PART – A
VIDYALAYA PLAN
I-VIDYALAYA PROFILE
A- GENERAL INFORMATION
NAME OF THE VIDYALAYA
AFS THANE (Shift-2) REGION
Type of Building A1/A/B/C/D/E
MUMBAI A
SCHOOL CODE 1219 AFFILIATION NO. 1100037
YEAR OF ESTABLISHMENT
Shift-1: 1981 Shift-2: 2004
SECTOR AIR FORCE
GEOGRAPHICAL LOCATION (COORDINATES)
AIR FORCE STATION, KOLSHET ROAD, SANDOZ BAUG POST, THANE (WEST) PIN 400607
AREA (BUILT UP) 2905 sq.mts. TOTAL AREA 3.17 ACRES
NAME OF THE PRINCIPAL
MR. CHANDRASHEKHAR SINGH
Landline (o)-022-25868447
Landline (R)-022-25868045
Mobile-9405146660, 8208407047
DATE OF JOINING IN
PRESENT KV- 17-08-2017
PRESENT POST-11-07-2017
NAME OF THE PERSON WHO CAN BE CONTACTED IN ABSENCE OF PRINCIPAL
Mrs. Anjali S Parchake Mobile No.940401216
NAME OF THE CHAIRMAN
GP CAPT KAMAL R CHANDRA
Landline (o)-022-25868501
Landline: 022-39287200
Mobile: 9496591257
E-mail: [email protected]
2
B- SCHOOL DATA (as on 01-10-2019)
(I) STUDENTS ENROLMENT POSITION CATEGORYWISE I II III IV V VI TOTAL
BOYS 21 15 6 11 145 0 198
GIRLS 29 14 7 11 95 0 156
TOTAL 354
RESV. CAEGORY SC ST PH OBC GEN TOTAL
BOYS 58 7 0 40 93 198
GIRLS 39 5 0 31 81 156
TOTAL 354
COMUNITY HINDU MUSLIM SIKH CHRISTIAN BUDDHIST
JAIN ZOROASTRIAN OTHER
TOTAL
BOYS 184 1 0 0 13 0 0 0 198
GIRLS 148 4 0 0 4 0 0 0 156
TOTAL
HANDICAPPED ORTHOPEADIC HANDICAPPED VISUAL HANDICAPPED
HEARING HANDICAPPED
AUTISTIC CHILDREN TOTAL
BOYS 0 0 0 0 0
GIRLS 0 0 0 0 0
TOTAL 0
MISC QUOTA RTE BPL SGC KVS-STAFF Sponsoring Agency
CHAIRMAN QUOTA
MP QUOTA
HRM Quota
TOTAL
BOYS & GIRLS 10 0 1 0 0 2 10 2 25
TOTAL 25
STAFF POSITION (AS ON 01-10-2019)
Cadre Sex wise
Category wise
Physical handicapped
Male Female Total SC ST OBC GEN TOT
Minority Others OH VH HH Total
Principal 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VP/Principal Gr.II
0 1 1 0 1 0 0 1 0 0 0 0 0 0
PGT 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TGT 0 5 5 1 1 1 2 5 0 0 0 0 0 0
TGT (WE) 1 0 1 0 0 0 1 1 0 0 0 0 0 0
TGT (AE) 0 1 1 0 0 0 1 1 0 0 0 0 0 0
TGT (P&HE) 0 1 1 0 0 0 1 1 0 0 0 0 0 0
HM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PRT 2 3 5 1 0 2 2 5 0 0 0 0 0 0
PRT (MUSIC)
0 1 1 1 0 0 0 1 0 0 0 0 0 0
ASO 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SSA 0 0 0 0 0 0 0 0 0 0 0 0 0 0
JSA 0 0 0 0 0 0 0 0 0 0 0 0 0 0
LIBRARIAN 0 1 1 0 0 0 1 1 0 0 0 0 0 0
SUB STAFF 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Hostel Staff 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL 3 13 16 3 2 3 8 16 0 0 0 0 0 0
3
(II) DATA RELATED TO WORKING SPOUSE OF TEACHERS
S No
Name of Teacher
Designation Name of Spouse
Details of organization & place where the spouse is working
Remarks
1 Mrs. Lalit Kishori Shrivastava
TGT English Railways
2 Dr. (Mrs.)
Alpana Kaushik TGT (AE) Mr. Anil Kumar
Sharma Sr. Engineering Assistant, GOI, Ministry of I & B, H. P. T DOORDARSHAN PITAMPURA DELHI
0
3 Mrs. Jyoti TGT Sanskrit
Mr. Sanjay Yadav
Process Server, Dwarka District Court, New Delhi.
(III) Appointment of Doctor, Nurses, Counselors and Coaches (Sports, Performing arts etc. )
Sl. No Post Sex Date of Appointment
1 Doctor Female 21-06-2019
2 Nurse Female 21-06-2019
3 Educational Counsellor Female 21-06-2019
4 Computer Instructor-1 Female 21-06-2019
ACHIEVMENTS AS ON 31 March 2019
1. Curricular Activities
(I) EXAMINATION (CBSE)
CLASSES Enrollment Appeared Passed Pass % PI
No. of students getting more than 70% marks
Name of position Holders
XII (Sc.) 0 0 0 0 0 0
0
0
0
XII (Comm.)
0 0 0 0 0 0
0
0
0
XII (Hum.)
0 0 0 0 0 0 0
X 27 27 27 100 58.24 11 1. T S VENKAT NARAYANAN
4
2. HRIDDHISHA HALDER
3. VAIDEHI SANTOSH PAWAR
(II) EXAMINATION (HOME)
CLASSES Enrollment Appeared Passed Pass
% PI
No. of students getting more
than 70% marks
Name of position Holders
XI (Sc.) 0 0 0 0 0 0
0
0
0
XI (Comm.)
0 0 0 0 0 0
0
0
0
XI (Hum.)
0 0 0 0 0 0 0
IX 44 44 33 75% 8
1. Shashank D Gupta 2. Hemang Khandagale 3. Darshan M Badekar
(III) The Learning Attainment of Students & Target
Class
Learning Attainment of Students for the
year 2018-19 (% of Students )
Target for the year 2019-20
(% of Students) Remarks
L 1 L 2 L 3 L 1 L 2 L 3
I 40 0 0 40 0 0
II 42 0 0 42 0 0
III 22 18 0 30 10 0
IV 27 0 12 30 10 0
V 28 0 10 30 10 0
VI 20 9 3 25 15 0
VII 14 12 11 20 20 0
VIII 14 12 14 20 20 0
( L 1- 70% and above Grade, L 2 – 45% - 69% L 3 45% below)
5
(IV) EXAMINATION (Competitive)
Competitive Exam AIEEE IIT-JEE NEET PMT CLAT NDA OTHER
No. of students Selected
0 0 0 0 0 0 0
Targets 0 0 0 0 0 0 0
2. (i) CO-CURRICULAR & EXTRACURRICULAR ACTIVITIES AS ON 31 March 2019
SPORTS
NUMBER OF PARTICIPANTS NUMBER OF POSITION HOLDER
Cluster Level
Regional level
National Level
SGFI/Associations/Federation (Open)
Cluster Level
Regional level
National Level
SGFI/Associations/Federation (Open)
45 23 10 3 38 32 9 3
SOCIAL SCIENCE EXHIBHITION
NUMBER OF PARTICIPANTS NUMBER OF POSITION HOLDERS
Cluster Level
Regional level
National Level
Cluster Level
Regional level
National Level
33 5 0 9 0 0
SCIENCE EXHIBHITION
NUMBER OF PARTICIPANTS NUMBER OF POSITION HOLDERS
Cluster Level
Regional level
National Level
Cluster Level
Regional level
National Level
0 0 0 0 0 0
SCIENTIFIC OLYMPIADS
AREA
NUMBER OF PARTICIPANTS NUMBER OF POSITION HOLDER
Regional Level
KVS National
National Level
Regional Level
KVS National
National Level
6
National Children Science Congress
12 0 0 0 0 0
Jawaharlal Nehru Junior Science and Maths Olympiad
4 0 0 0 0 0
INSPIRE Award 4 0 0 0 0 0
Maths Olympiad 4 0 0 0 0 0
Science Olympiad 0 0 0 0 0 0
SCOUTS & GUIDES
AREA
NUMBER OF PARTICIPANTS NUMBER OF POSITION HOLDER
Rashtrapati Purashkar/Golden Arrow
Rajya Purashkar/ChaturthCharan
TritiyaSopan/Tritiya Charan
Rashtrapati Purashkar/Golden Arrow
Rajya Purashkar/Chaturt4 Charan
TritiyaSopan/Tritiya Charan
Scouts & Guides
0 3+2 3+0 0 0 0
Cubs & Bulbuls
0 0 0 0 0 0
Tarunotsav
S.No. Name of the activity No. of students trained
Remarkable achievements if any
1 Career Guidance & Counselling 0
2 Sports & Yoga Practices 0
3 Improvement of Language Skills
0
4 Introductory classes for Science & Commerce Streams
0
Activities Level
(Cluster/Regional/ National)
No. of students Selected
Names of Achievers
Next stage of Participation
Science Olympiad 0 0 0 0
Math’s Olympiad 6 1 0 0
Cyber Olympiad 13 0 0 0
Green Olympiad 65 3 0 0
7
IGBC Green Building Contest
0 0 0 0
National Sci. Congress
4 0 0 0
Sci. Exhibition 6 0 0 0
National Social Sci. Exh.
58/16/0 34/0/0 0 0
Youth Parliament 0 0 0 0
Swachh Bharat Abhiyan
0 0 0 0
Scouts & Guides
1. Rastrapati Puraskar
1 1
2. Rajya Puraskar 8 4
3. Golden Arrow 0 0
Sports & Games
Level Event No. of
student Achievers
Remarks
SGFI Rope Skipping 1
Taekwondo 1
National Level Judo 3
Rope Skipping 4
Skating 1
Regional Level Judo 4
Taekwondo 4
Skating 1
Rope Skipping 18
State Level Rope Skipping 2
Other 0
(ii) ACTIVITIES OUTSIDE THE KVS
S No Name of Activity Name of Agency
No of Students participated
Position Names of Achievers
Remarks
1 SPORTS 0 0 0 0 0
2 CULTURAL 0 0 0 0 0
3 SCIENTIFIC 0 0 0 0 0
8
4 ANY OTHER (Eg: International events)
0 0 0 0 0
(iii) ALUMNI
Outstanding Alumni (Alumni who has recognition at local/state/National/International level in
different fields-Cultural,Technical,scientific,medicine,political,administrative etc)
S No
Name of Alumni
Qualification Field of working
Designation Contact Number Remarks
1 Afzal Hayat B.E.,M.B.A. 0 0 [email protected] Working in Special Springs, Italy
2 Arti B.A., 0 0 [email protected] Settled in USA
3 Ankit M.Sc., 0 0 [email protected] Working in Indian Navy
4 Dr. Rohit Ghatule
MBBS, MD., 0 0 [email protected] Medical Advisor, Eisai Pharma, Mumbai
5 Sanket Jaswal B.E., 0 Instrumentation Design Engineer
Number of Activities Organized (2018-19) : 01
Number of Classes/ Sessions taken by Alumni(2018-19): 01
Activities Planned under Alumni (2019-20): 01
Achievement of Vidyalaya (like “Green Your School” Contest by IGBC, Inter- school competition, National Swachhata Award etc. in 100 words): Participated .
(iv) Status of Foreign Language:
S.NO NAME OF THE LANGUAGE
NO. OF STUDENTS ENROLLED FOR THE FOREIGN LANGUAGE
VI VII VIII IX X XI XII
1 0 0 0 0 0 0 0 0
9
II- INFRASTRUCTURE PLAN
A. Building Plan:
Available in No.
Proposed / Expansion Budget plan
Class Rooms 26 36 In new building sanctioned
Smart /e-Class Rooms 11 9
Physics lab 1 0
Chemistry lab 1 0
Bio lab 1 0
Jr. Science lab 0 1
Geography Lab 0 0
Computer Lab 2 0
Math’s Lab 1 0
Language Lab 0 1
Work Experience Workshop 1 0
Yoga Room 0 1
Art Room 1 0
Resource Room 1 0
Music Room 1 0
Activity Room 1 0
Staff Room 1 0
Conference Hall / Auditorium 0 1
Sports Room 1 0
Library 1 0
Children’s’ Park 0 1
Playgrounds 1 0
Garden 0 0
Science/ Math’s Park 0 0
Admin Office 1 0
Canteen 0 1
Boys Toilets 3 3
Girls Toilets 3 3
Bathrooms 0 1
Facilities for Divyang
i) Ramp 1 0
ii) Toilet 0 1
iii) Wheel Chair 0 1
B. Assets (Furniture)
Furniture Type Available in No. Proposed Acquisition/ Repair
Remark
Duel Desk 550 50
Single Desk 28 3
10
Teacher’s Table 39 8
Teacher’s chair 83 0
Almirah 71 5
Computer Table 39 0
Computer Chair 34 12
Lab Table 15 0
Lab Stools 20 10
C. Assets (labs equipment (Value above Rs. 15.000/-)
Name of Lab Availability of infrastructure as per benchmark of labs
Availability of equipment as per benchmark of labs
Proposed development of infrastructure/acquisition
Physics Lab Yes Yes
Chemistry Lab Yes Yes
Biology Lab Yes Yes
D. Assets (IT Infrastructure) (Value above Rs. 15.000/-)
Articles Available in No. Proposed Procurement / Repair
Remark
Computers 33 10
Printers 1 2
UPSs 0 1
LCD Projectors 0 3
Smart Boards 0 9
E. Assets (Library)
Sl. No. Articles Available in No.
Proposed Acquisition/ Repair
Remark
1 Table 7 0
2 Almira 2 2
3 Bookshelves 4 4
4 Books in Hindi 1620 500
5 Books in English 1610 400
F. Assets (Music)
Sl. No. Articles Available in No.
Proposed Acquisition/ Repair
Remark
1 Harmonium 1 0
2 Synthesizer (Key Board) 1 0
3 Tabla 1 0
4 Dholak 0 0
5 Congo 0 0
6 Flute 0 0
7 Voilin 0 0
8 Mouth organ 0 0
9 Khanjari 0 0
11
10 Dufflee 0 0
11 Miracus 0 0
12 Marching Triangle 0 0
13 Marching drum 1 0
14 Symbate 0 0
15 Jazz drum set 0 0
16 Any other 0 0
G. Assets (Workshop/Art & Craft/Sport)(Value above Rs. 5.000/-)
Department Articles Available in No.
Proposed Acquisition/ Repair
Remark
Work Experience 0 0 0
Art & Culture 0 0 0
Sports TT Table 1 1
Gardening 0 0 0
Any other department
0 0 0
H. Assets (Office)(Value above Rs. 15.000/-)
Articles Available in No. Proposed Acquisition/ Repair
Remark
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
I. Medical Room Facilities
Facilities Available in No. Proposed Acquisition/ Repair
Remark
Cot 1 1
Wheel Chair 0 1
Almirah for Medicine 0 1
Stethoscope 1 0
Sphygmomanometer 1 0
Glucometer 0 1
J. Suggestion Box :
1. Whether the Suggestion Box is installed: Yes
2. Whether the Suggestion Box is opened every month: Yes
3. Whether the record is being maintained regarding suggestion: Yes
12
4. The Action taken on Suggestions:
S.No Suggestion Action Taken
1 Availability of Teachers in the same room at the time of PT Meeting
PT Meeting is being arranged in time slots so that the Teachers may be available in the same room.
2 Availability of Canteen Will be taken up
III. SAFETY & SECURITY
A. (1) Safety Plan
Security features Installed No. of article/Installed
Whether functioning or not
Location Where installed
Proposed new location for installation
No. of article required
Fire Extinguishers 6 Yes In different Floors
0 0
Fire Alarm 0 0 0 Ground Floor 1
CC TV 16 Cameras
Yes In Ground/1/2/3 Floors & Class Rooms
In Class Rooms 16
Public Announcement System
3 Yes 1. In Principal’s Chamber
2. Two in Morning Assembly Ground
0 0
Walkie Talkie System 0 0 0 0 0
(2) Emergency Supplies/ Facilities
Facilities Existing Position Proposed for Expansion
Article required
Sufficient Drinking Water& Food 4 0 0
Emergency Lighting System 0 1 1
First Aid Kits 1 1 1
Emergency Evacuation Plan 2 0 0
Emergency Communication System
1 0 0
Water Tanks 3 0 0
Sanitation Supplies 1 0 0
Boundary wall/ Fencing 1 0 0
Exit/Entrance Gate 2 0 0
3. Security Personnel
13
No. of Persons Male Female Remark
3 3 0 8 Hours each
B. School Staff Training:
Training Area No of Staff & Students Trained
Proposed Plan for training
A. Evacuation Drills All Mock Drills to be conducted
B. Basic First Aid/ First Responder Skills All Scouts/Guides
C. Safety Training All
D. Use of Fire Extinguisher 10/10 20/20
E. How to turn off electricity, water and gas All
F. Psychological First Aid 10/10 15/15
G. Other: 0 0
Note:
Sl. No. Certificates Date of Issue Valid Till
1 Certificate of the fire safety 27-07-2019 26-07-2020
2 Certificate of safety of school building Rehabilitation work has been done.
3 Certificate of Potable Water 13-09-2019 14-09-2020
C. SCHOOL RESPONSE TEAMS
Sl.No Particulars Name of Team Leader Members with Designation
Contact Details
1
Child Rights Protection Cell
1. Mrs. Alpana Kaushik 1. TGT AE
2 Evacuation Team 1. Mrs. Shweta Bhargava
TGT Mat 1. [email protected]
3 Search & Rescue Team
1. Mrs. Meena Adukia
2. Ms. Neeva Ghartang
1. TGT Lib
2. TGTP&HE
4 First Aid & Medical Team
1. Dr. Veena V Kawalkar
2. Mrs. Shital S Meshram
1. Doctor
2. Nurse
5 Transport Safety Team
1. Mrs. Meena Adukia 1. TGT Lib
6 Team for students with special needs
1. Mrs. Lalit Kishori Shrivastav
1. TGT English
14
(Divyang)
7 Internal Complaint Committee (ICC)
1. Mrs. Lalit Kishori Shrivastav
2. Mrs. Alpana Kaushik
1. TGT Eng
2. TGT(AE)
8 Grievance Redressal Committee
1. Mrs. Lalit Kishori Shrivastav
2. Mrs Alpana Kaushik
1. TGT Eng
2. TGT(AE)
V- ACADEMIC
A. Curricular Activities
1) Strategic goals and plan for expected improvement of quality & quantity of result for 2019-20
Class Enrollment Pass %
PI Strategies / Plan of Action
Remarks
Achieved Target Achieved Target
2019 2020 2019 2020 2019 2020
X 27 33 100% 100% 58.24 78 1) Extra/Remedial Classes 2) Study Periods 3) Study Material Distribution
IX 44 45 75% 100% 1) Extra/Remedial Classes 2) Study Periods 3) Study Material Distribution
A. Workshops to be planned for all teachers:
Short duration workshops to be organize at Vidyalaya level
Strategies Target Expected Achievement
Remarks
Content enrichment through Demonstration/Meeting/ seminars in concerned subjects
1) Conduct of Seminars
2) Discussion in Subject Committee Meetings
To make students confident in the conduct of activities
75%
15
Communication Skills 1) Through ASL 2) Through
Morning Assembly Exposure
To make students feeling ease in execution of communication skills
75%
Life Skills 1) Through tapping the latent skills
2) Through giving exposure in similar situations
To make students use the skills
75%
Workshop for planning the TLM/Activity and graded assignments/Question Bank
1) Organizing Workshops
2) Preparation of Questions Bank
To make students equipped with answers
75%
Any other training/workshops
B-1 Workshop for capacity building
Workshop for capacity building
Name of teacher Subject Area of concern Strategies
1) Raja Basha Workshop
Mrs. Tara Mishra Hindi Use of Hindi Lang. Writing Workshops
2) ICT Workshop 1) Mrs. Sreelekha P 2) Mr. V.
Pardhasaradhi
ICT 1) Use of Computers in Teaching-Learning Process
2) To browse net.
Direct exposure through Computer Lab.
3) Workshops on Examination Modules
Mrs. Lalit Kishori Shrivastav
Examinations To equip Examination Specifications
Briefing Sessions
B-2 Workshop for underachieving teachers:
Workshop for underachieving teachers
Subject Area of concern Strategies
In-service Course Commerce Commerce To propose for In-service Course
-------- ---------- --------- --------
16
B. Expected Co-curricular & Extracurricular activities for 2019-20
Activities Planned Targets/ Date
Actual Date of Completion
Remarks/ Shortfall (if any)
Investiture ceremony July 2019
Finalization of CCA schedule April 2019 April 2019 Done
Value Education Programme/Awakened Citizen Programme
June 2019 Done
School Annual Day/ Sports Day Sep 2019
Educational Excursions Nov/Dec 2019
Adventure Activities Nov/Dec 2019
Health Checkup of Students Daily & Half Yearly Done for Quarter-1
National Adolescence Education Programme
September 2019
Library Week June 2019
Science Exhibition September 2019 Conducted
Social Sc. Exhibition September 2019 Conducted
Art Exhibition October 2019
Science Congress October 2019
Publication of Vidyalaya Patrika July 2019 Published
News Letter December 2019
Scouts & Guides 1. Pratham Sopan Test July 2019 Done
2. Dwitiya Sopan Test August 2019 Done
Cubs & Bulbuls
1. Prathama Charan July 2019 Done
2. Dwitiya Charan August 2019
3. Tritiya Charan October 2019
Any Other
Games & Sports level Event No. of students
expected to participate
Strategies Planned No. of Achievers after the event
Remarks
SGFI 1) Rope Skipping 2) Badminton
2 1
Special Coaching Special Coaching
National Level 1) Rope Skipping 2) Hand Ball 3) Judo 4) Taekwondo 5) Skating 6) Athletics 7) Table Tennis 8) Yoga 9) Chess 10) Badminton
25 10 15 10 2 3 2 2 2 1
Special Coaching Special Coaching Special Coaching Special Coaching Special Coaching Special Coaching Special Coaching Special Coaching Special Coaching Special Coaching
Region Level 1) Rope Skipping 2) Hand Ball
25 35
Special Coaching Special Coaching
17
3) Judo 4) Taekwondo 5) Skating 6) Athletics 7) Table Tennis 8) Yoga 9) Chess 10) Badminton
30 20 5 3 2 5 2 1
Special Coaching Special Coaching Special Coaching Special Coaching Special Coaching Special Coaching Special Coaching Special Coaching
State Level Badminton Judo/Taekwondo
1 1
Special Coaching Special Coaching
Other (International Level)
Judo/Taekwondo 1 Special Coaching
NCC
Wing (Army/Navy/ Airforce)
No. of Troops No of Students
Not Availalbe 0 0
School Band
Teacher Head No. of Students Trained
Mrs. Alpana Kaushik 5
Mr. Mayur Galgate 5
V- ADMINISTRATION& FINANCE
S. No.
Activity/Programme Planned Achievement Targets
Expected Date of Completion
Actual Date of Completion/ Actual Achievement
Remarks
1 Staff sanctions proposals: Proposals for up gradation /additional sections etc.
Sending required information to RO
Nov/Dec 2019
2 Selection of staff for contractual appointments.
Conduct of Walk-in-interviews
February/March 2020
Done for 2019-20 in March.
3 Construction Works:
i) New works School Building June 2019 Demolition and construction yet to take place
18
ii) Maintenance & Repairs Procurement of Estimates & execution of works
July 2019
iii) Developmental work Children’s Park Dec 2019
iv) Coloring/white washing of school building and staff quarters, etc.
School Buildng & Staff Quarters to be whitewashed
Dec 2019
4 Transfer of land/execution of lease deed etc. if required.
Not required 0 0 0
5 Annual stock verification All Departments
31-03-2020 Done for 2018-19 in March 2019
6 Vidyalaya Management Committee/Vidyalaya Executive Committee Meetings
Three times in a year
In Aug 2019, Dec 2019 & Feb 2020
Conducted 3 times in 2018-19
7 Financial Management
i) Budget proposals Preparation for both the shifts separately
July 2019
ii)Revised Estimates Modifications in Budget Proposals
Feb 2020
iii)Rectification if any Then & There
Audit of school accounts
Activity/Programme Pending Expected Date of Settlement
Actual No. of Paras Settled
Remarks
Audit Paras (A) Internal Audit Para
0 0 0
(B) A G Audit Para 1 Dec 2019 0
Court cases
No. of Cases Subject of litigation Current Status Remarks
0 0 0 0
19
ACADEMIC LOSS COMPENSATION PROGRAMME (ALCP)
S.No Class No. Of Programmes organized Activities Planned
1 X REMEDIAL CLASSES DURING WINTER BREAK
TO EQUIP FACING BOARD EXAMINATION
VI- PLAN FOR COMMUNITY PARTICIPATION
A. Plan to encourage Community & Social Services by the students
Program/ Campaign Objective of Program/ Campaign
Target Area/ Population
Resources required
Swatch Bharat Abhiyan
To make people aware of the importance of cleanliness
Kolshet Scouts & Guides
B. Plan for Sharing facilities/ resources with less developed school
Program/ Campaign Objective of Program/ Campaign
Target schools Resources required
NIL
C. Connecting the Neighboring School under Handholding Support Scheme:
Name & Address of Mentee- 1:------------------------------------------------------------
Sl. No
Activity Organized
Kendriya Vidyalaya Neighboring School -1
No. of Students participated
No. of Teachers participated
No. of Students participated
No. of Teachers participated
1 NIL
2
Activities planned for the session:
Name & Address of Mentee-2: ---------------------------------------------------------------
20
Sl. No
Activity Organized
Kendriya Vidyalaya Neighboring School -2
No. of Students participated
No. of Teachers participated
No. of Students participated
No. of Teachers participated
1 NIL
2
Activities Planned for the session : The school building has been declared UNSAFE by MES with effect from December 2015. Due to the acute shortage of space/class rooms and staff, it is not feasible at present to take up the above project in order to avoid the extra live-load on the school building.
Chandrashekhar Singh
DATE: 03-10-2019 PRINCIPAL