34
! Introduction to mapping ! Creating a Current State Map ! Introduction To Lean Techniques ! Creating a Future State Map ! Using a Map as a basis for Tactical Implementation Planning AGENDA Value Stream Mapping

Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

Embed Size (px)

Citation preview

Page 1: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

! Introduction to mapping

! Creating a Current State Map

! Introduction To Lean Techniques

! Creating a Future State Map

! Using a Map as a basis for Tactical Implementation Planning

AGENDA

Value Stream Mapping

Page 2: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

1. What are the customer requirements

2. How to apply Continuous Flow Processing

3. Which process is the pacemaker

4. How to control upstream processes

5. What size supermarkets (shop stock) are required

6. Is it sequential or fill-up pull

7. Where to level production

8. At what frequency will kanban be released

9. What further improvements can be made

THE 9 KEY QUESTIONS :

Future State Value Stream Mapping

Page 3: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

THE 7 STEPS

1. Customer Requirements

2. Draw Process Steps

3. Process Data

4. Inventory

5. Material Flow: Supplier to Manufacturer & Manufacturer to Customer

6. Information Driving Flow & Internal Material Flow

7. Manufacturing Lead Time & Processing Time

Creating a Future State Value Stream Map

Page 4: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

Ref.ppt

FIFO

abcProduction Control

I

OXOX 44

4

SupermarketSupermarketwith Prod Card

Supermarket with Prod Card & Withdrawal card

First In First Out sequence flow Kanban Post

Inventory

Pull Symbol

Information System VSM Symbols

Production Control

Electronic information flow Level loading Production

Signal KanbanMin & Max

Manual Information flow

Kaizen lightening burst

Truck Shipment

Mon + Wed

PUSH arrow

300 pieces 1Day

CHANGEOVER

XYZ corporation

Outside sources

Sequenced-Pull Ball

Icons for use in Future State

Page 5: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

Go to white board and change Go to white board and change current state to future state.current state to future state.

Ask the delegates to draw it with Ask the delegates to draw it with youyou

Page 6: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

F.A.L.

.

Pack size = 1

320 pieces/ month•200 A1•120 A2

2 shifts

Shipping Assembly # 2Assembly # 1Spot weld # 2Spot weld # 1Stamping

Cycle time= 1 minute

Change over=1 hour

Uptime =85%

1 x

Cycle time= 39 minute

Change over=10 min.

Uptime =100%

1 x

10 T

Cycle time= 46 minute

Change over=10 min.

Uptime =80%

1 x

Cycle time= 62 minute

Change over=0 min.

Uptime =100%

1 x

Cycle time= 40 minute

Change over=0 min.

Uptime =100%

1 x

II I I5 days 150 A1

24 A2

I I42 A16 A2

16 A118 A2

42 A16 A2

27 A114 A2

Coils r us

500 ft coils

Tuesdayand

Thursday

Production Planning30/ 60/ 90 day forecast

Daily expedite

6 week forecast

Weekly fax

MRP

Weekly plan

Dailyshipping

plan

16 pieces/ day

10.9 days 2.1 days 3 days 2.6 days5 days

Production Lead Time = 26.6 days

Processing time = 188 mins

1 minute 39 minute 46 minute 62 minute 40 minute3 days

Current State Map

Slug Brackets StampingCurrents State Map Date :

1 x Daily

Page 7: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

F.A.L.

.

Pack size = 1

320 pieces/ month•200 A1•120 A2

2 shifts

Shipping Assembly # 1Assembly # 2Spot weld # 2Spot weld # 2Stamping

Cycle time= 1 minute

Change over=1 hour

Uptime =85%

1 x

Cycle time= 39 minute

Change over=10 min.

Uptime =100%

1 x

10 T

Cycle time= 46 minute

Change over=10 min.

Uptime =80%

1 x

Cycle time= 62 minute

Change over=0 min.

Uptime =100%

1 x

Cycle time= 40 minute

Change over=0 min.

Uptime =100%

1 x

II I I5 days 150 A1

24 A2

I I42 A16 A2

16 A18 A2

42 A16 A2

27 A114 A2

500 ft coils

Tuesdayand

Thursday

Production Planning30/ 60/ 90 day forecast

Daily expedite

6 week forecast

Weekly fax

MRP

Weekly plan

Dailyshipping

plan

16 pieces/ day

10.9 days 3 days 2.1 days 3 days 2.6 days5 days

Production Lead Time = 26.6 days

Processing time = 188 mins

Takt = 2(480-20)minutes = 57.5 mins16 pieces

Pitch = 57.5 mins x 1 pieces = 57.5 mins

x

1 minute 39 minute 46 minute 62 minute 40 minute

Coils r us

Add Takt Calculation

Slug Brackets StampingCurrents State Map Date :

1 x Daily

Page 8: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

Stamp SW 1 SW 2 Assy. 1 Assy. 2

1 min.

39 min.

46 min.

62 min.

40 min.

57.5 min.Takt

! DRAW ON FLIP CHART

Where is Continuous Flow Possible?

Page 9: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

F.A.L.

.

Pack size = 1

320 pieces/ month•200 A1•120 A2

2 shifts

Shipping Assembly # 1Assembly # 2Spot weld # 2Spot weld # 2Stamping

Cycle time= 1 minute

Change over=1 hour

Uptime =85%

1 x

Cycle time= 39 minute

Change over=10 min.

Uptime =100%

1 x

10 T

Cycle time= 46 minute

Change over=10 min.

Uptime =80%

1 x

Cycle time= 62 minute

Change over=0 min.

Uptime =100%

1 x

Cycle time= 40 minute

Change over=0 min.

Uptime =100%

1 x

II I I5 days 150 A1

24 A2

I I200 A16 A2

16 A18 A2

42 A16 A2

27 A114 A2

500 ft coils

Tuesdayand

Thursday

Production Planning30/ 60/ 90 day forecast

Daily expedite

6 week forecast

Weekly fax

MRP

Weekly plan

Dailyshipping

plan

16 pieces/ day

10.9 days 3 days 2.1 days 3 days 2.6 days5 days

Production Lead Time = 26.6 days

Processing time = 188 mins

Takt = 2(480-20)minutes = 57.5 mins16 pieces

Pitch = 57.5 mins x 1 pieces = 57.5 mins

Coils r us

Drawing a Future State Map

Slug Brackets StampingCurrents State Map Date :

1 x Daily

Page 10: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

Stamp SW 1 SW 2 Assy. 1 Assy. 2

1 min.

39 min.

46 min.

62 min.

40 min.

! DRAW ON FLIP CHART

57.5 min.Takt

Where is Continuous Flow Possible?

Page 11: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

F.A.L.

.

Pack size = 1

320 pieces/ month•200 A1•120 A2

2 shifts

Shipping Assembly # 1Assembly # 2Spot weld # 2Spot weld # 2Stamping

Cycle time= 1 minute

Change over=1 hour

Uptime =85%

1 x

Cycle time= 39 minute

Change over=10 min.

Uptime =100%

1 x

10 T

Cycle time= 46 minute

Change over=10 min.

Uptime =80%

1 x

Cycle time= 62 minute

Change over=0 min.

Uptime =100%

1 x

Cycle time= 40 minute

Change over=0 min.

Uptime =100%

1 x

II I I5 days 150 A1

24 A2

I I200 A16 A2

16 A18 A2

42 A16 A2

27 A114 A2

500 ft coils

Tuesdayand

Thursday

Production Planning30/ 60/ 90 day forecast

Daily expedite

6 week forecast

Weekly fax

MRP

Weekly plan

Dailyshipping

plan

16 pieces/ day

10.9 days 3 days 2.1 days 3 days 2.6 days5 days

Production Lead Time = 26.6 days

Processing time = 188 mins

Takt = 2(480-20)minutes = 57.5 mins16 pieces

Pitch = 57.5 mins x 1 pieces = 57.5 mins

Coils r us

Drawing a Future State Map

Slug Brackets StampingCurrents State Map Date :

1 x Daily

Page 12: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

Stamp SW 1 SW 2 Assy. 1 Assy. 2

1 min.

39 min.46 min.

62 min.

40 min.

! DRAW ON FLIP CHART

57.5 min.Takt

Where is Continuous Flow Possible?

Page 13: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

F.A.L.

.

Pack size = 1

320 pieces/ month•200 A1•120 A2

2 shifts

Shipping Assembly # 1Assembly # 2Spot weld # 2Spot weld # 2Stamping

Cycle time= 1 minute

Change over=1 hour

Uptime =85%

1 x

Cycle time= 39 minute

Change over=10 min.

Uptime =100%

1 x

10 T

Cycle time= 46 minute

Change over=10 min.

Uptime =80%

1 x

Cycle time= 62 minute

Change over=0 min.

Uptime =100%

1 x

Cycle time= 40 minute

Change over=0 min.

Uptime =100%

1 x

II I I5 days 150 A1

24 A2

I I200 A16 A2

16 A18 A2

42 A16 A2

27 A114 A2

500 ft coils

Tuesdayand

Thursday

Production Planning30/ 60/ 90 day forecast

Daily expedite

6 week forecast

Weekly fax

MRP

Weekly plan

Dailyshipping

plan

16 pieces/ day

10.9 days 3 days 2.1 days 3 days 2.6 days5 days

Production Lead Time = 26.6 days

Processing time = 188 mins

Takt = 2(480-20)minutes = 57.5 mins16 pieces

Pitch = 57.5 mins x 1 pieces = 57.5 mins

Coils r us

Drawing a Future State Map

Slug Brackets StampingCurrents State Map Date :

1 x Daily

Page 14: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

x

Ideal No. Of Operators = Total Work ContentTakt Time

e.g.

Ideal No. Of Operators = 187 minutes of work57.5 minutes Takt

= 3.25 operators

= 4

= target of 3

Where is Continuous Flow Possible?

Page 15: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

55 55 55

(55 X 3) + 22 = 187 minutes

! DRAW ON FLIP CHART

Takt

Cycle Time

Stamp

1 min.SW 1

SW 2

Assy. 1Assy. 2

39 min.

SW 2

30 min.

16 min.

25 min.

Assy. 1

37 min.

18 min.

Assy. 2

22 min.

57.5 min.Takt

Where is Continuous Flow Possible?

Page 16: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

F.A.L.

.

Pack size = 1

320 pieces/ month•200 A1•120 A2

2 shifts

Shipping Assembly # 1Assembly # 2Spot weld # 2Spot weld # 2Stamping

Cycle time= 1 minute

Change over=1 hour

Uptime =85%

1 x

Cycle time= 39 minute

Change over=10 min.

Uptime =100%

1 x

10 T

Cycle time= 46 minute

Change over=10 min.

Uptime =80%

1 x

Cycle time= 62 minute

Change over=0 min.

Uptime =100%

1 x

Cycle time= 40 minute

Change over=0 min.

Uptime =100%

1 x

II I I5 days 150 A1

24 A2

I I200 A16 A2

16 A18 A2

42 A16 A2

27 A114 A2

500 ft coils

Tuesdayand

Thursday

Production Planning30/ 60/ 90 day forecast

Daily expedite

6 week forecast

Weekly fax

MRP

Weekly plan

Dailyshipping

plan

16 pieces/ day

10.9 days 3 days 2.1 days 3 days 2.6 days5 days

Production Lead Time = 26.6 days

Processing time = 188 mins

Takt = 2(480-20)minutes = 57.5 mins16 pieces

Pitch = 57.5 mins x 1 pieces = 57.5 mins

Coils r us

Drawing a Future State Map

Slug Brackets StampingCurrents State Map Date :

1 x Daily

Page 17: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

F.A.L.

.

Pack size = 1

320 pieces/ month•200 A1•120 A2

2 shifts

Shipping Stamping

Cycle time= 1 minute

Change over=1 hour

Uptime =85%

1 x

10 T

TT= 60 minute

C/T=55 min

4 x

I5 days

500 ft coils

Tuesdayand

Thursday

Production Planning30/ 60/ 90 day forecast

Daily expedite

6 week forecast

Weekly fax

MRP

Weekly plan

Dailyshipping

plan

16 pieces/ day

Work contentTo 55 min.

SW C/OSW 2uptime

2 days

Weld+ assy.

Takt = 2(480-20)minutes = 57.5 mins16 pieces

Pitch = 57.5 mins x 1 pieces = 57.5 mins

Target 3 Ops

Coils r us

Drawing a Future State Map

Slug Brackets StampingCurrents State Map Date :

1 x Daily

Page 18: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

F.A.L.

.

Pack size = 1

320 pieces/ month•200 A1•120 A2

2 shifts

Shipping Stamping

Cycle time= 1 minute

Change over=1 hour

Uptime =85%

1 x

10 T

TT= 60 minute

C/T=55 min

4 x

I5 days

500 ft coils

Tuesdayand

Thursday

Production Planning30/ 60/ 90 day forecast

Daily expedite

6 week forecast

Weekly fax

MRP

Weekly plan

Dailyshipping

plan

16 pieces/ day

Work contentTo 55 min.

SW C/OSW 2uptime

2 days

1

Weld+ assy.

Takt = 2(480-20)minutes = 57.5 mins16 pieces

Pitch = 57.5 mins x 1 pieces = 57.5 mins

Target 3 Ops

Coils r us

Drawing a Future State Map

Slug Brackets StampingCurrents State Map Date :

1 x Daily

Page 19: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

F.A.L.

.

Pack size = 1

320 pieces/ month•200 A1•120 A2

2 shifts

Shipping Stamping

Cycle time= 1 minute

Change over=1 hour

Uptime =85%

1 x

10 T

TT= 60 minute

C/T=55 min

4 x

I5 days

500 ft coils

Tuesdayand

Thursday

Production Planning30/ 60/ 90 day forecast

Daily expedite

6 week forecast

Weekly fax

MRP

Weekly plan

Dailyshipping

plan

16 pieces/ day

Work contentTo 55 min.

SW C/OSW 2uptime

2 days

1

1

Weld+ assy.

Takt = 2(480-20)minutes = 57.5 mins16 pieces

Pitch = 57.5 mins x 1 pieces = 57.5 mins

Target 3 Ops

Drawing a Future State Map

Slug Brackets StampingCurrents State Map Date :

1 x Daily

Page 20: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

F.A.L.

.

Pack size = 1

320 pieces/ month•200 A1•120 A2

2 shifts

Shipping Stamping

Cycle time= 1 minute

Change over=1 hour

Uptime =85%

1 x

10 T

TT= 60 minute

C/T=55 min

4 x

I5 days

500 ft coils

Tuesdayand

Thursday

Production Planning30/ 60/ 90 day forecast

Daily expedite

6 week forecast

Weekly fax

MRP

Weekly plan

Dailyshipping

plan

16 pieces/ day

Work contentTo 55 min.

SW C/OSW 2uptime

2 days

1batch

Weld+ assy.

Takt = 2(480-20)minutes = 57.5 mins16 pieces

Pitch = 57.5 mins x 1 pieces = 57.5 mins

Target 3 Ops

Coils r us

Drawing a Future State Map

Slug Brackets StampingCurrents State Map Date :

1 x Daily

Page 21: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

F.A.L.

.

Pack size = 1

320 pieces/ month•200 A1•120 A2

2 shifts

Shipping Stamping

Cycle time= 1 minute

Change over=1 hour

Uptime =85%

1 x

10 T

TT= 60 minute

C/T=55 min

4 x

I5 days

500 ft coils

Tuesdayand

Thursday

Production Planning30/ 60/ 90 day forecast

Daily expedite

6 week forecast

Weekly fax

MRP

Weekly plan

Dailyshipping

plan

16 pieces/ day

Work contentTo 55 min.

SW C/OSW 2uptime

2 days

1batch

1.5 daysdelivery trays

Weld+ assy.

Takt = 2(480-20)minutes = 57.5 mins16 pieces

Pitch = 57.5 mins x 1 pieces = 57.5 mins

Target 3 Ops

Coils r us

Drawing a Future State Map

Slug Brackets StampingCurrents State Map Date :

1 x Daily

Page 22: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

11

F.A.L.

.

Pack size = 1

320 pieces/ month•200 A1•120 A2

2 shifts

Shipping

Weld+ assy.

Stamping

Cycle time= 1 minute

Change over=1 hour

Uptime =85%

1 x

10 T

TT= 60 minute

C/T=55 min

4 x

I5 days

500 ft coils

Tuesdayand

Thursday

Production Planning30/ 60/ 90 day forecast

Daily expedite

6 week forecast

Weekly fax

MRP

Weekly plan

DailyShipping plan

16 pieces/ day

Work contentTo 55 min.

SW C/OSW 2uptime

2 days

1batch

1.5 days

1

stagedelivery trays

Takt = 2(480-20)minutes = 57.5 mins16 pieces

Pitch = 57.5 mins x 1 pieces = 57.5 mins

Target 3 Ops

Coils r us

Drawing a Future State Map

Slug Brackets StampingCurrents State Map Date :

1 x Daily

Page 23: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

11

F.A.L.

.

Pack size = 1

320 pieces/ month•200 A1•120 A2

2 shifts

Shipping

Weld+ assy.

Stamping

Cycle time= 1 minute

Change over=1 hour

Uptime =85%

1 x

10 T

TT= 60 minute

C/T=55 min

4 x

I5 days

500 ft coils

Tuesdayand

Thursday

Production Planning30/ 60/ 90 day forecast

Daily expedite

6 week forecast

Weekly fax

MRP

Weekly plan

DailyShipping plan

16 pieces/ day

Work contentTo 55 min.

SW C/OSW 2uptime

2 days

1batch

1.5 days

1

stage

OOXXOOXX

Pitch = 57.5 mins

delivery trays

1

2

34

Takt = 2(480-20)minutes = 57.5 mins16 pieces

Pitch = 57.5 mins x 1 pieces = 57.5 mins

Target 3 Ops

Coils r us

Drawing a Future State Map

Slug Brackets StampingCurrents State Map Date :

1 x Daily

Page 24: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

11

F.A.L.

.

Pack size = 1

320 pieces/ month•200 A1•120 A2

2 shifts

Shipping

Weld+ assy.

Stamping

Cycle time= 1 minute

Change over=1 hour

Uptime =85%

1 x

10 T

TT= 60 minute

C/T=55 min

4 x

500 ft coils

Daily

Production Planning30/ 60/ 90 day forecast

Daily expedite

6 week forecast

MRP

Weekly plan

DailyShipping plan

16 pieces/ day

Work contentTo 55 min.

SW C/OSW 2uptime

2 days

1batch

1.5 days

1

stage

OOXXOOXX

Pitch = 57.5mins

1.5days

delivery trays

Takt = 2(480-20)minutes = 57.5 mins16 pieces

Pitch = 57.5 mins x 1 pieces = 57.5 mins

Target 3 Ops

Coils r us

Drawing a Future State Map

Slug Brackets StampingCurrents State Map Date :

1 x Daily

Page 25: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

11

F.A.L.

.

Pack size = 1

320 pieces/ month•200 A1•120 A2

2 shifts

Shipping

Weld+ assy.

Stamping

Cycle time= 1 minute

Change over=1 hour

Uptime =85%

1 x

10 T

TT= 60 minute

C/T=55 min

4 x

500 ft coils

Daily

Production Planning30/ 60/ 90 day forecast

Daily expedite

6 week forecast

MRP

DailyShipping plan

16 pieces/ day

Work contentTo 55 min.

SW C/OSW 2uptime

2 days

1batch

1.5 days

1

stage

OOXXOOXX

1.5days

1.5days 1 min

1.5 days165 min

2 days

5 days

166 minutes

delivery trays

Takt = 2(480-20)minutes = 57.5 mins16 pieces

Pitch = 57.5 mins x 1 pieces = 57.5 mins Pitch = 57.5 mins

Target 3 Ops

Coils r us

Drawing a Future State Map

Slug Brackets StampingCurrents State Map Date :

1 x Daily

Page 26: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

Delegates to design own future state map

Value Stream Mapping

Page 27: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

Current State Map

Future State Map

GapAnalysis……………...

WHERE WILL YOU START ?

Developing an Improvement Plan

Page 28: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

11

F.A.L.

.

Pack size = 1

320 pieces/ month•200 A1•120 A2

2 shifts

Shipping

Weld+ assy.

Stamping

Cycle time= 1 minute

Change over=1 hour

Uptime =85%

1 x

10 T

TT= 60 minute

C/T=55 min

3 x

F.A.L.

500 ft coils

Daily

Production Planning30/ 60/ 90 day forecast

Daily expedite

6 week forecast

MRP

DailyShipping plan

16 pieces/ day

Work contentTo 55 min.

SW C/OSW 2uptime

2 days

1batch

1.5 days

1

stage

OOXXOOXX

1.5days

1.5days 1 min

1.5 days165 min

2 days

5 days

166 minutes

Supplier loop

Stampingloop

Pacemaker loopdelivery trays

Takt = 2(480-20)minutes = 57.5 mins16 pieces

Pitch = 57.5 mins x 1 pieces = 57.5 mins

Pitch = 57.5 mins

Target 3 Ops

Dividing a Future State Map

Slug Brackets StampingCurrents State Map Date :

1 x Daily

Page 29: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

! Introduction to mapping

! Creating a Current State Map

! Practical Exercise

! Introduction To Lean Techniques

! Creating a Future State Map

! Using a Map as a basis for Tactical Implementation Planning

AGENDA

Value Stream Mapping

Page 30: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

To set theteam

direction

To show a relevant level of detail to those concerned -NB. each loop will have it’s own execution schedules

within the implementation plan

To encourage regular reviews for signs of QCD problems -slippage's, early deliveries, continued ownership

To formalise commitment from key people:Facility Manager Value stream managerThe Unions Manufacturing EngineeringMaintenance Process Engineering

Purchasing

The key elements of a Value Stream’s Implementation planare shown in the following example.

Why Have a Formal Plan to Achieve the future State?

Page 31: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

Example - Tactical Implementation Plan (T.I.P.)

TIPOwner

5C Activity

Category

Level 1 Activity

Level 2DetailedActions

TimebasedSchedule of

activities

Type of TIPand Model Line

Responsible People

Page 32: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

! Collect data across a value stream.

! Use the 7 steps to draw a current state Value Stream Map.

! Use the 9 questions and 7 steps to draw a future state Value Stream Map.

! Identify your Material/Information loops.

! Decide the order to tackle the loops.

! Write the Tactical Implementation Plan• Set objectives for each loop as required to achieve the future state• Set measurable goals for each objective• Use the 9 questions within each loop to set an order of work• Set milestones and write up the plan• Get formal agreement from all concerned

! The leader of each work stream should produce their own execution schedule showing how to achieve each goal by it’s milestone.

Summary

Page 33: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

! Introduction to mapping

! Creating a Current State Map

! Practical Exercise

! Introduction To Lean Techniques

! Creating a Future State Map

! Using a Map as a basis for Tactical Implementation Planning

AGENDA

Value Stream Mapping

Page 34: Value Stream Mapping - Beyond · PDF fileRef.ppt FIFO abc Production Control I OXOX 4 4 4 Supermarket Supermarket with Prod Card Supermarket with Prod Card & Withdrawal card First

Summary

Just do it !Just do it !