Vaquero Midstream – Permian DUG 2016 Capturing Economic Value of Mexico’s Natural Gas
Demand Through Midstream Reliability
Midstream Spotlight – May 23, 2016
3
Reliability: Realigning Around Value
If This PresentaLon Had a Facebook Page
Economic Up8ck – Mexico Demand
Poli8cal and Regulatory Unknown
Infrastructure Challenge
Vaquero: A Basin Midstream Solu8on
4
Mexico Demonstrates Natural Gas Demand
MAKE CLEARER
Agua Dulce
2-‐7 BCFD Waha
Mexico’s Demand From the Waha Hub: A Deliberate Choice
Presidio 1.4 BCFD
San Elizario 1.7 BCFD
California 1.2 BCFD
Midwest 1 BCFD
Metroplex 0.5 BCFD
Gulf Coast 1.5 BCFD
Katy -‐ LNG >0.5 BCFD ?
ExisLng Demand New Demand
5
WAHA
Comanche Trail Pipeline
Roadrunner Pipeline *
Trans Pecos Pipeline
3+ BCFD Capacity
*Already flowing 100 MMSCFD+ today
6
Previous Economic Status But …..
7
The Unknowns: Regulatory and PoliLcal
§ Railroad Commission, EPA and other regulatory influences § PoliLcal ElecLon to govern our country
?
8
§ Basin Wide average EURs improved by 30%
§ Delaware Wolfcamp to Reeves Core -‐ $30-‐$40/BBL
§ Service Costs fell 30-‐35% from 2014 to 2015 but may not be sustainable at the low rates currently be provided to E&P
§ Not yet taken into account longer laterals (7,500’ to 10,000’)
Good News In Southern Delaware
Source: Wood Mackenzie
9
Average ProducLon Comparison: Southern Delaware Basin
Year Permits Gas MMCFD
Oil MBbl/d
2012 3,043 850 120
2013 3,133 930 155
2014 3,868 1,200 235
2015 2,772 1,500 325
SOURCE: Drilling Info
SOURCE: Drilling Info
0 200 400 600 800
1,000 1,200 1,400 1,600 1,800
2012 2013 2014 2015
MMCFD
Rich Gas Produc8on
10
CreaLng a Challenge for Midstream Infrastructure
TOTAL PRODUCTION VOLUMES
Technology Advances & Applied Science
Price Points UP
DUCs
11
More Crude Trucks on the Road Again!!!
12
Southern Delaware Basin Gas Infrastructure Today
§ More Volume means no more quick fixes o Spotlights the need for increased reliability
§ Define Reliability ü Asset Quality
‒ Size, design and mechanics – AccounLng for Pressures, Liquid handling, TreaLng
ü OperaLonal Capability § Every Midstream being equal – what’s the difference?
o Capacity for Significant Growth – Scalability ‒ Capital Efficiency of Growth -‐ Unit cost lower ‒ Has been the area infrastructure problem – Don’t let history repeat itself
o Market Access ‒ Aggregate to Waha flat to capture best price ‒ Maximize the Direct and Local aspect of SDB
13
Infrastructure Challenges: Midstream Hurdles to Overcome
14
Alignment Challenge: Realigning Around Value
§ Back to the Basics of Partnerships (Synergy) o CreaLng value (monetary) together
§ Maximum value of the gas product is driven from drill bit through midstream to market o Processing Efficiency – (Maximizing the BTU value)
§ CreaLng reliable, predictable supply to meet demand o Run Time
Vaquero Midstream has assembled a team of strong industry professionals who have dedicated their careers to bringing products to market safely, efficiently and cost effecLvely. The members of the Vaquero team have served in both internal producer roles and external service provider roles, making us uniquely specialized to best serve our producer partners.
Vaquero Culture
Developing Willing
Partnerships
15
16
Realigning Around Value
§ Back to the Basics of Partnerships: Synergy o CreaLng monetary value together
§ Maximum value of the gas product is driven from drill bit through midstream to market o Processing Efficiency –Maximizing the BTU value
§ CreaLng reliable, predictable supply to meet demand o Run Time
The real WIN-‐WIN!
16
A high-‐quality, new-‐build system to provide higher plant recoveries, minimal downLme and lower fuel usage
75 Miles of 30”, 24” and 16” high pressure trunk line with 800 MMSCFD capacity
Tailored UOP Russell 200 MMSCFD plant
5,000 BPD condensate stabilizaLon at the plant inlet
Residue gas pipeline to the Waha market will connect producers TO AT LEAST 12 RESIDUE PIPELINES AND MARKETS
NGL pipelines connecLng to the Mont Belvieu market
Expandable up to 4 total cryogenic trains (800 MMSCFD processing capacity)
Vaquero’s Answer: Phase I Complete
17
Ini$al System In-‐Service
Midstream Challenge Accepted: Vaquero Rich Gas Gathering System
18
Midstream Challenge Accepted: Vaquero Caymus Cryo Plant I
800 MMSCFD Large Capacity Gathering Pipeline
*solving volume & hydraulic
issues
Two (2) or more NGL Outlets:
Reliable Service Mul8ple Residue Gas Outlets at
Waha Market Hub:
Atmos
OneOk WTX
Enterprise NTX
NNG
Lone Star NGL Pipeline
Chaparral NGL Pipeline Mexico
19
20
Vaquero Caymus Facility Phase I
Residue Gas Check Meter
Pistolero NGL Check Meter
Slug Catcher
Condensate Storage
Condensate Loading
Condensate Stabiliza8on
Inlet Compression
200 MMSCFD Cryogenic Unit w/
Propane Refrigera8on Dual Drive
Residue Compression
Electrical Substa8on
Bulk Trea8ng & Dehydra8on
30” Lariat Inlet Gas Pipeline
21
Vaquero Caymus Facility Phase I: Inlet Liquids Handling 5k BPD
Residue Gas Check Meter
30” Lariat Inlet Gas Pipeline
Pistolero NGL Check Meter
Slug Catcher
Condensate Storage
Condensate Loading
Condensate Stabiliza8on
Inlet Compression
200 MMSCFD Cryogenic Unit w/
Propane Refrigera8on Dual Drive
Residue Compression
Electrical Substa8on
Bulk Trea8ng & Dehydra8on
22
Vaquero Caymus Facility Phase I: Inlet Compression
Residue Gas Check Meter
Pistolero NGL Check Meter
Slug Catcher
Condensate Storage
Condensate Loading
Condensate Stabiliza8on
Inlet Compression
200 MMSCFD Cryogenic Unit w/
Propane Refrigera8on Dual Drive
Residue Compression
Electrical Substa8on
Bulk Trea8ng & Dehydra8on
30” Lariat Inlet Gas Pipeline
23
Vaquero Caymus Facility Phase I: Bulk TreaLng & DehydraLon
Residue Gas Check Meter
Pistolero NGL Check Meter
Slug Catcher
Condensate Storage
Condensate Loading
Condensate Stabiliza8on
Inlet Compression
200 MMSCFD Cryogenic Unit w/
Propane Refrigera8on Dual Drive
Residue Compression
Electrical Substa8on
Bulk Trea8ng & Dehydra8on
30” Lariat Inlet Gas Pipeline
24
Vaquero Caymus Facility Phase I: 200 MMSCFD Cryo Unit
Residue Gas Check Meter
Pistolero NGL Check Meter
Slug Catcher
Condensate Storage
Condensate Loading
Condensate Stabiliza8on
Inlet Compression
200 MMSCFD Cryogenic Unit w/
Propane Refrigera8on Dual Drive
Residue Compression
Electrical Substa8on
Bulk Trea8ng & Dehydra8on
30” Lariat Inlet Gas Pipeline
25
Vaquero Caymus Facility Phase I: Dual Drive Residue Compression
Residue Gas Check Meter
Pistolero NGL Check Meter
Slug Catcher
Condensate Storage
Condensate Loading
Condensate Stabiliza8on
Inlet Compression
200 MMSCFD Cryogenic Unit w/
Propane Refrigera8on Dual Drive
Residue Compression
Electrical Substa8on
Bulk Trea8ng & Dehydra8on
30” Lariat Inlet Gas Pipeline
26
Vaquero Caymus Facility Phase I: On Site SubstaLon
Residue Gas Check Meter
Pistolero NGL Check Meter
Slug Catcher
Condensate Storage
Condensate Loading
Condensate Stabiliza8on
Inlet Compression
200 MMSCFD Cryogenic Unit w/
Propane Refrigera8on Dual Drive
Residue Compression
Electrical Substa8on
Bulk Trea8ng & Dehydra8on
30” Lariat Inlet Gas Pipeline
27
Vaquero Caymus Facility Phase I: Product Delivery
Residue Gas Check Meter
Pistolero NGL Check Meter
Slug Catcher
Condensate Storage
Condensate Loading
Condensate Stabiliza8on
Inlet Compression
200 MMSCFD Cryogenic Unit w/
Propane Refrigera8on Dual Drive
Residue Compression
Electrical Substa8on
Bulk Trea8ng & Dehydra8on
30” Lariat Inlet Gas Pipeline
28
Vaquero Caymus Facility Site -‐ Scalable to 800 MMSCFD
29
What Does RunLme Mean to the Producer?
System Run8me Flaring Gas
Down Time
Hours per Month
Lost Value to Netback
Wellhead Netback $2.50/MCF
99% 1% 7 $0.025 95% 5% 36 $0.125 90% 10% 73 $0.250 85% 15% 109 $0.375
Financial Gain: • A 5% increase in runLme
on 25,000 MCFD is $95,000 per month
• On-‐Lme projects prevent flaring at a rate of $75,000/month/MMSCFD
AnLcipate 5%-‐10% runLme increase over gathering and processing providers with regional or single market outlets because of reliability/redundancy built-‐in to the design of the Vaquero asset both with equipment and mulLple markets connecLons– NO single failure shuts Producer wells in.
Doesn’t account for gas price arbitrage at market hub, NGL value from not processing the gas as well as potenLal crude oil curtailments.
30
Reliability -‐ Realignment Around Value
If This PresentaLon had a Facebook Page
Economic Up8ck – Mexico Demand
Poli8cal and Regulatory Unknown
Infrastructure Challenge
Vaquero -‐ A Basin Midstream Solu8on
Ø “Love” the arguably best drilling economics for producers in the country Ø “In a RelaLonship” with Mexican gas market demand real today and will conLnue to
grow Ø “Checked in” with SDB Producers who need a midstream partner to create reliable
supply Ø “Friend Request” Vaquero provides a basin-‐wide soluLon answering the challenge of
reliable and scalable supply. 31
Status Update: Southern Delaware Basin Page
ExecuLve Management Team
Gary E. Conway Principal, President
and CEO
William W. Davis Principal
32
Bryant H. Pahon Principal
Brian W. Best ExecuLve Vice President, Business Development
Business Development Team
Brian Hieh Business
Development
Breh Taylor Manager of Gas
Supply
33
Jus8n Benneh Business
Development
Christopher Seiders Vice President,
Corporate Development