1 Vectren Experience with MOD-033 Larry Rogers Manager, Transmission System Operations(TSO) Vectren Energy Delivery Evansville, Indiana

Vectren Experience with MOD-033 - Home - IEEE Power and ... · Vectren Experience with MOD-033 Larry Rogers Manager, Transmission System Operations(TSO) Vectren Energy Delivery

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Vectren Experience with MOD-033 - Home - IEEE Power and ... · Vectren Experience with MOD-033 Larry Rogers Manager, Transmission System Operations(TSO) Vectren Energy Delivery

1

Vectren Experience with

MOD-033

Larry Rogers

Manager, Transmission System Operations(TSO)

Vectren Energy Delivery

Evansville, Indiana

Page 2: Vectren Experience with MOD-033 - Home - IEEE Power and ... · Vectren Experience with MOD-033 Larry Rogers Manager, Transmission System Operations(TSO) Vectren Energy Delivery

Vectren at a glance

• Fortune 1000 company, Headquarter in Evansville, Indiana

• Gas & Electric Investor Owned Utility (IOU)(NSE: VVC)

• Indiana is not a degregulated state• Vectren Transmission System Operations –

Local BA, TO/TOP, TP, GO/GOP, LSE, DP, MP

• Vectren Power Supply, ALCOA, AMP - GOPs

• Midcontinent ISO - RC and BA

• ReliabilityFirst - NERC Regional Entity

• 65 miles 345kV, 350 miles 138kV lines, and

550 miles 69kV lines

• 50 Transmission Stations

• 140,000 Electric Customers - SW Indiana

• 1 Million Gas Customers - Indiana and Ohio

Generation and Load

Peak Load - 1,850 MW (Summer)

Total Resources – 1,866 MW

Interconnections

Big Rivers Electric Corporation

Duke Energy Midwest

LG&E/KU

Hoosier Energy REC

Indianapolis Power and Light

Page 3: Vectren Experience with MOD-033 - Home - IEEE Power and ... · Vectren Experience with MOD-033 Larry Rogers Manager, Transmission System Operations(TSO) Vectren Energy Delivery

Topics to cover today

• How Vectren builds Planning Models

• How Vectren builds Operational Models

• How Vectren checks model validity

– Steady State

– Short Circuit

– Dynamics

3

Page 4: Vectren Experience with MOD-033 - Home - IEEE Power and ... · Vectren Experience with MOD-033 Larry Rogers Manager, Transmission System Operations(TSO) Vectren Energy Delivery

Vectren’s Elec. Transmission Planning Modeling Process

Transmission

Planning

Steady State

Short Circuit

DynamicsTransmission

Owners (TO)

Lines (PLS-CAD),

transformers (test

sheets), shunts,

Ratings, GIS data.

Generator Owners

(GO’s - multiple)

Generation

add/retire/dispatch

interchange

Transmission

Operator (TOP)

SCADA and EMS,

Pi Historian

Planning Authority (PA-

MISO)

Model On Demand

(MOD), MTEP, GI,

TSR

Reliability Coordinator (RC-

MISO)

Webtool, Network model,

Commercial Model, Op-

Guides, Flowgates

Reliability Entity (RE-

Reliability First)

MMWG, Seasonal

Assesments, Near term &

Long Term plans

IURC (Resource

Planning)

Integrated

Resource Plan

NERC MOD-

010 & 012

Validation

Base Cases

Neighbor TO’s

(multiple)

Tie lines,

interchange

Inputs

Relay Protection (TO)

Disturbance data, DFR’s,

DDR’s, PMU’s

Load Serving Entities

(LSE’s-multiple)

Actual load (Meter

values), UFLS, and

future load forecast

Outputs

NERC MOD-

026, 027 & 033

NERC TPL-001

thru 004

Page 5: Vectren Experience with MOD-033 - Home - IEEE Power and ... · Vectren Experience with MOD-033 Larry Rogers Manager, Transmission System Operations(TSO) Vectren Energy Delivery

NERC TOP-002

thru 008

Vectren’s Elec. Transmission Operations Modeling Process

Transmission

Real-Time

Operations

SCADA – Real

time, alarms,

gross meas. errSubstation RTU’s

Equipment status,

flows, voltages,

alarms, frequency,

GPS clocks

Generator Owners

(GO’s - multiple)

Generation status

and forecasts

Transmission

Planning (TP)

Ratings and

connectivity

MISO Settelments

nMarket Reports,

Energy reports and

billing

Distribution System

Operations (DSO)

SCADA, OMS

MISO (RC)

ICCP data for outside

areas and generation set-

points

Validation

Neighbor TO’s

(multiple)

Tie line checkout,

(metered ties)

Inputs

PI Historian

All real-time archives

Load forecasts and

(LSE’s)

1) Pattern Recognition

Technologies

2) Internal ABB STLF

Nostradamus (future)

Outputs

State Estimation

(SE & CA) model

Dispatcher Load

Flow (DLF) –

Operational

Horizon

Simulation (EPRI)

Black start

validation

NERC EOP-005

NERC MOD-033

Page 6: Vectren Experience with MOD-033 - Home - IEEE Power and ... · Vectren Experience with MOD-033 Larry Rogers Manager, Transmission System Operations(TSO) Vectren Energy Delivery

Vectren’s Steady State Model Validation Process

• Validate EMS Model to real-time SCADA flows & voltages.

• EMS model that does not solve “is” an indicator of a model

error

• But EMS model that does solve “is not” an indicator of a valid

model. Solution values must be checked against real-time

values or some event.

• Vectren considers values valid if within these tolerances:

• MW & MVAR each within 3% of facility rating (lines &

transformers) with no contingencies.

(Vectren started with largest errors with the gross

measurement error tool and started between 5-10% error.)

Most values are within 1%.

• MW & MVAR each within 5% of facility rating (lines &

transformers) with contingency analysis prior to switching

compared to post switching values.

• Voltages within 1% of nominal voltage

Page 7: Vectren Experience with MOD-033 - Home - IEEE Power and ... · Vectren Experience with MOD-033 Larry Rogers Manager, Transmission System Operations(TSO) Vectren Energy Delivery

Vectren’s Steady State Model Validation Process

• PSS/e case compare EMS operational model snapshot to

Planning model to check exact match for R, X, B, Rate A, Rate B,

connectivity, & Out of service facilities (status).

• PSS/e case compare same cases to confirm total load, load

profile, generation dispatch, and net interchange “reasonably

represents” accurate time period for the models.

Example: a single commercial load normally varies daily

between 12-18MVA. When the EMS model snapshot was

exported the load was at 12MVA. The planning model contains

16MVA at that load. The load does not have to be exact as long

as it represents expectation. A peak model may be closer to

18MVA value and an off peak model may be closer to the

12MVA value. The load is commercial and may be non-

conforming and remain at 16MVA for all time periods.

Page 8: Vectren Experience with MOD-033 - Home - IEEE Power and ... · Vectren Experience with MOD-033 Larry Rogers Manager, Transmission System Operations(TSO) Vectren Energy Delivery

8

Real-Time Raw

Values

EMS Solved Case

Values

4MW/3MVAR

error on Line with

~300MVA rating

7MW/7MVAR error

on Line with

~300MVA rating

2MW/5MVAR error on

XFMr with ~150MVA

Rating (tap difference)1kV Voltage error

at 138kV bus

Page 9: Vectren Experience with MOD-033 - Home - IEEE Power and ... · Vectren Experience with MOD-033 Larry Rogers Manager, Transmission System Operations(TSO) Vectren Energy Delivery

Vectren’s Short Circuit Model Validation Process

• Planning engineers manually compare peak Planning model to

Aspen Short Circuit base model to check exact match for bus

names and numbers, R, X, B, Rate A, Rate B, connectivity, & Out

of service facilities (status).

This is somewhat difficult because comparing negative, zero,

and positive sequence data that is not a consistent data format

in each software application (PSS/e vs. Aspen).

• Planning Engineers manually compare all facilities match the

Aspen line property database and that the line database matches

the PLS-CAD detailed design and ESRI GIS system data.

• Relay engineers enter relays to link to Aspen relay database to

reflect most accurate base cases during peak conditions.

• Relay engineers copy the base model for specific conditions

during events to compare event fault data to a simulated fault in

the short circuit model and notify planning engineers of any

suspected issues. Accuracy at the descretion of the relay

engineers.

• Engineers keep periodic historical models to allow relay engineers

to go back and see model conditions that relay settings were likely

developed. Useful for mis-operation reviews.

Page 10: Vectren Experience with MOD-033 - Home - IEEE Power and ... · Vectren Experience with MOD-033 Larry Rogers Manager, Transmission System Operations(TSO) Vectren Energy Delivery

Vectren’s Dynamic Model Validation Process

Generator Owners

(GO’s - multiple)

Go’s submit initial

equipment data to

TP

Transmission Operator

(TOP)

Notifies that fault or

dynamic event occured

MMWG

Consolidates multiple TPs

data

Transmission Planner

(TP)

Develops Dynamic Base

cases for reference using

steady state topology.

Generation Operator

If no event occurs or

data is not captured,

coordinates test per

MOD-026&027

Base Cases

Relay Protection (TO)

Disturbance data

collected from Relays,

DFR’s, DDR’s, PMU’s

Load Serving

Entities (LSE’s-

multiple)

LSE’s submit

loads to TP

Transmission Planner

(TP)

Conducts simulation of

event to validate model

(valid or not valid)

Page 11: Vectren Experience with MOD-033 - Home - IEEE Power and ... · Vectren Experience with MOD-033 Larry Rogers Manager, Transmission System Operations(TSO) Vectren Energy Delivery

Other validation checks• Does the model adequately reflect actual events

within reason. Specifically, stable or not stable

within similar number of cycles/seconds.

11

Page 12: Vectren Experience with MOD-033 - Home - IEEE Power and ... · Vectren Experience with MOD-033 Larry Rogers Manager, Transmission System Operations(TSO) Vectren Energy Delivery

Questions?

Contact information:

Larry Rogers

Work Phone: (812)491-4563

Email: [email protected]