39
NCDWR September 2009 1 Validation of NRBHM OASIS Model Version: SimBase Intermediate version modified in August 2009 Assumptions: Demand 2007 – Actual monthly pattern for daily average WWRF 2007 Actual monthly pattern for daily average for demand nodes as pattern [Not a function of demand data - changed return flow OCL file]. Actual monthly pattern for daily average for direct return flow nodes as inflow Beginning of Yr 2007 Reservoir Levels No actual Agricultural Data - used as calculated by the model No actual Evaporation Data - used as calculated by the model No Actual Reservoir Drought/Special Operation Input Data File Location: F:\DATA\RBMS\Neuse Basin\Neuse Model\01 OASIS - Neuse Hydrologic Modeling\Validation Run Inputs.xls

Validation of NRBHM OASIS

  • Upload
    inara

  • View
    20

  • Download
    0

Embed Size (px)

DESCRIPTION

Validation of NRBHM OASIS. Model Version: SimBase Intermediate version modified in August 2009 Assumptions: Demand 2007 – Actual monthly pattern for daily average WWRF 2007 - PowerPoint PPT Presentation

Citation preview

Page 1: Validation of NRBHM OASIS

NCDWR September 2009 1

Validation of NRBHM OASIS

Model Version:SimBase Intermediate version modified in August 2009

Assumptions:– Demand 2007 – Actual monthly pattern for daily average – WWRF 2007

• Actual monthly pattern for daily average for demand nodes as pattern [Not a function of demand data - changed return flow OCL file].

• Actual monthly pattern for daily average for direct return flow nodes as inflow– Beginning of Yr 2007 Reservoir Levels– No actual Agricultural Data - used as calculated by the model– No actual Evaporation Data - used as calculated by the model– No Actual Reservoir Drought/Special Operation

Input Data File Location:• F:\DATA\RBMS\Neuse Basin\Neuse Model\01 OASIS - Neuse Hydrologic Modeling\Validation Run Inputs.xls

Page 2: Validation of NRBHM OASIS

NCDWR September 2009 2

Validation of NRBHM OASIS

Comparison of Computed vs. Historical Operation:– Falls Lake Elevation– Falls Lake and Beaver Dam Total storage percent– Falls Lake and BD Total WS - WQ percent– Falls Lake Release

– West Fork Eno River Reservoir Elevation– West Fork Eno River Reservoir Release

– Lake Orange Elevation– Lake Orange Release

– Little River and Lake Michie Elevations– Little River and Lake Michie Releases

Page 3: Validation of NRBHM OASIS

NCDWR September 2009 3

Validation of NRBHM OASIS

Comparison of Computed vs. Historical Data:• Hillsborough Gage Data – node 110

• Clayton Gage Data – node 630

• Princeton Gage Data – node 750

• Goldsboro Gage Data – node 780

• Kinston Gage Data – node 800

Page 4: Validation of NRBHM OASIS

NCDWR September 2009 4

Falls Lake – Beaver Dam Operation

Page 5: Validation of NRBHM OASIS

NCDWR September 2009 5

Wake County Voluntary - DM Levels

03/13/2007 D0 - Abnormally Dry

04/17/2007 No Drought  

05/01/2007 D0 - Abnormally Dry

06/26/2007 D1 - Moderate

08/14/2007 D2 - Severe  

09/04/2007 D3 - Extreme

10/02/2007 D4 - Exceptional

10/30/2007 D3 - Extreme

11/20/2007 D4 - Exceptional

12/31/2007 D4 - Exceptional

D4

D2

D1

D3

Page 6: Validation of NRBHM OASIS

NCDWR September 2009 6

Upper Rule Curve = 251.5 ‘

Page 7: Validation of NRBHM OASIS

NCDWR September 2009 7

Page 8: Validation of NRBHM OASIS

NCDWR September 2009 8

Page 9: Validation of NRBHM OASIS

NCDWR September 2009 9

Page 10: Validation of NRBHM OASIS

NCDWR September 2009 10

Page 11: Validation of NRBHM OASIS

NCDWR September 2009 11

@ 249’ Falls Elevation = BDam Elevation

Page 12: Validation of NRBHM OASIS

NCDWR September 2009 12

Page 13: Validation of NRBHM OASIS

NCDWR September 2009 13

Page 14: Validation of NRBHM OASIS

NCDWR September 2009 14

Lower Rule Curve = 236.5 ‘

Upper Rule Curve = 251.5 ‘

Winter Piggyback Release

Page 15: Validation of NRBHM OASIS

NCDWR September 2009 15

Upper Eno Operation

Page 16: Validation of NRBHM OASIS

NCDWR September 2009 16

Stage 1

Stage 2

Stage 3

Stage 4

Withdrawal Restriction Period 2007

Stage 1: May 27 Stage 2: Jul 31 Stage 3: Sep 5Stage 4: Sep 28 Stage 5: Nov 8

Stage 5

Drought Operation??

Page 17: Validation of NRBHM OASIS

NCDWR September 2009 17

Page 18: Validation of NRBHM OASIS

NCDWR September 2009 18

Upper Rule Curve 633’

Page 19: Validation of NRBHM OASIS

NCDWR September 2009 19

Upper Rule Curve 633’

Lower Rule Curve 603’

Tier 1

Tier 2

Tier 3

Page 20: Validation of NRBHM OASIS

NCDWR September 2009 20

Stage 1

Stage 2

Stage 3

Stage 4 Stage 5

Withdrawal Restriction Period 2007

Stage 1: May 27 Stage 2: Jul 31 Stage 3: Sep 5Stage 4: Sep 28 Stage 5: Nov 8

Upper Rule Curve 615’

~ 6’ D/D

Page 21: Validation of NRBHM OASIS

NCDWR September 2009 21

Upper Rule Curve 615’

Page 22: Validation of NRBHM OASIS

NCDWR September 2009 22

Page 23: Validation of NRBHM OASIS

NCDWR September 2009 23

Dead Storage 601.7’

Stage 4Stage 5

Zero outflow for 2 days in Dec 07

Withdrawal Restriction Period 2007

Stage 1: May 27 Stage 2: Jul 31 Stage 3: Sep 5Stage 4: Sep 28 Stage 5: Nov 8

Stage 1

Stage 2

Stage 3

Page 24: Validation of NRBHM OASIS

NCDWR September 2009 24

Dead Storage 198.6 AF

Lowest Storage 198.3 AF

0% remaining storage for 8 consecutive days from 12/20/07

Page 25: Validation of NRBHM OASIS

NCDWR September 2009 25

Durham Systems

Page 26: Validation of NRBHM OASIS

NCDWR September 2009 26

Page 27: Validation of NRBHM OASIS

NCDWR September 2009 27

Page 28: Validation of NRBHM OASIS

NCDWR September 2009 28

Gage Flows

Page 29: Validation of NRBHM OASIS

NCDWR September 2009 29

Page 30: Validation of NRBHM OASIS

NCDWR September 2009 30

Stage 1

Stage 2

Stage 3

Stage 4 Stage 5

Instream Flow Requirements @ HB Gage

Stage 1: 1.75 MGD – [May 27] Stage 2: 1.13 MGD – [Jul 31] Stage 3: 1.1 MGD – [Sep 5]Stage 4: 1.1 MGD – [Sep 28]Stage 5: 0.65 MGD – [Nov 8]

Page 31: Validation of NRBHM OASIS

NCDWR September 2009 31

10% CLoss @ 4 – 12 cfs

20% CLoss @ <4 cfs

0% CLoss @ > 12 cfs

Page 32: Validation of NRBHM OASIS

NCDWR September 2009 32

Page 33: Validation of NRBHM OASIS

NCDWR September 2009 33

Clayton Target 184 cfs Clayton Target 184 cfs

Clayton Target Safety Factor

Clayton Target 254 cfs

Page 34: Validation of NRBHM OASIS

NCDWR September 2009 34

Clayton Flood Control Max Target Flow 5332 cfs

Page 35: Validation of NRBHM OASIS

NCDWR September 2009 35

Page 36: Validation of NRBHM OASIS

NCDWR September 2009 36

Page 37: Validation of NRBHM OASIS

NCDWR September 2009 37

Flood Control Target Flow = 6003 cfs

Min calculated flow = 101 cfs

Page 38: Validation of NRBHM OASIS

NCDWR September 2009 38

Page 39: Validation of NRBHM OASIS

NCDWR September 2009 39

Flood Control Target Flow = 7168 cfs