41
L. M. Pant 1 RE Workshop, 19/11/12 Validation of RE4 Cu cooling systems for mass production L. M. Pant 1,* , Manish Kumar 2 1 Nuclear Physics Division 2 Mechanical Design & Prototype Development Division Bhabha Atomic Research Centre Mumbai - 400085, INDIA * email : [email protected]

Validation of RE4 Cu cooling systems for mass production

  • Upload
    taite

  • View
    37

  • Download
    0

Embed Size (px)

DESCRIPTION

Validation of RE4 Cu cooling systems for mass production. L. M. Pant 1,* , Manish Kumar 2 1 Nuclear Physics Division 2 Mechanical Design & Prototype Development Division Bhabha Atomic Research Centre Mumbai - 400085, INDIA * email : [email protected]. RE4/3. RE4/2. - PowerPoint PPT Presentation

Citation preview

Page 1: Validation of RE4 Cu cooling systems  for mass production

L. M. Pant 1RE Workshop, 19/11/12

Validation of RE4 Cu cooling systems for mass production

L. M. Pant1,*, Manish Kumar2

1Nuclear Physics Division2Mechanical Design & Prototype Development Division

Bhabha Atomic Research Centre Mumbai - 400085, INDIA

* email : [email protected]

Page 2: Validation of RE4 Cu cooling systems  for mass production

L. M. Pant RE Workshop, 19/11/12 2

RE4/3

RE4/2

Page 3: Validation of RE4 Cu cooling systems  for mass production

L. M. Pant RE Workshop, 19/11/12 3

• Vicker’s Hardness (HV5) : 90-100• Cu Plates : 1 mm thick• Cu Pipes : 8 mm OD

: 6 mm ID

• Chemical Compositions :• Plates (OFC) : 99.95% (Min) Cu• Pipe (DHP Cu) : 99.85% (Min) Cu

: 0.013 - 0.050% P• Solder (Sn62) : Sn : Ag : Pb & other

62 : 02 : Remaining

• Leak test : 20 bar of Ar

Specifications : Cu plates and pipes

Page 4: Validation of RE4 Cu cooling systems  for mass production

L. M. Pant RE Workshop, 19/11/12 4

Cutting, bending and drilling of Cu plates

Page 5: Validation of RE4 Cu cooling systems  for mass production

L. M. Pant 5RE Workshop, 19/11/12

Cu cooling assembly being soldered in a jig

Page 6: Validation of RE4 Cu cooling systems  for mass production

L. M. Pant 6RE Workshop, 19/11/12

Cu cooling assembly (RE4/3) finished product

Page 7: Validation of RE4 Cu cooling systems  for mass production

L. M. Pant 7RE Workshop, 19/11/12

RE4/2 and RE4/3 Cu cooling system, in queue for leak tests

Page 8: Validation of RE4 Cu cooling systems  for mass production

SAGANA connectors sent from CERN

Some of the connectors had ferrules missing inside them

L. M. Pant 8RE Workshop, 19/11/12

Page 9: Validation of RE4 Cu cooling systems  for mass production

SAGANA Nuts with double ferrules on Cu cooling assemblies, mounted on Al patch panel

SAGANA Nuts

Double SS ferrules from ROTAREX

“crimped”

Double Brass ferrules, on the other side

“not crimped”

L. M. Pant 9RE Workshop, 19/11/12

Page 10: Validation of RE4 Cu cooling systems  for mass production

L. M. Pant 10RE Workshop, 19/11/12

Cu cooling system placed in the Box for dispatch

Page 11: Validation of RE4 Cu cooling systems  for mass production

Some of the SAGANA couplings connected to Cu cooling systems

L. M. Pant 11RE Workshop, 19/11/12

Page 12: Validation of RE4 Cu cooling systems  for mass production

Some of the SAGANA couplings connected to Cu cooling systems

L. M. Pant 12RE Workshop, 19/11/12

Page 13: Validation of RE4 Cu cooling systems  for mass production

Some of the SAGANA couplings connected to Cu cooling systems

Aluminum patch panel,conforming with old HV Tripolar

Longer side of SAGANA coupling is

towards the inside of the “L” profile

L. M. Pant 13RE Workshop, 19/11/12

Page 14: Validation of RE4 Cu cooling systems  for mass production

Difficulties in taking the Brass nut over the bend in the pipe

L. M. Pant 14RE Workshop, 19/11/12

Page 15: Validation of RE4 Cu cooling systems  for mass production

Cu pipes raised much earlier near the “U” bend

L. M. Pant 15RE Workshop, 19/11/12

Page 16: Validation of RE4 Cu cooling systems  for mass production

L. M. Pant 16RE Workshop, 19/11/12

Cu cooling system placed in the Box for dispatch to CERN and Ghent

Page 17: Validation of RE4 Cu cooling systems  for mass production

L. M. Pant RE Workshop, 19/11/12 17

Heat Treated wooden box for transportation of Cu cooling assemblies to CERN & Ghent

Inside size (L x B x H) : 1900 mm x 700mm x 400 mm

Outtside size (L x B x H) : 2015 mm x 820 mm x 550 mm

Weight of empty box : 96 Kg

Page 18: Validation of RE4 Cu cooling systems  for mass production

• RE4/2 : 05 sets : fabricated, leak tested and dispatched to CERN

• RE4/3 : 05 sets : fabricated, leak tested and dispatched to CERN

• RE4/3 : 10 sets : fabricated, leak tested and dispatched to Ghent

: Both the boxes have been received at CERN and Ghent on 11th Nov. 2012

• RE 4/2 : 10 sets : under fabrication for BARC, at the moment

Pilot run for production of first 30 sets of Cu cooling systems for RE4 dispatched on 07th Nov. 2012

After the delivery of the Cu cooling sets, we would like to profit from your expertise and feedback to launch the mass production of the remaining 170 sets, including discussion on SS ferrules and Brass nuts

L. M. Pant 18RE Workshop, 19/11/12

Page 19: Validation of RE4 Cu cooling systems  for mass production

L. M. Pant 19RE Workshop, 19/11/12

Leak test for Cu cooling systems

Cu tubes :OD = 8 mm ID = 6 mm thickness : 1 mm

Page 20: Validation of RE4 Cu cooling systems  for mass production

Cu tube pinched at one end

Safety release

0 -35 bar pressure

transducer

Outlet Pressure20 bar

Inlet pressure 80 bar

Argon gas

Valve A open

Details of leak test facility

Extra Cu pipe : OD = 6 mm length = 100 cm

L. M. Pant 20RE Workshop, 19/11/12

Page 21: Validation of RE4 Cu cooling systems  for mass production

L. M. Pant 21RE Workshop, 19/11/12

Fall in pressure : dp/dt = - 8.43 x 10 - 4 bar / minLeak Rate measured = - 18.27 x 10 - 4 mbar . litre / s

Page 22: Validation of RE4 Cu cooling systems  for mass production

L. M. Pant 22RE Workshop, 19/11/12

Differences in dp/dt : explanationSame RE4/3-001 Cu cooling assembly

25th Aug. 2012 : dp/dt : - 2 .0 x 10 - 2 mbar /sec : Valve A open (19 joints) (6 more joints exposed)

06th Sept. 2012 : dp/dt : - 4.7 x 10 - 3 mbar /sec : Valve A closed (13 joints)

Valve A

Page 23: Validation of RE4 Cu cooling systems  for mass production

L. M. Pant 23RE Workshop, 19/11/12

fall in pressure, dp/dt, for 20 Cu cooling systems

Page 24: Validation of RE4 Cu cooling systems  for mass production

RE42-1

RE42-2

RE42-3

RE42-4

RE42-5

RE43-1

RE43-5

RE43-7

RE43-8

RE43-10

RE43-9

RE43-11

RE43-12

RE43-13

RE43-15

RE43-3

RE43-4

RE43-16

RE43-14

RE43-170

2

4

6

8

10

12

14

RE4/2RE4/3

Y axis : fall in pressure (- dp/dt) x 10 - 4 bar . min -1

CERN Ghent

(-dp/

dt )

x 10

- 4 b

ar .

min

-1

Brass ferrules

L. M. Pant 24RE Workshop, 19/11/12

Brass ferrules

Page 25: Validation of RE4 Cu cooling systems  for mass production

A

mm

B

mm

C

mm

D

mm

Total length

(A+B+C+D)

mm

Total length

cm

Internal radius

cm

Vol

E

cm3

Volume of fixed Cu

tube ID = 0.4 cm

& l = 100 cm

F

cm3

Total volume

(E+F)

cm3

TotalVolume

litreRE4/2 1504 1504 288 144 3440 344.0 0.3 97.264 12.566 109.83

say 110.00 0.110

RE4/3 1766 1766 288 288 4108 410.8 0.3 116.151 12.566 129.08say

130.00 0.130

Vol RE4/3 Cu tube = 1.194Vol RE4/2 Cu tube

dimensions of Cu tubes for RE4/2 and RE4/3

RE4/2 : x 10 -4 bar/min x 1.833 x 10 -4 mbar . litre . s-1

RE4/3 : x 10 -4 bar/min x 2.167 x 10 -4 mbar . litre . s-1

L. M. Pant 25RE Workshop, 19/11/12

Page 26: Validation of RE4 Cu cooling systems  for mass production

RE42-1

RE42-2

RE42-3

RE42-4

RE42-5

RE43-1

RE43-5

RE43-7

RE43-8

RE43-10

RE43-9

RE43-11

RE43-12

RE43-13

RE43-15

RE43-3

RE43-4

RE43-16

RE43-14

RE43-170

5

10

15

20

25

30

RE4/2RE4/3

Y axis : Leak Rate : x 10 - 4 mbar . litre . s -1

CERN Ghent

x 1

0 - 4

mba

r . li

tre

. s -1

L. M. Pant 26RE Workshop, 19/11/12

Page 27: Validation of RE4 Cu cooling systems  for mass production

L. M. Pant 27RE Workshop, 19/11/12

Page 28: Validation of RE4 Cu cooling systems  for mass production

L. M. Pant 28RE Workshop, 19/11/12

Page 29: Validation of RE4 Cu cooling systems  for mass production

L. M. Pant 29RE Workshop, 19/11/12

Page 30: Validation of RE4 Cu cooling systems  for mass production

L. M. Pant 30RE Workshop, 19/11/12

Page 31: Validation of RE4 Cu cooling systems  for mass production

L. M. Pant 31RE Workshop, 19/11/12

Page 32: Validation of RE4 Cu cooling systems  for mass production

L. M. Pant 32RE Workshop, 19/11/12

Page 33: Validation of RE4 Cu cooling systems  for mass production

L. M. Pant RE Workshop, 19/11/12 33

Page 34: Validation of RE4 Cu cooling systems  for mass production

L. M. Pant RE Workshop, 19/11/12 34

Page 35: Validation of RE4 Cu cooling systems  for mass production

L. M. Pant RE Workshop, 19/11/12 35

Page 36: Validation of RE4 Cu cooling systems  for mass production

L. M. Pant RE Workshop, 19/11/12 36

AC Off

Page 37: Validation of RE4 Cu cooling systems  for mass production

L. M. Pant RE Workshop, 19/11/12 37

Page 38: Validation of RE4 Cu cooling systems  for mass production

L. M. Pant RE Workshop, 19/11/12 38

Page 39: Validation of RE4 Cu cooling systems  for mass production

L. M. Pant RE Workshop, 19/11/12 39

Page 40: Validation of RE4 Cu cooling systems  for mass production

L. M. Pant RE Workshop, 19/11/12 40

- 2.857 x 10 -4 bar/min

Page 41: Validation of RE4 Cu cooling systems  for mass production

• Material in terms of Cu pipes, Cu plates, solder etc. have been procured

• Fabrication has started : cutting and bending of pipes and plates in progress

• We would like to finish the mass production in one go

• Tentative schedule of delivering 130 sets at CERN by July 2013RE4/3 : 85 setsRE4/2 : 45 setsTotal : 130 sets

Remaining : 40 sets of RE4/2 for BARC

• The above mentioned 130 sets include the Cu cooling systems for Ghent too, which shall be delivered at CERN

• Please arrange the delivery of SAGANA couplings and SS ferrules as soon as possible for 170 sets

Mass production of remaining 170 sets of Cu cooling systems for RE4

L. M. Pant 41RE Workshop, 19/11/12