Page 1: Vienna, 8 April 2008

Vienna, 8 April 2008

4th IG Meeting

Meeting Guide

Page 2: Vienna, 8 April 2008

2 4th IG meeting, Vienna, 8 April 2008

Agenda

Agenda Topic Rapporteur

12.45 Arrival and registration

13.00 Opening-Approval of the agenda-Approval of the operational conclusions of the 3rd IG meeting

Co-chair

13:15 Regional cooperation – Update2.1. Cooperation of regulators2.2. Update on Regional Gas Grids2.3. Update on New European Transmission System2.4. Cooperation of TSOs-Discussion

RCCEFETMOLTSOs

14:30 Standardised bulletin board – Update-Discussion

TAG GmbH

14.00 Coffee break

15.15 Status of conclusion of Interconnection Point Agreement at Baumgarten-Discussion

TSOs and CEGH

15.45 Implementation of EASEE-gas CBPs in the region EASEE-gas

16.15 Infrastructure development: pilot project for SSE region TSOs and Co-Chair

16.45 Strategic advisory panel Co-chair

17:00 Closure Co-chair

Page 3: Vienna, 8 April 2008

3 4th IG meeting, Vienna, 8 April 2008

1. Opening

Approval of the agenda

Review of action points from from 3rd SG Meeting (22.1.2008, Prague)

Approval of minutes from 3rd SG Meeting (22.1.2008, Prague)

Are there any AOB:Suggestion: Presentation by BOG GmbH on WAG extension

Any other AOB?

Page 4: Vienna, 8 April 2008

4 4th IG meeting, Vienna, 8 April 2008

1. Opening

Review of action points from last meetingAction Description Who

AP1 Best-practice standardised bulletin board: Update at next meeting

Paper to be provided by TAG GmbH to be presented at the next IG/SG meeting

Input from TSOs required on how often the services have been used

TAG GmbH

AP2 Removing remaining obstacles to implementation of IPA/OBA:TSOs to meet to discuss technical issues w/c 28th January 2008, TSOs to provide the CEGH with a list of concrete technical issues/obstacles

RCC to invite four Austrian TSOs and CEGH to discuss the issue further: remaining issues, potential remedies

Aim: To solve technical issues

Summary of actual outcomes of this meeting amongst TSOs to be sent to RCC (lead regulators)

CEGH, TSOs

AP3 Hub development as regional balancing market: Both CEGH/EFET and Eurelectric to provide updates regarding the hub development at the next IG/SG meeting.

RCC to monitor the development to ensure it is in line with the envisaged time tables.

Update to be provided at the next SG/IG meeting

CEGH, IBP TF (Aiget, EFET, Eurelectric)

AP4 Summary of planned investments in the region (incl. storage): RCC to evaluate GTE’s methodology

All SG invited to comment whether GTE’s methodology can be used for investment planning processes

RCC to examine data availability issues; RCC and members of the SG to define scenarios that might impact on long term investment planning (especially w.r.t. major infrastructure projects)

RCC SG members

Page 5: Vienna, 8 April 2008

5 4th IG meeting, Vienna, 8 April 2008

1. Opening

Review of action points from last meeting

Action Description Who

AP5 REETS: RCC to invite all SG to comment on the paper. The paper is available from the ERGEG web page.

Envisaged deadline: 31st March 2008.

Emails to be sent to [email protected] (CC to [email protected])

RCC

AP6 Best practice provision of OSS service/R_ISO model: EFET to evaluate all comments and draft an evaluation and conclusions paper based on the outcomes of the workshop.

TSOs to make a proposal (e.g. a memorandum of understanding (MoU) on cooperation) covering the identified issues, the envisaged structure for cooperation and a time schedule for implementation.

RCC to provide an update regarding the progress of Regional TSO-cooperation at next IG meeting WITH ALL STAKEHOLDERS in mid-April 2008 (including discussion of potential forms of regulatory cooperation, eg via MoU)

EFET TSOs RCC

AP7 Examining barriers to market entry in SSE: RCC to evaluate possibilities of commissioning a study on the topic of market barriers in the SSE region

RCC to draft the scope/ToR of such a study in line with the work that has been done for electricity in this area

RCC

Page 6: Vienna, 8 April 2008

6 4th IG meeting, Vienna, 8 April 2008

1. Opening

Approval of minutes from 3rd SG Meeting (22.1.2008, Prague)

Comments – as far as they have been sent – have already been included into the new version of the minutes

All documents are available online:http://www.energy-regulators.eu/portal/page/portal/EER_HOME/EER_INITIATIVES/GRI/South_South_East/Meetings1/SG_meetings/3rd_SSE_SG

Are there any additional comments?

Page 7: Vienna, 8 April 2008

7 4th IG meeting, Vienna, 8 April 2008

2. Regional cooperation – Update

2.1. Cooperation of regulators Draft MOU has been circulated for comments

Comments have been received

Main areas: Co-ordination, information and harmonisation

Regulatory Co-ordination Regulation of the Gas Market Sharing of Information Consultation Avoidance of Inconsistency of Action

Operation of MoU Term of MOU and Review Dispute Resolution

Aim should be to make cooperation visible to the outside world SSE Regulators‘ network

Page 8: Vienna, 8 April 2008

8 4th IG meeting, Vienna, 8 April 2008

2. Memorandum of Understanding

Aim: discussion of text today

Signing: Next RCC meeting on 9/10 June in Athens, Greece

Aim should be to make cooperation visible to the outside world Website for SSE Regulators‘ network

Page 9: Vienna, 8 April 2008

9 4th IG meeting, Vienna, 8 April 2008

Page 10: Vienna, 8 April 2008

10 4th IG meeting, Vienna, 8 April 2008

Page 11: Vienna, 8 April 2008

11 4th IG meeting, Vienna, 8 April 2008

Page 12: Vienna, 8 April 2008

12 4th IG meeting, Vienna, 8 April 2008

Page 13: Vienna, 8 April 2008

13 4th IG meeting, Vienna, 8 April 2008

2. Regional cooperation – Update

2.2. Update on Regional Gas Grids- Workshop participants identified scope for the regional cooperation in

the following areas where regional TSO cooperation delivers the greatest benefits to market integration- Access to capacity/Congestion Management at Cross Border Points

- Management of capacities (“one-stop-shop”)- Easier access to the systems through Interconnection Point Agreements- Harmonisation of services

- Merging of balancing zones to foster wholesale trading

- Regional investment planning to remove physical congestion- Roles and responsibilities

- Cost / Benefit analysis

Page 14: Vienna, 8 April 2008

Dipl. Ing. Dr. Stephan ResslVice Chairman EFET Europe GasCChair EFET SSE

Head of Business DevelopmentEconGas

GRI SSEVienna, 08.04.2008

European Federation of Energy Traders

Page 15: Vienna, 8 April 2008

Stephan Ressl Vienna, 08.04.2008 15

EFET R_ISO Model – Why?

R_ISO (multi-TSO) and

aspects of security of supply

physical capacity available from

source to final customers?

Transport cost clearly calculable at

point of supplier‘s decision on where to

source gas from?

Historically, many major investments

happened because of international

(cross-border) consortia/cooperation (e.g. Megal, TAG, BOG,…)

Aim must be that at least some different supply sources must potentially physically

arrive in each area – no security of supply without physical interconnection (long

term and short term)

Page 16: Vienna, 8 April 2008

Stephan Ressl Vienna, 08.04.2008 16

EFET R_ISO Model – Benefits for competition

R_ISO and aspects of

competition

final customerPooling of consumption withinone balancing area – increase of negotiating powerLarger netting of imbalance positions reduces opportunity costs for suppliersMore potential suppliers, reductionof market concentration

for shippers/suppliersMore similar customers in one market areaReduced opportunity cost: nomination, balancing,registration, etc.. reduced risk to deliver

Macro-economic/politicalPotential of economies of scale for system operationEg potential for higher capacity provision through larger flow optimisationReduced national influence

Grid 2007

Page 17: Vienna, 8 April 2008

Stephan Ressl Vienna, 08.04.2008 17

GRI SSE: EFET R_ISO Model – Comments received

A stakeholder consultation on R_ISO model took place, the

deadline was 10 January 2008Comments from following parties has been received so far:

CEER – supportive, asks for more detailsOGP – rather supportive, wants to avoid inefficient structures and more detail on the economiesEurelectric – supportiveEurogas – supportiveGTE – does not want to make effort before 3rd package, however acknowledges benefits of European integrated flow optimisation (winter outlook)

Based on the first reaction during the WS in Prague the GRI

SSE decided to launch an impact assessment analysis ---> results to be presented in June at SG GRI SSE

EFET has prepared an evaluation paper of the comments

received

Page 18: Vienna, 8 April 2008

Stephan Ressl Vienna, 08.04.2008 18

GRI SSE: Benefits of integrated flow pattern

GTE presented benefits of European flow optimisation in its winter

stress presentation at last meeting in Prague 22.01.2008

EFET SSE welcomes the integrated flow optimisation approach by

GTE

Page 19: Vienna, 8 April 2008

Stephan Ressl Vienna, 08.04.2008 19

Proposed timeline for establishment ofa regional E/E model in SSE

Harmonisation of rules at regional level (common transmission model)

Regional auction platform and market based balancing

Harmonised regional network access

Coordinated investment planning and regional balancing

Joint regional network operation

Regional entry-exit model

Interconnection agreements (incl. operational balancing accounts)

end 2011

mid 2011

end 2010

mid 2010

end 2009

mid 2009

end 2008

Page 20: Vienna, 8 April 2008

Stephan Ressl Vienna, 08.04.2008 20

EFET R_ISO Model - Conclusion

EFET is going to contact all interested associations in order to get to a common

view on the possible development of the regional model – within next month

EFET believes that starting implementation of such a model now is key for

further development of the liberalised market and taking already the elements of

the 3rd package on board

For SSE: Wait on the results of the PWC multi-client study (PWC sent out

questionnaire to traders and shippers)

For SSE: Establish an advisory panel for additional help

Regions must be established on a pragmatic basis, CEGH finally established,

Italy should also introduce a balancing market

Regions obviously must be compatible with each other

Germany is moving: E-ON CEO Bernotat statement for electricity;EGT and Bayernet

MOL proposal goes even further

Page 21: Vienna, 8 April 2008

21 4th IG meeting, Vienna, 8 April 2008

2. Regional cooperation – Update

2.3. Update on New European Transmission System

Page 22: Vienna, 8 April 2008

Update on the NETS Concept A new, value creating, cross-border business

Initiative4th IG Meeting

Vienna 8th April 2008

Page 23: Vienna, 8 April 2008

Proposal to unite Central and South-Eastern Europe’s gas pipeline networks within a new and independent regional natural gas transmission company

Significantly higher value for shareholders than operating separate systems

Would be well positioned to leverage international capital markets to finance major infrastructure development projects

Consumers would also enjoy the benefits of an integrated platform for natural gas supply and a greater overall security of supply

Potential Member Countries of New Europe Transmission System (NETS)

Austria

Czech Republic

Italy

Hungary

Slovakia

Greece

Romania

Bulgaria

Turkey

Bosnia

Germany Ukraine

Moldova

Croatia

Slovenia

Serbia

Albania

Montenegro

Poland

Macedonia

Source Company Information

Review: NETS – The Concept

Page 24: Vienna, 8 April 2008

Status Report of NETS

Timing Action/Event Deliverables

15 November – 7 December, 2007

Bilateral technical discussions with TSOs of the reginon

(Phase I)

Briefing of NETS:

- Famililarization of the concept

7 December, 20007 Official Announcement of NETS

21 January, 2008 ERGEG GRI, Prague Overview of the NETS Concept -presented by Péter Horváth

14 January – 6 March, 2008 Bilateral technical discussions with TSOs of the reginon

(Phase II)

- Organization of Roundtable for TSOs

- Proposed workstreams to be discussed in a Roundtable of TSOs

11 February, 2008 Central European Natural Gas Summit 2008, Warsaw

Gas supply security challanges of New Europe – presented by Lajos Alács

5 March, 2008 FLAME, Amsterdam Establishing a regional unbundled infrastucture company – presented by Lajos Alács

13-14 March, 2008 1st Roundtable of TSOs co-organized with and hosted by Transgas SA, in Bucharest, Romania

- Alternatives of common operation in the future

- Proposed workstreams

June, 2008 Next proposed meeting of TSOs, in Siófok, Hungary

- Discussion of workstream meetings’ achievements

Page 25: Vienna, 8 April 2008

Participants of the 1st Roundtable of TSOs in Bucharest on 14-13th March, 2008

From left to right: Dabris Bucanac - Director of Corporate Functions, Plinacro, CroatiaVlad Pavlovschi - Transgaz SA, Director of Resources, Engineering and Regulation Division, RomaniaSasa Ilic - Acting General Manager, JP Srbijagas, SerbiaGoran Francic - Plinacro Director of Development Division, CroatiaBranko Radosevic – President of the Board, Plinarcro, Croatia Nadzina Ninkovic – BH-GAS, Executive Managaer, Bosnia-HercegovinaJános Zsuga – Chief Executive Officer,FGSZ Földgázszállító Zrt., HungaryVidmantas Jankauskas - Project Ambassador, Expert on Regulatory Issues, REKK, HungaryIoan Rusu – General Manager, Transgaz SA, RomaniaLászló Varró – Chief Economist, MOL GROUP, HungaryMichael Woltran – Managing Director, OMV GAS, AustriaMarko Ilersic - Head of Commerce and Finance, Geoplin Plinovodi, SloveniaIain Smedley - General Manager, Morgan Stanley – LondonOlivier Silla – Representative of DG TREN, EU

Page 26: Vienna, 8 April 2008

Issues Presented on the 1st Roundtable of TSOs in Bucharest

1. NETS: A Broader Perspective – by László Varró, Chief Economist, MOL GROUP

2. Case Study – Creation of Snam Rete Gas – by Domenico Siniscalco, Morgan Stanley

Dealing with financial and structural Issues

3. Alternatives of Common Operation – by Ian Smedley, Morgan Stanley

Proposed structure of workstreamsStudy company considerations

4. Businesss Strategy and Vision – by János Zsuga, CEO, FGSZ Zrt., MOL GROUP

Business visionBusiness strategy and objectivesAnalysis of synergy potential

5. Regulatory Issues – by Vidmantas Jankauskas, International Expert on Regulatory Issues

Review of possible regulatory stragegiesProposed regulatory frameworkLong term regulatory vision

6. Energy Policy and Public Affairs – by Ian Smedley,Morgan Stanley Governmental dialogue and external dimensionsManaging stakeholder communicationsPublic buy-in through public relations

7. Financial and Structural Aspects - by Ian Smedley,Morgan Stanley 8. Next steps to be taken - by László Varró, Chief Economist, MOL GROUP

Page 27: Vienna, 8 April 2008

Steering Committee

Business Vision and Strategy

Regulatory Energy Policy and Public Affairs

Financial and Structural

Company Representative Company

[ ] BH-Gas

[ ] Geoplin Plinovodi (?)

[ ] FGSZ Natural Gas Transmission, MOL GROUP

[ ] OMV Gas (?)

[ ] Plinacro

[ ] Srbijagaz

[ ] Transgaz SA

Achievements: Participants* mutually agreed to investigate NETS’ feasibility by establishing a Steering Committee and delegating representatives in the 4 proposed Workstreams as follows

POTENTIAL WORKSTREAM ORGANIZATION

Participants*: BH-Gas, FGSZ Natural Gas Transmission Zrt. - MOL GROUP, Plinacro, Srbijagaz, Transgaz SA

Page 28: Vienna, 8 April 2008

Summary of the Event: Common press release in 40 different local and regional media

At the end of the meeting Transgaz’s CEO Ioan Rusu stated: “This has been a tremendously successful meeting and a move forward for NETS, this one-of-a-kind initiative in Europe. It demonstrates the high level of business cooperation our companies are capable of, as well as the commitment to competitiveness we are aiming to achieve in the context of an integrated European energy market”.“It is a great honor for BH-Gas and me personally to attend today’s meeting. This event is of great importance for both BiH and BH-Gas, taking into account that the natural gas field in BiH is still developing compared to other companies in the region. The NETS initiative may lead to launching and implementing important development projects for us. Our plans focus on the development of gas infrastructure, in order to increase the capacity of existing transmission systems. At the same time we also concentrate on diversifying the transmission routes and supply sources as well as on constructing underground gas storage. By accomplishing such projects, BiH would increase the natural gas share in the energy mix from the present 7% to the forecasted level of 15% by the end of 2020” said Nadzida Ninkovic, Executive Manager BH-Gas, Bosnia-Herzegovina’s gas transmission company.“This is a great step forward for NETS, as seven of the regions’ leading companies have today said that they support the concept in principle and are interested in working together to see how it can best be turned into reality”, commented Dr János Zsuga, the CEO of MOL Natural Gas Transmission Plc. He added.““Plinacro supports the initiative for cooperation, interconnection and joining of TSOs in the region with the aim to find the answer to question and challenges which are to come. We have discussed possible concepts and models of cooperation and interconnection. We think this is an extremely demanding and ambitious project and that today we have made the first step in the right direction. We agree to establish working groups to deal with all aspects from their respective fields in a professional manner and give the exact data as well as the pros and cons, on the basis of which we may bring adequate decisions and propose solutions to our owners. Plinacro will participate in this project and will bring its contribution to it”, said Branko Radošević, President of Plinacro Board, the Croatian gas transmission company.“The meeting in Bucharest confirmed that NETS concept, that aims establishing an independent regional natural gas transmission company is extremely attractive for all participants. It woud help increase the efficiency of existing capacities, bringing benefits that could make each of the markets more reliable in terms of security of supply and growth. Of course, we are at the beginning of a long and challanging harmonisation process of national gas transmission systems, but we believe that the NETS project is feasible. Srbijagas will actively take part in the future steps connected to the NETS project”, said Sása Ilić, General Manager of Srbjgas.The meeting was honored by MrOlivier Silla from the European Commission Directorate for Energy and Transport, who stated: “The Commission supports this project, which provides increased co-operation between TSOs (Transmission System Operators) in a region which is a critical crossroad of many energy markets”. He added, “The Commission’s consideration and support for the project is based on two advantages inherent in the NETS concept: firstly, it is a concept that linking together EU members with not-, or future-EU members and secondly, that NETS can provide the necessary scale for infrastructure development which will enhance competition and security of supply at the same time”.

Page 29: Vienna, 8 April 2008

29 4th IG meeting, Vienna, 8 April 2008

2. Regional cooperation – Update

2.4. Cooperation of TSOs

Page 30: Vienna, 8 April 2008

OMV Gas

Move & More.

4th IG Meetingon 8 April 2008 in ViennaMoU between TSOVienna, April 8, 2008

Page 31: Vienna, 8 April 2008

31 |OMV Gas GmbH, 4th IG Meeting, 8 Apri 2008

Cooperation of TSO’s

Memorandum of Understanding, draft as of 7 April 2008 Draft as of 7 April 2008 has been sent out for comments Next steps: Exchange of comments and finalization

Topics of discussion Bulletin Board Investment and new capacity Product harmonisation Transparency Platform Interconnection Agreement, OBA

Page 32: Vienna, 8 April 2008

32 4th IG meeting, Vienna, 8 April 2008

3. Standardised bulletin board – Update

Contents used by TAG as best practice

Page 33: Vienna, 8 April 2008

33 4th IG meeting, Vienna, 8 April 2008

Status of implementation of bulletin boards

Page 34: Vienna, 8 April 2008

34 4th IG meeting, Vienna, 8 April 2008

Use of bulletin boards

Shippers have made very little use of the bulletin boards so far

Page 35: Vienna, 8 April 2008

35 4th IG meeting, Vienna, 8 April 2008

4. Status of conclusion of IPA at Baumgarten

Update to be provided by CEGH/TSOs

Page 36: Vienna, 8 April 2008

ICA (OBA)ICA (OBA)

ERGEGERGEG

April 8th 2008April 8th 2008

Page 37: Vienna, 8 April 2008

SPP System

BOG System

OMV Gas System

TAG System

SPP System

SPP System

Technical IA Agreements

Bilaterally concluded

Business IA

Multilateral AgreementSPP System

CEGH System

BOG System TAG System

OMV Gas System

Interconnection Agreement (OBA):

Contractual structure

Page 38: Vienna, 8 April 2008

Technical ICP Agreements

Bilaterally conclusion

Business ICP

Multilateral Agreement

OBA: Contractual structure

Sole purpose: Matching platform dealing with the overall nomination management between transportation and trading activities across the systems

Dealing with all technical issues: balancing account, metering methodologies, operation of metering stations between TSO`s

Page 39: Vienna, 8 April 2008

HUB central matching station in between Transportation Systems

TAGc

c

c

WAG

Regulatory Zone Austria

SPP

Wheeling storage

Whe

elin

gH

AG

Page 40: Vienna, 8 April 2008

Operational Efficiency• Beneficial development concerning utilization of

interruptible services (liquid hub is beneficial for interruptible services)– Efficient operation of nomination management

integrating the world of trade; (everybody can transfer gas to 66 counterparts within 2 hours lead time)

– In case of interruption any shipper can trade gas on a liquid hub within 2 hours lead time

– full integration of storage quantities into the trading activities (wheeling) and shipping activities (more possibilities for shippers to manage interruptible transportation )

Page 41: Vienna, 8 April 2008

Commercial Efficiency• TSOs obtain free membership at CEGH platform• TSOs have access to Bulletin Board free of charge

– (used already twice by TSOs)

• No fees for shippers! buying or selling at the CEGH• No fees for TSOs buying or selling gas at the hub

– CEGH to be developed as balancing point

• TSOs and shippers will have access to future stock exchange (spot market)

• Transparency is guaranteed by E – Control, Financial authorities (Austrian Financial Markets Supervisory Agency  )

Page 42: Vienna, 8 April 2008

Tariff scheme: comparison CEGH - Zeebrugge

Zeebrügge: Title Tracking Fee

100 100100 100

buy exitentry sell sell buy

100 100

Minimum fee € 2500/month

0,02121 €/MWH

0,00636€/MWH

0,00424 €/MWH

Volume< 3.333.333 MWh

Volume< 10.000.000 MWh

Volume> 10.000.000 MWh

Minimum fee € 2500/month

0,02121 €/MWH

0,00636€/MWH

0,00424 €/MWH

Volume< 3.333.333 MWh

Volume< 10.000.000 MWh

Volume> 10.000.000 MWh

Minimum fee € 2500/month

0,02121 €/MWH

0,00636€/MWH

0,00424 €/MWH

Volume< 3.333.333 MWh

Volume< 10.000.000 MWh

Volume> 10.000.000 MWh

Minimum fee € 2500/month

0,02121 €/MWH

0,00636€/MWH

0,00424 €/MWH

Volume< 3.333.333 MWh

Volume< 10.000.000 MWh

Volume> 10.000.000 MWh

CEGH Title Transfer Service Fee

buysell

Free of charge

Free of charge

sell buy

Fixed monthly term:

€1,000

shipper shipper

0.02 €/MWH

0.012€/MWH

0.006 €/MWH

Volume< 3,333,333 MWh

Volume> 3,333,333 MWh

Volume> 10,000,000 MWh

Volume< 10,000,000 MWh

0.02 €/MWH

0.012€/MWH

0.006 €/MWH

Volume< 3,333,333 MWh

Volume> 3,333,333 MWh

Volume> 10,000,000 MWh

Volume< 10,000,000 MWh

Page 43: Vienna, 8 April 2008

SPP System

BOG System

OMV Gas System

TAG System

SPP System

SPP System

Technical IA Agreements

Bilaterally conclusion

Business IA

Common agreement

SPP System

Service provider CEGH System

BOG System TAG System

OMV Gas System

Interconnection Agreement (OBA):

Revised ICA - Concept

Page 44: Vienna, 8 April 2008

If CEGH would be 100% subsidiary of OMV GAS there would be no resistance integrating trade activities

Since GAZPROM will be participating in CEGH, there seems to be some reluctance in this respect

Shareholders will enter into discussions these days

Future approach

Page 45: Vienna, 8 April 2008

Thank you for your attention

Page 46: Vienna, 8 April 2008

46 4th IG meeting, Vienna, 8 April 2008

5. Implementation of EASEE-gas CBPs in the region

Presentation by EASEE-gas

Page 47: Vienna, 8 April 2008

47 4th IG meeting, Vienna, 8 April 2008

6. Infrastructure development

Analysis of infrastructure projects in the region regarding untilization, market integration and consequences on flows on existing transmission pipelines

● Nabucco● South Stream● Italy-Greece-Interconnector (Poseidon)● Trans Adriatic Pipeline (TAP)● LNG-Terminal in Krk● GALSI● Projects identified in the Gasification Study

Can TSOs provide this information?

Page 48: Vienna, 8 April 2008

48 4th IG meeting, Vienna, 8 April 2008

6. Sample Analysis Nord Stream pipeline

Page 49: Vienna, 8 April 2008

49 4th IG meeting, Vienna, 8 April 2008

6. Infrastructure development

Potential WAG expansionand related coordination with adjacent TSOs - Presentation by BOG GmbH

Page 50: Vienna, 8 April 2008

50 4th IG meeting, Vienna, 8 April 2008

7. Strategic advisory panel

Purpose: to achieve greater level of stakeholder involvement and commitment

A senior representative of each group of stakeholders (e.g. from TSOs, traders, suppliers, ministries,...) should form part of the panel

Task: the main task of the panel would be to define the strategic topics to be dealt with within the region and to set priorities for future work

Strategic advisory panel has been set up in the NW region(‘Programme Board’)

Suggestion:To create such a panel also in the ERGEG GRI REM SSE

Page 51: Vienna, 8 April 2008

51 4th IG meeting, Vienna, 8 April 2008

Strategic advisory panel

Regional Co-ordination Committee (RCC)

Regional Co-ordination Committee (RCC) Implementation GroupImplementation Group Stakeholder GroupStakeholder Group

RegulatorsGovernmentsEuropean Commission

RCC members+TSOs Hub operatorsStorage operators

IG members+Representatives of:

consumers (IFIEC)traders (EFET)suppliers (Eurogas)distributors

Strategic advisory panelStrategic advisory panel

Page 52: Vienna, 8 April 2008

52 4th IG meeting, Vienna, 8 April 2008

Update transparency monitoring 2007 – 1

The transparency monitoring report carried out in 2007 found the following main areas of non-compliance of the Austrian TSOs:

 Requirement of the Gas Regulation

  Austria

1 General        

1_1 Name of TSO   TAG OGG BOG

3 TPA services        

3_3Does the TSO offer the following services online

Capacity booking 0,00 1,00 1,00

Nomination and re-nomination procedures

0,00 1,00 1,00

Transfer of capacity rights 0,00 0,00 0,00

Information on the balancing status of network users

0,00 1,00 1,00

7 Technical information        

7_5Rules applicable for connection of infrastructure to the system of the TSO

Rules applicable for connection of infrastructure to the system of the TSO

0,00 3,00 0,00

Page 53: Vienna, 8 April 2008

53 4th IG meeting, Vienna, 8 April 2008

5. Update transparency monitoring 2007 – 2

8 Capacities        

8_1

Does the TSO publish for all relevant points including entry and exit points the maximum technical capacity

for daily periods? 0,00 1,00 1,00on a numerical basis? 1,00 1,00 1,00on a regular/rolling basis? 1,00 1,00 1,00in a standardised manner? 1,00 1,00 1,00online? 1,00 1,00 1,00without charge? 1,00 1,00 1,00

8_5Does the TSO publish for all relevant points the total contracted interruptible capacity

for daily periods? 0,00 2,00 0,00on a numerical basis? 1,00 2,00 0,00on a regular/rolling basis? 1,00 2,00 0,00in a standardised manner? 1,00 2,00 0,00online? 1,00 2,00 0,00without charge? 1,00 2,00 2,00

9 Exemptions        

9_1

Does the TSO limit publication of information on the capacity situation for certain points of his system due to the Application of the “3 minus shipper rule” [see Art. 6.5 of the Regulation]

0,00 0,00 0,00

Page 54: Vienna, 8 April 2008

54 4th IG meeting, Vienna, 8 April 2008

5. Update transparency monitoring 2007 – 3

Steps taken by E-Control to arrive at full compliance:

October 2007 E-Control requested TAG, OMV Gas and BOG to give reasons for not

implementing the requirements as stated in the ERGEG Monitoring Report

November 2007 E-Control specified request by pointing to the main areas of non-compliance

E-Control set date (31 January 2008) until the TSOs shall have implemented the requirements not yet implemented

February 2008 Requirements have been implemented by the TSOs

OMV Gas: request for application of the 3-minus-rule at one relevant pointProcedure ongoing

Page 55: Vienna, 8 April 2008

55 4th IG meeting, Vienna, 8 April 2008

5. Update transparency monitoring 2007 – 4

ERGEG to present update of monitoring at 14th Madrid Forum Areas where improvements have been made

Regulatory intervention triggering improvements

Sanctions imposed by NRAs to ensure compliance

Page 56: Vienna, 8 April 2008

56 4th IG meeting, Vienna, 8 April 2008

8. Closure

Any other business?

Page 57: Vienna, 8 April 2008

57 4th IG meeting, Vienna, 8 April 2008

7. Date and location of next meeting

A DATE TO BE NOTEDin YOUR diaries!

Next RCC Meeting:Monday, 09/06/2008, 14.00 - 17.00

Next SG Meeting:Tuesday, 10/06, 10.00 - 16.00

Both at Hotel Divani-Acropolis, Athens, Greece

Special room rates available!

Page 58: Vienna, 8 April 2008

58 4th IG meeting, Vienna, 8 April 2008

Conclusions and Outlook

[to be added]