VDOT eConstruction eConstruction Virginia Department of Transportation Julia Simo, P.E.

VDOT eConstruction - vaasphalt · PlanGrid: Pilot Program Results Add a footer 12 3.6 Average Total hours/wk saved 4.2 Additional hours/wk spent on jobsite by inspectors 16 Additional

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: VDOT eConstruction - vaasphalt · PlanGrid: Pilot Program Results Add a footer 12 3.6 Average Total hours/wk saved 4.2 Additional hours/wk spent on jobsite by inspectors 16 Additional

VDOTeConstruction

eConstructionV i r g i n i a D e p a r t m e n t o f Tr a n s p o r ta t i o n

J u l i a S i m o, P. E .

Page 2: VDOT eConstruction - vaasphalt · PlanGrid: Pilot Program Results Add a footer 12 3.6 Average Total hours/wk saved 4.2 Additional hours/wk spent on jobsite by inspectors 16 Additional

TABLET BASED INSPECTION

• PlanGrid for advanced PDF tools• Headlight Pilot for Field Data

Capture

JOBSITE TECH & FURTHER RESEARCH• Headlight Data Usage• RFID• Team Member• eTicketing• Augmented Reality• 3D Printing• Further Research & Development

UNMANNED AERIAL SYSTEMS• Progress Photos• Plan Verification

• As-Builts

DOCUMENT MANAGEMENT

SYSTEMS• Submittal processes• Workflow mapping• Project Document Management

DIGITAL STRATEGY• Project Analytics and Dashboarding• Evaluation of Current Systems

• Business Process Re-development• Seamless Integration

3D/4D MODELING• 3D engineered model linked to

project schedule (4D)• Automated Machine Guidance

(AMG)

2

eConstruction

Page 3: VDOT eConstruction - vaasphalt · PlanGrid: Pilot Program Results Add a footer 12 3.6 Average Total hours/wk saved 4.2 Additional hours/wk spent on jobsite by inspectors 16 Additional

Add a footer 3

Key Priorities

Time, Budget, Quality

Business Process Reengineering

Complexity Reduction

Change Management

Strengthen Core Competencies

Digital Transformation

User FocusReduce

FragmentationData Driven

Decision MakingEliminate Paper

Processes

Page 4: VDOT eConstruction - vaasphalt · PlanGrid: Pilot Program Results Add a footer 12 3.6 Average Total hours/wk saved 4.2 Additional hours/wk spent on jobsite by inspectors 16 Additional

Add a footer 4

Test Field User Applications

• Asses program strengths and limitations

• Collect User Feedback

• Identify additional areas for use

Develop Best Practices

• Help set standard for larger scale use

• Establish internal experts/power users

Asses Value

• Formal return-on-investment analysis

• Usability Assessment

Digital Transformation Strategy: Pilot Programs

Page 5: VDOT eConstruction - vaasphalt · PlanGrid: Pilot Program Results Add a footer 12 3.6 Average Total hours/wk saved 4.2 Additional hours/wk spent on jobsite by inspectors 16 Additional

Add a footer

VDOT eConstruction’s Tiered Approach

ProjectWiseCentralized data and

document management system

PlanGrid PDF and collaboration tool for inspectors

AWP* Contract Management

Provide the right tools for the right ROLE

Headlight Field data collection tool

5

Page 6: VDOT eConstruction - vaasphalt · PlanGrid: Pilot Program Results Add a footer 12 3.6 Average Total hours/wk saved 4.2 Additional hours/wk spent on jobsite by inspectors 16 Additional

Add a footer

Digital Transformation

iPads in Field

PlanGrid

Headlight

DMS/Submittal Workflow

Integrations

6

Page 7: VDOT eConstruction - vaasphalt · PlanGrid: Pilot Program Results Add a footer 12 3.6 Average Total hours/wk saved 4.2 Additional hours/wk spent on jobsite by inspectors 16 Additional

Add a footer 7

ProjectWise Explorer/ ProjectWise Deliverables Management

Digital Plans & DocumentsPunchlistProgress Photos

SiteManager – Contract Management/ Payment

PlanGrid HeadLightDigital Plans & DocumentsPunchlistProgress PhotosAs-Builts

Field Data Capture• Materials Testing• Daily Reports

eConstruction Integrations

Dashboarding/Analytics

Page 8: VDOT eConstruction - vaasphalt · PlanGrid: Pilot Program Results Add a footer 12 3.6 Average Total hours/wk saved 4.2 Additional hours/wk spent on jobsite by inspectors 16 Additional

Jobsite Tech &Further Research

• Jobsite Technologies• RFID• eTicketing• AMG• Advanced Survey Tools

• Data Management• Dashboarding• Project Level Analytics• Systems Integrations

• Further Research and Policy• Evaluation of Alternatives• Upcoming Technologies• Policy guidance

8

Page 9: VDOT eConstruction - vaasphalt · PlanGrid: Pilot Program Results Add a footer 12 3.6 Average Total hours/wk saved 4.2 Additional hours/wk spent on jobsite by inspectors 16 Additional

FR

Tablet Based Inspection

9

Three Parts to Tablet Based Inspection Program

• iPad Deployment

• PlanGrid Implementation

• Headlight Pilot

Page 10: VDOT eConstruction - vaasphalt · PlanGrid: Pilot Program Results Add a footer 12 3.6 Average Total hours/wk saved 4.2 Additional hours/wk spent on jobsite by inspectors 16 Additional

PlanGrid

• Digital Plans & Documents

• Mark ups

• Progress Photos Tied to Plans

• Real-Time Field Collaboration

• Punchlist

10

Page 11: VDOT eConstruction - vaasphalt · PlanGrid: Pilot Program Results Add a footer 12 3.6 Average Total hours/wk saved 4.2 Additional hours/wk spent on jobsite by inspectors 16 Additional

PlanGrid: Pilot Program

Add a footer 11

75 Pilot Program Participants

50Projects• Design Build• I-66 OTB Mega-Project• Emergency, on-call,

schedule

8 Districts Participating

Page 12: VDOT eConstruction - vaasphalt · PlanGrid: Pilot Program Results Add a footer 12 3.6 Average Total hours/wk saved 4.2 Additional hours/wk spent on jobsite by inspectors 16 Additional

PlanGrid: Pilot Program Results

Add a footer 12

3.6Average Total hours/wksaved

4.2Additional hours/wk spent on jobsite by inspectors

16Additional photos taken per week per inspector

Page 13: VDOT eConstruction - vaasphalt · PlanGrid: Pilot Program Results Add a footer 12 3.6 Average Total hours/wk saved 4.2 Additional hours/wk spent on jobsite by inspectors 16 Additional

FR

HeadLight

13

Real-Time Field Data Capture Tool

Page 14: VDOT eConstruction - vaasphalt · PlanGrid: Pilot Program Results Add a footer 12 3.6 Average Total hours/wk saved 4.2 Additional hours/wk spent on jobsite by inspectors 16 Additional

Headlight: Pilot Program

Add a footer 14

• Used to collect data in field

• Real Time Data

Cloud-based Reporting Tool

• Starts with Data, populates reports as needed

• Metadata associated with each observation

• Benefits Include:

• More Data

• Higher Quality Data

• Easier to find data

• Programmatic Level Analytics

Data First Reporting

Page 15: VDOT eConstruction - vaasphalt · PlanGrid: Pilot Program Results Add a footer 12 3.6 Average Total hours/wk saved 4.2 Additional hours/wk spent on jobsite by inspectors 16 Additional

What is Data-First Reporting?

Add a footer 15

Work is performed

Observation is made

Picture is taken

Notes are recorded

Material test is recorded

Pay item quantity is

input

Compiled into Daily Work Report

Feeds into applicable systems.

Page 16: VDOT eConstruction - vaasphalt · PlanGrid: Pilot Program Results Add a footer 12 3.6 Average Total hours/wk saved 4.2 Additional hours/wk spent on jobsite by inspectors 16 Additional

Add a footer

Headlight: Field Data Collection

16

Phase 1: Materials

Division Only

Phase 2: eConstruction

Field Data Capture

Phase 3: eConstruction

Data Automation

Implementation March 2021

Page 17: VDOT eConstruction - vaasphalt · PlanGrid: Pilot Program Results Add a footer 12 3.6 Average Total hours/wk saved 4.2 Additional hours/wk spent on jobsite by inspectors 16 Additional

Add a footer

Headlight: Phase 2 Details

17

45 Users

9Projects

8 Districts

Page 18: VDOT eConstruction - vaasphalt · PlanGrid: Pilot Program Results Add a footer 12 3.6 Average Total hours/wk saved 4.2 Additional hours/wk spent on jobsite by inspectors 16 Additional

Add a footer

Headlight: Preliminary Findings

18

Phase 1: Materials

Division Only

Phase 2: eConstruction

Field Data Capture

Phase 3: eConstruction

Data Automation

Implementation March 2021

Saves inspectors time and keeps them in the field longer

•~230 hours admin work eliminated per inspector per year

•~ 280 additional hours spent in the field per inspector per year

Improves documentation of projects

•Over 1,100 additional photos per inspector per year

• Improved project visibility for ACE/CM

• Improved timeliness and availability of reports and data

Improves communication

•Real time monitoring of projects

•VDOT/Contractor workflow

Page 19: VDOT eConstruction - vaasphalt · PlanGrid: Pilot Program Results Add a footer 12 3.6 Average Total hours/wk saved 4.2 Additional hours/wk spent on jobsite by inspectors 16 Additional

Headlight: Survey Highlights

19

Field Users

4.4 hoursAverage time saves per week on data entry

5.4 hours Average added time per week in field

21.4Average # of additional pictures

Office Users

13Average # additional observations

All Users

81%HeadLight Reports submitted within

24 hours

Page 20: VDOT eConstruction - vaasphalt · PlanGrid: Pilot Program Results Add a footer 12 3.6 Average Total hours/wk saved 4.2 Additional hours/wk spent on jobsite by inspectors 16 Additional
Page 21: VDOT eConstruction - vaasphalt · PlanGrid: Pilot Program Results Add a footer 12 3.6 Average Total hours/wk saved 4.2 Additional hours/wk spent on jobsite by inspectors 16 Additional

Add a footer 21

Phase 3

Additional Projects/More Users

Administrative Side

Integrations

Design Build??

Materials Notebook???

Page 22: VDOT eConstruction - vaasphalt · PlanGrid: Pilot Program Results Add a footer 12 3.6 Average Total hours/wk saved 4.2 Additional hours/wk spent on jobsite by inspectors 16 Additional

FRFABRIKAM RESIDENCES

Questions

22

[email protected]

Julia Simo

804-786-2993