Page 18. Master Builders Winners Alba Projects P/L is a construction company that has over 22 years experience in the industry. It is a modern building company that operates on a simple formula: building with integrity & experience and achieving excellence. Key essential characteristics of the team are high standards, common sense, good communication and efficient and timely work performance. Together, this makes for a competent building company that is able to produce results that speak for themselves. Colin Brown 0439 641 683 www.albaprojects.com.au BSA 1117 947 3347910aa QLD/NSW/VIC/ACT www.sthilliers.com.au Building projects that set benchmarks in construction excellence. Meridan State College - Stage 3 Winner Health & Education Facilities $4 million - $15 million MASTER BUILDERS Housing & Construction 2010 Awards Winners Advertising Feature within the wildlife corridor and gutterless roofs shed water patterns into the waterfalls below. The 5.4 hectare site could only be accessed by one 400m internal road which required fulltime traffic control. With limited space for site parking and restricted parking in surrounding streets, Matrix Projects implemented a bus service to transport more than 400 workers per day to and from the site from the local football ground. Access on and around the site was provided by narrow corridors, which later formed the permanent streets of the Viridian Village. To maintain stable access, and provide a first class pro- duct at handover, these tem- porary roads were graded, compacted and sealed 40mm lower than the finished street level, allowing a final asphalt seal to be placed on comple- tion. It features large landscape buffers that provide a green zone within the complex which, in turn, relate and connect to the surrounding National Park and greenbelt. Matrix Projects appointed a fulltime environmental manag- er to continually monitor, assess, document and custo- mise environmental control systems onsite. Site run-off into the Noosa River and surrounding fragile ecosystem was managed by a maze of construction swales, bioretention basins and sedi- ment ponds which contained the massive quantities of water and overland flow pro- duced by extreme downpours, in excess of 100mm per hour at times. Master Builders Sunshine Coast regional manager Ste- phen Robinson said, in some respects, Viridian 3 resembled an alpine village set in the subtropics as much of the development sat on stilts A 5-STAR resort on Noosa Hill has won builder Matrix Projects (Qld) the 2010 Master Builders Sunshine Coast Regional Project of the Year. The Viridian Resort and Spa comprises 39 luxury two- and three-storey villas, 139 units, 16 penthouses, a health spa, restaurant and a central facil- ities complex servicing 11 multi-storey blocks. With the idyllic Noosa Na- tional Park as its backdrop, the resort was a feat in engineer- ing that overcame the con- straints of a challenging ter- rain while respecting the natural environment. Constructed from a selec- tion of building materials, the resort commands the highest quality finish. Viridian is a linear develop- ment running along the valley between Picture Point and Noosa Hill. It covers an area as long as Noosa’s Hastings Street with a similar density. Award-winner ‘alpine village

Veridian Resort Noosa p1

Embed Size (px)

Citation preview

Page 1: Veridian Resort Noosa p1

Page 18. Master Builders Winners

Alba Projects P/L is a construction company that has over 22 years experiencein the industry. It is a modern building company that operates on a simpleformula: building with integrity & experience and achieving excellence. Keyessential characteristics of the team are high standards, common sense, goodcommunication and efficient and timely work performance. Together, thismakes for a competent building company that is able to produce results that

speak for themselves.

Colin Brown 0439 641 683 www.albaprojects.com.auBSA 1117 947

3347910aa

QLD/NSW/VIC/ACT www.sthilliers.com.au

Buildingprojects thatset benchmarksin constructionexcellence.

Meridan State College -Stage 3WinnerHealth & Education Facilities$4 million - $15 million

MASTER BUILDERSHousing & Construction 2010 Awards Winners

Advertising Feature

within the wildlife corridor and

gutterless roofs shed water

patterns into the waterfalls

below.

The 5.4 hectare site could

only be accessed by one 400m

internal road which required

fulltime traffic control.

With limited space for site

parking and restricted parking

in surrounding streets, Matrix

Projects implemented a bus

service to transport more than

400 workers per day to and

from the site from the local

football ground.

Access on and around the

site was provided by narrow

corridors, which later formed

the permanent streets of the

Viridian Village.

To maintain stable access,

and provide a first class pro-

duct at handover, these tem-

porary roads were graded,

compacted and sealed 40mm

lower than the finished street

level, allowing a final asphalt

seal to be placed on comple-

tion.

It features large landscape

buffers that provide a green

zone within the complex

which, in turn, relate and

connect to the surrounding

National Park and greenbelt.

Matrix Projects appointed a

fulltime environmental manag-

er to continually monitor,

assess, document and custo-

mise environmental control

systems onsite.

Site run-off into the Noosa

River and surrounding fragile

ecosystem was managed by a

maze of construction swales,

bioretention basins and sedi-

ment ponds which contained

the massive quantities of

water and overland flow pro-

duced by extreme downpours,

in excess of 100mm per hour at

times.

Master Builders Sunshine

Coast regional manager Ste-

phen Robinson said, in some

respects, Viridian 3 resembled

an alpine village set in the

subtropics as much of the

development sat on stilts

A 5-STAR resort on

Noosa Hill has won

builder Matrix Projects

(Qld) the 2010 Master Builders

Sunshine Coast Regional

Project of the Year.

The Viridian Resort and Spa

comprises 39 luxury two- and

three-storey villas, 139 units,

16 penthouses, a health spa,

restaurant and a central facil-

ities complex servicing 11

multi-storey blocks.

With the idyllic Noosa Na-

tional Park as its backdrop, the

resort was a feat in engineer-

ing that overcame the con-

straints of a challenging ter-

rain while respecting the

natural environment.

Constructed from a selec-

tion of building materials, the

resort commands the highest

quality finish.

Viridian is a linear develop-

ment running along the valley

between Picture Point and

Noosa Hill. It covers an area as

long as Noosa’s Hastings

Street with a similar density.

Award-winner ‘alpine village