Venkatesan Natesan Setty Experience: 19 years in Gulf & 2 years in India Mobile: 971 55 3301849 / 91 9566717643 E-mail: [email protected] Project summary High rise buildings-2 basement +11 floors (5 –Star Hotel Project)@Abudhabi (Working in Hotel Interior Company) High rise buildings- 5 basements+45 floors (5- Star hotel Project)@Dubai High rise buildings –3 basement Ground Floor+Helth club+35 floors commercial buildings@ Dubai. Substation – 132/32 KVA substation @ Halul Island ,Qatar. Oil and Gas Plant - Sulphur Granulation Plant for GASCO ABUDHABI Palace Project – sheik Abdulla bin zayed palace @ Abudhabi for AMANA STEEL BUILDING CONTRACTING COMPANY in the year of 2001 to 2003 Barka Palace – HH SULTHAN QABOOS PALACE @ Sultanate of OMAN for ALMEST COMPANY LLC.in the year of 1999 to 2001. Residential Building - 29 Nos residential Building @International city @Dubai, University Building @ KSA Career Objective: High rise building projects, High profile finishing buildings, palace construction and interior works, Oil & Gas field construction (EPCC), Industrial buildings, infrastructure, Consulting Engineering and project Management companies with 20 years of expertise in all aspects of the industry. Extensive experience in spearheading project management, project estimating, Continuous design improvements, document preparation, developing project scope (budgets, timelines and delivery dates), material purchasing, site management, customer relationships, cost avoidance as well as additional proficiency in strategic planning and QHSE Management.

Venkatesh - Construction Manager

Embed Size (px)

DESCRIPTION

To whomsoever it may concern,Greetings.Reference is made to your requirement for a suitable position in your esteemed organization. Based on your requirement herewith I wish to propose my candidate for the above titled job.My brief profile is as follows 20 years professional experience in oil and gas plant, pipeline works, power sector, buildings and interior decoration works (18 years Gulf experience, 2 years India experience) Working with M/S. Larsen and Toubro Limited (Power and Transmission Division) in Qatar as a civil construction manager. Strict compliance with HSES polices and implemented at site. Plan, direct and co-ordinate project's day to day activities. Provide direction and support to project team. Provide a framework to establish standard performance measures based on organizational goals and objectives. Actively involve in Risk management by performing risk assessment and mitigation and stakeholder management. Develop a full scale project plans and track project deliverables. Effectively handle the planning and implementation of project deadlines and customers' requirements. Have strong management and control of suppliers and subcontractors. The details of my experience are found in the attached CV. Should my profile match your requirement, please do not hesitate to contact me any time at [email protected] or call me +0091 971553301849Awaiting your positive response, I remain.Yours faithfully,Setty Natesan Venkatesan00971553301849

Citation preview

Venkatesan Natesan Setty Experience: 19 years in Gulf & 2 years in IndiaMobile: 971 55 3301849 / 91 9566717643E-mail: [email protected]

Project summary

High rise buildings-2 basement +11 floors (5 Star Hotel Project)@Abudhabi(Working in Hotel Interior Company)High rise buildings- 5 basements+45 floors (5- Star hotel Project)@DubaiHigh rise buildings 3 basement Ground Floor+Helth club+35 floors commercial buildings@ Dubai.Substation 132/32 KVA substation @ Halul Island ,Qatar.Oil and Gas Plant - Sulphur Granulation Plant for GASCO ABUDHABIPalace Project sheik Abdulla bin zayed palace @ Abudhabi for AMANA STEEL BUILDING CONTRACTING COMPANY in the year of 2001 to 2003Barka Palace HH SULTHAN QABOOS PALACE @ Sultanate of OMAN for ALMEST COMPANY LLC.in the year of 1999 to 2001.Residential Building - 29 Nos residential Building @International city @Dubai,University Building @ KSA

Career Objective:

High rise building projects, High profile finishing buildings, palace construction and interior works, Oil & Gas field construction (EPCC), Industrial buildings, infrastructure, Consulting Engineering and project Management companies with 20 years of expertise in all aspects of the industry.

Extensive experience in spearheading project management, project estimating, Continuous design improvements, document preparation, developing project scope (budgets, timelines and delivery dates), material purchasing, site management, customer relationships, cost avoidance as well as additional proficiency in strategic planning and QHSE Management.

Experience Highlights:

Project ManagementWith 20 years of experience in various environment of High rise tower projects, high finishing palace and villas, Industrial buildings, Oil & Gas field construction, Consulting Engineering and project Management companies

Building Works

Construction of commercial and administrative buildings, warehouses, high rise towers, road works, infrastructure, residential apartments, construction of hospitals and premium villas @OMAN &UAE

Oil & Gas Ruwais & Habshan sulphur plant, cross country pipe line works @UAE &KSA.

ServicesOH Tanks, Underground sumps, plumbing works, drainage works, irrigation works etc.,

Piling & ShoringSheet piling for foundations, shoring with H beams, trench piles and cast in situ piles

EstimationQuantity calculations and rate analysis for estimation of various civil, oil & gas construction, tower projects etc.,

BudgetingBudget allocation, Cost estimation, Cost assessment, cost variation, Project expenses, other expenses

Technical SupportMethod statements, Hazard identification and risk assessment, Project correspondence, site meeting, submission of materials, etc.,

Quantity SurveyingVariation and claims, managing costs, preparation of invoices, preparation of sub-contracts, etc.,

ProcurementSelection of suppliers, sub-contractors and carrying out negotiations for the procurement of materials and services, subcontractor prequalification

Strategic PlanningGoal setting, Strategy development process, Customer analysis, Setting action, short-term goal, deadlines

Health, Safety & EnvironmentAchieving the objective and targets, complying QHSE Policy, abiding legal requirements,

Pre-construction & SchedulingPhasing plans, critical milestones, Schedule of approvals from government bodies

Key Skills: Management Skills Participative management professional; results focused, entrepreneurial and practical Driven by new challenges and desire to be successful in all endeavours Immensely enjoy navigating all aspects of complex projects. Project presentation to clients and consultants.

Staff Development Skills Effective leadership counseling and motivating Lead through example

Interpersonal Skills Hardworking, efficient, proficient Deal effectively with conflicts Adapt to changes Reliable & reasonable work ethics Able to learn new jobs/ tasks quickly

Educational Qualification:April 1992Diploma in Civil EngineeringBoard of Technical Education, India

March 1996Diploma in Architectural CADD

Complementing Knowledge:

Survey equipment-total station

Auto Cad.

Primavera & MS Projects.

Preparing and reviewing BBS

Knowledge of all type of heavy shuttering systems

Computer knowledge in MS Word, Excel, Power Point.

Key Responsibilities:

Ensuring Environment, Health and Safety during construction

Attending safety awareness courses, PTW training, First aid training.

Preparation of construction programme on a daily, bi-weekly and monthly basis in integration with Clause 14-FIDIC Contract.

Determining resources (Manpower, Plant & Equipment, and Material) on the basis of desired output and monitoring same as the work proceeds by proper labour and other resource allocation.

Quantity take-off and billing

Compliance to design, drawings, specifications and workmanship

Coordinating with subcontractors, consultants, suppliers

Quality Assurance & Control, Inspection and test plans

Submittal: Materials, Shop drawings, subcontractor prequalification

Conducting weekly meetings

Preparation of Management Information Statements reports-Monitoring Quality ,Cost, Delivery

Designation Associated Companies and Projects Handled:April 2013 - Present LARSEN & TOUBRO LIMITED , DOHA,STATE OF QATAR CONSTRUCTION MANAGER

Project Owners: QATAR PETROLEAM OFFSHORE DIVISIONMain Contractor: L.S.Cable.

Project: HALUL ISLAND EPIC FOR POWER SUPPLY PROJECT THROUGH SUBMARINE CABLE FROM RAS LAFFAN TO HALUL ISLAND.

Project value: $ 900 Million

HALUL ISLAND OFFSHORE OPERATION. Site area preparation and shifting of dredged materials Temporary Access road work Construction of 133 KVA sub station Steel structural building construction of transformers and reacters 2 nos of cable transaction joint bay at sea shore. Construction of 2 K.M R.C.C cable trench Pipe rack foundation for fire water piping works. Shore protection works 3Nos of road culverts Access Road work to entire plant Construction of labour camp and facilities

May 2010 May 2013 DODSAL ENGINEERING & CONSRUCTION PVT LTD, ABUDHABI, UAE DEPUTY CONSTRUCTION MANAGER

Project Owners: GASCO

Project: Sulphur Granulation Plant at Habshan, Abu Dhabi.

Project value: $ 400 Million

HABSHAN SULPHUR GRANULATION PLANT-GREEN FIELD. Site area preparation (Earth work 7 Million Cum Cutting& Filling) Right of work (road work) for all facilities. 12 nos of administrative and operation buildings with high profile finishes. Construction of tank foundations-12 no ( Dia varying 15m-42 m) Pipe rack foundations (Pipe rack length 2200 m) Granulator foundations and Shelter- 12 granulators Electrical Sub stations 3 nos 33 KV Conveyor with Rail car loading Shelter Stacker and declaimer Sulphur storage And Blocking Building Roads and Drainages App: 14 Km Evaporation and Retention PondWorking at Live Plant -Habshan 1-4 Construction of 6 Nos of Pump foundation and 1000 Meter Pipe Rack foundations Assisting HSE Department to prepare HIRA Hazard identification and risk analysis Attending required safety inductions and Safe work permit procedures. Attending H2S awareness Training.

May 2008 Apr 2010 GOLDEN ARROW INTERIORS , ABU DHABI, UAE PROJECT MANAGER

Project Owners: FAIRMOUNT HOTAL-ABUDHABI

WORKING AS INTERIORS CONTRACTERS UNDER M/S.SAPOORJI AND PALOONJI CONSTRUCTION COMPANY

Project Value: AED 900 million

Construction of 900 million - 2 basements +G/F + 9 floors FAIRMOUNT (BOB AL BHAR) 5-star hotel at Abu DhabiConstruction of Different type of interior works and the restaurants like All Day Dining, Frankies, Steak, Lebanese, coffee shop, meeting rooms, banquette halls, 420 NOS different type of hotel rooms and good-looking reception area.

Using high class fit out works, different type of floors finishes, wall finishes, ceiling finishes. Co-ordinate with clients architect to finalise end products. Construction of water fountains and waterfalls with various types of stone finishes. Wooden cladding and stone claddings,decatative, cast glass works, polish plaster finishes, wall paper finishes,decarative false ceiling works, stone ceiling works, concrete colour flooring,corien top finishes,Etc.

Project: Interior fit out works for Al Ghurair city Phase 2, Dubai.

Client: Al Ghurair groupConsultant: RTKL Architects (Consultant)/Arif&Bintoak (Local Consultant)Main Contractor: Al Habtoor Leighton groupProject cost: 25 Million

Key Responsibilities: Involved in management of civil works and Interior fit out works including supply and installation of wall cladding and finishing, false ceiling, column cladding and floor finishes for walkways, common areas, entrance lounge, food court areas and toilet areas.

Dec 2006 May 2008 AL ARAAB CONTRACTING COMPANY, Dubai, UAE CONSTRUCTION MANAGER

Project Owners: Tameer Properties, Regal Tower Dubai, U.A.E.

Project: 3 Basement + G/F + 4 Parking podium + Health club + 27 Floors and 2 nos substations at Business Bay, Dubai.

Project Value: 240 million

Mile stone achieved 14,000 cu.m of raft foundation shuttering, reinforcement and concreting works within 75 days.Every typical slab concreting cycle in duration of 10 days with help of DOKA shuttering works.Using advance level of floating shuttering system sallow lift pit in depth of 12.5 m from M/S.GOLF SCOFFOLDING SYSTEM.Using 40 m.m dia bars using with mechanical couplers for all columns.1 no of substation construction with DEWA guidance and hand over to with in construction schedule.Co-ordinate with all sub contractors to achieve project schedule at right time.Co-ordinating with electrical, mechanical, HAVC, interiors and glass and aluminium curtain wall.Logistic plan for all equipment and resources moment and manpower arrangement.Estimating and quantity surveying for planning purposes.Preparing monthly, weekly target in order to achieve project schedule.

Apr 2005 Dec 2006 M3AR CONSULTING ENGINEERS, Dubai, UAE SR CIVIL ENGINEER

Project Owners: The Bonnington Hotel Ltd-London, UK

Project: Project Management of a high rise Building of 56,500 M2 Area (5 basements + Concourse + 12 Hotel Floors + 28 Residential Floors + 2 Mechanical Floors) 5-Star hotel plus Residential apartment at Jumeira Lake Towers, Dubai

Project Value: AED 267 Million

This project consists of various types of restaurants like all day dining, Indian, Chinese and bar. Co-ordination with all interior sub-contractors to finalise the product. Reviewing sub-contractors shop drawings, materials inspections and progress monitoring as per project schedule.Observing weekly progress by primavera project schedule.

Monitoring monthly progress by manpower histogram, cash flow and project durationSupervising and coordinate with material approvals with procurement department.Co-ordinate with interiors, external lighting, kitchen equipment, room management system, master key system

Feb 2004 Apr 2005 GAMMON &BILLIMORIA LLC, Dubai, UAE SR PROJECT ENGINEER

Project Owners: Nakheel International city Dubai

Project: Construction of 150,000M2 G + 3 and 4 Storey residential apartment at the intl city buildings 29 Nos

Project Value: AED 400 Million

Construction of 150,000M2 G + 3 and 4 Storey residential apartment at the international city buildings 29 Nos, All infrastructure works like underground sewer system, internal roads constructions and street light system established. 6 Nos of substations constructions as per DEWA standards, co-ordinating with DEWA Engineers for final approvals and handing over. Co-ordinating with M/S Nakheel for all Client supply finishing Items like floor tiles, wall tiles, marbles, raised floor, ironmongery, bath room fixtures and Etc.

Aug 2001 Jan 2004 AMANA STEEL BUILDING CONTRACTING, Abu Dhabi, UAE PROJECT ENGINEER

Project Owners: RAYAL FAMILY ENGINEERING OFFICE-ABUDHABI

Projects: 1. SHAKE ABDHULLA BIN ZAYED @ UMALNAR.

Project Value: AED-900 Millions.

The overall building plot consist of 1000M X 1000M.area grading and levelling Construction of kitchen building, main building, security and staff buildings, and guest palace. infrastructure works and maintenance works day by day supervisions, logistics arrangements, preparing gate pass for required activities. Meeting with consultants, sub-contractors and HSE engineers. Review shop drawing, Raising Requesting for information for drawings clarification. Applying all QA/QC procedures.

Construction of mens and womans college including all facilities. Key Responsibilities includes working with QA/QC department, materials submittal, inspection request, and material at site inspection, maintain concrete pore record, cube test result monitoring, submittal log maintaining as per master programme.

Ensure all safety requirements, site safety conditions and enhancing where possible safety measures. Exposure to all type of safety permits as per EHS requirements. Directed activities of staff involved in site supervision & payment certificate. Performed manpower allocation and supervision. Prepared, implemented and updated work schedules, for on-time completion of projects.

Jan 1999 Aug 2001 ALMEST COMPANY L.L.C. RUWI, OMAN SITE ENGINEER

Client: Government Department. Barka palace.

Construction of Additional buildings for additional guest residence in barka palace. All building walls are blast proof. All Finishes as per client requirements.Monitoring and executing of project as per approved drawings and specification.Planning of manpower and required resources.co ordinate with consultants for inspection and finishes mock-ups.

Jan 1995 Aug 1998 AL-HASANA TRADING EST, RIYADH, KSA CIVIL SUPERVISOR

Client: ARAMCO & Riyadh municipality.Construction of Library building for KING ABDHUL AZIZ UNIVERSITY @RIYADH.80 K.M of 12 Fuel pipe line at uptake near Dhamam.

Excavation up to required level, compaction. Laying of pipes, hydro test and back filling.Road crossing, culvert construction by precast and cast in situ.Co-ordinate with Micro tunnelling sub-contractors.

Jun 1992-Nov 1994 ASHWIN CONSULTANTS, INDIA. SITE SUPERVISOR

Construction and conversion of rail way track from meter gauge to broad gauge.De railing of existing meter gauge track and hand over to railway departmentRemoving of existing aggregate and levelling.Rail and concrete sleepers assembling at assembling yard with help of cranes.Laying of ACESS RAIL TRACK for PQRS engines.Placing of new broad gauge assembled rail with concrete sleepers with help of PQRS engines.Alignment of new broad gauge railway line and providing necessary packing where ever required.Filling of 50 m.m gravels with goods trains and packed with shovels.Fish plate filling with cast iron where ever required.Trail run with help of motorizes trolleys.

Verifiable track record for the successful completion of multi-million dollar projects

Favourite Quote: Honesty once pawned cannot be redeemed