19
VentStop V.C.U Step 6

VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step

Embed Size (px)

Citation preview

Page 1: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step

VentStop V.C.U

Step 6

Page 2: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step

Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath.

Check orientation.

Step 8

Page 3: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step

Roll out back and front, inflation point must be on the front side. Quickly check condition of gate sides to ensure there

are no sharps or other issues.

Page 4: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step

One person at each end, pull the Ventstop so it is as flat as possible, Un-fold top fabric from centre out to side wall

and repeat other side. Ensure you end up with an even square shape.

Page 5: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step

When the unfolding is complete, re-check orientation.

Step 9

Page 6: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step

Blow out your Air line, check to ensure you have Safety clips. Clamp the Venturi to the inflation flange with air flow

pointing towards the Ventstop. Keep open end of Venturi off the ground.

Step 15

Page 7: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step

Attach the air line to the quick connect fitting on the venturi, Keep the tap on the Venturi turned off.

Page 8: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step

Place the control box in a suitable location, and check that all taps inside the box are turned off before connecting.

Page 9: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step

Connect the first hose from mine air to the “AIR IN” side of the control box.

Step17

Page 10: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step

Connect the second hose between the “AIR OUT” and the air fitting on the venturi.

Page 11: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step

Connect the blue sensor hose to the hose tail on the “AIR OUT” side of the box and fix in place with a hose clamp

Step 16

Page 12: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step

Insert the other end of the sensor hose about 400mm into the flange located next to the inflation point and tighten.

Page 13: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step

Check the control box, make sure bypass valve is open and Regulator valve is closed. Turn on air commence inflation,

keep open end of Venturi of the ground.

Page 14: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step

During inflation process, check for snagging or hook-ups e.g. Ventstop caught on side-wall, Excessive fabric caught

under the front of the Ventstop.

Step 31

Page 15: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step

You can assist the Ventstop by pulling down on the pulley ropes if these are available, or by pulling top corners away

from the side wall.

Page 16: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step

Before full inflation is achieved check the orientation of the Ventstop Adjust top corners if required.

Step 33

Page 17: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step

With Ventstop fully inflated and in the desired position, you have 2 choices, To operate directly from the Venturi, or

operate via the control box.

Step 34-35

Page 18: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step

If you are running directly from the Venturi, check that the Venturi has equalised, place hand over open end of

Venturi, air should not be blowing or sucking.

Step 36

Page 19: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step

Job done in 15 minutes