NO. CE/KLNZ/TECH/TENDER NO.7/ 2007 -08 Maharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1 st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD. TENDER FOR REPAIRS OF FAILED 33/11 KV, 33/22 KV, 1 To 5 MVA CAPACITY POWER TRANSFORMERS IN VASAI CIRCLE AREA ISSUED TO :- M /s ________________________________ ____________________________________ ____________________________________ ____________________________________ Date of issue :- Place :- CHIEF ENGINEER ( KLNZ) KALYAN 1

 · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

Embed Size (px)

Citation preview

Page 1:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

NO. CE/KLNZ/TECH/TENDER NO.7/ 2007 -08Maharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan.

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD.

TENDER FOR

REPAIRS OF FAILED 33/11 KV, 33/22 KV, 1 To 5 MVA CAPACITYPOWER TRANSFORMERS IN VASAI CIRCLE AREA

ISSUED TO :-

M /s ________________________________

____________________________________

____________________________________

____________________________________

Date of issue :-

Place :-

CHIEF ENGINEER ( KLNZ)KALYAN

TENDER PUBLISHED BYOffice of the Chief Engineer ( KLNZ )Maharashtra State Electricity Distribution Co. LTd. Kalyan Zone , Kalyan.

Cost of Tender Rs.3000/-(Rs. Three Thousand only)

1

Page 2:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

TENDER NO. CE/KLNZ/TECH/TENDER NO.7 / 2007 –08

1 ) Date from which : 05/10/2007 in the office of the sale of blank tender Office of the Chief Engineer ( KLNZ )forms starts. KALYAN. ( Only on working days and working hours.)

i.e. 10.30 hrs. to 15.30 hrs.

2 ) Date and time of : 20/10/2007 upto 15.00 Hrs.closing of sale ofblank tender forms

3 ) Due date of : 22/10/2007 Upto 13.00 HrsSubmission

4 ) Date of opening : At 15.00 Hrs. on 22/10/2007 ( if possible )of tender Telephone Nos. 0251- 2328283, 2325959

Fax - 2329488

5 ) Price : Rs. 3000 /-. Per copy by hand delivery inoffice of the Chief Engineer, (KLNZ) M.S.E.D.C.L. Kalyan.

2

Page 3:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

MAHARASHTRA STATE ELECTRICITY DISTIBUTION CO.LTD.KALYAN ZONE OFFICE,

Tejashree Building, 1st FLOOR, Jahangir Maidan, KALYAN

TENDER FOR REPAIRS OF HV CLASS POWER TRANSFORMERS

TENDER NO. CE/KLNZ/TECH/TENDER NO.7/ 2007 –08

TENDER INDEX

Sr.No. Particular Page No.

1 Tender general information 4

2 Tender Notice 5

3 Instruction to the tenderers & General conditions. 6

4 Technical Offer Part “A” 7 - 11

5 General Conditions Part “B” 20 - 22

6 Arbitration 23 - 26

7 Part “B” Commercial Offer 27 - 28

8 Bank Guarantee form 29 - 30

9 Indeminity Bond 31 - 32

10 Schedule “A” for rate. 33 - 36

MAHARASHTRA STATE ELECTRICITY DISTIBUTION CO.LTD.KALYAN ZONE, KALYAN

3

Page 4:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

TENDER GENERAL INFORMATION

TENDER NO. : CE/KLNZ/TECH/TENDER NO.7/2007–08

NAME OF WORK : Repairs of 33KV/22KV & 33KV/11KV. 1 to 5 MVA Power Transformer under VASAI Circle area, available from time to time.

ESTIMATED COST : Rs. 30 /- lacs approximately (Rs. Thirty lacs only)

E.M.D. : Rs. 30,000 /-

DUE DATE OF RECEIPT : 22/10/2007 upto 13.00 Hrs.OF TENDER

DATE OF OPENING : 22/10/2007 at 15.00 Hrs. ( If possible )

Completed Tender is to be : ADDRESS IS AS BELOW :Submitted to The Chief Engineer ( KLNZ )

Maharashtra State Electricity Distribution Co.Ltd. Kalyan Zone , Tejashree Building, 1st floor, Karnik Road, Jahangir Maidan, Kalyan-421 304

4

Page 5:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

TENDER NOTICE

Tender No. CE/KLNZ/TECH/T - 7 / 2007-2008

Sealed tenders in prescribed form duly superscribed, are invited for Repairing of H.V. Power Transformer having capacity 1 MVA, 2 MVA, 3.15 MVA ,5 MVA & Voltage level 33/11 kV, 33/22 kV.

Estimated amount Rs.30 Lakhs. ( Rs. Thirty Lakhs).

The tender form consisting of schedules of rates with terms & conditions will be sold at the cost of Rs.3000/- only. Sale of tender will start from 5.10.2007 to 20.10.2007 excluding holidays) Interested supplier may purchase such tender forms & submit them on or before 22.10.2007 13.00 hrs. Tender will be opened on 22.10.1007 at 15.00 hrs. However, if this date is declared as Holiday, then tender shall be opened on the next working day. Right to reject / accept any or all the tenders without assigning any reasons thereof, is reserved by the undersigned.

The tender documents can be made available from the Office of the Chief Engineer, (KLNZ) Maharashtra State Electricity Distribution Co. Ltd., “Tejashri” 1st floor, Jahangir Maidan, Karnik Road, Kalyan (West) 421 301. From 11.00 hrs to 13.00 hrs and 14.00 hrs to 16.00 hrs. on payment of non refundable fee by cash. E.M.D. of Rs.30,000/- (Rs. Thirty thousand only) shall be paid by cash / D.D. payable on any schedule Bank in Kalyan to M.S.E.D.C.L. and the receipt or D.D. shall be attached with the tender to be submitted. The Tender documents can be downloaded from Company’s website www. mahadiscom.in, In this case the tender fee should paid by D.D. in favour of M.S.E.D.C.Ltd. on schedule bank payable at Kalyan on or before 20.10.07.

CHIEF ENGINEER ( KLNZ )

5

Page 6:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.KALYAN ZONE, KALYAN

INSTRUCTIONS TO TENDERERS & GENERAL CONDITIONS.

1 ) The annual item rate tenders complete with all Annexures duly filled in

where necessary are invited in sealed covers for attending to repairs of power

transformers in VASAI CIRCLE area as per the items specified in Annexure “A”

attached hereto. The tender should be submitted so as to reach the office of

the Chief Engineer, Kalyan Zone Office, M.S.E.D.C.L. Kalyan not later than 15.00

Hrs. on 20/10/2007.

ADDRESS IS AS BELOW :The Chief Engineer ( KLNZ )Maharashtra State Electricity Distribution Co.Ltd. Kalyan Zone , Tejashree Building, 1ST Floor,Kalyan-421 304

The tender should be filled in ink or typewritten. While quoting, the rates

shall be given both in figures and words. There should not be any over

writing and erasures. In case, any changes are to be made, those should be

done by crossing the original writing and signed by the tenderer. In case of

difference between rates in figures and words, the rate most favourable to the

Company shall considered to have been quoted.

2 ) The tenderer should submit unconditional acceptance in two separate sealed

envelopes as indicated below. These two envelopes super scribing on individual cover

as “ Cover “A” & “Cover “B“ shall be put in one combined cover which is to be

properly sealed and super scribed as below :

a ) Tender for repairs of power transformers against tender

specification no. CE/KLNZ/Tech/ tender no.7/2007-08.

b ) Due date

c ) Name and address of firm.

d ) Earnest money paid by D.D./Receipt no. and date _____________

6

Page 7:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

3 A ) The first envelope ( i.e. cover “A” ) shall contain following documents.

PART – ATECHNICAL OFFER To be submitted

To be submitted in each complete with all enclosures. In case of Consortium, Companies, details are to be given for all the member firms.

To,

The Chief Engineer (KLNZ). Maharashtra State Electricity Distribution Company Ltd.,“Tejashree” 1st floor, Karnik Road, Jahangir Maidan,Kalyan (West) 421 301.

SUB:SUB: REPAIRS OF FAILED 33/11 KV / 33/22 KV 1 To 5 MVA CAPACITYPOWER TRANSFORMERS IN VASAI CIRCLE AREAPOWER TRANSFORMERS IN VASAI CIRCLE AREA

Dear Sir,

We have procured the bid documents FOR ENGAGEMENT OF AGENCYFOR REPAIRS OF FAILED 33/11 KV / 33/22 KV 1 To 5 MVA POWER TRANSFORMERS IN VASAI CIRCLE AREA. We are submitting our proposals with complete set of enclosures: The details asked for are being furnished in accordance with the following:

GENERAL PROFILE OF THE BIDDER

1 NAME & COMMUNICATION DETAILS

1. Full legal name of the Company / firm

2. Date and location of establishment

3. Registered Office address

4. Address for communication

5. Telegraphic address

6. Telephone number

7. Fax number

8. E – mail address

9. Date and location of Establishment

10. Authorised person (s) to be contacted

11. Names and addresses of the proprietors/partners/consortium members

12. Type of firm – private limited / Public limited / Government sector

13. Whether registered under companies act or any other act

14. Registration number

15. Annual turn over in last 3 years 2003 -2004. 2004 -2005, 2005 – 2006 (Copies to be enclosed)

7

Page 8:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

B TECHNICAL AND QUALIFYING REQUIREMENT DETAILS:

1 STRUCTURE AND ORGANIZATION:

1. Attach the organisation chart showing the structure of the organisation including the names of Directors and position of officers.

2. How many years has your organisation been in business under your present name? What were your fields when you established your organization? When did you add new field (if any)?

3. Have you ever not completed any work awarded to you? (If so, give name of project and reasons for not completing work).

2. Financial details1. Capital

(a) Authorised

(b) Issued and paid-up

2. Details of the work completed and applicant’s performance record as on date of submission of this bid.

3. Furnish balance sheet and profit and loss statement with auditor’s reports for the last three years, it should inter-alias include the following information

(i) Working capital

(ii) Foreign investment

(iii) Turn over:

I) Turn over (gross sales) for 2004-05

II) Turn over (gross sales) for 2005-06

III) Turn over (gross sales) for 2006-07

(iv) Gross profits:

i) In the year 2004-05

ii) In the year 2005-06

iii) In the year 2006-07

(v) Total liabilities :

(a) Current ratio :

(Current assets to current liabilities)

(b) Total liabilities to net worth.

(vi) What is the maximum annual value of the project that you can handle?

7. Have you ever been denied tendering facilities by any Government Department / Public Sector Undertaking? (If yes, give details).

8. List your sources of finance.

9. Certificate of financial soundness by bank.

10. Name and address of bank from whom reference can be obtained.

11. Have you ever been declared bankrupt? (If yes, please give details)

8

Page 9:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

3. Personnel capacity3.1 The bidder should have a minimum of three years experience in any of the man management technical activities consisting of Managers, Technical and semi-skilled personnel.3.2 As far as possible the Bidder shall not change the officer in-charge / nodal officer frequently. Any change in officer incharge / nodal officer should be mutually agreed upon and communicated to MSEDCL in writing.3.3 The Bidder shall furnish documents regarding the qualification of the key personnel proposed to be employed by him with minimum three years experience.3.4 Manpower details

3.4.1 DETAILS OF COMPANY OF DIRECTORS:

Name of the Director

Organisation

Address

Remarks

3.4.2 KEY AND ADMINISTRATIVE PERSONNEL AND CONSULTANTS:

Individual’s name

Qualification

Present position of office

Professional experience and details of work carried out.

Years with the applicant.

Language known

Remarks.

3.4.3 MANAGERS: Individual’s Name

Qualifications

Present position of office

Professional experience and details of work carried out.

Years with the applicant

3.4.4 STAFF / WORKMEN: Individual’s Name

Qualifications

Present position of office

Professional experience and details of work carried out.

Years with the applicantYears with the applicant4. Infrastructure Availability

4.1 The minimum average annual turnover of the bidder for the last three financial years should not be less than 30% of the quoted price of the bid The figures of average annual turnover for each joint venture / consortium partners shall be added together to determine the bidder's compliance with the minimum average annual turnover requirement for the package. However, the lead partner must meet at least 40% and each of other partners must meet at least 25% of the

9

Page 10:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

minimum average annual turnover criteria given at para c) above.

Notwithstanding anything stated above, MSEDCL reserves the right to assess the capacity and capability of the bidder to execute the work, should the circumstance warrant such assessment in the overall interest of MSEDCL.

4.2. The above stated requirements are a minimum and MSEDCL reserves the right to request for any additional requirement and also reserves the right to reject the proposal of any bidder, if in the opinion of MSEDCL, the qualification data is incomplete or the bidder is found not qualified to satisfactorily perform the works.

5 EXPERIENCE):

5.1 The bidder shall provide necessary evidences in support of meeting above qualifying requirement like copies of purchase order, performance certificate from the concerned utilities etc.5.2 The bidder should possess adequate trained manpower, machines and the requisite stationary.

A. Annexure “ A “ giving the particulars of tenderer which includes

previous experience in Public and private sector. The minimum turnover for last

three financial year consider for similar nature works together, should be equal

upto Rs.30,00,000/-. Copies of orders shall be attached by you.

B. Income Tax return filed and submitted. ( along with PAN No. and TAN No.)

C. Solvency certificate of Rs.3,00,000/- from any nationalized bank or scheduled

bank.

D. Details of machinery and Testing equipments.

E. Xerox copy of EMD paid to the Company, against this tender.

F. Attested copies of Provident Fund registration, ESIC registration, Service Tax,

VAT registration, W.C.T. registration/SSI registration/registration of the firm

from registrar of companies should be enclosed.

We understand that MSEDCL reserves the right to invite detailed proposals from any private entrepreneur-company; irrespective of the fact whether the company or entrepreneur has been pre-qualified. We also understand that the MSEDCL reserves the right to reject any or all of the bids without assigning any reason thereof. We agree to abide by all the conditions governing the bids and decisions of the MSEDCL. The validity of the bid is 120 days from date of opening of Part-A bid or 90 days from the date of opening of Part-B bid whichever is later. It is certified that we have quoted for all circles prescribed in this specification; we understand that in case any circle is not quoted in financial offer, our offer will be rejected irrespective that we are qualified and even the lowest one.Thanking you,

Encl : As above Yours faithfully,

__________________________________________

10

Page 11:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO LTD.PART ‘A’ .

PARTICULARS OF THE TENDERER

The following data may be furnished in detail.

1. Name and address of the tenderer.

2. The facility available for repairing the power transformers may please be

furnished such as number of winding machines, size of vaccum of hot air

oven, testing equipments, lifting equipments, and covered/opened area in your

workshop.

3. The details of the technical staff along with their qualifications for carrying out

repairs.

4. Particulars of registration of the workshop to be given. If it is registered under

small scale industries, the Small Scale Industries certificate should be enclosed.

5. Particulars of registration and class in which registered.

a) In the Company b) In other Govt. Departments.

6. Reference may be made to :

a)

b)

c)

7. Previous experience in public & private sectors.

Sr. Name of work Department Value of work No. executed done

8. Certified true copies of Sales Tax and Work Tax(MVAT) registration certificate,

Partnership deed, registration of Co. certificate and power of attorney if applicable.

9. Any other information the contractor may desire to give.

Place :___________

Date :____________

Signature of the Tenderer with rubber stamp

( Note: True copies of testimonials should be attached which will not be returned.)

11

Page 12:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

3 ( B ) Further, after opening of cover “A” and scrutinizing of the same, the cover “B”

only such tenderers will be opened who are found to be satisfying prequalifying

conditions. The second envelop ( i.e. cover “B”) shall contain following documents.

The acceptance of schedule of rates as indicated in “Schedule “A” in Part “B”

The tenderer is also required to submit tender copy after duly putting his full signature

on each page viz. these instructions sheets, special conditions duly signed/initialed on

every page, etc. the tenderer will be deemed to be fully aware of the Distrbution Co.s

general conditions of contract for supply of plant, equipments and material particularly,

in respect of security deposit, terms of payment, penalty for late delivery, etc. And any

ignorance of these conditions will not exempt him from his liability to abide by the

same. It will also be presume that , he has fully readed and understood all the terms

and conditions of the tender documents submitted.

4 ) INTERPRETATION :- If the tenderer has any doubt about the meaning of any portion of this

tender, he should at once seek clarification from the Chief Engineer, M.S.E.

Dist.Co.Ltd., Kalyan Zone, Kalyan in writing in any case at least five days

before the due date . Additions and alternations in the tender form / conditions,

etc. by the tenderer without the consent of the Chief Engineer ( KLNZ ), M.S.E.

Dist.Co.Ltd., Kalyan Zone, Kalyan are not permissible. Tenderer should either

quote his rates for the works described in the Annexure “A” or write this word

“ RATE NOT QUOTED “ against concerned items.

5 ) ACCEPTANCE OF TENDER :-The Chief Engineer ( KLNZ ), KALYAN, on behalf of the Maharashtra

State Electricity Dist.Co.Ltd., reserves the right to reject any or all the tenders

without assigning any reason thereof and also reserves the right to place

orders for any of the items of work for any number of power transformers of

any capacity and for ratio 33 kV. on primary and 22KV/11KV level on secondary

from Vasai circle under this Zone. The tender is floated for repairing of 1 MVA TO

5 MVA Power Transformers. The number of failed transformers will be as

available from time to time. There is no binding on the Company to accept the

lowest or any other tender. There is also no binding on the Company to

disclose any analysis or report or notes on the tenders. The tenderer on his

part binds himself to repair any transformer or transformers at the rate quoted

12

Page 13:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

by him for different items or repair works. The Co. reserves the right to reject

any tender which does not confirm to any of the conditions. An open item rate

order indicating number of transformers of various capacities and ratios to be

repaired will be issued by the Chief Engineer, Maharashtra State Electricity

Dist.Co.Ltd.,Kalyan Zone, Kalyan to successful tenderers. The decision regarding

acceptance of the tender shall be intimated by the Co. to

the eligible Tenderer within a period of 90 days from the date of opening the

tender and the offer given by the tenderer should be valid for 90 days. The

tenderer shall be bound to repair the transformers when the acceptance is

intimated at tenderer’s address.

6 ) PERIOD OF THE CONTRACT :-The contract period for this tender is 12 months from the date of

placements of order with you and may be extended after taking consents from

tenderers if required by the company.

7 ) ITEM RATE SEHEDULE :-The item rate schedule prepared by the Co. is enclosed herewith.;which

is inclusive of all taxes. The tenderer is requested to go through every item

and quote in part “B”

8 ) WORK ORDER :-The failed transformers will be transported by repairer to the place of

repairer’s workshop and is to be opened by the repairer in the presence of a

Co.’s representatives i.e. Executive Engineer, Testing and concerned Executive

Engineer, find out the item for which repairs are required to be carried out.

The cost of repairs of each transformer will be worked out separately at the

rates quoted for the items or work required to be attended to and the

inspection report shall be signed by both parties. A work order will then be

issued by the Superintending Engineer, M.S.E. D.C.L. concerned for each

transformer separately as per joint inspection report.

9 ) PAYMENT :-The payment of repaired power transformer will be made after

satisfactory repairs as per following procedure :-

13

Page 14:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

i ) 70 % payment of repairing charges after satisfactory testing of

repaired unit at works.

ii ) 20 % payment will be released on successful commissioning of the

transformer.

iii ) Balance 10 % payment will be paid after submission of B.G.from

scheduled/nationalized Bank having branch in Maharashtra State of

equal amount by tenderer. The B.G. will be retained by the Co. till expiry

of the Guarantee period as performance security.

10 ) EARNEST MONEY DEPOSIT :-A sum of Rs. 30000 /- should be deposited by the tenderer as Earnest

Money Deposit in cash or by Demand Draft or in the form of Bank Guarantee

on any National / Scheduled bank in Kalyan/ Mumbai in favour of Maharashtra

State Electricity Distibution Co. Ltd., along with the tender. A reference to the

tender number should invariably be given in case E.M.D. is paid in cash OR

D.D. before the due date of tender and relevant receipt number should be

mentioned in the tender and on the sealed cover. No interest will be allowed on

E.M.D. in case of unsuccessful tenderers Earnest Money Deposit will not

normally be retained by the Company for more than 6 months from the date

of finalizing of the tender. Earnest Money Deposited by successful tenderers will

be refunded as soon as possible after finalization of contract and within six

months or will be adjusted in security deposit. The tenderer shall submit an

advance stamped receipt for the amount of E.M.D. discharged in favour of the

Co. for obtaining refund of E.M.D.

E.M.D. is liable for forfeiture (a) if the tender which it covers is

withdrawn by the tenderer before finalization of the tender i.e. within 90 days

from the opening of the tender. (b) if the tenderer fails to pay security deposit

as stipulated. (c) if the successful tenderer refused to sign/ complete the

contract documents and agreement to execute the contracted work.

In case of payment of E.M.D. in cash , the same should be

remitted in the office of the Superintending Engineer , Kalyan Circle Office,

Kalyan and an official stamp receipt obtained immediately. If E.M.D. is not

paid , tender will not be considered.

14

Page 15:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

11 ) SECURITY DEPOSIT :-The agency has to pay security deposit to the tune of 10% of the value of

the tender in cash / B.G. scheduled/nationalized Bank having branch in Maharashtra

State of before lifting the the power T/F. allotted to him for repairs from the site ,

in the office of the Superintending Engineer , Vasai. The amount of S.D. will be

returned after 100% successful completion and commissioning of Power Transformer

and certified by authority not below the rank of Executive Enginer.

12 ) TAXES :- The tenderer should quote the rates inclusive of all taxes such as VAT

tax , Excise , Octroi , Service tax & other taxes if any applicable from time to

time. No liability for any type taxes prevailing/applicable upto period of completion of

tender works, rest with MSEDCL which may be noted.

It may be noted that we can issue required form if necessary and

applicable for concession in tax wherever required.

It should be noted that no consideration will be given by this office on

account of payment work tax and Service Tax to Govt. by the contractor and

it will be entire responsibility of contractor to pay work tax to Government.

13 ) REPAIR CAPACITY / JOINT INSPECTION :-(A) The company has anticipated repair period of 90 days as under ( item a to f ) :

a ) After receipt of allotment letter the tenderer should lift the power

transformer as per Co.’s item rate schedule within 8 days after

completing all the formalities.

( b ) After lifting the transformer from Co.’s site , the intimation shall be

given by the repairer within 8 days to the concerned

Superintending Engineer for deputing the officer ( not below the

rank of Ex. Engr. ) for joint inspection. The concerned

Superintending Engineer will depute the officer for joint inspection

within 8 days.

( c ) After joint inspection the detailed work order will be placed by the

concerned Superintending Engineer within 15 days.

15

Page 16:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

( d ) After receipt of detailed order , the transformer should be repaired

at agency’s works within 31 days.

( e ) After carrying out repairs , an intimation for stage inspection to be

given to Co.’s representative within the stipulated period of 10

days for repairs.

( f ) After above calls stage inspection should be carried out within 10 days.

( g ) After stage inspection a call should be given for testing within 10

days from the date of receipt of oil.

( h ) The repairer will have to transport the transformer from works to

Co.’s site as per item rate schedule and will have to carry out

assembly of the transformer at Co.’s site for attending pre-

commissioning work and commissioning of the transformer and the

testing of the transformer as per I.S.2026 with latest amendments.

This is to be carried out within 15 days.

( B ) REPAIR CAPACITY :- Time being essence of contract the output should be strictly adhered to.

Capacity as to how many transformers repairer can repair simultaneously

should be clearly mentioned. The power T/Fs. should be repaired within the

period of 3 months from the date of handing over of the transformer , otherwise

penalty as per clause No. 19 hereto will be charged on the firm.

14 ) DAMAGED HV/LV COILS :- Tenderer will have to return all damaged HV/LV coils to the Co’s Store,

for which the receipt giving details of quantity and weight etc. as necessary

will be given accordingly. The weight of copper will be measured after

removing all the insulation material in the joint inspection. The copy of credit

note of damaged HV/LV coils to store center should be attached with bill.

Payment of bills will not be processed if credit note is not attached.

15 ) GUARANTEE PERIOD :-Each repaired transformer as a whole shall be guaranteed for trouble –

free service for the period of 12 months from the date of commissioning or 16

Page 17:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

18 months from the date of dispatch whichever is earlier. If the transformer

fails within guaranteed period during service then the total period of 12

months will be counted as subsequent period of service after repairs. Any

failure and further repairs required during the guarantee period thereafter for one

year shall be attended by the repairer free of charge including transport.

16 ) DUE DATE OF TENDER : -All the tenders received upto the due date and time will be opened as far as

possible on the specified date and time in the presence of the tenderers or

their authorized representatives who choose to remain present at that time

under normal circumstances.

17) STAGE INSPECTION :

Every stage of repairs is to be intimated to the divn. office for deputing the

representative for stage inspection.

18 ) INCOME TAX RETURNS : -No tender will be considered unless it is accompanied by Income Tax returns

certificate and solvency certificate to the tune of Rs.3 lac.

19 ) DEDUCTIONS :-Any amount or amounts becoming due on account of damages or

compensation for default breach of contract by the repairer , in addition to the

deduction from security deposit, the said amount/s may be retained from any

payments due to the repairer and the Company shall have the right to retain

amount/amounts from any payment due to the repairer under particular contract

which may be deducted by the Company from amount / amounts due or being

due by him to the repairer under the same or any other contract. All disputes

or differences arising under, out of or in connection with the contract, so

concluded shall be subject to the exclusive jurisdiction of Kalyan Courts.

Once a receipt for taking over the transformer in custody is signed by

the repairer, the failed power transformer would be in his custody till the repaired

transformer is handed over to the Co.’s representative after due repairs and tests and

receipt thereof is signed in token of acceptance by Co.’s representative.

17

Page 18:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

Any loss or damage due to handling , theft or any other reason during

this period would be to the repairer’s account . Accordingly , the repairer will

have to pay within a time specified in the order a security deposit in cash.

After lifting the transformer from Co’s site , any losses or damages due to

handling or theft or any other reasons during the period would be on your

account. The amount of damages if any will be recovered from your bill. For

this purpose , you will have to execute an indemnity bond on stamp paper of

Rs.100 /- and agreement of Rs. 100/- at your cost. The blank specification of

indemnity bond and agreement are enclosed for your reference.

20 ) FAILURE TO EXECUTE ORDER :- In case of failure on the part of the repairer to cope up with the work

within the specified period, the same will be got executed through some other

agency at your risk and cost even at higher rates and the difference in

amount if any, will be recovered from the repairer in addition to 15%

supervision charges.

Further in case of failure to repair the transformer as agreed by repairer

in the offer, the Company reserves the right to curtail the quantity. If the

performance is poor then cancellation of order in part or whole will be

considered. The Chief Engineer, M.S.E.Dist.Co.Ltd., Kalyan Zone ,Kalyan,

reserves the right for cancellation of order partly or fully without assigning any

reason.

21 ) PENALTY FOR LATE DELIVERY :-In case the transformer is not delivered within the specified time , the

contractor shall be liable to pay penalty @ 1% per week subject to maximum

of 10 % of the value of order.

22 ) MISCELLANEOUS :-( i ) No modification of any kind such as rebates, etc. in the tender value will

be accepted after due date and time of receipt of tender. No deviation

from specifications will be allowed. The Chief Engineer (KLNZ) Kalyan

will, However, be free to negotiate any particular item with any tenderer.

( ii ) The tenderer should furnish full details about himself and amount of the

work of receipt of power transformers carried out by him for this

18

Page 19:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

Company and in other Govt. or Semi-Govt. organization on the page

provided for this purpose and submit true copies of certificates in proof

thereof ( which will not be returned. )

( iii ) Right to place work orders item wise for any of the items is reserved.

( iv ) The contract or any part of thereof shall not be sublet without written

permission of the Chief Engineer (KLNZ) , M.S.E.D.C.L. Kalyan Zone ,

Kalyan.

( v ) The tenderer will be presumed to be aware of the Co’s general

conditions of contract ( Part II ) and general conditions of work contract

which are also binding so far as they are applicable in respect of this

contract except the terms and conditions mentioned in this tender.

( vi ) The decision of the Chief Engineer (KLNZ) , M.S.E.D.C.L. , Kalyan Zone ,

Kalyan about the interpretation of any items and conditions of this tender

specification including Annexures and booklets of general terms and

conditions and order placed under this tender shall be final and binding

on the tenderers / repairers.

( vii ) This complete tender documents shall be deemed to form the part of

the item rate contract and work orders if and when placed subsequently

on the basis of this shall be binding on the tenderer / repairer.

( viii) The tenderer should have annual turnover of Rs.6.00 Lakhs for repairing

of Power Transformers of ratio of either 33/22 KV, 33/11 KV or together.

19

Page 20:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

SPECIAL CONDITIONS OF CONTRACT FOR REPAIRSOF POWER TRANSFORMERS.

1 ) The tenderer should quote the item rates in accordance with items,

remarks and notes in PART “B” hereto.

2 ) The transformers shall be repaired at the repairer’s workshop only. The

repairers should give the detailed address of their factory / workshop where the

transformers will be repaired. The failed transformers will be transported to the

repairer’s factory / workshop and transported back after repairs from the factory

by the repairer and repairer will have to arrange loading, unloading of

transformer also. Further repairer will have to make Insurance of the

transformer during transportation at his own cost.

3 ) Efforts have been made to make the list of items of repairs (Annexure

“A” ) as exhaustive as possible. The decision of the Chief Engineer ( KLNZ ) ,

M.S.E.D.C.L. Kalyan about the interpretation of any item and actual scope

work covered by any item shall be final. If any special or extra item of repair

not covered by the item rate order is required to be carried out , the repairer

shall get the item rate for the same approved from the Chief engineer ,

Kalyan Zone ,M.S.E.D.C.L. Kalyan before carrying out the special or extra item

of work.

In case of damage to the yoke or limb no repairs to be carried out without permission from this office. Also in case of installation of New OLTC.

4 ) The repair work, generally involves replacement / re insulation of H.V./L.V.

coils, gaskets, breathers, bushings, terminal bolts and other work-out parts

wherever necessary and reassembly, filtering, etc. The replacement parts should

be of original, genuine or reputed standard makes of best quality &

workmanship and confirmed to relevant I.S.S. subject to the approval of the

Company’s officer deputed for this work.

It is presumed that tenderer has got qualified & experienced staff to

carry out the repair work. The repair work shall be in conformity with relevant

Indian Standard Specification and clear certificate to that effect should be furnished

on completion of the repair work.

20

Page 21:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

Unless credit rate is approved for particular item, all old damaged /

replaced parts will be returned to the Company’s representative, for which a

receipt giving detailed of quantity and weight etc. as necessary shall be

obtained and attached to the test certificate.

5 ) The repaired transformers shall be subjected to routine tests as per IS-

2026/1977 for repaired transformers and the testing arrangements will have to be

made by the repairer and the repairer should have all testing equipments / facilities.

All the tests shall be carried out in the presence of the Company’s representative,

nominated by the Chief Engineer , M.S.E.D.C.L. Kalyan Zone, Kalyan. A certificate

of all tests carried out on the repaired transformers jointly signed by the

repairer and Co’s representative shall be submitted to Superintending Engineer ,

M.S.E.D.C.L., Vasai Circle office with a copy to the Chief Engineer, M.S.E.D.C.L.,

Kalyan Zone, Kalyan. The repaired transformers will be dispatched only after Co’s

representative certifies the tests to the satisfaction on the test certificates. The

repairer shall give an advance intimation of seven days to Co’s representative

before the repaired transformers are ready for inspection and testing, failing

which the repairer shall be responsible for delay in delivery.

6) While attending repairs of the transformers, the repairer shall ensure that

the guaranteed technical particulars & performance as the original maintained

for repaired transformers except where voltage ratio order is to be changed.

Under no circumstances the values of percentages impedance, losses and

efficiency should be altered from original values except when voltage ratio is

changed.

7) if any extra items of repairs are required to be carried such works shall be carried by

you only after separate work order is placed on you by this office after getting

quotation from you.

8) The transformer oil will normally be supplied by the Co. and same

should be used for filling in the tank of repaired transformer. In case if

required , the firm will have to supply the transformer oil of EHV grade and the

cost of the same will be refunded to you at rate prevailing at our Central

Purchase Agency at Mumbai.

21

Page 22:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

9) On completion of repairs and tests, before delivery the repairer shall

affix, free of cost, just below the manufacturer’s name plate on the transformer,

a suitable metallic name plate with following details punched on it :

Repaired by _______________________________________________________

( Name of the repairer )

Tested and delivered on _____________________ ( Date )

Test Results :

1 ) Megger values : H.T. to Earth. ---

L.T. to Earth. ---

H.T. to L.T. ---

2 ) Oil Test : a ) Dielectric strength of oil.

b ) Acidity test of oil.

10 ) After satisfactory completion of repairs and test, the repairer shall submit

his bill in triplicate to the Superintending Engineer ,Vasai circle alongwith test

certificate etc. for making arrangements of payment.

11 ) Before lifting the transformer, tenderer will have to arrange for insurance

of the power transformer for all risks such as the fire , theft, damage or riots,

etc. The insurance charges are to be borned by the repairer covering the cost

of the transformer. The insurance should be in the name of Maharashtra State

Electricity Distribution Co.Ltd.

22

Page 23:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

THE MATTERS TO BE DETERMINED BY THE CHIEF ENGINEER :-All disputes and differences of any kind whatsoever arising out of or in

connection with the contract, whether during the progress of the work or after

its completion and whether before or after the determination of the contract ,

shall be referred by the contractor to the C.E. and the C.E. shall ( within 120

days ) after receipt of the contractor’s representation make and notify decisions

of all matters referred to by the contractor in writing.

(i) Demand for Arbitration :- In the event of any dispute or difference between the parties here to as

to the construction or operation of this contract, or the respective rights

and liabilities of the parties on any matter in question , the dispute or

difference on any account or as to the withholding by M.S.E.B. of any

certificate to which the contractor may claim to be entitled to, or if the

C.E. fails to make a decision ( within 120 days ) then and any such case,

the contractor ( after 120 days ) but within ( 180 days ) of his presenting his

final claim on disputed matters shall demand in writing that the dispute

or difference to be referred to arbitration.

(ii) The demand for arbitration shall specified the matters which are in

question , or subject of the dispute or difference as also the amount of

claim itemwise. Only such dispute(s) or difference(s) in respect of which

the demand has been made, together with counter claims or set off,

shall be referred to arbitration and other matters shall not be included

in the reference.

(a) The arbitration proceedings shall be assumed to have commenced

from day , a written and valid demand for arbitration is received

by the Company.

(b) The claimant shall submit his claim stating the facts supporting the

claims along with all relevant documents and the relief or remedy

sought against each claim within a period of 30 days from the

date of appointment of the Arbitral Tribunal.

(c) The Company shall submit its defense statement and counter

claim(s) , if any , within a period of 60 days of receipt of copy of

claims from the Tribunal thereafter unless otherwise extension has

been granted by the Tribunal.

23

Page 24:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

(iii) No new claim shall be added during the proceedings by either party.

However, a party may amend or supplement the original claim or

defense thereof during the course of arbitration proceedings subject to

acceptance by Tribunal having due regard to the delay in making it.

(iv) If the contractor (s) does /do not prefer his /their specific and final claims

in writing ,within a period of 90 days of receiving the intimation from

the Company , that the final bill is ready for payment , he/they will

deemed to have waived his/their claims(s) and the Companys shall be

discharged and released of all liabilities under the contract in respect of

these claims

OBLIGATION DURING PENDENCY OF ARBITRATION :-Work under the contract shall , unless otherwise directed by the Engineer

continue during the arbitration proceedings , and no payment due or payable

by the Company shall be with held on account of such proceedings ,

provided , however ,it shall be open for Arbitral Tribunal to consider and

decided whether or not such work should be continued during arbitration

proceedings .

(i) In cases where the total value of all claims in questions added together

does not exceed Rs. 1,00,00,000 /- (Rupees One Crore) the Arbitral

Tribunal shall consist of a Sole Arbitrator who shall be either the C.E.

of the Company or serving or retired officer of the Company

/Government not below the grade of C.E. or equivalent nominated by the

M.D. of the Company in that behalf. The Sole Arbitrator shall be

appointed within 60 days from the day when a written and valid demand

for arbitration is received by Company.

(ii) In cases the value of the claim exceeds Rs. 1,00,00,000 /- (Rupees One

Crore) as above, the Arbitral tribunal shall consist of panel of three

serving or retired officers of M.S.E.D.C.L../ Government not below the

grade of C.E. / C.A.O. as the Arbitrators. For this purpose the Company

will send a panel of more than three names of Arbitrators of one or

more departments of the Company / Government to the contractor who

will be asked to suggest to the M.D. at least 2 names for appointment

24

Page 25:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

as contractor’s nominee . The M.D. shall appoint at least one of them as

the contractor’s nominee and will also appoint the balance number of

Arbitrators either from the panel or from outside the panel , duly

indicating the presiding Arbitrator from amongst the three(3) Arbitrators so

appointed. While nominating Arbitrators, it will be necessary to insure

that one of them is or has worked in Accounts department.

(iii) If one or more Arbitrators appointed as above refuses to act as

Arbitrator, withdraws from his office as Arbitrator or vacates his /their

office/offices or is /are unable to unwilling to perform his function as

Arbitrator for any reason whatsoever or dies or in the opinion of the

M.D. fails to act without undue delay, the M.D. shall appoint new

Arbitrator/s to act in his /their place in the same manner in which the

earlier Arbitrator/s had been appointed such reconstituted Tribunal , may ,

as its discretion proceed with the reference from the stage at which it

was left by the previous Arbitrator (s).

(iv) The Tribunal shall have powers to call such evidence by way of

affidavits or otherwise as the Arbitral Tribunal shall think proper , and it

shall be the duty of the parties hereto to do or cause to be done all

such things as may be necessary to enable the Arbitral Tribunal to

make the award without any delay.

(v) While appointing Arbitrator (s) as above , due care shall be taken that

he / they is/are not the one /those who had an opportunity to deal with

the matters to which the correct relates or who in the course of

his/their as Company’s servant (s) expressed view on all or any of the

Arbitral Tribunal or the award made by such Tribunal will , however, not

be invalid merely for the reason that one or more Arbitrator had , in the

course of his service , opportunity to deal with the matters to which the

correct relates or who in the course of his/their duties expressed views

on all or any of the matters under dispute.

(vi) Arbitral award shall straight item wise , the sum and reasons upon

which it is based.

(vii) A party may apply for corrections of any computational errors , any

typographical or clerical errors or any other errors of similar nature

25

Page 26:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

occurring in the award to Tribunal within 30 days of receipt of the

award.

(viii) A party may apply to Tribunal within 30 days of receipt of award to

make an additional award as to claims presented in the Arbitral

proceedings , but omitted form the Arbitral award.

(ix) In case of the Tribunal , comprising of three members any ruling or

award shall be made by a majority of Members of Tribunal in the

absence of such a majority , the views of the Presiding Arbitrator (s) shall

prevail.

(x) Where the Arbitral award is for payment of money , no interest shall

be payable on whole or any part of the money for any period till the

date on which the award is made.

(xi) The cost of the Arbitration shall be borne equally by the respective

parties. The cost shall inter-alia include fees of the Arbitrators as per the

rates fixed by the Company from time to time. Provided that the fees

payable per Arbitrator for claims up to Rs. One Crore , shall not exceed

Rs.2000/- per sitting subject to a maximum of Rs. 25,000 /-

and the fees payable per Arbitrator for claims over Rs. One Crore ,

shall not exceed Rs. 2000/- per sitting subject to a maximum of Rs.

50,000/- provided further that the Arbitrators who are in service of

Government / M.S.E.D.C.L.. shall draw fees at half of the rates mentioned

above .

(xii) Company shall maintain a list of Arbitrators the M.D. shall have full

powers to delete or add the name of the Arbitrators in the list to make

amendments to the said list as per his discretion.

(xiii) The Arbitral proceedings should be completed and the award be finalized

within one year from the date of appointment of the Arbitrators.

(xiv) Subject to the provisions as aforesaid , Arbitration an conciliation

act ,1996 and the rules there under , and any statutory notification

thereof shall apply to the Arbitration proceedings under this clause.

In case the contractor(s) falls within the ambit of Small Scale and

Ancillary Industrial Undertakings Act , 1993 , following clause regarding payment

shall be incorporated.

26

Page 27:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

TENDER NO. CE/KLNZ/TECH/T-7 / 2007 –08

PART “B”

NOTE :- Proforma to be filled in by the Contractor / Repairer for quoting the

percentage below / at par / above of the company’s item rate schedule. Please note that

only percentage figure is to be quoted for all the items taken together.

To :- The Chief Engineer ( KLNZ ), Kalyan.

A) We are ready to execute the order at _____% ( in words ___________________%) of

schedule of rates for parts I, II, III, IV of schedule “A” of tender

No. CE/KLNZ/TECH/T-7/ 2007 –08

B) We are ready to execute the order at lowest tender matching rate. Yes/No

TENDERER’S / CONTRACTOR’S

SIGNATURE

27

Page 28:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

TENDERER SHOULD RETURN THIS SHEET DULY SIGNED, ALONGWITH PART “B”

1 ) All the gaskets for cover, bushing, etc. will have to be replaced by new

once while reassembling the transformers.

2 ) All the damaged parts including coils as well as tap changer parts and

conservator if removed are to be returned to the Company, unless stipulated

otherwise, in the order.

3 ) The rates should be inclusive of all taxes, etc. where applicable , and

shall be on firm quotation basis and shall be valid till the allotted work of

repairing of transformers is completed.

4 ) If the transformer fails during guarantee period after repairs, then the

tenderer / repairer will have to transport the transformer from site to his work

and back at his own cost and risk. If, however, the transportation is done by

the Company, the charges of the same will be recovered from the tenderer /

repairer.

5 ) Decision regarding acceptance of item rate tenders will be taken within

90 days of opening of Tender and rates quoted should be valid till that time

( for purpose of placing of order. )

SIGNATURE OF THE TENDERER

WITH RUBBER STAMP

Date : ________________________

28

Page 29:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

SECTION V Ref no. GSO-517

Para 6.2(C) proforma ‘C’

FORM OF BANK GUARANTEE FOR PAYMENT OF E.M.D.

This deed of guarantee is made this ________________ date of _______ by

__________________________________________________________________________

of ____________________________ Kalyan branch having its H.O. at ___________

( Hereinafter called “ The Surety “ which expression shall, where the context so admits

include its permitted assigns ) in favour of Maharashtra State Electricity Distribution

Co.Ltd., being the Company constituted under the Electricity ( Suppy ) Act , 1948

(Hereinafter called the “Creditor “ which expression shall include its permitted assigns )

WHEREAS M/S ______________________________________________________

is required under the terms of the contract to furnish a Bank Guarantee for Rs.

_______________ ( Rs. ___________________________________ only ), the said sum

representing the ___________________________ price as given in the said contract

towards E.M.D. / S.D.

The surety at the request of M/S ________________________________ has

agreed to give this guarantee.

NOW THE RECORD OF THIS DEED WITNESSED AS FOLLOWS :-1. Surety may be called up on to pay not exceeding in the aggregate a sum of

Rs. ___________________ (Rs._____________________________________ ) as

per terms stipulated in the tender documents.

2. The surety hereby guarantee to the creditor the due acceptance of contract by

the debtor of the terms and conditions of the contract.

3. The decision of the creditor that any sum has become payable shall be final

and binding on the surety.

4. This guarantee shall come into force on the _____________ & shall remain

in force till end of __________________________.

29

Page 30:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

5. In case of any dispute arising out of or in connection with the extension of

encashment of Bank Guarantee, the courts in Kolhapur will have jurisdiction.

6. The guarantee therein contained shall not be effected by any change in the

constitution of the surety or the debtor.

7. Our liability under this guarantee is restricted to Rs. _______________________

( Rs.____________________________ ) and our guarantee shall remain in force

until and unless a claim this guarantee is lodged with us within six months

from the date of expiry of guarantee i.e. on or before _____________ all your

rights under this guarantee shall be encashed and we shall be relieved and

discharged from all our liability.

IN WITNESS WHERE THE SURETY HAS EXTENDED THIS BOND DEED IN

PRESENCE OF –

WITNESSED :-

30

Page 31:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

ON STAMP PAPER WORTH Rs. 100/- INDEMNITY BOND FORM

Whereas we are the contractors to the Maharashtra State Electricity Distribution

Co. Ltd. and the contract of the repairs of failed power transformers is entrusted by

the Company to us vide no.

We bind ourselves to indemnify and make good any loss and all costs and

experiences which may be incurred by the Company in respect of the transformer or

its spares in the course of handling and transport and undertake that :

1. We shall make good any loss ,shortage, damage to or destructions of the

transformer or its spares during the handling of the same.

2. We shall make good the amount of loss within a period of one month from

the date of report by the designated consignce and further agree and authorize

the Company in case of our default so to make good the amount of loss to

recover the loss of the cost of such spares without any further notice to us

from our pending bills with the Company or from any other payments due to

us including the security deposits placed with the Company under the terms of

the said contract.

3. we shall indemnify and save the Company harmless at all the times from any

all loss, costs and consequences in respect of the transformers entrusted to us

for handling and repairs and agree that any case of any default or failure on

our part to discharge the above mentioned obligations, the Company shall in

addition to above and without prejudice to its right of recovery provided herein

or in our contract with the Company entitled not only to terminate that contract

at our cost but also be held us liable and may take legal action against us.

IN WITNESS WEhave herein to set our hand on this day

in the presence of

1. Company’s Representative

2. Repairer’s Representative

SIGNED.

31

Page 32:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

Legal :-

1) Agency will indemnify M.S.E.D.C.L. against any liability or damages by

way of compensation arising from any accident to person or property of

persona in the Agency’s employment.

2) Agency shall indemnify M.S.E.D.C.L. against any liability or damages by

way of compensation arising from any accident to any other person

related or unrelated to Agency or M.S.E.D.C.L.

3) Agency shall bear the entire responsibility, liability and risk relating to

coverage of work force under different statutory regulations including but

not limited to workmen compensation Act, ESI, Factory Act, Contract

labor Act 1970 etc. and any relevant regulations, as the case may be.

4) Agency shall be fully responsible for payments for benefit including but

not limited to Provident Fund, Bonus, Retrenchment Compensation,

Leave Encashment, E.S.I. etc. as per statuary provisions.

5) Necessary payments and liability shall be

responsibility of Agency irrespective of payments received from

M.S.E.D.C.L. or oetherwise.

6) All taxes and dues payable to government and or local authorities in

respect of these works shall be the responsibility of the Agency and on

Agency will have to indemnify M.S.E.D.C.L. against liabilities on account

of such levies or taxes.

7) In the event Agency is not in a position to complete the contract or any

part of contract for any reason whatsoever, M.S.E.D.C.L. will make

alternate arrangement to complete the work at the cost, this can

responsibility of Agency.

32

Page 33:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

SCHEDULE ‘A’Rates for repairing of HV Power Transformers ( 33/22 kV , 5MVA & 3.15 MVA Power Transformer.)Sr.No.

Item Basic unit to Which rate is applicable.

Rate in Rs/Unit1 MVAT/f

2 MVAT/f

3.15 MVA T/f

5 MVAT/f

I Job involving labour charges

Dismantalling complete transformer. Cleaning all healthy parts, including coils, laminations tanks, tap changer, radiator tubes pins insulting sleeves, conservator , Breather etc.& reassembly of core and winding with only healthy & rewound coils, other new parts in lieu of damaged ones including brazing, soldering sleeving & insulating etc. as required. Oven drying of assembled core reassembly of COMPLETE transformer by tanking the dried core, changing all gaskets, making all terminal transformers connections, filling oil, filtration ,as necessary & complete testing as per ISS-2026-1977 with latest amendments as applicable (Dismantling includes removing of core lamination & rebuilding after cleaning)

Lump sum per Transformer

11,450 12,800 14,250 17,100

2 Overhauling of OLTC Lump sum 4,750 4,750 4,750 4,7503 Welding of tank & other parts at

points of leakages6.00 6.00 6.00 6.00

4 Complete Spray Painting of transformer (including OLTC & radiators) externally with 2 coat of high glossy heat resistive grey paint (including supply of paint) ( paint to confirm to ISS & brand to be got approved in advance from Executive Engineer. Deputed for joint inspection

Lump sum per Transformer

1550 1650 1,900 2,375

5 Painting of Internal wall of the tank with two coats of hot oil resistant paint (including supply of paint) (Paint to confirm to ISS & brand to be got approved in advance from Executive Engineer, Deputed for joint inspection.

Lump sum per Transformer 1200 1300 1,425 1,900

6 Transportation –a) Transportation of transformer up to 100 kms. Above 100 kms.

Per ton per KmPer ton per Km

5.7

4.75

5.7

4.75

5.7

4.75

5.7

4.75b) Loading of transformer at site

Per tonPer ton

475380

475380

475380

475380

33

Page 34:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

c) Unloading of Transformer at Worksc) Loading of transformer at Worksd) Unloading of Transformer at sitee) Wintching of Transformer.

Per ton Per tonPer mtr per ton

3804759.5

3804759.5

3804759.5

3804759.5

II Jobs involving Materials with labour.Damaged coils to be returned to the M.S.E.D.C.L.

1 Rewinding of H.V. coils with new winding wire & new insulation.

Rs.Per Kg.ofwound coilDPC Cu

310 310 310 310

2 Reinsulation of H.V. coils with existing conductor but using new insulation.

Rs.Per Kg.Of Copper

65 65 65 65

3 Rewinding of L.V. coils with new winding wire & new insulation.

Rs.per Kg. Ofwound coil DPC Cu

310 310 310 310

4 Reinsulation of H.V. coils with existing conductor but using new insulation.

Rs .per Kg. ofcopper

65 65 65 65

5 Insulating material, if required. Kg. 180 180 180 1806 Supply and replacement of

OLTC parts –a) Driving Motor ( O/M)b) Motor Arm Assembly ( O/M)c) Motor Protection Relay ( O/M)d) Tap position indicator ( O/M) e) Transient Resistance per unitf) Moving contacts pair ( Inside)g) Epaxy Am (inside)h) Oil Seal ( inside)i) Epaxy terminal Bamier Company for OLTC to main tankj) Epaxy phase Bamier Companyk) Fix contact with moving bridge (inside)l) Selector switches ( RTC)m) OLTC handlen) Energy Accumulaktoro) Lost Motion gearp) Raise & Lower Switch contractorq) Sliding Dog.r) Epaxy Coated bushing

No.NoNo.No.No.SetNoNoSet

SetSetPer noNoNoNoNoNolumpsum

4275209015673081045123514259527,650

10,45015202611902850142528501615400

4275209015673081045123514259527,950

10,45015202611902850142528501615400

4275209015673081045123514259528,500

10,45015202611902850142528501615400

4275209015673081045123514259530,400

10,45015202611902850142528501615400

7 Providing of new OLTC of same make

lumpsum 1,99,500

1.99.500 1,99,500 1.99.500

8 Providing new leads ( Phase & neutral) tap leads, inter winding connections & inter coil connections. Inter phase sleeving & insulation of core bolt lamination etc. No separate charges for leads of any type terminal connector will be given ( 17 Nos. of top leads)

lumpsum 6,650 6,650 6,650 6,650

9 Providing insulation between the coils,phase limbs, cores & limbs,inter phase cylinders blocks, slots, papers etc.(All types of insulation spacers including top & bottom wooden

lumpsum 10600 10800 11,400 14,250

34

Page 35:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

blocks & permali ring).

III Supply & replacement of following Parts / Materials

1 HV Bushing 12 mm 20 mm

Per No 570807

570807

570807

570807

2 HV Busing rod with accessories 12 mm 20 mm

Per Set 237285

237285

237285

237285

3 LV Busing 12 mm 20 mm

Per No 261427

261427

261427

261427

4 LV Busing road with accessories 12 mm 20 mm

Per set 237285

237285

237285

237285

5 Explosion Vent diaphragm Per No. 66 66 66 66

6 Valves for Oil drain 20 mm 25-40 mm 50 mm

Per No.205each

225 each

237each

285each

7 Radiator valves Per No. 237 237 237 237

8 Buchhoiz oil & gas relay Per No. 2375 2375 2375 23759 Oil Temperature indicator Per No. 1900 1900 1900 190010 Winding Temperature indicator Per No. 1900 1900 1900 190011 Marshalling box for Dial The

mometerPer No. 570 570 570 570

12 Breather complete with silicagel main tank OLTC

Per No. 475 475 475 475

13 Magetic oil gauge of conservator

Per No. 1900 1900 1900 1900

14 Blanking plates for radiator Per No. 76 76 76 7615 Glass Diaphragm Per No. 57 57 57 5716 Plain Oil gauge Per No. 119 119 119 11917 Core bolts brass non magnetic Per Kg. 114 114 114 11418 Core Lamination Per Kg. 95 95 95 9519 MS Nut bolts for tank Per Kg.. 33 33 33 3320 Supply of Transformer Oil EHV

grade if required as per ISSPer Kl. 23750 23750 23750 23750

IV Credit for parts if permitted to be retained.

1 Damaged Drain valve Per Kg. 57 57 57 572 Damaged Brass parts Per Kg. 57 57 57 573 Damaged MS Hardware Per Kg. 8 8 8 84 Scrap core laminations Per Kg. 10 10 10 105 Radiator valve Per No. 60 60 60 606 OLTC & other material except

copper windingPer No. 150 150 150 150

7 Buchholtz relay Per No. 400 400 400 400

35

Page 36:  · Web viewMaharashtra State Electricity Distribution Co.Ltd. “Tejashree” 1st floor, Jahangir Maidan, Karnik Road, Kalyan Zone , Kalyan. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION

Chief Engineer (KLNZ) Kalyan.

36