VIA WEBSITE POSTING AND MAILING
May 7, 2020
Contract No. T201804301.01Federal Aid Project No. NH-S018(18)Georgetown East Gateway ImprovementsSussex County
Ladies and Gentlemen:
Enclosed is Addendum No. 2 for the referenced contract consisting of the following:
1. The Bid Proposal Cover, revised, to be substituted for the same page of the Proposal.
2. One (1) page, Special Provision Listing, page 46, revised, to be substituted for the same page in the Proposal.
3. Two (2) pages, Special Provision, 202560 - Contaminated Material, pages 48A through 48B, new, to be addedto the Proposal.
4. Three (3) pages, Special Provision, 710500 - Installation Of Water Mains And Accessories, pages 76A through76C, new, to be added to the Proposal.
5. Three (3) pages, Special Provision, 711501 - Installation Of Sanitary Sewer Mains And Accessories, pages 77Athrough 77C, new, to be added to the Proposal.
6. One (1) page, Breakout Sheet Instructions, page 182A, new, to be added to the Proposal.
7. One (1) page, Attention to Bidders, page 182B, new, to be added to the Proposal.
8. Four (4) pages, Breakout Sheets for 710500, pages 182C through 182F, new, to be added to the Proposal.
9. Three (3) pages, Breakout Sheets for 711501, pages 182G through 182I, new, to be added to the Proposals.
10. Twenty-seven sheets, Construction Plans, sheets 3, 16, 17, 18, 19, 20, 23, 26, 27, 54, 82, 95, 99, 102, 118, 123,127, 129, 133, 135, 136, 139, 142, 143, 149, 152 and 153.
11. Fifteen (15) pages, Bid Proposal Forms, pages 1 through 15, revised, to be substituted for the sixteen (16) pagesin the Proposal.
The following Item Number have been added: 202560, 501001, 710500 and 711501
The following Item Numbers have been deleted: 602035, 710030, 710031, 710374, 710376, 710406, 710438,710487, 711004, 711009, and 711036
The following Item Number has a revised quantity: 501526
12. Bid Express Amendment File No. 1, new.
Please note the revisions listed above and submit your bid based upon this information.
Sincerely,
~signature on file~
Connie Ivins Competitively Bid Contracts Coordinator Delaware Department of Transportation
STATE OF DELAWARE
DEPARTMENT OF TRANSPORTATION
BID PROPOSAL
for
CONTRACT T201804301.01 FEDERAL AID PROJECT NO. NH-S018(18)
CFDA NO. 20.205
GEORGETOWN EAST GATEWAY IMPROVEMENTS
SUSSEX COUNTY
ADVERTISEMENT DATE: April 3, 2020
COMPLETION TIME: 537 Calendar Days
SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTIONDELAWARE DEPARTMENT OF TRANSPORTATION
AUGUST 2016
Bids will be received in the Bidder's Room at the Delaware Department of Transportation's Administration Building, 800 Bay Road, Dover, Delaware prior to 2:00 P.M. local time May 5 12, 2020
Addendum No. 2
May 1, 2020Addendum No. 2 May 7, 2020
Contract T201804301.01
GEORGETOWN EAST GATEWAY IMPROVEMENTS
SPECIAL PROVISIONS
S.P. Code SPECIAL PROVISION DESCRIPTION
202560-15 CONTAMINATED MATERIAL 401699-15 QUALITY CONTROL/QUALITY ASSURANCE OF BITUMINOUS CONCRETE 501526-15 PATTERNED P.C.C., 8" 601505-15 DRAINAGE SAFETY END STRUCTURE 615518-15 3-INCH PVC PIPE FOR ROOF DRAIN OUTFALL 701510-15 CURB/SIDEWALK OPENING 705521-15 PATTERNED PORTLAND CEMENT CONCRETE, 8" 706500-15 RIGHT-OF-WAY MARKER, CAPPED REBAR 710500-15 INSTALLATION OF WATER MAINS AND ACCESSORIES 711500-15 ADJUST AND REPAIR EXISTING SANITARY MANHOLE 711501-15 INSTALLATION OF SANITARY SEWER MAINS AND ACCESSORIES 711502-15 ADJUST AND REPAIR EXISTING SANITARY CLEANOUTS 763501-15 CONSTRUCTION ENGINEERING 763503-15 TRAINEE 763508-15 PROJECT CONTROL SYSTEM DEVELOPMENT PLAN 763509-15 CPM SCHEDULE UPDATES AND/OR REVISED UPDATES 763597-15 UTILITY CONSTRUCTION ENGINEERING 763599-15 FIELD OFFICE, SPECIAL II 831514-15 FURNISH AND INSTALL 2-1/2" SCHEDULE 80 PVC CONDUIT (TRENCH) 831515-15 FURNISH AND INSTALL 3" SCHEDULE 80 PVC CONDUIT (TRENCH) 831516-15 FURNISH AND INSTALL 4" SCHEDULE 80 PVC CONDUIT (TRENCH) 831523-15 FURNISH AND INSTALL 2" GALVANIZED STEEL CONDUIT (TRENCH) 831545-15 FURNISH AND INSTALL 4" HDPE SDR-13.5 CONDUIT (BORE) 831574-15 FURNISH AND INSTALL SECOND AND SUBSEQUENT ADDTIONAL 4" SCHEDULE 80 PVC
CONDUITS IN TRENCH OR OPEN CUT 834501-15 PARTIAL REMOVAL OF CONCRETE POLE BASES AND CABINET FOUNDATIONS 842501-15 FURNISH AND INSTALL ELECTRIC UTILITY SERVICE EQUIPMENT 120/240 (100 AMP) 850503-15 LUMINAIRE (LED), 160 WATTS 851504-15 ALUMINUM LIGHTING SINGLE DAVIT ARM, 15' ARM SPREAD 851506-15 ALUMINUM LIGHTING STANDARD, 30' POLE 851515-15 PARKING LOT LIGHING SYSTEM 907500-15 TEMPORARY SWALE, TYPE A-1 907506-15 EARTH DIKE, TYPE A-1
Addendum No. 2 May 7, 2020
Page 46 of 186
Contract No. T201804301.01
202560 - CONTAMINATED MATERIAL Description: Contaminated Material is defined as solids or liquids (including soil) potentially contaminated with a hazardous substance, requiring special handling and/or disposal per state or federal regulation. This work describes the excavation, removal and treatment/disposal of contaminated materials resulting from project construction including utility and other types of excavation activities in accordance with the locations and notes on the Plans, and as directed by the Engineer or the Department's environmental representative. The Contractor will be notified of the Department's environmental representative at the pre-construction meeting. Overview of Costs: Potential contaminated solids may affect contractor's costs as follows; Additional cost to normal excavation requirements: -Cost of 8 mil plastic for placement under and over solid contaminated material, -Maintaining the segregated contaminated solids staging area. Reduced cost to normal excavation requirements: -Not required to, or charged for, transport of contaminated material from site. -Not required to, or charged for, disposal of contaminated soil. Potential contaminated liquids will affect contractor’s cost as follows; Additional cost to normal excavation requirements: -None Reduced cost to normal excavation requirements: -None Construction Methods and Responsibilities: Contractor's Responsibilities for potential contaminated solids: The Contractor shall be responsible for providing the appropriate equipment and personnel necessary to excavate, stage, and load contaminated material for off-site disposal, as identified from previous site environmental investigations or identified during construction activities. The work will be performed in accordance with the procedures described in the site specific "Contaminated Material and Water Removal Work Plan" prepared by the Department's environmental representative. The Department will provide a copy of this plan after the project is awarded and before any work begins. The Contractor shall adhere to applicable Occupational Safety and Health standards, Guidelines and/or Laws. This will include compliance with 29 CFR Part 1910. After award of the Contract, the Contractor shall immediately be responsible for notifying the Department's HAZMAT Program Mananger’s office (760-2463) for scheduling coordination with the environmental representative. The contractor shall submit a proposed schedule of work to the Department for review and approval prior to any commencement of work on this site. The Contractor is required to perform to a high standard of workmanship to assure protection of workers, local water supplies, and the environment. The Contractor shall coordinate with the utility companies prior to excavation. The Department's environmental representative shall be present during all phases of work associated with the excavation and removal of potentially contaminated material. Payment will not be made for any work done when a Department approved Inspector or environmental representative is not present to provide environmental oversight.
Addendum No. 2 May 7, 2020
Page 48A of 186
Contract No. T201804301.01
Specific tasks to be performed by the Contractor will include excavating soil per the project specifications. The Contractor will segregate "contaminated" soil as designated by the Department or their environmental representative, from "clean" soil and place the "contaminated" soil in a designated on-site staging area constructed by the Contractor. At a minimum the staging area needs to be lined with 8-mil plastic and a berm constructed to minimize storm water run-off. The "contaminated" soil will need to be covered by the Contractor at the end of each work day. The Contractor will be responsible for loading contaminated soil onto trucks arranged by the Department's environmental representative on the days the contaminated soil is shipped off-site to a licensed disposal/treatment facility. The Contractor will backfill and compact the excavated area(s) according to the project specifications and payment will be made under that item of the Contract. Department's Responsibilities: The Department is responsible for providing and paying; the environmental representative; the transportation of contaminated material for disposal; and the disposal of contaminated material. The "Contaminated Material and Water Removal Work Plan" will identify; the procedures to be used to excavate and stage the contaminated material; the licensed treatment/disposal facility where the Department will ship the contaminated material; the method the material will be transported to the treatment/disposal facility; and any additional health and safety requirements for site personnel. The Department's environmental representative will conduct a health and safety briefing prior to commencement of activities on the sites to insure an understanding of all applicable standards, guidelines, laws, procedures, etc. consistent with the successful completion of this type of activity. The Department's environmental representative will conduct air monitoring during any excavation activities at the site to identify and mitigate fire, explosion and vapor hazards. The Department's environmental representative shall coordinate the excavation activities with all applicable local, state, and federal environmental regulatory agencies. The Department's environmental representative will also oversee the excavation, removal and treatment/disposal of the material in the designated area(s) and perform such tests as field screening for soil contamination utilizing vapor monitoring techniques and collect soil samples for laboratory analysis to meet the requirements of the treatment/disposal facility, DNREC and/or the USEPA. The Department's environmental representative's personnel will subcontract with the disposal/treatment facility to provide transportation and disposal/treatment of all contaminated materials to be removed as part of the project. The Department's environmental representative is responsible for measuring the quantity of contaminated material removed, via certified scale weights, for the Department's records. Method of Measurement: The quantity of contaminated material will not be measured. It will be included in the excavation quantity. Basis of Payment: No additional payment will be made for the handling of contaminated material included in the excavation quantities. Contractor's costs for handling contaminated material as described herein are to be included in the standard excavation pay items included in this contract, and will constitute full compensation for excavation, constructing and maintaining the segregated soil staging area, placement of the contaminated soil in the staging area, providing plastic and daily covering of the segregated soil staging area, and loading of contaminated soil for removal by the Department. This item is a contingency item and the Department reserves the right to delete from the Contract. The Contractor shall make no claims for additional compensation because of deletion of the item.
08/14/2017
Addendum No. 2 May 7, 2020
Page 48B of 186
710500 – INSTALLATION OF WATER MAINS AND ACCESSORIES
Description:
This work consists of furnishing and installing all materials to relocate Water Mains, including Taps, Tie-ins, Fittings, and Valves; relocate fire hydrants; and other related items as shown on the plans and meeting the requirements of the applicable DelDOT Standard Specifications, these Special Provisions and the applicable Technical Specifications. The relocations are located in distinct sections as shown on the plans. Any requirements included on the plans that are not addressed by these Special Provisions, shall be performed in accordance with the Technical Specifications as part of the Town of Georgetown Design and Construction Standards for Water, Sewer, and Streets. The Contractor is advised to obtain and be fully acquainted with the applicable specifications of the Owner. Costs to comply are considered incidental to Item 710500. The Owner of the water line on this project is Town of Georgetown and their Technical Specifications are available online. When referenced in these Special Provisions, or the Technical Specifications, the Owner is intended to be represented by an employee of Town of Georgetown. “Breakout Sheets” are included in the contract to establish unit prices for the items listed in the specific Breakout Sheet. The total of these unit prices multiplied by the estimated quantities, as totaled for all Breakout Sheets, will establish the total Lump Sum price to be submitted with the bid. Each listed item will be measured as a unit price item in the field. The final Lump Sum payment for Item 710500 will be adjusted by change order, either plus or minus, to match the final totals of all unit price items established in the Breakout Sheets. Breakout Item Description
W-1 8"W US 9 Sta. 101+00 to Sand Hill Rd Sta. 213+50 [Lump Sum]
W-2 10"W Airport Rd Sta. 206+00 to Sand Hill Rd Sta. 214+00 [Lump Sum] W-3 8"W Cheer Center [Lump Sum]
General Requirements: As listed in the Technical Specifications. Any and all emergency repairs required during the period of this Contract shall be the responsibility of the Contractor. In the event the Owner or Engineer is unable to contact the Contractor for the immediate emergency repair items of work, or in the event the Contractor does not take action when contacted within a reasonable length of time, the Owner of the utility reserves the right to attend to any and all emergency repair work items and to resubmit the costs directly to the Contractor for complete payment. An inspector representing the Owner must be present during any service connections. All service connections must be performed by a Licensed Plumber.
Contract No. T201804301.01Addendum No. 2
May 7, 2020
Page 76A of 186
Specifications: DelDOT Standard Specifications Technical Specifications Contract Plans and Details These Special Provisions Submittals: In addition to the as-built drawings outlined in Technical Specifications, the Contractor shall submit sources of supply and catalog cuts to DelDOT for all materials furnished as part of Item 710500 as required by Standard Specification Section 106. The Contractor shall submit for review and approval by the Engineer a detailed plan for dewatering the work zone prior to beginning any water relocation work. It is intended to place all pipe and appurtenances in a “dry trench”. Refer to Technical Specifications for additional bedding details. The Contractor shall submit the proposed materials, procedure, and sequence of operations for review and approval by the Engineer and Owner prior to beginning work on any “wet taps”. Materials:
Furnish all materials for all materials related to the water main work. Material requirements are as listed in the plan details, the Technical Specification Sections and this Special Provision. Cast-in-place Concrete shall meet the requirements of Section 1022, Class B of the Delaware Standard Specifications. Borrow, Type C, or existing material meeting Borrow, Type C for backfilling shall conform to the requirements of Section 209 of the DelDOT Standard Specifications. Pipe foundation bedding shall meet Borrow, Type B, or existing material meeting Borrow, Type B requirements in accordance with Section 209 of the DelDOT Standard Specifications. Construction Methods: In accordance with the Technical Specifications, Contract Plans and this Special Provision.
Contract No. T201804301.01Addendum No. 2
May 7, 2020
Page 76B of 186
Measurement and Payment: General Requirements –
Price and payment for all breakout items listed as part of Item 710500 include excavation, dewatering, furnishing, installing, and removing sheeting, shoring, or trench boxes to meet OSHA requirements; backfill (including furnishing Type B and/or Type C Borrow), backfilling, and Testing to meet the requirements of the Owner. Also included in all items are, where necessary, concrete thrust blocks and restraints, tracing wire, and detector tape per Owner’s requirements. Also included are in all items are removing, cutting, capping, and/or abandoning existing facilities as described in the Contract Documents. Payment for all items also includes all labor, equipment, and incidentals needed to complete the item. Measurement for items identified in the Breakout Sheets with a Linear Foot unit will be made from end to end of the final length of installed pipe and fittings. Measurement will be made through any fittings with no deduction. The price for each item shall include furnishing and installing all materials to resolve any alignment conflict between a water main and storm sewer or other Utility pipe. Also included is any required temporary support of the pipe in conflict with the water main. Any excavation and backfill below the originally designed elevations due to unsuitable material shall be addressed in accordance with the Technical Specifications. Pavement Sawcutting, Roadway Patching materials (GABC and warm mix), removal of existing concrete, topsoil, seeding, and all Maintenance of Traffic items will be paid for separately under their respective bid items, if required by the contract documents. For Service Connections, the price per each shall also include installation of necessary service lateral pipe, labor and equipment necessary to adjust an existing service connection and/or meter box. Any new materials required will be furnished by the Owner. Also included in the price per each is the cost to have any service connections performed by a Licensed Plumber.
Payment Clarification – A percentage of the total Lump Sum bid price will be paid based on the work performed in each pay period. The percentage will be calculated by multiplying the total units of each completed Breakout Item times the appropriate unit price; then adding the total dollars of completed work, divided by the total Lump Sum bid price for item 710500, Installation of Water Mains and Accessories. Final payment may result in less than 100% of the total Lump Sum based on actual work performed. Should the Lump Sum total be exceeded, additional funds will be added by Change Order based on the best available estimate at the time.
Contract No. T201804301.01Addendum No. 2
May 7, 2020
Page 76C of 186
Contract No. T201804301.01
711501 - INSTALLATION OF SANITARY SEWER MAINS AND ACCESSORIES
Description:
This work consists of furnishing and installing all materials to relocate sewer mains, including Laterals, Cleanouts, Tie-ins, Fittings, and Manholes; relocate force mains, including Tie-ins, Fittings, Valves, Air Release and Vacuum Valves, and Structures; and other related items as shown on the plans and meeting the requirements of the applicable DelDOT Standard Specifications, these Special Provisions and the applicable Technical Specifications. The relocations are located in distinct sections as shown on the plans. Any requirements included on the plans that are not addressed by these Special Provisions, shall be performed in accordance with the Technical Specifications as part of the Town of Georgetown Design and Construction Standards for Water, Sewer, and Streets. The Contractor is advised to obtain and be fully acquainted with the applicable specifications of the Owner. Costs to comply are considered incidental to Item 711501. The Owner of the sanitary sewer on this project is Town of Georgetown and their Technical Specifications are available online. When referenced in these Special Provisions, or the Technical Specifications, the Owner is intended to be represented by an employee of Town of Georgetown. “Breakout Sheets” are included in the contract to establish unit prices for the items listed in the specific Breakout Sheet. The total of these unit prices multiplied by the estimated quantities, as totaled for all Breakout Sheets, will establish the total Lump Sum price to be submitted with the bid. Each listed item will be measured as a unit price item in the field. The final Lump Sum payment for Item 711501 will be adjusted by change order, either plus or minus, to match the final totals of all unit price items established in the Breakout Sheets. Breakout Item Description
S-1 8"FM Airport Rd Sta. 206+00 to Sand Hill Rd Sta. 221+50 [Lump Sum]
S-2 8"S US 9 Sta. 111+25 to Sta. 113+00 [Lump Sum] General Requirements: As listed in the Technical Specifications. Any and all emergency repairs required during the period of this Contract shall be the responsibility of the Contractor. In the event the Owner or Engineer is unable to contact the Contractor for the immediate emergency repair items of work, or in the event the Contractor does not take action when contacted within a reasonable length of time, the Owner of the utility reserves the right to attend to any and all emergency repair work items and to resubmit the costs directly to the Contractor for complete payment. An inspector representing the Owner must be present during any service connections. All service connections must be performed by a Licensed Plumber.
Addendum No. 2 May 7, 2020
Page 77A of 186
Contract No. T201804301.01
Specifications: DelDOT Standard Specifications Technical Specifications Contract Plans and Details Sussex County Ordinance 38 These Special Provisions Submittals: In addition to the as-built drawings outlined in Technical Specifications, the Contractor shall submit sources of supply and catalog cuts to DelDOT for all materials furnished as part of Item 711501 as required by Standard Specification Section 106. The Contractor shall submit for review and approval by the Engineer a detailed plan for dewatering the work zone prior to beginning any water relocation work. It is intended to place all pipe and appurtenances in a “dry trench”. Refer to Technical Specifications for additional bedding details. The Contractor shall submit the proposed materials, procedure, and sequence of operations for review and approval by the Engineer and Owner prior to beginning work on any “wet taps”. Materials:
Furnish all materials for all materials related to the sanitary sewer work. Material requirements are as listed in the plan details, the Technical Specification Sections and this Special Provision. Cast-in-place Concrete shall meet the requirements of Section 1022, Class B of the Delaware Standard Specifications. Borrow, Type C, or existing material meeting Borrow, Type C for backfilling shall conform to the requirements of Section 209 of the DelDOT Standard Specifications. Pipe foundation bedding shall meet Borrow, Type B, or existing material meeting Borrow, Type B requirements in accordance with Section 209 of the DelDOT Standard Specifications. Construction Methods: In accordance with the Technical Specifications, Contract Plans and this Special Provision. Measurement and Payment: General Requirements –
Price and payment for all breakout items listed as part of Item 711501 include excavation, dewatering, furnishing, installing, and removing sheeting, shoring, or trench
Addendum No. 2 May 7, 2020
Page 77B of 186
Contract No. T201804301.01
boxes to meet OSHA requirements; backfill (including furnishing Type B and/or Type C Borrow), backfilling, and Testing to meet the requirements of the Owner. Also included in all items are, where necessary, concrete thrust blocks and restraints, tracing wire, and detector tape per Owner’s requirements. Also included are in all items are removing, cutting, capping, and/or abandoning existing facilities as described in the Contract Documents. Payment for all items also includes all labor, equipment, and incidentals needed to complete the item. Measurement for items identified in the Breakout Sheets with a Linear Foot unit will be made from end to end of the final length of installed pipe and fittings. Measurement will be made through any fittings with no deduction. The price for each item shall include furnishing and installing all materials to resolve any alignment conflict between a sewer main, and water main, storm sewer, or other Utility pipe. Also included is any required temporary support of the pipe in conflict with the sewer main. Any excavation and backfill below the originally designed elevations due to unsuitable material shall be addressed in accordance with the Technical Specifications. Pavement Sawcutting, Roadway Patching materials (GABC and warm mix), removal of existing concrete, topsoil, seeding, and all Maintenance of Traffic items will be paid for separately under their respective bid items, if required by the contract documents. For Service Connections, the price per each shall also include installation of necessary service lateral pipe, labor and equipment necessary to adjust an existing service connection and/or meter box. Any new materials required will be furnished by the Owner. Also included in the price per each is the cost to have any service connections performed by a Licensed Plumber.
Payment Clarification – A percentage of the total Lump Sum bid price will be paid based on the work performed in each pay period. The percentage will be calculated by multiplying the total units of each completed Breakout Item times the appropriate unit price; then adding the total dollars of completed work, divided by the total Lump Sum bid price for item 711501, Installation of Sanitary Sewer Mains and Accessories. Final payment may result in less than 100% of the total Lump Sum based on actual work performed. Should the Lump Sum total be exceeded, additional funds will be added by Change Order based on the best available estimate at the time.
Addendum No. 2 May 7, 2020
Page 77C of 186
Delaware Department of Transportation
05/05/2020 1:04:10 PM
AASHTOWare Project™ Version 4.2 Revision 026
Proposal ID: T201804301.01 Project(s): T201804301
Contractor:
0001 ROADSECTION:
Alt Set ID: Alt Mbr ID:
All figures must be typewritten
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber Dollars Cents Dollars Cents
0010 201000
CLEARING AND GRUBBING LUMP SUM _________._____LUMP SUM
0020 202000
EXCAVATION AND EMBANKMENT CY
31,395.000
_________._____ _________._____
0030 202003
UNDERCUT EXCAVATION CY
335.000
_________._____ _________._____
0040 204000
TEST HOLE CY
100.000
_________._____ _________._____
0050 207000
STRUCTURAL EXCAVATION CY
2,085.000
_________._____ _________._____
0060 209001
BORROW, TYPE A CY
2,054.000
_________._____ _________._____
0070 209002
BORROW, TYPE B CY
1,599.000
_________._____ _________._____
0080 209005
FURNISHING BORROW, TYPE C FORPIPE AND UTILITY TRENCHBACKFILL
CY
1,000.000
_________._____ _________._____
0090 209006
BORROW, TYPE F CY
100.000
_________._____ _________._____
0100 211000
REMOVAL OF STRUCTURES ANDOBSTRUCTIONS
LUMP SUM _________._____LUMP SUM
0110 211001
REMOVAL OF PORTLAND CEMENTCONCRETE PAVEMENT, CURB ANDSIDEWALK
SY
7,383.000
_________._____ _________._____
Proposal Schedule of Items Page 1 of 15
Addendum No. 2 May 7, 2020
Delaware Department of Transportation
05/05/2020 1:04:10 PM
AASHTOWare Project™ Version 4.2 Revision 026
Proposal ID: T201804301.01 Project(s): T201804301
Contractor:
0001 ROADSECTION:
Alt Set ID: Alt Mbr ID:
All figures must be typewritten
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber Dollars Cents Dollars Cents
0120 301001
GRADED AGGREGATE BASECOURSE, TYPE B
CY
8,562.000
_________._____ _________._____
0130 401005
SUPERPAVE TYPE C, PG 64-22(CARBONATE STONE)
TON
2,929.000
_________._____ _________._____
0140 401014
SUPERPAVE TYPE B, PG 64-22 TON
4,247.000
_________._____ _________._____
0150 401015
SUPERPAVE TYPE B, PG 70-22 TON
4,602.000
_________._____ _________._____
0160 401021
SUPERPAVE TYPE BCBC, PG 64-22 TON
7,289.000
_________._____ _________._____
0170 401045
SUPERPAVE TYPE C, PG 70-22 (NON-CARBONATE STONE)
TON
2,726.000
_________._____ _________._____
0180 501001
PORTLAND CEMENT CONCRETEPAVEMENT, 8"
SY
28.000
_________._____ _________._____
0190 501526
PATTERNED PORTLAN CEMENTCONCRETE, 8"
SF
2,654.000
_________._____ _________._____
0200 601032
REINFORCED CONCRETE PIPE, 15",CLASS IV
LF
639.000
_________._____ _________._____
0210 601033
REINFORCED CONCRETE PIPE, 18",CLASS IV
LF
971.000
_________._____ _________._____
Proposal Schedule of Items Page 2 of 15
Addendum No. 2 May 7, 2020
Delaware Department of Transportation
05/05/2020 1:04:10 PM
AASHTOWare Project™ Version 4.2 Revision 026
Proposal ID: T201804301.01 Project(s): T201804301
Contractor:
0001 ROADSECTION:
Alt Set ID: Alt Mbr ID:
All figures must be typewritten
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber Dollars Cents Dollars Cents
0220 601115
REINFORCED CONCRETEELLIPTICAL PIPE, 14" X 23", CLASS IV
LF
795.000
_________._____ _________._____
0230 601116
REINFORCED CONCRETEELLIPTICAL PIPE, 19" X 30", CLASS IV
LF
616.000
_________._____ _________._____
0240 601119
REINFORCED CONCRETEELLIPTICAL PIPE, 27" X 42", CLASS IV
LF
152.000
_________._____ _________._____
0250 601141
REINFORCED CONCRETE FLAREDEND SECTION, 15"
EACH
3.000
_________._____ _________._____
0260 601142
REINFORCED CONCRETE FLAREDEND SECTION, 18"
EACH
8.000
_________._____ _________._____
0270 601170
REINFORCED CONCRETE FLAREDEND SECTION, 14" X 23"
EACH
5.000
_________._____ _________._____
0280 601171
REINFORCED CONCRETE FLAREDEND SECTION, 19" X 30"
EACH
4.000
_________._____ _________._____
0290 601174
REINFORCED CONCRETE FLAREDEND SECTION, 27"X42"
EACH
1.000
_________._____ _________._____
0300 601505
DRAINAGE SAFETY END STRUCTURE EACH
2.000
_________._____ _________._____
0310 602003
DRAINAGE INLET, 34" X 24" EACH
13.000
_________._____ _________._____
Proposal Schedule of Items Page 3 of 15
Addendum No. 2 May 7, 2020
Delaware Department of Transportation
05/05/2020 1:04:10 PM
AASHTOWare Project™ Version 4.2 Revision 026
Proposal ID: T201804301.01 Project(s): T201804301
Contractor:
0001 ROADSECTION:
Alt Set ID: Alt Mbr ID:
All figures must be typewritten
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber Dollars Cents Dollars Cents
0320 602004
DRAINAGE INLET, 48" X 30" EACH
16.000
_________._____ _________._____
0330 602005
DRAINAGE INLET, 48" X 48" EACH
4.000
_________._____ _________._____
0340 602006
DRAINAGE INLET, 66" X 30" EACH
4.000
_________._____ _________._____
0350 602031
MANHOLE, 48" X 48" EACH
8.000
_________._____ _________._____
0360 602100
REPLACE DRAINAGE INLET GRATE(S) EACH
5.000
_________._____ _________._____
0370 602101
REPLACE DRAINAGE INLETFRAME(S)
EACH
5.000
_________._____ _________._____
0380 602130
ADJUSTING AND REPAIRINGEXISTING DRAINAGE INLET
EACH
6.000
_________._____ _________._____
0390 615518
3-INCH PVC PIPE FOR ROOF DRAINOUTFALL
LF
16.000
_________._____ _________._____
0400 701013
PORTLAND CEMENT CONCRETECURB, TYPE 1-8
LF
1,331.000
_________._____ _________._____
0410 701014
PORTLAND CEMENT CONCRETECURB, TYPE 2
LF
2,334.000
_________._____ _________._____
0420 701018
INTEGRAL PORTLAND CEMENTCONCRETE CURB AND GUTTER,TYPE 1-8
LF
6,181.000
_________._____ _________._____
Proposal Schedule of Items Page 4 of 15
Addendum No. 2 May 7, 2020
Delaware Department of Transportation
05/05/2020 1:04:10 PM
AASHTOWare Project™ Version 4.2 Revision 026
Proposal ID: T201804301.01 Project(s): T201804301
Contractor:
0001 ROADSECTION:
Alt Set ID: Alt Mbr ID:
All figures must be typewritten
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber Dollars Cents Dollars Cents
0430 701023
INTEGRAL PORTLAND CEMENTCONCRETE CURB AND GUTTER,TYPE 3-8
LF
498.000
_________._____ _________._____
0440 701027
PORTLAND CEMENT CONCRETECURB, TYPE 1-2 MODIFIED
LF
1,159.000
_________._____ _________._____
0450 701032
CURB OPENING, 4' OPENING EACH
1.000
_________._____ _________._____
0460 701510
CURB/SIDEWALK OPENING EACH
17.000
_________._____ _________._____
0470 702000
TRIANGULAR CHANNELIZINGISLANDS
SF
1,244.000
_________._____ _________._____
0480 705001
PORTLAND CEMENT CONCRETESIDEWALK, 4"
SF
13,506.000
_________._____ _________._____
0490 705002
PORTLAND CEMENT CONCRETESIDEWALK, 6"
SF
9,615.000
_________._____ _________._____
0500 705007
SIDEWALK SURFACE DETECTABLEWARNING SYSTEM
SF
334.000
_________._____ _________._____
0510 705521
PATTERNED PORTLAND CEMENTCONCRETE SIDEWALK, 8"
SF
280.000
_________._____ _________._____
0520 706000
MONUMENT EACH
6.000
_________._____ _________._____
Proposal Schedule of Items Page 5 of 15
Addendum No. 2 May 7, 2020
Delaware Department of Transportation
05/05/2020 1:04:10 PM
AASHTOWare Project™ Version 4.2 Revision 026
Proposal ID: T201804301.01 Project(s): T201804301
Contractor:
0001 ROADSECTION:
Alt Set ID: Alt Mbr ID:
All figures must be typewritten
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber Dollars Cents Dollars Cents
0530 706500
RIGHT-OF-WAY MARKER, CAPPEDREBAR
EACH
53.000
_________._____ _________._____
0540 707001
RIPRAP, R-4 SY
553.000
_________._____ _________._____
0550 708002
GEOTEXTILES, SEPARATION SY
4,750.000
_________._____ _________._____
0560 708003
GEOTEXTILES, RIPRAP SY
664.000
_________._____ _________._____
0570 709001
PERFORATED PIPE UNDERDRAINS,6"
LF
1,250.000
_________._____ _________._____
0580 709011
UNDERDRAIN OUTLET PIPE, 6" LF
157.000
_________._____ _________._____
0590 709017
UNDERDRAIN OUTLET EACH
4.000
_________._____ _________._____
0600 710002
ADJUST WATER VALVE BOXES EACH
13.000
_________._____ _________._____
0610 710500
INSTALLATION OF WATERMAIN ANDACCESSORIES
LUMP SUM _________._____LUMP SUM
0620 711500
ADJUST AND REPAIR EXISTINGSANITARY MANHOLE
EACH
9.000
_________._____ _________._____
0630 711501
SANITARY SEWER SYSTEM LUMP SUM _________._____LUMP SUM
Proposal Schedule of Items Page 6 of 15
Addendum No. 2 May 7, 2020
Delaware Department of Transportation
05/05/2020 1:04:10 PM
AASHTOWare Project™ Version 4.2 Revision 026
Proposal ID: T201804301.01 Project(s): T201804301
Contractor:
0001 ROADSECTION:
Alt Set ID: Alt Mbr ID:
All figures must be typewritten
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber Dollars Cents Dollars Cents
0640 711502
ADJUST AND REPAIR EXISTINGSANITARY CLEANOUTS
EACH
8.000
_________._____ _________._____
0650 760010
PAVEMENT MILLING, BITUMINOUSCONCRETE PAVEMENT
SYIN
23,310.000
_________._____ _________._____
0660 762000
SAW CUTTING, BITUMINOUSCONCRETE
LF
2,158.000
_________._____ _________._____
0670 762001
SAW CUTTING, CONCRETE, FULLDEPTH
LF
90.000
_________._____ _________._____
0680 763000
INITIAL EXPENSE/DE-MOBILIZATION LUMP SUM _________._____LUMP SUM
0690 763501
CONSTRUCTION ENGINEERING LUMP SUM _________._____LUMP SUM
0.80000
0700 763503
TRAINEE HOUR
1,080.000
864.00_________._____
0710 763508
PROJECT CONTROL SYSTEMDEVELOPMENT PLAN
LUMP SUM _________._____LUMP SUM
0720 763509
CPM SCHEDULE UPDATES AND/ORREVISED UPDATES
EAMO
17.000
_________._____ _________._____
0730 763597
UTILITY CONSTRUCTIONENGINEERING
HOUR
100.000
_________._____ _________._____
0740 763599
FIELD OFFICE, SPECIAL II EAMO
17.000
_________._____ _________._____
Proposal Schedule of Items Page 7 of 15
Addendum No. 2 May 7, 2020
Delaware Department of Transportation
05/05/2020 1:04:10 PM
AASHTOWare Project™ Version 4.2 Revision 026
Proposal ID: T201804301.01 Project(s): T201804301
Contractor:
0001 ROADSECTION:
Alt Set ID: Alt Mbr ID:
All figures must be typewritten
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber Dollars Cents Dollars Cents
0750 801000
MAINTENANCE OF TRAFFIC LUMP SUM _________._____LUMP SUM
0760 802003
ARROW PANELS TYPE C EADY
1,600.000
_________._____ _________._____
0770 803001
FURNISH AND MAINTAIN PORTABLECHANGEABLE MESSAGE SIGN
EADY
3,000.000
_________._____ _________._____
0780 804001
FURNISH AND MAINTAIN PORTABLELIGHT ASSEMBLY (FLOOD LIGHTS)
EADY
2,000.000
_________._____ _________._____
0790 805001
PLASTIC DRUMS EADY
82,400.000
_________._____ _________._____
75.00000
0800 806001
TRAFFIC OFFICERS HOUR
740.000
55,500.00_________._____
0810 808002
FURNISH AND MAINTAIN TRUCKMOUNTED ATTENUATOR, TYPE II
EADY
1,600.000
_________._____ _________._____
0820 810001
TEMPORARY WARNING SIGNS ANDPLAQUES
EADY
36,000.000
_________._____ _________._____
0830 811009
FLAGGER, SUSSEX COUNTY,FEDERAL
HOUR
14,000.000
_________._____ _________._____
0840 811018
FLAGGER, SUSSEX COUNTY,FEDERAL, OVERTIME
HOUR
2,800.000
_________._____ _________._____
0850 813001
TEMPORARY BARRICADES, TYPE III LFDY
148,000.000
_________._____ _________._____
Proposal Schedule of Items Page 8 of 15
Addendum No. 2 May 7, 2020
Delaware Department of Transportation
05/05/2020 1:04:10 PM
AASHTOWare Project™ Version 4.2 Revision 026
Proposal ID: T201804301.01 Project(s): T201804301
Contractor:
0001 ROADSECTION:
Alt Set ID: Alt Mbr ID:
All figures must be typewritten
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber Dollars Cents Dollars Cents
0860 817001
PAINTING OF WHITE OR YELLOW,SYMBOL/LEGEND
SF
55.000
_________._____ _________._____
0870 817002
PERMANENT PAVEMENT STRIPING,SYMBOL/LEGEND, ALKYD-THERMOPLASTIC
SF
9,640.000
_________._____ _________._____
0880 817003
TEMPORARY MARKINGS, PAINT, 4" LF
1,455.000
_________._____ _________._____
0890 817005
PERMANENT PAVEMENT STRIPING,ALKYD-THERMOPLASTIC, 5"
LF
45.000
_________._____ _________._____
0900 817006
PERMANENT PAVEMENT STRIPING,ALKYD-THERMOPLASTIC, 12"
LF
75.000
_________._____ _________._____
0910 817013
PERMANENT PAVEMENT STRIPING,EPOXY RESIN PAINT,WHITE/YELLOW, 5"
LF
70,865.000
_________._____ _________._____
0920 817014
PERMANENT PAVEMENT STRIPING,EPOXY RESIN PAINT,WHITE/YELLOW, 10"
LF
65.000
_________._____ _________._____
0930 817015
PREFORMED RETROREFLECTIVETHERMOPLASTIC MARKINGS, BIKESYMBOL
EACH
22.000
_________._____ _________._____
0940 817027
RAISED/RECESSED PAVEMENTMARKER
EACH
45.000
_________._____ _________._____
Proposal Schedule of Items Page 9 of 15
Addendum No. 2 May 7, 2020
Delaware Department of Transportation
05/05/2020 1:04:10 PM
AASHTOWare Project™ Version 4.2 Revision 026
Proposal ID: T201804301.01 Project(s): T201804301
Contractor:
0001 ROADSECTION:
Alt Set ID: Alt Mbr ID:
All figures must be typewritten
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber Dollars Cents Dollars Cents
0950 817031
REMOVAL OF PAVEMENT STRIPING SF
13,500.000
_________._____ _________._____
0960 819018
INSTALLATION OR REMOVAL OFTRAFFIC SIGN(S) ON SINGLE SIGNPOST
EACH
163.000
_________._____ _________._____
0970 819019
INSTALLATION OR REMOVAL OFTRAFFIC SIGN(S) ON MULTIPLE SIGNPOSTS
SF
57.000
_________._____ _________._____
0980 825001
TUBULAR MARKERS EACH
6.000
_________._____ _________._____
0990 830001
CONDUIT JUNCTION WELL, TYPE 1,20" X 20" PRECAST CONCRETE
EACH
15.000
_________._____ _________._____
1000 830002
CONDUIT JUNCTION WELL, TYPE 4,20" X 42-1/2" PRECAST CONCRETE
EACH
12.000
_________._____ _________._____
1010 830003
CONDUIT JUNCTION WELL, TYPE 5,24" X 16" PRECAST CONCRETE
EACH
1.000
_________._____ _________._____
1020 830004
CONDUIT JUNCTION WELL, TYPE 7,36" X 60" PRECAST POLYMERCONCRETE
EACH
1.000
_________._____ _________._____
1030 830008
ADJUST OR REPAIR EXISTINGCONDUIT JUNCTION WELL
EACH
7.000
_________._____ _________._____
1040 830010
REMOVAL OF EXISTING JUNCTIONWELL
EACH
7.000
_________._____ _________._____
Proposal Schedule of Items Page 10 of 15
Addendum No. 2 May 7, 2020
Delaware Department of Transportation
05/05/2020 1:04:10 PM
AASHTOWare Project™ Version 4.2 Revision 026
Proposal ID: T201804301.01 Project(s): T201804301
Contractor:
0001 ROADSECTION:
Alt Set ID: Alt Mbr ID:
All figures must be typewritten
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber Dollars Cents Dollars Cents
1050 831514
FURNISH AND INSTALL 2-1/2"SCHEDULE 80 PVC CONDUIT(TRENCH)
LF
60.000
_________._____ _________._____
1060 831515
FURNISH AND INSTALL 3" SCHEDULE80 PVC CONDUIT (TRENCH)
LF
885.000
_________._____ _________._____
1070 831516
FURNISH AND INSTALL 4" SCHEDULE80 PVC CONDUIT (TRENCH)
LF
4,310.000
_________._____ _________._____
1080 831523
FURNISH AND INSTALL 2"GALVANIZED CONDUIT (TRENCH)
LF
100.000
_________._____ _________._____
1090 831545
FURNISH AND INSTALL 4" HDPE SDR-13.5 CONDUIT (BORE)
LF
1,085.000
_________._____ _________._____
1100 831574
FURNISH AND INSTALL SECOND ANDSUBSEQUENT ADDITIONAL 4"SCHEDULE 80 PVC CONDUIT INTRENCH OR OPEN CUT
LF
75.000
_________._____ _________._____
1110 832006
FURNISH AND INSTALL 1-CONDUCTOR #2 AWG STRANDEDCOPPER, TYPE USE-2
LF
80.000
_________._____ _________._____
1120 832008
FURNISH AND INSTALL 1-CONDUCTOR #6 STRANDEDCOPPER, TYPE USE-2
LF
8,525.000
_________._____ _________._____
1130 834001
POLE BASE, TYPE 3 EACH
1.000
_________._____ _________._____
Proposal Schedule of Items Page 11 of 15
Addendum No. 2 May 7, 2020
Delaware Department of Transportation
05/05/2020 1:04:10 PM
AASHTOWare Project™ Version 4.2 Revision 026
Proposal ID: T201804301.01 Project(s): T201804301
Contractor:
0001 ROADSECTION:
Alt Set ID: Alt Mbr ID:
All figures must be typewritten
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber Dollars Cents Dollars Cents
1140 834003
POLE BASE, TYPE 3B EACH
2.000
_________._____ _________._____
1150 834005
POLE BASE, TYPE 4A EACH
6.000
_________._____ _________._____
1160 834006
POLE BASE, TYPE 6 EACH
10.000
_________._____ _________._____
1170 834007
POLE BASE EXTENSION CF
30.000
_________._____ _________._____
1180 834501
PARTIAL REMOVAL OF CONCRETEPOLE BASES AND CABINETFOUNDATIONS
CY
2.000
_________._____ _________._____
1190 835002
CABINET BASE TYPE M EACH
1.000
_________._____ _________._____
1200 835003
CABINET BASE TYPE P EACH
1.000
_________._____ _________._____
1210 835004
CABINET BASE TYPE R EACH
1.000
_________._____ _________._____
1220 842501
FURNISH AND INSTALL ELECTRICUTILITY SERVICE EQUIPMENT120/240 (100 AMP)
EACH
1.000
_________._____ _________._____
1230 846001
FURNISH AND INSTALL LOOP WIRE 1-CONDUCTOR #14 AWG ENCASED IN1/4" FLEXIBLE TUBING IN A LOOPSAWCUT
LF
1,070.000
_________._____ _________._____
Proposal Schedule of Items Page 12 of 15
Addendum No. 2 May 7, 2020
Delaware Department of Transportation
05/05/2020 1:04:10 PM
AASHTOWare Project™ Version 4.2 Revision 026
Proposal ID: T201804301.01 Project(s): T201804301
Contractor:
0001 ROADSECTION:
Alt Set ID: Alt Mbr ID:
All figures must be typewritten
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber Dollars Cents Dollars Cents
1240 846002
FURNISH AND INSTALL A 1-1/2 INCHGALVANIZED RIGID METAL CONDUITDETECTOR SLEEVE WITH LOOPWIRE
LF
35.000
_________._____ _________._____
1250 847004
LIGHTING CONTROL ANDDISTRIBUTION ENCLOSURE(120/240;100 AMP)
EACH
1.000
_________._____ _________._____
1260 850503
LUMINAIRE (LED), 160 WATTS EACH
10.000
_________._____ _________._____
1270 851504
ALUMINUM LIGHTING SINGLE DAVITARM, 15' ARM SPREAD
EACH
10.000
_________._____ _________._____
1280 851506
ALUMINUM LIGHTING STANDARD, 30'POLE
EACH
10.000
_________._____ _________._____
1290 851515
PARKING LOT LIGHTING SYSTEM LUMP SUM _________._____LUMP SUM
1300 905001
SILT FENCE LF
4,278.000
_________._____ _________._____
1310 905004
INLET SEDIMENT CONTROL,DRAINAGE INLET
EACH
35.000
_________._____ _________._____
1320 905005
INLET SEDIMENT CONTROL, CURBINLET
EACH
63.000
_________._____ _________._____
1330 906001
PORTABLE SEDIMENT TANK EACH
6.000
_________._____ _________._____
Proposal Schedule of Items Page 13 of 15
Addendum No. 2 May 7, 2020
Delaware Department of Transportation
05/05/2020 1:04:10 PM
AASHTOWare Project™ Version 4.2 Revision 026
Proposal ID: T201804301.01 Project(s): T201804301
Contractor:
0001 ROADSECTION:
Alt Set ID: Alt Mbr ID:
All figures must be typewritten
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber Dollars Cents Dollars Cents
1340 906003
SUMP PIT EACH
13.000
_________._____ _________._____
1350 906004
SKIMMER DEWATERING DEVICE EACH
2.000
_________._____ _________._____
1360 907017
COMPOST FILTER LOGS LF
139.000
_________._____ _________._____
1370 907500
TEMPORARY SWALE, TYPE A-1 LF
109.000
_________._____ _________._____
1380 907506
EARTH DIKE, TYPE A-1 LF
693.000
_________._____ _________._____
1390 908004
TOPSOIL, 6" DEPTH SY
2,000.000
_________._____ _________._____
1400 908010
TOPSOILING, 6" DEPTH SY
49,500.000
_________._____ _________._____
1410 908015
PERMANENT GRASS SEEDING,STORMWATER
SY
49,470.000
_________._____ _________._____
1420 908017
TEMPORARY GRASS SEEDING SY
42,100.000
_________._____ _________._____
1430 908020
EROSION CONTROL BLANKETMULCH
SY
25,850.000
_________._____ _________._____
1440 908021
TURF REINFORCEMENT MATTING,TYPE 1
SY
23,620.000
_________._____ _________._____
1450 908023
STABILIZED CONSTRUCTIONENTRANCE
SY
1,620.000
_________._____ _________._____
Proposal Schedule of Items Page 14 of 15
Addendum No. 2 May 7, 2020
Delaware Department of Transportation
05/05/2020 1:04:10 PM
AASHTOWare Project™ Version 4.2 Revision 026
Proposal ID: T201804301.01 Project(s): T201804301
Contractor:
0001 ROADSECTION:
Alt Set ID: Alt Mbr ID:
All figures must be typewritten
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber Dollars Cents Dollars Cents
1460 910006
OUTLET STRUCTURE EACH
5.000
_________._____ _________._____
1470 910008
STORMWATER MANAGEMENT POND CY
24,690.000
_________._____ _________._____
Section: 0001 _________._____Total:
Total Bid: _________._____
Proposal Schedule of Items Page 15 of 15
Addendum No. 2 May 7, 2020
BREAKOUT SHEETINSTRUCTIONS
BREAKOUT SHEET(S) MUST BE SUBMITTED EITHER WITH YOUR BID DOCUMENTS; OR
WITHIN SEVEN (7) CALENDAR DAYS FOLLOWING THE BID DUE DATE BY THE LOWEST
APPARENT BIDDER.
BREAKOUT SHEETS ARE TO BE SUBMITTED TO DELDOT'S CONTRACT ADMINISTRATION AS
SHOWN BELOW. BREAKOUT SHEETS CANNOT BE CHANGED AFTER AWARD. THE
DEPARTMENT WILL REVIEW THE FIGURES SUBMITTED ON THE BREAKOUT SHEET(S) TO
ENSURE THEY MATCH THE RESPECTIVE LUMP SUM BID AMOUNT(S). MATHEMATICALLY
INCORRECT BREAKOUT SHEETS WILL BE RETURNED FOR IMMEDIATE CORRECTION.
BREAKOUT SHEETS MAY BE SUBMITTED;
VIA E-MAIL TO: [email protected] SUBJECT: T201804301.01 Breakout Sheet
OR MAILED TO: DELDOTCONTRACT ADMINISTRATIONPO BOX 778, DOVER, DE 19903
'BREAKOUT SHEET' AND THE PROJECT NUMBER MUST APPEAR ON THE ENVELOPE.
Addendum No. 2 May 7, 2020
Page 182A of 186
"ATTENTION"
TO BIDDERS
BREAKOUT SHEET(S) MUST BE SUBMITTED EITHER WITH YOUR BID DOCUMENTS; OR
WITHIN SEVEN (7) CALENDAR DAYS FOLLOWING THE BID DUE DATE BY THE LOWEST
APPARENT BIDDER.
BREAKOUT SHEETS ARE TO BE SUBMITTED TO DELDOT'S CONTRACT ADMINISTRATION AS
SHOWN BELOW. BREAKOUT SHEETS CANNOT BE CHANGED AFTER AWARD. THE
DEPARTMENT WILL REVIEW THE FIGURES SUBMITTED ON THE BREAKOUT SHEET(S) TO
ENSURE THEY MATCH THE RESPECTIVE LUMP SUM BID AMOUNT(S). MATHEMATICALLY
INCORRECT BREAKOUT SHEETS WILL BE RETURNED FOR IMMEDIATE CORRECTION.
BREAKOUT SHEETS MAY BE SUBMITTED;
VIA E-MAIL TO: [email protected] SUBJECT: T201804301.01 Breakout Sheet
OR MAILED TO: DELDOTCONTRACT ADMINISTRATIONPO BOX 778, DOVER, DE 19903
'BREAKOUT SHEET' AND THE PROJECT NUMBER MUST APPEAR ON THE ENVELOPE.
Addendum No. 2 May 7, 2020
Page 182B of 186
BREAKOUT SHEET - 1 CONTRACT NO. T201804301 ITEM 710500 – Installation of Water Mains and Accessories, W-1, 8"W US 9 (Market St) Sta. 101+00 to Sand Hill Rd Sta. 213+50 ITEM NO.
APPROX. QTY.
UNIT OF MEASURE DESCRIPTION UNIT PRICE AMOUNT
1 1 EA Furnish & Install 8” DIP, 90-degree bend $ $
2 4 EA Furnish & Install 8” DIP, 22.5-degree bend $ $
3 6 EA Furnish & Install 8” DIP,11.25-degree bend $ $
4 5 EA Furnish & Install 8” DIP, 45-degree bend $ $
5 450 LF Furnish & Install 1” Service Line $ $
6 1100 LF Furnish & Install 8” PVC $ $
7 8 EA Furnish & Install meter and meter yoke, 1”x1” $ $
8 1 EA Furnish & Install New Fire Hydrant Assembly (includes tee and 6” valve)
$ $
SUBTOTAL ITEM 710500 – Installation of Water Mains and Accessories $ ____________________ (SUB TOTAL LUMP SUM BID PRICE FOR ITEM 710500)
Addendum No. 2 May 7, 2020
Page 182C of 186
BREAKOUT SHEET - 2 CONTRACT NO. T201804301 ITEM 710500 – Installation of Water Mains and Accessories, W-2, 10"W Airport Rd Sta. 206+00 to Sand Hill Rd Sta. 214+00 ITEM NO.
APPROX. QTY.
UNIT OF MEASURE DESCRIPTION UNIT PRICE AMOUNT
1 5 EA Furnish & Install 10” DIP, 22.5-degree bend $ $
2 2 EA Furnish & Install 10” DIP,11.25-degree bend $ $
3 1 EA Furnish & Install 10” DIP, 45-degree bend $ $
4 1 EA Furnish & Install 10” DIP, 90-degree bend $ $
5 1 EA Furnish & Install 10”x8” DIP Reducer $ $
6 1 EA Furnish & Install 8”x8” DIP Tee $ $
7 1100 LF Furnish & Install 10” PVC $ $
8 215 LF Furnish & Install 16” Steel Casing $ $
9 1 EA Furnish & Install New Fire Hydrant Assembly (includes tee and valve) $ $
SUBTOTAL ITEM 710500 – Installation of Water Mains and Accessories $ ____________________ (SUB TOTAL LUMP SUM BID PRICE FOR ITEM 710500)
Addendum No. 2 May 7, 2020
Page 182D of 186
BREAKOUT SHEET - 3 CONTRACT NO. T201804301 ITEM 710500 – Installation of Water Mains and Accessories, W-3, Existing Line, W-3, 8"W Cheer Center ITEM NO.
APPROX. QTY.
UNIT OF MEASURE DESCRIPTION UNIT PRICE AMOUNT
1 63 LF Furnish & Install 8” PVC $ $
2 3 EA Furnish & Install 8” DIP, 45-degree bend $ $
SUBTOTAL ITEM 710500 – Installation of Water Mains and Accessories $ ________________ (SUBTOTAL LUMP SUM BID PRICE FOR ITEM 710500)
Addendum No. 2 May 7, 2020
Page 182E of 186
BREAKOUT SHEET SUMMARY CONTRACT NO. T201804301 ITEM 710500 – Installation of Water Mains and Accessories, Existing Line
BREAKOUT SHEET SUBTOTAL LUMP SUM
1 $
2 $
3 $
TOTAL LUMP SUM BID PRICE FOR ITEM 710500 Installation of Water Mains and Accessories =
$
Addendum No. 2 May 7, 2020
Page 182F of 186
BREAKOUT SHEET - 1 CONTRACT NO. T201804301 ITEM 711501 – Installation of Sewer Mains and Accessories, S-1, 8"FM Airport Rd Sta. 206+00 to Sand Hill Rd Sta. 221+50 ITEM NO.
APPROX. QTY.
UNIT OF MEASURE DESCRIPTION UNIT PRICE AMOUNT
1 1 EA Furnish & Install 8” DIP, 90-degree bend $ $
2 7 EA Furnish & Install 8” DIP, 22.5-degree bend $ $
3 4 EA Furnish & Install 8” DIP, 11.25-degree bend $ $
4 3 EA Furnish & Install 8” DIP, 45-degree bend $ $
5 100 LF Furnish & Install 12” Steel Casing $ $
6 1700 LF Furnish & Install 8” PVC $ $
7 3 EA Furnish & Install Air Release Valve $ $
SUBTOTAL ITEM 711501 – Installation of Sewer Mains and Accessories $ ____________________
(SUB TOTAL LUMP SUM BID PRICE FOR ITEM 711501)
Addendum No. 2 May 7, 2020
Page 182G of 186
BREAKOUT SHEET - 2 CONTRACT NO. T201804301 ITEM 711501 – Installation of Sewer Mains and Accessories, S-2, 8"S US 9 Sta. 111+25 to Sta. 113+00 ITEM NO.
APPROX. QTY.
UNIT OF MEASURE DESCRIPTION UNIT PRICE AMOUNT
1 250 EA Furnish & Install 8” PVC $ $
2 3 EA Furnish & Install Precast Concrete Manholes $ $
3 5 VF Furnish & Install Manhole Additional Feet $ $
SUBTOTAL ITEM 711501 – Installation of Sewer Mains and Accessories $ ____________________
(SUB TOTAL LUMP SUM BID PRICE FOR ITEM 711501)
Addendum No. 2 May 7, 2020
Page 182H of 186
BREAKOUT SHEET SUMMARY CONTRACT NO. T201804301 ITEM 711501 – Installation of Sewer Mains and Accessories, Existing Line
BREAKOUT SHEET SUBTOTAL LUMP SUM
1 $
2 $
TOTAL LUMP SUM BID PRICE FOR ITEM 711501 Installation of Sewer Mains and Accessories =
$
Addendum No. 2 May 7, 2020
Page 182I of 186
CONTRACT
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.ADDENDA / REVISIONS SECTION
SHEET NO.
N:\
3198
5-015\
CA
DD\
AR
01.d
gn
5/1/2
02
011:1
9:3
6
AM
3
GATEWAY IMPROVEMENTSSUSSEX
AR-01
WRA
NOT TO SCALEGEORGETOWN EAST T201804301
ADDENDA ANDREVISIONS
SEAL
ADDENDUM PREPARED BY
139, 142-143, 149, 152-153.
102, 118, 123, 127, 129, 133, 135-136,
3, 16-20, 23, 26-27, 54, 82, 95, 99,
SHEETS CHANGED UNDER ADDENDUM #2:
THIS SEAL APPLIES TO THE FOLLOWING
2
Whitman, Requardt and Associates, LLPEngineers Architects Environmental Planners Est. 1915
DATE
ADDED ADDENDUM #2 SIGNATURE BLOCK. RWILLS - 5/1/20
50+00 55+00 60+00
PO
B 50
+00.0
0
100+00
PO
B 98
+00.00
REBAR & CAP
REBAR & CAP REBAR & CAPTP115 TP114
TP120
CONTRACT
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.ADDENDA / REVISIONS SECTION
SHEET NO.
N:\
3198
5-015\
CA
DD\
HV
01.d
gn
5/1/2
02
08:5
6:3
6
AM
US 9 (S 18, MARKET STREET)
30019
668331.3269 30019 253941.98190.00'50+00.00
STATION OFFSET EASTINGNORTHING
HORIZONTAL / VERTICAL CONTROL DATA
ELEVATIONPOINT STATION OFFSET EASTINGNORTHING
CONSTRUCTION ALIGNMENT CONTROL
POINT
30024 668798.8427254119.26380.00'55+00.00
30025 669266.3586254296.54580.00'60+00.00
STATION OFFSET EASTINGNORTHING
R / W BASELINE ALIGNMENT CONTROL US 9 (WEST)
POINT
10000
SCALE
FEET
0 60 120 180
10000 0.00'
CONSTRUCTION AND RIGHT OF WAY BASELINE US 9 (S 18, MARKET STREET)
TP120 100+28.58 -47.94' 254293.1648 48.89'669122.2246
TP114 100+86.49 25.73' 254244.8113 48.87'669202.4899
TP115 254178.7817 49.16'669026.1597
EXISTING RIGHT-OF-WAY BASELINE US 9 (WEST)
N
MA
TC
H
LIN
E S
TA. 10
2+
00 - H
V-02
98+00.00 254167.2887 668925.4906
98+98.20 24.95'
RRW
JAD
GATEWAY IMPROVEMENTSSUSSEX
HV-01
WRAGEORGETOWN EAST
16
T201804301HORIZONTAL AND
VERTICAL CONTROL
NOTES:
1. NEGATIVE (-) DENOTES LEFT OFFSET. VERTICAL - THIS PROJECT IS REFERENCED TO NAVD 88.
PLANE COORDINATE SYSTEM (NAD 83/91). (NAD 83/2011).
HORIZONTAL - THIS PROJECT IS REFERENCED TO THE DELAWARE STATE
DATUM REFERENCE:
2
2 REVISED DATUM REFERENCE NOTE. R. WILLS - 5/1/20
210
+00
215
+00
PC 213+33.49
PT 216+94.65
PI 208+72.4
6
PI 215+15.78
0+00
5+00
0+00
5+00
65+00
70+0
0
PC
63
+07.4
5
PI 6
6+82.8
7
40+0
0
45+00
PC 39+38.5
8
PT 4
5+66.0
8
PI 4
2+57.4
5
PT 70
+48.8
4
BA
CK
=
PO
B 38
+22.4
5
AH
EA
D
PT 211+37.08POT 212+10.32 (AIRPORT ROAD/SAND HILL ROAD, S319)
POC 110+77.61 (US 9, S 18, MARKET STREET) =
US 9 (W
EST) =
EXISTI
NG RI
GHT-OF-
WAY
BASELINE
POC 66
+93.
80
AIRPORT
ROAD (S 3
19)
EXISTI
NG RI
GHT-OF-
WAY
BASELINE
POB 0+0
0.00
US 9 (WEST) =
EXISTING RIGHT-OF-WAY BASELINE
POC 67+66.96
SAND HILL ROAD (S 319)
EXISTING RIGHT-OF-WAY BASELINE
POB 0+00.00
500+00
PO
B 499+50.00
PC 500+80.27
PT 501+
29.78
PC 502+
34.58
PT 502+88.07
PI 5
01+
06.3
8
PI 502+62.80
105+00
110+00
115+00
120+00
PC 10
4+77.00
PT 111+
53.52
PC 113+62.03
PT 11
9+50.53
PI 10
8+19.14
PI 11
6+60.66
REBAR & CAP
TP113
& CAPREBAR
TP112
& CAPREBAR
& CAPREBAR
TP109
TP146
& CAPREBAR
& CAPREBAR
TP145
TP81
& CAPREBAR
TP 83
& CAPREBAR & CAP
REBARTP 139
& CAPREBAR
TP138
& CAPREBAR
TP130
& CAPREBAR
TP103
& CAPREBAR
TP105
& CAPREBAR
TP106
& CAPREBAR
TP132
& CAPREBAR
TP136
& CAPREBAR
TP133
& CAPREBAR
TP131
TP104
CONTRACT
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.ADDENDA / REVISIONS SECTION
SHEET NO.
N:\
3198
5-015\
CA
DD\
HV
02.d
gn
5/1/2
02
08:5
6:3
8
AM
30003
30018
30016
30015
30006
30012
30011
30001
10001
10002
10004 10005
10006
10008
10022
10024
10025
10026
10028
STATION OFFSET EASTINGNORTHING ELEVATIONPOINT
HORIZONTAL / VERTICAL CONTROL DATA
STATION OFFSET EASTINGNORTHINGPOINT
30001 669898.8128254578.02210.00'0+00.00
AIRPORT ROADR / W BASELINE ALIGNMENT CONTROL
STATION OFFSET EASTINGNORTHINGPOINT
30003 669959.8528254618.35410.00'0+00.00
30020 670037.6510255112.26445+00.00 0.00'
SAND HILL ROADR / W BASELINE ALIGNMENT CONTROL
1
1
1
2
2
2
3
3
4
4
4
21
21
21
20
20
20
AIRPORT ROAD (S 319)
EXISTING RIGHT-OF-WAY BASELINE
SAND HILL ROAD (S 319)
EXISTING RIGHT-OF-WAY BASELINE
EXISTING RIGHT-OF-WAY BASELINE US 9 (EAST)
BASELINE US 9 (WEST)
EXISTING RIGHT-OF-WAY
10
10
10
11
11
11
10100
10101
10102
10104
10105
10106
10108
STATION OFFSET EASTINGNORTHING
CONSTRUCTION ALIGNMENT CONTROL
POINT
10100 499+50.00 0.00' 254865.4976 669929.8741
CIRCULAR CURVE NO. 1
STATION NORTHING EASTING
Tangent Direction: N 48°06'35.0469" E
Radial Direction: S 41°53'24.9531" E
Chord Direction: N 58°40'17.4235" E
Radial Direction: S 20°46'00.2000" E
Tangent Direction: N 69°13'59.8000" E
External: 31.6246
Middle Ordinate: 31.0888
Chord: 672.6944
Tangent: 342.1438
Length: 676.5193
Degree of Curvature(Arc): 3°07'20.5889"
Delta: 21°07'24.7531" Left
Superelevation: -3.5100%
Design Speed(mph): 40.0000
Radius: 1835.0000
PT ( 10004) 111+53.52 254757.0919 670133.1230
CC ( 10003) 256123.1118 668907.8823
PI ( 10002) 108+19.14 254528.6404 669878.4225
PC ( 10001) 104+77.00 254407.3285 669558.5071
Element: Circular
SCALE
FEET
0 60 120 180
US 9 (S 18, MARKET STREET)
RIGHT OF WAY BASELINE
CONSTRUCTION AND
US 9 (S 18, LEWES-GEORGETOWN HIGHWAY)
CONSTRUCTION AND RIGHT OF WAY BASELINE
AIRPORT ROAD (S 319)
RIGHT OF WAY BASELINE
CONSTRUCTION AND
EXIS
TIN
G S
AN
D
HIL
L R
OA
D (S 319)
CLA
RK
DRIV
E
US 9 (S 18, MARKET STREET)
)91
3
S(
DA
OR
LLI
H
DN
AS
DE
SO
PO
RP
)YAWHGIH NWOTEGROEG-SEWEL ,81 S( 9 SU
TP81 207+63.82 254305.8211 670248.5196 49.18'
TP83 208+39.49 254406.5370 670274.6847 48.60'
110+15.77 254696.8592 670005.8214 47.47'
500+97.00 254855.3863 669769.5275 47.11'
502+85.28 255038.0123 669731.7393 47.84'
106+74.76
255118.0574 669667.5144 49.05'
104+50.36
254518.3167 669723.5026 47.41'
103+01.61
30.01' 254369.8252 669544.2339 48.59'
30.94' 254316.2097 669405.4848 47.93'
110+51.77
114+82.03
30.94' 254667.1470 670074.8846 47.93'
116+85.15
254990.6124 670367.3572 48.96'
119+98.90
255102.5156 670540.8530 48.72'
118+20.45
255224.7910 670833.5946 48.08'
113+10.07
24.23' 255119.6011 670682.6003 47.79'
208+38.05
254724.3632 670372.7695 46.57'
254429.1853 670315.8427 47.91'
208+65.24
107+45.50
254301.3745 670033.6103 47.68'
41.63' 254484.1711 669821.9924 47.51'
TP103
TP104
TP105
TP106
TP109
TP112
TP113
TP130
TP131
TP132
TP133
TP136
TP138
TP139
TP145
TP146
503+56.22
-164.94'
143.70'
184.38'
-23.52'
-22.06'
-22.64'
-34.83'
-29.55'
-38.32'
-35.09'
96.74'
20.07'
46.37'
EXIS
TIN
G
AIR
PO
RT R
OA
D (S 319)
)91
3
S(
DA
OR
TR
OP
RIA
DE
SO
PO
RP
SAND HILL ROAD (S 319)
CONSTRUCTION BASELINE
N
CLARK DRIVE
CONSTRUCTION BASELINE
MA
TC
H
LIN
E S
TA. 10
2+
00 - H
V-01
MATCH LIN
E STA. 2
07+00
- HV-0
5
MA
TC
H
LIN
E S
TA. 12
0+
00 - H
V-03
MATCH LINE STA. 217+
00 - HV-04
RRW
JAD
GATEWAY IMPROVEMENTSSUSSEX
HV-02
WRAGEORGETOWN EAST
17
T201804301HORIZONTAL AND
VERTICAL CONTROL
NOTES:
2.
1.
NEGATIVE (-) DENOTES LEFT OFFSET.
SEE THIS SHEET AND SHEET HV-06 FOR CURVE DATA CHARTS. VERTICAL - THIS PROJECT IS REFERENCED TO NAVD 88.
PLANE COORDINATE SYSTEM (NAD 83/91). (NAD 83/2011).
HORIZONTAL - THIS PROJECT IS REFERENCED TO THE DELAWARE STATE
DATUM REFERENCE:
2
2 REVISED DATUM REFERENCE NOTE. R. WILLS - 5/1/20
50+00 55+00
PO
E 55
+00.0
0
120+00
PO
E 12
2+50.00
& CAPREBAR
CONTRACT
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.ADDENDA / REVISIONS SECTION
SHEET NO.
N:\
3198
5-015\
CA
DD\
HV
03.d
gn
5/1/2
02
08:5
6:3
9
AM
US 9 (S 18, LEWES-GEORGETOWN HIGHWAY)
30014
10009
671689.5726255476.6835
STATION OFFSET EASTINGNORTHING
R / W BASELINE ALIGNMENT CONTROL US 9 (WEST)
POINT
30014 0.00'55+00.00
STATION OFFSET EASTINGNORTHING
CONSTRUCTION ALIGNMENT CONTROL
POINT
10009 122+50.00 0.00' 255279.6205 671079.7593
30026 671213.7979255322.935550+00.00 0.00'
SCALE
FEET
0 60 120 180
CONSTRUCTION AND RIGHT OF WAY BASELINE US 9 (S 18, LEWES-GEORGETOWN HIGHWAY)
EXISTING RIGHT-OF-WAY BASELINE US 9 (EAST)
N
MA
TC
H
LIN
E S
TA. 12
0+
00 - H
V-02
RRW
JAD
GATEWAY IMPROVEMENTSSUSSEX
HV-03
WRAGEORGETOWN EAST
18
T201804301HORIZONTAL AND
VERTICAL CONTROL
NOTES:
1. NEGATIVE (-) DENOTES LEFT OFFSET. VERTICAL - THIS PROJECT IS REFERENCED TO NAVD 88.
PLANE COORDINATE SYSTEM (NAD 83/91). (NAD 83/2011).
HORIZONTAL - THIS PROJECT IS REFERENCED TO THE DELAWARE STATE
DATUM REFERENCE:
2
2 REVISED DATUM REFERENCE NOTE. R. WILLS - 5/1/20
220+00 225+00 230+00 235+00
PO
E 236
+00.00
10+00 15+00 20+00
PO
E 24
+00.0
0
PI 4
2+57.4
5
505+00
510
+00
PC 507
+56.71
PT 508+57.20
PI 5
08+20.6
7
POE 511+29.95 (CLARK DRIVE)PC 0+00.00/PT 2+95.29 (ROUNDABOUT)
0+00
POT 220+30.30 (SAND HILL ROAD, S 319) =POT 219+83.31 (SAND HILL ROAD, S 319) =
REBAR & CAP
TP102
& CAPREBAR
TP100
CONTRACT
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.ADDENDA / REVISIONS SECTION
SHEET NO.
N:\
3198
5-015\
CA
DD\
HV
04.d
gn
5/1/2
02
08:5
6:4
1 A
M
SAND HILL ROAD (S 319)
SAND HILL ROAD (S 319)
EXISTING RIGHT-OF-WAY BASELINE
30004
STATION OFFSET EASTINGNORTHING
HORIZONTAL / VERTICAL CONTROL DATA
ELEVATIONPOINT
256989.1238 670333.2840 30004 24+00.00 0.00'
STATION OFFSET EASTINGNORTHING
SAND HILL ROADR / W BASELINE ALIGNMENT CONTROL
POINT
10034
STATION OFFSET EASTINGNORTHING
CONSTRUCTION ALIGNMENT CONTROL
POINT
10029 235+00.00 0.00' 256971.6069 670330.5249
10032 230+00.00 0.00' 256477.6966 670252.7267
10031 225+00.00 0.00' 255983.7862 670174.9285
10030 220+00.00 0.00' 255489.8759 670097.1303
670115.4491255606.1748
670193.2473
670271.0455256593.9955
256100.7603
30021 10+00.00
30022 15+00.00
30023 20+00.00
0.00'
0.00'
0.00'
12
12
12
13
CIRCULAR CURVE NO. 12
STATION NORTHING EASTING
CIRCULAR CURVE NO. 13
STATION NORTHING EASTING
10109
10110
10112
10116
10113
10115
10117
SCALE
FEET
0 60 120 180
SAND HILL ROAD (S 319)
RIGHT OF WAY BASELINE
CONSTRUCTION AND
CLARK DRIVE
217+83.57 20.73' 255272.8586 670083.9340 47.31'TP102
221+53.26 255647.8474 670079.2293 46.61'TP100 -42.26'
CLARK DRIVE
BASELINE
CONSTRUCTION
N
MA
TC
H
LIN
E S
TA. 217
+00 - H
V-02
Tangent Direction: S 81°02'55.0178" E
Radial Direction: S 8°57'04.9822" W
Chord Direction: N 53°58'06.8105" E
Radial Direction: S 81°00'51.3613" E
Tangent Direction: N 8°59'08.6389" E
External: 26.4825
Middle Ordinate: 18.7316
Chord: 90.4825
Tangent: 63.9616
Length: 100.4926
Degree of Curvature(Arc): 89°31'28.7598"
Delta: 89°57'56.3433" Right
Radius: 64.0000
PT ( 10112) 508+57.20 255562.2471 669832.4233
CC ( 10111) 255499.0266 669822.4652
PI ( 10110) 508+20.67 255572.1993 669769.2407
PC ( 10109) 507+56.71 255509.0227 669759.2506
Element: Circular
Tangent Direction: S 81°02'43.2358" E
08°57'16.7642" W Radial Direction: S
Chord Direction: N 08°57'16.7642" E
Radial Direction: N 08°57'16.7642" E
Tangent Direction: N 81°02'43.2358" W
External:
Middle Ordinate:
Chord: 94.00
Tangent:
Length: 295.2913
Degree of Curvature(Arc): 121°54'48.6343"
Delta: 180°00'00.0000" Right
Radius: 47.00
255473.3872 670094.53312+95.29( 10116) PT
255566.2357 670109.16361+47.65( 10115) PCC
255519.8114 670101.8484( 10114) CC
255473.3872 670094.53310+00.00( 10113) PC
Element: Circular
10117 511+29.95 0.00' 255519.8092 670101.8453
NOTES:
1. NEGATIVE (-) DENOTES LEFT OFFSET.
10034 236+00.00 0.00' 257045.0773 670342.0975
ROUNDABOUT
CONSTRUCTION BASELINE
WRA
HV-04
SUSSEX
GATEWAY IMPROVEMENTSGEORGETOWN EAST
19
T201804301
JAD
RRW
HORIZONTAL ANDVERTICAL CONTROL
VERTICAL - THIS PROJECT IS REFERENCED TO NAVD 88.
PLANE COORDINATE SYSTEM (NAD 83/91). (NAD 83/2011).
HORIZONTAL - THIS PROJECT IS REFERENCED TO THE DELAWARE STATE
DATUM REFERENCE:
2
2 REVISED DATUM REFERENCE NOTE. R. WILLS - 5/1/20
200+00 205+00
PO
B 19
7+00.00
PC 205
+87.95
5+00
10+0015+00
PO
E 18
+82.6
4REBAR & CAP
REBAR & CAP
SPIKE
MAG NAIL
TP144
TP76
TP78
TP143
REBAR & CAP
REBAR & CAPTP140
TP141
CONTRACT
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.ADDENDA / REVISIONS SECTION
SHEET NO.
N:\
3198
5-015\
CA
DD\
HV
05.d
gn
5/1/2
02
08:5
6:4
2
AM
AIRPORT ROAD (S 319)
EXISTING RIGHT-OF-WAY BASELINE AIRPORT ROAD (S 319)
30002
671280.5341253299.27440.00'18+82.6430002
STATION OFFSET EASTINGNORTHING
HORIZONTAL / VERTICAL CONTROL DATA
ELEVATIONPOINT
POINT STATION
SAND HILL ROADR / W BASELINE ALIGNMENT CONTROL
OFFSET NORTHING EASTING
10021
STATION OFFSET EASTINGNORTHING
CONSTRUCTION ALIGNMENT CONTROL
POINT
10020 200+00.00 0.00' 253762.9466 670779.5238
10033 205+00.00 0.00' 254102.5614 670412.5609
30008 670632.7386253898.79250.00'10+00.00
670999.7016253559.17770.00'15+00.0030009
3
SCALE
FEET
0 60 120 180
AIRPORT ROAD (S 319)
RIGHT OF WAY BASELINE
CONSTRUCTION AND
TP76 201+54.24 253910.6286 670706.0426 48.31'
TP78 205+70.92 254240.3110 670443.4203 49.23'122.06'
202+69.50
205+69.15
253856.9084 670499.2757 50.44'
254062.8291 670281.5642 48.94'
TP143
TP144 -118.14'
-121.39'
58.48'
N
MA
TC
H
LIN
E S
TA. 207+
00 - H
V-02
10019 197+00.00 0.00' 253559.1777 670999.7016
10019
NOTES:
2.
1.
NEGATIVE (-) DENOTES LEFT OFFSET.
SEE SHEET HV-06 FOR CURVE DATA CHARTS.
205+67.57
203+29.19
254165.2719 670378.5284 48.98'
253959.9144 670513.2787 48.54'
TP140
TP141 -36.28'
22.91'
WRA
HV-05
SUSSEX
GATEWAY IMPROVEMENTSGEORGETOWN EAST
20
T201804301
JAD
RRW
HORIZONTAL ANDVERTICAL CONTROL
VERTICAL - THIS PROJECT IS REFERENCED TO NAVD 88.
PLANE COORDINATE SYSTEM (NAD 83/91). (NAD 83/2011).
HORIZONTAL - THIS PROJECT IS REFERENCED TO THE DELAWARE STATE
DATUM REFERENCE:
2
2 REVISED DATUM REFERENCE NOTE. R. WILLS - 5/1/20
CONTRACT
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.ADDENDA / REVISIONS SECTION
SHEET NO.
N:\
3198
5-015\
CA
DD\
CP
02.d
gn
5/1/2
02
08:5
6:5
2
AM
UU
U
#MV1
6" CHERRY
GRASSGRASS
12"DPE
MIX
HOT
CIN
DERS
+
SM
AL
L
TR
EE
S
PA
TIO
ST
ON
E
POND
VINYL MOBILE TRAILER
SHED
METAL
GR
AV
EL
GR
AV
EL
ST
ON
ES
SPIKE
12"
RC
P
12" RCP
24"
HDP
E
12"
RC
P
12"
RCP
SHED
WOOD
SHED
WOOD
D.I.
D.I.
HOT
MIX
#VC53GRAVEL
DPL
#52
05259
#53546/
CONC W
EIR
PCC CURB TYPE 3-6
PCC CURB TYPE 3-6
TYPE 1-
6
PC
C
CU
RB
27"
X4
2"
RC
EP
CAP&
REBARTP130
12" RCP 12"
RC
P
X
X
6" 6"
WR
A14
7
N:2
54
225.8
690
RE
BA
R
&
CA
P
CO
NC
VINYL
BLOCK AND
1 STORY
CEDAR
5" 1
GRASS
MIX
HOT
MIX
HOT
GRASS
CONC
HOT MIX
OPTIC
FIBER
BURIED
GRASS
REBAR & CAP
TP108
EL = 50.06'
"+" CUT
FLANGE BOLT FH
ROADSIDE
BM - #3
& CAP
REBAR
TP109
GRAVEL
REBAR & CAP
TP138
GRASS
GRASS
GRASS
#10B8"
14" TWIN PINE
GRAVEL
6" TWIN
MAPLE
8" CLUSTER
16" PINE
PINE
12" 1
12" PINE
12" MAPLE
GRASS
GRAVEL
CEDAR12"
CEDAR12"
GRASS
MULBERRY15"
MULBERRY12"
CHERRY10"
GRASS
CLUSTER4"
GRASS
POND
REBAR & CAP
TP110
GRASS
GRASS
& CAPREBARTP103
GRASS
GRASS
SOYBEAN
HOT MIX
MYRTLE6" CLUSTER
GRASS
SHRUBSSMALL
MYRTLE4" CLUSTER
CEDAR8"
8"
28"
SHEDVINYL
SHEDMETAL
05273
#53536/
DPL
05284
#53548/
DPL
05275
#53525/
DPL
05263
#53522/
DPL
05258
#58519/
DPL
MAPLE
6"
FRAME
WOOD
1 STORY
TWIN
6"
05249
#53523/
DPL
D.I.
CEDAR
4X1"
TWIN
2"
4" CLUSTER
TRIPLE
5" MAPLE
30"
SPIKE
TP86
05256
#53526/
DPL
SPIKE
TP85
05294
#53562/
DPL
PA
TIO
CO
NC
PIN
E16" 1
WVU
U
EM
EM
EM
CAPREBAR &
TP104
DP&L
05249
#53499/
DPL
05244
#53502/
+
+
P.B. 62-346
EASEMENT #5
EXISTING DRAINAGE EASEMENT
16.77'
P.B. 91-36
D.R. 3024-328,
GRANTED TO DELDOT
PERMANENT EASEMENT
40'
30'
25'25'
30'
30'
15'
10' DRAINAGE EASEMENT PB 70-26
30'
30'
30'
30'
45'
105'
105'
55'
105'
P.B. 39-185
D.R. 2052-152
AND MARTHA O. HERNANDEZ
ALEJANDRO C. HERNANDEZ
135-15.00-119.03
LOT 2
P.B. 39-185
P.B. 70-26
P.B. 214-117
D.R. 4136-117
ACADEMY FOUNDATION, INC.
SUSSEX PREPARATORY
135-15.00-119.02
P.B. 198-94
D.R. 4156-158
CHEER, INC.
135-15.00-25.01
P.B. 198-94
D.R. 4156-158
CHEER, INC.
135-15.00-25.01
30'
P.B. 60-90
D.R. 4148-165
STERLING SQUARE, LLC
135-15.00-115.06
LOT 1
P.B. 60-90
D.R. 4410-107
STERLING SQUARE, LLC
135-15.00-115.09
LOT 3
P.B. 91-36
D.R. 3102-291
GEORGETOWN EAST PARK CENTER, LLC
135-15.00-39.01
LOT 1
P.B. 91-36
D.R. 3102-291
PARK CENTER, LLC
GEORGETOWN EAST
135-15.00-39.01
DELDOT ACQUISITION
PARCEL A FUTURE
D.R. 2345-93
CHEER APARTMENTS, LP
135-15.00-26.01
EXISTING R/W
W/
R
GNI
TSI
XE
W/R GNITSIXE
W/R GNITSIXE
30'
40'
TCE-1TCE-1
TC
E-1
P.B.
39-185
P.B.
70-26
P.B.
214-117
D.R.
4136-117
FO
UN
DA
TIO
N, IN
C.
AC
AD
EM
Y
PR
EP
AR
AT
OR
YS
US
SE
X
135-15.0
0-119.0
2
45'
TCE
D.R. 3057-80
GRANTED TO DELDOT
PERMANENT EASEMENT
DELMARVA RIGHT OF WAY - D.R. 1409-259 - P.B. 91-36
R/W-1
110'
175'
R/W
15'
P.B. 62-346
EASEMENT #6
UTILITY EASEMENT
EXISTING
R/
W
R/
W
R/
W
P.B. 60-90
D.R. 4410-107
LLC
STERLING SQUARE,
135-15.00-115.08
LOT 2
D.R. 4983-6
JOSEPH M. SCHELL
135-15.00-117.00
P.B. 62-346
D.R. 2004-182
SUSSEX COUNTY SENIOR SERVICES, INC.
135-15.00-26.03
PARCEL C
25'
25'
7-R
11-R
8-R
12-R
10-R
13-R
5-L
6-L
9-L
11-L
PER PB 129-53.
ACCESS AND DRAINAGE
EASEMENT FOR CROSS
20' WIDE PERMANENT
PE-1
R/
W
PE-2
PE-2
PE-2
PE-2
PE-2
PE-2
LOC
211
+00
212
+00
213
+00
214
+00
PT 211+37.08
PC 213+33.49
500+00
501+
00
POB 499+50.0
0
PC 500+80.2
7
PT 501+29.78
107+00
108+00
109+00110+00 111+00
112+00113+00
114+00
PT 11
1+53.52
PC 11
3+62.03
0+00
1+00
0+00
1+00
2+00
3+00
65+00
66+00
67+00
68+0069+00 70+00
39+00
40+00
SV
SV
SV
8" TG-W (B)
8"
TG-S (B)
VE
R-C (B)
VE
R-
C (B)
VE
R-F
O (B)
VER-C (B)
BV-C (B)
BV-C (B)10" T
G-S (B)
10" TG-S (B)
10" TG-S (B)
10" T
G-
W (B)
VER-C (B)
DP-E (B)
VE
R-
C (B)
VE
R-
C (B)
BV-
C (B)
VE
R-
C (B)
VER-C (B)
VER-C (B)
VER-C (B)
VER-C (B)
VER-C (B)
VER-C (B)
VER-C (B)
8" TG-W (B)
10"
TG-
W (B)
8" T
G-W (B)
10" TG-S (B)
10" T
G-S (B)
10" T
G-S (B)8
" T
G-S
FM (B)
8"
TG-S
FM (B)
DP-E (B)
DP-E (B)
UNK (B)
UN
K (B)
EX SIG (B)
EX
SIG (B)EX SIG (B)
EX SIG (B)
EX SIG (B)
EX
SIG (B)
EX SIG (B)
EX SIG (B)
VER-F
O (B)
DP-E (B)
DP-E (
B)
ABANDONED
DP-E (B)
P
13
DI
14
P
12
DI
15
DI
25
P
26
P
11
DI
26P
25
DI
11
DI
12
P
32
MH
2 DI
13
DI
27
P
34
DI
28
DI
34
DI
10
DI
35
P
15
P
17
DI
9
P
18
DI
8
P
16
DI
7
P
19
DI
5
P
20
DI
6
FES
3
FES
4
FES
5
FES
6
FES
7 FES
8
P
6
P
31
P
33
P
30
FES
12
FES
14
DI
52
DI
36
P
39
P
37
DI
21
DI
45
P
35
MH
9P
50
B-02
B-03
SB-03 SB-04
SB-05
SB-06
SB-07
SB-08
A
EMW.V.
N
SCALE
FEET
0 30 60 90
US 9 (S 18, LEWES-GEORGETOWN HIGHWAY)
AIR
PO
RT
RO
AD (S 319)
MATCH LINE STA. 210+
50
)TEERTS TEKRAM ,81
S( 9 SU
)91
3
S(
DA
OR
LLI
H
DN
AS
SAN
D HILL
RO
AD (S 319)
)91
3
S(
DA
OR
TR
OP
RIA
C
3
C
4
C
5
C
6
C
7
C
8
C
9
C
10
C
11
SAWCUT
SAWCUT
EX-C-100
EX-C-101
EX-C-103
EX-C-102
RC-04
EX-C-104
20'
9'
33'
41'
33'
28'
22'
30'
28'
33'
30'
23'
40'
29'
33'
RM
C
RM
O
RM
C
SAWCUT
RL
O RL
O
A
C
DND
DND
RL
O
RL
O
RM
O
RL
O
RM
O
RL
O
RL
O
RL
O
RL
O
RL
O
RL
O
RL
C
A
C
RL
O
RM
C
P.B. 40-173
D.R. 4079-125
TER-PEN, LLC
135-15.00-118.00
LOT A
9-R
RM
C
RM
C
M
7
M
8
M
15
M
13
19'(L) X 6'(W)
RIPRAP
13 SY R-4
8'(L) X 7'(W)
RIPRAP
7 SY R-4
15'(L) X 6'(W)
RIPRAP
8 SY R-4
CO
SW
CO
SW
CO
SW
CO
SW
8'(L) X 5'(W)
9 SY R-4 RIPRAP
8'(L) X 5'(W)
RIPRAP
9 SY R-4
16'(L) X 6'(W)
RIPRAP
11 SY R-4
MA
TC
H
LIN
E S
TA. 10
6+
50 - CP-01
- CP-05
MATCH LIN
E STA. 214+50 - CP-06
MA
TC
H
LIN
E S
TA. 11
4+
50 - C
P-03
RL
O
POLE
UTIL.
M.H.
S.S.
POLE
UTIL.
WEIR
CONC.
SIGN
POLE
UTIL.
SHED
POLE
UTIL.
POLE
UTIL.
S.V.
S.S. M.H.
POLE
UTIL.
BOX
POLE/
UTIL.
RL
O
SIGN
RM
C
BOX
UTIL.
RL
O
SIGNRL
O
POLE
UTIL.
SIGN
RL
O
22.5'
32.5'
32.5'
35.5'
A
C
DND
M
11
M
10
M
9
M
52
M
12
M
14
GUY
POLE/
UTIL.
RL
O
W.M. RM
C M.H.
VER.
GUY
POLE/
UTIL.
RL
O
RRW
JAD
GATEWAY IMPROVEMENTSSUSSEX
CP-02
WRAGEORGETOWN EASTCONSTRUCTION PLAN
23
T201804301
RM
C
RM
O
SAWCUT
RM
O
RM
C
RM
C
RM
O
S.V.
S.V.
RM
C
A
C
M.H.
SEPTIC
RM
C
RM
C
PC
2
PC
2
PC
2
PC
2
PC
2
PC
2
PC
5
PC
5
9'(L) X 6'(W)
RIPRAP
6 SY R-4
C
12
C
13
C
14
23'
23'
UD
89
UD
36
UD
68
C
44
19'(L) X 16'(W)
RIPRAP
35 SY R-4
29'(L) X 14'(W)
RIPRAP
43 SY R-4
12'(L) X 6'(W)
RIPRAP
8 SY R-4
BOX
UTIL.
CURB
CURB
PIPE
9'(L) X 11'(W)
RIPRAP
10 SY R-4
UD
78
UD
45UD
23
UD
127
12'(L) X 6'(W)
RIPRAP
8 SY R-4
9' 20'
NOTES:
1. SEE SHEET CP-09 FOR SCHEDULES.
7'(L) X 4'(W)
RIPRAP
3 SY R-4
13'(L) X 6'(W)
RIPRAP
9 SY R-4
METER
SIGN AND
CHEER CENTER
RELOCATED
WET POND
BMP NO. 1031
WET POND
BMP NO. 1032
RM
C
2
2 ADDED FIRE HYDRANT AND WATER VALVE. R. WILLS - 5/1/20
CONTRACT
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.ADDENDA / REVISIONS SECTION
SHEET NO.
N:\
3198
5-015\
CA
DD\
CP
05.d
gn
5/1/2
02
08:5
6:5
4
AM
WV
WV + + + +
X
GRASS
GRASS
GRAVEL
GRASS
GRASS
SPIGOT
AC
12" RCP 12" RCP
HOT MIX
HOT MIX
HOT MIX
HOT MIX
MIX
HOT
MAC
++
4" CLUSTER
GRASS
6" TWIN
SMALL TREES
VIN
YL
MO
BIL
E
TR
AIL
ER
27"X42" RCEP
12" PVC
+
GRASS
27"X42" RCEP
AND TREES
SMALL SHRUBS
3"
#10
B
14"
TWIN
PIN
E
PINE
3" PINE
3"
PINE
3"
PINE
2"
PINE
4"
MYRTLE
CLUSTER
2"
MYRTLE
CLUSTER
2"
MYRTLE
CLUSTER
2"
MYRTLE
CLUSTER
2"
MYRTLE
CLUSTER
2"
& CAP
REBAR
TP145
POND
4" 4"
3"3"3"HOLLY
2"
HOLLY
2"
HOLLY
2" HOLLY
2"
HOLLY
2"
MAPLE
3"
MAPLE
3"
MAPLE
3"
MAPLE
3"
MAPLE
3"MAPLE
3"
MAPLE
3"
& CAP
REBAR
TP144
POND
MAPLE
3"MAPLE
3"
MAPLE
3"MAPLE
3"
MAPLE
3"
MAPLE
3"
05204
53571/
DPL
MAPLE
3"
ABANDONED
05219
#53555/
DPLPINE
3"
PINE
3"
PINE
3"
PINE
3"PINE
3"
PINE
3"PINE
3"
PINE
3"
PINE
3"
PINE
3"PINE
3"
PINE
3"
PINE
3"
PINE
3"
PINE
3"
PINE
3"
PINE
3" PINE
3"
PINE
3"
PINE
3"
PINE
3"
PINE
3"
PINE
3"
PINE
3"
PINE
3"
PINE
3"
05235
#53538/
DPL
PINE
3"
PINE
3"
PINE
3"
PINE
3"PINE
3"
PINE
3"
PATIO
CONC
MAPLE
36"
& CAP
REBAR
TP82OAK
24"MAPLE
40"10"
& CAP
REBAR
TP81
LOCATION
APPROX. WELL
VINYL
1 STORY
SHED
WOOD
SHED
WOOD
MAPLE
TWIN
10"VINYL
2 STORY
& CAP
REBAR
TP140
SHRUBS
CLUSTER
1"SHELTER
BUS
APPLE
6"
APPLE
6"
PLUM
2"
OAK
12"
MAPLE
15"MAPLE
14"
FIR
14"
CEDAR
CLUSTER
6"
NAIL
MAG
TP78MYRTLE
CLUSTER
2"
MYRTLE
CLUSTER
2"
MYRTLE
CLUSTER
2"
BLOCK
1 STORY
MYRTLE
2" TRIPLE
MYRTLE
3" TRIPLE
& CAP
REBAR
TP83
BEECH
12"
& CAP
REBAR
TP139
42X12" CEDAR
10" 3"12"
8"
TWIN
8"
TWIN
8"
PINE
16" 1
PINE
14"
CLUSTER
8"
TV
U
VINYL
1 STORY
EASEMENT - P.B. 60-90
CROSS-ACCESS
50' WIDE PERPETUAL
10' D
RAIN
AG
E
EA
SE
ME
NT
PB 70-26
P.B. 70-25
P.B. 214-117
D.R. 4136-117
SUSSEX PREPARATORY ACADEMY FOUNDATION, INC.
135-15.00-119.00
P.B. 40-173
D.R. 3753-258
AND MARJORIE A. SHORT
CHARLES F. SHORT
135-15.00-116.00
LOT F
D.R. 3764-240
PROPERTIES, LLC
D.M. TAYLOR
135-15.00-115.07
P.B. 60-90
D.R. 4148-165
STERLING SQUARE, LLC
135-15.00-115.06
LOT 1
P.B. 6
0-90
D.R. 4
14
8-165
ST
ER
LIN
G
SQ
UA
RE, L
LC
135-15.0
0-115.0
6
LO
T 1
EXISTING R/W
EXISTING R/W
TCE-1
TCE-2
R/W
P.B. 39-185
P.B. 70-26
P.B. 214-117
D.R. 4136-117
FOUNDATION, INC.
ACADEMY
PREPARATORY
SUSSEX
135-15.00-119.02
PB 70-26
EASEMENT
10' DRAINAGE
R/W-2
R/W
R/W
45'
45'
35'
40'
R/W
TCE-3PE-5
PE-5
PE-5
TCE-4
TCE-4
PE-6
PE-7
PE-7
TCE-4
TCE
D.R. 4983-6
JOSEPH M. SCHELL
135-15.00-117.00
25'
25'
25'
25'
25'
25'
16-R
11-R10-R
17-R
8-R
10-
R
18-R
205+00 206+00
207+00
208+00
209+00
210+00
PC 205
+87.95
2+003+004+005+006+007+00
SV
+
UEM
PVTPVT
VER-C (B)
VER-C (B)VER-FO (B)
VER-C (B)
BV-C (B)
VER-C (B)
VER-FO (B)
VER-C (B)
VER-C (B)
COM-C (B)
COM-FO (B)
VER-C (B)
VE
R-
C (B)
VER-C (B)
DP-E (B)
BV-C (B)
CO
M-F
O (B)
COM-C (B)
VER-C (B)
VER-C (B)
DP-
E (B)
COM-C (B)
10" TG-W (B)
10" TG-W (B)
8" TG-SFM (B)8" TG-SFM (B)8" TG-SFM (B)
UNK (B)
COM-FO (B)VER-C (B)
COM-C (B)
SCO
VER-C (B)
VE
R-
C (B)
VE
R-F
O (B)
DP-E (B)
DP-
E (B)
CO
M-
C (B)
DP-E (B)
VE
R-
C (B)
DI
29
DI
32
DI
31
DI
40
DI
33
DI
30
B-07
A
TV
TV
F.H.
W.V.
NSCALE
FEET
0 30 60 90
STE
RLIN
G
AV
EN
UE
AIRPORT ROAD (S 319)
SAWCUT
NO. ITEM DESCRIPTION / TYPE LENGTH
CURB SCHEDULE
C
20
C
21
RC-07
RC-08
DESCRIPTION
ROADWAY CORE SCHEDULE
NO. STATION OFFSET
208+66.27
206+99.64
RC-07
RC-08
4" HMA
3.5" HMA, 0.5" ST, 0.5" ATB
42.5'LT.
12.9'LT.
A
C
RM
O
RM
O
RL
O
RM
O
RM
O
RL
O
*
*
*
*
*
*
STATION OFFSET EASTINGNORTHING
RIGHT-OF-WAY MONUMENT SCHEDULE
NO. TYPE
M
31
M
32
M
30
8'(L) X 6'(W)
RIPRAP
6 SY R-4
6'(L) X 6'(W)
RIPRAP
4 SY R-4
19'(L) X 6'(W)
RIPRAP
13 SY R-4
19'(L) X 6'(W)
RIPRAP
13 SY R-4
P.B. 40-173
D.R. 4079-125
TER-PEN, LLC
135-15.00-118.00
LOT A
9-RRL
O
CO
SW
CO
SWCO
SWDND
20 I.P.C.C. CURB AND GUTTER, TYPE 1-8 511'
21 I.P.C.C. CURB AND GUTTER, TYPE 1-8 612'
MA
TC
H
LIN
E S
TA. 204+
50 - C
P-04
RL
O
7'(L) X 6'(W)
5 SY R-4 RIPRAP
MATC
H LIN
E STA. 210
+50- C
P-02F.H.
W.V.
BOX
UTILITY
BOX
UTILITY
SIGN
SHED
DI-29 ***210+20.98 * *
DI-30 ***209+69.90 * *
DI-31 ***207+01.66 * *
DI-32 ***208+47.26 * *
DI-33 ***209+54.59 * *
DI-40 ***204+97.80 * *
NO.
DRAINAGE INLET SCHEDULE
BOX SIZE GRATESTATION OFFSET INV. EL.T.G. EL.
CO
SW
CO
SW
RL
C
PAD
CONC.
22.5'
24.5'
22.5'
22.5'
22.5'
32.5'
22.5'
32.5'
15'(L) X 6'(W)
RIPRAP
10 SY R-4
2
UDO
3
UDO
4
UDO
NO. LENGTH DIS. EL.
UNDERDRAIN OUTLETS
* TO BE SET IN FIELD.A
C
BOX
UTILITY
M
29
POLE/GUY
UTILITY
DND
DND
RL
O BOX
UTIL.
GATEWAY IMPROVEMENTSSUSSEX
CP-05
WRAGEORGETOWN EAST
RM
OM
27 M
28
29 205+20.00 -45.00' 254083.1193 670367.3171CAPPED REBAR
32 207+68.09 -45.00' 254271.8180 670192.8682CAPPED REBAR
RM
C
S.V.
RL
O
RM
O
POLE
UTILITY
POLE
UTILITY
RL
O
POLE
UTILITY
PC
1
*CURB OPENING BENEATH SIDEWALK. SEE DETAIL, SHEET DT-06
28 205+07.06 40.00' 254136.7135 670434.5488CAPPED REBAR UD
152
UD
154
UD
74
19'(L) X 6'(W)
RIPRAP
13 SY R-4
19'(L) X 6'(W)
RIPRAP
13 SY R-4
2 31 LF *
3 30 LF *
4 59 LF *
PIPE
CO
SW
CONSTRUCTION PLAN
26
T201804301
JAD
RRW
30 205+84.16 40.00' 254189.0846 670377.9604CONCRETE
31 205+87.95 -45.00' 254129.2709 670317.4490CONCRETE
27 205+06.32 35.00' 254132.5431 670431.6938CAPPED REBAR
2
2 ADDED FIRE HYDRANT AND WATER VALVE. R. WILLS - 5/1/20
CONTRACT
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.ADDENDA / REVISIONS SECTION
SHEET NO.
N:\
3198
5-015\
CA
DD\
CP
06.d
gn
5/1/2
02
08:5
6:5
6
AM
WVWV
WV
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
ACAC
WVWV WV
WV
WV
WV
WV
++ CONC
WIER
CONC
GRASS
CINDERS
8" PVC
15" RCP
1
1
+
+
+
++
1
+ +
WA
LL
CO
NC
1"
3"
GRASS
CO
NC
CO
NC
3'
CO
NC
3'
CO
NC
6"
32"
TWIN
MA
PL
E
PO
ND
CO
NC
3'
BUS
HES
ST
ON
ES
WA
LL
AC
ACACA
CAC
AC
ACA
CAC
BUSHES
AC
5'
3'
4" P
VC
(DO
WNSP
OUT)
4"
PV
C
(D
OW
NS
PO
UT)
4" P
VC
(D
OW
NS
PO
UT)
4" P
VC
(D
OW
NS
PO
UT)
4" P
VC
12" PVC
GRASS
X
LANE
FIRE
MULBERR
Y
12"
SOYBEAN
HOT MIX
05294
#153528/
DPL
HOT MIX
MYRTLE
6" CLUSTER
105314
#5353/
DPL
CONC
HOT MIX
GRASS
CLUSTER
6"
REBAR & CAP
TP102
EL = 48.09'
"+" CUT
FLANGE BOLT FH
ROADSIDE
BM - #2
05334
#53534/
DPL
SOYBEAN
GRASS
GRASS
HOT MIX HOT MIX 05354
#53536/
DPL
QUAD
8"
CONC
PIPE
VERTICAL
TOP 12"
8"
8"
8"
7"
6"
6"
HOLLY
8" 0
7"
7"
7"
7"
6"
8"
8"
GRASS
FREEZER
WALK IN
TANK
MIX
HOT
MAC
4'
4'
HOT MIX
WALL
SHED
WOOD
VALVE
PROPANE& CAP
REBAR
TP107
GRASS
STUCKO
BLOCK/BRICK
2 STORY
GRASS
SAW
CONCBRICK
HOT MIX
HOT MIX
2"
2"
3' 0 PINE
1"PINE
1"3"
WALL
BLOCK
GRASS
SAW
& CAP
REBAR
TP50& CAP
REBAR
TP105
GRASS8"
8"
HOUSE
SCREEN
WOOD
CLUSTER
3"
GRILL
BBQ
CEDAR
QUAD
18"
MYRTLE
CLUSTER
3"
GRASS
GRASS
CEDAR
1"
TRIPLE
8"MYRTLE
CLUSTER
2"
TWIN
10"
& CAP
REBAR
TP51
1"
TRIPLE
5"PINE
6"
GRASS
PINE
10"
MYRTLE
CLUSTER
4"
3"
MYRTLE
CLUSTER
3"
MYRTLE
CLUSTER
3"
QUAD
8"
GRASS
SAW 3"
PAD
DUMPSTER
CONC
TRIPLE
8"
TWIN
4"3"
4"
4"
5"
BUSHES6"
& CAP
REBAR
TP106
6"
6" GRASSCONC
MYRTLE
CLUSTER
5"
HOLLY
2"
GRASS
& CAP
REBAR
TP100
?
U
U
U
X
HOT MIX3" CLUSTER
6" CLUSTER
MYRTLE
12"
2" HOLLY
BOXPANELELEC.
REBAR & CAPTP52
GUM1"
TRIPLE10"
OAK1"
GRASS
+
P.B. 62-346
EASEMENT #1
EXISTING ACCESS EASEMENT
P.B. 62-346
EASEMENT #3
EASEMENT
EXISTING UTILITY
P.B. 62-346
EASEMENT #4
EXISTING UTILITY EASEMENT
P.B.
62-34
6
EA
SE
ME
NT
#7
EA
SE
ME
NT
EXIS
TIN
G
DR
AIN
AG
E
30'
30'
25'
30'
30'
20'
50'
50'
P.B. 62-346
EASEMENT #7
DRAINAGE EASEMENT
EXISTING
P.B. 91-36
D.R. 3102-291
GEORGETOWN EAST PARK CENTER, LLC
135-15.00-39.01
LOT 1
D.R. 2345-93
CHEER APARTMENTS, LP
135-15.00-26.01
EXISTING R/W
EXISTING R/W
50'
75'
TCE-2
TCE-2 TCE-2
TCE-3
TCE-
3
TCE-
375'
75'
90'
75'
R/W
R/W
R/
W
R/
W
D.R. 2345-93
CHEER APARTMENTS, L.P.
135-15.00-26.02
PARCEL B
P.B. 62-346
EASEMENT #6
EXISTING UTILITY EASEMENT
15'
P.B. 62-346
EASEMENT #6
UTILITY EASEMENT
EXISTING
P.B. 62-346
D.R. 2004-182
SUSSEX COUNTY SENIOR SERVICES, INC.
135-15.00-26.03
PARCEL C
6-L
9-L
11-L
10-L
215+00
216+00217+00 218+00 219+00 220+00 221+00
PT 216
+94.65
502+00
503+00 504+00 505+00 506+00 507+00
508+00
509+00
510
+00
511+
00
PT 5
01+
29.7
8
PC 502+34.5
8
PT 502
+88.07
PC 507
+56.71
PT 508+57.20
0+00
1+00
2+00
4+00 5+00 6+00 7+00 8+00 9+00 10+00
WV
PV
T
8" TG-W (B) 8" TG-W (B)
10"
TG-S (B)
8"
TG-S (C)
6"
TG-S (C)
8" TG-S (C)8" T
G-S (C)
VER-C (B)
10" TG-S (B)
VER-C (B)
VER-C (B) VER-C (B)VER-C (B)
VER-C (B)
VER-C (B)VER-C (B)
VER-C (B)
VER-C (B)
VER-C (B)
VER-C (B)
VER-C (B)
COM-C (B)
DP-E (B)
DP-E (B)
VER-C (B)
VE
R-C (B)
8" TG-SFM (B)
8" TG-SFM (B)
DP-
E (B)
VE
R-
C (B)
VE
R-
C (D)
VER-C (D)
VE
R-
C (D)
8" TG-W (D)
8"
TG-
W (D)
8" T
G-
W (D)
8"
TG-
W (D)
8" T
G-
W (D)
8" TG-W (D)
DI
46
P
38
DI
49
P
46
DI
50
P
47
DI
51
P
49
P
48
FES
17
FES
18
FES
19
FES
20
DI
55
DI
54
MH
10P
44
P
45P
51
B-08
SB-09
SB-10
W.V.
A
W.V.
N
SCALE
FEET
0 30 60 90
SAND HILL ROAD (S 319)
SAWCUTSAWCUT
SAWCUT
SAWCUT
SAWCUT
C
22
C
24
C
26
C
27
C
25
RC-09
RC-10
C
29
RM
C
A
C
A
C
DND
A
C
A
C
14'
SAWCUT
4'
4'
4'
RM
C
C
28
RL
O
RM
C
RL
O
RL
C RL
O
A
C
RL
O
RL
C
M
33
M
36
M
41
M
40
M
39
M
38
M
35M
34
DND
RM
C
MA
TC
H
LIN
E S
TA. 2
14+
50 - CP-02 M
AT
CH
LIN
E S
TA. 221+
50 - C
P-07
RL
O
MATCH LINE STA. 214+50 - CP-02
RL
O
LAMP
POLE
LIGHTPOLE
LIGHT
F.H.
W.V.
WEIR
CONC.
W.V.
RM
O
RL
O
POLE
UTILITY
CONC.
POLE
LIGHT
SIGNPOLE
LIGHT POLE
LIGHT
CONC.
MANHOLE
S.S.
RL
O
SIGN
TREE
SIGN
POLE
LIGHT
SIGN
RL
O
BOX
UTIL.POLE
UTIL.
RL
O
POLE
UTIL.
BOX
UTIL.
BOX
UTIL.MANHOLE
S.S.
POLE
UTIL.
SIGN
S.V.
S.V.
POLE
LIGHT
POLE
LIGHT
RL
O
RL
O
RL
O
CROSSWALK DETAILS.
SEE SHEET DT-01 FOR
DND
TREE
SAWCUT
32.5'
35.5'
32.5'
22.5'
A
C
RM
C
PAD
RM
C
LIGHT POLE
M
37
RM
C
DND
POLE
LIGHT DND
W.V.
C
31
C
30
RM
C
CLARK DRIVE
RL
O
DNDPOLE
LIGHT
C
23
C
32
C
33
C
34
C
35
C
36
C
37C
38
21'
11'
19'
14'
18'
15'
17'
17'
W.V./F.H.
21.5'
M
42
M
43
RM
O
RM
C
RL
O
A
C
M.H.
S.S.
PC
2
PC
2
18'(L) X 10'(W)
RIPRAP
20 SY R-4
9'(L) X 6'(W)
RIPRAP
6 SY R-4
C
39
C
40
BY OTHERS
CONSTRUCTION
FUTURE
8'
12'
12'
14'
14.75'
M
53
M
54
9'(L) X 10'(W)
RIPRAP
10 SY R-4
RL
C
RL
C
RL
C
C
O
RL
C
RL
C
RL
C
RL
C
RL
CRL
C
RL
C
PIPE
DND
35.5'
15'
NOTE 2
SEE SEE NOTE 2
NOTES:
2.
1.
CONSTRUCT DOWNSPOUT DRAIN, SEE DETAIL ON SHEET DT-05.
SEE SHEET CP-10 FOR SCHEDULES.
WRA
CP-06
SUSSEX
GATEWAY IMPROVEMENTSGEORGETOWN EAST
CONSTRUCTION PLAN
27
T201804301
JAD
RRW
45'(L) X 4'(W)
RIPRAP
20 SY R-4
19'(L) X 6'(W)
RIPRAP
13 SY R-4
8'(L) X 6'(W)
RIPRAP
5 SY R-4
C
45
RM
O
9'(L) X 6'(W)
RIPRAP
6 SY R-4
27'(L) X 6'(W)
RIPRAP
18 SY R-4
FOREBAY
WET POND
BMP NO. 1033
WET POND
BMP NO. 1033
WET POND
BMP NO. 1031
2
W.V.1
1
2 ADDED FIRE HYDRANT AND WATER VALVE. R. WILLS - 5/1/20
CONTRACT
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.ADDENDA / REVISIONS SECTION
SHEET NO.
N:\
3198
5-015\
CA
DD\
DT
01.d
gn
5/1/2
02
08:5
6:5
9
AM
CHEER CENTER CROSS WALK
2% 2%
12:1
PGA
0.67'
6'10'6'
9:1 9:10.35%
SECTION B-B
SCALE: 1" = 5'
CLARK DRIVE
PROPOSED GRADECLARK DRIVE
EXISTING
(ITEM 301001)
8" GABC, TYPE B
2%
SECTION A-A
SCALE: 1" = 5'
O.G.
CLARK DRIVE
CONSTRUCTION BASELINE
(ITEM 705521)
8" SIDEWALK
CEMENT CONCRETE
PATTERNED PORTLAND
O.G.
B B
A
A
8'
6'10'6'
10'
SCALE: 1" = 5'
2'
2'
(ITEM 705521)
8" SIDEWALK
CEMENT CONCRETE
PATTERNED PORTLAND
SURFACE (ITEM 705007)
DETECTABLE WARNING
SIDEWALK SURFACE
SURFACE (ITEM 705007)
DETECTABLE WARNING
SIDEWALK SURFACE
N
CLARK DRIVE
BASELINE
CONSTRUCTION
R=4'
R=4'
TYPE 1-8, (ITEM 701013)
CONCRETE CURB
PORTLAND CEMENT
9:1
9:1
9:1
9:1
(ITEM 401005)
(CARBONATE STONE)
2" SUPERPAVE TYPE C, PG 64-22
80182
80181
80210
80180
80179
80211
80212
80209
80345 80346
80201
80202
80218
80217
80203
80204
80216
80215
STATION OFFSETPOINT NO.
COORDINATE LIST
EASTINGNORTHING
(ITEM 401015)
4" SUPERPAVE TYPE B, PG 64-22
SCALE: NONE
PAVEMENT
PROPOSED
14"
6"
9"6"
2"
1•" R
P.C.C. CURB TYPE 1-2, MODIFIED
1" BATTER8"
TYPE B (ITEM 705001)
4" OVER 4" GABC,
CONCRETE SIDEWALK
PORTLAND CEMENT
(ITEM 701013)
4" GABC, TYPE B
TYPE 1-8 OVER
CONCRETE CURB
PORTLAND CEMENT
CROSSWALK CROSSWALK
CROSSWALK
10.75'
4'
14'14.75'
2%
5'
5'
5'
80592 504+46.57 19.00 255199.7234 669729.5774
80591 504+36.57 19.00 255189.8461 669728.0155
80346 504+40.73 29.50 255192.3160 669739.0366
80345 504+33.72 29.50 255185.3881 669737.9411
80218 504+30.57 -4.00 255187.5121 669704.3607
80217 504+36.57 -4.00 255193.4384 669705.2978
80216 504+46.57 -4.00 255203.3157 669706.8597
80215 504+52.57 -4.00 255209.2421 669707.7968
80212 504+52.57 4.00 255207.9925 669715.6987
80211 504+46.57 4.00 255202.0662 669714.7615
80210 504+36.57 4.00 255192.1889 669713.1996
80209 504+30.57 4.00 255186.2625 669712.2625
80204 504+52.57 -14.75 255210.9211 669697.1788
80203 504+46.57 -14.75 255204.9947 669696.2416
80202 504+36.57 -14.75 255195.1174 669694.6798
80201 504+30.57 -14.75 255189.1911 669693.7426
80182 504+30.57 14.00 255184.7007 669722.1398
80181 504+36.57 14.00 255190.6270 669723.0769
80180 504+46.57 14.00 255200.5043 669724.6388
80179 504+52.57 14.00 255206.4307 669725.5759
WRA
DT-01
SCALE: AS NOTED
SUSSEX
GATEWAY IMPROVEMENTSGEORGETOWN EAST
CONSTRUCTION DETAILS
54
T201804301
JAD
RRW
BASE COURSE, TYPE B
GRADED AGGREGATE
14" GABC, TYPE B
(ITEM 705521)
8" SIDEWALK
CEMENT CONCRETE
PATTERNED PORTLAND
14" GABC, TYPE B
80591
80592
(ITEM 908014)
SEEDING, DRY GROUND
PERMANENT GRASS
(ITEM 908004)
TOPSOIL, 6" DEPTH
DRY GROUND (ITEM 908014)
PERMANENT GRASS SEEDING,
TOPSOIL, 6" DEPTH(ITEM 908004)
15" RCP
DRAIN OUTFALL
3" PIPE FOR ROOF
DRAIN OUTFALL
3" PIPE FOR ROOF
8" TG-S (C)
8" TG-W (D)
2
2
2
2 ADDED LABELS. R. WILLS - 5/1/20
(ITEM 501001)
PAVEMENT, 8"
CEMENT CONCRETE
PORTLAND
(ITEM 501001)
PAVEMENT, 8"
CEMENT CONCRETE
PORTLAND
(ITEM 501001)
PAVEMENT, 8"
CEMENT CONCRETE
PORTLAND
WV
INV:4
5.5
4
INV:4
5.8
9
TOP:4
9.5
4
INV:47.07
205+00 206+00
207+00
208+00
209+00
210+00
EXISTING R/W
EXISTING R/W
TCE-1
TCE-2
R/WR/W-2
R/W
R/W
R/W
TCE-3PE-5
PE-5
PE-5
TCE-4
TCE-4
PE-6
PE-7
PE-7
TCE-4
TCE
A
8" TG-S-30
10" TG-W-20
8" TG-S-30
8" TG-S-30
10" TG-W-20
F.H.
W.V.
CONTRACT
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.ADDENDA / REVISIONS SECTION
SHEET NO.
N:\
3198
5-015\
CA
DD\
CS
12-1B.d
gn
5/1/2
02
08:5
7:0
5
AM
SEQUENCE OF CONSTRUCTION - PHASE 1B
1
2
3
4
5
6 SEE TEMPORARY SIGNAL PLAN SG-02 FOR SIGNAL WORK OCCURING DURING PHASE 1B.
CONSTRUCT REMAINDER OF AIRPORT ROAD UNDER DETOUR. PERMANENTLY CLOSE EXISTING AIRPORT ROAD SOUTH OF US 9.
SETUP VEHICULAR DETOUR PER DP-02 AND CLOSE AIRPORT ROAD (S 319) TO TRAFFIC.
CONFLICTING STRIPING.
APPLY TEMPORARY PAVEMENT MARKINGS AS SHOWN ON THE MAINTENANCE OF TRAFFIC PLAN, SEE CS-11 TO CS-13. ERADICATE
INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES, SEE ES-05 TO ES-07.
MAINTAIN ALL PERMANENT WARNING SIGNS AS SHOWN ON THE PERMANENT WARNING SIGN SHEET.
SCALE
FEET
0 30 60 90
N
AIRPORT ROAD (S 319)
MATC
H LIN
E STA. 210
+50
MA
TC
H
LIN
E S
TA. 204+
50 - C
S-13
- C
S-11
(24"x12")
R9-9
WRA
CS-12
SUSSEX
GATEWAY IMPROVEMENTSGEORGETOWN EAST
82
T201804301
DWC
MJB
MAINTENANCE OF TRAFFICPLAN - PHASE 1B
DURING NON-LANE CLOSURE HOURS.
ALLOWABLE LANE CLOSURE HOURS OR DRUMS
AIRPORT ROAD USING FLAGGING DURING
MAINTAIN ACCESS TO STERLING CENTER VIA
STE
RLIN
G
AV
EN
UE
2
2 ADDED FIRE HYDRANT AND WATER VALVE. R. WILLS - 5/1/20
WVWV
WV
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
WVWV WV
WV
WV
WV
WV
?
U
U
U
INV:45.90INV:45.91
INV:44.62
INV:44.60
INV:46.83
DIR. ONLY
215+00
216+00217+00 218+00 219+00 220+00 221+00
502+00
503+00 504+00 505+00 506+00 507+00
508+00
509+00
510
+00
511+
00
0+00
1+00
2+00
EXISTING R/W
EXISTING R/W
TCE-2
TCE-2 TCE-2
TCE-3
TCE-
3R/
W
R/
W
R/
W
8" TG-S-30
A
8" TG-S-30
8" T
G-S-
30
W.V.
CONTRACT
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.ADDENDA / REVISIONS SECTION
SHEET NO.
N:\
3198
5-015\
CA
DD\
CS
25-2
A.d
gn
5/1/2
02
08:5
7:0
8
AM
STRIPING (ITEM 817013)(10' LINE, 30' GAP, 10' LINE)
5" BROKEN WHITE EPOXY RESIN PAINT PERMANENT PAVEMENT
PAVEMENT STRIPING (ITEM 817013)
5" SOLID DOUBLE YELLOW EPOXY RESIN PAINT PERMANENT
PAVEMENT MARKINGS LEGEND
ITEMSYMBOL
A
B
QUANTITY
PAVEMENT STRIPING (ITEM 817013)
5" SOLID WHITE EPOXY RESIN PAINT PERMANENT
STRIPING (ITEM 817013)(2' LINE, 6' GAP, 2' LINE)
5" DOTTED WHITE EPOXY RESIN PAINT PERMANENT PAVEMENT
STRIPING, SYMBOL/LEGEND (ITEM 817002)
WHITE ALKYD THERMOPLASTIC, PERMANENT PAVEMENT
PAVEMENT STRIPING (iTEM 817013)
5" SOLID YELLOW EPOXY RESIN PAINT PERMANENT
SCALE
FEET
0 30 60 90
N
SAND HILL ROAD (S 319)
PHASE 2A
PHASE 2A
AB
1
2
3
4
5
6
7
MA
TC
H
LIN
E S
TA. 2
14+
50 - CS-23 M
AT
CH
LIN
E S
TA. 221+
00 - C
S-26
EXIS
TIN
G
CL
AR
K
DRIV
E
PR
OP
OS
ED
CL
AR
K
DRIV
E
DRUMS @ 10 LF O.C.
(48"x30")
R11-2
(24"x12")
R9-9
WRA
CS-25
SUSSEX
GATEWAY IMPROVEMENTSGEORGETOWN EAST
95
T201804301
DWC
MJB
MAINTENANCE OF TRAFFICPLAN - PHASE 2A
SEQUENCE OF CONSTRUCTION - PHASE 2A
(48"x30")
(3) R11-2
435 LF
290 LF
DRUMS @ 10 LF O.C.
(48"x30")
(2) R11-2
DRUMS @ 35 LF O.C.
(SEE UTILITY RELOCATION PLANS)
INSTALL UNDERGROUND SEWER LINE
SHIFT TRAFFIC FOR PHASE 3.
TO 119+50 AT THE END OF PHASE 2, THEN IMMEDIATELY
USING TA-10 CONSTRUCT THE SECTION FROM STA 117+25
CENTER ENTRANCE.
MARKINGS AND SIGNING NORTH OF EXISTING CHEER
FINAL PAVEMENT ELEVATION. INSTALL FINAL PAVEMENT
NORTH OF EXISTING CHEER CENTER ENTRANCE UP TO
ROUNDABOUT AND PROPOSED SECTION OF SAND HILL ROAD
CONSTRUCT BMP-1033, PROPOSED CLARK DRIVE,
CENTER ENTRANCE AND IMPLEMENT DETOUR PLAN DP-03.
CLOSE SAND HILL ROAD NORTH OF THE EXISTING CHEER
USING WEDGE AT THE END OF THE WORKDAY.
BUS STOP ACCESS AND RESTORE DRIVEWAY CONNECTIONS
9 TRAVEL LANE. COORDINATE WITH DART TO MAINTAIN
TA-11B WHEN WORKING ADJACENT TO THE SHIFTED EB US
CLOSE SHOULDER USING TA-3 OR USING TA-10 OR
PROPOSED EB US 9 AND REMOVE TEMPORARY PAVEMENT.
WITH US 9 TRAFFIC SHIFTED TO THE NORTH, CONSTRUCT
MEASURES, SEE ES-10 TO ES-16.
INSTALL ALL EROSION AND SEDIMENT CONTROL
ERADICATE CONFLICTING STRIPING.
MAINTENANCE OF TRAFFIC PLAN, SEE CS-24 TO CS-31.
APPLY TEMPORARY STRIPING AS SHOWN ON THE
THE PERMANENT WARNING SIGN SHEET.
MAINTAIN ALL PERMANENT WARNING SIGNS AS SHOWN ON
2
2 ADDED FIRE HYDRANT AND WATER VALVE. R. WILLS - 5/1/20
INV.(45.06)
8" NOTCHED WEIR
INV. (46.12)
3' RECTANGULAR WEIR
EM
INV:4
5.6
2
DIR.
ONLY
DM
H(4
437)
TOP:4
7.7
4
INV:4
5.2
3IN
V:4
5.2
3
211
+00
212
+00
213
+00
214
+00
500+00
501+
00
107+00
108+00
109+00110+00 111+00
112+00113+00
114+00
EXISTING R/W
W/
R
GNI
TSI
XE
W/R GNITSIXE
W/R GNITSIXE
TCE-1TCE-1
TC
E-1
TCE
R/W-1
R/W
R/
W
R/
W
R/
W
PE-1
PE-2
PE-2
PE-2
PE-2
PE-2
PE-2
8" T
G-S-
30
8" TG-S-30
8"
TG-S-40
8" TG-S-40
8"
TG-S-30
10" T
G-
W-20
10"
TG-
W-20
10" TG-W-20
8" TG-W-10
8" TG-W-10
8" TG-W-10
8"
TG-
W-10
W.V.
CONTRACT
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.ADDENDA / REVISIONS SECTION
SHEET NO.
N:\
3198
5-015\
CA
DD\
CS
29-3.d
gn
5/1/2
02
08:5
7:1
2
AM
SEQUENCE OF CONSTRUCTION - PHASE 3
1
2
3
4
5
6
7
8
9
10 SEE TEMPORARY SIGNAL PLAN SG-04 FOR SIGNAL WORK OCCURING DURING PHASE 3.
DRIVEWAY CONNECTIONS USING WEDGE AT THE END OF THE WORKDAY.
ADJACENT TO THE SHIFTED WB US 9 TRAVEL LANE. COORDINATE WITH DART TO MAINTAIN BUS STOP ACCESS AND RESTORE
CONSTRUCT PROPOSED WB US 9 AND REMOVE TEMPORARY PAVEMENT. CLOSE SHOULDER USING TA-3 OR USE TA-10 WHEN WORKING
AS SHOWN ON SIGNAL PLAN SG-04.
REMOVE DETOUR AND COORDINATE WITH DELDOT TRAFFIC / TMC TO HAVE THE SIGNAL PHASING UPDATED TO CONFIGURATION 3A,
AND SIGNING ON REMAINDER OF SAND HILL ROAD.
CONSTRUCT REMAINING PORTION OF SAND HILL ROAD UP TO FINAL PAVEMENT ELEVATION. INSTALL FINAL PAVEMENT MARKINGS
CONSTRUCT RAISED ISLANDS IN CHEER CENTER PARKING LOT AND MILL AND OVERLAY EXISTING PARKING LOT.
CONSTRUCT DRIVEWAY CONNECTING RELOCATED CLARK DRIVE TO CHEER CENTER PARKING LOT AND REMOVE EXISTING CLARK DRIVE.
INTERSECTION.
SHIFT US 9 TRAFFIC TO THE SOUTH AND REMOVE DETOUR PLAN DP-03 AND IMPLEMENT DP-04 CLOSING SAND HILL ROAD AT US 9
INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES, SEE ES-15 TO ES-18.
CONFLICTING STRIPING.
APPLY TEMPORARY PAVEMENT MARKINGS AS SHOWN ON THE MAINTENANCE OF TRAFFIC PLAN, SEE CS-28 TO CS-32. ERADICATE
MAINTAIN ALL PERMANENT WARNING SIGNS AS SHOWN ON THE PERMANENT WARNING SIGN SHEET.
N
SA
ND
HIL
L R
OA
D (S 319)
SCALE
FEET
0 30 60 90
11'
NOT TO SCALE
US 9
WB
11'2'
TRAVEL LANE
ACTIVE US 9
TRAVEL LANE
ACTIVE US 9
WORK AREA
A
PHASE 3
PHASE 3
PHASE 3
PHASE 3
US 9
EB
AIR
PO
RT R
OA
D (S 319)
PH
AS
E 3
PH
AS
E 3
PH
ASE 3
PH
ASE 3
10 LF O.C.
DRUMS @
US 9 (S 18, E MARKET STREET)US 9 (S 18
, LEWES-GEORGETOWN HIGHWAY)
SECTION A-A, US 9
A B A
VARIES
SHOULDER
10 LF O.C.
DRUMS @
A
MA
TC
H
LIN
E S
TA. 10
6+
50 - CS-28
MA
TC
H
LIN
E S
TA. 11
4+
50 - C
S-30
MATCH LIN
E STA. 214+50 - CS-32
35 LF O.C.
DRUMS @
PH
AS
E 3
PH
AS
E 3
MATCH LINE STA. 210+50 - CS-31
J
J
J
A
A
A
A
1,870 LF
1,380 LF
60 SF
PAVEMENT STRIPING (ITEM 817013)
5" SOLID DOUBLE YELLOW EPOXY RESIN PAINT PERMANENT
PAVEMENT MARKINGS LEGEND
ITEMSYMBOL
A
B
QUANTITY
PAVEMENT STRIPING (ITEM 817013)
5" SOLID WHITE EPOXY RESIN PAINT PERMANENT
JSTRIPING, SYMBOL/LEGEND, (ITEM 817002)
16" SOLID WHITE ALKYD THERMOPLASTIC, PERMANENT PAVEMENT
B
B
B
A
(24"x12")
R9-9
(24"x12")
R9-9
WRA
CS-29
SUSSEX
GATEWAY IMPROVEMENTSGEORGETOWN EAST
99
T201804301
DWC
MJB
MAINTENANCE OF TRAFFICPLAN - PHASE 3
AND OPENING SAND HILL ROAD
PRIOR TO REMOVING DETOUR
CONTACT DELDOT TRAFFIC/TMC
(48"x30")
(2) R11-2
TEMPORARY STRIPING
TIE INTO EXISTING
OF WB TRAVEL LANE
TA-10 WHEN WORKING WITHIN 10'
OR CLOSE TRAVEL LANE USING
CLOSE SHOULDER USING TA-3
BLACK-ON-ORANGE
(48"x48")
W1-4-DE
BLACK-ON-ORANGE
(48"x48")
W1-4-DE
AHEAD
SHIFT
LANE
AHEAD
SHIFT
LANE
(SEE UTILITY RELOCATION PLANS)
WATER AND SEWER LINES
INSTALL UNDERGROUND
2
2 ADDED FIRE HYDRANT AND WATER VALVE. R. WILLS - 5/1/20
AC
AC
WV
WV
U
INV:44.62
INV:44.60
INV:46.83
DIR. ONLY
215+00
216+00217+00 218+00 219+00 220+00 221+00
509+00
510
+00
511+
00
0+00
1+00
2+00
EXISTING R/W
EXISTING R/W
TCE-2
TCE-2 TCE-2
TCE-3
TCE-
3R/
W
8" TG-S-30
A
8" TG-S-30
W.V.
8" T
G-S-
30
W.V.
CONTRACT
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.ADDENDA / REVISIONS SECTION
SHEET NO.
N:\
3198
5-015\
CA
DD\
CS
32-3.d
gn
5/1/2
02
08:5
7:1
4
AM
SEQUENCE OF CONSTRUCTION - PHASE 3
1
2
3
4
5
6
7
8
9
10 SEE TEMPORARY SIGNAL PLAN SG-04 FOR SIGNAL WORK OCCURING DURING PHASE 3.
DRIVEWAY CONNECTIONS USING WEDGE AT THE END OF THE WORKDAY.
ADJACENT TO THE SHIFTED WB US 9 TRAVEL LANE. COORDINATE WITH DART TO MAINTAIN BUS STOP ACCESS AND RESTORE
CONSTRUCT PROPOSED WB US 9 AND REMOVE TEMPORARY PAVEMENT. CLOSE SHOULDER USING TA-3 OR USE TA-10 WHEN WORKING
AS SHOWN ON SIGNAL PLAN SG-04.
REMOVE DETOUR AND COORDINATE WITH DELDOT TRAFFIC / TMC TO HAVE THE SIGNAL PHASING UPDATED TO CONFIGURATION 3A,
AND SIGNING ON REMAINDER OF SAND HILL ROAD.
CONSTRUCT REMAINING PORTION OF SAND HILL ROAD UP TO FINAL PAVEMENT ELEVATION. INSTALL FINAL PAVEMENT MARKINGS
CONSTRUCT RAISED ISLANDS IN CHEER CENTER PARKING LOT AND MILL AND OVERLAY EXISTING PARKING LOT.
CONSTRUCT DRIVEWAY CONNECTING RELOCATED CLARK DRIVE TO CHEER CENTER PARKING LOT AND REMOVE EXISTING CLARK DRIVE.
INTERSECTION.
SHIFT US 9 TRAFFIC TO THE SOUTH AND REMOVE DETOUR PLAN DP-03 AND IMPLEMENT DP-04 CLOSING SAND HILL ROAD AT US 9
INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES, SEE ES-15 TO ES-18.
CONFLICTING STRIPING.
APPLY TEMPORARY PAVEMENT MARKINGS AS SHOWN ON THE MAINTENANCE OF TRAFFIC PLAN, SEE CS-28 TO CS-32. ERADICATE
MAINTAIN ALL PERMANENT WARNING SIGNS AS SHOWN ON THE PERMANENT WARNING SIGN SHEET.
SCALE
FEET
0 30 60 90
N
SAND HILL ROAD (S 319)
PH
ASE 3
PHASE 3
CL
AR
K
DRIV
E
MA
TC
H
LIN
E S
TA. 2
14+
50 - CS-29
CS-32
WRA
CLOSE PARKING LOT FOR RESURFACING
(24"x12")
(2) R9-9
SUSSEX
GATEWAY IMPROVEMENTSGEORGETOWN EAST
102
T201804301
DWC
MJB
MAINTENANCE OF TRAFFICPLAN - PHASE 3
10 LF O.C.
DRUMS @
PH
AS
E 3
PH
AS
E 3
(48"x30")
(2) R11-2
CONSTRUCTION ON SAND HILL ROAD
REMOVED AT THE COMPLETION OF
SIGNS AND BARRICADES SHALL BE
2
2
2 ADDED FIRE HYDRANTS AND WATER VALVES. R. WILLS - 5/1/20
CONTRACT
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.ADDENDA / REVISIONS SECTION
SHEET NO.
N:\
3198
5-015\
CA
DD\
ES
07.d
gn
5/1/2
02
08:5
7:2
4
AM
10' D
RAIN
AG
E
EA
SE
ME
NT
PB 70-26
P.B. 70-25
P.B. 214-117
D.R. 4136-117
SUSSEX PREPARATORY ACADEMY FOUNDATION, INC.
135-15.00-119.00
P.B. 40-173
D.R. 3753-258
AND MARJORIE A. SHORT
CHARLES F. SHORT
135-15.00-116.00
LOT F
D.R. 3764-240
PROPERTIES, LLC
D.M. TAYLOR
135-15.00-115.07
P.B. 60-90
D.R. 4148-165
STERLING SQUARE, LLC
135-15.00-115.06
LOT 1
P.B. 6
0-90
D.R. 4
14
8-165
ST
ER
LIN
G
SQ
UA
RE, L
LC
135-15.0
0-115.0
6
LO
T 1
EXISTING R/W
EXISTING R/W
TCE-1
TCE-2
R/W
P.B. 39-185
P.B. 70-26
P.B. 214-117
D.R. 4136-117
FOUNDATION, INC.
ACADEMY
PREPARATORY
SUSSEX
135-15.00-119.02
R/W-2
R/W
R/W
R/W
TCE-3PE-5
PE-5
PE-5
TCE-4
TCE-4
PE-6
PE-7
PE-7
TCE-4
TCE
D.R. 4983-6
JOSEPH M. SCHELL
135-15.00-117.00
16-R
11-R10-R
17-R
8-R
10-
R
18-R
WV
WV + +
X
GRASS
GRASS
GRAVEL
GRASS
GRASS
SPIGOT
AC
12" RCP 12" RCP
HOT MIX
HOT MIX
HOT MIX
HOT MIX
MIX
HOT
MAC
++
4" CLUSTER SMALL TREES
27"X42" RCEP
12" PVC
+
GRASS
27"X42" RCEP
AND TREES
SMALL SHRUBS
3"
PINE
3" PINE
3"
PINE
3"
PINE
2"
PINE
4"
MYRTLE
CLUSTER
2"
MYRTLE
CLUSTER
2"
MYRTLE
CLUSTER
2"
MYRTLE
CLUSTER
2"
MYRTLE
CLUSTER
2"
& CAP
REBAR
TP145
POND
4" 4"
3"3"3"HOLLY
2"
HOLLY
2"
HOLLY
2" HOLLY
2"
HOLLY
2"
MAPLE
3"
MAPLE
3"
MAPLE
3"
MAPLE
3"
MAPLE
3"MAPLE
3"
MAPLE
3"
& CAP
REBAR
TP144
POND
MAPLE
3"MAPLE
3"
MAPLE
3"MAPLE
3"
MAPLE
3"
MAPLE
3"
05204
53571/
DPL
MAPLE
3"
ABANDONED
05219
#53555/
DPLPINE
3"
PINE
3"
PINE
3"
PINE
3"PINE
3"
PINE
3"PINE
3"
PINE
3"
PINE
3"
PINE
3"PINE
3"
PINE
3"
PINE
3"
PINE
3"
PINE
3"
PINE
3"
PINE
3" PINE
3"
PINE
3"
PINE
3"
PINE
3"
PINE
3"
PINE
3"
PINE
3"
PINE
3"
PINE
3"
05235
#53538/
DPL
PINE
3"
PINE
3"
PINE
3"
PINE
3"PINE
3"
PINE
3"
MAPLE
40"10"
& CAP
REBAR
TP81
LOCATION
APPROX. WELL
SHED
WOOD
SHED
WOOD
MAPLE
TWIN
10"VINYL
2 STORY
& CAP
REBAR
TP140
SHRUBS
CLUSTER
1"SHELTER
BUS
APPLE
6"
APPLE
6"
PLUM
2"
OAK
12"
MAPLE
15"MAPLE
14"
FIR
14"
CEDAR
CLUSTER
6"
NAIL
MAG
TP78MYRTLE
CLUSTER
2"
MYRTLE
CLUSTER
2"
MYRTLE
CLUSTER
2"
BLOCK
1 STORY
MYRTLE
2" TRIPLE
MYRTLE
3" TRIPLE
& CAP
REBAR
TP83
BEECH
12"
& CAP
REBAR
TP139
42X12" CEDAR
10"
12"
TWIN
8"
INV:45.54
INV:47.56
INV:47.86
INV:4
5.5
4
INV:4
5.8
9
TOP:4
9.5
4
DM
H(10846)
INV:47.04INV:47.12 INV:47.07INV:46.78
DIR. ONLY
DIR. ONLY
TV
U
VINYL
1 STORY
205+00 206+00
207+00
208+00
209+00
210+00
PC 205
+87.95
SP
A
8" TG-S-30
10" TG-W-20
45.5
45.545.5
45.5 45.5
46.0
46.0
46.0
46.0
46.0
46.5
46.5
46.5
46.5
46.5
46.5
47.0
47.0
47.0
47.0
47.0
47.5
47.5
47.5
47.5
47.5
47.5
47.5
47.5
48.048.0
48.0
48.0
48.0
48.0
48.0
48.0
48.0
48.0
48.0
48.0
48.048.0
48.0
48.5
48.5
48.5
48.5 48.5 48.5
48.5
48.5
48.5
48.5
48.5
48.548.5
48.5
48.548.5
48.5
48.5
49.0
49.0
49.0
49.0
49.0
49.0
49.0
49.5
49.5
49.5
50.0
50.0
47.0
47.0
48.0
48.0
48.0
48.049.0
49.050.0
50.0
50.5
SC
E
46.0
46.0
46.0
47.0
47.0
47.0
48.0
48.0
48.0
49.0
DI
32
DI
31
DI
40
49
50
48.5
47.5
48.5
49
488" TG-S-30
8" TG-S-30
10" TG-W-20
F.H.
W.V.
NSCALE
FEET
0 30 60 90
STE
RLIN
G
AV
EN
UE
AIRPORT ROAD (S 319)
AIRPORT ROAD (S 319)
CONSTRUCTION BASELINE
SF
282'
SF
357'
SF
77'
ES-05
MATC
H LIN
E STA. 210
+50 -
MA
TC
H
LIN
E S
TA. 204+
50 - ES-06
SUSSEX
ES-07
WRA
GATEWAY IMPROVEMENTSGEORGETOWN EAST
118
T201804301
BPG
JDC
EROSION AND SEDIMENTCONTROL PLANMOT STAGE 1B
SF
80'
INCIDENTAL TO THE COST OF THE SUMP PITS.
PRIOR TO DISCHARGE. COST OF FILTERING DEVICES SHALL BE
BAGS, PORTABLE SEDIMENT TANK, OR OTHER APPROVED MEANS
DISCHARGE FROM SUMP PITS SHALL BE TREATED WITH FILTER
STABLE OUTFALL FOR PUMPED DISCHARGE. SEDIMENT LADEN
LOCATING SUMP PITS AND PROVIDING ADEQUATE PUMPS AND
NECESSARY. CONTRACTOR SHALL BE RESPONSIBLE FOR
SUMP PITS SHALL BE USED FOR DEWATERING WORK AREA AS
SUMP PIT (SP)
NOTES:
1.
CONTROL, CURB INLET (905005).
PRICE PER EACH (ONE PER INLET) FOR INLET SEDIMENT
PROTECTION SHALL BE PAID AT THE CONTRACT UNIT
AND CENTERED ACROSS CURB OPENING. THE INLET
COMPOST FILTER LOG PLACED IN GUTTER FLOWLINE
CONSIST OF 8 FOOT LONG, 12 INCH DIAMETER
INLET PROTECTION FOR CURB OPENING INLETS SHALL
2
2 ADDED FIRE HYDRANT AND WATER VALVE. R. WILLS - 5/1/20
CONTRACT
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.ADDENDA / REVISIONS SECTION
SHEET NO.
N:\
3198
5-015\
CA
DD\
ES
12.d
gn
5/1/2
02
08:5
7:2
6
AM
+
P.B. 62-346
EASEMENT #1
EXISTING ACCESS EASEMENT
P.B. 62-346
EASEMENT #3
EASEMENT
EXISTING UTILITY
P.B. 62-346
EASEMENT #4
EXISTING UTILITY EASEMENT
P.B. 62-346
EASEMENT #7
DRAINAGE EASEMENT
EXISTING
P.B. 91-36
D.R. 3102-291
GEORGETOWN EAST PARK CENTER, LLC
135-15.00-39.01
LOT 1
D.R. 2345-93
CHEER APARTMENTS, LP
135-15.00-26.01
EXISTING R/W
EXISTING R/W
TCE-2
TCE-2 TCE-2
TCE-3
TCE-
3R/
W
R/
W
R/
W
D.R. 2345-93
CHEER APARTMENTS, L.P.
135-15.00-26.02
PARCEL B
P.B. 62-346
EASEMENT #6
EXISTING UTILITY EASEMENT
P.B. 62-346
D.R. 2004-182
SUSSEX COUNTY SENIOR SERVICES, INC.
135-15.00-26.03
PARCEL C
6-L
9-L
11-L
10-L
215+00
216+00217+00 218+00 219+00 220+00 221+00
PT 216
+94.65
502+00
503+00 504+00 505+00 506+00 507+00
508+00
509+00
510
+00
511+
00
PT 5
01+
29.7
8
PC 502+34.5
8
PT 502
+88.07
PC 507
+56.71
PT 508+57.20
0+00
1+00
2+00
46.0
46.0
46.0
46.5
46.5
46.5
46.5
47.0
47.0
47.0
47.0
47.0
47.5
47.5
47.5
47.5
47.5
47.5
47.5
47.5
48.0
48.0
48.0
48.0
48.0
48.0
48.0
48.0
48.0
48.0
48.5
48.5
48.5
48.5
48.5
48.5
48.5
48.5
49.0
49.0
49.0
49.0
49.0
49.0
49.0
49.5
49.5
8" TG-S-30
A
8" TG-S-30
PS
T
SCE
PS
T
43.043.0
43.043.0
43.043.0
43.5
44.0
44.0
44.0
44.0
44.0
44.0
44.0
44.5
44.5
45.0
45.0
45.0
45.0
45.0
45.0
45.0
45.0
45.0
45.5
46.0
46.0
46.0
46.0
46.0
46.0
46.0
46.0 46.5
46.5
46.5
46.5
47.0
47.0
47.0
47.0
47.547.5
48.0
48.0
DI
49
DI
50
P
46
P
47
FES
17
FES
18
DI
51
P
48
FES
19
P
49
FES
20
DI
46
P
38
SCE
SCE
SCE
SP
DI
54
P
44DI
55
P
45
MH
10
P
51SP
43.0
44.0
46.0
46.0
47.0
47.0
47
47
47
47.5
47.5
47.5
47.547.5
48.0
48.0
48.0
48.0
48.0
48.0
48.0
48
48
48
48
48.5
48.5
48.5
48.5
48.5
49.0
49.0
49.0
49
49
49
49
49
49
49.5
49.5
44
43
42
45
46
47
47
4546
4443
46
47
44.75
44.75
41.
75
47.40
47.30
45
44
43
40.75
8" T
G-S-
30
W.V.
WVWV
WV
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
WVWV WV
WV
WV
WV
WV
LANE
FIRE
?
U
U
U
INV:45.90INV:45.91
INV:44.62
INV:44.60
INV:46.83
DIR. ONLY
NC
LA
RK
DRIV
E
SCALE
FEET
0 30 60 90
SAND HILL ROAD (S 319)SAND HILL ROAD (S 319)
CONSTRUCTION BASELINE
MA
TC
H
LIN
E S
TA. 2
14+
50 - ES-09
ES-12
WRA
NO. TONS
STABILIZED CONSTRUCTION ENTRANCE
STATION OFFSET
12-1 507+67.41 10' LT. 60
12-2 505+02.03 9' RT. 60
12-3 216+75.37 3' RT. 60
NO.
SEDIMENT BASIN SCHEDULE
CLEAN-OUT ELEV.(EL)
FACILITY AREA, AC.
REQUIRED STORAGE (Vs), CY
4.54
0.62
608
42.31
SB 12-1
SF
113'
A-112-1 508+64.61 508+66.17 VARIES 36'
ED
12-1
SB
9-1
MA
TC
H
LIN
E S
TA. 221+
00 - ES-13
SB
12-1
SEE NOTE, THIS SHEET
SAME DAY STABILIZATION,
UNSTABILIZED OVERNIGHT.
EACH WORK DAY. NO DISTURBED AREA SHALL BE LEFT
BE DISTURBED THAT CANNOT BE STABILZIED BY THE END OF
STABILIZED BY THE END OF EACH WORK DAY. NO AREA SHALL
ALL AREAS IDENTIFIED FOR SAME DAY STABILIZATION MUST BE
SAME DAY STABILIZATION NOTE
NO. L.F.STATION SIZE
TEMPORARY PIPE
12-1 510+06 15" RCP 50
2888
454
WET STORAGE, CY
DRY STORAGE, CY
TP
12-1
SUSSEX
GATEWAY IMPROVEMENTSGEORGETOWN EAST
123
T201804301
BPG
JDC
EROSION AND SEDIMENTCONTROL PLAN
DRAINAGE AREA, AC.
SF
74'
MOT STAGE 2, 2A
SCE
12-1
SCE
12-2
SCE
12-3
INCIDENTAL TO THE COST OF THE SUMP PITS.
PRIOR TO DISCHARGE. COST OF FILTERING DEVICES SHALL BE
BAGS, PORTABLE SEDIMENT TANK, OR OTHER APPROVED MEANS
DISCHARGE FROM SUMP PITS SHALL BE TREATED WITH FILTER
STABLE OUTFALL FOR PUMPED DISCHARGE. SEDIMENT LADEN
LOCATING SUMP PITS AND PROVIDING ADEQUATE PUMPS AND
NECESSARY. CONTRACTOR SHALL BE RESPONSIBLE FOR
SUMP PITS SHALL BE USED FOR DEWATERING WORK AREA AS
SUMP PIT (SP)
CONTROL.*SEE SW-09 FOR WEIR WALL OUTLET SEDIMENT
*SEE ED-01 FOR ADDITIONAL INFORMATION.
NO. LENGTHOFFSETBEGIN STA. END STA. *TYPE
EARTH DIKE
UNIT PRICE PER TON.REHABILITATION SHALL BE PAID PER *QUANTITY FOR INITIAL INSTALLATION.
USED AS SEDIMENT BASIN 12-1
BMP NO. 1033 WET POND TO BE
WET POND FOREBAY
BMP NO. 1033
USED AS SEDIMENT BASIN 9-1
BMP NO. 1031 WET POND TO BE
NOTES:
1.
CONTROL, CURB INLET (905005).
PRICE PER EACH (ONE PER INLET) FOR INLET SEDIMENT
PROTECTION SHALL BE PAID AT THE CONTRACT UNIT
AND CENTERED ACROSS CURB OPENING. THE INLET
COMPOST FILTER LOG PLACED IN GUTTER FLOWLINE
CONSIST OF 8 FOOT LONG, 12 INCH DIAMETER
INLET PROTECTION FOR CURB OPENING INLETS SHALL
2
2 ADDED FIRE HYDRANT AND WATER VALVE. R. WILLS - 5/1/20
CONTRACT
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.ADDENDA / REVISIONS SECTION
SHEET NO.
N:\
3198
5-015\
CA
DD\
ES
16.d
gn
5/1/2
02
08:5
7:2
7
AM
+
P.B. 62-346
EASEMENT #5
EXISTING DRAINAGE EASEMENT
P.B. 91-36
D.R. 3024-328,
GRANTED TO DELDOT
PERMANENT EASEMENT
10' DRAINAGE EASEMENT PB 70-26
P.B. 39-185
D.R. 2052-152
AND MARTHA O. HERNANDEZ
ALEJANDRO C. HERNANDEZ
135-15.00-119.03
LOT 2
P.B. 39-185
P.B. 70-26
P.B. 214-117
D.R. 4136-117
ACADEMY FOUNDATION, INC.
SUSSEX PREPARATORY
135-15.00-119.02
P.B. 198-94
D.R. 4156-158
CHEER, INC.
135-15.00-25.01
P.B. 60-90
D.R. 4148-165
STERLING SQUARE, LLC
135-15.00-115.06
LOT 1
P.B. 60-90
D.R. 4410-107
STERLING SQUARE, LLC
135-15.00-115.09
LOT 3
P.B. 91-36
D.R. 3102-291
GEORGETOWN EAST PARK CENTER, LLC
135-15.00-39.01
LOT 1
P.B. 91-36
D.R. 3102-291
PARK CENTER, LLC
GEORGETOWN EAST
135-15.00-39.01
DELDOT ACQUISITION
PARCEL A FUTURE
D.R. 2345-93
CHEER APARTMENTS, LP
135-15.00-26.01
EXISTING R/W
W/
R
GNI
TSI
XE
W/R GNITSIXE
W/R GNITSIXE
TCE-1TCE-1
TC
E-1
P.B.
39-185
P.B.
70-26
P.B.
214-117
D.R.
4136-117
FO
UN
DA
TIO
N, IN
C.
AC
AD
EM
Y
PR
EP
AR
AT
OR
YS
US
SE
X
135-15.0
0-119.0
2
TCE
D.R. 3057-80
GRANTED TO DELDOT
PERMANENT EASEMENT
DELMARVA RIGHT OF WAY - D.R. 1409-259 - P.B. 91-36
R/W-1
R/W
P.B. 62-346
EASEMENT #6
UTILITY EASEMENT
EXISTING
R/
W
R/
W
P.B. 60-90
D.R. 4410-107
LLC
STERLING SQUARE,
135-15.00-115.08
LOT 2
D.R. 4983-6
JOSEPH M. SCHELL
135-15.00-117.00
P.B. 62-346
D.R. 2004-182
SUSSEX COUNTY SENIOR SERVICES, INC.
135-15.00-26.03
PARCEL C
7-R
11-R
8-R
12-R
10-R
13-R
5-L
6-L
9-L
11-L
PER PB 129-53.
ACCESS AND DRAINAGE
EASEMENT FOR CROSS
20' WIDE PERMANENT
PE-1
R/
W
PE-2
PE-2
PE-2
PE-2
PE-2
PE-2
U
6" CHERRY
GRASSGRASS
12"DPE
MIX
HOT
SM
AL
L
TR
EE
S
PA
TIO
ST
ON
E
POND
VINYL MOBILE TRAILER
GR
AV
EL
ST
ON
ES
12"
RC
P
12" RCP
24"
HDP
E
SHED
WOOD
SHED
WOOD
D.I.
D.I.
05259
#53546/
CONC W
EIR
PCC CURB TYPE 3-6
PCC CURB TYPE 3-6
TYPE 1-
6
PC
C
CU
RB
27"
X4
2"
RC
EP
12" RCP 12"
RC
P
6" 6"
WR
A14
7
N:2
54
225.8
690
RE
BA
R
&
CA
P
CO
NC
VINYL
BLOCK AND
1 STORY
CEDAR
5" 1
GRASS
MIX
HOT
CONC
HOT MIX
OPTIC
FIBER
BURIED
REBAR & CAP
TP108
EL = 50.06'
"+" CUT
FLANGE BOLT FH
ROADSIDE
BM - #3
& CAP
REBAR
TP109
GRAVEL
REBAR & CAP
TP138
GRASS
GRASS
8"
14" TWIN PINE
MAPLE
8" CLUSTER
16" PINE
PINE
12" 1
12" PINE
12" MAPLE
CHERRY10"
GRASS
CLUSTER4"
REBAR & CAP
TP110
& CAPREBARTP103
GRASS
GRASS
SOYBEAN
HOT MIX
MYRTLE6" CLUSTERMYRTLE
4" CLUSTER
28"
SHEDVINYL
SHEDMETAL
05273
#53536/
DPL
05284
#53548/
DPL
05263
#53522/
DPL
05258
#58519/
DPL
MAPLE
6"
FRAME
WOOD
1 STORY
TWIN
6"
05249
#53523/
DPL
D.I.
CEDAR
4X1"
4" CLUSTER
TRIPLE
5" MAPLE
30"
SPIKE
TP86
05256
#53526/
DPL
SPIKE
TP85
05294
#53562/
DPL
PA
TIO
CO
NC
PIN
E16" 1
WVU
U
DIR.
ONLY
INV:4
5.7
1
INV:4
5.3
7
INV:45.22
INV:44.99
INV:4
4.8
6IN
V:4
5.1
5IN
V:4
4.8
5
INV:4
5.2
3IN
V:4
5.2
3
TOP:4
7.9
9
DM
H(4
488)
05249
#53499/
DPL
211
+00
212
+00
213
+00
214
+00
PT 211+37.08
PC 213+33.49
500+00
501+
00
POB 499+50.0
0
PC 500+80.2
7
PT 501+29.78
107+00
108+00
109+00110+00 111+00
112+00113+00
114+00
PT 11
1+53.52
PC 11
3+62.03
8" TG-W-10
8" TG-W-10
8" TG-W-10
8"
TG-
W-10
W.V.
46.0
46.5
46.5
46.5
46.5
47.0
47.0
47.0
47.0
47.0
47.0
47.0
47.047.047.5
47.5
47.5
47.5
47.5
47.5
47.5
47.5
47.5
47.
5
48.0
48.0
48.0
48.0
48.0
48.0
48.0
48.0
48.0
48.0
48.0
48.0
48.0
48.0
48.0
48.0
48.0
48.0
48.0
48.5
48.5
48.5
48.5
48.5
48.5
48.5
49.0
46.0
43.043.04
3.5
43.5
44.0
44.5
45.0
45.0
45.5
45.5 4
5.5
46.0
46.0
46.0
46.5
47.0
47.0
47.5
47.5
48.0
48.0
48.0
48.0
48.0
48.0
48.0
48.0
48.5
48.5
48.5
49.0
49.0
49.050.0
50.0
50.5
50.5
50.5
51.0
51.0
51.5
8" T
G-S-
30
8" TG-S-30
8"
TG-S-40
8" TG-S-40
8"
TG-S-30
10" T
G-
W-20
10"
TG-
W-20
10" TG-W-20
45
45
46
45
47
464
4
44
43
42
4546
42
43
44
45
46
42
43
44
45
42
44
4243
4444
43
45
46.5
48
44
4442
46.50
44
4443
42
46.50
46.50
46.50
46.50
45
46
47
46
41
46
4746
46.5
49
49
48.5
47.5
47.5
47
47
46.5
47
47
46
41
44
43
42
44
42
43
45 44
44
42
41
40
40
43.0
43.0
43.0
44.0
45.0
46.5
47.0
47.5
48.049.0
49.0
50.0
50.0
50.5
51.0
51.051.0
51.0
51.0
51.5
51.5
52.0
SP
SP
SP
SP
SCE
43.5
45.5
46.0
46.5
46.5
46.5
47.0
47.0
47.0
47.0
47.5
47.5
48.0
48.0
48.0
48.5
49.0
49.0
43.0
43.043.0
44.0
44.0
44.0
45.0
45.0
45.0
45.0
46.0
46.0
46.0
46.0
47.0
47.0
47.5
48.0
48.0
48.0
FES
3P
13
DI
36
P
39
DI
14
P
33
FES
4
DI
11
P
32
DI
12P
31
DI
9
DI
21
P
37
P
16
DI
7
P
19
DI
5
FES
5
P
18
DI
8
DI
6
P
20
FES
6
N
SCALE
FEET
0 30 60 90
US 9 (S 18, LEWES-GEORGETOWN HIGHWAY)
)TEERTS TEKRAM ,81
S( 9 SU
)91
3
S(
DA
OR
LLI
H
DN
AS
SAND HILL ROAD (S 319)
CONSTRUCTION BASELINE
US 9 (S 18, LEWES-GEORGETOWN HIGHWAY)
CONSTRUCTION BASELINE
AIRPORT ROAD (S 319)
CONSTRUCTION BASELINE
)91
3
S(
DA
OR
TR
OP
RIA
NO. TONS
STABILIZED CONSTRUCTION ENTRANCE
STATION OFFSET
MA
TC
H
LIN
E S
TA. 10
6+
50 - ES-15
MATCH LIN
E STA. 214+50 - ES-18
MA
TC
H
LIN
E S
TA. 11
4+
50 - ES-17
SB
9-1
P
17
16-2 111+63.17 25' LT. 60
WRA
ES-16
SUSSEX
GATEWAY IMPROVEMENTSGEORGETOWN EAST
127
T201804301
BPG
JDC
EROSION AND SEDIMENTCONTROL PLANMOT STAGE 3
SCE
16-2
UNSTABILIZED OVERNIGHT.
EACH WORK DAY. NO DISTURBED AREA SHALL BE LEFT
BE DISTURBED THAT CANNOT BE STABILZIED BY THE END OF
STABILIZED BY THE END OF EACH WORK DAY. NO AREA SHALL
ALL AREAS IDENTIFIED FOR SAME DAY STABILIZATION MUST BE
SAME DAY STABILIZATION NOTE
SEE NOTE, THIS SHEET
SAME DAY STABILIZATION
DISCHARGE TO ROADWAY.
ACCORDING TO PREVENT SEDIMENT
INSERT SUBMERGENCE AND CLEAN
CONTRACTOR TO MONITOR FOR INLET
MARKET STREET)
US 9 (S 18,
CONSTRUCTION BASELINE
UNIT PRICE PER TON.
REHABILITATION SHALL BE PAID PER
*QUANTITY FOR INITIAL INSTALLATION.
2
2 ADDED FIRE HYDRANT AND WATER VALVE. R. WILLS - 5/1/20
CONTRACT
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.ADDENDA / REVISIONS SECTION
SHEET NO.
N:\
3198
5-015\
CA
DD\
ES
18.d
gn
5/1/2
02
08:5
7:3
6
AM
+
P.B. 62-346
EASEMENT #1
EXISTING ACCESS EASEMENT
P.B. 62-346
EASEMENT #3
EASEMENT
EXISTING UTILITY
P.B. 62-346
EASEMENT #4
EXISTING UTILITY EASEMENT
P.B. 62-346
EASEMENT #7
DRAINAGE EASEMENT
EXISTING
P.B. 91-36
D.R. 3102-291
GEORGETOWN EAST PARK CENTER, LLC
135-15.00-39.01
LOT 1
D.R. 2345-93
CHEER APARTMENTS, LP
135-15.00-26.01
EXISTING R/W
EXISTING R/W
TCE-2
TCE-2 TCE-2
TCE-3
TCE-
3R/
W
R/
W
R/
W
D.R. 2345-93
CHEER APARTMENTS, L.P.
135-15.00-26.02
PARCEL B
P.B. 62-346
EASEMENT #6
EXISTING UTILITY EASEMENT
P.B. 62-346
D.R. 2004-182
SUSSEX COUNTY SENIOR SERVICES, INC.
135-15.00-26.03
PARCEL C
6-L
9-L
11-L
10-L
WV
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
WV
WV
WV
WV
CINDERS
1
1
+
+
+
++
1
WA
LL
CO
NC
CO
NC
CO
NC
3'
CO
NC
3'
3'
ST
ON
ES
WA
LL
AC
ACACA
CAC
AC
BUSHES
AC
(DO
WNSP
OUT)
4"
PV
C
(D
OW
NS
PO
UT)
4" P
VC
(D
OW
NS
PO
UT)
4" P
VC
(D
OW
NS
PO
UT)
4" P
VC
12" PVC
X
MULBERR
Y
12"
SOYBEAN
HOT MIX
05294
#153528/
DPL
HOT MIX
MYRTLE
6" CLUSTER
105314
#5353/
DPL
CONC
HOT MIX
GRASS
CLUSTER
6"
REBAR & CAP
TP102
SOYBEAN
GRASS
HOT MIX 05354
#53536/
DPL
QUAD
8"
CONC
PIPE
VERTICAL
TOP 12"HOLLY
8" 0
FREEZER
WALK IN
TANK
HOT MIX
WALL
SHED
WOOD
VALVE
PROPANE& CAP
REBAR
TP107
GRASS
STUCKO
BLOCK/BRICK
2 STORY
GRASS
SAW
CONCBRICK
HOT MIX
HOT MIX
WALL
BLOCK
8"
8"
HOUSE
SCREEN
WOOD
CLUSTER
3"
GRILL
BBQ
CEDAR
QUAD
18"
MYRTLE
CLUSTER
3"
GRASS
GRASS
CEDAR
1"
TRIPLE
8"MYRTLE
CLUSTER
2"
TWIN
10"
& CAP
REBAR
TP51
TRIPLE
5"PINE
6"
GRASS
PINE
10"
MYRTLE
CLUSTER
4"
MYRTLE
CLUSTER
3"
TRIPLE
8"
TWIN
4"3"
4"
4"
5"
BUSHES6"
& CAP
REBAR
TP106
6"
6" GRASSCONC
MYRTLE
CLUSTER
5"
HOLLY
2"
GRASS
U
U
INV:46.83
DIR. ONLY
215+00
216+00217+00 218+00 219+00 220+00 221+00
PT 216
+94.65
502+00
503+00 504+00 505+00 506+00 507+00
508+00
509+00
510
+00
511+
00
PT 5
01+
29.7
8
PC 502+34.5
8
PT 502
+88.07
PC 507
+56.71
PT 508+57.20
0+00
1+00
2+00
W.V.
46.0
46.5
47.0
47.0
47.5
47.5
47.5
47.5
47.5
47.5
47.5
48.0
48.0
48.0
48.5
48.5
48.5
48.5
48.5
49.0
49.0
49.0
49.0
49.0
49.5
49.5
43.0
43.0
43.0 43.0
43.0
43.0
43.043.5
43.5
43.5
43.5
43.543.5
43.5
44.0
44.0
44.0
44.0
44.0
44.0
44.0
44.5
44.5
44.5
44.5
44.5
44.5
44.5
44.5 45.0
45.0
45.0
45.0
45.045.0
45.0
45.0
45.045.5
45.5
45.5
45.5
45.5
45.5
46.0
46.0
46.0
46.0
46.0
46.0
46.0
46.0
46.546.5
46.5
46.5
46.5
46.5
46.547.0
47.047.0
47.0
47
47
47
47.5
47.5
47.5
47.547.5
47.5
48.0
48.0
48.0
48.0
48.048.0
48.0
48
48
48
48
48.5
48.5
48.5
48.5
49
49
49
49
49
8" TG-S-30
A
8" TG-S-30
3:1
3:1
5'
44
43
42
45
46
47
47
4546
4443
46
47
44.75
44.75
41.
75
47.40
47.30
45
44
43
40.75
46.0
SP
SCE
45.0
48.0
48.0
48.0
48.5
48.5
48.5
49.049.0
49.0
49.5
43.043.0
43.043.0
43.043.0
43.5
44.0
44.0
44.0
44.0
44.0
44.0
44.0
44.5
44.5
45.0
45.0
45.0
45.0
45.0
45.0
45.0
45.0
45.0
45.5
46.0
46.0
46.0
46.0
46.0
46.0
46.0
46.0 46.5
46.5
46.5
46.5
47.0
47.0
47.0
47.0
47.547.5
48.0
48.0
8" T
G-S-
30
W.V.
NC
LA
RK
DRIV
E
SCALE
FEET
0 30 60 90
SAND HILL ROAD (S 319)SAND HILL ROAD (S 319)
CONSTRUCTION BASELINE
MA
TC
H
LIN
E S
TA. 2
14+
50 - ES-16
NO. TONS
STABILIZED CONSTRUCTION ENTRANCE
STATION OFFSET
ES-18
WRA
18-1 216+22.96 2' RT. 60
SEE SHEET, THIS SHEET
SAME DAY STABILIZATION,
SUSSEX
GATEWAY IMPROVEMENTSGEORGETOWN EAST
129
T201804301
BPG
JDC
EROSION AND SEDIMENTCONTROL PLANMOT STAGE 3
18-1
SCE
UNSTABILIZED OVERNIGHT.
EACH WORK DAY. NO DISTURBED AREA SHALL BE LEFT
BE DISTURBED THAT CANNOT BE STABILZIED BY THE END OF
STABILIZED BY THE END OF EACH WORK DAY. NO AREA SHALL
ALL AREAS IDENTIFIED FOR SAME DAY STABILIZATION MUST BE
SAME DAY STABILIZATION NOTE
UNIT PRICE PER TON.
REHABILITATION SHALL BE PAID PER
*QUANTITY FOR INITIAL INSTALLATION.
WET POND FOREBAY
BMP NO. 1033
WET POND
BMP NO. 1033
2
2 ADDED FIRE HYDRANT AND WATER VALVE. R. WILLS - 5/1/20
CONTRACT
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.ADDENDA / REVISIONS SECTION
SHEET NO.
N:\
3198
5-015\
CA
DD\
LI0
2.d
gn
5/1/2
02
08:5
7:4
7
AM
211
+00
212
+00
213
+00
214
+00
500+00
501+
00
107+00
108+00
109+00110+00 111+00
112+00113+00
114+00
P.B. 62-346
EASEMENT #5
EXISTING DRAINAGE EASEMENT
P.B. 91-36
D.R. 3024-328,
GRANTED TO DELDOT
PERMANENT EASEMENT
10' DRAINAGE EASEMENT PB 70-26
EXISTING R/W
W/
R
GNI
TSI
XE
W/R GNITSIXE
W/R GNITSIXE
TCE-1TCE-1
TC
E-1
TCE
D.R. 3057-80
GRANTED TO DELDOT
PERMANENT EASEMENT
DELMARVA RIGHT OF WAY - D.R. 1409-259 - P.B. 91-36
R/W
P.B. 62-346
EASEMENT #6
UTILITY EASEMENT
EXISTING
R/
W
R/
W
PER PB 129-53.
ACCESS AND DRAINAGE
EASEMENT FOR CROSS
20' WIDE PERMANENT
PE-1
PE-2
PE-2
PE-2
PE-2
PE-2
PE-2
SV
SV
SV
SEPTIC T
AN
K
AB
AN
DO
ND
EL.= 4
7.18'
SS
MH LID
#6742 15
X
DPL
8" TG-W (B)
8"
TG-S (B)
VE
R-C (B)
VE
R-
C (B)
VE
R-F
O (B)
VER-C (B)
BV-C (B)
BV-C (B)10" T
G-S (B)
10" TG-S (B)
10" TG-S (B)
10" T
G-
W (B)
VER-C (B)
DP-E (B)
VE
R-
C (B)
VE
R-
C (B)
BV-
C (B)
VE
R-
C (B)
VER-C (B)
VER-C (B)
VER-C (B)
VER-C (B)
VER-C (B)
VER-C (B)
VER-C (B)
8" TG-W (B)
10"
TG-
W (B)
8" T
G-W (B)
10" TG-S (B)
10" T
G-S (B)
10" T
G-S (B)8
" T
G-S
FM (B)
8"
TG-S
FM (B)
DP-E (B)
DP-E (B)
UNK (B)
UN
K (B)
EX SIG (B)
EX
SIG (B)EX SIG (B)
EX SIG (B)
EX SIG (B)
EX
SIG (B)
EX SIG (B)
EX SIG (B)
VER-F
O (B)
DP-E (B)
DP-E (
B)
ABANDONED
DP-E (B)
P
BV-C
A
EMW.V.
U
U
DPL
05249
#53496/
05258
#58519/
DPL
05249
#53523/
DPL
05256
#53526/
DPL
05263
#53522/
DPL
05275
#53525/
DPL
05273
#53536/
DPL
05284
#53548/
DPL 05294
#53562/
#52#VC53
#MV1
05294
#15
3528/
DPL
P
N
SCALE
FEET
0 30 60 90
MATCH LINE STA. 210+
50
)91
3
S(
DA
OR
LLI
H
DN
AS
)91
3
S(
DA
OR
TR
OP
RIA
WB US 9 (S 18, LEWES-GEORGETOWN HIGHWAY)EB US 9 (S 18, MARKET STREET)
OL
D
AIR
PO
RT
RO
AD (S 319)
NO. CIRCUIT NO. STATION OFFSET ARM LIGHT STANDARD
LIGHTING STANDARD SCHEDULE
HEIGHT
30'
30'
30'
30'
N/A
N/A
DENOTES LIGHTING STANDARD TO BE INSTALLED ON PROPOSED DELMARVA UTILITY POLE.
DENOTES LIGHTING STANDARD TO BE INSTALLED ON PROPOSED VERIZON UTILITY POLE.
250 W HPS EQUIVALENT LED UTILITY OWNED LEASED LIGHT
250 W HPS EQUIVALENT LED UTILITY OWNED LEASED LIGHT
LS
13LS
9
LS
8
LS
7
LS
EX
RM
D
LS
EX
RM
D
LS
15
LS
16
LS
18
LS
12
LS
11
CA
R
JW
4
PB
6
30'
30'
30'
N/A
N/A
N/A 12'
250 W HPS EQUIVALENT LED UTILITY OWNED LEASED LIGHT
250 W HPS EQUIVALENT LED UTILITY OWNED LEASED LIGHT
250 W HPS EQUIVALENT LED UTILITY OWNED LEASED LIGHT
30'
7
8
9
10
11
12
13
14
15
2
SR
1
SR
3
SR
6
SR
11
SR
JW
4
12
SR
13
SR
110+30.7 57.4' LT.
214+39.5 54.9' LT.
SEE NOTE 1
SEE NOTE 2
SEE NOTE 2SEE NOTE 2
SEE NOTE 2
MA
TC
H
LIN
E S
TA. 10
6+
50 - LI-
01
MATCH LIN
E STA. 214+50 - LI-05
MA
TC
H
LIN
E S
TA. 11
4+
50 - LI-
03
- LI-04
LS
14
SEE NOTE 1
SEE NOTE 1
RUNSERVICE
LIGHTING SERVICE SCHEDULE
DISTANCE INSTALLATIONDESCRIPTIONCONDUITS
# OFSIZE
** SERVICE RUN CONTINUES TO ADJACENT SHEET* RIGID GALVANIZED STEEL CONDUITNOTE: SERVICE RUN DISTANCE REFLECTS CONDUIT LENGTH ONLY.
3.0" 29' (2)#6,(1)#6 GROUND TRENCH15
2.0" 10' (3)#2,(1)#2 GROUND - LOAD SIDE TRENCH12*
4.0" 108' (4)#6,(1)#6 GROUND TRENCH18
3.0" 182'** (2)#6,(1)#6 GROUND TRENCH16
4.0" 133' (4)#6,(1)#6 GROUND TRENCH17
LS
20
30'N/A 12' 250 W HPS EQUIVALENT LED UTILITY OWNED LEASED LIGHT16
17
250 W HPS EQUIVALENT LED UTILITY OWNED LEASED LIGHT12'N/A
JW
1
SEE NOTE 2
SEE NOTE 3
LS
17
4
SR
PB
6PB
6
5
SR
7
SR 8
SR 9
SR10
SR
JW
1JW
1
PB
6
LS
10
SEE NOTE 1
LS
EX
LS
EX
LS
19
SEE NOTE 1
18
30'N/A 12' 250 W HPS EQUIVALENT LED UTILITY OWNED LEASED LIGHT19
20
3.0" 15' (2)#6,(1)#6 GROUND TRENCH19
3.0" 191'** (2)#6,(1)#6 GROUND TRENCH110
4.0" 131' (2)#6,(1)#6 GROUND TRENCH14
4.0" 200' (4)#6,(1)#6 GROUND BORE111
3.0" 20' (2)#6,(1)#6 GROUND TRENCH112
4.0" 107'** (4)#6,(1)#6 GROUND TRENCH113
N/A
N/A
161 W LED, IES TYPE 2 DISTRIBUTION
161 W LED, IES TYPE 2 DISTRIBUTION
161 W LED, IES TYPE 2 DISTRIBUTION
161 W LED, IES TYPE 2 DISTRIBUTION
250 W HPS EQUIVALENT LED UTILITY OWNED LEASED LIGHT
250 W HPS EQUIVALENT LED UTILITY OWNED LEASED LIGHT
4'
15'
4'
4'
12'
15'
15'
15'
4'
47.1' LT.107+49.4
109+37.3 50.5' LT.
213+50.8 58.5' RT.
112+39.5 58.1' LT.
114+48.9 53.0' LT.
107+13.0 43.3' RT.
108+47.8 53.7' RT.
109+59.7 56.6' RT.
44.8' LT.210+85.8
211+56.7 53.1' RT.
112+12.8 49.9' RT.
113+40.9 39.7' RT.
2.0" 8' (3)#2,(1)#2 GROUND - LINE SIDE TRENCH11*
4.0" 8' (8)#6,(4)#6 GROUND TRENCH43
4'
PANELBOARD SE
LOAD SERVEDCIRCUIT BREAKER
LOAD SERVEDNO.
CKT.
NO.
CKT.
FRAME TRIP POLE
CIRCUIT BREAKER
FRAME TRIP POLE
120211203-161W LED
SURFACE MOUNTED
240 VOLTS
100 AMP BUS
ENCLOSURE: BASE MOUNTED CABINET
SOLID NEUTRAL
AIC RATING - 22 KAIC
1 PHASE, 3 WIRE + GROUND
100 AMP MCCB
100 100
120431202-161W LED 100 100
12065120100 100
12087120100 100
SPARE
SPARE
3-161W LED
2-161W LED
SPARE
SPARE
100 20 1 100 20 19 10SPARE SPARE
3
2
1
3
WRA
LI-02
SUSSEX
GATEWAY IMPROVEMENTSGEORGETOWN EAST
LIGHTING PLAN
133
T201804301
DWC
MJB
NOTES:
3.
2.
1.
STANDARD NO. T-17 (2013).
FURNISH AND INSTALL ELECTRICAL SERVICE PEDESTAL (100 AMP) PER DELDOT
LED LUMINAIRE ON THE PROPOSED UTILITY POLE MOUNTED AT APPROXIMATELY 30 FT.
DELMARVA POWER SHALL INSTALL A 4 FT BRACKET ARM WITH 250 WATT EQUIVALENT
LED LUMINAIRE ON THE PROPOSED UTILITY POLE MOUNTED AT APPROXIMATELY 30 FT.
DELMARVA POWER SHALL INSTALL A 12 FT BRACKET ARM WITH 250 WATT EQUIVALENT
40'
40'
40'
40'
2
2 ADDED FIRE HYDRANT AND WATER VALVE. R. WILLS - 5/1/20
CONTRACT
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.ADDENDA / REVISIONS SECTION
SHEET NO.
N:\
3198
5-015\
CA
DD\
LI0
4.d
gn
5/1/2
02
08:5
7:4
9
AM
WV
WV
205+00 206+00
207+00
208+00
209+00
210+00
10' D
RAIN
AG
E
EA
SE
ME
NT
PB 70-26
EXISTING R/W
EXISTING R/W
TCE-1
TCE-2
R/WR/W-2
R/W
R/W
R/W
TCE-3PE-5
PE-5
PE-5
TCE-4
TCE-4
PE-6
PE-7
PE-7
TCE-4
TCE
SV
+
PU
MP T
AN
K
SE
WAGE T
AN
K LID
DR
AIN FIE
LD
SEPTIC T
AN
K
AB
AN
DO
ND
UEM
PVTPVT
VER-C (B)
VER-C (B)VER-FO (B)
VER-C (B)
BV-C (B)
VER-C (B)
VER-FO (B)
VER-C (B)
VER-C (B)
COM-C (B)
COM-FO (B)
VER-C (B)
VE
R-
C (B)
VER-C (B)
DP-E (B)
BV-C (B)
CO
M-F
O (B)
COM-C (B)
VER-C (B)
VER-C (B)
DP-
E (B)
COM-C (B)
10" TG-W (B)
10" TG-W (B)
8" TG-SFM (B)8" TG-SFM (B)8" TG-SFM (B)
UNK (B)
COM-FO (B)VER-C (B)
COM-C (B)
SCO
VER-C (B)
VE
R-
C (B)
VE
R-F
O (B)
DP-E (B)
DP-
E (B)
CO
M-
C (B)
DP-E (B)
VE
R-
C (B)
BV-C
A
TV
TV
F.H.
W.V.
U
05235
#53538/
DPL
DPL
05219
#53555/
05204
#53571/
DPL
N
SCALE
FEET
0 30 60 90
STE
RLIN
G
AV
EN
UE
AIRPORT ROAD (S 319)
NO. CIRCUIT NO. STATION OFFSET ARM LIGHT STANDARD
LIGHTING STANDARD SCHEDULE
HEIGHT
24 15' 161 W LED, IES TYPE 2 DISTRIBUTION1 209+76.1 46.9' RT.
PB
6
6
SR
RUNSERVICE
LIGHTING SERVICE SCHEDULE
DISTANCE INSTALLATIONDESCRIPTIONCONDUITS
# OFSIZE
** SERVICE RUN CONTINUES TO ADJACENT SHEET* RIGID GALVANIZED STEEL CONDUITNOTE: SERVICE RUN DISTANCE REFLECTS CONDUIT LENGTH ONLY.
3.0" 182'** (2)#6,(1)#6 GROUND TRENCH16
MATC
H LIN
E STA. 210
+50
- LI-
02
LS
24
WRA
LI-04
SUSSEX
GATEWAY IMPROVEMENTSGEORGETOWN EAST
LIGHTING PLAN
135
T201804301
DWC
MJB
40'
NOTE:
1.
AT APPROXIMATELY 30 FT.
EQUIVALENT LED LUMINAIRE ON THE PROPOSED UTILITY POLE MOUNTED
DELMARVA POWER SHALL INSTALL A 12 FT BRACKET ARM WITH 250 WATT
LS
33
SEE NOTE 1
30'N/A 12' 250 W HPS EQUIVALENT LED UTILITY OWNED LEASED LIGHT33 208+97.5 41.1' LT.
DENOTES LIGHTING STANDARD TO BE INSTALLED ON PROPOSED DELMARVA UTILITY POLE.
2
2 ADDED FIRE HYDRANT AND WATER VALVE. R. WILLS - 5/1/20
CONTRACT
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.ADDENDA / REVISIONS SECTION
SHEET NO.
N:\
3198
5-015\
CA
DD\
LI0
5.d
gn
5/1/2
02
08:5
7:5
0
AM
AC
AC
AC
AC
AC
AC
ACAC
AC
AC
ACAC
WVWV WV
WV
WV
WV
WV
U
U
215+00
216+00217+00 218+00 219+00 220+00 221+00 222+00
502+00
503+00 504+00 505+00 506+00 507+00
508+00
509+00
510
+00
511+
00
0+00
1+00
2+00
P.B. 62-346
EASEMENT #1
EXISTING ACCESS EASEMENT
P.B. 62-346
EASEMENT #3
EASEMENT
EXISTING UTILITY
P.B. 62-346
EASEMENT #4
EXISTING UTILITY EASEMENT
P.B.
62-34
6
EA
SE
ME
NT #7
EA
SE
ME
NT
EXIS
TIN
G
DR
AIN
AG
E
P.B. 62-346
EASEMENT #7
DRAINAGE EASEMENT
EXISTING
EXISTING R/W
EXISTING R/W
TCE-2
TCE-2 TCE-2
TCE-3
TCE-
3
TCE-
3
TCE-3
R/W
R/W
P.B. 62-346
EASEMENT #6
EXISTING UTILITY EASEMENT
EXISTING R/W
EXISTING R/W
WV
PV
T
TG-S
TG-S
TG-S
8" TG-W (B) 8" TG-W (B)
10"
TG-S (B)
8"
TG-S (C)
6"
TG-S (C)
8" TG-S (C)8" T
G-S (C)
VER-C (B)
10" TG-S (B)
VER-C (B)
VER-C (B) VER-C (B)VER-C (B)
VER-C (B)
VER-C (B)VER-C (B)
VER-C (B)
VER-C (B)
VER-C (B)
VER-C (B)
VER-C (B)
COM-C (B)
DP-E (B)
DP-E (B)
VER-C (B)
VE
R-C (B)
8" TG-SFM (B)
8" TG-SFM (B)
DP-
E (B)
VE
R-
C (B)
8" TG-SFM (B)
VE
R-
C (D)
VER-C (D)
VE
R-
C (D)
8" TG-W (D)
8"
TG-
W (D)
8" T
G-
W (D)
8"
TG-
W (D)
8" TG-W (D)
W.V.
A
W.V.
?
U
U
U
05294
#153528/
DPL
105314
#5353/
DPL
05334
#53534/
DPL
05354
#53536/
DPL05375
#53540/
DPL
N
CL
AR
K
DRIV
E
SCALE
FEET
0 30 60 90
SAND HILL ROAD (S 319)
NO. CIRCUIT NO. STATION OFFSET ARM LIGHT STANDARD
LIGHTING STANDARD SCHEDULE
HEIGHT
30'
30'
N/A
N/A
12'
12'
DENOTES LIGHTING STANDARD TO BE INSTALLED ON PROPOSED DELMARVA UTILITY POLE.
250 W HPS EQUIVALENT LED UTILITY OWNED LEASED LIGHT
250 W HPS EQUIVALENT LED UTILITY OWNED LEASED LIGHT
LS
25
SEE NOTE 1
25
26
LS
26
SEE NOTE 1
30'N/A 12' 250 W HPS EQUIVALENT LED UTILITY OWNED LEASED LIGHT27
LS
28
SEE NOTE 1
LS
27
NOTE 1
SEE
13
SR
JW
1
PB
614
SR
15
SR 16
SR17
SR
18
SR
JW
1 JW
1JW
1
PB
6
PB
6
PB
6
LS
29
LS
30
LS
31
LS
32
19
SR
20
SR
LS
EX
LS
EX
LS
EX
LS
EX
LS
EX
NOTE 3
SEE
LS
EX
NOTE 3
SEE
LS
EX
NOTE 4
SEE
LS
EXLS
EX
NOTE 4
SEE NOTE 4
SEE
LS
EX
LS
EX
NOTE 4
SEE
LS
EXNOTE 4
SEE
LS
EX
LS
EX LS
EX
NOTE 4
SEE LS
EX
LS
EX
LS
EX
RM
D
SEE NOTE 2
30'N/A 12'28
29
30 161 W LED, IES TYPE 2 DISTRIBUTION
161 W LED, IES TYPE 2 DISTRIBUTION15'
15'
31
32 161 W LED, IES TYPE 2 DISTRIBUTION
161 W LED, IES TYPE 2 DISTRIBUTION15'
15'
RUNSERVICE
LIGHTING SERVICE SCHEDULE
DISTANCE INSTALLATIONDESCRIPTIONCONDUITS
# OFSIZE
3.0" 29' (2)#6,(1)#6 GROUND TRENCH116
4.0" 116' (4)#6,(1)#6 GROUND TRENCH118
4.0" 209' (4)#6,(1)#6 GROUND TRENCH117
3.0" 78' (2)#6,(1)#6 GROUND TRENCH119
4.0" 107'** (4)#6,(1)#6 GROUND TRENCH113
** SERVICE RUN CONTINUES TO ADJACENT SHEETNOTE: SERVICE RUN DISTANCE REFLECTS CONDUIT LENGTH ONLY.
4.0" 222' (4)#6,(1)#6 GROUND TRENCH115
3.0" 216' (2)#6,(1)#6 GROUND TRENCH120
215+80.0 39.5' LT.
217+94.7 41.5' LT.
219+37.1 41.5' LT.
221+15.2 40.5' LT.
42.0' RT.214+75.6
216+82.5 42.2' RT.
221+00.7 44.8' RT.
222+34.0 29.7' RT.
4
2
4
2
WRA
LI-05
SUSSEX
GATEWAY IMPROVEMENTSGEORGETOWN EAST
LIGHTING PLAN
136
T201804301
DWC
MJB
MA
TC
H
LIN
E S
TA. 2
14+
50 - LI-
02
NOTES:
4.
3.
2.
1.
MEET OR EXCEED EXISTING CONDITIONS AND NEC.
PARKING LOT LIGHTING TO REMAIN. ALL WIRING OF PROPOSED POLES SHALL
CONCRETE POLE BASE AND SQUARE TUBE POLE THAT MATCHES THE EXISTING
THE CONTRACTOR SHALL RELOCATE THE EXISTING LUMINAIRE ONTO A NEW
OR RELOCATE THE EXISTING POLE IF UNABLE TO ROTATE THE EXISTING LIGHT.
DELMARVA POWER SHALL ROTATE THE EXISTING LEASED LIGHT, AS SHOWN.
APARTMENTS.
REMOVE THE LIGHT FROM THE EXISTING ACCOUNT WITH THE CHEER CENTER
DELMARVA POWER SHALL REMOVE THE EXISTING LEASED POLE AND LIGHT AND
AT APPROXIMATELY 30 FT.
EQUIVALENT LED LUMINAIRE ON THE PROPOSED UTILITY POLE MOUNTED
DELMARVA POWER SHALL INSTALL A 12 FT BRACKET ARM WITH 250 WATT
250 W HPS EQUIVALENT LED UTILITY OWNED LEASED LIGHT
40'
40'
40'
40'
3.0" 5' (2)#6,(1)#6 GROUND TRENCH114
2
2 ADDED FIRE HYDRANT AND WATER VALVE. R. WILLS - 5/1/20
CONTRACT
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.ADDENDA / REVISIONS SECTION
SHEET NO.
N:\
3198
5-015\
CA
DD\
UT
02.d
gn
5/1/2
02
08:5
7:5
4
AM
+
+
P.B. 62-346
EASEMENT #5
EXISTING DRAINAGE EASEMENT
P.B. 91-36
D.R. 3024-328,
GRANTED TO DELDOT
PERMANENT EASEMENT
10' DRAINAGE EASEMENT PB 70-26
P.B. 39-185
D.R. 2052-152
AND MARTHA O. HERNANDEZ
ALEJANDRO C. HERNANDEZ
135-15.00-119.03
LOT 2
P.B. 39-185
P.B. 70-26
P.B. 214-117
D.R. 4136-117
ACADEMY FOUNDATION, INC.
SUSSEX PREPARATORY
135-15.00-119.02
P.B. 198-94
D.R. 4156-158
CHEER, INC.
135-15.00-25.01
P.B. 60-90
D.R. 4148-165
STERLING SQUARE, LLC
135-15.00-115.06
LOT 1
P.B. 60-90
D.R. 4410-107
STERLING SQUARE, LLC
135-15.00-115.09
LOT 3
P.B. 91-36
D.R. 3102-291
GEORGETOWN EAST PARK CENTER, LLC
135-15.00-39.01
LOT 1
P.B. 91-36
D.R. 3102-291
PARK CENTER, LLC
GEORGETOWN EAST
135-15.00-39.01
DELDOT ACQUISITION
PARCEL A FUTURE
D.R. 2345-93
CHEER APARTMENTS, LP
135-15.00-26.01
EXISTING R/W
W/
R
GNI
TSI
XE
W/R GNITSIXE
W/R GNITSIXE
TCE-1TCE-1
TC
E-1
P.B.
39-185
P.B.
70-26
P.B.
214-117
D.R.
4136-117
FO
UN
DA
TIO
N, IN
C.
AC
AD
EM
Y
PR
EP
AR
AT
OR
YS
US
SE
X
135-15.0
0-119.0
2
TCE
D.R. 3057-80
GRANTED TO DELDOT
PERMANENT EASEMENT
DELMARVA RIGHT OF WAY - D.R. 1409-259 - P.B. 91-36
R/W-1
R/W
P.B. 62-346
EASEMENT #6
UTILITY EASEMENT
EXISTING
R/
W
R/
W
R/
W
P.B. 60-90
D.R. 4410-107
LLC
STERLING SQUARE,
135-15.00-115.08
LOT 2
D.R. 4983-6
JOSEPH M. SCHELL
135-15.00-117.00
P.B. 62-346
D.R. 2004-182
SUSSEX COUNTY SENIOR SERVICES, INC.
135-15.00-26.03
PARCEL C
7-R
11-R
8-R
12-R
10-R
13-R
5-L
6-L
9-L
11-L
PER PB 129-53.
ACCESS AND DRAINAGE
EASEMENT FOR CROSS
20' WIDE PERMANENT
PE-1
R/
W
PE-2
PE-2
PE-2
PE-2
PE-2
PE-2
LOC
211
+00
212
+00
213
+00
214
+00
PT 211+37.08
PC 213+33.49
500+00
501+
00
POB 499+50.0
0
PC 500+80.2
7
PT 501+29.78
107+00
108+00
109+00110+00 111+00
112+00113+00
114+00
PT 11
1+53.52
PC 11
3+62.03
SV
SV
SV
8" TG-W (B)
8"
TG-S (B)
VE
R-C (B)
VE
R-
C (B)
VE
R-F
O (B)
VER-C (B)
BV-C (B)
BV-C (B)10" T
G-S (B)
10" TG-S (B)
10" TG-S (B)
10" T
G-
W (B)
VER-C (B)
DP-E (B)
VE
R-
C (B)
VE
R-
C (B)
BV-
C (B)
VE
R-
C (B)
VER-C (B)
VER-C (B)
VER-C (B)
VER-C (B)
VER-C (B)
VER-C (B)
VER-C (B)
8" TG-W (B)
10"
TG-
W (B)
8" T
G-W (B)
10" TG-S (B)
10" T
G-S (B)
10" T
G-S (B)8
" T
G-S
FM (B)
8"
TG-S
FM (B)
DP-E (B)
DP-E (B)
UNK (B)
UN
K (B)
EX SIG (B)
EX
SIG (B)EX SIG (B)
EX SIG (B)
EX SIG (B)
EX
SIG (B)
EX SIG (B)
EX SIG (B)
VER-F
O (B)
DP-E (B)
DP-E (
B)
ABANDONED
DP-E (B)
UU
U
#MV1
6" CHERRY
GRASSGRASS
12"DPE
MIX
HOT
CIN
DERS
+
SM
AL
L
TR
EE
S
PA
TIO
ST
ON
E
POND
VINYL MOBILE TRAILER
SHED
METAL
GR
AV
EL
GR
AV
EL
ST
ON
ES
SPIKE
12"
RC
P
12" RCP
24"
HDP
E
12"
RC
P
12"
RCP
SHED
WOOD
SHED
WOOD
D.I.
D.I.
HOT
MIX
#VC53GRAVEL
DPL
#52
05259
#53546/
CONC W
EIR
PCC CURB TYPE 3-6
PCC CURB TYPE 3-6
TYPE 1-
6
PC
C
CU
RB
27"
X4
2"
RC
EP
CAP&
REBARTP130
12" RCP 12"
RC
P
X
X
6" 6"
WR
A14
7
N:2
54
225.8
690
RE
BA
R
&
CA
P
CO
NC
VINYL
BLOCK AND
1 STORY
CEDAR
5" 1
GRASS
MIX
HOT
MIX
HOT
GRASS
CONC
HOT MIX
OPTIC
FIBER
BURIED
GRASS
REBAR & CAP
TP108
EL = 50.06'
"+" CUT
FLANGE BOLT FH
ROADSIDE
BM - #3
& CAP
REBAR
TP109
GRAVEL
REBAR & CAP
TP138
GRASS
GRASS
GRASS
#10B8"
14" TWIN PINE
GRAVEL
6" TWIN
MAPLE
8" CLUSTER
16" PINE
PINE
12" 1
12" PINE
12" MAPLE
GRASS
GRAVEL
CEDAR12"
CEDAR12"
GRASS
MULBERRY15"
MULBERRY12"
CHERRY10"
GRASS
CLUSTER4"
GRASS
POND
REBAR & CAP
TP110
GRASS
GRASS
& CAPREBARTP103
GRASS
GRASS
SOYBEAN
HOT MIX
MYRTLE6" CLUSTER
GRASS
SHRUBSSMALL
MYRTLE4" CLUSTER
CEDAR8"
8"
28"
SHEDVINYL
SHEDMETAL
05273
#53536/
DPL
05284
#53548/
DPL
05275
#53525/
DPL
05263
#53522/
DPL
05258
#58519/
DPL
MAPLE
6"
FRAME
WOOD
1 STORY
TWIN
6"
05249
#53523/
DPL
D.I.
CEDAR
4X1"
TWIN
2"
4" CLUSTER
TRIPLE
5" MAPLE
30"
SPIKE
TP86
05256
#53526/
DPL
SPIKE
TP85
05294
#53562/
DPL
PA
TIO
CO
NC
PIN
E16" 1
WVU
U
EM
EM
EM
CAPREBAR &
TP104
DP&L
05249
#53499/
DPL
05244
#53502/ TH-35
TH-34
TH-33
TH-32
TH-42
TH-30
TH-29
TH-28
TH-27
TH-25
TH-24
TH-23
TH-21TH-22
TH-20
TH-19
8" TG-W-10
8" TG-W-10
BV-C
16+00
17+00
18+00 19+00
20+00
20+88
20+88
38
+00
39+00
28
+00
29+00
30+00
8"
TG-S-30
10"
TG-
W-20
10" TG-
W-20
A
40
+00
41+00
42+00
35+00
36+00
37
+00
25
+00
26+0
0
27+00
8" TG-S-30
8" T
G-S-
30
8" TG-S-40
8"
TG-S-40
10" T
G-
W-20
10" TG-W-20
8" TG-W-10
8"
TG-
W-10
EMW.V.
N
SCALE
FEET
0 30 60 90
US 9 (S 18, LEWES-GEORGETOWN HIGHWAY)
MATCH LINE STA. 210+
50
)TEERTS TEKRAM ,81
S( 9 SU
)91
3
S(
DA
OR
LLI
H
DN
AS
SAN
D HILL
RO
AD (S 319)
)91
3
S(
DA
OR
TR
OP
RIA
P.B. 40-173
D.R. 4079-125
TER-PEN, LLC
135-15.00-118.00
LOT A
9-R
MA
TC
H
LIN
E S
TA. 10
6+
50 - U
T-01
MATCH LIN
E STA. 214+50 - U
T-06
MA
TC
H
LIN
E S
TA. 11
4+
50 - U
T-03
- UT-05
AB
O
VER.
VER.
AB
O
AB
O
AB
O
VER.
RL
O
COMCAST
VER., DPE
RL
ODPE
AB
O
AIR
PO
RT
RO
AD (S 319)
VER.
F.O.
VER.
RM
C VAULT
UTILITY
VER.AB
O
RM
C
RM
C
RM
CSIG.
SIG.
SIG.
AB
O
VER.
AB
OVER.
VER.
TG-W
DND
RL
OVALLEY
BROAD
VALLEY
BROAD
TG-W
TG-S
TG-W
TG-S
C
AB
C
AB
C
AB
DNDTG-W
TG-W
DND
C
AB
C
AB
TG-S
C
ABTG-S
DNDTG-S
DNDTG-S
RM
C
DND TG-S
DND
TG-S
UTILITY GRND EL. COVER O.D. & MATERIAL
UTILITY TEST HOLE SCHEDULE
NO. STATION OFFSET
1.82'
3.50'
3.67'
3.50'
3.27'
3.34'
2.04'
2.19'
1.38'
3.01'
3.65'
3.09'
2.15'
3.03'
3.80'
2.56'
1ƒ" D.B. CABLE
1ƒ" D.B. CABLE
1ƒ" D.B. CABLE
10•" PLASTIC PIPE
10•" PLASTIC PIPE
1" D.B. CABLE
(2)1•" PLASTIC CONDUITS
1†" D.B. CABLE
1ƒ" PLASTIC CONDUIT
1†" D.B. CABLE
(4)4•" PLASTIC CONDUITS
8•" PLASTIC PIPE
3/8" D.B. CABLE
4•" PLASTIC PIPE
(2)1•" PLASTIC CONDUITS
8•" PLASTIC PIPE
VER-C
VER-C
VER-C
TG-W
TG-W
VER-C
VER-C
VER-C
DP-E
VER-C
VER-C
TG-W
VER-C
TG-SHC
BV-C
TG-W
TH-42 110+32.31 68.39'LT 47.45'
TH-35 112+47.56 16.34'RT 48.01'
TH-34 111+65.43 15.46'RT 48.23'
TH-33 111+30.70 38.09'RT 47.09'
TH-32 110+86.39 27.82'LT 47.75'
TH-30 108+94.17 81.78'RT 48.18'
TH-29 108+65.41 90.23'RT 48.00'
TH-28 108+62.48 80.73'RT 47.92'
TH-27 108+39.27 43.59'RT 48.83'
TH-25 108+28.50 31.24'RT 48.59'
TH-24 108+24.17 27.26'RT 48.39'
TH-23 108+19.83 28.63'LT 48.18'
TH-22 107+03.93 34.14'RT 47.92'
TH-21 106+89.36 34.61'RT 47.84'
TH-20 106+60.23 22.35'RT 48.41'
TH-19 106+63.52 28.45'LT 47.97'
1
2
3
46
5
6
MH
7
MH
8
MH
FIELD SURVEYED. THE CONTRACTOR SHALL LOCATE EXISTING UTILITIES PRIOR TO CONSTRUCTION.
*WATER SERVICES, METERS, AND SEWER LATERALS SHOWN ARE APPROXIMATE AND HAVE NOT BEEN
7 ARV
2
WRA
UT-02
SUSSEX
GATEWAY IMPROVEMENTSGEORGETOWN EAST
UTILITY RELOCATION PLAN
139
T201804301
FJB
RRW
A
O
DND
DNDVALLEY
BROAD
METER
SIGN AND
CHEER CENTER
RELOCATED
NOTES:
8.
7.
6.
5.
4.
3.
2.
1.
VALVE. SEE DETAIL D2-7 ON SHEET DT-03.
RELOCATE EX. FIRE HYDRANT AND WATER
DETAIL ON SHEET DT-04.
INSTALL ARV. SEE AIR RELEASE VALVE
ON SHEET DT-03.
INSTALL DOGHOUSE MANHOLE. SEE DETAIL D4-5
PROVIDE 95 LF 12" STEEL CASING UNDER US 9.
PROVIDE 115 LF 16" STEEL CASING UNDER US 9.
HILL ROAD.
PROVIDE 100 LF 16" STEEL CASING UNDER SAND
SLEEVE AS NECESSARY.
CONNECT TO EX. WATER WITH TEE. PROVIDE SOLID
SOLID SLEEVE AS NECESSARY.
CONNECT TO EX. WATER WITH 45° H.B. PROVIDE
8
2
2
2 ADDED FIRE HYDRANT AND WATER VALVE. ADDED NOTE 8. R. WILLS - 5/1/20
CONTRACT
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.ADDENDA / REVISIONS SECTION
SHEET NO.
N:\
3198
5-015\
CA
DD\
UT
05.d
gn
5/1/2
02
08:5
7:5
6
AM
10' D
RAIN
AG
E
EA
SE
ME
NT
PB 70-26
P.B. 70-25
P.B. 214-117
D.R. 4136-117
SUSSEX PREPARATORY ACADEMY FOUNDATION, INC.
135-15.00-119.00
P.B. 40-173
D.R. 3753-258
AND MARJORIE A. SHORT
CHARLES F. SHORT
135-15.00-116.00
LOT F
D.R. 3764-240
PROPERTIES, LLC
D.M. TAYLOR
135-15.00-115.07
P.B. 60-90
D.R. 4148-165
STERLING SQUARE, LLC
135-15.00-115.06
LOT 1
P.B. 6
0-90
D.R. 4
14
8-165
ST
ER
LIN
G
SQ
UA
RE, L
LC
135-15.0
0-115.0
6
LO
T 1
EXISTING R/W
EXISTING R/W
TCE-1
TCE-2
R/W
P.B. 39-185
P.B. 70-26
P.B. 214-117
D.R. 4136-117
FOUNDATION, INC.
ACADEMY
PREPARATORY
SUSSEX
135-15.00-119.02
R/W-2
R/W
R/W
R/W
TCE-3PE-5
PE-5
PE-5
TCE-4
TCE-4
PE-6
PE-7
PE-7
TCE-4
TCE
D.R. 4983-6
JOSEPH M. SCHELL
135-15.00-117.00
16-R
11-R10-R
17-R
8-R
10-
R
18-R
205+00 206+00
207+00
208+00
209+00
210+00
PC 205
+87.95
SV
+
U
PVTPVT
VER-C (B)
VER-C (B)VER-FO (B)
VER-C (B)
BV-C (B)
VER-C (B)
VER-FO (B)
VER-C (B)
VER-C (B)
COM-C (B)
COM-FO (B)
VER-C (B)
VE
R-
C (B)
VER-C (B)
DP-E (B)
BV-C (B)
CO
M-F
O (B)
COM-C (B)
VER-C (B)
VER-C (B)
DP-
E (B)
COM-C (B)
10" TG-W (B)
10" TG-W (B)
8" TG-SFM (B)8" TG-SFM (B)8" TG-SFM (B)
UNK (B)
COM-FO (B)VER-C (B)
COM-C (B)
SCO
VER-C (B)
VE
R-
C (B)
VE
R-F
O (B)
DP-E (B)
DP-
E (B)
CO
M-
C (B)
DP-E (B)
VE
R-
C (B)
WV
WV + + + +
X
GRASS
GRASS
GRAVEL
GRASS
GRASS
SPIGOT
AC
12" RCP 12" RCP
HOT MIX
HOT MIX
HOT MIX
HOT MIX
MIX
HOT
MAC
++
4" CLUSTER
GRASS
6" TWIN
SMALL TREES
VIN
YL
MO
BIL
E
TR
AIL
ER
27"X42" RCEP
12" PVC
+
GRASS
27"X42" RCEP
AND TREES
SMALL SHRUBS
3"
#10
B
14"
TWIN
PIN
E
PINE
3" PINE
3"
PINE
3"
PINE
2"
PINE
4"
MYRTLE
CLUSTER
2"
MYRTLE
CLUSTER
2"
MYRTLE
CLUSTER
2"
MYRTLE
CLUSTER
2"
MYRTLE
CLUSTER
2"
& CAP
REBAR
TP145
POND
4" 4"
3"3"3"HOLLY
2"
HOLLY
2"
HOLLY
2" HOLLY
2"
HOLLY
2"
MAPLE
3"
MAPLE
3"
MAPLE
3"
MAPLE
3"
MAPLE
3"MAPLE
3"
MAPLE
3"
& CAP
REBAR
TP144
POND
MAPLE
3"MAPLE
3"
MAPLE
3"MAPLE
3"
MAPLE
3"
MAPLE
3"
05204
53571/
DPL
MAPLE
3"
ABANDONED
05219
#53555/
DPLPINE
3"
PINE
3"
PINE
3"
PINE
3"PINE
3"
PINE
3"PINE
3"
PINE
3"
PINE
3"
PINE
3"PINE
3"
PINE
3"
PINE
3"
PINE
3"
PINE
3"
PINE
3"
PINE
3" PINE
3"
PINE
3"
PINE
3"
PINE
3"
PINE
3"
PINE
3"
PINE
3"
PINE
3"
PINE
3"
05235
#53538/
DPL
PINE
3"
PINE
3"
PINE
3"
PINE
3"PINE
3"
PINE
3"
PATIO
CONC
MAPLE
36"
& CAP
REBAR
TP82OAK
24"MAPLE
40"10"
& CAP
REBAR
TP81
LOCATION
APPROX. WELL
VINYL
1 STORY
SHED
WOOD
SHED
WOOD
MAPLE
TWIN
10"VINYL
2 STORY
& CAP
REBAR
TP140
SHRUBS
CLUSTER
1"SHELTER
BUS
APPLE
6"
APPLE
6"
PLUM
2"
OAK
12"
MAPLE
15"MAPLE
14"
FIR
14"
CEDAR
CLUSTER
6"
NAIL
MAG
TP78MYRTLE
CLUSTER
2"
MYRTLE
CLUSTER
2"
MYRTLE
CLUSTER
2"
BLOCK
1 STORY
MYRTLE
2" TRIPLE
MYRTLE
3" TRIPLE
& CAP
REBAR
TP83
BEECH
12"
& CAP
REBAR
TP139
42X12" CEDAR
10" 3"12"
8"
TWIN
8"
TWIN
8"
PINE
16" 1
PINE
14"
CLUSTER
8"
TV
U
VINYL
1 STORY
BV-C
A
33+00
34+00
24+00
8" TG-S-30
8" TG-S-30
30+00
31+00
32+00
20+00 21+00
22+00
23+00
8" TG-S-30
10" TG-W-20
10" TG-W-20
TV
TV
F.H.
W.V.
NSCALE
FEET
0 30 60 90
AIRPORT ROAD (S 319)
MA
TC
H
LIN
E S
TA. 204+
50 - U
T-04
MATC
H LIN
E STA. 210
+50
- U
T-02
STE
RLIN
G
AV
EN
UE
DND
F.O.
VER. AB
O
AB
O
AB
O
VER.
AB
O
COMCAST
RL
OCOMCAST
AB
OVER.
VER.
AB
O
AB
OVER.
RL
O VALLEY
BROAD
DND
TG-S
TG-S
C
ABTG-W
C
AB
DND
TG-W
C
ABTG-W
TG-SC
AB
COMCAST DND
2
1
FIELD SURVEYED. THE CONTRACTOR SHALL LOCATE EXISTING UTILITIES PRIOR TO CONSTRUCTION.
*WATER SERVICES, METERS, AND SEWER LATERALS SHOWN ARE APPROXIMATE AND HAVE NOT BEEN
3
ARV
1
WRA
UT-05
SUSSEX
GATEWAY IMPROVEMENTSGEORGETOWN EAST
UTILITY RELOCATION PLAN
142
T201804301
FJB
RRW
DP-E
DNDVALLEY
BROAD
NOTES:
4.
3.
2.
1.
RELOCATE EX. FIRE HYDRANT AND WATER VALVE. SEE DETAIL D2-7 ON SHEET DT-03.
INSTALL ARV. SEE AIR RELEASE VALVE DETAIL ON SHEET DT-04.
NECESSARY.
CONNECT TO EX. WATER WITH 22.5° H.B. PROVIDE SOLID SLEEVE AS
CONNECT TO EX. FORCE MAIN. PROVIDE SOLID SLEEVE AS NECESSARY.
4
2
2
2 ADDED FIRE HYDRANT AND WATER VALVE. ADDED NOTE 4. R. WILLS - 5/1/20
CONTRACT
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.ADDENDA / REVISIONS SECTION
SHEET NO.
N:\
3198
5-015\
CA
DD\
UT
06.d
gn
5/1/2
02
09:0
1:3
3
AM
+
P.B. 62-346
EASEMENT #1
EXISTING ACCESS EASEMENT
P.B. 62-346
EASEMENT #3
EASEMENT
EXISTING UTILITY
P.B. 62-346
EASEMENT #4
EXISTING UTILITY EASEMENT
P.B.
62-34
6
EA
SE
ME
NT
#7
EA
SE
ME
NT
EXIS
TIN
G
DR
AIN
AG
E
P.B. 62-346
EASEMENT #7
DRAINAGE EASEMENT
EXISTING
P.B. 91-36
D.R. 3102-291
GEORGETOWN EAST PARK CENTER, LLC
135-15.00-39.01
LOT 1
D.R. 2345-93
CHEER APARTMENTS, LP
135-15.00-26.01
EXISTING R/W
EXISTING R/W
TCE-2
TCE-2 TCE-2
TCE-3
TCE-
3
TCE-
3
R/W
R/W
R/
W
D.R. 2345-93
CHEER APARTMENTS, L.P.
135-15.00-26.02
PARCEL B
P.B. 62-346
EASEMENT #6
EXISTING UTILITY EASEMENT
P.B. 62-346
EASEMENT #6
UTILITY EASEMENT
EXISTING
P.B. 62-346
D.R. 2004-182
SUSSEX COUNTY SENIOR SERVICES, INC.
135-15.00-26.03
PARCEL C
6-L
9-L
11-L
10-L
215+00
216+00217+00 218+00 219+00 220+00 221+00
PT 216
+94.65
502+00
503+00 504+00 505+00 506+00 507+00
508+00
509+00
510
+00
511+
00
PT 5
01+
29.7
8
PC 502+34.5
8
PT 502
+88.07
PC 507
+56.71
PT 508+57.20
0+00
1+00
2+00
PV
T
8" TG-W (B) 8" TG-W (B)
10"
TG-S (B)
8"
TG-S (C)
6"
TG-S (C)
8" TG-S (C)8" T
G-S (C)
VER-C (B)
10" TG-S (B)
VER-C (B)
VER-C (B) VER-C (B)VER-C (B)
VER-C (B)
VER-C (B)VER-C (B)
VER-C (B)
VER-C (B)
VER-C (B)
VER-C (B)
VER-C (B)
COM-C (B)
DP-E (B)
DP-E (B)
VER-C (B)
VE
R-C (B)
8" TG-SFM (B)
8" TG-SFM (B)
DP-
E (B)
VE
R-
C (B)
VE
R-
C (D)
VER-C (D)
VE
R-
C (D)
8" TG-W (D)
8"
TG-
W (D)
8" T
G-
W (D)
8"
TG-
W (D)
8" T
G-
W (D)
8" TG-W (D)
WVWV
WV
EM
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
ACAC
WVWV WV
WV
WV
WV
WV
++ CONC
WIER
CONC
GRASS
CINDERS
8" PVC
15" RCP
+
1
1
+
+
+
++
1
+ +
WA
LL
2"
PE
AR
CO
NC
8"
OA
K VIN
YL
CH
ER
RY
1"
OA
K
3"
GRASS
GR
AS
S
CO
NC
CO
NC
3'
CO
NC
3'
CO
NC
6"
32"
TWIN
MA
PL
E
3"
TWIN
PO
ND
CO
NC
3'
BUS
HES
ST
ON
ES
WA
LL
3
ST
OR
YB
OX
CO
NT
RO
LD
OO
R
AC
AC
AC
AC
ACACA
CAC
AC
ACA
CAC
ACACAC
AC
AC
AC
CONC
BUSHES
AC
5'
3'
4" P
VC
4" P
VC
(DO
WNSP
OUT)
4"
PV
C
(D
OW
NS
PO
UT)
4" P
VC
(D
OW
NS
PO
UT)
4" P
VC
(D
OW
NS
PO
UT)
4" P
VC
12" PVC
HO
T
MIX
GRASS
LANE
FIRE
SOYBEAN
HOT MIX
05294
#153528/
DPL
HOT MIX
MYRTLE
6" CLUSTER
105314
#5353/
DPL
CONC
HOT MIX
GRASS
CLUSTER
6"
REBAR & CAP
TP102
EL = 48.09'
"+" CUT
FLANGE BOLT FH
ROADSIDE
BM - #2
05334
#53534/
DPL
SOYBEAN
GRASS
GRASS
HOT MIX HOT MIX 05354
#53536/
DPL
QUAD
8"
CONC
PIPE
VERTICAL
TOP 12"
8"
8"
8"
7"
6"
6"
HOLLY
8" 0
7"
7"
7"
7"
6"
8"
8"
GRASS
FREEZER
WALK IN
TANK
MIX
HOT
MAC
4'
4'
HOT MIX
WALL
SHED
WOOD
VALVE
PROPANE& CAP
REBAR
TP107
GRASS
STUCKO
BLOCK/BRICK
2 STORY
GRASS
SAW
CONCBRICK
HOT MIX
HOT MIX
2"
2"
3' 0 PINE
1"PINE
1"3"
WALL
BLOCK
GRASS
SAW
& CAP
REBAR
TP50& CAP
REBAR
TP105
GRASS8"
8"
HOUSE
SCREEN
WOOD
CLUSTER
3"
GRILL
BBQ
CEDAR
QUAD
18"
MYRTLE
CLUSTER
3"
GRASS
GRASS
CEDAR
1"
TRIPLE
8"MYRTLE
CLUSTER
2"
TWIN
10"
& CAP
REBAR
TP51
1"
TRIPLE
5"PINE
6"
GRASS
PINE
10"
MYRTLE
CLUSTER
4"
3"
MYRTLE
CLUSTER
3"
MYRTLE
CLUSTER
3"
QUAD
8"
GRASS
SAW 3"
PAD
DUMPSTER
CONC
TRIPLE
8"
TWIN
4"3"
4"
4"
5"
BUSHES6"
& CAP
REBAR
TP106
6"
6" GRASSCONC
MYRTLE
CLUSTER
5"
HOLLY
2"
GRASS
& CAP
REBAR
TP100
?
U
U
U
X
HOT MIX3" CLUSTER
6" CLUSTER
MYRTLE
12"
2" HOLLY
BOXSWITCHELEC.
BOXPANELELEC.
REBAR & CAPTP52
GUM1"
TRIPLE10"
OAK1"
GRASS
TH-40
W.V.
A
39+00
40+00
41+00
42+00
43+00
44+00
45+0
0
46+0
0
8" TG-S-30
8" TG-S-30
8" T
G-S-
30
8"
TG-S-30
8"
TG-
W-30
30
+00
30+62
W.V.
N
CL
AR
K
DRIV
E
SCALE
FEET
0 30 60 90
SAND HILL ROAD (S 319)
MA
TC
H
LIN
E S
TA. 2
14+
50 - U
T-02 M
AT
CH
LIN
E S
TA. 221+
50 - U
T-07
AB
O
AB
O
VER.
AB
OVER.
VER.
C
ABTG-S
TG-SC
AB
DND TG-W
DNDTG-S
DNDTG-S
DND TG-S
RL
O
UTILITY GRND EL. COVER O.D. & MATERIAL
UTILITY TEST HOLE SCHEDULE
NO. STATION OFFSET
TG-W 3.72'TH-40 217+60.26 29.97'LT 48.27' 8•" PLASTIC PIPE
AB
O
VER.
1
FIELD SURVEYED. THE CONTRACTOR SHALL LOCATE EXISTING UTILITIES PRIOR TO CONSTRUCTION.
*WATER SERVICES, METERS, AND SEWER LATERALS SHOWN ARE APPROXIMATE AND HAVE NOT BEEN
2
ARV
3
WRA
UT-06
SUSSEX
GATEWAY IMPROVEMENTSGEORGETOWN EAST
UTILITY RELOCATION PLAN
143
T201804301
FJB
RRW
NOTES:
3.
2.
1.
DT-03.
RELOCATE EX. FIRE HYDRANT AND WATER VALVE. SEE DETAIL D2-7 ON SHEET
INSTALL ARV. SEE AIR RELEASE VALVE DETAIL ON SHEET DT-04.
SLEEVE AS NECESSARY.
CONNECT TO EX. FORCE MAIN WITH 90° H.B. PROVIDE SOLID
DNDVER.
RL
CTG-W
DND
TG-W
DND TG-W
DND TG-W
2
2
3
3
2
2 ADDED FIRE HYDRANT AND WATER VALVE. ADDED NOTE 3. R. WILLS - 5/1/20
CONTRACT
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.ADDENDA / REVISIONS SECTION
SHEET NO.
N:\
3198
5-015\
CA
DD\
SS
02.d
gn
5/1/2
02
08:5
8:0
1 A
M
INV.(45.06)
8" NOTCHED WEIR
INV. (46.12)
3' RECTANGULAR WEIR
EM
INV:4
5.6
2
DIR.
ONLY
INV:4
5.7
1
INV:4
5.6
5
DM
H(4
437)
TOP:4
7.7
4
INV:4
5.2
3IN
V:4
5.2
3
211
+00
212
+00
213
+00
214
+00
500+00
501+
00
107+00
108+00
109+00110+00 111+00
112+00113+00
114+00
EXISTING R/W
W/
R
GNI
TSI
XE
W/R GNITSIXE
W/R GNITSIXE
TCE-1TCE-1
TC
E-1
TCE
R/W-1
R/W
R/
W
R/
W
PE-1
R/
W
PE-2
PE-2
PE-2
PE-2
PE-2
PE-2
P
P
8" TG-W-10
8" TG-W-10
BV-C
16+00
17+00
18+00 19+00
20+00
20+88
20+88
38
+00
39+00
28
+00
29+00
30+00
8"
TG-S-30
10"
TG-
W-20
10" TG-
W-20
A
40
+00
41+0035+00
36+00
37
+00
25
+00
26+0
0
27+00
8" TG-S-30
8" T
G-S-
30
8" TG-S-40
8"
TG-S-40
10" T
G-
W-20
10" TG-W-20
8" TG-W-10
8"
TG-
W-10
EMW.V.
STRIPING (ITEM 817013)(10' LINE, 30' GAP, 10' LINE)
5" BROKEN WHITE EPOXY RESIN PAINT PERMANENT PAVEMENT
PAVEMENT STRIPING (ITEM 817013)
5" SOLID DOUBLE YELLOW EPOXY RESIN PAINT PERMANENT
PAVEMENT MARKINGS LEGEND
ITEMSYMBOL
A
B
C
E
QUANTITY
PAVEMENT STRIPING (ITEM 817013)
5" SOLID WHITE EPOXY RESIN PAINT PERMANENT
D
STRIPING (ITEM 817013)(2' LINE, 6' GAP, 2' LINE)
5" DOTTED WHITE EPOXY RESIN PAINT PERMANENT PAVEMENT
STRIPING, SYMBOL/LEGEND (ITEM 817002)
WHITE ALKYD THERMOPLASTIC, PERMANENT PAVEMENT
F
GMARKING, BIKE SYMBOL (ITEM 817015)
PREFORMED RETROREFLECTIVE THERMOPLASTIC PAVEMENT
HSTRIPING (ITEM 817005)(2' LINE, 6' GAP, 2' LINE)
5" DOTTED WHITE ALKYD-THERMOPLASTIC PERMANENT PAVEMENT
ISTRIPING, 10'x2' (ITEM 817002)
WHITE ALKYD THERMOPLASTIC, PERMANENT PAVEMENT
JSTRIPING, SYMBOL/LEGEND, (ITEM 817002)
16" SOLID WHITE ALKYD THERMOPLASTIC, PERMANENT PAVEMENT
PAVEMENT STRIPING (iTEM 817013)
5" SOLID YELLOW EPOXY RESIN PAINT PERMANENT
STRIPING,(ITEM 817014)(2' LINE, 2' GAP, 2' LINE)
10" BROKEN WHITE EPOXY RESIN PAINT, PERMANENT PAVEMENT
STRIPING (ITEM 817006)
12" SOLID WHITE ALKYD-THERMOPLASTIC PERMANENT PAVEMENT
STRIPING (ITEM 817002)
5" SOLID WHITE ALKYD-THERMOPLASTIC PERMANENT PAVEMENT
DEAD ZONECAMERA
P
YIELD
YIELD
SPEEDLIMIT
35
DART
DELAWARE TRANSIT CORPORATION
1-800-652-DART
206 303
DART
DELAWARE TRANSIT CORPORATION
1-800-652-DART
206 303
SPEEDLIMIT
35
STRIPING (ITEM 817005)(2' LINE, 6' GAP, 2' LINE)
5" DOTTED WHITE ALKYD-THERMOPLASTIC PERMANENT PAVEMENT
STRIPING, 10'x2' (ITEM 817002)
WHITE ALKYD THERMOPLASTIC, PERMANENT PAVEMENT
STRIPING, SYMBOL/LEGEND, (ITEM 817002)
16" SOLID WHITE ALKYD THERMOPLASTIC, PERMANENT PAVEMENT
L
STRIPING,(ITEM 817014)(2' LINE, 2' GAP, 2' LINE)
10" BROKEN WHITE EPOXY RESIN PAINT, PERMANENT PAVEMENT
STRIPING (ITEM 817006)
12" SOLID WHITE ALKYD-THERMOPLASTIC PERMANENT PAVEMENT
STRIPING (ITEM 817002)
5" SOLID WHITE ALKYD-THERMOPLASTIC PERMANENT PAVEMENT
N
SCALE
FEET
0 30 60 90
MATCH LINE STA. 210+
50
)91
3
S(
DA
OR
LLI
H
DN
AS
2
CO
JW
4
9
CO
AMOUNT AND TYPE OF CABLE/ WIRESIZE LENGTHCONDUITS# OF
CO# B/T/O
1
1
B = BORE, T = TRENCH, O = OPEN CUT
ITMS CONDUIT RUN SCHEDULE
T4.0 IN
4.0 IN B
EMPTY
SS-02
3
1 28 FT
T2.0 IN
2.0 IN T
4*
5*
2
3
351 FT**
23 FT
SS-02
2
SS-02
4A
SS-02
4B
SS-02
4C
SS-02
5A
SS-02
5B
SS-02
6
SS-02
8
SS-02
7A
SS-02
7B
SS-02
7C
SS-02
7D
SS-02
9SS-02
12
SS-02
11
SS-02
13
SS-02
14
SS-02
16
SS-02
17A
SS-02
17B
SS-02
19ASS-02
21A
SS-02
21B
SS-02
19B
SS-02
19C
SS-02
18
SS-02
20
SS-02
23SS-02
24
SS-02
26
SS-02
22A
SS-02
22B
SS-02
25A
SS-02
25B
SS-02
25C
SS-02
25D
SS-02
25E
SS-02
27
SS-02
29
SS-02
31
SS-02
34
SS-02
33
SS-02
28A
SS-02
28B
SS-02
32B
SS-02
32A
D
C
A
B
E
I
I
H I
I
D
I
J
E
G
G
A E
A
J
GF
A
G
8.0'
11.0'
11.0'
11.0'
11.0'
8.0'
11.0'
5.0'
G
A
E
J
11.0'
11.0'
11.0'
11.0'
(S 319)
AIR
PO
RT R
OA
D
5.0'
AB
11.0'
5.0'
11.0'
8.0'
11.0'
11.0'
11.0'
11.0'
5.0'
11.0'
B
A
G
A
F
C
EA
E
A
G
A
F
G
J
A
SS-02
1
SS-02
15
1 4.0 IN T6
SS-02
10A
SS-02
10B
3625 LF
70 LF
790 LF
200 LF
300 SF
1410 LF
40 LF
1480 SF
160 SF
SS-02
30
+62
+66+14
+00
+70+50
+50
+25
+03
(TYP.)
12.0'
(TYP.)
8.5'
L
EL
E
E
E
E
L
L
L
1
A
A
A
A
G
G
G
A
A
A
10 EA
11.0'
10.0'
1300 LF
NEW SIGN POST
INSTALL ON
+49
+84
+69
E
C
US 9 (S 18, LEWES-GEORGETOWN HIGHWAY)
** QUANTITY CONTINUES ON ADJACENT SHEET
4.0 IN T7
3.0 IN T8
NOTES:
ALL CABLES ARE NEW
* PROPOSED RIGID GALVANIZED STEEL
SERVICE FEED
PROPOSED
1 4.0 IN T9
1 4.0 IN T11
MA
TC
H
LIN
E S
TA. 10
6+
50 - SS-01
- SS-05
MA
TC
H
LIN
E S
TA. 11
4+
50 - SS-03
MATCH LIN
E STA. 214+50 - SS-06
(1) 2/#8 U.F. W/ GROUND - LINE SIDE
205 FT**
(1) 2/#8 U.F. W/ GROUND - LOAD SIDE
EMPTY
CCTV CAMERA CABLES
SIG-CON
SIGN
PRIVATE
SIGNING, STRIPING,
MJB
AFD
GATEWAY IMPROVEMENTSSUSSEX
SS-02
WRAGEORGETOWN EAST
149
T201804301
AND CONDUIT PLAN
I
11.0'
11
CO
JW
4
JW
7
3
CO
5
CO
6
CO
CA
M
8
CO
7
CO
PB
3
PL
12CAMERA50' CCTV
4
CO
14 FT EMPTY
EMPTY
275 FT EMPTY
454 FT**
US 9 (S 18, E. MARKET STREET)
1
E
+758'
8'
8'
8'
SCAM178
NOTE 3
SEE
3.
2.
1.
NUMBER 2019-AEA-12437-OE.
WITHIN 5 DAYS OF THE INSTALLATION OF THE 50' CCTV POLE. REFERENCE AERONAUTICAL STUDY
DELDOT'S TRAFFIC CONTRACTOR SHALL FILL OUT FAA FORM 7460-2 (NOTICE OF ACTUAL CONSTRUCTION)
IS IN PLACE.
THE CONTRACTOR SHALL CONTACT DENISE KSIAZEK (DELDOT) AT 302-981-6464 ONCE ALL ITMS CONDUIT
HDPE SDR-13.5 WHEN INSTALLED BY BORING, UNLESS OTHERWISE NOTED.
ALL CONDUITS SHALL BE SCHEDULE 80 PVC WHEN INSTALLED BY TRENCHING OR OPEN CUT AND
2 14 FT
8 FT CCTV CAMERA CABLES
2
2 ADDED FIRE HYDRANT AND WATER VALVE. R. WILLS - 5/1/20
CONTRACT
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.ADDENDA / REVISIONS SECTION
SHEET NO.
N:\
3198
5-015\
CA
DD\
SS
05.d
gn
5/1/2
02
08:5
8:1
7
AM
SCHOOL
PATTERN
TRAFFIC
NEW
9
EAST
WEST
9
404
404
SPEEDLIMIT
35
STOP
WV
INV:45.54
INV:47.56
INV:47.86
INV:4
5.5
4
INV:4
5.8
9
TOP:4
9.5
4
DM
H(10846)
INV:47.07
DIR. ONLY
DIR. ONLY
205+00 206+00
207+00
208+00
209+00
210+00
EXISTING R/W
EXISTING R/W
TCE-1
TCE-2
R/WR/W-2
R/W
R/W
R/W
TCE-3PE-5
PE-5
PE-5
TCE-4
TCE-4
PE-6
PE-7
PE-7
TCE-4
TCE
BV-C
A
33+00
34+00
24+00
8" TG-S-30
8" TG-S-30
30+00
31+00
32+00
20+00 21+00
22+00
23+00
8" TG-S-30
10" TG-W-20
10" TG-W-20
TV
TV
F.H.
W.V.
STRIPING (ITEM 817013)(10' LINE, 30' GAP, 10' LINE)
5" BROKEN WHITE EPOXY RESIN PAINT PERMANENT PAVEMENT
PAVEMENT STRIPING (ITEM 817013)
5" SOLID DOUBLE YELLOW EPOXY RESIN PAINT PERMANENT
PAVEMENT MARKINGS LEGEND
ITEMSYMBOL
A
B
C
QUANTITY
PAVEMENT STRIPING (ITEM 817013)
5" SOLID WHITE EPOXY RESIN PAINT PERMANENT
STRIPING (ITEM 817013)(2' LINE, 6' GAP, 2' LINE)
5" DOTTED WHITE EPOXY RESIN PAINT PERMANENT PAVEMENT
STRIPING, SYMBOL/LEGEND (ITEM 817002)
WHITE ALKYD THERMOPLASTIC, PERMANENT PAVEMENT
MARKING, BIKE SYMBOL (ITEM 817015)
PREFORMED RETROREFLECTIVE THERMOPLASTIC PAVEMENT
STRIPING (ITEM 817005)(2' LINE, 6' GAP, 2' LINE)
5" DOTTED WHITE ALKYD-THERMOPLASTIC PERMANENT PAVEMENT
PAVEMENT STRIPING (iTEM 817013)
5" SOLID YELLOW EPOXY RESIN PAINT PERMANENT
STRIPING (ITEM 817013)(10' LINE, 30' GAP, 10' LINE)
5" BROKEN WHITE EPOXY RESIN PAINT PERMANENT PAVEMENT
PAVEMENT STRIPING (ITEM 817013)
5" SOLID DOUBLE YELLOW EPOXY RESIN PAINT PERMANENT
E
PAVEMENT STRIPING (ITEM 817013)
5" SOLID WHITE EPOXY RESIN PAINT PERMANENT
STRIPING (ITEM 817013)(2' LINE, 6' GAP, 2' LINE)
5" DOTTED WHITE EPOXY RESIN PAINT PERMANENT PAVEMENT
STRIPING, SYMBOL/LEGEND (ITEM 817002)
WHITE ALKYD THERMOPLASTIC, PERMANENT PAVEMENT
MARKING, BIKE SYMBOL (ITEM 817015)
PREFORMED RETROREFLECTIVE THERMOPLASTIC PAVEMENT
STRIPING (ITEM 817005)(2' LINE, 6' GAP, 2' LINE)
5" DOTTED WHITE ALKYD-THERMOPLASTIC PERMANENT PAVEMENT
STRIPING, 10'x2' (ITEM 817002)
WHITE ALKYD THERMOPLASTIC, PERMANENT PAVEMENT
STRIPING, SYMBOL/LEGEND, (ITEM 817002)
16" SOLID WHITE ALKYD THERMOPLASTIC, PERMANENT PAVEMENT
PAVEMENT STRIPING (iTEM 817013)
5" SOLID YELLOW EPOXY RESIN PAINT PERMANENT
STRIPING (ITEM 817013)(10' LINE, 30' GAP, 10' LINE)
5" BROKEN WHITE EPOXY RESIN PAINT PERMANENT PAVEMENT
STRIPING (ITEM 817013)(2' LINE, 6' GAP, 2' LINE)
5" DOTTED WHITE EPOXY RESIN PAINT PERMANENT PAVEMENT
STRIPING, SYMBOL/LEGEND (ITEM 817002)
WHITE ALKYD THERMOPLASTIC, PERMANENT PAVEMENT
GMARKING, BIKE SYMBOL (ITEM 817015)
PREFORMED RETROREFLECTIVE THERMOPLASTIC PAVEMENT
STRIPING (ITEM 817005)(2' LINE, 6' GAP, 2' LINE)
5" DOTTED WHITE ALKYD-THERMOPLASTIC PERMANENT PAVEMENT
STRIPING, 10'x2' (ITEM 817002)
WHITE ALKYD THERMOPLASTIC, PERMANENT PAVEMENT
STRIPING, SYMBOL/LEGEND, (ITEM 817002)
16" SOLID WHITE ALKYD THERMOPLASTIC, PERMANENT PAVEMENT
PAVEMENT STRIPING (iTEM 817013)
5" SOLID YELLOW EPOXY RESIN PAINT PERMANENT
STRIPING,(ITEM 817014)(2' LINE, 2' GAP, 2' LINE)
10" BROKEN WHITE EPOXY RESIN PAINT, PERMANENT PAVEMENT
STRIPING (ITEM 817002)
5" SOLID WHITE ALKYD-THERMOPLASTIC PERMANENT PAVEMENT
MARKING, BIKE SYMBOL (ITEM 817015)
PREFORMED RETROREFLECTIVE THERMOPLASTIC PAVEMENT
STRIPING (ITEM 817005)(2' LINE, 6' GAP, 2' LINE)
5" DOTTED WHITE ALKYD-THERMOPLASTIC PERMANENT PAVEMENT
STRIPING, 10'x2' (ITEM 817002)
WHITE ALKYD THERMOPLASTIC, PERMANENT PAVEMENT
JSTRIPING, SYMBOL/LEGEND, (ITEM 817002)
16" SOLID WHITE ALKYD THERMOPLASTIC, PERMANENT PAVEMENT
PAVEMENT STRIPING (iTEM 817013)
5" SOLID YELLOW EPOXY RESIN PAINT PERMANENT
STRIPING,(ITEM 817014)(2' LINE, 2' GAP, 2' LINE)
10" BROKEN WHITE EPOXY RESIN PAINT, PERMANENT PAVEMENT
STRIPING (ITEM 817006)
12" SOLID WHITE ALKYD-THERMOPLASTIC PERMANENT PAVEMENT
STRIPING (ITEM 817002)
5" SOLID WHITE ALKYD-THERMOPLASTIC PERMANENT PAVEMENT
NSCALE
FEET
0 30 60 90
STE
RLIN
G
AV
EN
UE
AIRPORT ROAD (S 319)
SS-05
11
NOTE 1
SEE
SS-05
8A
SS-05
8B
SS-05
7
SS-05
9B
SS-05
9C
SS-05
9D
SS-05
5
SS-05
4
SS-05
1
SS-05
3B
SS-05
3A
11.0'
11.0'
11.0'
6.0'
6.0'
6.0'11.0'
11.0'5.0'
G
B
B
C
11.0'
G
A
11.0'
E
A
G
G A E
C
A A
G
+25
+20
+20
+70
+78
+70+48
+70
+18
SS-05
9A
8.0'
SS-05
2A
SS-05
2B
J
AMOUNT AND TYPE OF CABLE/ WIRESIZE LENGTHCONDUITS# OF
CO# B/T/O
1
1
B = BORE, T = TRENCH, O = OPEN CUT
ITMS CONDUIT RUN SCHEDULE
T4.0 IN
4.0 IN T
EMPTY
EMPTY
11
12
205 FT**
** QUANTITY CONTINUES ON ADJACENT SHEET
MATC
H LIN
E STA. 210
+50
QUANTITY
5 EA
1265 LF
2000 LF
140 LF
60 SF
20 SF
- SS-02
MA
TC
H
LIN
E S
TA. 204+
50 - SS-04
SIGNING, STRIPING,
MJB
AFD
GATEWAY IMPROVEMENTSSUSSEX
SS-05
WRAGEORGETOWN EAST
152
T201804301
AND CONDUIT PLAN
A
JW
4 11
CO
12
CO
13
COJW
4
13 1 4.0 IN 258 FT** T EMPTY
286 FT
C
11.0'
NOTES:
3.
2.
1.
IS IN PLACE.
THE CONTRACTOR SHALL CONTACT DENISE KSIAZEK (DELDOT) AT 302-981-6464 ONCE ALL ITMS CONDUIT
HDPE SDR-13.5 WHEN INSTALLED BY BORING, UNLESS OTHERWISE NOTED.
ALL CONDUITS SHALL BE SCHEDULE 80 PVC WHEN INSTALLED BY TRENCHING OR OPEN CUT AND
MAXIMUM OF 180 DAYS. STATE FORCES SHALL BE RESPONSIBLE FOR REMOVING THE W23-2P-DE SIGN.
THE PROPOSED W23-2P-DE SIGN SHALL BE INSTALLED FOR A MINIMUM OF 30 DAYS AND A
SS-05
6
SS-05
10A
SS-05
10B
SS-05
10C
SS-05
10D
2
2 ADDED FIRE HYDRANT AND WATER VALVE. R. WILLS - 5/1/20
CONTRACT
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.ADDENDA / REVISIONS SECTION
SHEET NO.
N:\
3198
5-015\
CA
DD\
SS
06.d
gn
5/1/2
02
08:5
8:1
8
AM
JCT
9
PATTERN
TRAFFIC
NEW
404
9
EAST
WEST
9
404
404
YIELD
YIELD
YIELD
YIELD
WV
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
ACAC
WVWV WV
WV
WV
U
U
U
INV:44.62
INV:44.60
INV:46.83
DIR. ONLY
215+00
216+00217+00 218+00 219+00 220+00 221+00 222+00 223+00
502+00
503+00 504+00 505+00 506+00 507+00
508+00
509+00
510
+00
511+
00
0+00
1+00
2+00
EXISTING R/W
EXISTING R/W
TCE-2
TCE-2 TCE-2
TCE-3
TCE-
3
TCE-
3
TCE-3
R/W
R/W
EXISTING R/W
EXISTING R/WTH-40
W.V.
A
39+00
40+00
41+00
42+00
43+00
44+00
45+0
0
46+0
0
8" TG-S-30
8" TG-S-30
8" T
G-S-
30
8"
TG-S-30
8"
TG-
W-30
30
+00
W.V.
STRIPING (ITEM 817013)(10' LINE, 30' GAP, 10' LINE)
5" BROKEN WHITE EPOXY RESIN PAINT PERMANENT PAVEMENT
PAVEMENT STRIPING (ITEM 817013)
5" SOLID DOUBLE YELLOW EPOXY RESIN PAINT PERMANENT
PAVEMENT MARKINGS LEGEND
ITEMSYMBOL
A
B
C
QUANTITY
PAVEMENT STRIPING (ITEM 817013)
5" SOLID WHITE EPOXY RESIN PAINT PERMANENT
STRIPING (ITEM 817013)(2' LINE, 6' GAP, 2' LINE)
5" DOTTED WHITE EPOXY RESIN PAINT PERMANENT PAVEMENT
STRIPING, SYMBOL/LEGEND (ITEM 817002)
WHITE ALKYD THERMOPLASTIC, PERMANENT PAVEMENT
MARKING, BIKE SYMBOL (ITEM 817015)
PREFORMED RETROREFLECTIVE THERMOPLASTIC PAVEMENT
STRIPING (ITEM 817005)(2' LINE, 6' GAP, 2' LINE)
5" DOTTED WHITE ALKYD-THERMOPLASTIC PERMANENT PAVEMENT
PAVEMENT STRIPING (iTEM 817013)
5" SOLID YELLOW EPOXY RESIN PAINT PERMANENT
STRIPING (ITEM 817013)(10' LINE, 30' GAP, 10' LINE)
5" BROKEN WHITE EPOXY RESIN PAINT PERMANENT PAVEMENT
STRIPING, SYMBOL/LEGEND (ITEM 817002)
WHITE ALKYD THERMOPLASTIC, PERMANENT PAVEMENT
MARKING, BIKE SYMBOL (ITEM 817015)
PREFORMED RETROREFLECTIVE THERMOPLASTIC PAVEMENT
STRIPING (ITEM 817005)(2' LINE, 6' GAP, 2' LINE)
5" DOTTED WHITE ALKYD-THERMOPLASTIC PERMANENT PAVEMENT
ISTRIPING, 10'x2' (ITEM 817002)
WHITE ALKYD THERMOPLASTIC, PERMANENT PAVEMENT
STRIPING, SYMBOL/LEGEND, (ITEM 817002)
16" SOLID WHITE ALKYD THERMOPLASTIC, PERMANENT PAVEMENT
PAVEMENT STRIPING (iTEM 817013)
5" SOLID YELLOW EPOXY RESIN PAINT PERMANENT
STRIPING,(ITEM 817014)(2' LINE, 2' GAP, 2' LINE)
10" BROKEN WHITE EPOXY RESIN PAINT, PERMANENT PAVEMENT
STRIPING (ITEM 817006)
12" SOLID WHITE ALKYD-THERMOPLASTIC PERMANENT PAVEMENT
STRIPING (ITEM 817002)
5" SOLID WHITE ALKYD-THERMOPLASTIC PERMANENT PAVEMENT
STRIPING (ITEM 817013)(10' LINE, 30' GAP, 10' LINE)
5" BROKEN WHITE EPOXY RESIN PAINT PERMANENT PAVEMENT
PAVEMENT STRIPING (ITEM 817013)
5" SOLID DOUBLE YELLOW EPOXY RESIN PAINT PERMANENT
E
PAVEMENT STRIPING (ITEM 817013)
5" SOLID WHITE EPOXY RESIN PAINT PERMANENT
STRIPING (ITEM 817013)(2' LINE, 6' GAP, 2' LINE)
5" DOTTED WHITE EPOXY RESIN PAINT PERMANENT PAVEMENT
STRIPING, SYMBOL/LEGEND (ITEM 817002)
WHITE ALKYD THERMOPLASTIC, PERMANENT PAVEMENT
F
GMARKING, BIKE SYMBOL (ITEM 817015)
PREFORMED RETROREFLECTIVE THERMOPLASTIC PAVEMENT
STRIPING (ITEM 817005)(2' LINE, 6' GAP, 2' LINE)
5" DOTTED WHITE ALKYD-THERMOPLASTIC PERMANENT PAVEMENT
STRIPING, 10'x2' (ITEM 817002)
WHITE ALKYD THERMOPLASTIC, PERMANENT PAVEMENT
STRIPING, SYMBOL/LEGEND, (ITEM 817002)
16" SOLID WHITE ALKYD THERMOPLASTIC, PERMANENT PAVEMENT
PAVEMENT STRIPING (iTEM 817013)
5" SOLID YELLOW EPOXY RESIN PAINT PERMANENT
STRIPING,(ITEM 817014)(2' LINE, 2' GAP, 2' LINE)
10" BROKEN WHITE EPOXY RESIN PAINT, PERMANENT PAVEMENT
STRIPING (ITEM 817002)
5" SOLID WHITE ALKYD-THERMOPLASTIC PERMANENT PAVEMENT
MARKING, BIKE SYMBOL (ITEM 817015)
PREFORMED RETROREFLECTIVE THERMOPLASTIC PAVEMENT
STRIPING (ITEM 817005)(2' LINE, 6' GAP, 2' LINE)
5" DOTTED WHITE ALKYD-THERMOPLASTIC PERMANENT PAVEMENT
STRIPING, 10'x2' (ITEM 817002)
WHITE ALKYD THERMOPLASTIC, PERMANENT PAVEMENT
STRIPING, SYMBOL/LEGEND, (ITEM 817002)
16" SOLID WHITE ALKYD THERMOPLASTIC, PERMANENT PAVEMENT
K
L
STRIPING,(ITEM 817014)(2' LINE, 2' GAP, 2' LINE)
10" BROKEN WHITE EPOXY RESIN PAINT, PERMANENT PAVEMENT
MSTRIPING (ITEM 817006)
12" SOLID WHITE ALKYD-THERMOPLASTIC PERMANENT PAVEMENT
STRIPING (ITEM 817002)
5" SOLID WHITE ALKYD-THERMOPLASTIC PERMANENT PAVEMENT
N
CL
AR
K
DRIV
E
SCALE
FEET
0 30 60 90
SAND HILL ROAD (S 319)
NOTE 1
SEE
SS-06
1
SS-06
2A
SS-06
2B
SS-06
4A
SS-06
4B
SS-06
4C
SS-06
4D
SS-06
7
SS-06
3A
SS-06
14
SS-06
16
SS-06
17
SS-06
18
SS-06
20
SS-06
23
SS-06
21A
SS-06
22A
SS-06
22B
SS-06
22C
SS-06
28A
SS-06
28B
8.0'
11.0'
11.0'
11.0'
8.0'
11.0'
11.0'
11.0'
11.0'
11.0'5.0'
6.0'
B
A
CGA
B
C
A
E
G A
+96
+95
+86
+95
SS-06
3B
LE 17.0'
(TYP.)
12.7'
E
E
E
E
E
E
(TYP.)
12.0'
(TYP.)
9.0'
20.0'
E
E
20.0'
L 17.0'
L
L
(TYP.)
3.0'
L13.0'
13.0'
14.0'
E
24.0'
28.0' E
10.0'
6.0'6.0'
10.0'
6.0'
SS-06
6
8.5' (TYP.)
12.0' (TYP.)
I
L
M
LL
L
L
SS-06
22D
SS-06
21BE
MA
TC
H
LIN
E S
TA. 2
14+
50 - SS-02 M
AT
CH
LIN
E S
TA. 223+
25 - SS-07
SIGNING, STRIPING,
MJB
AFD
GATEWAY IMPROVEMENTSSUSSEX
SS-06
WRAGEORGETOWN EAST
153
T201804301
AND CONDUIT PLAN
2 EA
220 SF
70 LF
3850 LF
2050 LF
185 LF
2670 LF
300 SF
SS-06
5A
SS-06
5B
SS-06
9A
SS-06
9B
SS-06
12
SS-06
29
SS-06
15
SS-06
24
SS-06
25
SS-06
26
SS-06
27
SS-06
8
SS-06
10A
SS-06
10B
SS-06
11A
SS-06
11B
SS-06
13A
SS-06
13B
SS-06
13C
SS-06
19A
SS-06
19B
A
KE
E
K
EK
AA
F
A
F
60 LF
SS-06
30
B
F
A
A
I
I
F
A
F
F
1110 LF
+11
1.
RESPONSIBLE FOR REMOVING THE W23-2P-DE SIGN.
OF 30 DAYS AND A MAXIMUM OF 180 DAYS. STATE FORCES SHALL BE
THE PROPOSED W23-2P-DE SIGN SHALL BE INSTALLED FOR A MINIMUM
NOTE:
2
2 ADDED FIRE HYDRANT AND WATER VALVE. R. WILLS - 5/1/20