W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
Variable Generation SubcommitteeUpdate to PCC
Ann Finley - VGS-PCC LiaisonMetropolitan Water District of So. Cal
October 7, 2014Salt Lake City, Utah
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
Current VGS Task Force
o Variable Energy Resource (VER) Integration Dashboard
• Being Developed by the Western Interconnection Regional Advisory Board (WIRAB)
• Renewable resource info state-by-state
• Posted at: http://www.westgov.org/ver/index.htm
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
Current VGS Task Force
o OC – Operating Reserves for VG • Developing recommendations for calculating
operating reserves
• Collecting surveys from 38 Balancing Authorities
• Expect two years to complete
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
Current VGS Task Force
o TEPPC – Technical Advisory Subcommittee’s Intra-Hour Task Force
• Newly created task force and WECC to scope work to develop an intra-hour dataset and determine source of data
• Soliciting stakeholder participation
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
Proposed VGS Task Forceo Interconnection Requirements
• Sept 2012 - A NERC Integrating VG Task Force produced a report link with titled:
“Interconnection Requirements for Variable Generation”
• Determine if interest and value in forming a Task Force to PCC to identify recommendations and also collect lessons learned
• BPA has interest and has provided some documents of their interconnection requirements
• Next Steps: If interest to PCC, select a Chair, draft scope and White Paper
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
VGS-PCC Contacts
• Ann Finley, Program ManagerMWD, [email protected]
• Matt Hunsaker, Manager, Operations WECC, [email protected]