2
CONVENTO OBRA PIA VICEROY CARTAGENA Colombia’s 1st 6-star hotel market background the project 14,163m 2 of urban construction 102 urban guest rooms - 42m 2 avg. size 1st Las Vegas-style day club in Cartagena 202m 2 infinity pool & terrace bar w/ 360º view Rooftop terrace seating 450+; 2,100 standing 1st valet parking service in the old city 650m 2 luxury fitness center & urban spa 225m 2 surface-level swimming pool linked to gym 420m 2 cross function event-space Signature restaurant & nightclub 3-meal restaurant seating 140+ 3 bar areas seating 200+ 2 sandwicherias/cafés 2 luxury boutique stores 8 suites w/ private terrace & jacuzzi 60,000m 2 + of beachfront construction 15 beachfront cabanas - 70m 2 avg. size 1 restaurant, scene bar lounge and beach bar Beachfront spa with 6 treatment rooms and complete facilities “One of the world’s top 10 cultural tourism destinations” -The New York Times- centro san diego hotel santa clara hotel santa teresa four seasons (in progress) Centro de convenciones viceroy cartagena obra pía la matuna getsemaní New Architecture Colonial Restoration (Phase 1) Colombia has experienced a sustained “peace dividend” economic boom for 15+ years 5%+ compounded GDP growth since 1994 3rd largest economy in Latin America— after Brazil and Mexico U.S.-Colombia FTA: 2012 EU-Colombia FTA: 2014 Cartagena’s colonial fort city (1533) is a UNESCO World Heritage site Premier “jetset” destination globally One of the top 5 conference destinations in Latin America Over 750,000 visitors in 2014 International airlift from Atlanta, Houston, Miami, JFK, Madrid, Frankfurt, etc. to Cartagena’s int’l airport expected to triple by 2018 Visitors to Cartagena projected to grow at a double-digit percentage pace for next decade High-end hospitality in the old city area of Cartagena (site of the Viceroy project) is chronically under-supplied; under 1,000 total rooms at 4 stars and above getsemaní: Convento Obra Pía is located in the heart of the hippest neighborhood within the colonial city Fully entitled; most risky part of construction (Phase 1: colonial restoration) completed ORLANDO MIAMI FT. LAUDERDALE HOUSTON QUITO EXISTING ROUTES UPCOMING ROUTES PANAMA CITY MADRID FRANKFURT NEW YORK Due to UNESCO protections, Viceroy Cartagena’s 5-property footprint represents one of the last few places in colonial Cartagena where it is possible to build a large-format hotel.

Viceroy Cartagena Download Executive Summary

  • Upload
    buinhan

  • View
    228

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Viceroy Cartagena Download Executive Summary

CONVENTO OBRA PIAVICEROY CARTAGENA

Colombia’s 1st 6-star hotel

market background

the project• 14,163m2ofurbanconstruction• 102urbanguestrooms-42m2avg.size• 1stLasVegas-styledayclubinCartagena• 202m2infinitypool&terracebarw/360ºview• Rooftopterraceseating450+;2,100standing• 1stvaletparkingserviceintheoldcity• 650m2luxuryfitnesscenter&urbanspa• 225m2surface-levelswimmingpoollinkedtogym• 420m2crossfunctionevent-space• Signaturerestaurant&nightclub• 3-mealrestaurantseating140+• 3barareasseating200+• 2sandwicherias/cafés• 2luxuryboutiquestores• 8suitesw/privateterrace&jacuzzi• 60,000m2+ofbeachfrontconstruction• 15beachfrontcabanas-70m2avg.size• 1restaurant,scenebarloungeandbeachbar• Beachfrontspawith6treatmentroomsand

completefacilities

“One of the world’s top 10 cultural tourism destinations”

-The New York Times-

centro

san diego

hotel santa clara

hotel santa teresa

four seasons

(in progress)Centro

de convenciones

viceroy cartagena

obra pía

la matuna

getsemaní

New Architecture Colonial Restoration (Phase 1)

• Colombiahasexperiencedasustained “peacedividend” economicboom for15+years

• 5%+compoundedGDPgrowthsince1994 • 3rdlargesteconomy inLatinAmerica—

afterBrazilandMexico• U.S.-ColombiaFTA:2012• EU-ColombiaFTA:2014• Cartagena’s colonialfortcity(1533)isa

UNESCOWorldHeritagesite• Premier“jetset”destinationglobally• Oneofthe top5conferencedestinations in

LatinAmerica• Over750,000visitorsin2014• International airliftfromAtlanta,Houston,

Miami,JFK,Madrid,Frankfurt,etc. toCartagena’sint’lairportexpectedtotripleby2018

• VisitorstoCartagenaprojectedtogrowatadouble-digitpercentagepacefornextdecade

• High-endhospitalityintheoldcityareaofCartagena(siteoftheViceroyproject)is chronicallyunder-supplied;under1,000totalroomsat4starsandabove

• getsemaní: ConventoObraPíaislocatedintheheartofthe hippestneighborhood withinthecolonialcity

• Fullyentitled;mostriskypartofconstruction(Phase1:colonialrestoration)completed

orlando

miamift. lauderdalehouston

quito

existing routes

upcoming routes

panama city

madrid

frankfurt

new york

DuetoUNESCOprotections,ViceroyCartagena’s5-propertyfootprintrepresentsoneofthelastfewplacesincolonialCartagenawhereitispossibletobuildalarge-formathotel.

Page 2: Viceroy Cartagena Download Executive Summary

current situation viceroy cartagenadevelopment partners

things to remember aboutthe viceroy cartagena

VICEROY HOTEL GROUPviceroyhotelsandresorts.com

• 7countrieswith15+Hotelsinprime,exoticplaces

• Viceroy’shotelsandresortsoccupybothvibranturbansettingsandspectacularresortlocations.

• Glamorousandexclusivesensibilitythatepitomizestheheightofluxury.

• AssetsinViceroyportfoliohaveconsistentlybeenrankedamongstworld’sbesthotels,includingViceroySantaMonica,ViceroyPalmSprings,ViceroyAnguillaandViceroyMaldives.

• ViceroyHotelsandResortsembodytheessenceofstyleandservice.

KIT CAPITALkitcapital.com

KITCapitalisafamilyofficeandmerchantbankfirmfoundedin2001byserialentrepreneurandformerGoldmanSachsinvestmentbankerKaleilIsazaTuzman.

Sinceinception,KITCapitalhascreatedoverUS$1billioninincrementalmarketvaluethroughmanagedinvestmentsandassetsales.

ThefirmhasbeenanactiveinvestorinCartagenarealestateforoveradecadeandhasbeensuccessfullyinvestinggloballyinhigh-endhospitalityprojectssince2005.

RepresentsaprimeassetbetonColombia’spositivemacrotrajectory

AnnualIRRof20%(withoutanyleverage)

Takesadvantageoflong-termshortageofhigh-endhospitalitysupplyinCartagena’scolonialcity

Limitedexecutionrisk:Phase1constructioncomplete;experiencedhotelinvestor

TaxincentivesforhotelconstructioninColombiaprovide30yearsofincometaxexemptions

1.

2.

3.

4.

5.

Colombia’s 1st 6-star hotel

Thepartnersbringrecentexperienceinotherupscaleand6-starhospitalityprojectssuchas:

• ViceroyDubaiPalmJumeirah• ViceroyNewYork• ViceroyBodrum(Turkey)• ViceroyMiami• CoralHiltonBaghdad• D’OroMedellín(inprogress)

• Beginningin2010,KITCapitalpurchased5borderingpropertieswithintheGetsemaníneighborhoodofcolonialCartagena.

• Architecturaldesigns-integratingcolonialrestorationandnewbuild-completedbyrenownedcolonialrestorationfirmBarrera&Barrera.

• CompetitiveprocessesledtoKITCapitalchoosingViceroyHotelGroupasoperatorandinternationallyacclaimedfirmArquitecturadeInteriorestoleadinteriordesignontheproject.

• 3-yearprocessofobtainingIPCC/UNESCOapprovalswascompletedinApril2014;constructionlicenseobtained.

• ConstructiononPhase1(colonialrestoration)commencedNovember2014andcompletedontimeandunderbudgetinAugust2015.

• Executionriskhasbeenvastlyreduced,withallentitlementsinplaceandmostriskyphaseofconstructionhasbeenfundedandcompleted.

• KITCapitalhasreceivedattractiveinstitutionalequityco-investmentanddebtofferstofillPhase2fundingneed;hybridroundisintendedtobuildfutureequityco-investmentrelationshipsandincreasenegotiatingleveragebyfundingconstructionthroughQ12016.