4
CASE STUDY TESCO PLC Helping a leading supermarket identify and implement exceptional energy savings

VES Case Study Tesco Plc

Embed Size (px)

Citation preview

CASE STUDYTESCO PLC

Helping a leading supermarket identify and implement exceptional energy savings

CHALLENGELeading UK supermarket chain Tesco has the ever growing pressures of adhering to their energy saving commitments by reducing energy and carbon consumption, whilst providing comfortable conditions for customers and colleagues alike.

With a large retail estate and varying store layouts, Tesco have an on-going challenge to maintain the effectiveness of their ventilation system, as well as ensuring they are energy efficient, particularly due to escalating energy supply costs.

The main challenge for improving Tesco’s ventilation systems was their out-dated extract equipment, that was slowly going into disrepair with the fan components being the main issue. This was due to out-dated belt driven motor technology. Tesco were experiencing clear energy losses of up to 20%.

This was an ambitious project and as a result required the help of a specialist ventilation supplier, to provide solutions that achieved both of these objectives.

[Pictures show Out-dated roof extract unit (a), Out-dated belt driven motor (b)]

VES, the ventilation solutions provider has helped a leading supermarket identify and implement exceptional energy savings by upgrading fan technology across their retail estate.

VES surveyed each site involved to identify possible energy saving initiatives and produced a robust business case, helping the supermarket chain reduce energy consumption and meet carbon reduction commitments.

CASE STUDY

TOP VENTILATION SOLUTIONS PROVIDER, VES, SAVES TESCO 3.9 GW OF ENERGY

Better air for the built environment

(a)

(b)

in partnership with

SOLUTIONWorking closely as part of Tesco’s supply chain, VES were able to identify a number of energy saving initiatives that could help meet the client’s objectives. These ideas were born from vast experience and knowledge of the industry, coupled with the ability to offer solutions across the whole spectrum of Heating Ventilation and Air Conditioning (HVAC) using the latest technology.

VES developed a robust process to provide detailed business cases. This allowed Tesco to understand the benefits of the initiatives on many levels, from financial feasibility to operational delivery, maintenance, return on investment and after sales support.

The business case answered all these concerns clearly and concisely, whilst demonstrating the return on investment in simple monetary terms. This left the Tesco energy compliance team with an easy decision to sign off a roll out across 150 stores, to achieve the energy savings as quickly as possible, consisting of 750 new extract fans designed to fit the footprint of the existing equipment.

VES surveyed all 150 applicable sites to gather energy data and produce specifications for the extraction systems. Emphasis was placed on validation and verification as these were the key ingredients to provide Tesco with confidence and technical credibility, something VES sees as a major asset to be incorporated into every business case.

VES developed a roof extract fan replacement with state of the art Electronically Commutated (EC) motor technology to provide a solution that answered the energy reduction needs and delivered a number of additional benefits:

CASE STUDY

Better air for the built environment

TOP VENTILATION SOLUTIONS PROVIDER, VES, SAVES TESCO 3.9 GW OF ENERGY

“Working with VES has definitely made a positive contribution to Tesco’s goal to improve energy efficiency”

in partnership with

f The motor and fan technology provided energy savings in excess of 80%f In built protection systemf Direct drive motor, removing the need to check and replace belts on a yearly basisf Low noise transmission due to modern fan technologyf Designed for future proof integration to any control systemf Commissioned to Tesco’s exact specification, including a customised colour

CASE STUDY

RESULTSThe documented results to finalise the business case delivery detailed a 3.9 GW energy saving across the project, which equates to 2,713 tonnes of CO2. Equivalent to 248 homes’ energy use or 2,224 acres of forest for one year.

“Working with VES has definitely made a positive contribution to Tesco’s goal to improve energy efficiency. Not only did VES provide a full business case for their proposed solution, they also delivered the solution smoothly and efficiently. Most importantly, the potential savings they identified have been achieved and, in some cases, exceeded.”

Eagle Close, Chandlers Ford Industrial Estate, Chandlers Ford, Eastleigh, Hampshire, SO53 4NF Tel: 08448 15 60 60 Fax: 023 8026 1204 ves.co.uk [email protected]

VES’ dedicated energy division replaced up to 13 extract units a day, enabling Tesco to benefit immediately from energy reduction. Each fan replacement was subjected to a before and after calibrated energy consumption reading to meet the strict validation and verification guidelines. The readings taken were also verified by an independent assessor.