Value Chain Solutions (India) Pvt. Ltd. Offers…. About

Embed Size (px)

Citation preview

  • Slide 1
  • Value Chain Solutions (India) Pvt. Ltd. Offers
  • Slide 2
  • About
  • Slide 3
  • Overview A Decision Support System (DSS) for operations planning Comprehensive solution for Cement Logistics Optimization Builds optimal multi-site procurement, production and distribution plans Projects contribution across the sales hierarchy Runs multiple scenarios for comparison Enables comparison of actual performance against plan Identifies bottleneck resources/equipments and facilities Supports strategic decisions like re-alignment in supply chain, utilization of capacities Identifies most attractive products & markets for marketing Strategies
  • Slide 4
  • Features 24x7 accessibility through the web Robust data exchange from ERP and other data systems Visual insights through Grids, Graphs and Maps Customizable reports through variant formation Information download in Excel Robust inbuilt optimization engine Supports multiple objective functions Excel upload and direct database connectivity with legacy systems
  • Slide 5
  • Application Specific User identification and authentication Discretionary access control features User and user class definition Field level security Password naming conventions enforced Password Expiration Server Specific (VCS server) External Access Protection Login Auditing Treat All Requests from Internet as Untrusted Measures Against Session Stealing Database Behind Firewall Security Features
  • Slide 6
  • Demo Application
  • Slide 7
  • Slide 8
  • Slide 9
  • Edit master dataEdit city details Save & close page
  • Slide 10
  • Slide 11
  • Create New Model
  • Slide 12
  • Select objective & constraints to build modelGive model a titleAdd description if requiredSave the model
  • Slide 13
  • Slide 14
  • Give Name Execute Select Period Select Model
  • Slide 15
  • Select InputDownload Input Format/s Browse File to Upload Input
  • Slide 16
  • Edit Manufacturing CostFiltersSave & Close Changes Edit
  • Slide 17
  • Ensure all data uploaded successfully Click to proceed
  • Slide 18
  • Edit ConstraintEnter ValuesSave & CloseMonth NavigationSelect Constraint RangeValidation check for constraint input Proceed to optimize
  • Slide 19
  • Execute Optimizing
  • Slide 20
  • Slide 21
  • FiltersExecute
  • Slide 22
  • Expand All
  • Slide 23
  • Download to Excel Sort
  • Slide 24
  • Drag in fields to view details Grid Filter
  • Slide 25
  • Drag in fields create your own format & save as variant
  • Slide 26
  • Click to execute the variant
  • Slide 27
  • Drill Down
  • Slide 28
  • Select scenario to set as base planSave Base Plan
  • Slide 29
  • Click on the bars to view details
  • Slide 30
  • Thank You