3
Various • Wrote Run Coordination job description – Found this exercise to be useful as CSC Operations guy, so decided to do it as Deputy Run Coordinator… – First version located at… https://twiki.cern.ch/twiki/pub/CMS/GregRakness/CMS_Run_Coordination_job_description_v1.docx – Already discussed with Maria and Christophe. Next: discuss with Tiziano… • Will be on DAQ2 review committee 17 June – DAQ2 is the upgrade to DAQ during LS1 28 May 2013 G. Rakness (UCLA) 1

Various Wrote Run Coordination job description – Found this exercise to be useful as CSC Operations guy, so decided to do it as Deputy Run Coordinator…

Embed Size (px)

Citation preview

Page 1: Various Wrote Run Coordination job description – Found this exercise to be useful as CSC Operations guy, so decided to do it as Deputy Run Coordinator…

Various

• Wrote Run Coordination job description– Found this exercise to be useful as CSC Operations guy, so

decided to do it as Deputy Run Coordinator…– First version located at…

https://twiki.cern.ch/twiki/pub/CMS/GregRakness/CMS_Run_Coordination_job_description_v1.docx

– Already discussed with Maria and Christophe. Next: discuss with Tiziano…

• Will be on DAQ2 review committee 17 June– DAQ2 is the upgrade to DAQ during LS1

28 May 2013 G. Rakness (UCLA) 1

Page 2: Various Wrote Run Coordination job description – Found this exercise to be useful as CSC Operations guy, so decided to do it as Deputy Run Coordinator…

Stuff added to CSC sync documentation

• Top-level steps taken in 2008-2011 to time in trigger– Spring 2008: w/cosmic rays, synchronize CSC chambers relative to each other– June 2008: w/cosmic rays, establish good timing between muon subsystems – Fall 2008: w/reflectometry, equalize TTC-CCB fiber lengths– Sept 2008: w/beam halo, determine the absolute timing reference for the trigger – Oct 2009: install muonic timing firmware and software at point 5 – Nov 2009: implement "best guess" for collision muons – 30 Mar—6 Apr 2010: w/collisions, timing scan for fine timing shifts per crate– 30 Apr: CSC have sufficiently good timing to be included into CMS trigger – Aug 2010: fine tune trigger timing per chamber using ALCT muonic timing– Feb 2011: CLCT muonic timing was done for all chambers

• Description of TTC fiber equalization– Including MPC-SP automated measurements

• Links to Joe’s new-ME1/1 electronics and Amanda’s offline timing pages– … although Amanda’s page is essentially empty…– (Amanda leaves in ~one week for a new job at Mayo Clinic in Rochester, MN, so I am trying to

write her twiki for her to check… also make sure we keep in touch!)28 May 2013 G. Rakness (UCLA) 2

https://twiki.cern.ch/twiki/bin/view/CMS/CSCsynchronizationDocuments

Page 3: Various Wrote Run Coordination job description – Found this exercise to be useful as CSC Operations guy, so decided to do it as Deputy Run Coordinator…

To do• Discuss with Maria, Christophe, and Tiziano: What

can we do to improve operations in 2015? – Get going on these now…

• Pick up neutron note– Read it again… what all is left to be done?– Chad’s analysis documented here: http://

cern.ch/rakness/internal/log/1111/log.html

• Documentation suggestion from Rainer…– Write template for Shift leader summary elog

28 May 2013 G. Rakness (UCLA) 3