Vapor Lock Project Synopsis Project: Western Michigan University-School of Medicine, Vapor Lock enhanced concrete Project Location: Kalamazoo, Michigan A/E: S.L.A.M. Collaborative / DiekemaHamann GC: Walbridge, Michigan Concrete Contractor: Grand River Concrete, Michigan Batch Plant: High Grade Materials, Kalamazoo, Michigan Project Description: Three levels Slab on Grade, Slab on pan Approx. 34,000 sqft Project Date: April 2013 Product’s used: Vapor Lock 20/20 WVRA Notes: Three separate pours were done. Multiple fill-in basement pours, slab on grade along with slab on pan. Moisture testing and Bond testing was done in multiple locations. Two ASTM D-5084 Permeability Test were performed. Flooring contractor was surprised they had “no moisture issues in the concrete on this project and we always have moisture issues”. Both the Batch Plant and the flatwork contractor have been certified by Specialty Products Group.

Vapor Lock Project Synopsis...Flooring contractor was surprised they had “no moisture issues in the concrete on this project and we always have moisture issues”. Both the Batch

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Vapor Lock Project Synopsis...Flooring contractor was surprised they had “no moisture issues in the concrete on this project and we always have moisture issues”. Both the Batch

Vapor Lock Project Synopsis

Project: Western Michigan University-School of Medicine, Vapor Lock enhanced

concrete

Project Location: Kalamazoo, Michigan

A/E: S.L.A.M. Collaborative / DiekemaHamann

GC: Walbridge, Michigan

Concrete Contractor: Grand River Concrete, Michigan

Batch Plant: High Grade Materials, Kalamazoo, Michigan

Project Description: Three levels Slab on Grade, Slab on pan Approx. 34,000 sqft

Project Date: April 2013

Product’s used: Vapor Lock 20/20 WVRA

Notes: Three separate pours were done. Multiple fill-in basement pours, slab on grade

along with slab on pan. Moisture testing and Bond testing was done in multiple

locations. Two ASTM D-5084 Permeability Test were performed.

Flooring contractor was surprised they had “no moisture issues in the concrete on this

project and we always have moisture issues”. Both the Batch Plant and the flatwork

contractor have been certified by Specialty Products Group.

Page 2: Vapor Lock Project Synopsis...Flooring contractor was surprised they had “no moisture issues in the concrete on this project and we always have moisture issues”. Both the Batch

~ 34,000 sqft slab on grade and pan Vapor Lock 20/20 enhanced concrete

Page 3: Vapor Lock Project Synopsis...Flooring contractor was surprised they had “no moisture issues in the concrete on this project and we always have moisture issues”. Both the Batch