    SOFTWARE SHORT DESCRIPTION OF VAIL - Plant

    RISKBASEDINSPECTIONANDINSPECTIONPLANNING

    VELOSIASSETINTEGRITYMANAGEMENTSERVICES

    Page 2 of 21

    VELOSI SOFTWARE

    TABLE OF CONTENTS

    1. INTRODUCTION (VAIL-PLANT)....................................................................................... 4

    2. PRESSURIZED EQUIPMENT MANAGEMENT SYSTEM (PEMS) ................................ 6

    3. PRESSURE SAFETY VALVES INTEGRITY MANAGEMET SYSTEM (PSVMS) ........ 7

    4. LIFTING EQUIPMETN MANAGEMENT SYSTEM (LEMS)........................................... 7

    5. CIVIL INSPECTION MANAGEMENT SYSTEM (CIMS) ................................................ 8

    6. FACILITY STATUS INTEGRITY REPORT (FSIR) .......................................................... 8

    7. ELECTRICAL, INSTRUMENTAL AND ROTARY MANAGEMENT SYSTEM (EIRMS)

    8

    8. STRUCTURE INTEGRITY MANAGEMENT SYSTEM (SIMS) ...................................... 9

    9. PIPELINE INTEGRITY MANAGEMENT SYSTEM (PIMS) ............................................ 9

    6.1 WHYPIPELINEINTEGRITYMANAGEMENT?............................................ 10

    6.2 VELOSIS PIPELINE INTEGRITY MANAGEMENT SYSTEM..................................... 10

    6.3 BENEFITSANDFEATURES ....................................................................... 10

    6.4 KEYFEATURES .......................................................................................... 10

    6.5 DATAMANAGEMENT ................................................................................. 11

    6.6 RISKASSESSMENTS.................................................................................. 11

    6.7 LONGTERMINSPECTIONPLANNINGANDMANAGEMENT ................... 116.8 SURVEYSRECORDINGCATEGORIES...................................................... 11

    6.9 EXTERNALCORROSIONDIRECTASSESSMENT(ECDA) ....................... 12

    6.10 INTERNALCORROSIONDIRECTASSESSMENT(ICDA)....................... 12

    6.11 STRESSCORROSIONCRACKING(SCC) ............................................... 13

    10. HULL INTEGRITY MANAGEMENT SYSTEM .............................................................. 13

    11. WELL HEAD INTEGRITY MANAGEMENT SYSTEM ................................................. 14

    12. CATHODIC PROTECTION & MONITORING SYSTEM .............................................. 16

    13. KPI (KEY PERFORMANCE INDICATORS) SYSTEM .................................................. 16

    14. ROOT CAUSE ANALYSIS (RCA) SYSTEM .................................................................... 17

    15. ESTIMATED CORROSION RATE ANALYSIS ............................................................... 17

    16. INSPECTION MANAGEMENT ( PIR MODULE) ........................................................... 17

    17. SYTEM INTEGRATION/INTERFAC ING ....................................................................... 18

  • 7/28/2019 VAIL-Plant Software Description

    3/21

    SOFTWARE SHORT DESCRIPTION OF VAIL - Plant

    RISKBASEDINSPECTIONANDINSPECTIONPLANNING

    VELOSIASSETINTEGRITYMANAGEMENTSERVICES

    Page 3 of 21

    VELOSI SOFTWARE

    12.1 SAP INTEGRATION AND INTERFACES ................................................................. 18

    12.2 API RISK BASED INSPECTION SOFTWARE.......................................................... 18

    12.3 DATA LOGGER ........................................................................................................... 18

    18. INSPECTION SCHEDULER .............................................................................................. 18

    19. MAINTENANCE PACKAGE ............................................................................................. 18

    20. STANDARD REPORTS ...................................................................................................... 19

    21. AD-HOC REPORTS (USER DEFINED REPORTS) ......................................................... 19

    22. REFERENCE LIBRARIES ................................................................................................. 19

    23. NORSOK M-506 CO2 CORROSION MODEL ................................................................. 19

    24. INTEGRITY PARAMETERS TRENDS REPORTING .................................................... 19

    25. SYSTEM USERS & USER GROUPS ................................................................................. 20

    26. DATA RECORDING BUSINESS LOGIC.......................................................................... 20

    27. SOFTWARE REQUIREMENTS ........................................................................................ 20

    28. HARDWARE REQUIREMENTS ....................................................................................... 21

  • 7/28/2019 VAIL-Plant Software Description

    4/21

    SOFTWARE SHORT DESCRIPTION OF VAIL - Plant

    RISKBASEDINSPECTIONANDINSPECTIONPLANNING

    VELOSIASSETINTEGRITYMANAGEMENTSERVICES

    Page 4 of 21

    VELOSI SOFTWARE

    1. INTRODUCTION (VAIL-PLANT)

    Oil & Gas Industries need to manage a complex portfolio of risks. These range from minor events to major

    incidents that may involve serious personnel injuries, significant environmental damage or substantial financial

    impact. Globally, the Oil & Gas Industry has been relatively successful in managing major incident risk.

    Nevertheless, the challenge remains to reduce the likelihood of such events.

    This program is mainly developed for Oil & Gas Industry to maintain the records and reduce the risk (injuries,

    environmental damage etc.) of all the equipments in the plant. Plant contains Pressurized equipments, Pressure

    safety valves and Pressure relief valves, Tank, Vessels, Heat Exchangers, Heaters, Columns, Pipes, Reactors,

    Fin Fan Coolers, Drums, Structures, Boilers, Chimney, Flares, and Cranes etc. These equipments contains

    engineering data, operating data, analysis data, history data (Inspection, Failures and Replacements data) ,

    inspection results and maintenance routine data.

    Risk Based Inspection is a method for using risk as a basis to prioritize and manage the efforts of an inspection

    program. An effective risk based program results in a reduced level of risk for a given level of inspectionactivity. In any operating plant, a relatively large percentage of the risk is usually associated with a small

    percentage of equipment. A Risk Based Inspection methodology permits the shift of inspection and maintenance

    resources to provide a higher level of coverage on the high risk items and an appropriate effort on lower risk

    equipment.

    Being risk-based, the method requires consideration of both the probability of failure as well as the

    consequences associated with failure. The methodology can be applied to process equipment, structures and

    pipelines. The main deliverable of an RBI study is an Inspection Program, describing:

    Prioritization of equipment items to inspect.

    When to inspect these items (inspection interval).

    Which method to use for the inspection.

    The VAIL-Plant Software is developed as part of the Velosi Risk Based Inspection Services and intended to be

    used for:

    Risk ranking and risk matrix.

    Risk driving degradation methods.

    Probability of failure and consequences for each individual equipment item.

    Calculates consequence to personnel, environment, production loss and material damage for ignited

    and unignited leaks.

    Evaluation of the impact of changes in process conditions and materials on installation risk and

    inspection programme.

    Effect of inspection effectiveness and the number of inspections on the individual equipment itemrisk for a given period of time.

    Inspection guidelines and detailed equipment inspection plans can be derived.

    Inspection Plans generation based on engineering measures.

    Inspection History Management.

    Man hour resource planning of on stream & off stream Inspection.

    Inspection results analysis based on Reliability Data.

  • 7/28/2019 VAIL-Plant Software Description

    5/21

    SOFTWARE SHORT DESCRIPTION OF VAIL - Plant

    RISKBASEDINSPECTIONANDINSPECTIONPLANNING

    VELOSIASSETINTEGRITYMANAGEMENTSERVICES

    Page 5 of 21

    VELOSI SOFTWARE

    The development idea behind the VAIL-Plant is, How to manage all types of equipments of Oil & gas industries

    in effective software. It covers all the equipments in each separate modules based on their functional &

    operational features. There are following modules in VAIL-Plant:

    Pressurized Equipment Management System (PEMS)

    It covers Pipes, Column, Tank, Fin-fan cooler, Heat exchanger, Heater, Reactor, Vessel, Flares,

    chimney etc.

    Structure Integrity Management System (SIMS)

    It covers all type of Structures.

    Pressure Safety Valve & relief Valve Management System (PSVMS)

    It covers Pressure Safety Valves (PSV) and Pressure Relief Valves (PRV).

    Lifting Equipment Management System (LEMS)

    Civil Inspection Management System (CIMS)

    Facility Status Integrity Report (FSIR)

    Electrical, Instrumental and Rotary Management System (EIRMS)

    Miscellaneous Equipment Management System (MEMS)

    It covers POs /FOs, NRVs and other equipments based on the functions of plant.

    Pipeline Integrity Management System (PIMS)

    Hull Integrity Management System

    Wellhead Integrity Management System

    It covers all types of Pipelines and their components, crossings, joints & attached equipments.

  • 7/28/2019 VAIL-Plant Software Description

    6/21

    SOFTWARE SHORT DESCRIPTION OF VAIL - Plant

    RISKBASEDINSPECTIONANDINSPECTIONPLANNING

    VELOSIASSETINTEGRITYMANAGEMENTSERVICES

    Page 6 of 21

    VELOSI SOFTWARE

    2. PRESSURIZED EQUIPMENT MANAGEMENT SYSTEM (PEMS)

    The purpose of this document is to provide the PTT team with an overview of the Pressurized

    Equipment Management System Module scope of work, and the software solution capability. This

    includes the description of business processes and how a Velosis PEMS solution will enable these

    processes.

    Pressurized Equipment Management System includes the features:

    Engineering data capturing along with hierarchy management of the facility

    Risk assessment and inspection planning of static equipments as per API RBI

    Semi quantitative RBI methodology for risk evaluation and inspection planning against

    identified damage mechanisms compliance with API St. 580

    Inspection history recording with respect to multiple positions and TMLs as well

    Failure and replacement history recording

    CP monitoring data recoding and evaluation.

    KPIs identifications and calculation/evaluations

    Short term/long term corrosion rate calculations

    Remnant life calculations based on minimum measured thickness

    Asset Integrity /RBI related documents management and capturing of drawings, isometrics,

    PFDs and P&IDs

    Reference documents attachment.

    Trends and console reporting

    Plant Inspection Requirements (PIRs) generation

    Root Cause Analysis (RCA) against failures

    Time, Cost & Resources (CTR) Management

    Data importing from excel workspace templates

    Risk Based Inspection (RBI) is a systematic approach to create an accurate, well targeted inspectionstrategy based on risk. The inspection plans developed are to mitigate the specific failure mechanisms

    identified. It is applicable to offshore & onshore installations such as fixed or mobile units as well as

    FPSOs and pipelines.

    The oil & gas, process industry handles a wide range of flammable and toxic materials which are

    potentially hazardous. To reduce the hazards to an acceptable level, the authorities through

    legislation, have imposed requirements on the management of plants and facilities, requiring it to

    demonstrate that it has identified the existing hazards and undertaken mandatory inspection and

    mitigation measures to prevent accidents.

    In the cyclic nature of the business, operators constantly find themselves having had to balance

    between meeting the regulatory requirements to shutdown and avoiding business interruption. Those

    plants that succeed in operating more efficiently and reliably will be better positioned to ensure longterm survival and success. Increasingly, innovative asset integrity strategies such as RBI are being

    implemented to meet these goals.

    VELOSIs Asset Operations Process is based on a risk-based strategy for maintenance and inspection

    planning (i.e. time-based, condition-based, operational or corrective maintenance). These strategies

    are associated with company and plant objectives towards plant availability and safety. Risk-based

    methods like Reliability, Availability and Maintainability (RAM), Reliability Centred Maintenance

    (RCM) and Risk Based Inspection (RBI) can be used to rank systems and equipment and develop

    strategies for maintenance and inspection.

  • 7/28/2019 VAIL-Plant Software Description

    7/21

    SOFTWARE SHORT DESCRIPTION OF VAIL - Plant

    RISKBASEDINSPECTIONANDINSPECTIONPLANNING

    VELOSIASSETINTEGRITYMANAGEMENTSERVICES

    Page 7 of 21

    VELOSI SOFTWARE

    The outcomes from RBI and Inspection Management System;

    Risk ranking, risk matrix & pareto curves.

    Risk driving degradation methods.

    Probability of failure and consequences for each individual equipment item. Calculates consequence to personnel, environment, production loss and material damage for

    ignited and unignited leaks.

    Evaluation of the impact of changes in process conditions and materials on installation risk

    and inspection program.

    Effect of inspection effectiveness and the number of inspections on the individual equipment

    item risk for a given period of time.

    Inspection guidelines and detailed equipment inspection plans can be derived

    The benefits of RBI and Inspection Management System;

    Establish risk ranking among individual equipment items in order to optimise inspection efforts

    and reduce costs

    o All pressure equipment contains flaws

    o Most flaws are innocuous; just a few may cause critical failures

    o Those critical flaws must be found cost effectively

    Extend inspection intervals beyond statutory requirements

    Potential for reduction of production loss during turnaround inspection

    Increase confidence in equipment integrity

    Established path to regulatory approval

    3. PRESSURE SAFETY VALVES INTEGRITY MANAGEMET SYSTEM (PSVMS)

    VAIL-Plant has a module for pressure safety valves integrity management. It maintains;

    Hierarchy of the valve(PSV/ PRV)

    Design/engineering data

    Inspection history recording

    Risk evaluation

    Inspection planning

    Cost, time & Resource management

    4. LIFTING EQUIPMETN MANAGEMENT SYSTEM (LEMS)

    VAIL-Plant has the module for Risk Based Inspection of lifting equipments like cranes, etc. It

    includes,

    Hierarchy recording and management

    Design / Engineering data capturing Operational data recording

    Risk evaluation against identified damage mechanisms

    Inspection planning

    Reporting feature

  • 7/28/2019 VAIL-Plant Software Description

    8/21

    SOFTWARE SHORT DESCRIPTION OF VAIL - Plant

    RISKBASEDINSPECTIONANDINSPECTIONPLANNING

    VELOSIASSETINTEGRITYMANAGEMENTSERVICES

    Page 8 of 21

    VELOSI SOFTWARE

    5. CIVIL INSPECTION MANAGEMENT SYSTEM (CIMS)

    VAIL-Plant has a module for Management of Civil assets like Concrete Structures, Pipe Sleeper,

    Buildings, Fencing, Roads & Paving, Equipment Foundation, Pipe Track Foundation etc. It includes,

    Hierarchy recording and management Design / Engineering data capturing

    Defects Recording

    Risk evaluation against identified Defects

    Defect Assessment and Repair plan

    Cost estimation against Defected area

    Reporting feature

    6. FACILITY STATUS INTEGRITY REPORT (FSIR)

    VAIL-Plant has a module to see the overall facility status report against trips/failures, Anomalies,

    Backlogs etc. It includes,

    Hierarchy recording and management

    Each hierarchy level have divided into three groups (HSECS, HCS, Non HCS)

    Number of leaks for last 30 days and to date against hierarchy each level

    Number of trips/failures for last 30 days and to date against hierarchy each level

    Number of Anomalies for last 30 days and to date against hierarchy each level

    Number of equipments (Remnant life =2 & 7 years) for last 30 days and to date against hierarchy

    each level

    Number of equipments (MTBF 7 years) for last 30 days and to date against hierarchy each

    level

    Backlogs Inspection activities for last 30 days and to date against hierarchy each level

    Backlogs PM activities for last 30 days and to date against hierarchy each level

    7. ELECTRICAL, INSTRUMENTAL AND ROTARY MANAGEMENT SYSTEM (EIRMS)

    VAIL-Plant has a module of Reliability Centered Maintenance (RCM) for Electrical, Instrumental andRotary equipments like Generator, Pressure gauge and turbine etc. It includes,

    Hierarchy recording and management

    Design / Operational data capturing

    Functional data recording

    Reliability operator and reliability generic data recording

    Failure mode and effect analysis based on equipment type

    Failure mode, effect and criticality analysis and their criticality matrix

  • 7/28/2019 VAIL-Plant Software Description

    9/21

    SOFTWARE SHORT DESCRIPTION OF VAIL - Plant

    RISKBASEDINSPECTIONANDINSPECTIONPLANNING

    VELOSIASSETINTEGRITYMANAGEMENTSERVICES

    Page 9 of 21

    VELOSI SOFTWARE

    Plant Maintenance Routines (PIR) generation

    Work order and work packs generation

    Inspection history recording

    Maintenance history recording

    Failures and Replacements recording Mean Time Between Failures (MTBF) and Mean Time to Repair (MTTR) calculation

    Effective Reporting

    8. STRUCTURE INTEGRITY MANAGEMENT SYSTEM (SIMS)

    VAIL-Plant has the module for Risk Based Inspection of lifting equipments like cranes, etc. It include,

    Hierarchy recording and management

    Design / Engineering data capturing

    Operational data recording

    Risk evaluation against identified damage mechanisms

    Inspection planning

    Reporting feature

    9. PIPELINE INTEGRITY MANAGEMENT SYSTEM (PIMS)

    The purpose of this document is to provide the company team with an overview of the Pipeline

    Integrity Management Module scope of work, and the software solution capability. This includes the

    description of business processes and how a Velosis PIMS solution will enable these processes.

    Whenever the term Oil & Gas appears, it shall be interpreted to fulfill requirements of Oil & Gas

    Industry.

    The primary modules enabled by Velosis PIMS are:

    Pipeline profile recording and plotting Probability of Failure (POF) calculation and plotting along the pipeline (POF Vs TIME)

    against applicable damage mechanism

    Consequence of Failure (COF) calculation against applicable damage mechanism

    External Corrosion Direct Assessment (ECDA)

    Internal Corrosion Direct Assessment (ICDA)

    Risk assessment against third party damages

    Risk assessment against Stress Corrosion Cracking (SCC)

    Corrosion calculation (NORSOK M-506)

    Inline inspection analysis

    Asset management

    Scheduling of integrity management and inspection Cost, Time and Resources (CTR) management

    Standardized reporting features

    VAIL-Pipeline is a composite application designed for pipelines integrity management. VAIL-Pipeline

    provides a structured work process which allows the organization to define inspection strategies

    based upon Risk Based Inspection (RBI) principles. In addition, VAIL-Pipeline provides specific

    capabilities to evaluate and measure the effectiveness of inspection strategies using analytics which

    provides a closed loop, continuous improvement process.

  • 7/28/2019 VAIL-Plant Software Description

    10/21

    SOFTWARE SHORT DESCRIPTION OF VAIL - Plant

    RISKBASEDINSPECTIONANDINSPECTIONPLANNING

    VELOSIASSETINTEGRITYMANAGEMENTSERVICES

    Page 10 of 21

    VELOSI SOFTWARE

    VAIL-Pipeline provides a framework that allows conducting pipeline risk based analysis for

    components, sections and whole line as well. In addition the system is flexible, allowing clients the

    flexibility to configure a specific criticality matrix to suite their specific business process needs.

    VAIL-Pipeline will support the analysis and creation of inspection strategies that are to be

    implemented. The application will permit the reviewing and adjustment of strategies to meetadditional or new requirements from the RBI analysis system.

    Contents of this document are confidential and proprietary.

    6.1 WHYPIPELINEINTEGRITYMANAGEMENT?

    Pipelines are subject to regular statutory inspections, verifications and re-certifications just as often as

    facilities containing and transporting hazardous products as well as pressure equipment. Until

    recently, such requirements have been enforced and have imposed pressure testing of oil pipelines to

    occur every ten years. Operators are now asked to have in place a comprehensive integrated Pipeline

    Integrity Management (PIM), which is more in depth than an inspection and maintenance program,

    but a management system encompassing engineering, operation, inspection, maintenance, HSE and

    Corporate communications.

    6.2 VELOSIS PIPELINE INTEGRITY MANAGEMENT SYSTEM

    VELOSI brings a wealth of experience in many integrity management related fields such asHSE, system certification, risk assessment, fitness for services evaluation, risk based

    inspection and maintenance.

    VELOSI brings together all the skills. Expertise, operation support and local presence to ourclients the best PIMS available on the market.

    Its a best available solution for Pipeline Integrity Management that facilitates for both onshoreand offshore pipelines.

    User friendly inspection management tool.

    Optimum inspection periods are formally obtained based on an implicit time dimension of risk.

    6.3 BENEFITSANDFEATURES

    Meeting customer needs is Velosis ultimate business objective. Main benefits and features of VAIL-

    Pipeline can be summarized are as follow:

    Implements company specific inspection strategies and best practices

    Reduces risk for non-planned shut downs

    Increases reliability and availability

    Provides the management with an aggregated overview of asset integrity

    Scalable to meet company specific work processes and asset portfolio

    Common storage for all life cycle data

    Benchmarking internally or against external best practice

    6.4 KEYFEATURES

    The major functional modules of VAIL-Plants PIMS include:

    Data management

    Analysis tools and code checks

    Risk assessments

    Planning and inspection management

    Built-in library of form such as corrosion mapping, SSC

  • 7/28/2019 VAIL-Plant Software Description

    11/21

    SOFTWARE SHORT DESCRIPTION OF VAIL - Plant

    RISKBASEDINSPECTIONANDINSPECTIONPLANNING

    VELOSIASSETINTEGRITYMANAGEMENTSERVICES

    Page 11 of 21

    VELOSI SOFTWARE

    Dialogs based input forms, DCVG & CIP information recording, SSC & MIC information

    recording,

    Coating fault information

    Metal loss assessment

    Soil receptivity & pH values Event log

    Surveys & inspection results,

    Defect assessment & condition assessment

    Short term and long term inspection planning

    Dynamic reporting features.

    Key support functions include document management, integration interfaces and a project

    execution environment

    6.5 DATAMANAGEMENT

    Velosis PIMS is based on the PODS data model with an offshore/onshore extension to cater for

    offshore/onshore objects like e.g. risers and subsea templates. The database is enveloped by a securitysystem and role-based access restrictions on pipelines and groups of pipelines ensuring integrity of

    information. A specifically powerful capability in Velosis PIMS is the dynamic segmentation of

    pipelines associated with varying profiles such as location classes, pipeline sections and other specific

    user definition. The dynamic segmentation function is essential to the effectiveness and flexibility of

    the system.

    6.6 RISKASSESSMENTS

    PIMS module supports the semi-qualitative risk assessment methodology and provides selected

    quantitative risk assessment functions to qualify and document interpretations on the PoF scoring and

    resulting risk levels. Threats, CoF and PoF can be based on various segmentation principles, such as

    pipeline sections, location and safety class, entire pipeline and also refined, adjusted by the pipelineengineer. The resulting risk will be displayed along the pipeline for each projected year. The risk

    assessment for components and critical areas (hotspots) can be performed in both overview and

    detailed mode.

    6.7 LONGTERMINSPECTIONPLANNINGANDMANAGEMENT

    The inspection planning module provides the engineer with functions to define inspections targeted

    for the entire pipeline or some selected sections. The long-term inspection plan is calculated from a

    combination of the risk assessment results and the prescribed inspection intervals.

    6.8 SURVEYSRECORDINGCATEGORIES

    Using the Velosis Pipeline Integrity Management Software, surveys can be recorded by segregatingon the basis of desired outcome. The surveys monitoring parameters classification supported by

    VAIL-Plants PIMS module are:

    Metal loss single

    Anode depletion

    CP readings

    Vertical configurations

    Vertical out-of-straightness

    Feature findings

  • 7/28/2019 VAIL-Plant Software Description

    12/21

    SOFTWARE SHORT DESCRIPTION OF VAIL - Plant

    RISKBASEDINSPECTIONANDINSPECTIONPLANNING

    VELOSIASSETINTEGRITYMANAGEMENTSERVICES

    Page 12 of 21

    VELOSI SOFTWARE

    Component Observation

    Exposure

    Others

    6.9 EXTERNALCORROSIONDIRECTASSESSMENT(ECDA)VAIL-Plants PIMS module covers the following ECDA surveys regarding inspection management &

    to analyze the likelihood and impact of pipeline failures caused by external corrosion.

    Soil Resistivity Analysis

    Structure to soil Analysis

    DCVG Survey

    ACVG Survey

    Pearson coating survey

    CIP (Close Interval Potential) survey

    Pipe to soil potential survey

    C Scan current attenuation Pipeline current mapper

    6.10 INTERNALCORROSIONDIRECTASSESSMENT(ICDA)VAIL-Pants PIMS module covers the Internal Corrosion Direct Assessment regarding inspection

    management & to analyze the likelihood and impact of pipeline failures caused by internal corrosion.

    For ICDA the PIMS module has the capability be recorded the following necessary data for the

    pipeline:

    Construction Related Data

    o Removed taps

    o Locations of inputs and outputs to the pipeline

    oYear of construction

    o Locations of drips

    o Existence of flow coatings

    o Diameter and wall thickness

    o Length/Map

    o Location of compressors

    Elevation Profile (Topography)

    o Depth of cover preferred

    o Elevation changes from roads, rivers, drains, valves, drips

    Process Information

    o Change in gas flow direction Minimum and maximum Operating pressures

    o Gas flow rates - maximum flow rates at minimum and Maximum operating pressures

    o Liquid water flow rateo Liquid hydrocarbon flow rate

    o Temperature

    Maintenance Data

    o Pigging type and frequency

    o Presence of solids

    o Presence of glycol

    Inspection and Repair Data

    o Leaks

  • 7/28/2019 VAIL-Plant Software Description

    13/21

    SOFTWARE SHORT DESCRIPTION OF VAIL - Plant

    RISKBASEDINSPECTIONANDINSPECTIONPLANNING

    VELOSIASSETINTEGRITYMANAGEMENTSERVICES

    Page 13 of 21

    VELOSI SOFTWARE

    o Hydro test and ILI data if available

    o Replacement or sleeve repair

    o Dig site inspections

    Chemical Treatment

    oYears of treatment

    o Type of chemical (biocide, inhibitor) and properties (e.g., oil soluble)

    o Continuous or Batch (dosage and frequency)

    Sampling Data

    o Gas analyses

    o Solids

    o Liquids

    o Solids

    o Bacteria testing results

    Corrosion monitoring data

    o Coupons

    o Probes

    6.11 STRESSCORROSIONCRACKING(SCC)VAIL-Plant has the module for POF, COF and risk assessment for stress corrosion cracking based on

    coating type, age and specified yield strength factor.

    10. HULL INTEGRITY MANAGEMENT SYSTEM

    Ship owners and managers strive to maintain a high level of structural integrity. The ship crews and

    shore staff perform inspections of hull structure on a regular basis to assess the hull condition. The

    inspection regimes require easy identification of problems. Besides owners, inspections and surveys

    are carried out by many agencies such as classification societies, insurers, vetting agencies, cargo

    surveyors, port state, coastal state and flag state authorities.

    All have an interest in the safe operation of the ship and ensuring that it is properly maintained. The

    effectiveness of these inspections is being continually challenged by the ever decreasing time that these

    vessels remain in port. In this paper a holistic, simple and quantifiable approach is proposed. This

    methodology employs the application of risk-based decision-making techniques. Risk-based

    techniques have demonstrated great potential in identifying key structural elements and focusing

    resources for maintenance and inspection. The proposed methodology for rationalizing the hull

    inspection program is via the development of a vessel-specific inspection program which includes a

    scoring system for identified inspection criteria and a list of target inspection areas (critical structural

    areas) for each compartment. The condition for each inspection criteria, depending upon the score, is

    displayed within the context of a simple traffic light system. This methodology can be applied by a

    trained and qualified owners representative. The scoring system can be utilized and analyzed to viewthe condition status of compartments, vessels, and a fleet. The scoring system also utilizes a system to

    trigger anomaly list generation, which can be used to manage the damages and repairs as well as

    create a repair list for future repair / drydock events.

    The shipping industry needs a rationalized approach to perform inspections of hull structure and a

    methodology on what to inspect, when to inspect, where to inspect and how much to inspect. The

    benefits of hull inspection are usually well answered and known to all the inspection agencies.

  • 7/28/2019 VAIL-Plant Software Description

    14/21

    SOFTWARE SHORT DESCRIPTION OF VAIL - Plant

    RISKBASEDINSPECTIONANDINSPECTIONPLANNING

    VELOSIASSETINTEGRITYMANAGEMENTSERVICES

    Page 14 of 21

    VELOSI SOFTWARE

    Traditionally ship owners and vessel managers have their in-house hull inspection schemes and

    programs to track, assess and maintain the hull structure. Inspections to assess hull condition are also

    performed by many agencies such as classification societies, insurers, vetting agencies, cargo

    surveyors, port state, coastal state and flag state authorities.

    The inspection module for Hull within VAIL-Plant has the following features/capabilities;

    A compartment is divided into zones similar to the area of consideration

    All compartments are divided into zones those can be inspected and graded for the inspection

    criteria

    Six inspection criteria have been identified for each compartment & these are inspected for

    each zone.

    Critical structural areas (if any) are identified for a compartment/zone based on engineering

    analysis and in-service experience.

    The inspection criteria are graded with a score (rating) from 0 to 6. A traffic light status (red

    5 to 6, yellow 3 to 4, green 0 to 2) is assigned to each zone for each criterion.

    These scores are added for each zone and rolled up to get a normalized score for the

    compartment. A red signifies the presence of an anomaly which needs to be documented for

    resolution/rectification.

    Six inspection criteria for the Hull structure;

    o Coating Condition

    o General Condition

    o Pitting/Grooving

    o Deformation

    o Fractures

    o Cleanliness (House Keeping)

    System has the capability to identify the general inspection activities and inspection activities

    for critical area as well.

    Damage mechanisms identification for each zone & risk evaluation Inspection history recording

    Maintenance history recording

    Replacements history recording

    Failure history recording

    Hull Inspection Routines (Inspection Packs) definition and execution

    Reporting feature

    11. WELL HEAD INTEGRITY MANAGEMENT SYSTEM

    The objective of developing Well Integrity Management System (WIMS) is to provide standard

    guidelines to ensure that technical integrity of all the wells is maintained throughout their life cycle,

    they operate under safe condition and are capable to function continuously to achieve the targeted

    production/injection requirements. Well integrity is based on the establishment and maintenance of

    confinement barriers in the particular well. As per WIMS standards, a well is considered integral if at

    least two separate and sound confinement barriers across each flow path between the potential

    reservoir and surface are available all the time.

    WIMS very much emphasis on the problem prevention based approach (endeavour to predict & solve

    the problem before it happens) that can accommodate several direct advantages and benefits like

  • 7/28/2019 VAIL-Plant Software Description

    15/21

    SOFTWARE SHORT DESCRIPTION OF VAIL - Plant

    RISKBASEDINSPECTIONANDINSPECTIONPLANNING

    VELOSIASSETINTEGRITYMANAGEMENTSERVICES

    Page 15 of 21

    VELOSI SOFTWARE

    reduction in operating down time, enhancement in well control and safety aspects, minimized

    unplanned repair intervention & cost impact etc.

    Major well issues that impact on the technical integrity and operability of a well viz; Surface

    Completion Components (Wellhead & X-mass tree), Sub-surface Completion Components (downholesafety valve (DHSV), Gas lift valves, electric submersible pump (ESP), Well Construction (Casing &

    Annulus), Communication Problems, Corrosion, Scaling, Non-hydrocarbon Effluents / Products, Well

    Operation Suspension, Well Intervention Services (Electric/Slick Line, Stimulation, coiled tubing unit

    (CTU), Risk Management Process & Auditing System.

    Many of the mature oil and gas production areas in the world are characterized by an aging well

    stock. Poorly maintained wells can be a potential threat to people and the environment and can result

    in economic loss through production deferment. At a time when high oil prices mean any downtime is

    bad news, has WI ever been more important?

    The inspection module for WIMS within VAIL-Plant has the following features/capabilities; Providing up-to-date information on the current well integrity status,

    Looking closer at the functionality, the information available for an individual well is divided

    into five main categories; Status assessments, operational history, well details, well monitoring

    and non-conformance logs.

    Each of these categories consists of a set of sub-categories, logically broken down into

    manageable chunks of information.

    The predefined key indicators are split into several status codes and give the user the means to

    properly describe the well situation. The predefined codes are:

    o Integrity Status

    The well risk status indicates the level of risk the well has been assessed to have. The

    integrity status is derived from risk assessment of the wells condition.o Well barrier status

    This principle implies that at least two independent and testable well barrier envelopes shall

    exist in a well.

    o Annuli status

    When an abnormal pressure behavior is detected and identified as a leak to an annulus, the

    annuli status should be assessed and the status changed. Pressure build up may be caused

    by e.g. a casing leak or micro annuli.

    o Valve status

    The valve status indicates the status of the safety valves in a well. These barrier elements

    are periodically tested and will constitute a major part of the well barrier. Customized

    reports on test information and test performance indicators are available as an add-on

    module.

    o Life cycle status

    The lifecycle status states the operational phase of the well, i.e. if the well is operating or

    handed over for workover / intervention or P&A. This documents the responsible

    department for the well integrity throughout the wells lifetime.

    VAIL-Plant (WIMS) offers the possibility to retrieve and present data from automatic and

    manual sensor readings available for the well, e.g. automatic A- and B-annulus pressure

    readings and manual C-annulus pressure readings. In addition to pressure, temperature, choke

    position, wing valve position may be retrieved.

  • 7/28/2019 VAIL-Plant Software Description

    16/21

    SOFTWARE SHORT DESCRIPTION OF VAIL - Plant

    RISKBASEDINSPECTIONANDINSPECTIONPLANNING

    VELOSIASSETINTEGRITYMANAGEMENTSERVICES

    Page 16 of 21

    VELOSI SOFTWARE

    For all available sensor readings, manual or automatic, the last read values are presented

    graphically in a gauge together with the defined alarm limits.

    VAIL-Plant (WIMS) enables the user to see trends in graphs, e.g. annuli and tubing pressures

    and temperatures. In this way, VAIL-Plant (WIMS) simplifies the process of establishing trend

    data for evaluation purposes. The graphs can also indicate other types of information such as the start-up of test activities or

    build in logic to determine if the well is shut-in or flowing.

    An important feature of VAIL-Plant (WIMS) is the possibility to store and present bleed-off

    and top-up pressure data for annuli.

    VAIL-Plant (WIMS) can in many ways be described as a portal to information relevant to well

    integrity management. As part of this, VAIL-Plant (WIMS) has included a category with

    typical background information to be used as input in well integrity assessments, e.g.

    completion data, handover documentation, completion schematics etc. In addition, the well

    details category is used to define the alarm limits in the well. These can either be connected

    automatically from existing systems or entered manually.

    An important part of VAIL-Plant (WIMS) is the ability to generate reports. In order to

    accommodate the different requirements, VAIL-Plant (WIMS) can easily be configured to

    generate customized reports. This combined with the ability to connect to and extract

    information in various company databases makes VAIL-Plant (WIMS) a very flexible

    reporting tool.

    Several add-on modules are available, e.g. Scale management and Tubing deformation. These

    modules will be customized to requirements.

    12. CATHODIC PROTECTION & MONITORING SYSTEM

    Velosi methodology for CP System is classified into two parts:

    Data review & engineering works

    Field works- surveys, inspections and investigations

    Velosi has identified seven key steps to carry out evaluation & condition monitoring of CP

    system:

    Pre-Assessment study

    Preparation of methodology and procedures

    Technical audit of existing CP system installation of main pipelines & performance

    assessment of Tank Form area, Pump stations facilities and associated piping network

    On/Off potential survey, CIP survey and line current survey

    Visual Inspection of Heat Shrinkable Sleeves.

    13. KPI (KEY PERFORMANCE INDICATORS) SYSTEM

    The following features of VAIL-Plants KPI module are described given below:

    The system has capable to incorporate standard industry metrics such as Mean Time

    Between Failure (MTBF), Mean Time Between Event, Equipment Reliability, Equipment

    Availability as well as is flexible to allow user defined metrics based on the systems data

    and other external data sources.

    Supports metrics involving incidents and lost production.

    Enterprise-wide metrics for maintenance, reliability, safety, environmental, health, asset

    and financial problems

  • 7/28/2019 VAIL-Plant Software Description

    17/21

    SOFTWARE SHORT DESCRIPTION OF VAIL - Plant

    RISKBASEDINSPECTIONANDINSPECTIONPLANNING

    VELOSIASSETINTEGRITYMANAGEMENTSERVICES

    Page 17 of 21

    VELOSI SOFTWARE

    Support and display a multilevel performance scoreboard

    Support the building of Key Performance Indicators (KPI) and their display

    Support the graphical display of all metrics

    Alert company personnel when KPIs fall outside of established limits

    Provide configured KPIs for the companyProvide automatic electronic interface to company production monitoring system to create production

    KPIs14. ROOT CAUSE ANALYSIS (RCA) SYSTEM

    The following features of VAIL-Plants RCA module are described given below:

    Analysis the different types of failures events such as environmental, health, safety or

    recurring equipment failures

    Support multiple fault tree development and display methodologies as configured content

    within the system

    Maintaining the database of Team members, team goals and critical success factors for

    the analysis

    Ability to define standard templates to help facilitate the analysis of typical or previouslyexperienced failure events

    Ability to collect, store, analyze, print and report failure data for an analysis

    Ability to assign the task of collecting failure data to a team member and track any

    outstanding task by team member, group,, area or analysis

    Ability to visually analyze events by organizing failure modes, hypotheses and causes of

    an event through the use of a logic tree

    Charting tool to track the effectiveness of implemented recommendations

    Closed loop tracking recommendation tracking from within the RCA solution

    Ability to verify and communicate hypothesis to users.

    15. ESTIMATED CORROSION RATE ANALYSISThe following features of VAIL-Plants ECR module are described given below:

    Capable of calculating estimated corrosion rate according to applicable damage

    mechanisms of a equipment based on services.

    Capable of calculating susceptibility according to applicable damage mechanism.

    16. INSPECTION MANAGEMENT ( PIR MODULE)

    The following features of VAIL-Plants Plant Inspection requirements (PIR) module are described

    given below:

    Capable to manage inspection activities for all types of assets/ equipment (tags). The

    system shall allow performing inspections on groups of tags, platforms and corrosion

    loops. Allow users to plan, schedule and execute the PIRs. It automatically extracts inspection

    plans from SAP.

    Allow the users to create work scopes, work packages for execution of PIR on a tag or a

    set of tags (package like boliers, pipe). Drawings, documents, specifications, previous

    history schedule date, previous readings, previous anomalies etc.

    Allow monitoring process of the PIR Plan.

  • 7/28/2019 VAIL-Plant Software Description

    18/21

    SOFTWARE SHORT DESCRIPTION OF VAIL - Plant

    RISKBASEDINSPECTIONANDINSPECTIONPLANNING

    VELOSIASSETINTEGRITYMANAGEMENTSERVICES

    Page 18 of 21

    VELOSI SOFTWARE

    17. SYTEM INTEGRATION/INTERFAC ING

    12.1 SAP INTEGRATION AND INTERFACES

    The following features of VAIL-Plants SAP Integration module are described given below:

    The VAIL-Plant have certified interface to SAP

    Support an interface with SAP Plant Maintenance and Financial Software System

    Capability to be configured for alerting based on preset criteria

    Support to interface bi-directional of notification/ work order data from SAP into the

    system

    bi-directional synchronization of financial data into system

    bi-directional synchronization of Location/ Equipment records from SAP to the system

    Notification/ work request creation based on the systems criteria and/ or user interaction

    Update to the systems location/ equipment source tables based on changes to SAP master

    data records, including movement of equipment from one location to another

    Automatically synchronize with SAP tag/equipment master data

    Capable to link to SAP work notifications and allow automatic creation of notifications

    Link from SAP work order completions and provide inspection costs

    Automatically interface to SAP preventive maintenance plans

    12.2 API RISK BASED INSPECTION SOFTWARE

    System has the capability to be integrated with API RBI V8.02/8.03

    VAIL-Plant can fetches the RBI results data in batch from API RBI Database

    Pre-Requisites:

    Equipment Tag for which RBI results have to be fetched must exist in VAIL-Plant

    API RBI Database should be in SQL Server12.3 DATA LOGGER

    System has the capability to be integrated with Inspection Data logger. ULTRASONIC

    THICKNESS GAGE (38DL PLUS )

    Spec.

    Dual and Single Element ransducers

    Rugged, designed for IP67

    Thickness range from 0.08 mm (0.003 in.) to 635 mm (25 in.)

    Color Transflective VGA Display

    18. INSPECTION SCHEDULER

    An Inspection order goes through the following process to be executed;

    Planned against a RANGE of Dates

    Approved for Inspection Scheduled Pending (Before exc. Date)

    Scheduled-In progress (In 30 Days of Execution)

    Completed (On Work order Closing)

    Backlog (Passed 30 Days of Inspection Date)

    Cancelled (Cancelled)

    19. MAINTENANCE PACKAGE

    A maintenance order goes through the following process to be executed;

  • 7/28/2019 VAIL-Plant Software Description

    19/21

    SOFTWARE SHORT DESCRIPTION OF VAIL - Plant

    RISKBASEDINSPECTIONANDINSPECTIONPLANNING

    VELOSIASSETINTEGRITYMANAGEMENTSERVICES

    Page 19 of 21

    VELOSI SOFTWARE

    Filtering out the Tags for Maintenance Planning

    Dispatch for Maintenance Work Order notification

    Filtering would work based on remnant life

    20. STANDARD REPORTSVAIL-Plant has the feature of built in standard reports those includes;

    Piping - Equipment Summery Sheet

    Vessel Equipment Summery Sheet

    Column Equipment Summery Sheet

    Heat Exchangers Equipment Summery Sheet

    Fin/Fan Cooler - Equipment Summery Sheet

    Heater Equipment Summery Sheet

    API 650/629 Tank Equipment Summery Sheet

    RISK MATRIX (VELOSI)

    RISK MATRIC (API RBI)

    Risk Ranking Summery Inspection History & Analysis

    Plant Inspection Requirements

    Replacements & Failures Reporting

    Leaks & Defects

    21. AD-HOC REPORTS (USER DEFINED REPORTS)

    User can query the data as per desire & export to *.xls format files. Query might be SAVED for

    future use.

    22. REFERENCE LIBRARIES

    System has the feature of adding the Reference Doc. Library i.e. SOPs

    Operating Manuals

    Drawings

    Piping & Instrumentation Diagrams

    Process Flow Diagrams

    GA Drawing

    Isometrics

    ARIMS

    Corrosion Model

    23. NORSOK M-506 CO2 CORROSION MODEL

    NORSOK M-506 CO2 Corrosion Model is available with in system to calculate/Assess the corrosion

    due to CO2.

    24. INTEGRITY PARAMETERS TRENDS REPORTING

    System has capability of reporting integrity parameters trends; graphical representation of following

    parameters is a static feature of VAIL-Plant;

    Leaks

    Metal Loss

  • 7/28/2019 VAIL-Plant Software Description

    20/21

    SOFTWARE SHORT DESCRIPTION OF VAIL - Plant

    RISKBASEDINSPECTIONANDINSPECTIONPLANNING

    VELOSIASSETINTEGRITYMANAGEMENTSERVICES

    Page 20 of 21

    VELOSI SOFTWARE

    Remnant Life

    Defects

    Replacements

    Risk Level

    Corrosion Rate

    25. SYSTEM USERS & USER GROUPS

    User Groups can be created and configured based on the Clients BUSINESS LOGIC

    Groups naming is not a hard & fast rule with in the system, only concern is the

    configuration

    User can be created and configured according to their concerned groups

    Normally naming convention for Inspection Management System USERS is INSPCTOR,

    ENGINEER & MANAGER

    Separate Role can be assigned to each system users based on the needs & can be assigned

    to a particular USER Group.

    Only system ADMINSTRATOR has the rights to CREATE, MODIFY,ENABLE/DISABLE, BLOCK or DELETE any user account

    26. DATA RECORDING BUSINESS LOGIC

    INSERT:

    Inspector can flag to create a new record/Tag (STATUS: NEW)

    Engineer will review that Record/Tag (STATUS: REVIEWED)

    Manager have to Approve that particular record/Tag (STATUS:APPROVED)

    UPDATE:

    Inspector Can flag to modify the Record (STATUS: MODIFIED)

    Inspection Engineer will review the MODIFIED Record (STAUS: REVIEWED)

    Inspection Manager will approve that particular Record/TagDELETE:

    Inspector will flag the Tag for Deletion (STATUS:DELETED)

    Inspection Engineer will review the flagged Record/Tag (STATUS:REVIEWED)

    Inspection Manager will approve the deletion of Record/Tag

    INSPECTION RECORDING:

    Inspector has the full rights to inspection recording to INSERT, DELETE & UPDATE

    ADMINISTRATOR has the full ACCESS RIGHTS to the system

    27. SOFTWARE REQUIREMENTS

    VELOSI VAIL-Plant software licenses will be required to meet the projects deliverables. Velosi

    software required to support the VAIL-Plant implementation will be provided under licensesagreement.

    In addition to Velosi software VAIL-Plant, third party software and SAP operating platforms will

    be required to successfully install, integrate and operate the Velosi solution. The details are given as

    under;

    Microsoft Operating System Windows 2000 or Xp that is needed even to operate SAP

    Any web browser supported by SAP Web Application Server, if not previously installed

    DotNet framework 3.5

    Crystal Reports 10.x

  • 7/28/2019 VAIL-Plant Software Description

    21/21

    SOFTWARE SHORT DESCRIPTION OF VAIL - Plant

    RISKBASEDINSPECTIONANDINSPECTIONPLANNING

    VELOSIASSETINTEGRITYMANAGEMENTSERVICES

    Page 21 of 21

    SynFusion 2.0

    SQL Server 2005

    Windows Installer 3.1

    CLIENT may desire Microsoft Office Suite tools like Excel, Word, etc. based on the end

    users needs.28. HARDWARE REQUIREMENTS

    Minimum: 1.6 GHz CPU, 512 MB RAM, 1024x768 display, 5400 RPM hard disk, Pentium

    processor or equivalent (Recommended)

    Recommended: 2.6 GHz or higher CPU, 2 GB RAM, 1280x1024 display, 7200 RPM or higher hard

    disk