Upload
kael
View
41
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Vertical Test Area RF qualification of C100 cavities for 12 GeV project. Mircea Stirbet. Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland. Key Project Parameters. CEBAF 12 GeV Upgrade. CHL-2. - PowerPoint PPT Presentation
Citation preview
Vertical Test Area RF qualification of C100 cavities for 12 GeV project
Mircea Stirbet
Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011
CERN – Geneva Switzerland
Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland
CHL-2
New cryomodules get new rf zones
CEBAF 12 GeV Upgrade
New cryomodules: 10Voltage per cryomodule: 108 MV avg.Cavities per cryomodule 8Heat budget: @ 2.07 K 300 W / CM 29 W / cavity, avg.Cavity: 1.497 GHz
0.7 m “Low loss” cell shapeHigher order mode damping: - Transverse (R/Q)Qk < 2.4 x 1010 Ω/m- Longitudinal (R/Q)Q < 6.5 x 1011 Ω /m
Key Project Parameters
Principles
Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland
- All cavities (R100 and C100) for 12 GeV project should be qualified in Vertical Test Area (VTA) before being string assemble.
- VTA tests will be done on cavities with or without He vessels.
Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland
State-of-the-art production SRF cavity
Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland
Inventory Receipt Visual Inspection
Dimensional Receipt
Inspection via CMM
RF Receipt Inspection
Ultrasonic Clean1 hour at 120FDI+Liquinox
Heat Treatment 10 hours at 600C
Ultrasonic Clean 1 hour at 120F DI+Liquinox
Electropolish30 microns at 20C
Ultrasonic Clean1 hour at 120FDI+Liquinox
RF Tune
Dimensional Check and Correction
Helium Vessel Welding
Measure RF Properties
Lap Vacuum Seal Surfaces
Final Dimensional
CMM
Ultrasonic Clean1 hour 120FDI+Liquinox
First HPR2 hours, 2.4 gpm
at 1250 psig
First AssemblyClass 10
Final HPR2 hours, 2.4 gpm
at 1250 psig
Final AssemblyClass 10
Test Stand and Leak Check
Bake24 hours at 120C
RF Test2K Dewar
Qualified?
Store in Clean Room for String
Assembly
12 GeV C100 Cavity Process Flow
Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland
Vertical test Area (VTA): Qualification tests
- HOM survey- RF power qualification:a) Cavity performances: Lock frequency, Emax, FE onset,
Radiation, test limits, cavity vacuum. b) Qo vs Eaccc) Rad vs Eaccd) HOM A and HOM B vs Eacce) Delta Freq vs Eacc2f) Qo vs T
Data mining and analysis for eventual corrective actions for the process flow.
Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland
Vertical test Area (VTA): Landing area and control room
Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland
Vertical test Area (VTA): Dewars area
Vertical test Area (VTA): HOM survey
- Specifications- Measurement methods : manual and enhanced Polfit
package based on Carsten’s and Hans Walter method to extract loaded Q from measured scattering parameters.
Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland
1800 2000 2200 2400 2600 2800 30001.0E+01
1.0E+02
1.0E+03
1.0E+04
1.0E+05
1.0E+06
1.0E+07
1.0E+08
1.0E+09
1.0E+10
1.0E+11
VTA HOM CharacterizationC100-RI-048 9/23/2011
maximum allowable Q (USE AS GUIDELINE ONLY) C100-RI-048 Loaded Q Values
Frequency (MHz)
Loa
ded
Q
Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland
Vertical test Area (VTA): HOM survey cont.
Operator interface – low loss cavity LL002 at 44 MV/m
Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland
Operator interface – LabView program
Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland
Data acquisition, traveler, Excel macro
Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland
Qo and Rad vs Eacc
Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland
HOM A and HOM B power vs Eacc
Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland
Lorentz coefficient
Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland
1/Qo vs temp
Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland
Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland
C100-R
I-001
C100-R
I-003
C100-R
I-005
C100-R
I-008
C100-R
I-005
C100-R
I-003
C100-R
I-005
C100-R
I-007
C100-R
I-010
C100-R
I-003
C100-R
I-008
C100-R
I-013
C100-R
I-001
C100-R
I-008
C100-R
I-018
C100-R
I-017
C100-R
I-020
C100-R
I-022
C100-R
I-025
C100-R
I-029
C100-R
I-034
C100-R
I-027
C100-R
I-035
C100-R
I-027
C100-R
I-016
C100-R
I-024
C100-R
I-029
C100-R
I-036
C100-R
I-037
C100-R
I-040
0
5
10
15
20
25
30
35
40
45
Eac
c (M
V/m
)
HPR wand accidental iris damage Unsuccessful HPR
Cavity C100-RI-008 recovered after light EP!!!
With and without Helium vessel
Project specification: cavity gradient 19.2 MV/m average
Administrative limit set at 27 MV/m
From 9/23/2010 Up to 7/7/2011
Emax of VTA Qualified Cavities for 12 GeV Upgrade
Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland
Emax of VTA Qualified Cavities for 12 GeV Upgrade
Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland
0 10 20 30 40 50 60 701000000000
10000000000
100000000000
Eacc (MV/m)
Qo
T = 2.07K
CEBAF upgrade cavity specification
Max. Eacc (MV/m) Test limitC100-RI-029 20.56* QuenchC100-RI-031 27.5 QuenchC100-RI-021 27.1 FEC100-RI-014 27 Admin limit at 27
MV/mC100-RI-022 28 FEC100-RI-030 27.8 QuenchC100-RI-025 30.1 Radiation >100mR/hC100-RI-028 27 Admin limited at 27 MV/m
* In previous tests, C100-RI-029 was quench limited at 26.7 MV/m
.1.1.1.1.1.1.1
.1
Qualified Cavities for 12 GeV Upgrade Cryomodule C100-3
Data mining
Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland
Data mining
Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland
Data mining
Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland
- Cables (some trivial – cables not connected, broken connectors supposed to operate at low temperature).
- Lambda vacuum leaks.- Occasional high radiation levels –> all cavities are
now radiation monitored after VTA tests.- Clean room over crowed (sometimes).- Glycol spill.- Vibration due to demolition , fumes and dust from
construction area, power outages.
Issues during VTA qualification tests
Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland
Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland
12 GeV Upgrade Cavities Production Tracking System
Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland
C100 string assembly
All remaining cavity strings should be clean room assembled by the middle for Feb 2012
Cryomodule assembly
Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland
- All 80 cavities will be VTA qualified by mid Dec 2011 – important effort to qualify at least 3 cavities each week!
- 3 Cryomodules installed and commissioned in CEBAF machine (R100 and 2 C100).
- C100-3 advanced qualification tests in CMTF- 7 cavity strings in different phases of assemble- All reaming cavity strings should be clean room
assembled by the middle of February 2012.
VTA operator team for 12 GeV project
Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland
Kirk DavisChristiana GrenobleMircea StirbetTiffany BassPete KushnickGrigory EmereevAri PalczewskiGianluigi CiovatiRongi GengJohn MammosserAndrew BurrillTom GoodmanJ. C. Westby-Gibson
Cryogenie supportPete KushnickTiffany BassDanny Forehand
Pansophy supportValery BookwalterBonnie MadreMelody Jones
Crane operatorsChris DreyfusSteve CastagnolaTom GoodmanDanny ForehandRoland Overton
TUPO061 SRF 2011 Chicago, July 25-29, 2011
Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland
Conclusions
Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland
Almost all cavities for 12 GeV project are qualified.Thank you !!!