10
C. Pasquino, P. Chiggiato, J. Hansen, P. R. Demarest VACUUM ANALYSIS OF PS SECTOR 20 MTE MEETING - 13TH SEPTEMBER 2012

Vacuum Analysis of PS Sector 20

  • Upload
    sarai

  • View
    41

  • Download
    0

Embed Size (px)

DESCRIPTION

Vacuum Analysis of PS Sector 20. C. Pasquino, P. Chiggiato, J. Hansen, P. R. Demarest. outline. PS sector 20 : vacuum layout Electrical Network – Vacuum analogy: principles Vacuum simulations & results Conclusions & accomplishments Acknowledgements. PS sector 20 vacuum layout. - PowerPoint PPT Presentation

Citation preview

Page 1: Vacuum Analysis of PS Sector 20

C. Pasquino, P. Chiggiato, J. Hansen, P. R. Demarest

VACUUM ANALYSIS OF PS SECTOR 20

MTE MEETING - 13TH SEPTEMBER 2012

Page 2: Vacuum Analysis of PS Sector 20

MTE MEETING - 13TH SEPTEMBER 2012

OUTLINE

PS sector 20 : vacuum layout

Electrical Network – Vacuum analogy: principles

Vacuum simulations & results

Conclusions & accomplishments

Acknowledgements

Page 3: Vacuum Analysis of PS Sector 20

MTE MEETING - 13TH SEPTEMBER 2012

PS SECTOR 20 VACUUM LAYOUT

- 16 Sputter Ion Pumps (SIP) 220 l/s;

- 5 Penning gauges : VGP13, VGP13a, VGP16, VGP17, VGP18.

Goal: to evaluate how the installation of the dummy 15 is going to affect the pressure profile in the PS ring

Page 4: Vacuum Analysis of PS Sector 20

ELECTRICAL NETWORK – VACUUM ANALOGY: PRINCIPLES

MTE MEETING - 13TH SEPTEMBER 2012

][

][][

ohm

AV R

IV

]/[

/

][

sleff

slmbar

mbar SQ

P

VACUUM ELECTRICAL NETWORK

Volume Capacitance

Conductance Resistance

Flow Current

Pressure Voltage

Qin

Page 5: Vacuum Analysis of PS Sector 20

ELECTRICAL NETWORK – VACUUM ANALOGY:DUMMY15

CONDUCTANCE CALCULATION

MTE MEETING - 13TH SEPTEMBER 2012

ma M

RTAC2

aCC

T temperature; R gas constant; Mm molecular mass; Area of the entrance; α transmission probability;

MOLFLOW*

*program written by R. Kersevan

Page 6: Vacuum Analysis of PS Sector 20

MTE MEETING - 13TH SEPTEMBER 2012

ELECTRICAL NETWORK – VACUUM ANALOGY: OUTGASSING DATA

Non baked vacuum line: water vapor outgassing Hydrogen outgassing (200-300 h of pumpdown) Beam losses: Ion Induced Desorption H2, CO, CO2,CH4

2

9

**

][10*3

2 cmslmbar

htQ OH

2

12

**10*3

2 cmslmbarQH

The desorption yield depends on:• the nature of the ion;• Its energy;• Its angle of impingment;• Temperature of the

substrate;• Dose (cleaning effect).

Measurements on protons by W. Fischer (Brookhaven National Labs) show a < 1. Safety factor of 10 has been considered for the simulations.

E. Mahner, PRST

Page 7: Vacuum Analysis of PS Sector 20

MTE MEETING - 13TH SEPTEMBER 2012

EQUIVALENT ELECTRICAL NETWORK – SECTOR 20

Page 8: Vacuum Analysis of PS Sector 20

MTE MEETING - 13TH SEPTEMBER 2012

PS SECTOR 20 SIMULATIONS: PRESENT SITUATION

1*10-9 mbar

12 days

Case Study: intervention on Septum 16, January 2012

No beam losses induced total pressure rise

H2O + H2

VGP13 VGP13A VGP17 VGP181E-12

1E-11

1E-10

1E-9

1E-8

Parti

al Pr

essu

re (m

bar)

position (-)

VGP_sim_H2O VGP_sim_H2 VGP_sim_CO VGP_sim_CO2 VGP_sim_CH4

WITH BEAM LOSSES

1E+11 p/s

VGP13 VGP13A VGP17 VGP181E-12

1E-11

1E-10

1E-9

1E-8

P (m

bar)

position (-)

VGP VGP _sim

NO BEAM LOSSES

Page 9: Vacuum Analysis of PS Sector 20

MTE MEETING - 13TH SEPTEMBER 2012

PS SECTOR 20 SIMULATIONS: INSTALLATION OF DUMMY 15

No beam losses induced total pressure rise

VGP13 VGP13A VGP17 VGP181E-12

1E-11

1E-10

1E-9

1E-8

P (m

bar)

position (-)

VGP _sim VGP _sim_dummy

NO BEAM LOSSES

VGP13 VGP13A VGP17 VGP181E-12

1E-11

1E-10

1E-9

1E-8

Parti

al Pr

essu

re (m

bar)

position (-)

VGP_sim_dummy_H2O VGP_sim_dummy_H2 VGP_sim_dummy_CO VGP_sim_dummy_CO2 VGP_sim_dummy_CH4

WITH BEAM LOSSES

1E+11 p/s

Page 10: Vacuum Analysis of PS Sector 20

MTE MEETING - 13TH SEPTEMBER 2012

DUMMY 15 INSTALLATION: ACTIONS AND CONCLUSIONS

The simulations shows that the installation of dummy 15 is not going to have a major impact on PS sector 20 pressures profiles;

The installation of extra pumping group is not needed: the current vacuum system is going to cope with the gas loads coming from the dummy 15;

Contingency: installation of a blind flange in case of future need.