30
Welcome Veranda Street Bridge Replacement Public Meeting East End Community Center 195 North Street, Portland, ME Thursday, August 8, 2019 6:00 PM

Veranda Street Bridge Replacement - Maine.gov

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Veranda Street Bridge Replacement - Maine.gov

WelcomeVeranda Street Bridge Replacement

Public Meeting

East End Community Center195 North Street, Portland, ME

Thursday, August 8, 20196:00 PM

Page 2: Veranda Street Bridge Replacement - Maine.gov

Veranda Street Bridge ReplacementPublic Meeting

• Welcome• Project Schedule• April Workshop Recap• Alignment Design Selection & Enhancements• Discussion/Question and Answer• Close

Agenda:

Page 3: Veranda Street Bridge Replacement - Maine.gov

Project Schedule

Page 4: Veranda Street Bridge Replacement - Maine.gov

April 2019 Public Workshop Findings

• Alignment 2b received the most public support• Decreasing motorist speed is a priority • Increasing bicycle and pedestrian safety is

important• Addition of green space is positive for the

neighborhood• The multiuse path should connect (now or in the

future) to neighboring areas • Opinions varied about parking options on the

street • Opinions varied about center turning lanes

Page 5: Veranda Street Bridge Replacement - Maine.gov

Alignment Selection

NORTH

Alignment Alternative 2b

Page 6: Veranda Street Bridge Replacement - Maine.gov

Veranda Street Beneath Bridge (Looking toward Falmouth)

11’-0” Lane

11’-0” Lane

5’-0” Bike w/2’-0” Buffer

5’-0” Bike w/2’-0” Buffer

10’-0” Multi-Use Path5’-0”Sdwk.

3’-0” 3’-0”

57’-0”

Veranda Street Away From Bridge (Looking toward Falmouth)

11’-0”Lane

11’-0”Lane

Varies 6’-0” to 10’-0”6’-0”Sdwk.

5’-0” Bike2’-0” Buffer

5’-0” Bike2’-0” Buffer

Alignment Selection

Page 7: Veranda Street Bridge Replacement - Maine.gov

• Broadly supported by public workshop attendees

• Provides sufficient capacity in the current year and future

• Reduces vehicle speeds and maximizes green space

• Signalized intersections at both interstate ramps

• Increases safety for all transportation modes

• Provides community green space as well as a buffer to existing homes

• Supports accelerated construction of the new bridge

• Facilitates multi-use pathway connections

Benefits of Selected Alignment

Page 8: Veranda Street Bridge Replacement - Maine.gov

Alignment Enhancements

NORTH

Alignment Alternative 2b

Install radar speed sign south of Martin’s Point Bridge

Page 9: Veranda Street Bridge Replacement - Maine.gov

Alignment Enhancements

NORTH

Alignment Alternative 2b

Rectangular Rapid Flashing Beacons, signage and high-visibility crosswalks

mid-block crossings

Page 10: Veranda Street Bridge Replacement - Maine.gov

Alignment Enhancements

NORTH

Alignment Alternative 2b

Painted bike lane buffers

Page 11: Veranda Street Bridge Replacement - Maine.gov

Alignment Enhancements

Limited on-street parking, two separate parking areas

Page 12: Veranda Street Bridge Replacement - Maine.gov

Alignment Enhancements

Shifting roadway alignment south further improves visibility and sight lines

Page 13: Veranda Street Bridge Replacement - Maine.gov

Alignment Enhancements

Bicycle & Pedestrian Accommodations

Page 14: Veranda Street Bridge Replacement - Maine.gov

Bridge Improvements• Unchanged from concepts previously presented• Includes accelerated construction of a new single span steel girder bridge• Remainder of existing bridge converted to embankment

Page 15: Veranda Street Bridge Replacement - Maine.gov

Bridge Improvements• Unchanged from concepts previously presented• Includes accelerated construction of a new single span steel girder bridge• Remainder of existing bridge converted to embankment

Page 16: Veranda Street Bridge Replacement - Maine.gov

Construction Phasing

Existing Conditions

Page 17: Veranda Street Bridge Replacement - Maine.gov

Construction Phasing

Phase 1 (Approx. May 2020 – August 2020)

• Maintain Veranda Street traffic pattern and pedestrian movement

• Construct foundations, abutments, and falsework

Page 18: Veranda Street Bridge Replacement - Maine.gov

Construction Phasing

Phase 2 (Approx. August 2020 – Nov. 2020)

• Combine Veranda Street NB and SB traffic

• Construct lightweight fill embankment

• Construct upper portion of bridge

Page 19: Veranda Street Bridge Replacement - Maine.gov

Construction Phasing

Phase 3Accelerated Bridge ConstructionClosure Period, Step 1 (April 2021)(Total closure period approx. 56 hours)(Step 1 closure period approx. 22 hours)

• I-295 and Veranda Street closed• Demolish existing bridge

Page 20: Veranda Street Bridge Replacement - Maine.gov

Construction Phasing

Phase 3Accelerated Bridge ConstructionClosure Period, Step 2 (April 2021)(Total closure period approx. 56 hours)(Step 2 closure period approx. 17 hours)

• I-295 and Veranda Street closed• Complete lateral slide and construct

earth embankment

Page 21: Veranda Street Bridge Replacement - Maine.gov

Construction Phasing

Phase 3Accelerated Bridge ConstructionClosure Period, Step 3 (April 2021)(Total closure period approx. 56 hours)(Step 3 closure period approx. 13 hours)

• I-295 and Veranda Street closed• Construct bridge approaches

Page 22: Veranda Street Bridge Replacement - Maine.gov

Construction Phasing

Phase 3Accelerated Bridge ConstructionClosure Period, Step 4 (April 2021)(Total closure period approx. 56 hours)(Step 4 closure period approx. 11 hours)

• I-295 and Veranda Street closed• Place I-295 pavement, install median

barrier and guardrail

Page 23: Veranda Street Bridge Replacement - Maine.gov

Phase 4(Approx. April 2021 – July 2021)

• I-295 and Veranda Street reopened to traffic

• Construct north portion of Veranda Street

Construction Phasing

Page 24: Veranda Street Bridge Replacement - Maine.gov

Construction Phasing

Phase 5(Approx. July 2021 – November 2021)

• I-295 and Veranda Street open• Construct south portion of Veranda

Street and I-295 ramps

Page 25: Veranda Street Bridge Replacement - Maine.gov

Construction Phasing

Completed Project(November 2021)

• Potential green space improvements not shown and will be completed under the direction of the City of Portland

Page 26: Veranda Street Bridge Replacement - Maine.gov

Detours

Interstate Through Traffic Northbound Interstate Traffic Southbound Interstate Traffic

Page 27: Veranda Street Bridge Replacement - Maine.gov

Detours

Southbound Route 1 Traffic Northbound Route 1 Traffic Southbound Route 88 Traffic

Page 28: Veranda Street Bridge Replacement - Maine.gov

Next Steps

Page 29: Veranda Street Bridge Replacement - Maine.gov

Discussion and Questions

Page 30: Veranda Street Bridge Replacement - Maine.gov

Thank You!