Consultants and Supervisor Engineers
Design and construction Management
Angelos Papavasileiou
Civil-Structural-Architectural Engineer
Angelos Papavasileiou Surveying and Geoinformatics Engineer
Georgios Iliopoulos Geologist Engineer
Euaggelos Mermigas Mechanical Engineer
Orestis Basileios Electrical Engineer
Vlachavas Dimitrios
Building Information3 Stories –Vacation House
0 Floor Level Flat 1 1 Upper Floor Flat 2 2 Upper Floor Semi Detached Flat 3 Roof Level Semi Detached Flat
138,70 m2 per Floor
476,10 m2 all levels
Budget 1.045.000 Euros
Technical Challenges
High falling gradient field
No access road
Unstable climate/weather conditions
Headwaters control
Rain water control
Rock falls in Construction site
Slow moving underground clay layers
Low Tension of ground σ=0,11MPa and Soil elastic modulus K=400 KPa/cm
Long distance of concrete construction site more than 60 Kilometres
Construction Management challenges
Long distance of Supplies contractors of the construction materials .
High material transfer cost.
4 months stop in the winder period.
Health and Safety challenges
Long distance from Hospital in the accident conditions .
High falling gradient field.
Quick daily change of the weather conditions.