Thompson Ave 325.9407 22.5 815 Rural 4 Edge Grind, Patch & Overlay 22,839.56$ 6th St North Ave Cavin Ave 314.454 21 734 Rural 4 Edge Grind, Patch & Overlay 21,021.62$ 6th St Thompson Ave Holdridge Ave 325.9129 21 761 Rural 4 Edge Grind, Patch & Overlay 21,326.26$ 6th St Holdridge Ave Russell Ave 323.3904 21 755 Rural 4 Edge Grind, Patch & Overlay 21,158.12$ 6th St Russell Ave Geddes Ave 332.4217 21 776 Rural 4 Edge Grind, Patch & Overlay 21,746.62$ 6th St Geddes Ave Kirkwood Ave 327.6779 21 765 Rural 4 Edge Grind, Patch & Overlay 21,438.36$ 6th St Kirkwod Ave College Ave 336.2411 21 785 Rural 4 Edge Grind, Patch & Overlay 21,998.84$ 6th St College Ave Whitney Ave 357.4046 21 834 Rural 3 Full Width Grind, Patch & Overlay 24,502.92$ 7th St Kirkwod Ave College Ave 340.875 21 796 Rural 4 Edge Grind, Patch & Overlay 22,039.52$

*Includes Estimated Construction Cost, Design and Construction Engineering.All Engineering and Cost Estimation Values are based on a minimum street program of $500,000.

Appendix 4Page 1 of 8

Page 27: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

Village of Winthrop Harbor, IllinoisAppendix 4 - 2018 Village Street Network (Alphabetical)

Street Name From Street To Street

Length (Feet)

Width (Feet)

Area (S.Y.) Cross Section PASER Number Recommended Rehabilitation Strategy

*2018 Total Project Cost

7th St Geddes Ave Kirkwood Ave 334.9416 21 782 Rural 4 Edge Grind, Patch & Overlay 21,659.84$ 7th St Russell Ave Geddes Ave 324.5874 21 758 Rural 4 Edge Grind, Patch & Overlay 24,006.85$ 7th St Holdridge Ave Russell Ave 327.6315 24 874 Urban 4 Edge Grind, Patch & Overlay 32,958.47$ 7th St Thompson Ave Holdridge Ave 321.3521 24 857 Urban 4 Edge Grind, Patch & Overlay 32,320.04$ 7th St Garnett Ave Thompson Ave 326.2274 24 870 Urban 4 Edge Grind, Patch & Overlay 32,810.33$ 7th St Cavin Ave Garnett Ave 326.8841 24 872 Urban 4 Edge Grind, Patch & Overlay 31,488.22$ 7th St Fulton Ave Franklin Ave 284.9126 28 887 Urban 4 Edge Grind, Patch & Overlay 29,279.57$ 7th St Franklin Ave North Park Ave 322.101 28 1003 Urban 4 Edge Grind, Patch & Overlay 33,107.88$ 7th St North Park Ave Ravine Dr 356.8533 28 1111 Urban 4 Edge Grind, Patch & Overlay 36,673.62$ 7th St College Ave Whitney Ave 316.4747 24 844 Rural 4 Edge Grind, Patch & Overlay 23,341.28$ 7th St North Ave Cavin Ave 311.8874 24 832 Urban 4 Edge Grind, Patch & Overlay 32,903.06$ 7th St End North Ave 41.89825 24 112 Urban 4 Edge Grind, Patch & Overlay 4,427.30$ 7th St Ravine Dr RR Xing 550 28 1712 Urban 4 Edge Grind, Patch & Overlay 56,513.56$ 7th St Sheridan Rd Fulton Ave 298.3849 25 978 Urban 5 Edge Grind, Patch & Overlay 29,895.11$ 7th St Whitney Ave 50' W of Sheridan 259.358 21 606 Rural 4 Edge Grind, Patch & Overlay 16,434.72$ 7th St 50' W of Sheridan Sheridan Rd 50 21 117 Rural 4 Edge Grind, Patch & Overlay 3,437.46$ 8th St Geddes Ave Kirkwood Ave 338.2804 22 827 Rural 4 Edge Grind, Patch & Overlay 29,421.81$ 8th St Kirkwod Ave College Ave 334.2717 22 818 Rural 4 Edge Grind, Patch & Overlay 22,636.16$ 8th St Landon Ave South Park Ave 325.4526 22 796 Rural 4 Edge Grind, Patch & Overlay 21,587.52$ 8th St Fulton Ave Franklin Ave 310.0207 25 862 Urban 3 Full Width Grind, Patch & Overlay 29,280.79$ 8th St Franklin Ave Landon Ave 321.2614 25 893 Urban 3 Full Width Grind, Patch & Overlay 28,300.41$ 8th St Sheridan Rd Fulton Ave 328.4238 25 913 Urban 3 Full Width Grind, Patch & Overlay 30,987.13$ 8th St College Ave Whitney Ave 272.6841 22 667 Rural 4 Edge Grind, Patch & Overlay 20,727.03$ 8th St Whitney Ave Sheridan Rd 253.4396 22 620 Rural 4 Edge Grind, Patch & Overlay 19,266.50$ 8th St Russell Ave 80' E of Russell 80 26 232 Urban 2 Agg. Base Repair & Install New Bit. Binder & Surface 34,306.80$ 8th St 80' E of Russell Geddes Ave 246.489 26 713 Rural 4 Edge Grind, Patch & Overlay 24,976.39$ 9th St Fulton Ave Franklin Ave 360.1854 35 1401 Urban 2 Agg. Base Repair & Install New Bit. Binder & Surface 123,481.38$ 9th St Franklin Ave Landon Ave 366.0489 35 1424 Urban 2 Agg. Base Repair & Install New Bit. Binder & Surface 125,047.46$ 9th St Landon Ave South Park Ave 440 30 1467 Urban 2 Agg. Base Repair & Install New Bit. Binder & Surface 125,983.70$ 9th St Sheridan Rd Fulton Ave 363.2914 35.33 1427 Urban 3 Full Width Grind, Patch & Overlay 47,362.63$ 10th St Monroe Ave Kimberly Ln 518.0188 24 1382 Urban 3 Full Width Grind, Patch & Overlay 76,707.40$ 10th St Ellis Ave End 175 22 428 Rural 3 Full Width Grind, Patch & Overlay 13,993.92$ 10th St Shields Ave 515' W of Ellis 458.997 23 1173 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 93,688.30$ 10th St 515' W of Ellis Ellis Ave 515 23 1317 Rural 9 No Work -$ 10th St Sheridan Rd Aiken Ave 251.7095 25 700 Urban 3 Full Width Grind, Patch & Overlay 27,836.63$ 10th St Landon Ave South Park Ave 383.8049 25 1067 Urban 3 Full Width Grind, Patch & Overlay 45,054.37$ 10th St Aiken Ave Fulton Ave 225.5342 25 627 Urban 3 Full Width Grind, Patch & Overlay 25,839.35$ 10th St Fulton Ave Franklin Ave 360.003 25 1001 Urban 4 Edge Grind, Patch & Overlay 33,929.41$ 10th St Franklin Ave Landon Ave 365.6262 25 1016 Urban 4 Edge Grind, Patch & Overlay 34,433.66$ 10th St East Broadway Ave Washington Ave 378.1 22 925 Rural 5 Edge Grind, Patch & Overlay 22,715.83$ 10th St Washington Ave End 146.637 22 359 Rural 4 Edge Grind, Patch & Overlay 11,155.93$ 10th St South Park Ave End 134 20 298 Rural 4 Edge Grind, Patch & Overlay 8,755.24$ 10th St Kimberly Ln 100' E of Kimberly 100 23 256 Urban 2 Agg. Base Repair & Install New Bit. Binder & Surface 20,701.60$ 10th St 100' E of Kimberly Shields Ave 225.8424 23 578 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 46,171.80$ 11th St Lewis Ave West Broadway Ave 2410.264 22 5892 Rural 3 Full Width Grind, Patch & Overlay 213,054.72$ 11th St East Broadway Ave Monroe Ave 2646.647 23 6764 Rural 4 Edge Grind, Patch & Overlay 290,446.16$ 11th St Monroe Ave Adams Ave 2008.407 21 4687 Rural 4 Edge Grind, Patch & Overlay 145,648.53$ 11th St Adams Ave Mary Ave 476.838 22 1166 Rural 4 Edge Grind, Patch & Overlay 36,685.45$ 11th St Mary Ave Sheridan Rd 388.5605 22 1050 Rural 4 Edge Grind, Patch & Overlay 28,476.00$ 11th St Sheridan Rd Aiken Ave 280.0622 25 778 Urban 4 Edge Grind, Patch & Overlay 27,604.69$ 11th St Aiken Ave Fulton Ave 267.2696 25 743 Urban 4 Edge Grind, Patch & Overlay 25,301.49$ 11th St Fulton Ave Franklin Ave 364.1242 25 1012 Urban 4 Edge Grind, Patch & Overlay 34,299.16$ 11th St Franklin Ave Landon Ave 359.5845 25 999 Urban 4 Edge Grind, Patch & Overlay 30,366.88$ 11th St Landon Ave South Park Ave 445.6595 25 1238 Urban 4 Edge Grind, Patch & Overlay 44,378.37$ 12th St Adams Ave Sheridan Rd 782.139 24 2086 Rural 4 Edge Grind, Patch & Overlay 67,082.45$ 12th St Sheridan Rd Aiken Ave 360.7665 25 1003 Urban 4 Edge Grind, Patch & Overlay 33,316.35$ 12th St Aiken Ave Fulton Ave 272.4548 25 757 Urban 4 Edge Grind, Patch & Overlay 25,147.95$

*Includes Estimated Construction Cost, Design and Construction Engineering.All Engineering and Cost Estimation Values are based on a minimum street program of $500,000.

Appendix 4Page 2 of 8

Page 28: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

Village of Winthrop Harbor, IllinoisAppendix 4 - 2018 Village Street Network (Alphabetical)

Street Name From Street To Street

Length (Feet)

Width (Feet)

Area (S.Y.) Cross Section PASER Number Recommended Rehabilitation Strategy

*2018 Total Project Cost

12th St Fulton Ave Franklin Ave 362.5391 25 1008 Urban 4 Edge Grind, Patch & Overlay 31,885.65$ 12th St Franklin Ave Landon Ave 363.9531 25 1011 Urban 4 Edge Grind, Patch & Overlay 31,530.99$ 12th St South Park Ave End 280.5076 20 624 Rural 4 Edge Grind, Patch & Overlay 14,454.96$ 12th St Monroe Ave End 363 22 888 Rural 3 Full Width Grind, Patch & Overlay 34,116.96$ 12th St Landon Ave South Park Ave 438.6131 25 1219 Urban 4 Edge Grind, Patch & Overlay 38,467.61$ 13th St End Monroe Ave 1305.795 21 3047 Rural 4 Edge Grind, Patch & Overlay 95,137.53$ 13th St Sheridan Rd Aiken Ave 414.6679 23 1060 Rural 3 Full Width Grind, Patch & Overlay 29,199.20$ 13th St Aiken Ave Fulton Ave 289.7557 23.5 757 Rural 3 Full Width Grind, Patch & Overlay 20,981.84$ 13th St Franklin Ave Landon Ave 359.8066 23 920 Rural 4 Edge Grind, Patch & Overlay 25,370.76$ 13th St Fulton Ave Franklin Ave 363.6738 22 889 Rural 5 Edge Grind, Patch & Overlay 24,561.57$ 13th St Landon Ave South Park Ave 442.9025 23 1132 Rural 4 Edge Grind, Patch & Overlay 30,904.60$ 13th St South Park Ave East Rd 369.4975 23 945 Rural 4 Edge Grind, Patch & Overlay 26,023.34$ 13th St East Broadway Ave End 666.766 22 1630 Rural 3 Full Width Grind, Patch & Overlay 59,844.80$ 13th St Monroe Ave Pennsylvania Ave 375 22 917 Rural 4 Edge Grind, Patch & Overlay 24,869.04$ 13th St Pennsylvania Ave Adams Ave 1632.521 22 4522 Rural 4 Edge Grind, Patch & Overlay 132,050.44$ 13th St Lewis Ave Creekside Ct 1962.526 22 4798 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 379,973.80$ 13th St Creekside Ct West Broadway Ave 450 22 1100 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 87,462.00$ 14th St Monroe Ave April Ln 835.1674 22 2042 Rural 6 Crak Sealing and Patching 5,768.65$ 14th St Mae Ct End 67 21.5 705 Rural 4 Edge Grind, Patch & Overlay 19,119.60$ 14th St Funderburk Dr Mae Ct 425.2713 21.5 1016 Rural 4 Edge Grind, Patch & Overlay 28,005.92$ 14th St April Ln Funderburk Dr 380.6638 22 931 Rural 4 Edge Grind, Patch & Overlay 25,248.72$ 14th St Aiken Ave Fulton Ave 289.7549 21 677 Rural 3 Full Width Grind, Patch & Overlay 18,360.24$ 14th St Sheridan Rd Aiken Ave 418.4081 21 977 Rural 4 Edge Grind, Patch & Overlay 26,406.63$ 14th St Fulton Ave Franklin Ave 363.4761 21 849 Rural 4 Edge Grind, Patch & Overlay 19,667.09$ 14th St Franklin Ave Landon Ave 355.5488 22 870 Rural 4 Edge Grind, Patch & Overlay 20,605.55$ 14th St Landon Ave South Park Ave 415.3201 21 970 Rural 4 Edge Grind, Patch & Overlay 25,319.91$ 15th St Monroe Ave End 623.5117 19 1317 Rural 7 Crak Sealing and Patching 3,720.53$ 15th St End Landon Ave 177.7765 20 396 Rural 3 Full Width Grind, Patch & Overlay 10,739.52$ 15th St Landon Ave South Park Ave 422 22 1032 Rural 4 Edge Grind, Patch & Overlay 23,906.28$ 15th St South Park Ave East Rd 349.971 21 817 Rural 4 Edge Grind, Patch & Overlay 21,326.15$ 15th St End 700' W of Monroe 1243 15 2072 Rural 4 Edge Grind, Patch & Overlay 60,875.36$ 15th St 700' W of Monroe Monroe Ave 700 20 1556 Rural 3 Full Width Grind, Patch & Overlay 49,231.84$

AAdams Ave 12th St 11th St 653.264 20 1452 Rural 7 Crak Sealing and Patching 2,092.76$ Adams Ave 13th St 12th St 642.275 20 1428 Rural 7 Crak Sealing and Patching 2,065.64$ Aiken Ave End 14th St 259.4758 21 606 Rural 7 Crak Sealing and Patching 684.78$ Aiken Ave 14th St 13th St 656.8684 21 1533 Rural 4 Edge Grind, Patch & Overlay 53,700.99$ Alley Alley off Sheridan 7th St 580 20 1289 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 101,959.90$ Alley 13th St End 256 12 342 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 27,052.20$ Alley 12th St End 353 12 471 Rural 1 Complete Bit. Surface Removal, Agg. Base Repair & Install New Bit. Binder & Surface 55,706.74$ Alley 11th St End 107 12 143 Rural 1 Complete Bit. Surface Removal, Agg. Base Repair & Install New Bit. Binder & Surface 16,913.09$ Alley 11th St End 80 12 107 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 8,463.70$ Alley 11th St 10th St 663.127 12 885 Rural 1 Complete Bit. Surface Removal, Agg. Base Repair & Install New Bit. Binder & Surface 104,671.90$ Alley 11th St 10th St 657.351 11 804 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 63,596.40$ Alley 10th St End 186 12 248 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 19,616.80$ Alley 10th St End 34 12 46 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 3,638.60$ Alley 9th St End 241 11 295 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 23,334.50$ Alley 9th St 207' N. of 9th St 207.187 18 415 Rural 7 Crak Sealing and Patching 1,372.95$ Alley 207' N. of 9th St 8th St 456 12 608 Rural 7 Crak Sealing and Patching 1,139.04$ Alley 9th St 8th St 658.774 12 879 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 69,528.90$ Alley 9th St 8th St 657.861 11 805 Rural 1 Complete Bit. Surface Removal, Agg. Base Repair & Install New Bit. Binder & Surface 95,210.03$ Alley 8th St End 30 11 37 Rural 1 Complete Bit. Surface Removal, Agg. Base Repair & Install New Bit. Binder & Surface 4,376.11$ Alley 9th St End 133 12 178 Rural 1 Complete Bit. Surface Removal, Agg. Base Repair & Install New Bit. Binder & Surface 21,052.65$ Alley 67' E of Sheridan Fulton Ave 238.913 11 293 Rural 1 Complete Bit. Surface Removal, Agg. Base Repair & Install New Bit. Binder & Surface 34,654.09$ Alley Sheridan Rd 67' E of Sheridan 66.846 12 90 Rural 6 Crak Sealing and Patching 132.21$ Alley Alley 6th St 487.384 14 759 Rural 4 Edge Grind, Patch & Overlay 21,870.59$ Alley 6th St Whitney Ave 573.139 11 701 Rural 1 Complete Bit. Surface Removal, Agg. Base Repair & Install New Bit. Binder & Surface 82,909.61$

*Includes Estimated Construction Cost, Design and Construction Engineering.All Engineering and Cost Estimation Values are based on a minimum street program of $500,000.

Appendix 4Page 3 of 8

Page 29: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

Village of Winthrop Harbor, IllinoisAppendix 4 - 2018 Village Street Network (Alphabetical)

Street Name From Street To Street

Length (Feet)

Width (Feet)

Area (S.Y.) Cross Section PASER Number Recommended Rehabilitation Strategy

*2018 Total Project Cost

Alley Sheridan Rd Alley 371.403 18 743 Rural 3 Full Width Grind, Patch & Overlay 25,187.70$ Alley Whitney Ave Alley 164.848 12 220 Rural 4 Edge Grind, Patch & Overlay 6,836.50$ Alley Alley Sheridan Rd 162.502 12 217 Rural 4 Edge Grind, Patch & Overlay 6,743.28$ Alley (Aiken Ave) 11th St 10th St 656.3402 14 1021 Rural 6 Crak Sealing and Patching 3,336.33$ Alley (Aiken Ave) 12th St 11th St 662.0046 16 1177 Rural 8 Crak Sealing and Patching 3,484.02$ Alley (Aiken Ave) 13th St 12th St 646.6643 21 1509 Rural 3 Full Width Grind, Patch & Overlay 52,059.10$ Alton Ct End 9th St 454 24 1769 Urban 4 Edge Grind, Patch & Overlay 73,360.73$ April Ln End 14th St 667.0088 24 1854 Urban 5 Edge Grind, Patch & Overlay 64,933.44$

BBen Ct Funderburk Dr End 133 22 884 Rural 4 Edge Grind, Patch & Overlay 23,974.08$ Berrong Ave Washington Ave Berrong Ct 490 21.5 1171 Rural 5 Edge Grind, Patch & Overlay 31,757.52$ Berrong Ave Berrong Court End 1760 22 4303 Rural 5 Edge Grind, Patch & Overlay 116,697.36$ Berrong Court Berrong Ave Cul-de-sac 210 22 1044 Rural 8 Crak Sealing and Patching 7,078.32$ Block Ln Kenosha Rd Prairie Ave 380.3895 25.5 1078 Rural 9 No Work -$ Burke Dr End Sheridan Rd 382.5892 20 851 Rural 3 Full Width Grind, Patch & Overlay 26,925.64$

CCamden Cove End Fairhaven Dr 62 22 683 Rural 4 Edge Grind, Patch & Overlay 18,974.96$ Casco Bay End Fairhaven Dr 79 22 724 Rural 4 Edge Grind, Patch & Overlay 19,634.88$ Cavin Ave End Russell Rd 642.9518 21 1501 Rural 5 Edge Grind, Patch & Overlay 34,770.67$ Cavin Ave 5th St 4th St 628.1956 21 1466 Rural 4 Edge Grind, Patch & Overlay 40,661.92$ Cavin Ave 6th St 5th St 658.2108 22 1609 Rural 4 Edge Grind, Patch & Overlay 39,085.57$ Cavin Ave 7th St 6th St 656.5273 22 1605 Rural 3 Full Width Grind, Patch & Overlay 43,979.60$ Calvin Ave 2nd St 3rd St 630 24 1680 Rural 6 Crak Sealing and Patching 3,606.96$ Cedar Ct End Ravine Dr 399.9055 22 1565 Rural 6 Crak Sealing and Patching 4,421.13$ Charles Ave 658' S of 9th St 9th St 657.5335 32 2374 Urban 2 Agg. Base Repair & Install New Bit. Binder & Surface 262,536.68$ Charles Ave 658' S of 9th St End 200 32 712 Urban 3 Full Width Grind, Patch & Overlay 28,259.04$ Chatham Ct Old Darby Ln End 179 24 982 Urban 4 Edge Grind, Patch & Overlay 40,467.56$ Chesapeake Bay Old Darby Ln End 196 22 1038 Urban 4 Edge Grind, Patch & Overlay 35,246.96$ Chestnut Cir 4th St End 318.0816 22 1350 Rural 6 Crak Sealing and Patching 3,813.75$ Clearview Ct Prairie Ave End 230 22 1040 Rural 4 Edge Grind, Patch & Overlay 28,204.80$ College Ave 5th St End 264.6081 21 618 Rural 5 Edge Grind, Patch & Overlay 14,874.64$ College Ave 2nd St Russell Rd 624.2415 21 1457 Rural 6 Crak Sealing and Patching 6,585.64$ College Ave 2nd St 2nd St 48.31896 21 113 Rural 6 Crak Sealing and Patching 510.76$ College Ave 3rd St 2nd St 583.0933 21 1361 Rural 6 Crak Sealing and Patching 6,151.72$ College Ave 8th St 7th St 657.669 22 1608 Rural 4 Edge Grind, Patch & Overlay 44,060.96$ College Ave 6th St 5th St 658.5863 22 1610 Rural 5 Edge Grind, Patch & Overlay 39,655.09$ College Ave 7th St 6th St 663.9822 22 1624 Rural 6 Crak Sealing and Patching 7,411.90$ College Ave 9th St 8th St 656.8779 22 1606 Rural 4 Edge Grind, Patch & Overlay 44,006.72$ College Ave 3rd St 4th St 544.764 22 1332 Rural 5 Edge Grind, Patch & Overlay 36,123.84$ Compton Ct Cornerstone Dr End 259 22 1178 Rural 4 Edge Grind, Patch & Overlay 31,947.36$ Cornerstone Dr End Rose Ct 444 22.5 1628 Rural 4 Edge Grind, Patch & Overlay 44,151.36$ Cornerstone Dr Rose Ct Ivy Ct 555.708 22.5 1390 Rural 4 Edge Grind, Patch & Overlay 37,696.80$ Cornerstone Dr Ivy Ct Compton Ct 120.4611 22.5 302 Rural 4 Edge Grind, Patch & Overlay 8,190.24$ Cornerstone Dr Compton Ct Lewis Ave 322.1537 22.5 806 Rural 4 Edge Grind, Patch & Overlay 21,858.72$ Creekside Ct 13th St Cul-de-sac 1712.595 24 5258 Urban 4 Edge Grind, Patch & Overlay 202,548.99$

DDanbury Cove End Old Darby Ln 118 24 819 Urban 4 Edge Grind, Patch & Overlay 24,145.84$ Deerpath Cir End Ravine Dr 201.7993 22 1052 Rural 6 Crak Sealing and Patching 2,971.90$ Deerpath Dr Ravine Dr Ravine Dr 1803.386 22 4409 Rural 6 Crak Sealing and Patching 21,284.68$

EEast Broadway Ave 13th St 11th St 1317.977 22 3222 Rural 4 Edge Grind, Patch & Overlay 100,123.65$ East Broadway Ave 10th St 9th St 655 22 1602 Rural 4 Edge Grind, Patch & Overlay 49,782.15$ East Broadway Ave 11th St 10th St 659.1156 22 1612 Rural 3 Full Width Grind, Patch & Overlay 54,646.80$ East Rd 15th St End 601.6412 22 1505 Rural 4 Edge Grind, Patch & Overlay 36,223.85$ East Rd 13th St End 309 14 656 Rural 1 Complete Bit. Surface Removal, Agg. Base Repair & Install New Bit. Binder & Surface 77,587.31$ Ellis Ave 10th St 9th St 657.38 26 1900 Urban 9 No Work -$ English Ln Washington Ave 485' N of Washington 485 22 1186 Rural 9 No Work -$

*Includes Estimated Construction Cost, Design and Construction Engineering.All Engineering and Cost Estimation Values are based on a minimum street program of $500,000.

Appendix 4Page 4 of 8

Page 30: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

Village of Winthrop Harbor, IllinoisAppendix 4 - 2018 Village Street Network (Alphabetical)

Street Name From Street To Street

Length (Feet)

Width (Feet)

Area (S.Y.) Cross Section PASER Number Recommended Rehabilitation Strategy

*2018 Total Project Cost

English Ln 485' N of Washington End 1470.936 22 3643 Rural 3 Full Width Grind, Patch & Overlay 131,730.88$ English Ln Old Darby Ln Richards Ct 741 24 1976 Urban 6 Crak Sealing and Patching 13,955.50$ English Ln Richards Ct Richards Ct 68.981 24 184 Urban 6 Crak Sealing and Patching 1,299.29$ English Ln Richards Ct End 430.166 24 1148 Urban 6 Crak Sealing and Patching 8,555.98$

FFairhaven Dr Camden Cove Roberts Rd 487.7013 22 1193 Rural 4 Edge Grind, Patch & Overlay 32,354.16$ Fairhaven Dr Camden Cove Casco Bay 784.5925 22 1918 Rural 4 Edge Grind, Patch & Overlay 52,016.16$ Fairhaven Dr Casco Bay Roberts Rd 364.236 22 891 Rural 4 Edge Grind, Patch & Overlay 24,163.92$ Fossland Ave 5th St 4th St 646.147 24 1724 Urban 4 Edge Grind, Patch & Overlay 53,810.83$ Fossland Ave 4th St End 454.373 24 1212 Urban 4 Edge Grind, Patch & Overlay 37,831.94$ Franklin Ave 9th St 8th St 657.8784 25 1828 Urban 4 Edge Grind, Patch & Overlay 47,715.14$ Franklin Ave 8th St 7th St 657.8848 25 1828 Urban 4 Edge Grind, Patch & Overlay 47,715.18$ Franklin Ave 10th St 9th St 663.8248 25 1844 Urban 4 Edge Grind, Patch & Overlay 48,585.85$ Franklin Ave 11th St 10th St 659.2703 25 1832 Urban 4 Edge Grind, Patch & Overlay 48,271.29$ Franklin Ave 12th St 11th St 659.116 25 1831 Urban 3 Full Width Grind, Patch & Overlay 56,067.13$ Franklin Ave 13th St 12th St 654.0368 25 1817 Urban 3 Full Width Grind, Patch & Overlay 83,397.92$ Franklin Ave 14th St 13th St 654.2733 25 1818 Rural 4 Edge Grind, Patch & Overlay 47,455.25$ Franklin Ave End 14th St 657.0499 22 1607 Rural 4 Edge Grind, Patch & Overlay 41,947.52$ Franklin St South Park Ave End 256.8044 21.5 614 Rural 3 Full Width Grind, Patch & Overlay 16,651.68$ Franklin St End South Park Ave 596.6176 18 1194 Rural 4 Edge Grind, Patch & Overlay 31,166.98$ Frans Ct End Roberts Rd 225 22 1109 Rural 4 Edge Grind, Patch & Overlay 30,076.08$ Fulton Ave 9th St 8th St 660.5693 25 1835 Urban 3 Full Width Grind, Patch & Overlay 53,949.42$ Fulton Ave 8th St 7th St 657.8755 25 1828 Urban 3 Full Width Grind, Patch & Overlay 53,744.36$ Fulton Ave 11th St 10th St 655.4409 25 1821 Urban 4 Edge Grind, Patch & Overlay 47,984.89$ Fulton Ave 10th St 9th St 667.8996 25 1856 Urban 4 Edge Grind, Patch & Overlay 49,349.70$ Fulton Ave 12th St 11th St 661.1662 25 1837 Urban 3 Full Width Grind, Patch & Overlay 51,516.06$ Fulton Ave 13th St 12th St 650.7231 25 1808 Urban 3 Full Width Grind, Patch & Overlay 64,191.30$ Fulton Ave End 14th St 419.6539 21 980 Rural 3 Full Width Grind, Patch & Overlay 29,244.40$ Fulton Ave 14th St 13th St 650.8924 21 1519 Rural 4 Edge Grind, Patch & Overlay 37,464.81$ Funderburk Dr Ben Ct West Dr 328.3472 22 803 Rural 4 Edge Grind, Patch & Overlay 23,864.36$ Funderburk Dr 14th St Ben Ct 837.9023 22 2049 Rural 4 Edge Grind, Patch & Overlay 61,346.23$

GGarnett Ave 5th St 4th St 624.4836 22 1527 Rural 3 Full Width Grind, Patch & Overlay 43,244.65$ Garnett Ave 166' N of 7th St 7th St 166.0281 21 388 Rural 6 Crak Sealing and Patching 701.50$ Garnett Ave 6th St 285' S of 6th St 284.705 21 665 Rural 6 Crak Sealing and Patching 1,202.32$ Garnett Ave 6th St 5th St 662.1869 22 1619 Rural 6 Crak Sealing and Patching 2,927.15$ Garnett Ave 285' S of 6th St 166' N of 7th St 208.543 21 487 Rural 4 Edge Grind, Patch & Overlay 13,207.44$ Garnett Ave 2nd St Russell Rd 630 21 1470 Rural 5 Edge Grind, Patch & Overlay 35,381.43$ Garnett Ave 3rd St 2nd St 627.269 21 1464 Rural 5 Edge Grind, Patch & Overlay 35,689.02$ Geddes Ave 2nd St Russell Rd 635.86 21 1484 Rural 6 Crak Sealing and Patching 6,707.68$ Geddes Ave 3rd St 2nd St 621.5768 21 1451 Rural 6 Crak Sealing and Patching 6,558.52$ Geddes Ave End 3rd St 471.4426 21 1101 Rural 6 Crak Sealing and Patching 4,976.52$ Geddes Ave End 8th St 114 30 884 Urban 3 Full Width Grind, Patch & Overlay 30,998.16$ Geddes Ave 8th St 7th St 657.5207 24 1754 Urban 3 Full Width Grind, Patch & Overlay 108,004.54$ Geddes Ave 7th St 6th St 660.5831 20.5 1505 Rural 6 Crak Sealing and Patching 5,612.15$

HHarbor Ln Roberts Rd End 69 22 727 Rural 4 Edge Grind, Patch & Overlay 19,716.24$ Highland Ct Roberts Rd End 431 24 1708 Rural 4 Edge Grind, Patch & Overlay 59,831.24$ Holdridge Ave 3rd St 2nd St 645 24 1720 Rural 3 Full Width Grind, Patch & Overlay 50,533.60$ Holdridge Ave 2nd St Russell Rd 630.2215 24 1681 Rural 3 Full Width Grind, Patch & Overlay 49,387.78$ Holdridge Ave 4th St 3rd St 628.7568 22 1537 Rural 3 Full Width Grind, Patch & Overlay 45,609.06$ Holdridge Ave Ja-Lor Ct 7th St 1097.59 24 2927 Urban 4 Edge Grind, Patch & Overlay 97,570.76$ Holdridge Ave 9th St Ja-Lor Ct 214.0084 24 571 Urban 4 Edge Grind, Patch & Overlay 16,613.36$ Holdridge Ave 6th St 5th St 659.9507 22 1614 Rural 3 Full Width Grind, Patch & Overlay 51,066.96$ Holdridge Ave 7th St 6th St 661.9311 22 1619 Rural 4 Edge Grind, Patch & Overlay 43,907.28$

IIvy Ct End Cornerstone Dr 253 22 1136 Rural 4 Edge Grind, Patch & Overlay 30,808.32$

*Includes Estimated Construction Cost, Design and Construction Engineering.All Engineering and Cost Estimation Values are based on a minimum street program of $500,000.

Appendix 4Page 5 of 8

Page 31: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

Village of Winthrop Harbor, IllinoisAppendix 4 - 2018 Village Street Network (Alphabetical)

Street Name From Street To Street

Length (Feet)

Width (Feet)

Area (S.Y.) Cross Section PASER Number Recommended Rehabilitation Strategy

*2018 Total Project Cost

JJa-Lor Ct Thompson Ave Holdridge Ave 322.3002 24 860 Urban 4 Edge Grind, Patch & Overlay 34,460.48$ James Ave End Roberts Rd 486.3902 22 1189 Rural 4 Edge Grind, Patch & Overlay 36,948.18$ James Ave Roberts Rd End 280 22 1112 Rural 4 Edge Grind, Patch & Overlay 34,555.40$ Judith Ct End Roberts Rd 696 22 2539 Rural 4 Edge Grind, Patch & Overlay 89,393.17$

KKimberly Ln 10th St 9th St 655.1691 24 1748 Urban 2 Agg. Base Repair & Install New Bit. Binder & Surface 193,792.38$ Kirkwood Ave 2nd St Russell Rd 627.0716 21 1464 Rural 6 Crak Sealing and Patching 3,143.21$ Kirkwood Ave End 3rd St 595.6536 21 1390 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 110,401.00$ Kirkwood Ave 5th St End 265.3613 21 620 Rural 4 Edge Grind, Patch & Overlay 16,814.40$ Kirkwood Ave 8th St 7th St 657.6395 22 1608 Rural 3 Full Width Grind, Patch & Overlay 47,695.04$ Kirkwood Ave 6th St 5th St 658.7678 20 1464 Rural 4 Edge Grind, Patch & Overlay 35,237.02$ Kirkwood Ave 7th St 6th St 661.6698 20 1471 Rural 5 Edge Grind, Patch & Overlay 40,345.52$ Kirkwood Ave 9th St 8th St 657.2403 22 1607 Rural 3 Full Width Grind, Patch & Overlay 45,486.57$ Kirkwood Ave 2nd St End 60 14 94 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 8,285.16$

LLandon Ave 8th St 7th St 442.5548 25 1230 Urban 4 Edge Grind, Patch & Overlay 38,358.47$ Landon Ave 9th St 8th St 659.1192 25 1831 Urban 4 Edge Grind, Patch & Overlay 57,556.77$ Landon Ave South Park Ave 7th St 217.9428 25 606 Urban 4 Edge Grind, Patch & Overlay 18,897.47$ Landon Ave 10th St 9th St 655.8817 25 1822 Urban 3 Full Width Grind, Patch & Overlay 80,786.47$ Landon Ave 11th St 10th St 666.9909 25 1853 Urban 3 Full Width Grind, Patch & Overlay 86,331.69$ Landon Ave 12th St 11th St 658.5185 25 1830 Urban 2 Agg. Base Repair & Install New Bit. Binder & Surface 182,411.29$ Landon Ave 13th St 12th St 651.0667 25 1809 Urban 2 Agg. Base Repair & Install New Bit. Binder & Surface 143,543.90$ Landon Ave 15th St 14th St 663.4362 22 1622 Rural 3 Full Width Grind, Patch & Overlay 44,892.64$

MMae Ct 14th St End 145 21.5 891 Rural 4 Edge Grind, Patch & Overlay 24,163.92$ Mary Ave 11th St End 637.4964 22 1559 Rural 6 Crak Sealing and Patching 6,717.51$ Meadow Dr End Meadow Ln 769.8382 22 2413 Rural 4 Edge Grind, Patch & Overlay 65,440.56$ Meadow Ln Meadow Dr 5th St 391.7472 22 958 Rural 4 Edge Grind, Patch & Overlay 25,980.96$ Meadow Ln End Meadow Dr 1275 22 3486 Rural 4 Edge Grind, Patch & Overlay 94,540.32$ Monroe Ave 11th St 10th St 655.2551 20 1457 Rural 4 Edge Grind, Patch & Overlay 41,818.81$ Monroe Ave 10th St 9th St 660.6904 20 1469 Rural 4 Edge Grind, Patch & Overlay 39,839.28$ Monroe Ave 15th St 14th St 644.5455 21 1504 Rural 5 Edge Grind, Patch & Overlay 37,389.44$ Monroe Ave 14th St 13th St 659.9586 22 1614 Rural 4 Edge Grind, Patch & Overlay 43,771.68$ Monroe Ave 12th St 11th St 660 22 1614 Rural 4 Edge Grind, Patch & Overlay 50,155.05$ Monroe Ave 13th St 12th St 655.917 22 1604 Rural 4 Edge Grind, Patch & Overlay 49,844.30$

NNorth Ave End Russell Rd 596.7109 15 995 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 78,704.50$ North Ave 4th St 5th St 631.2184 23.5 1649 Urban 4 Edge Grind, Patch & Overlay 72,030.01$ North Ave 4th St End 52.38776 23.5 137 Urban 4 Edge Grind, Patch & Overlay 4,899.40$ North Ave 6th St 5th St 654.8676 24 1747 Urban 4 Edge Grind, Patch & Overlay 73,240.03$ North Ave 7th St 6th St 658.6232 24 1757 Urban 4 Edge Grind, Patch & Overlay 65,762.44$ North Park Ave End 7th St 654.3884 20 1455 Rural 4 Edge Grind, Patch & Overlay 35,020.40$ North Park Ave 5th St Sheridan Rd 418.432 24 1116 Rural 4 Edge Grind, Patch & Overlay 31,589.29$

OOak Ln 3rd Bend 490.6323 22.5 1227 Rural 4 Edge Grind, Patch & Overlay 33,276.24$ Oak Ln Prairie Ave Bend 635.5714 22.5 1589 Rural 4 Edge Grind, Patch & Overlay 43,093.68$ Oakdale Ave 3rd St Russell Rd 1225.225 20 2723 Rural 4 Edge Grind, Patch & Overlay 79,819.25$ Old Darby Ln Chesapeake Bay Russell Rd 309.3241 24 825 Urban 10 No Work -$ Old Darby Ln Potomac Ln Chesapeake Bay 258.593 24 690 Urban 10 No Work -$ Old Darby Ln Danbury Cove Potomac Ln 411.1494 24 1097 Urban 9 No Work -$ Old Darby Ln Potomac Ln Danbury Cove 391.0953 24 1043 Urban 9 No Work -$ Old Darby Ln Roberts Rd Potomac Ln 586.9591 24 1566 Urban 4 Edge Grind, Patch & Overlay 81,171.26$ Old Darby Ln Chatham Ct Roberts Rd 955.5917 24 2549 Urban 4 Edge Grind, Patch & Overlay 117,365.47$ Old Darby Ln Roberts Rd Chatham Ct 371.3395 24 991 Urban 4 Edge Grind, Patch & Overlay 43,383.73$

PPennsylvania 13th St End 646 24 2254 Urban 5 Edge Grind, Patch & Overlay 67,436.14$

*Includes Estimated Construction Cost, Design and Construction Engineering.All Engineering and Cost Estimation Values are based on a minimum street program of $500,000.

Appendix 4Page 6 of 8

Page 32: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

Village of Winthrop Harbor, IllinoisAppendix 4 - 2018 Village Street Network (Alphabetical)

Street Name From Street To Street

Length (Feet)

Width (Feet)

Area (S.Y.) Cross Section PASER Number Recommended Rehabilitation Strategy

*2018 Total Project Cost

Potomac Ln Old Darby Ln Old Darby Ln 963.7188 24 3190 Urban 4 Edge Grind, Patch & Overlay 125,455.96$ Prairie Ave 5th St Clearview Ct 700.9374 22 1714 Rural 5 Edge Grind, Patch & Overlay 42,610.04$ Prairie Ave Clearview Ct 3rd St 885.9436 22 2166 Rural 5 Edge Grind, Patch & Overlay 53,846.76$ Prairie Ave Block Ln Oak Ln 239.3261 24 639 Rural 4 Edge Grind, Patch & Overlay 17,329.68$ Prairie Ave 3rd St Block Ln 254.1063 24 678 Rural 4 Edge Grind, Patch & Overlay 18,387.36$ Prairie Ave Oak Ln End 221.0997 24 590 Rural 4 Edge Grind, Patch & Overlay 16,000.80$ Prairie Ridge Dr 5th St 4th St 650.578 24 1735 Urban 4 Edge Grind, Patch & Overlay 61,756.26$ Prairie Ridge Dr 4th St Cul-de-sac 415.454 24 1108 Urban 4 Edge Grind, Patch & Overlay 37,090.91$

RRavine Dr Sheridan Rd Chestnut Cir 323.1184 22 790 Rural 6 Crak Sealing and Patching 2,231.75$ Ravine Dr Chestnut Cir Deerpath Dr 310.7276 22 760 Rural 6 Crak Sealing and Patching 2,147.00$ Ravine Dr Cedar Ct Deerpath Dr 391.2971 22 957 Rural 6 Crak Sealing and Patching 3,352.37$ Ravine Dr Deerpath Cir Cedar Ct 483.8223 22 1183 Rural 6 Crak Sealing and Patching 4,144.05$ Ravine Dr Deerpath Cir 7th St 974.6478 22 2383 Rural 6 Crak Sealing and Patching 25,581.51$ Richards Ct English Ln English Ln 383.7617 24 1024 Urban 6 Crak Sealing and Patching 7,229.31$ Roberts Rd Fairhaven Dr Old Darby Ln 235.8991 22 577 Rural 4 Edge Grind, Patch & Overlay 15,648.24$ Roberts Rd Fairhaven Dr Fairhaven Dr 806.8814 22 1973 Rural 4 Edge Grind, Patch & Overlay 53,507.76$ Roberts Rd 5th St Old Darby Ln 311.9797 22 763 Rural 4 Edge Grind, Patch & Overlay 20,692.56$ Roberts Rd Judith Ct 5th St 277.5198 22 679 Rural 4 Edge Grind, Patch & Overlay 21,099.93$ Roberts Rd James Ave Judith Ct 978.5833 22 2393 Rural 4 Edge Grind, Patch & Overlay 74,362.48$ Roberts Rd Highland Ct James Ave 605.3695 23 1548 Rural 4 Edge Grind, Patch & Overlay 48,104.10$ Roberts Rd Frans Ct Harbor Ln 276.2665 24 737 Rural 4 Edge Grind, Patch & Overlay 19,987.44$ Roberts Rd Highland Ct Frans Ct 274.9977 24 734 Rural 4 Edge Grind, Patch & Overlay 20,358.08$ Roberts Rd Harbor Ln 9th St 472.1959 24 1260 Rural 4 Edge Grind, Patch & Overlay 36,306.90$ Rose Ct Cornerstone Dr End 234.7493 22 1119 Rural 4 Edge Grind, Patch & Overlay 30,347.28$ Runyard Ave 4th St 3rd St 611.2831 22 1495 Rural 4 Edge Grind, Patch & Overlay 40,544.40$ Russell Ave 5th St 4th St 625.0119 21 1459 Rural 4 Edge Grind, Patch & Overlay 51,560.77$ Russell Ave 2nd St Russell Rd 630.0262 21.5 1506 Rural 3 Full Width Grind, Patch & Overlay 51,053.40$ Russell Ave End 3rd St 304 21 894 Rural 5 Edge Grind, Patch & Overlay 25,149.28$ Russell Ave 3rd St 2nd St 623.2822 22 1524 Rural 6 Crak Sealing and Patching 6,888.48$ Russell Ave 9th St 8th St 652.4059 30 2175 Urban 10 No Work -$ Russell Ave 8th St 7th St 658.8308 25 1831 Urban 4 Edge Grind, Patch & Overlay 76,377.96$ Russell Ave 6th St 5th St 662.0198 21 1545 Rural 4 Edge Grind, Patch & Overlay 54,121.35$ Russell Ave 7th St 6th St 659.9745 21 1540 Rural 4 Edge Grind, Patch & Overlay 54,398.20$

SShields Ave 10th St 9th St 655.5978 28.5 2077 Urban 2 Agg. Base Repair & Install New Bit. Binder & Surface 224,460.74$ South Park Ave 8th St End 216.5199 20 482 Rural 3 Full Width Grind, Patch & Overlay 14,161.16$ South Park Ave Landon Ave 8th St 608.7602 21.5 1455 Rural 4 Edge Grind, Patch & Overlay 39,459.60$ South Park Ave 10th St 9th St 758.8986 25 2109 Urban 3 Full Width Grind, Patch & Overlay 79,113.53$ South Park Ave 11th St 10th St 666.7452 25 1853 Urban 3 Full Width Grind, Patch & Overlay 65,742.47$ South Park Ave 12th St 11th St 660.8802 25 1836 Urban 3 Full Width Grind, Patch & Overlay 65,595.60$ South Park Ave 13th St 12th St 651.5746 25 1810 Urban 3 Full Width Grind, Patch & Overlay 76,536.59$ South Park Ave 14th St 13th St 661.7977 21 1545 Rural 4 Edge Grind, Patch & Overlay 39,281.63$ South Park Ave Franklin St 15th St 353.154 20 785 Rural 4 Edge Grind, Patch & Overlay 18,894.17$ South Park Ave 15th St 14th St 664.3777 21 1551 Rural 3 Full Width Grind, Patch & Overlay 42,063.12$

TThompson Ave 3rd St Russell Rd 1257.005 21 2934 Rural 3 Full Width Grind, Patch & Overlay 79,570.08$ Thompson Ave 5th St 4th St 625.0822 22 1528 Rural 4 Edge Grind, Patch & Overlay 37,986.08$ Thompson Ave 4th St 3rd St 630.9454 22 1543 Rural 3 Full Width Grind, Patch & Overlay 42,750.16$ Thompson Ave Ja-Lor Ct 7th St 1098.105 24 3208 Urban 4 Edge Grind, Patch & Overlay 143,397.71$ Thompson Ave 6th St 5th St 662.4459 22 1620 Rural 4 Edge Grind, Patch & Overlay 40,725.20$ Thompson Ave 7th St 6th St 659.1958 22 1612 Rural 4 Edge Grind, Patch & Overlay 50,092.90$

WWashington Ave 9th St English Ln 740.7212 21 1729 Rural 3 Full Width Grind, Patch & Overlay 50,798.02$ Washington Ave 10th St Cul-de-sac 455.011 24 1214 Urban 4 Edge Grind, Patch & Overlay 40,636.12$ Washington Ave Berrong Ave Berrong Ave 2080 21 4854 Rural 5 Edge Grind, Patch & Overlay 131,640.48$ West Broadway Ave 13th St 11th St 1313.987 21 3066 Rural 5 Edge Grind, Patch & Overlay 83,149.92$

*Includes Estimated Construction Cost, Design and Construction Engineering.All Engineering and Cost Estimation Values are based on a minimum street program of $500,000.

Appendix 4Page 7 of 8

Page 33: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

Village of Winthrop Harbor, IllinoisAppendix 4 - 2018 Village Street Network (Alphabetical)

Street Name From Street To Street

Length (Feet)

Width (Feet)

Area (S.Y.) Cross Section PASER Number Recommended Rehabilitation Strategy

*2018 Total Project Cost

West Broadway Ave 11th St 9th St 1320.392 21 3081 Rural 4 Edge Grind, Patch & Overlay 96,194.08$ West Broadway Ave End 13th St 216.8499 22 531 Rural 4 Edge Grind, Patch & Overlay 16,500.83$ West Dr Funderburk Dr End 165.5869 22 607 Rural 4 Edge Grind, Patch & Overlay 19,068.30$ West Dr End Funderburk Dr 165.058 22 404 Rural 4 Edge Grind, Patch & Overlay 12,006.48$ Whitney Ave 6th St 5th St 657.9941 21 1536 Rural 9 No Work -$ Whitney Ave 9th St 8th St 658.8755 22 1611 Rural 4 Edge Grind, Patch & Overlay 63,256.84$ Whitney Ave 8th St 7th St 656.9825 21 1533 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 122,164.30$ Whitney Ave 7th St 6th St 667.0831 21 1557 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 150,881.56$ Wilson Ave 4th St 3rd St 669.9846 21 1564 Rural 7 Crak Sealing and Patching 1,767.32$

*Includes Estimated Construction Cost, Design and Construction Engineering.All Engineering and Cost Estimation Values are based on a minimum street program of $500,000.

Appendix 4Page 8 of 8

Page 34: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

Village of Winthrop Harbor, IllinoisAppendix 5 - 2018 Village Street Network (PASER)

Street Name From Street To Street

Length (Feet)

Width (Feet)

Area (S.Y.) Cross Section PASER Number Recommended Rehabilitation Strategy

*2018 Total Project Cost

Old Darby Ln Chesapeake Bay Russell Rd 309.3241 24 825 Urban 10 No Work -$ Old Darby Ln Potomac Ln Chesapeake Bay 258.593 24 690 Urban 10 No Work -$ Russell Ave 9th St 8th St 652.4059 30 2175 Urban 10 No Work -$

10th St 515' W of Ellis Ellis Ave 515 23 1317 Rural 9 No Work -$ Block Ln Kenosha Rd Prairie Ave 380.3895 25.5 1078 Rural 9 No Work -$ Ellis Ave 10th St 9th St 657.38 26 1900 Urban 9 No Work -$ English Ln Washington Ave 485' N of Washington 485 22 1186 Rural 9 No Work -$ Old Darby Ln Danbury Cove Potomac Ln 411.1494 24 1097 Urban 9 No Work -$ Old Darby Ln Potomac Ln Danbury Cove 391.0953 24 1043 Urban 9 No Work -$ Whitney Ave 6th St 5th St 657.9941 21 1536 Rural 9 No Work -$

Alley (Aiken Ave) 12th St 11th St 662.0046 16 1177 Rural 8 Crak Sealing and Patching 3,484.02$ Berrong Court Berrong Ave Cul-de-sac 210 22 1044 Rural 8 Crak Sealing and Patching 7,078.32$

15th St Monroe Ave End 623.5117 19 1317 Rural 7 Crak Sealing and Patching 3,720.53$ Adams Ave 12th St 11th St 653.264 20 1452 Rural 7 Crak Sealing and Patching 2,092.76$ Adams Ave 13th St 12th St 642.275 20 1428 Rural 7 Crak Sealing and Patching 2,065.64$ Aiken Ave End 14th St 259.4758 21 606 Rural 7 Crak Sealing and Patching 684.78$ Alley 9th St 207' N. of 9th St 207.187 18 415 Rural 7 Crak Sealing and Patching 1,372.95$ Alley 207' N. of 9th St 8th St 456 12 608 Rural 7 Crak Sealing and Patching 1,139.04$ Wilson Ave 4th St 3rd St 669.9846 21 1564 Rural 7 Crak Sealing and Patching 1,767.32$

2nd St College Ave End 386.9866 21 903 Rural 6 Crak Sealing and Patching 4,591.76$ 2nd St Garnett Ave End 140 18 280 Rural 6 Crak Sealing and Patching 1,898.40$ 2nd St Garnett Ave Calvin Ave 315 22 770 Rural 6 Crak Sealing and Patching 1,653.19$ 3rd St Sheridan Rd Oakdale Ave 1104.494 22 3100 Rural 6 Crak Sealing and Patching 9,209.50$ 3rd St Oakdale Ave End 141.2607 22 346 Rural 6 Crak Sealing and Patching 1,881.45$ 4th St Runyard Ave Wilson Ave 299.4086 21 699 Rural 6 Crak Sealing and Patching 4,739.22$ 4th St Wilson Ave Sheridan Rd 277.5128 21 648 Rural 6 Crak Sealing and Patching 2,928.96$ 4th St Runyard Ave College Ave 316.953 21 740 Rural 6 Crak Sealing and Patching 5,017.20$ 14th St Monroe Ave April Ln 835.1674 22 2042 Rural 6 Crak Sealing and Patching 5,768.65$ Alley Sheridan Rd 67' E of Sheridan 66.846 12 90 Rural 6 Crak Sealing and Patching 132.21$ Alley (Aiken Ave) 11th St 10th St 656.3402 14 1021 Rural 6 Crak Sealing and Patching 3,336.33$ Calvin Ave 2nd St 3rd St 630 24 1680 Rural 6 Crak Sealing and Patching 3,606.96$ Cedar Ct End Ravine Dr 399.9055 22 1565 Rural 6 Crak Sealing and Patching 4,421.13$ Chestnut Cir 4th St End 318.0816 22 1350 Rural 6 Crak Sealing and Patching 3,813.75$ College Ave 2nd St Russell Rd 624.2415 21 1457 Rural 6 Crak Sealing and Patching 6,585.64$ College Ave 2nd St 2nd St 48.31896 21 113 Rural 6 Crak Sealing and Patching 510.76$ College Ave 3rd St 2nd St 583.0933 21 1361 Rural 6 Crak Sealing and Patching 6,151.72$ College Ave 7th St 6th St 663.9822 22 1624 Rural 6 Crak Sealing and Patching 7,411.90$ Deerpath Cir End Ravine Dr 201.7993 22 1052 Rural 6 Crak Sealing and Patching 2,971.90$ Deerpath Dr Ravine Dr Ravine Dr 1803.386 22 4409 Rural 6 Crak Sealing and Patching 21,284.68$ English Ln Old Darby Ln Richards Ct 741 24 1976 Urban 6 Crak Sealing and Patching 13,955.50$ English Ln Richards Ct Richards Ct 68.981 24 184 Urban 6 Crak Sealing and Patching 1,299.29$ English Ln Richards Ct End 430.166 24 1148 Urban 6 Crak Sealing and Patching 8,555.98$ Garnett Ave 166' N of 7th St 7th St 166.0281 21 388 Rural 6 Crak Sealing and Patching 701.50$ Garnett Ave 6th St 285' S of 6th St 284.705 21 665 Rural 6 Crak Sealing and Patching 1,202.32$ Garnett Ave 6th St 5th St 662.1869 22 1619 Rural 6 Crak Sealing and Patching 2,927.15$ Geddes Ave 2nd St Russell Rd 635.86 21 1484 Rural 6 Crak Sealing and Patching 6,707.68$ Geddes Ave 3rd St 2nd St 621.5768 21 1451 Rural 6 Crak Sealing and Patching 6,558.52$ Geddes Ave End 3rd St 471.4426 21 1101 Rural 6 Crak Sealing and Patching 4,976.52$ Geddes Ave 7th St 6th St 660.5831 20.5 1505 Rural 6 Crak Sealing and Patching 5,612.15$ Kirkwood Ave 2nd St Russell Rd 627.0716 21 1464 Rural 6 Crak Sealing and Patching 3,143.21$ Mary Ave 11th St End 637.4964 22 1559 Rural 6 Crak Sealing and Patching 6,717.51$ Ravine Dr Sheridan Rd Chestnut Cir 323.1184 22 790 Rural 6 Crak Sealing and Patching 2,231.75$ Ravine Dr Chestnut Cir Deerpath Dr 310.7276 22 760 Rural 6 Crak Sealing and Patching 2,147.00$

PASER 10 - Excllent

PASER 9 - Excllent

PASER 8 - Very Good

PASER 7 - Good

PASER 6 - Good

*Includes Estimated Construction Cost, Design and Construction Engineering.All Engineering and Cost Estimation Values are based on a minimum street program of $500,000.

Appendix 5Page 1 of 7

Page 35: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

Village of Winthrop Harbor, IllinoisAppendix 5 - 2018 Village Street Network (PASER)

Street Name From Street To Street

Length (Feet)

Width (Feet)

Area (S.Y.) Cross Section PASER Number Recommended Rehabilitation Strategy

*2018 Total Project Cost

Ravine Dr Cedar Ct Deerpath Dr 391.2971 22 957 Rural 6 Crak Sealing and Patching 3,352.37$ Ravine Dr Deerpath Cir Cedar Ct 483.8223 22 1183 Rural 6 Crak Sealing and Patching 4,144.05$ Ravine Dr Deerpath Cir 7th St 974.6478 22 2383 Rural 6 Crak Sealing and Patching 25,581.51$ Richards Ct English Ln English Ln 383.7617 24 1024 Urban 6 Crak Sealing and Patching 7,229.31$ Russell Ave 3rd St 2nd St 623.2822 22 1524 Rural 6 Crak Sealing and Patching 6,888.48$

2nd St Kirkwod Ave College Ave 321.4336 22 786 Rural 5 Edge Grind, Patch & Overlay 19,984.05$ 2nd St Sheridan Rd End 823.8899 21 1923 Rural 5 Edge Grind, Patch & Overlay 80,985.63$ 3rd St End Garnett Ave 609.6788 21 1423 Rural 5 Edge Grind, Patch & Overlay 35,375.78$ 5th St Holdridge Ave Russell Ave 332.2701 21 776 Rural 5 Edge Grind, Patch & Overlay 19,743.36$ 5th St Meadow Ln Prairie Ave 259.7798 22 636 Rural 5 Edge Grind, Patch & Overlay 15,810.96$ 7th St Sheridan Rd Fulton Ave 298.3849 25 978 Urban 5 Edge Grind, Patch & Overlay 29,895.11$ 10th St East Broadway Ave Washington Ave 378.1 22 925 Rural 5 Edge Grind, Patch & Overlay 22,715.83$ 13th St Fulton Ave Franklin Ave 363.6738 22 889 Rural 5 Edge Grind, Patch & Overlay 24,561.57$ April Ln End 14th St 667.0088 24 1854 Urban 5 Edge Grind, Patch & Overlay 64,933.44$ Berrong Ave Washington Ave Berrong Ct 490 21.5 1171 Rural 5 Edge Grind, Patch & Overlay 31,757.52$ Berrong Ave Berrong Court End 1760 22 4303 Rural 5 Edge Grind, Patch & Overlay 116,697.36$ Cavin Ave End Russell Rd 642.9518 21 1501 Rural 5 Edge Grind, Patch & Overlay 34,770.67$ College Ave 5th St End 264.6081 21 618 Rural 5 Edge Grind, Patch & Overlay 14,874.64$ College Ave 6th St 5th St 658.5863 22 1610 Rural 5 Edge Grind, Patch & Overlay 39,655.09$ College Ave 3rd St 4th St 544.764 22 1332 Rural 5 Edge Grind, Patch & Overlay 36,123.84$ Garnett Ave 2nd St Russell Rd 630 21 1470 Rural 5 Edge Grind, Patch & Overlay 35,381.43$ Garnett Ave 3rd St 2nd St 627.269 21 1464 Rural 5 Edge Grind, Patch & Overlay 35,689.02$ Kirkwood Ave 7th St 6th St 661.6698 20 1471 Rural 5 Edge Grind, Patch & Overlay 40,345.52$ Monroe Ave 15th St 14th St 644.5455 21 1504 Rural 5 Edge Grind, Patch & Overlay 37,389.44$ Pennsylvania 13th St End 646 24 2254 Urban 5 Edge Grind, Patch & Overlay 67,436.14$ Prairie Ave 5th St Clearview Ct 700.9374 22 1714 Rural 5 Edge Grind, Patch & Overlay 42,610.04$ Prairie Ave Clearview Ct 3rd St 885.9436 22 2166 Rural 5 Edge Grind, Patch & Overlay 53,846.76$ Russell Ave End 3rd St 304 21 894 Rural 5 Edge Grind, Patch & Overlay 25,149.28$ Washington Ave Berrong Ave Berrong Ave 2080 21 4854 Rural 5 Edge Grind, Patch & Overlay 131,640.48$ West Broadway Ave 13th St 11th St 1313.987 21 3066 Rural 5 Edge Grind, Patch & Overlay 83,149.92$

3rd St Garnett Ave Thompson Ave 327.8066 22 802 Rural 4 Edge Grind, Patch & Overlay 19,937.72$ 3rd St Thompson Ave Holdridge Ave 328.4569 22 803 Rural 4 Edge Grind, Patch & Overlay 21,777.36$ 3rd St Holdridge Ave Russell Ave 326.9948 21 763 Rural 4 Edge Grind, Patch & Overlay 21,144.56$ 3rd St Geddes Ave Kirkwood Ave 333.0118 21 778 Rural 4 Edge Grind, Patch & Overlay 21,099.36$ 3rd St Prairie Ave Oak Ln 663.79 23 1697 Rural 4 Edge Grind, Patch & Overlay 46,022.64$ 3rd St Oak Ln End 197.125 23 504 Rural 4 Edge Grind, Patch & Overlay 13,668.48$ 4th St End Russell Ave 153.7709 22 376 Rural 4 Edge Grind, Patch & Overlay 10,197.12$ 4th St Prairie Ridge Dr Fossland Ave 464.792 24 1240 Urban 4 Edge Grind, Patch & Overlay 38,880.95$ 5th St College Ave Whitney Ave 401.1401 23 1026 Rural 4 Edge Grind, Patch & Overlay 27,825.12$ 5th St Thompson Ave Holdridge Ave 317.31 22 776 Rural 4 Edge Grind, Patch & Overlay 30,500.17$ 5th St Garnett Ave Thompson Ave 325.6579 21 760 Rural 4 Edge Grind, Patch & Overlay 19,345.60$ 5th St North Ave Cavin Ave 317.1043 21 740 Rural 4 Edge Grind, Patch & Overlay 18,848.40$ 5th St Cavin Ave Garnett Ave 323.5142 21 755 Rural 4 Edge Grind, Patch & Overlay 22,633.90$ 5th St Kenosha Rd Meadow Ln 755.1526 22 1846 Rural 4 Edge Grind, Patch & Overlay 45,891.56$ 5th St Prairie Ave Subdivision Limit 271.5058 22 664 Rural 4 Edge Grind, Patch & Overlay 16,507.04$ 5th St Roberts Rd North Ave 828.5643 26 2394 Rural 4 Edge Grind, Patch & Overlay 59,514.84$ 5th St Russell Ave Kirkwood Ave 655.6184 21 1530 Rural 4 Edge Grind, Patch & Overlay 38,487.80$ 5th St Kirkwod Ave College Ave 341.8703 22 836 Rural 4 Edge Grind, Patch & Overlay 23,576.32$ 5th St Subdivision Limit Prairie Ridge Dr 238.572 24 637 Urban 4 Edge Grind, Patch & Overlay 22,667.17$ 5th St Prairie Ridge Dr Fossland Ave 475.439 24 1268 Urban 4 Edge Grind, Patch & Overlay 45,133.08$ 5th St Whitney Ave North Park Ave 147.5 23 377 Rural 4 Edge Grind, Patch & Overlay 10,676.24$ 6th St Whitney Ave Sheridan Rd 376.7279 21 880 Rural 4 Edge Grind, Patch & Overlay 24,317.60$ 6th St Cavin Ave Garnett Ave 324.679 21 758 Rural 4 Edge Grind, Patch & Overlay 21,242.19$ 6th St Garnett Ave Thompson Ave 325.9407 22.5 815 Rural 4 Edge Grind, Patch & Overlay 22,839.56$ 6th St North Ave Cavin Ave 314.454 21 734 Rural 4 Edge Grind, Patch & Overlay 21,021.62$ 6th St Thompson Ave Holdridge Ave 325.9129 21 761 Rural 4 Edge Grind, Patch & Overlay 21,326.26$

PASER 4 - Fair

PASER 5 - Fair

*Includes Estimated Construction Cost, Design and Construction Engineering.All Engineering and Cost Estimation Values are based on a minimum street program of $500,000.

Appendix 5Page 2 of 7

Page 36: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

Village of Winthrop Harbor, IllinoisAppendix 5 - 2018 Village Street Network (PASER)

Street Name From Street To Street

Length (Feet)

Width (Feet)

Area (S.Y.) Cross Section PASER Number Recommended Rehabilitation Strategy

*2018 Total Project Cost

6th St Holdridge Ave Russell Ave 323.3904 21 755 Rural 4 Edge Grind, Patch & Overlay 21,158.12$ 6th St Russell Ave Geddes Ave 332.4217 21 776 Rural 4 Edge Grind, Patch & Overlay 21,746.62$ 6th St Geddes Ave Kirkwood Ave 327.6779 21 765 Rural 4 Edge Grind, Patch & Overlay 21,438.36$ 6th St Kirkwod Ave College Ave 336.2411 21 785 Rural 4 Edge Grind, Patch & Overlay 21,998.84$ 7th St Kirkwod Ave College Ave 340.875 21 796 Rural 4 Edge Grind, Patch & Overlay 22,039.52$ 7th St Geddes Ave Kirkwood Ave 334.9416 21 782 Rural 4 Edge Grind, Patch & Overlay 21,659.84$ 7th St Russell Ave Geddes Ave 324.5874 21 758 Rural 4 Edge Grind, Patch & Overlay 24,006.85$ 7th St Holdridge Ave Russell Ave 327.6315 24 874 Urban 4 Edge Grind, Patch & Overlay 32,958.47$ 7th St Thompson Ave Holdridge Ave 321.3521 24 857 Urban 4 Edge Grind, Patch & Overlay 32,320.04$ 7th St Garnett Ave Thompson Ave 326.2274 24 870 Urban 4 Edge Grind, Patch & Overlay 32,810.33$ 7th St Cavin Ave Garnett Ave 326.8841 24 872 Urban 4 Edge Grind, Patch & Overlay 31,488.22$ 7th St Fulton Ave Franklin Ave 284.9126 28 887 Urban 4 Edge Grind, Patch & Overlay 29,279.57$ 7th St Franklin Ave North Park Ave 322.101 28 1003 Urban 4 Edge Grind, Patch & Overlay 33,107.88$ 7th St North Park Ave Ravine Dr 356.8533 28 1111 Urban 4 Edge Grind, Patch & Overlay 36,673.62$ 7th St College Ave Whitney Ave 316.4747 24 844 Rural 4 Edge Grind, Patch & Overlay 23,341.28$ 7th St North Ave Cavin Ave 311.8874 24 832 Urban 4 Edge Grind, Patch & Overlay 32,903.06$ 7th St End North Ave 41.89825 24 112 Urban 4 Edge Grind, Patch & Overlay 4,427.30$ 7th St Ravine Dr RR Xing 550 28 1712 Urban 4 Edge Grind, Patch & Overlay 56,513.56$ 7th St Whitney Ave 50' W of Sheridan 259.358 21 606 Rural 4 Edge Grind, Patch & Overlay 16,434.72$ 7th St 50' W of Sheridan Sheridan Rd 50 21 117 Rural 4 Edge Grind, Patch & Overlay 3,437.46$ 8th St Geddes Ave Kirkwood Ave 338.2804 22 827 Rural 4 Edge Grind, Patch & Overlay 29,421.81$ 8th St Kirkwod Ave College Ave 334.2717 22 818 Rural 4 Edge Grind, Patch & Overlay 22,636.16$ 8th St Landon Ave South Park Ave 325.4526 22 796 Rural 4 Edge Grind, Patch & Overlay 21,587.52$ 8th St College Ave Whitney Ave 272.6841 22 667 Rural 4 Edge Grind, Patch & Overlay 20,727.03$ 8th St Whitney Ave Sheridan Rd 253.4396 22 620 Rural 4 Edge Grind, Patch & Overlay 19,266.50$ 8th St 80' E of Russell Geddes Ave 246.489 26 713 Rural 4 Edge Grind, Patch & Overlay 24,976.39$ 10th St Fulton Ave Franklin Ave 360.003 25 1001 Urban 4 Edge Grind, Patch & Overlay 33,929.41$ 10th St Franklin Ave Landon Ave 365.6262 25 1016 Urban 4 Edge Grind, Patch & Overlay 34,433.66$ 10th St Washington Ave End 146.637 22 359 Rural 4 Edge Grind, Patch & Overlay 11,155.93$ 10th St South Park Ave End 134 20 298 Rural 4 Edge Grind, Patch & Overlay 8,755.24$ 11th St East Broadway Ave Monroe Ave 2646.647 23 6764 Rural 4 Edge Grind, Patch & Overlay 290,446.16$ 11th St Monroe Ave Adams Ave 2008.407 21 4687 Rural 4 Edge Grind, Patch & Overlay 145,648.53$ 11th St Adams Ave Mary Ave 476.838 22 1166 Rural 4 Edge Grind, Patch & Overlay 36,685.45$ 11th St Mary Ave Sheridan Rd 388.5605 22 1050 Rural 4 Edge Grind, Patch & Overlay 28,476.00$ 11th St Sheridan Rd Aiken Ave 280.0622 25 778 Urban 4 Edge Grind, Patch & Overlay 27,604.69$ 11th St Aiken Ave Fulton Ave 267.2696 25 743 Urban 4 Edge Grind, Patch & Overlay 25,301.49$ 11th St Fulton Ave Franklin Ave 364.1242 25 1012 Urban 4 Edge Grind, Patch & Overlay 34,299.16$ 11th St Franklin Ave Landon Ave 359.5845 25 999 Urban 4 Edge Grind, Patch & Overlay 30,366.88$ 11th St Landon Ave South Park Ave 445.6595 25 1238 Urban 4 Edge Grind, Patch & Overlay 44,378.37$ 12th St Adams Ave Sheridan Rd 782.139 24 2086 Rural 4 Edge Grind, Patch & Overlay 67,082.45$ 12th St Sheridan Rd Aiken Ave 360.7665 25 1003 Urban 4 Edge Grind, Patch & Overlay 33,316.35$ 12th St Aiken Ave Fulton Ave 272.4548 25 757 Urban 4 Edge Grind, Patch & Overlay 25,147.95$ 12th St Fulton Ave Franklin Ave 362.5391 25 1008 Urban 4 Edge Grind, Patch & Overlay 31,885.65$ 12th St Franklin Ave Landon Ave 363.9531 25 1011 Urban 4 Edge Grind, Patch & Overlay 31,530.99$ 12th St South Park Ave End 280.5076 20 624 Rural 4 Edge Grind, Patch & Overlay 14,454.96$ 12th St Landon Ave South Park Ave 438.6131 25 1219 Urban 4 Edge Grind, Patch & Overlay 38,467.61$ 13th St End Monroe Ave 1305.795 21 3047 Rural 4 Edge Grind, Patch & Overlay 95,137.53$ 13th St Franklin Ave Landon Ave 359.8066 23 920 Rural 4 Edge Grind, Patch & Overlay 25,370.76$ 13th St Landon Ave South Park Ave 442.9025 23 1132 Rural 4 Edge Grind, Patch & Overlay 30,904.60$ 13th St South Park Ave East Rd 369.4975 23 945 Rural 4 Edge Grind, Patch & Overlay 26,023.34$ 13th St Monroe Ave Pennsylvania Ave 375 22 917 Rural 4 Edge Grind, Patch & Overlay 24,869.04$ 13th St Pennsylvania Ave Adams Ave 1632.521 22 4522 Rural 4 Edge Grind, Patch & Overlay 132,050.44$ 14th St Mae Ct End 67 21.5 705 Rural 4 Edge Grind, Patch & Overlay 19,119.60$ 14th St Funderburk Dr Mae Ct 425.2713 21.5 1016 Rural 4 Edge Grind, Patch & Overlay 28,005.92$ 14th St April Ln Funderburk Dr 380.6638 22 931 Rural 4 Edge Grind, Patch & Overlay 25,248.72$ 14th St Sheridan Rd Aiken Ave 418.4081 21 977 Rural 4 Edge Grind, Patch & Overlay 26,406.63$ 14th St Fulton Ave Franklin Ave 363.4761 21 849 Rural 4 Edge Grind, Patch & Overlay 19,667.09$ 14th St Franklin Ave Landon Ave 355.5488 22 870 Rural 4 Edge Grind, Patch & Overlay 20,605.55$

*Includes Estimated Construction Cost, Design and Construction Engineering.All Engineering and Cost Estimation Values are based on a minimum street program of $500,000.

Appendix 5Page 3 of 7

Page 37: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

Village of Winthrop Harbor, IllinoisAppendix 5 - 2018 Village Street Network (PASER)

Street Name From Street To Street

Length (Feet)

Width (Feet)

Area (S.Y.) Cross Section PASER Number Recommended Rehabilitation Strategy

*2018 Total Project Cost

14th St Landon Ave South Park Ave 415.3201 21 970 Rural 4 Edge Grind, Patch & Overlay 25,319.91$ 15th St Landon Ave South Park Ave 422 22 1032 Rural 4 Edge Grind, Patch & Overlay 23,906.28$ 15th St South Park Ave East Rd 349.971 21 817 Rural 4 Edge Grind, Patch & Overlay 21,326.15$ 15th St End 700' W of Monroe 1243 15 2072 Rural 4 Edge Grind, Patch & Overlay 60,875.36$ Aiken Ave 14th St 13th St 656.8684 21 1533 Rural 4 Edge Grind, Patch & Overlay 53,700.99$ Alley Alley 6th St 487.384 14 759 Rural 4 Edge Grind, Patch & Overlay 21,870.59$ Alley Whitney Ave Alley 164.848 12 220 Rural 4 Edge Grind, Patch & Overlay 6,836.50$ Alley Alley Sheridan Rd 162.502 12 217 Rural 4 Edge Grind, Patch & Overlay 6,743.28$ Alton Ct End 9th St 454 24 1769 Urban 4 Edge Grind, Patch & Overlay 73,360.73$ Ben Ct Funderburk Dr End 133 22 884 Rural 4 Edge Grind, Patch & Overlay 23,974.08$ Camden Cove End Fairhaven Dr 62 22 683 Rural 4 Edge Grind, Patch & Overlay 18,974.96$ Casco Bay End Fairhaven Dr 79 22 724 Rural 4 Edge Grind, Patch & Overlay 19,634.88$ Cavin Ave 5th St 4th St 628.1956 21 1466 Rural 4 Edge Grind, Patch & Overlay 40,661.92$ Cavin Ave 6th St 5th St 658.2108 22 1609 Rural 4 Edge Grind, Patch & Overlay 39,085.57$ Chatham Ct Old Darby Ln End 179 24 982 Urban 4 Edge Grind, Patch & Overlay 40,467.56$ Chesapeake Bay Old Darby Ln End 196 22 1038 Urban 4 Edge Grind, Patch & Overlay 35,246.96$ Clearview Ct Prairie Ave End 230 22 1040 Rural 4 Edge Grind, Patch & Overlay 28,204.80$ College Ave 8th St 7th St 657.669 22 1608 Rural 4 Edge Grind, Patch & Overlay 44,060.96$ College Ave 9th St 8th St 656.8779 22 1606 Rural 4 Edge Grind, Patch & Overlay 44,006.72$ Compton Ct Cornerstone Dr End 259 22 1178 Rural 4 Edge Grind, Patch & Overlay 31,947.36$ Cornerstone Dr End Rose Ct 444 22.5 1628 Rural 4 Edge Grind, Patch & Overlay 44,151.36$ Cornerstone Dr Rose Ct Ivy Ct 555.708 22.5 1390 Rural 4 Edge Grind, Patch & Overlay 37,696.80$ Cornerstone Dr Ivy Ct Compton Ct 120.4611 22.5 302 Rural 4 Edge Grind, Patch & Overlay 8,190.24$ Cornerstone Dr Compton Ct Lewis Ave 322.1537 22.5 806 Rural 4 Edge Grind, Patch & Overlay 21,858.72$ Creekside Ct 13th St Cul-de-sac 1712.595 24 5258 Urban 4 Edge Grind, Patch & Overlay 202,548.99$ Danbury Cove End Old Darby Ln 118 24 819 Urban 4 Edge Grind, Patch & Overlay 24,145.84$ East Broadway Ave 13th St 11th St 1317.977 22 3222 Rural 4 Edge Grind, Patch & Overlay 100,123.65$ East Broadway Ave 10th St 9th St 655 22 1602 Rural 4 Edge Grind, Patch & Overlay 49,782.15$ East Rd 15th St End 601.6412 22 1505 Rural 4 Edge Grind, Patch & Overlay 36,223.85$ Fairhaven Dr Camden Cove Roberts Rd 487.7013 22 1193 Rural 4 Edge Grind, Patch & Overlay 32,354.16$ Fairhaven Dr Camden Cove Casco Bay 784.5925 22 1918 Rural 4 Edge Grind, Patch & Overlay 52,016.16$ Fairhaven Dr Casco Bay Roberts Rd 364.236 22 891 Rural 4 Edge Grind, Patch & Overlay 24,163.92$ Fossland Ave 5th St 4th St 646.147 24 1724 Urban 4 Edge Grind, Patch & Overlay 53,810.83$ Fossland Ave 4th St End 454.373 24 1212 Urban 4 Edge Grind, Patch & Overlay 37,831.94$ Franklin Ave 9th St 8th St 657.8784 25 1828 Urban 4 Edge Grind, Patch & Overlay 47,715.14$ Franklin Ave 8th St 7th St 657.8848 25 1828 Urban 4 Edge Grind, Patch & Overlay 47,715.18$ Franklin Ave 10th St 9th St 663.8248 25 1844 Urban 4 Edge Grind, Patch & Overlay 48,585.85$ Franklin Ave 11th St 10th St 659.2703 25 1832 Urban 4 Edge Grind, Patch & Overlay 48,271.29$ Franklin Ave 14th St 13th St 654.2733 25 1818 Rural 4 Edge Grind, Patch & Overlay 47,455.25$ Franklin Ave End 14th St 657.0499 22 1607 Rural 4 Edge Grind, Patch & Overlay 41,947.52$ Franklin St End South Park Ave 596.6176 18 1194 Rural 4 Edge Grind, Patch & Overlay 31,166.98$ Frans Ct End Roberts Rd 225 22 1109 Rural 4 Edge Grind, Patch & Overlay 30,076.08$ Fulton Ave 11th St 10th St 655.4409 25 1821 Urban 4 Edge Grind, Patch & Overlay 47,984.89$ Fulton Ave 10th St 9th St 667.8996 25 1856 Urban 4 Edge Grind, Patch & Overlay 49,349.70$ Fulton Ave 14th St 13th St 650.8924 21 1519 Rural 4 Edge Grind, Patch & Overlay 37,464.81$ Funderburk Dr Ben Ct West Dr 328.3472 22 803 Rural 4 Edge Grind, Patch & Overlay 23,864.36$ Funderburk Dr 14th St Ben Ct 837.9023 22 2049 Rural 4 Edge Grind, Patch & Overlay 61,346.23$ Garnett Ave 285' S of 6th St 166' N of 7th St 208.543 21 487 Rural 4 Edge Grind, Patch & Overlay 13,207.44$ Harbor Ln Roberts Rd End 69 22 727 Rural 4 Edge Grind, Patch & Overlay 19,716.24$ Highland Ct Roberts Rd End 431 24 1708 Rural 4 Edge Grind, Patch & Overlay 59,831.24$ Holdridge Ave Ja-Lor Ct 7th St 1097.59 24 2927 Urban 4 Edge Grind, Patch & Overlay 97,570.76$ Holdridge Ave 9th St Ja-Lor Ct 214.0084 24 571 Urban 4 Edge Grind, Patch & Overlay 16,613.36$ Holdridge Ave 7th St 6th St 661.9311 22 1619 Rural 4 Edge Grind, Patch & Overlay 43,907.28$ Ivy Ct End Cornerstone Dr 253 22 1136 Rural 4 Edge Grind, Patch & Overlay 30,808.32$ Ja-Lor Ct Thompson Ave Holdridge Ave 322.3002 24 860 Urban 4 Edge Grind, Patch & Overlay 34,460.48$ James Ave End Roberts Rd 486.3902 22 1189 Rural 4 Edge Grind, Patch & Overlay 36,948.18$ James Ave Roberts Rd End 280 22 1112 Rural 4 Edge Grind, Patch & Overlay 34,555.40$ Judith Ct End Roberts Rd 696 22 2539 Rural 4 Edge Grind, Patch & Overlay 89,393.17$

*Includes Estimated Construction Cost, Design and Construction Engineering.All Engineering and Cost Estimation Values are based on a minimum street program of $500,000.

Appendix 5Page 4 of 7

Page 38: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

Village of Winthrop Harbor, IllinoisAppendix 5 - 2018 Village Street Network (PASER)

Street Name From Street To Street

Length (Feet)

Width (Feet)

Area (S.Y.) Cross Section PASER Number Recommended Rehabilitation Strategy

*2018 Total Project Cost

Kirkwood Ave 5th St End 265.3613 21 620 Rural 4 Edge Grind, Patch & Overlay 16,814.40$ Kirkwood Ave 6th St 5th St 658.7678 20 1464 Rural 4 Edge Grind, Patch & Overlay 35,237.02$ Landon Ave 8th St 7th St 442.5548 25 1230 Urban 4 Edge Grind, Patch & Overlay 38,358.47$ Landon Ave 9th St 8th St 659.1192 25 1831 Urban 4 Edge Grind, Patch & Overlay 57,556.77$ Landon Ave South Park Ave 7th St 217.9428 25 606 Urban 4 Edge Grind, Patch & Overlay 18,897.47$ Mae Ct 14th St End 145 21.5 891 Rural 4 Edge Grind, Patch & Overlay 24,163.92$ Meadow Dr End Meadow Ln 769.8382 22 2413 Rural 4 Edge Grind, Patch & Overlay 65,440.56$ Meadow Ln Meadow Dr 5th St 391.7472 22 958 Rural 4 Edge Grind, Patch & Overlay 25,980.96$ Meadow Ln End Meadow Dr 1275 22 3486 Rural 4 Edge Grind, Patch & Overlay 94,540.32$ Monroe Ave 11th St 10th St 655.2551 20 1457 Rural 4 Edge Grind, Patch & Overlay 41,818.81$ Monroe Ave 10th St 9th St 660.6904 20 1469 Rural 4 Edge Grind, Patch & Overlay 39,839.28$ Monroe Ave 14th St 13th St 659.9586 22 1614 Rural 4 Edge Grind, Patch & Overlay 43,771.68$ Monroe Ave 12th St 11th St 660 22 1614 Rural 4 Edge Grind, Patch & Overlay 50,155.05$ Monroe Ave 13th St 12th St 655.917 22 1604 Rural 4 Edge Grind, Patch & Overlay 49,844.30$ North Ave 4th St 5th St 631.2184 23.5 1649 Urban 4 Edge Grind, Patch & Overlay 72,030.01$ North Ave 4th St End 52.38776 23.5 137 Urban 4 Edge Grind, Patch & Overlay 4,899.40$ North Ave 6th St 5th St 654.8676 24 1747 Urban 4 Edge Grind, Patch & Overlay 73,240.03$ North Ave 7th St 6th St 658.6232 24 1757 Urban 4 Edge Grind, Patch & Overlay 65,762.44$ North Park Ave End 7th St 654.3884 20 1455 Rural 4 Edge Grind, Patch & Overlay 35,020.40$ North Park Ave 5th St Sheridan Rd 418.432 24 1116 Rural 4 Edge Grind, Patch & Overlay 31,589.29$ Oak Ln 3rd Bend 490.6323 22.5 1227 Rural 4 Edge Grind, Patch & Overlay 33,276.24$ Oak Ln Prairie Ave Bend 635.5714 22.5 1589 Rural 4 Edge Grind, Patch & Overlay 43,093.68$ Oakdale Ave 3rd St Russell Rd 1225.225 20 2723 Rural 4 Edge Grind, Patch & Overlay 79,819.25$ Old Darby Ln Roberts Rd Potomac Ln 586.9591 24 1566 Urban 4 Edge Grind, Patch & Overlay 81,171.26$ Old Darby Ln Chatham Ct Roberts Rd 955.5917 24 2549 Urban 4 Edge Grind, Patch & Overlay 117,365.47$ Old Darby Ln Roberts Rd Chatham Ct 371.3395 24 991 Urban 4 Edge Grind, Patch & Overlay 43,383.73$ Potomac Ln Old Darby Ln Old Darby Ln 963.7188 24 3190 Urban 4 Edge Grind, Patch & Overlay 125,455.96$ Prairie Ave Block Ln Oak Ln 239.3261 24 639 Rural 4 Edge Grind, Patch & Overlay 17,329.68$ Prairie Ave 3rd St Block Ln 254.1063 24 678 Rural 4 Edge Grind, Patch & Overlay 18,387.36$ Prairie Ave Oak Ln End 221.0997 24 590 Rural 4 Edge Grind, Patch & Overlay 16,000.80$ Prairie Ridge Dr 5th St 4th St 650.578 24 1735 Urban 4 Edge Grind, Patch & Overlay 61,756.26$ Prairie Ridge Dr 4th St Cul-de-sac 415.454 24 1108 Urban 4 Edge Grind, Patch & Overlay 37,090.91$ Roberts Rd Fairhaven Dr Old Darby Ln 235.8991 22 577 Rural 4 Edge Grind, Patch & Overlay 15,648.24$ Roberts Rd Fairhaven Dr Fairhaven Dr 806.8814 22 1973 Rural 4 Edge Grind, Patch & Overlay 53,507.76$ Roberts Rd 5th St Old Darby Ln 311.9797 22 763 Rural 4 Edge Grind, Patch & Overlay 20,692.56$ Roberts Rd Judith Ct 5th St 277.5198 22 679 Rural 4 Edge Grind, Patch & Overlay 21,099.93$ Roberts Rd James Ave Judith Ct 978.5833 22 2393 Rural 4 Edge Grind, Patch & Overlay 74,362.48$ Roberts Rd Highland Ct James Ave 605.3695 23 1548 Rural 4 Edge Grind, Patch & Overlay 48,104.10$ Roberts Rd Frans Ct Harbor Ln 276.2665 24 737 Rural 4 Edge Grind, Patch & Overlay 19,987.44$ Roberts Rd Highland Ct Frans Ct 274.9977 24 734 Rural 4 Edge Grind, Patch & Overlay 20,358.08$ Roberts Rd Harbor Ln 9th St 472.1959 24 1260 Rural 4 Edge Grind, Patch & Overlay 36,306.90$ Rose Ct Cornerstone Dr End 234.7493 22 1119 Rural 4 Edge Grind, Patch & Overlay 30,347.28$ Runyard Ave 4th St 3rd St 611.2831 22 1495 Rural 4 Edge Grind, Patch & Overlay 40,544.40$ Russell Ave 5th St 4th St 625.0119 21 1459 Rural 4 Edge Grind, Patch & Overlay 51,560.77$ Russell Ave 8th St 7th St 658.8308 25 1831 Urban 4 Edge Grind, Patch & Overlay 76,377.96$ Russell Ave 6th St 5th St 662.0198 21 1545 Rural 4 Edge Grind, Patch & Overlay 54,121.35$ Russell Ave 7th St 6th St 659.9745 21 1540 Rural 4 Edge Grind, Patch & Overlay 54,398.20$ South Park Ave Landon Ave 8th St 608.7602 21.5 1455 Rural 4 Edge Grind, Patch & Overlay 39,459.60$ South Park Ave 14th St 13th St 661.7977 21 1545 Rural 4 Edge Grind, Patch & Overlay 39,281.63$ South Park Ave Franklin St 15th St 353.154 20 785 Rural 4 Edge Grind, Patch & Overlay 18,894.17$ Thompson Ave 5th St 4th St 625.0822 22 1528 Rural 4 Edge Grind, Patch & Overlay 37,986.08$ Thompson Ave Ja-Lor Ct 7th St 1098.105 24 3208 Urban 4 Edge Grind, Patch & Overlay 143,397.71$ Thompson Ave 6th St 5th St 662.4459 22 1620 Rural 4 Edge Grind, Patch & Overlay 40,725.20$ Thompson Ave 7th St 6th St 659.1958 22 1612 Rural 4 Edge Grind, Patch & Overlay 50,092.90$ Washington Ave 10th St Cul-de-sac 455.011 24 1214 Urban 4 Edge Grind, Patch & Overlay 40,636.12$ West Broadway Ave 11th St 9th St 1320.392 21 3081 Rural 4 Edge Grind, Patch & Overlay 96,194.08$ West Broadway Ave End 13th St 216.8499 22 531 Rural 4 Edge Grind, Patch & Overlay 16,500.83$ West Dr Funderburk Dr End 165.5869 22 607 Rural 4 Edge Grind, Patch & Overlay 19,068.30$

*Includes Estimated Construction Cost, Design and Construction Engineering.All Engineering and Cost Estimation Values are based on a minimum street program of $500,000.

Appendix 5Page 5 of 7

Page 39: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

Village of Winthrop Harbor, IllinoisAppendix 5 - 2018 Village Street Network (PASER)

Street Name From Street To Street

Length (Feet)

Width (Feet)

Area (S.Y.) Cross Section PASER Number Recommended Rehabilitation Strategy

*2018 Total Project Cost

West Dr End Funderburk Dr 165.058 22 404 Rural 4 Edge Grind, Patch & Overlay 12,006.48$ Whitney Ave 9th St 8th St 658.8755 22 1611 Rural 4 Edge Grind, Patch & Overlay 63,256.84$

1st Street Sheridan Rd Oakdale Ave 958 26 2768 Rural 3 Full Width Grind, Patch & Overlay 75,068.16$ 2nd St Holdridge Ave Russell Ave 328.285 22 803 Rural 3 Full Width Grind, Patch & Overlay 25,406.92$ 2nd St Russell Ave Geddes Ave 325.2042 22 795 Rural 3 Full Width Grind, Patch & Overlay 23,357.10$ 2nd St Geddes Ave Kirkwood Ave 337.055 22 824 Rural 3 Full Width Grind, Patch & Overlay 24,209.12$ 3rd St Russell Ave Geddes Ave 326.0673 22 798 Rural 3 Full Width Grind, Patch & Overlay 27,504.20$ 3rd St Kirkwod Ave College Ave 315.9016 21 738 Rural 3 Full Width Grind, Patch & Overlay 26,686.08$ 3rd St End Runyard Ave 75 21 175 Rural 3 Full Width Grind, Patch & Overlay 5,932.50$ 3rd St Runyard Ave End 75 21 175 Rural 3 Full Width Grind, Patch & Overlay 5,932.50$ 4th St North Ave Cavin Ave 315.4275 22 772 Rural 3 Full Width Grind, Patch & Overlay 24,426.08$ 4th St Cavin Ave Garnett Ave 325.128 22 795 Rural 3 Full Width Grind, Patch & Overlay 27,854.50$ 6th St College Ave Whitney Ave 357.4046 21 834 Rural 3 Full Width Grind, Patch & Overlay 24,502.92$ 8th St Fulton Ave Franklin Ave 310.0207 25 862 Urban 3 Full Width Grind, Patch & Overlay 29,280.79$ 8th St Franklin Ave Landon Ave 321.2614 25 893 Urban 3 Full Width Grind, Patch & Overlay 28,300.41$ 8th St Sheridan Rd Fulton Ave 328.4238 25 913 Urban 3 Full Width Grind, Patch & Overlay 30,987.13$ 9th St Sheridan Rd Fulton Ave 363.2914 35.33 1427 Urban 3 Full Width Grind, Patch & Overlay 47,362.63$ 10th St Monroe Ave Kimberly Ln 518.0188 24 1382 Urban 3 Full Width Grind, Patch & Overlay 76,707.40$ 10th St Ellis Ave End 175 22 428 Rural 3 Full Width Grind, Patch & Overlay 13,993.92$ 10th St Sheridan Rd Aiken Ave 251.7095 25 700 Urban 3 Full Width Grind, Patch & Overlay 27,836.63$ 10th St Landon Ave South Park Ave 383.8049 25 1067 Urban 3 Full Width Grind, Patch & Overlay 45,054.37$ 10th St Aiken Ave Fulton Ave 225.5342 25 627 Urban 3 Full Width Grind, Patch & Overlay 25,839.35$ 11th St Lewis Ave West Broadway Ave 2410.264 22 5892 Rural 3 Full Width Grind, Patch & Overlay 213,054.72$ 12th St Monroe Ave End 363 22 888 Rural 3 Full Width Grind, Patch & Overlay 34,116.96$ 13th St Sheridan Rd Aiken Ave 414.6679 23 1060 Rural 3 Full Width Grind, Patch & Overlay 29,199.20$ 13th St Aiken Ave Fulton Ave 289.7557 23.5 757 Rural 3 Full Width Grind, Patch & Overlay 20,981.84$ 13th St East Broadway Ave End 666.766 22 1630 Rural 3 Full Width Grind, Patch & Overlay 59,844.80$ 14th St Aiken Ave Fulton Ave 289.7549 21 677 Rural 3 Full Width Grind, Patch & Overlay 18,360.24$ 15th St End Landon Ave 177.7765 20 396 Rural 3 Full Width Grind, Patch & Overlay 10,739.52$ 15th St 700' W of Monroe Monroe Ave 700 20 1556 Rural 3 Full Width Grind, Patch & Overlay 49,231.84$ Alley Sheridan Rd Alley 371.403 18 743 Rural 3 Full Width Grind, Patch & Overlay 25,187.70$ Alley (Aiken Ave) 13th St 12th St 646.6643 21 1509 Rural 3 Full Width Grind, Patch & Overlay 52,059.10$ Burke Dr End Sheridan Rd 382.5892 20 851 Rural 3 Full Width Grind, Patch & Overlay 26,925.64$ Cavin Ave 7th St 6th St 656.5273 22 1605 Rural 3 Full Width Grind, Patch & Overlay 43,979.60$ Charles Ave 658' S of 9th St End 200 32 712 Urban 3 Full Width Grind, Patch & Overlay 28,259.04$ East Broadway Ave 11th St 10th St 659.1156 22 1612 Rural 3 Full Width Grind, Patch & Overlay 54,646.80$ English Ln 485' N of Washington End 1470.936 22 3643 Rural 3 Full Width Grind, Patch & Overlay 131,730.88$ Franklin Ave 12th St 11th St 659.116 25 1831 Urban 3 Full Width Grind, Patch & Overlay 56,067.13$ Franklin Ave 13th St 12th St 654.0368 25 1817 Urban 3 Full Width Grind, Patch & Overlay 83,397.92$ Franklin St South Park Ave End 256.8044 21.5 614 Rural 3 Full Width Grind, Patch & Overlay 16,651.68$ Fulton Ave 9th St 8th St 660.5693 25 1835 Urban 3 Full Width Grind, Patch & Overlay 53,949.42$ Fulton Ave 8th St 7th St 657.8755 25 1828 Urban 3 Full Width Grind, Patch & Overlay 53,744.36$ Fulton Ave 12th St 11th St 661.1662 25 1837 Urban 3 Full Width Grind, Patch & Overlay 51,516.06$ Fulton Ave 13th St 12th St 650.7231 25 1808 Urban 3 Full Width Grind, Patch & Overlay 64,191.30$ Fulton Ave End 14th St 419.6539 21 980 Rural 3 Full Width Grind, Patch & Overlay 29,244.40$ Garnett Ave 5th St 4th St 624.4836 22 1527 Rural 3 Full Width Grind, Patch & Overlay 43,244.65$ Geddes Ave End 8th St 114 30 884 Urban 3 Full Width Grind, Patch & Overlay 30,998.16$ Geddes Ave 8th St 7th St 657.5207 24 1754 Urban 3 Full Width Grind, Patch & Overlay 108,004.54$ Holdridge Ave 3rd St 2nd St 645 24 1720 Rural 3 Full Width Grind, Patch & Overlay 50,533.60$ Holdridge Ave 2nd St Russell Rd 630.2215 24 1681 Rural 3 Full Width Grind, Patch & Overlay 49,387.78$ Holdridge Ave 4th St 3rd St 628.7568 22 1537 Rural 3 Full Width Grind, Patch & Overlay 45,609.06$ Holdridge Ave 6th St 5th St 659.9507 22 1614 Rural 3 Full Width Grind, Patch & Overlay 51,066.96$ Kirkwood Ave 8th St 7th St 657.6395 22 1608 Rural 3 Full Width Grind, Patch & Overlay 47,695.04$ Kirkwood Ave 9th St 8th St 657.2403 22 1607 Rural 3 Full Width Grind, Patch & Overlay 45,486.57$ Landon Ave 10th St 9th St 655.8817 25 1822 Urban 3 Full Width Grind, Patch & Overlay 80,786.47$ Landon Ave 11th St 10th St 666.9909 25 1853 Urban 3 Full Width Grind, Patch & Overlay 86,331.69$ Landon Ave 15th St 14th St 663.4362 22 1622 Rural 3 Full Width Grind, Patch & Overlay 44,892.64$

PASER 3 - Poor

*Includes Estimated Construction Cost, Design and Construction Engineering.All Engineering and Cost Estimation Values are based on a minimum street program of $500,000.

Appendix 5Page 6 of 7

Page 40: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

Village of Winthrop Harbor, IllinoisAppendix 5 - 2018 Village Street Network (PASER)

Street Name From Street To Street

Length (Feet)

Width (Feet)

Area (S.Y.) Cross Section PASER Number Recommended Rehabilitation Strategy

*2018 Total Project Cost

Russell Ave 2nd St Russell Rd 630.0262 21.5 1506 Rural 3 Full Width Grind, Patch & Overlay 51,053.40$ South Park Ave 8th St End 216.5199 20 482 Rural 3 Full Width Grind, Patch & Overlay 14,161.16$ South Park Ave 10th St 9th St 758.8986 25 2109 Urban 3 Full Width Grind, Patch & Overlay 79,113.53$ South Park Ave 11th St 10th St 666.7452 25 1853 Urban 3 Full Width Grind, Patch & Overlay 65,742.47$ South Park Ave 12th St 11th St 660.8802 25 1836 Urban 3 Full Width Grind, Patch & Overlay 65,595.60$ South Park Ave 13th St 12th St 651.5746 25 1810 Urban 3 Full Width Grind, Patch & Overlay 76,536.59$ South Park Ave 15th St 14th St 664.3777 21 1551 Rural 3 Full Width Grind, Patch & Overlay 42,063.12$ Thompson Ave 3rd St Russell Rd 1257.005 21 2934 Rural 3 Full Width Grind, Patch & Overlay 79,570.08$ Thompson Ave 4th St 3rd St 630.9454 22 1543 Rural 3 Full Width Grind, Patch & Overlay 42,750.16$ Washington Ave 9th St English Ln 740.7212 21 1729 Rural 3 Full Width Grind, Patch & Overlay 50,798.02$

4th St Garnett Ave Thompson Ave 324.1642 22 793 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 62,726.30$ 4th St Thompson Ave Holdridge Ave 325.2263 22 795 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 62,884.50$ 8th St Russell Ave 80' E of Russell 80 26 232 Urban 2 Agg. Base Repair & Install New Bit. Binder & Surface 34,306.80$ 9th St Fulton Ave Franklin Ave 360.1854 35 1401 Urban 2 Agg. Base Repair & Install New Bit. Binder & Surface 123,481.38$ 9th St Franklin Ave Landon Ave 366.0489 35 1424 Urban 2 Agg. Base Repair & Install New Bit. Binder & Surface 125,047.46$ 9th St Landon Ave South Park Ave 440 30 1467 Urban 2 Agg. Base Repair & Install New Bit. Binder & Surface 125,983.70$ 10th St Shields Ave 515' W of Ellis 458.997 23 1173 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 93,688.30$ 10th St Kimberly Ln 100' E of Kimberly 100 23 256 Urban 2 Agg. Base Repair & Install New Bit. Binder & Surface 20,701.60$ 10th St 100' E of Kimberly Shields Ave 225.8424 23 578 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 46,171.80$ 13th St Lewis Ave Creekside Ct 1962.526 22 4798 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 379,973.80$ 13th St Creekside Ct West Broadway Ave 450 22 1100 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 87,462.00$ Alley Alley off Sheridan 7th St 580 20 1289 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 101,959.90$ Alley 13th St End 256 12 342 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 27,052.20$ Alley 11th St End 80 12 107 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 8,463.70$ Alley 11th St 10th St 657.351 11 804 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 63,596.40$ Alley 10th St End 186 12 248 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 19,616.80$ Alley 10th St End 34 12 46 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 3,638.60$ Alley 9th St End 241 11 295 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 23,334.50$ Alley 9th St 8th St 658.774 12 879 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 69,528.90$ Charles Ave 658' S of 9th St 9th St 657.5335 32 2374 Urban 2 Agg. Base Repair & Install New Bit. Binder & Surface 262,536.68$ Kimberly Ln 10th St 9th St 655.1691 24 1748 Urban 2 Agg. Base Repair & Install New Bit. Binder & Surface 193,792.38$ Kirkwood Ave End 3rd St 595.6536 21 1390 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 110,401.00$ Kirkwood Ave 2nd St End 60 14 94 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 8,285.16$ Landon Ave 12th St 11th St 658.5185 25 1830 Urban 2 Agg. Base Repair & Install New Bit. Binder & Surface 182,411.29$ Landon Ave 13th St 12th St 651.0667 25 1809 Urban 2 Agg. Base Repair & Install New Bit. Binder & Surface 143,543.90$ North Ave End Russell Rd 596.7109 15 995 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 78,704.50$ Shields Ave 10th St 9th St 655.5978 28.5 2077 Urban 2 Agg. Base Repair & Install New Bit. Binder & Surface 224,460.74$ Whitney Ave 8th St 7th St 656.9825 21 1533 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 122,164.30$ Whitney Ave 7th St 6th St 667.0831 21 1557 Rural 2 Agg. Base Repair & Install New Bit. Binder & Surface 150,881.56$

Alley 12th St End 353 12 471 Rural 1 Complete Bit. Surface Removal, Agg. Base Repair & Install New Bit. Binder & Surface 55,706.74$ Alley 11th St End 107 12 143 Rural 1 Complete Bit. Surface Removal, Agg. Base Repair & Install New Bit. Binder & Surface 16,913.09$ Alley 11th St 10th St 663.127 12 885 Rural 1 Complete Bit. Surface Removal, Agg. Base Repair & Install New Bit. Binder & Surface 104,671.90$ Alley 9th St 8th St 657.861 11 805 Rural 1 Complete Bit. Surface Removal, Agg. Base Repair & Install New Bit. Binder & Surface 95,210.03$ Alley 8th St End 30 11 37 Rural 1 Complete Bit. Surface Removal, Agg. Base Repair & Install New Bit. Binder & Surface 4,376.11$ Alley 9th St End 133 12 178 Rural 1 Complete Bit. Surface Removal, Agg. Base Repair & Install New Bit. Binder & Surface 21,052.65$ Alley 67' E of Sheridan Fulton Ave 238.913 11 293 Rural 1 Complete Bit. Surface Removal, Agg. Base Repair & Install New Bit. Binder & Surface 34,654.09$ Alley 6th St Whitney Ave 573.139 11 701 Rural 1 Complete Bit. Surface Removal, Agg. Base Repair & Install New Bit. Binder & Surface 82,909.61$ East Rd 13th St End 309 14 656 Rural 1 Complete Bit. Surface Removal, Agg. Base Repair & Install New Bit. Binder & Surface 77,587.31$

PASER 2 - Very Poor

PASER 1 - Failed

*Includes Estimated Construction Cost, Design and Construction Engineering.All Engineering and Cost Estimation Values are based on a minimum street program of $500,000.

Appendix 5Page 7 of 7

Page 41: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

9th St

11th St

Lewi

s Ave

7th St

Sheri

dan R

d

5th St

6th St

Fulto

n Ave

8th St

Keno

sha R

d

Fran

klin A

ve

12th St

15th St

Robe

rts R

d

13th St Land

on Av

e

Monr

oe Av

e

Thom

pson

Ave

Sout

h Park

Ave

Russ

ell Av

e

10th St

Colle

ge Av

e

14th St

Whitn

ey Av

e

Ravine Dr

Kirkw

ood A

ve

3rd St

North

Ave

Old Darby Ln

Prair

ie Av

e

Cavin

Ave

Holdr

idge A

veEngli

sh Ln Ga

rnett

Ave

Wash

ingto

n Ave

West

Broa

dway

Ave

Mead

ow Ln

Alley

East

Broa

dway

Ave

Berro

ng Av

e

Gedd

es Av

e

2nd St

Alley

(Aike

n Ave

)

Hayn

er Av

e

Adam

s Ave

Oak L

n Oakd

ale Av

e

Creekside Ct Aike

n Ave

April

Ln

Foss

land A

ve

Franklin St

4th St

Ellis

Ave

East

Rd

Willo

w Ho

llow

Ln

Corne

rston

e Dr

Char

les Av

e

James Ave

Deer

path

Dr

Mary

Ave

Prair

ie Ri

dge D

r

Alton

Ct

Funderburk Dr

Fairh

aven

Dr

Wilso

n Ave

Judit

h Ct

Calvi

n Ave

Potomac Ln

Kimb

erly

LnPe

nnsy

lvania

Meadow Dr

Runy

ard A

ve

Cedar CtNorth Park Ave

Highland Ct

Burke Dr

Ivy Ct

Ja-Lor Ct

Mae Ct

Clearvie

w Ct

Frans C

t

Chatham Ct

Berro

ng C

ourt

Alley

Garn

ett Av

e

2nd St

North Park Ave

4th St

Alley

Alley

2nd St

Alley

11th St

Holdr

idge A

ve

5th St

15th St

13th St

Cavin

Ave

10th St

East

Rd

3rd St

Alley

14th St

Colle

ge Av

e

10th St

Alley

Russ

ell Av

e

Alley

13th St

South Park Ave

North

Ave

13th St Alley

Alley

Gedd

es Av

e

Kirkw

ood A

ve

3rd St

Alley

Engli

sh Ln

Alley

Land

on Av

e

Alley

VILLAGE OF WINTHROP HARBOR, ILLINOIS RECOMMENDED REHABILITATION STRATEGIESEXHIBIT 1PAVEMENT MANAGEMENT REPORT

\\corp

.baxw

ood.c

om\Pr

ojects

\Cryst

al Lake

\WINH

R\140

407-P

MR Up

date\

30-Re

portS

tudy\W

ork\Ro

adPro

gram_

MXDs

\WINH

R_Re

hab_

Strate

gies.m

xd S

aved:

2/25/2

019 3

:34:05

PM D

esign

er: 84

4tmk

Source(s): Lake County, Illinois (Dec 2018)

o

Recommended Rehabilitation StrategiesNo WorkCrak Sealing and PatchingEdge Grind, Patch & OverlayFull Width Grind, Patch & OverlayAgg. Base Repair & Install New Bit. Binder& SurfaceComplete Bit. Surface Removal, Agg. BaseRepair & Install New Bit. Binder & Surface

0 1,000 2,000500Feet

1 " = 1,000 '

Page 42: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management
Page 43: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

9th St

11th St

Lewi

s Ave

7th St

Sheri

dan R

d

5th St

6th St

Fulto

n Ave

8th St

Keno

sha R

d

Fran

klin A

ve

12th St

15th St

Robe

rts R

d

13th St Land

on Av

e

Monr

oe Av

e

Thom

pson

Ave

Sout

h Park

Ave

Russ

ell Av

e

10th St

Colle

ge Av

e

14th St

Whitn

ey Av

e

Ravine Dr

Kirkw

ood A

ve

3rd St

North

Ave

Old Darby Ln

Prair

ie Av

e

Cavin

Ave

Holdr

idge A

veEngli

sh Ln Ga

rnett

Ave

Wash

ingto

n Ave

West

Broa

dway

Ave

Mead

ow Ln

Alley

East

Broa

dway

Ave

Berro

ng Av

e

Gedd

es Av

e

2nd St

Alley

(Aike

n Ave

)

Hayn

er Av

e

Adam

s Ave

Oak L

n Oakd

ale Av

e

Creekside Ct Aike

n Ave

April

Ln

Foss

land A

ve

Franklin St

4th St

Willo

w Ho

llow

Ln

Ellis

Ave

East

Rd

Corne

rston

e Dr

Char

les Av

e

James Ave

Deer

path

Dr

Mary

Ave

Prair

ie Ri

dge D

r

Alton

Ct

Funderburk Dr

Fairh

aven

Dr

Wilso

n Ave

Judit

h Ct

Calvi

n Ave

Potomac Ln

Kimb

erly

LnPe

nnsy

lvania

Meadow Dr

Runy

ard A

ve

Cedar CtNorth Park Ave

Highland Ct

Burke Dr

Ivy Ct

Ja-Lor Ct

Mae Ct

Clearvie

w Ct

Frans C

t

Chatham Ct

Berro

ng C

ourt

Alley

Garn

ett Av

e

2nd St

North Park Ave

4th St

Alley

Alley

2nd St

Alley

11th St

Holdr

idge A

ve

5th St

15th St

13th St

Cavin

Ave

10th St

East

Rd

3rd St

Alley

14th St

Colle

ge Av

e

10th St

Alley

Russ

ell Av

e

Alley

13th St

South Park Ave

North

Ave

13th St Alley

Alley

Gedd

es Av

e

Kirkw

ood A

ve

3rd St

Alley

Engli

sh Ln

Alley

Land

on Av

e

Alley

VILLAGE OF WINTHROP HARBOR, ILLINOIS PAVEMENT SURFACE EVALUATION AND RATING (PASER)EXHIBIT 3PAVEMENT MANAGEMENT REPORT

I:\Crys

tal La

ke\WI

NHR\1

4040

7-PMR

Upda

te\30

-Repo

rtStud

y\Work

\Road

Progra

m_MX

Ds\W

INHR_

PaserR

ating

_Upd

ate.m

xd S

aved:

2/25/2

019 3

:56:33

PM D

esign

er: 84

4tmk

Source(s): Lake County, Illinois (Dec 2018)

Pavement Management Report (PASER)10 - 9 : Excellent8 : Very Good7 - 6 : Good5 - 4 : Fair3 : Poor2 : Very Poor1 : Failed

o0 1,000 2,000500Feet

1 " = 1,000 '

Page 44: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

9th St

11th St

Lewi

s Ave

7th St

Sheri

dan R

d

5th St

6th St

Fulto

n Ave

8th St

Keno

sha R

d

Fran

klin A

ve

12th St

15th St

Robe

rts R

d

13th St Land

on Av

e

Monr

oe Av

e

Thom

pson

Ave

Sout

h Park

Ave

Russ

ell Av

e

10th St

Colle

ge Av

e

14th St

Whitn

ey Av

e

Ravine Dr

Kirkw

ood A

ve

3rd St

North

Ave

Old Darby Ln

Prair

ie Av

e

Cavin

Ave

Holdr

idge A

veEngli

sh Ln

Garn

ett Av

e

Wash

ingto

n Ave

West

Broa

dway

Ave

Mead

ow Ln

Alley

East

Broa

dway

Ave

Berro

ng Av

e

Gedd

es Av

e

2nd St

Alley

(Aike

n Ave

)

Hayn

er Av

e

Adam

s Ave

Oak L

n Oakd

ale Av

e

Creekside Ct Aike

n Ave

April

Ln

Foss

land A

ve

Franklin St

4th St

Ellis

Ave

East

Rd

Willo

w Ho

llow

Ln

Corne

rston

e Dr

Char

les Av

e

James Ave

Deer

path

Dr

Mary

Ave

Prair

ie Ri

dge D

r

Alton

Ct

Funderburk Dr

Fairh

aven

Dr

Wilso

n Ave

Judit

h Ct

Calvi

n Ave

Potomac Ln

Kimb

erly

LnPe

nnsy

lvania

Meadow Dr

Runy

ard A

ve

Cedar CtNorth Park Ave

Highland Ct

Burke Dr

Ivy Ct

Ja-Lor Ct

Mae Ct

Clearvie

w Ct

Frans C

t

Chatham Ct

Berro

ng C

ourt

Alley

Garn

ett Av

e

2nd St

North Park Ave

4th St

Alley

Alley

2nd St

Alley

11th St

Holdr

idge A

ve

5th St

15th St

13th St

Cavin

Ave

10th St

East

Rd

3rd St

Alley

14th St

Colle

ge Av

e

10th St

Alley

Russ

ell Av

e

Alley

13th St

South Park Ave

North

Ave

13th St Alley

Alley

Gedd

es Av

e

Kirkw

ood A

ve

3rd St

Alley

Engli

sh Ln

Alley

Land

on Av

e

Alley

VILLAGE OF WINTHROP HARBOR, ILLINOIS Year of Last RepairEXHIBIT 4PAVEMENT MANAGEMENT REPORT

\\corp

.baxw

ood.c

om\Pr

ojects

\Cryst

al Lake

\WINH

R\140

407-P

MR Up

date\

30-Re

portS

tudy\W

ork\Ro

adPro

gram_

MXDs

\WINH

R_Yea

rLastR

epair.

mxd

Save

d: 1/1

1/201

9 12:1

1:04 P

M De

signe

r: 844

tmk

Source(s): Lake County, Illinois (Dec. 2018)

o

Year of Last Repair200320042005200620072008

20102011201220152017

0 1,000 2,000500Feet

1 " = 1,000 '

Page 45: Village of Winthrop Harbor Pavement Management Report€¦ · Pavement Management Report 140407 LIST OF APPENDICES Appendix 1 Photo Examples of Conditions 2 2018 Pavement Management

9th St

11th St

Russell Rd

Lewi

s Ave

7th St

Sheri

dan R

d

5th St

6th St

8th St

Fulto

n Ave

Frank

lin Av

e

Keno

sha R

d

12th St

15th St

Robe

rts R

d

13th St

Land

on Av

e

Thom

pson

Ave

Monro

e Ave

South

Park

Ave

10th St

Russ

ell Av

e

Colle

ge Av

e

14th St

Kirkw

ood A

ve

Whitn

ey Av

e

Ravine Dr

3rd St

North

Ave

Prair

ie Av

e

Cavin

Ave

Old Darby Ln

Holdr

idge A

ve

Engli

sh Ln Ga

rnett A

ve

Wash

ington

Ave

Alley

Berro

ng Av

e

Mead

ow Ln

West

Broa

dway

Ave

East

Broa

dway

Ave

2nd St

Gedd

es Av

e

Alley

(Aike

n Ave

)

Adam

s Ave

Hayn

er Av

e

1st Street

Oak L

n

Oakd

ale Av

e

Creekside Ct Aiken

Ave

April

Ln

Foss

land A

ve

4th St

Franklin St

Ellis

Ave

Willo

w Ho

llow

Ln

East

Rd

Corne

rston

e Dr

Charl

es Av

e

James Ave

Mary

Ave

Deerp

ath D

r

Alton

Ct

Prair

ie Rid

ge D

r

Funderburk DrJu

dith C

tFa

irhav

en D

r

Wilso

n Ave

Potomac Ln

Kimbe

rly Ln

Meadow Dr

Runy

ard Av

e

Penn

sylva

nia

Cedar Ct

Highland Ct

Burke Dr

North Park Ave

Ivy Ct

Ja-Lor Ct

Mae Ct

Berro

ng C

t

Clearview

Ct

Frans C

t

Chatham Ct

Alley

10th St

Alley

Garne

tt Ave

3rd St

5th St

North Park Ave

2nd St

11th St

13th St

Alley

15th St

East

Rd

Alley

13th St

4th St

Russ

ell Av

e

Cavin

Ave

14th St

Colle

ge Av

e

Alley

Alley

2nd St

10th St

Alley

South Park Ave

North

Ave

Engli

sh Ln

13th St

Alley

Alley

Kirkw

ood A

ve

Alley

3rd St

Holdr

idge A

ve

Alley

Alley

Gedd

es Av

e

²0 1,200 2,400

Feet

VILLAGE OF WINTHROP HARBOR, ILLINOIS2006 PAVEMENT MANAGEMENT REPORT

MAP DATE: 04/06

Village Limits

EXHIBIT 5RECOMMENDED REHABILITATION STRATEGIES

I:\Winh

r\050

879\E

xhibi

t 1_R

ecom

mend

ed R

ehab

ilitati

on S

trateg

ies - 1

1x17

.mxd

Crea

ted by

: SLN

D

ate: A

pril 1

8, 20

06 (R

evisi

on D

ate: J

une 9

, 200

6)

Recommended Rehabilitation StrategiesNo WorkPatchPatch & Overlay

Edge Grind, Patch & OverlayFull Width Grind, Patch & OverlayAgg. Base Repair & Install New Bit. Binder & Surface

Complete Bit. Surface Removal, Agg. Base Repair & Install New Bit. Binder & SurfaceIn-Place Recycling & Install New Bit. Binder & SurfaceComplete Pavement Reconstruction