1 V-8 Guidance on the application process and on completing this application form is available at from the Solent LTB website . One application should be completed per project. Applications are restricted to a maximum of 20 pages (excluding accompanying documentation). Please amend the sizes of the response boxes to suit your application. Accompanying Documentation Accompanying documentation should be restricted to: Letters of support from stakeholders; Map(s); and Scheme drawing(s). Deadline for applications Applications must be submitted to the Solent LTB by 1800 on Wednesday 12 th June 2013. Please submit electronic versions of this form along with any accompanying documentation to: [email protected] . Where email attachments sum to 10mb or above in file size, you should ensure that arrangements are made for these to be received by the LTB by the above deadline. Please note, your Project Application Forms will be published on the Solent LTB website. Section A: Applicant Information A1 Lead applicant name (Organisation) Portsmouth City Council. A2 Joint applicant name(s) if applicable Not applicable. A3 Lead applicant address Civic Offices, Guildhall Square, Portsmouth, PO1 2BG. A4 Bid manager details Name: Simon Moon Position: Head of Transport & Environment Employer: Portsmouth City Council Telephone: 023 9283 4092 Email: [email protected] Section B: Eligibility Check List B1 Is the project included within the Transport Delivery Plan (TDP)? Yes No B2 Is the project expected to have a clearly defined scope? Yes No B3 Is the project expected to drive employment and/or housing growth and/or solve a current or future transport problem that constrain economic and/or housing growth or that safeguards existing employment? Yes No B4 Is the project expected to provide sustainable access? Yes No B5 Is the project expected to comprise a 100% capital funding request from the Yes No

V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

1

V-8

Guidance on the application process and on completing this application form is available at from the Solent LTB website. One application should be completed per project. Applications are restricted to a maximum of 20 pages (excluding accompanying documentation). Please amend the sizes of the response boxes to suit your application. Accompanying Documentation Accompanying documentation should be restricted to:

Letters of support from stakeholders;

Map(s); and

Scheme drawing(s). Deadline for applications Applications must be submitted to the Solent LTB by 1800 on Wednesday 12

th June 2013. Please submit electronic

versions of this form along with any accompanying documentation to: [email protected]. Where email attachments sum to 10mb or above in file size, you should ensure that arrangements are made for these to be received by the LTB by the above deadline. Please note, your Project Application Forms will be published on the Solent LTB website.

Section A: Applicant Information

A1 Lead applicant name (Organisation)

Portsmouth City Council.

A2 Joint applicant name(s) if applicable

Not applicable.

A3 Lead applicant address

Civic Offices, Guildhall Square, Portsmouth, PO1 2BG.

A4 Bid manager details Name: Simon Moon

Position: Head of Transport & Environment

Employer: Portsmouth City Council

Telephone: 023 9283 4092

Email: [email protected]

Section B: Eligibility Check List

B1 Is the project included within the Transport Delivery Plan (TDP)?

Yes No

B2 Is the project expected to have a clearly defined scope?

Yes No

B3 Is the project expected to drive employment and/or housing growth and/or solve a current or future transport problem that constrain economic and/or housing growth or that safeguards existing employment?

Yes No

B4 Is the project expected to provide sustainable access?

Yes No

B5 Is the project expected to comprise a 100% capital funding request from the Yes No

Page 2: V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

2

LTB?

B6 Is the project supported by a local contribution (public and/ or private and revenue and/ or capital) of at least 25% of the overall project cost?

Yes No

B7 Will the project comprise a capital funding request from the LTB of over £2,000,000?

Yes No

B8 Is the project expected to deliver high value for money? Yes No

B9 Would the project be largely delivered between 2015-19? Yes No

B10 Is the project supported by the Local Transport Authority/ies whose area(s) within which the proposal would be delivered?

Yes No

B11 For a project that is on the strategic highway or rail networks is an in principle letter of support attached?

Yes N/A No

Section C: Project Summary

C1 Project title

Portsmouth and Havant Growth Zone – Dunsbury Hill Farm – Link Road to enable business and technology park.

C2 Headline project description (100 words)

The scheme involves provision of a link road from the B2150 Hulbert Road (just south of Junction 3 of the A3(M)) to the Dunsbury Hill Farm site, and a bus only link (with bus gate) to the east of the site to Woolston Road (Leigh Park). Once developed the site will create a new business destination for south Hampshire and become a visible gateway to the Solent. The high quality business and technology park will facilitate the growth of SMEs, with an overall emphasis on job creation and the provision of flexible working space. In addition to office space there will also be light and general industrial plus warehouse accommodation.

C3 Is this a request for a grant or a loan? Grant Loan

C4 Project costs.

Total Project Cost £8.540 million.

LTB Funding Request £3.540 million.

Local Contributions (Please specify source and whether they are confirmed)

£5.000 million.

From local public sector sources.

C5a Do alternative funding options exist to cover the full project cost?

Yes No

C5b If ‘Yes’ to C5a, please explain why LTB funding is being sought.

N/A

C5c If ‘No’ to C5a, please list other funding sources considered and reasons for rejection.

Solent LEP, Portsmouth City Council, and Southampton City Council submitted a Round 4 Regional Growth Fund bid (March 2013) to support of the Southampton-Portsmouth Wave 2 City Deal. The bid is for £13.3 million to provide the infrastructure required to deliver a £130.5 million growth programme at Watermark West Quay, Dunsbury Hill Farm, and Solent Lean Manufacturing Centre of Excellence. While we are confident that we have submitted a strong bid, there is no guarantee that funding will be awarded. Given the ‘transformational’ impact that the scheme would have on the Solent economy and the limited time associated with planning permission (7 years), an application is also being made for LTB funding which would be used to deliver the scheme if the RGF bid is unsuccessful. This application will be withdrawn if the RGF funding bid incorporating DHF is successful.

The City Council and Havant Borough Council have considered a number of innovative potential funding options in the past (e.g. tax incremental finance) but none of these have come to fruition either because of the market place or lack of legislation. Currently there is no certainty that such approaches will be successful or over what timetable.

Page 3: V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

3

C6 Describe the geographical area covered by the project

Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site lies immediately to the east of the A3(M) Junction 3, which links London to Portsmouth and Southampton. The residential area of Waterlooville lies to the west of the site, while Leigh Park estate lies to the east. The adjoining road is Calshot Road on the Leigh Park estate.

The site is situated within the Havant Borough Council boundary, but the land is owned by Portsmouth City Council.

Postcode: PO9 4HS

C7 Has any Equality Analysis been undertaken in line with the Equality Duty?

Yes No

No. However, the provision of the Link Road and subsequent development of the Business Park is expected to have a positive impact on equal opportunities, particularly given the proximity of Leigh Park an area of significant deprivation and high unemployment.

C8 Please indicate if any information contained in this application is of a commercial nature and should not be published. (State which questions)

Financial information in Section F. Last paragraph of D2 (reference to private engineering firm).

C9 Provide a list of the Partnership Bodies (if any) you plan to work with in the design, delivery and operation of the scheme.

Havant Borough Council (planning authority and promoter of employment opportunity through site allocation in their core strategy) – Letter of support provided in Appendix B.

Hampshire County Council (highway authority for planning purposes) – The Link Road is obviously aligned with the HCC proposal to carry out improvements to the existing Asda Roundabout (Purbrook Way / Hulbert Road Junction), which will also help to unlock development at the Dunsbury Hill Farm site.

Potential occupier supported by BIS.

Portsmouth University (consultee in the creation of the Science Park).

C10 Earliest start date October 2015.

Desired start date October 2015.

Delivery timescale (months) 18 months (includes 6 months float)

C11 Are any associated consents in place? If not, state when these are expected to be in place.

Approval in principle has been granted by Havant Borough Council (28/03/2103) for a hybrid permission comprising in part detailed planning for a new link road from the B2150 Hulbert Road (to the west) and Woolston Road, Leigh Park (to the east); and in part outline planning 61,789 sq. m of mixed use employment floor space (including Enterprise Centre) and 5,574 sq. m of hotel floor space.

The conditions attached to the resolution to grant are set out in D1 below.

C12 Is this scheme linked to any other applications to the LTB? If so, please provide the project title(s).

Yes. The long term vision for the South East Hampshire Bus Rapid Transit Network proposes a route from Havant to Waterlooville (and West Waterlooville Major Development Area) via Dunsbury Hill Farm. The provision of the link road will be key in delivering this east/west route. We also understand HCC will be submitting a separate bid to carry out improvements to the existing Asda Roundabout (Purbrook Way / Hulbert Road Junction).

C13 If you are the Lead Authority for more than one application, please prioritise your projects.

Applications have been prioritised as follows:

1 = City Centre Transport Scheme;

2 = The Hard Interchange;

3 = Portsmouth BRT and Highway Network Improvements Package;

4 = Dunsbury Hill Farm Link Road; Horsea Island Bridge Link.

Page 4: V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

4

The order of priority was agreed by the Members at an Informal Cabinet Meeting on 10th

June 2013.

Section D: The Strategic Case

D1 Provide a description of the transport project.

The scheme comprises the following elements which have been identified as critical infrastructure for unlocking development at the DHF strategic employment site (see Havant Core Strategy (adopted):

A new access road comprising a link from the B2150 Hulbert Road (just south of Junction 3 of the A3(M)) to the Dunsbury Hill Farm site (see Figure A2). The proposed access arrangements comprise a roundabout adjoining the B2150 to the west. From this traffic can distribute north to the A3(M) Junction 3 and south to Purbrook Way. The roundabout is proposed to include single lane approaches on the south and east arms, flaring to two lanes on the approach (approximately 20m before the give way lines). The north arm would include a single straight ahead lane and a dedicated left turn to the site approximately 80m north of the give way markings.

A further link will be provided through the site to the east into Leigh Park joining the existing Woolston Road three arm roundabout (see Figure A3). This will operate as a bus only link enforced via a bus gate and will also serve to provide a second point of access in emergencies. It will also provide access for pedestrians and cyclists. It will provide a west to east link across the borough that will bring significant social benefits.

The following complementary infrastructure has also been identified by HCC as important in terms of site improving the local highway network and accessibility:

Enlargement of the Hulbert Road/Purbrook Way (ASDA roundabout) by HCC, which will be a significant road improvement scheme for the Leigh Park area and assist in providing access to the Dunsbury Hill Farm site for approximately 15% of traffic (with the remaining 85% accessing the site from Jn3 of the A3(M)). This element is being progressed by HCC. Portsmouth City Council, subject to formal Member consideration, has offered to transfer land needed for the junction improvement and has agreed to make a financial contribution towards the works not exceeding £250,000. This matter is to be formally considered by Portsmouth City Council Cabinet at its meeting on 1

st July 2013.

A pedestrian link across Junction 3 of the A3(M) from Waterlooville to Dunsbury Hill Farm to be secured by means of a either a section 106 or 278 agreement.

This Expression of Interest therefore relates to the new link road from the B2150 Hulbert Road (to the west) and Woolston Road, Leigh Park (to the east), and the associated bus gate.

The design specification for the scheme, as set out in Transport Assessment Report (Atkins, March 2012) and Addendum Report (Jan 2013), comprises:

a four arm standard roundabout on Hulbert Road;

a lay by accessed off the fourth arm of the roundabout on Hulbert Road;

two way single lane carriageway between the proposed new roundabouts on Hulbert Road and Woolston Road and a new link into the existing roundabout on Woolston Road;;

a bridge over Hermitage Stream;

a 3m wide shared footway/cycleway to the north and a footway to the south of the link road between the hotel roundabout and Woolston roundabout;

a bus stop in each direction (located within lay bys between the hotel roundabout and the Woolston Road roundabout) constructed to BRT specification, including implementation of bus kerbs, bus shelter, and real time passenger information;

a bus gate at the Woolston Road roundabout to prevent access to the proposed development by general traffic; and

provision of a turning head on the link road west of the bus gate.

The development layout has been designed to avoid any perceived coalescence between Havant/Leigh Park and Waterlooville/Cowplain urban areas with careful consideration of the integration of built form within the landscape such that built form is screened by the established and proposed landscape structure.

Havant Borough Council at its Development Management Committee Meeting (28 Mar 2013) resolved to grant planning permission pursuant to the hybrid planning application, subject to the following conditions:

That, in liaison with the Highway Authority, provision is secured towards a scheme for the improvement of the Asda Roundabout*.

That, in liaison with the Ecologist at Hants CC, officers determine whether ecological information submitted

Page 5: V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

5

by PCC as part of its planning application is adequate, with regard to any risk to protected species and wider benefits of the development.

The satisfactory completion of a S106.

*The Asda Roundabout does not fall within the planning application boundary and is already congested (see E4).

The resolution to grant also included approval for outline planning permission in principle for two phases of development:

Phase 1 (13.2 ha):

­ 46,450 sq. m of mixed use employment floor space (including Enterprise Centre);

­ 5,574 sq. m of hotel floor space.

Phase 2 (7 ha):

­ 15,329 sq. m of additional employment floor space (80% to be split flexibly between B1 (business) and B2 (general industrial); B8 (storage and distribution) not to exceed 20% of floor space);

­ 150m - 180m landscaped gap between A3(M) and the development.

D2 Explain how the project will respond to current and/or future transport problems that constrain economic and/or housing growth or that will safeguard existing employment areas.

The development unlocked by the link road will form a new business gateway to South Hampshire from the A3 (M) and is intended to deliver a high number of locally-based accessible jobs in close proximity to Leigh Park and promote regeneration for the area by 2026. Implementation of the DHF Link Road will enable the business and technology park to progress, and this will assist in:

Creating confidence in inward investment

Creating green infrastructure

Creating greater prosperity in the local community (e.g. Leigh Park) where there is much worklessness.

At present, there is no access road to the Dunsbury Hill Farm strategic employment site. The scheme will provide the infrastructure require to construct, access and service the site, by providing a new link road from the A3(M) to the site and an bus only eastern link into Leigh Park. It will unlock the opportunity for the creation of a high quality (BREEM “excellent” standard) business and technology park with excellent transport connections, which could provide approximately 60,000 m

2 of new employment floorspace for start-up and

growing businesses. This is about a third of the total requirement for new employment in Havant Borough up to 2026, and represents a deliverable transformational opportunity for the sub region with significant GVA, employment growth, and social benefits. The proposed quality hotel with conference facilities would considerably enhance the offer of the Borough.

The site is located in an excellent location for developers, at the gateway to the Solent area, with good access to labour markets and other businesses. It has fast direct access to the A3(M) which provides fast access to London and Guildford (particularly following the opening of the Hindhead Tunnel) and the rest of the Solent area to the south. It is also located on a potential cross-borough Bus Rapid Transit route, which is part of a wider BRT Network being pursued by the Solent authorities.

The proposals for the development of employment uses at Dunsbury Hill Farm have been evolving for a number of years. The site at Dunsbury Hill Farm was first allocated for employment uses in the Revised Deposit Draft Havant Borough District-Wide Local Plan, February 2002. The justification for additional employment land was based on two important issues:

A serious lack of supply of good quality employment sites to attract inward investment and provide for expansion of existing businesses; and

Problems in the Havant economy evidenced by high out-commuting, higher than average unemployment (in some wards) and an over dependence on traditional manufacturing.

Lack of employment land - The Employment Land Review (ELR) undertaken by Havant BC in 2010 concluded that in terms of meeting future supply and demand for employment land over the period to 2026, the Borough is heavily dependent on two large sites (Dunsbury Hill Farm and Brockhampton West) successfully accommodating their floorspace allocations of 78,200 m

2. If this level of floorspace cannot be delivered on these sites during the

plan period, there will be a significant impact on the demand and supply balance.

The ELR describes the Dunsbury Hill Farm site as the Borough’s major ‘stand alone’ employment allocation offering huge development potential due to its scale, proximity to the highway network, green field character and public sector ownership (amongst other things). The site is described as representing a key opportunity to deliver major transformational change in the Borough as well as wider regeneration benefits on a sub-regional level. Alternative sites along the A27 were considered in 2000, but none provided the opportunities for raising

Page 6: V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

6

standards and facilitating inward investment in the same way as DHF.

Problems in the Havant economy - Many of the manufacturing firms that were once based in Havant have now left the area and there is a significant gap between the skills of the local population and the jobs available in the sub-region, and high levels of deprivation. The type of development permitted on the site will create a range of high and lower skilled jobs, and will help address a number of particular issues in Havant (including Leigh Park, located next to the site):

Low job density - There are only 0.64 jobs per resident in Havant compared with 0.82 in the SE and 0.79 in GB. This results in very high net out-commuting in Havant. The creation of a major employment site would create a significant number of jobs which could be filled by local residents. (NOMIS)

Low gross week pay - Havant residents earn on average £501/wk which is just below the national average of £502 but well below the SE average of £548 (NOMIS). Compared to South Hampshire and the South East region as a whole, the study area (Havant and Portsmouth) has a lower proportion of jobs in higher-value sectors such as finance and insurance, professional, scientific and technical services, and business administration and support services. This largely explained by the low qualification levels of the study area’s population.

High Unemployment - Recent unemployment figures (2010) show unemployment in the 4 Leigh Park wards to be double that of other wards in the Borough: Barncroft (5.4%); Battins (5.5%); Bondfields (5.1%); Warren Park (5.8%); average for Havant (2.9%).

Unlocking the Dunsbury site has the potential to create 1,315 net additional direct jobs and 578 net additional indirect jobs, and a further 1495 construction jobs (direct and indirect) over the life of the development. The majority of jobs will come in Phase 1 through a hotel development, creation of incubation space and an innovation centre focusing on the development of new enterprises.

The creation of a wide range of construction, office, industrial and warehouse jobs will provide local people, local skills and learning providers and local businesses with the opportunity to work in partnership to address the area’s skills gap and enable local people to fully capture the benefits of the new jobs in their area.

The Annual Population Survey’s Standard Occupational Classification indicates that Havant and Portsmouth have a higher than average proportion of people working in skilled trades occupations (11.3% compared to the regional average of 9.7%). This suggests that the local labour force is well prepared to take up the construction jobs that would be created by the scheme.

PCC has agreed, in principle, an Employment and Skill Plan for the construction/occupation phases of the development, as a part of the Section 106 agreement. This will ensure that a percentage of the local population will be employed during the construction of the link road. In addition, training and employment plans will be required to be submitted by major employers (e,g. the proposed hotel) ensuring that all posts are advertised through Jobcentre Plus and that workless applicants can access some form of pre-employment training.

Developer interest – PCC has commissioned external Property Consultants to assess market demand in any proposed development. The study confirms the proposal will attract interest provided the cost of providing the infrastructure is met by the public purse.

The Council has also been in confidential discussions with XXXX, a private engineering company based in the sub-region (see letter of support in Appendix B). ……. They have particular interest in DHF due to the location, scale and local skill base. ………

D3 Explain how the project will contribute to the Solent LEPs economic growth agenda.

Dunsbury Hill Farm was identified by PUSH as a key strategic employment site in a number of evidence-based studies including the Economic Development Strategy (PUSH, 2006), Economic Drivers and Growth (DTZ for PUSH, 2007) and Employment Floorspace Policy Framework (2008).

The development enabled by the site represents a deliverable transformational opportunity for the sub region with significant GVA, employment growth, and social benefits. It has the potential to create 1,315 net additional direct jobs and 578 net additional indirect jobs, and a further 1495 construction jobs (direct and indirect) over the life of the development. This will contribute significantly to the Solent LEP’s ambitions to deliver an additional 10,000 jobs over and above the baseline; leading to an additional £1 billion in GVA; and reducing the GVA per capita gap with the South East to 7%.

The development is also consistent with the following LEP strategic priorities:

Support new businesses, enterprise and ensure SME survival and growth - The high quality business and technology park will facilitate the growth of SMEs, with an overall emphasis on job creation, innovation, and the provision of flexible working space.

Page 7: V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

7

Develop strategic sectors and clusters (interconnected groups and businesses) of marine, aero and defence, advanced manufacturing, engineering, transport and logistics businesses - establishing the area as a business gateway, both on local and international levels.

The PUSH Economic Development Strategy (DTZ June 2010) recognises the importance of Advanced Manufacturing, Marine and Aerospace as generators of high GVA. Havant already has a strong industrial base with several multi-national companies present and a strong local supply chain exists to service the needs of new businesses that may relocate to Dunsbury Hill Farm. The strategy also recognised the importance of developing new sites and premises, such as Dunsbury Hill Farm, to facilitate growth (Action 3: Ensuring Sites & Premises to Facilitate Growth).

Dunsbury Hill Farm has been identified as one of six economic growth hubs which are key to the Solent City Deal.

PUSH provided the funding to enable studies to be undertaken to prepare the planning application.

D4 Explain how the project fits with Local Transport Authority objectives and Local Plans.

Fit with local transport objectives is summarised below:

LTP3 Objective Impact Evidence

Reduced dependence on the private car through an increased number of people choosing public transport and the ‘active travel’ modes of walking and cycling

See D5.

Improved awareness of the different travel options available to people for their journeys, enabling informed choices about whether people travel, and how

See D5. Section 106.

Improved journey time reliability for all modes See E4.

Improved road safety within the sub-region See E5.

Improved accessibility within and beyond the sub-region See D5.

Promoting a higher quality of life See D2, E3, E9, E13

Fit with Local Plan:

The Havant BC Core Strategy sets out the framework for future development and growth in the Borough over the period to 2026. In terms of policy guidance, the Core Strategy recognises the necessity to revitalise the economy of the Borough by providing high quality land and buildings for employment development and by promoting development that will help to raise skill levels and employment opportunities. Support for advanced manufacturing is identified as a priority for the future of the local economy and the Core Strategy also supports the growth of the marine based and tourism sectors. The Core Strategy identifies five strategic sites that are critical to the delivery of the overall vision, Dunsbury Hill Farm being one of them.

Policy CS2 Employment states that the Council will seek to accommodate flexibly a net total of 162,000 m2 of

new employment floorspace between 2006 and 2026 as follows: 75,000 m2 of B1 offices; 45,500 m

2 of B2

manufacturing; and 41,500 m2 of B8 warehousing.

Policy CS18.3 identifies Dunsbury Hill Farm as a strategic site, critical to achieving the Core Strategy vision.

The Core Strategy also recognises that addressing the skills gap in the area is of equal importance for regeneration.

D5 Does the project improve sustainable access? If so, is this to a town, city centre or major employment area?

Yes – Particularly between DHF site and Havant / Leigh Park / Waterlooville, and between Havant and Waterlooville Town Centres.

Bus access - The DHF Transport Assessment (Atkins, March 2012) outlines how the proposed infrastructure will assist in the delivery of plans for a Havant Cross Borough Bus Service connecting Waterlooville to the west and Leigh Park to the east of the A3(M) corridor. It is envisaged that this bus route will use the Hulbert Road access and the Woolston Road bus-only link and cross the site (see Figure A3). This will substantially reduce the journey time between Leigh Park and Waterlooville.

Portsmouth City Council is committed, through the provision of the infrastructure, to the Cross Borough Bus Service being facilitated as part of the development at Dunsbury Hill Farm. Discussions have been held with HCC, TfSH and local bus companies to consider the opportunity of a linkage to the wider BRT network. A letter demonstrating this is provided in Appendix B. Longer term proposals by TfSH have been outlined for a BRT link from Havant via DHF to ‘West of Waterlooville Major Development Area’ with its 3,000 new homes; providing

Page 8: V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

8

significant opportunity for sustainable access to / from West Waterlooville, Waterlooville, Dunsbury Hill Farm, and Havant.

In addition these access points will enable the existing local bus routes to enter and leave the site from either the east or west of the A3(M) without needing to travel through the site. New bus infrastructure on the link road in the form of a bus turn round or bus interchange will enable the site to be served by any future Cross Borough service and the existing local bus services. The development site thus provides the opportunity for a direct link to connect the existing bus routes 39 and 23 into and potentially to the west of the site. A letter of support from First Group is provided in Appendix B.

Pedestrians and cyclists – As specified in the planning application, the main pedestrian and cycling access route to the site will be from the east side at Woolston Road in Leigh Park, and to the west via the existing bridleway the crosses the A3(M). This will provide pedestrian and cycling connections between the site and Leigh Park and Havant. Isochrones plots (see Figure A4) show that there is a considerable population living in walking and cycling distance of the DHF site.

Within the site, it is proposed that a 3 metre wide shared footway / cycleway is provided to the north of the link road, and a 2 metre wide footway to the south of the road, with crossing points at key locations. An existing bridleway passes through the development site along Park Lane and provides a popular pedestrian and cycle link between Leigh Park and Waterlooville (see Figure A2).

Further detail relating to new pedestrian routes and cycleways will be addressed as part of Reserved Matters applications with the aim of providing enhanced links between the new development areas and Leigh Park and Havant and the wider countryside.

Travel plan - Measures to promote sustainable travel will be developed as part of the Travel Plan for the site, required as part of the S106 agreement. In addition it is proposed that a Car Park Management Strategy would be implemented at the site to include a parking allocation system based on needs-based permit criteria. The Travel Plan will be led by a dedicated Travel Plan Co-ordinator on site, supported by a Travel Plan steering group and strong marketing / communication. To ensure continuous effectiveness of the Travel Plan, it will be monitored through annual travel surveys for the first three years of occupation and periodically thereafter.

Mode share - The forecast 2026 mode share is: car (74%), public transport (2%), walking and cycling (24%) (Transport Assessment, Atkins, March 2012, based on forecasts from the Sub-Regional Transport Model). Whilst public transport accounts for only 2% of total predicted trips, SRTM still predicts a demand for 258 two-way or 129 one-way trips to the site by bus across the day. This would support demand for a frequent bus service especially during peak periods.

D6 Does this project form part of a wider programme of investment? If so, what is the wider programme and how critical is LTB investment for this project to the successful delivery of the overall programme?

Yes, DHF represents an important element of a wider programme of investment in developing the advanced manufacturing, marine and aerospace sector within the sub-region. For example, Portsmouth and Southampton authorities have recently submitted a Wave 2 City Deal EoI (Jan 2013) to address the complex challenge associated with facilitating the growth and diversification of our maritime sector. The focus of the bespoke part of the Portsmouth and Southampton City Deal is to deliver enabling infrastructure and assemble land to bring forward the development of seven other key sites (Royal Pier, Itchen Riverside, Marchwood, Watermark Westquay the Portsmouth Naval Base, Tipner/Horsea Island and the Northern Quarter) around the Southampton/Portsmouth Waterfronts, allowing growth in this sector and the associated sub-sectors of transport and logistics, defence and advanced manufacturing, the visitor economy and the complex supply chains linked to research and innovation. The proposed City Deal has the potential to unlock £1.5 bn of investment and generate significant growth. The Government has informed the Solent authorities that their EoI has been fast-tracked, and following a period of negotiation (currently in progress), wish to sign a deal in July 2013.

The creation of an E-W bus only link would form part of wider investment in developing a BRT network for the sub-region (see TfSH Transport Delivery Plan, Feb 2013).

D7 What will happen if funding for this project is not secured?

PCC commissioned a market report from Property Consultants JLL (November 2012). This concludes that the current market evidence is that the business park will not be developed by the private sector unless the risk of the enabling works is removed by the public sector. The report also sets out a number of scenarios that will improve the viability of the proposal and delivery timetable, e.g. the extent of public sector contribution to the infrastructure , the mix of employment uses and improved market conditions. Developers confidence in the

Page 9: V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

9

scheme will undoubtably be linked the deliverability of any planning consent issued.

The site has been the subject of developer interest for many years. As recently as 2008, the site attracted significant interest through a market procurement exercise. The process got as far as preferred bidder stage with a leading national developer but negotiations fell away with the onset of the recession and the development market contracted. The critical factor from that exercise and subsequent discussions with the private sector developers is that the risk of the enabling works was considered too significant. Given the current market, it is highly probable that without public support to provide the infrastructure, the development of this site will be delayed for 10-15 years. The next market led opportunity is likely to be at the peak of the next upturn in the market, at which point the risks may be considered acceptable with an adequate number of pre-lets and little speculative building. The planning permission granted to date (for the link road and associated development), however, only lasts for 7 years and there is no guarantee that approval would be given again at a later date.

D8 Is this a project that has funding from another LTB area or is located within another LTB area? If so, please explain the benefits to the Solent LTB area.

See responses to D2 – D6, which relate to the Solent LTB area.

Section E: The Economic Case

Transport Economics

E1 Indicate the level of Benefit Cost Ratio (BCR) that this scheme would be expected to realise following WebTAG appraisal?

<1

=/>1 - <1.5

=/>1.5 - <2

=/>2 - <4

>4

Please describe the basis of the expected BCR.

Employment benefits

Analysis undertaken for a previous RGF Bid in 2011, prior to planning application being secured and based on a scheme cost of £8 million (current estimate is £8.540 million), showed that at least 600 jobs would need to be created to generate a positive BCR. Further analysis showed that the creation of 1300 jobs would generate a BCR of 2.28, while the creation of 1950 jobs would generate a BCR of 3.76 (based on employment benefits alone). BCR estimates were considered to be at the low end of the expected range, and therefore represent a conservative estimate.

This calculation has been based on Department for Work and Pensions valuations of the average gross earnings for Jobseeker Allowance claimants entering employment, supplemented by the net impacts on health costs and crime, related to reducing unemployment. The derived value per job was set against an expenditure of £8 million to determine a range of projected BCRs dependent on the level of employment generated.

Response E8 shows that the site is expected to generate a net additionality benefit to the region of 1,315 FTE direct permanent jobs and 578 FTE indirect permanent jobs, suggesting that a BCR of at least 3 is realistic (based on employment benefits alone).

Net GVA benefits

Inclusion of the net GVA benefits increases the BCR significantly. For example, assuming only 25% occupancy of the Phase 1 development in 2018, gives a first year discounted benefit of £13.06 million, when converted to 2010 prices and values; or a first year discounted benefit of £26.12 million at 50% occupancy.

Increase in land value

Further benefits would be derived from the increase in land value.

The current land value reflects existing use as poor grade agricultural land. Land for development purposes attracts significantly higher values which in this case will be derived provided the infrastructure costs are met by the public sector, and market conditions improve. The value that the land owner receives will ultimately be determined by the viability of the project and only after an investor has received a return on the risk of their investment.

Other benefits

Additional benefits which have not been considered within the above BCR include journey time savings for cars

Page 10: V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

10

and particularly public transport users (see E2); a change in the overall cost of travel associated with safer journeys to work (see E3), reliability improvements (see E4) and safety benefits associated with shorter journeys (see E6). These are benefits which are likely to contribute to the BCR at later stages of the business case process based strategic transport modelling outputs.

Collectively, these benefits suggest a BCR in excess of 4:1, indicating that the scheme represents very high value for money.

*The Asda Roundabout improvements (£5.3 million) have not been included in the scheme cost, as others are looking at opportunities to address existing problems at the junction.

E2 Where a BCR is unavailable, please use the space below to provide the data requested within the guidance to this question that is not captured elsewhere in this application.

-

E3 What impact is the project expected to have end-to-end journey time?

0->2min reduction (car)

2->5min reduction

=/<5min reduction (bus)

Please describe the basis of the expected end-to-end journey time reductions.

The DHF site is expected to generate 9,388 two-way car trips and 258 two-way bus trips on completion in 2026 (Transport Assessment, Atkins, Mar 2012).

As part of the Transport Assessment work, journey times were analysed for two routes (with and without development):

Route 1 – starts from the A3(M) Junction 4 to A3(M) Junction 3 (Northbound) to Hulbert Road (Southbound) to Purbrook (Westbound) to A3(M) Junction 4 on-slip; and

Route 2 – starts from A3(M) Junction 4 Northbound off-slip to Purbrook Way (Eastbound) to Hulbert Road (Northbound) to A3(M) Junction 3 to A3(M) Junction 4 (Southbound).

The journey time results show that the total journey times on both routes in both peak hours would increase and most notably on Route 1 northbound in the PM Peak by 91 seconds. However some of the journey times on the individual route segments would see only a minimal increase, for example the A3(M) northbound and southbound and Hulbert Road / Purbrook Way Roundabout to A3(M) Junction 4. The greatest journey time increase is on the section of route from A3(M) Junction 3 to the Hulbert Road / Purbrook Way Roundabout, which would increase by 87 seconds. This is due to the longer queues on Hulbert Road southbound approaching the roundabout. Only minimal or no delays are predicted elsewhere on the network.

A resolution to grant planning permission has been made subject inter-alia that in liaison with the Highways Authority provision is secured towards a scheme to improve this roundabout (which would result in an overall improvement in journey time reliability). The preferred design (set out in the Transport Assessment Addendum Report) comprises a partly signalised elongated roundabout and traffic calming measures at the Park House Farm Way junction, which would be retained as a priority junction. This will address the issues referred to above. This element is being progressed by HCC. Portsmouth City Council, subject to formal Member consideration, has offered to transfer land needed for the junction improvement and has agreed to make a financial contribution towards the works not exceeding £250,000. This matter is to be formally considered by Portsmouth City Council Cabinet at its meeting on 1

st July 2013.

The above impacts would be further offset by the provision of the new link road which will enable the proposed Havant Cross Borough Bus Service connecting Waterlooville to the west and Leigh Park to the east (see D5), substantially reducing journey times (by >5 mins) between these two locations.

E4 Is the project likely to have an impact on the cost of travel? If so, describe briefly what that will be?

Existing trips – Inevitably, increases in traffic on the local network will result in an increase in the cost of travel (vehicle operating costs) for some existing car trips, however any increase in cost will not be substantial and likely to be offset by complementary improvements to the Hulbert Road / Purbrook Way Roundabout (see above).

VISSIM modelling of the link road, undertaken for the Transport Assessment, showed that the local highway network is predicted to experience an increase in queues and delays between the future base and with development scenarios on most approaches. The impacts are most significant at the Hulbert Road / Purbrook Way roundabout as well as on the Hulbert Road (W) approach at A3(M) Junction 3 and the northbound off slip at A3(M) Junction 4. All queues were predicted to be within available queuing space. However, the Hulbert

Page 11: V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

11

Road / Purbrook Way roundabout experiences increased congestion with queues even without the proposed development (i.e. between the 2011 Base and 2019 and 2026 future base scenarios). These impacts are apparent in particular on the Purbrook Way (E and W) arms, and Hulbert Road (S). It is also apparent from the Vissum results that the queues and delays do not increase on all approaches; some approaches would see a decrease with development. This is a result of different flows on all arms, as a result of increased demand, affecting the priority and gap opportunities at the roundabouts, and hence different affects on queues and delays. The impacts would be offset by improvements to the Hulbert Road / Purbrook Way Roundabout.

As part of the Transport Assessment, merge assessments were also carried out for the slip roads at Junctions 3 and 4 on the A3(M) and these were shown to remain within design standards with the forecast traffic flows.

Some shorter journey to work trips – The development unlocked by the scheme will generate new employment opportunities within the locality (particularly for workers living in Leigh Park and Havant) who may benefit from shorter and cheaper journeys to work. This will be particularly beneficial given that Havant residents earn on average significantly less than the SE average and less than the national average. (See D2 for context)

Further analysis will be undertaken as part of the preparation of a Strategic / Outline Business Case, using SRTM to estimate the expected change in trip distribution and the change in overall network travel cost.

E5 Is the project expected to improve journey time reliability?

The provision of the new, bus only link road through the site will help deliver reliable journey times for bus users.

E6 Is the project expected to improve journey safety?

Neutral impact expected – As part of the Transport Assessment (Atkins, Mar 2012), accident data for the last 5 years and within the study area (including the A3(M) Junction, Hulbert Road/ Purbrook Way Roundabout, and related links), was obtained and reviewed. This showed that the majority of accidents were due to driver error or behaviour.

If shorter journeys to work can be demonstrated (see E4), this will give a positive safety impact due to a reduction in vehicle kms.

E7 Does the project make better use of existing transport infrastructure or complement / multiply the benefits of existing transport infrastructure / operations?

Yes, the bus gate provides the opportunity for existing bus services (23 and 39) to serve the site and locations to the west of the site. Also makes better use of the capacity at Jnct 3, A3(M), which will carry 85% of traffic to this site.

Page 12: V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

12

Economic Growth Please use the Part B application form (Excel Spreadsheet) for questions E8-E11.

E8

What are the expected employment (direct or indirect) outputs? (Complete the table below and use the space below to provide any explanatory information of the numbers.) Part B

Direct permanent jobs (B1, B2, B8, C1)

Direct jobs have been calculated based on floorspace by land use, in accordance with the HCA’s Employment Densities Guide (2010), as follows:

Use Class Floorspace (bedrooms in the case of the hotel)

Employment Density (m2

per FTE employee/ bedrooms per FTE employee)

FTE Jobs (gross)

B1 (offices, light industry) 18,580 m2 10 m

2 1,858

B2 (general industrial) 18,580 m2 47 m

2 395

B8 (storage and distribution) 9,290 m

2 70 m

2 133

C1 (hotels) 5,574 m2

95 bedrooms -

2 bedrooms

190

Phase 1 total 52,024 m2 - 2,576

B1 (offices, light industry) 7,665 m2 10 m

2 766

B2 (general industrial) 7,665 m2 47 m

2 163

Phase 2 total 15,329 m2 - 930

TOTAL 67,354 m2 - 3,506

Source: Dunsbury Hill Farm Environmental Statement, Tables 7.4 and 7.5 (Atkins, Mar 2012)

It is assumed however, that 50% of the businesses based at the site would move from elsewhere in the region (rather than be new start-ups or businesses currently based outside the region. It follows therefore, that 50% of the jobs created would not be additional new jobs but merely displaced from elsewhere in the region. In addition, it is likely that some additional employment would occur in the area without the development of DHF. A reference case has therefore been assumed, using a deadweight assumption that 25% of non-displaced jobs (i.e. 438) would have been created anyway.

The net additionality benefit to the region, assuming 50% displacement and compared with the reference case, is estimated at 1,315 FTE jobs. (DHF Env Statement, Table 7.7)

Indirect permanent jobs

In addition to the above direct permanent jobs, further indirect jobs would be supported locally and regionally through supply linkage and income multiplier effects, i.e. relating to purchases made as a result of the development and further purchases associated with linked firms alongside the supply chain as well as local expenditure as a result of those who derive incomes from the direct and supply linkage impacts of the development. Composite multipliers for the English Partnerships Additionality Guidance (2008, Table 4.8) have been used to calculate indirect jobs: 0.44 * 1753 net regional jobs after 50% displacement = 771 FTE jobs.

The net additionality benefits to the region, compared with the reference case, is estimated at 578 FTE jobs. (DHF Env Statement, Table 7.7)

Construction jobs (Direct)

In accordance with the guidance from the LTB, the estimate of construction jobs is based on 12.5 FTE jobs for every £1 million spend on physical infrastructure:

Cost of constructing new road layout = £8m (incl. 25% contingency; see F1). Jobs = £8m * 12.5 = 100 FTE jobs.

Cost of constructing the development sites (both phases) = £75 million (see H1). Jobs = £75m * 12.5 = 938 FTE jobs.

Indirect jobs related to construction

In addition to the above construction jobs, further indirect jobs would be supported locally and regionally through supply linkage and income multiplier effects. This includes local firms supplying construction materials and equipment and construction workers spending part of their wages in the local economy. Assuming a composite multiplier of 1.44 at the regional level (English Partnerships Additionality Guide, Third Edition, 2008), the construction of the scheme could indirectly support a further 457 jobs regionally (0.44*(100+938).

The total number of construction jobs created is 1495 FTE jobs. Note, the estimated number of construction

Page 13: V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

13

jobs is slightly higher than in the Environmental Statement (March 2012), which assumed only 10.4 jobs per £1 million construction spend.

Total Jobs

Total jobs created (direct or indirect) 1,315 net additional FTE jobs (Phase 1 = 966, Phase 2 = 349)

Total Jobs safeguarded 578 net additional FTE jobs regionally (Phase 1 = 425, Phase 2 = 153)

Total construction Jobs created 1038 FTE jobs (100 FTE jobs related to link road + 938 FTE jobs related to development of employment land)

Total indirect jobs related to construction 371 FTE jobs (regionally)

Total new jobs 3,302 FTE net jobs within the region

E9 Identify the expected total employment floorspace that the transport project will support (directly or indirectly). Provide the total number, and use the space provided to explain how the transport project will support the employment floorspace.

Total employment floorspace 67,354m2

Outline planning permission, in principle, has been granted for 67,354m2 (GFA) of employment floorspace

comprising B1, B2, B8 and C2 uses (but not comprising more than 20% B8 use) – see table above.

Development of the DHF site cannot commence until construction of the access and link road has been commenced, and it is considered that providing the entirety of the link would be the most cost effective solution. For the purposes of this bid, it is assumed that the site will be constructed in two phases, commencing in 2016 and 2020. However in practice, the market will dictate the development period reflecting level of occupier interest and requirement. The hotel is intended to be internal-facing and provide conferencing facilities and accommodation for visitors to the employment zone.

E10 How many housing starts is the transport project expected to support (directly or indirectly). Provide the total number, and use the space provided to explain how the transport project will support the housing starts.

Total housing starts -

There is no housing development directly associated with this scheme.

E11 Identify the expected GVA impact of the transport project.

Construction stage GVA £30.710 million (see Part B)

GVA per capita £94.417 million (see Part B)

Note - The above Operational GVA has been calculated using the approach and benchmarks outlined in the LTB guidance. The value is somewhat higher than the value of £72.5 million estimated in the DHF Environmental Statement. This was based on an average GVA per capita of £34,800 in the Urban South Hampshire area and £38,300 in the South East region in 2008 (a conservative estimate given the current timescales and nature of the development). Both totals have been based on the net additional direct and indirect jobs in the region (estimated as 1,893) rather than the gross number of direct and indirect jobs (4276).

E12 Describe any wider economic benefits expected to contribute to the overall value for money of the project.

The scheme will over time (subject to a minimum level of public sector investment ) generate limited capital receipts for Portsmouth City Council (from the sale of land), which could be reinvested in enabling works at other development locations within Portsmouth, including Portsmouth Naval Base, Tipner / Horsea Island Regeneration Area, and the City Centre. The Solent (Wave Two) City Deal EoI (submitted Jan 2013) identifies these locations as priority sites within the sub-region requiring infrastructure and enabling works to unlock significant development, as part of a strategy to facilitate the growth and diversification of the region’s maritime sector.

Local Environment

E13 Explain the impact of the project on emissions from transport and disturbance from noise. What impact will this will have on the local area?

Air quality (Env Statement, 2012) - Air quality in the vicinity of the site is currently good, with pollutant concentrations below the Air Quality Strategy (AQS) objectives. Results of the local air quality assessment have shown that changes in concentrations of NO2 and PM10 due to the proposed development are small or imperceptible at all receptors, in both future years of assessment. As concentrations would be expected to

Page 14: V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

14

remain below the AQS objectives both with and without the proposed development, the overall effect on air quality is considered to be negligible.

There are 444 properties within 200 metres of the development. Provided dust mitigation measures are implemented during construction, the risk to these surrounding properties from dust nuisance would be negligible. Traffic travelling to and from the Site during construction would be most likely to use the A3(M) for access, with construction workers additionally using the local road network. The effect of construction traffic is expected to be negligible.

Noise and vibration (Env Statement, 2012) – The operation of the site, including the car parks, site traffic and night time deliveries is unlikely to have a significant effect on the nearest noise sensitive properties. The noise from the A3(M), the access road, the car parks and night time deliveries is most likely to affect the proposed hotel. The design of the layout, construction and orientation of the hotel can influence the noise levels within the hotel bedrooms. An increase in traffic flows by 25% or a decrease by 20% would result in a 1 dB noise change. It is expected that the additional road traffic generated by the proposed development would be sufficiently low volume not to affect the existing road network.

With appropriate noise mitigation measures and good working practices, it would be possible to minimise the duration and extent of significant construction noise effects.

E14 What is likely to be the overall impact on the natural environment?

Beneficial - The proposed development has been designed on the basis that this large site should continue to function as a strategic gap between Waterlooville and Havant, involving a 150-180m wide landscaped buffer between the employment uses and the A3(M). Existing important trees, particularly protected trees, and hedgerows, within the site will be retained where possible. The proposals also seek to preserve the site’s important habitats and features of ecological value as far as possible.

In addition, the Hermitage Stream Corridor will be enhanced through the restoration of a section of the stream and provision of a new wetland feature to provide both wildlife benefits and increased flood storage capacity. Appropriate sustainable drainage system (SUDS) techniques will be incorporated to ensure that greenfield run-off rates are achieved.

The operational effects of the proposed development are considered to be neutral.

Enhanced green infrastructure links between Havant Thicket Reservoir, Dunsbury Hill and the amenity open space west of Ramsdale Avenue on the edge of Leigh Park are proposed, in accordance with the requirements of the Core Strategy.

E15 What is likely to be the overall impact on streetscape and/ or the urban environment?

The site layout has been designed to avoid any perceived coalescence between Havant/Leigh Park and Waterlooville/Cowplain urban areas with careful consideration of the integration of built form within the landscape such that built form is screened by the established and proposed landscape structure.

Rooflines of buildings within Phase 1 will be below the 40m contour to exploit the screening effect of Beech Wood and planting alongside the A3 (M) corridor. Phase 2 rooflines will be below the 45m contour to ensure that Dunsbury Hill and Bell’s Copse and the planting to the east of Park Lane Stream will screen views into the site.

Section F: The Financial Case

F1 What is the total cost of the project?

£8.540 million

Activity

Feasibility

Studies

Design

Stage

Approvals

Process

Planning

Fees

Funding

Bid costs

25%

Cont'cy

Phase 1

Summary Build Costs 25% Cont'cy

Total Cost Ph

1 + Build

Dunsbury Hill Farm

Access Road £40,000 £300,000 £75,000 £25,000 £0 £100,000 £540,000 £6,400,000 £1,600,000 £8,540,000

Totals £40,000 £300,000 £75,000 £25,000 £0 £100,000 £540,000 £6,400,000 £1,600,000 £8,540,000

The above costs were developed as part of the initial feasibility work on the site, and are based on initial design

Page 15: V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

15

drawings and site surveys. To allow for these variable levels of design a contingency of 25% has been added to both the development costs and the construction costs.

The City Council with PUSH provided the resources for Phase 1 site investigation, preliminary design and applying for regulatory approvals for Dunsbury Hill Farm.

Cost do not cover any works associated with Hulbert Road/Purbrook Way (Asda) Roundabout (£5.3 million); which does not form part of planning application site and implementation would be undertaken by HCC. The proposed pedestrian / cycle route to the west; or environmental mitigation.

F2 What is the capital funding request from the LTB?

£3.540 million

F3 What percentage of the total transport project cost is the LTB request?

59%

F4 How is the remainder of the transport project cost to be funded?

From local public sector sources. Details to be confirmed.

F5 Set out the indicative funding profile in the table below

£m <2015-16 2015-16 2016-17 2017-18 2018-19 >2018-19 Total

LTB Capital Funding Sought

£0.540 m £1.500 m £1.500 m £3.540 m

LA Capital £2.500 m £2.500 m £5.000 m

LA Revenue

Total £0.540m £4.000m £4.000m £8.540 m

F6 Will the project require ongoing revenue support? If so, how will this be funded?

After completion of its construction it is intended the proposed new link will be adopted for highway purposes by HCC. The remainder of the proposed built form will become the responsibility of the appointed developer.

F7 Would funding awarded to this project comply with European State Aid regulations?

The Council is currently seeking advice on this issue.

Loan Applications

F8 Please list the source(s) of loan repayment.

N/A

F9 Please set out the preferred loan repayment term.

N/A

Section G: The Management Case

G1 Is the scheme deliverable within the 2015-19 period? If not, when will the project be delivered and will LTB funds be spent within the 2015-19 period?

Yes (see programme below). Approval in principal has already been granted (28/03/2103) in relation to a detailed planning application for the road link and parties are working together to enable a permission to be issued by the 31st July 2013. Subject to securing funding for the link road, marketing of the site could commence in the second half of 2013 and contractural negotiations completed to allow commencement on site in April 2015. Construction of the link road is expected to take 12 to 18 months.

G2 Is the scheme on the Strategic Road or Rail network? If yes, does the relevant infrastructure owner support this scheme and committed to its delivery within the 2015-19 period.

The scheme is not on the Strategic Road Network, but will impact on the A3(M). The Highways Agency was

Page 16: V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

16

consulted as part of the planning application process, and submitted a letter of support for the scheme and related development. Discussions are on-going in relation to detailed aspects of the scheme design.

G3 Does the scheme impact on public transport operations? If yes, are public transport operators supportive of the scheme?

Yes. A bus only link will be provided from the site to the east into Leigh Park joining the existing Woolston Road three arm roundabout, enforced via a bus gate.

Discussions have been held with HCC, TfSH and local bus companies to advise of the opportunity of a linkage to the wider BRT network. A letter demonstrating this is provided in Appendix B. In addition, First and Stagecoach were on the steering group for the BRT study, and were supportive of the proposals for a BRT link from Havant through DHF to Waterlooville, extended to West of Waterlooville MDA in the longer term.

A letter of support from First Group is also provided in Appendix B, confirming that they would be willing to extend their services into the DHF site.

G4 Demonstrate the design and implementation resources that will be in place to develop and deliver this project. Also confirm who the senior officer responsible for the delivery of the project will be.

A project manager will be appointed to oversee the development and delivery of this scheme. In addition, PCC is able to draw on the expertise and resources of its term consultants who are able to provide the skills required to develop and deliver this scheme. Portsmouth City Council, Hampshire County Council, and Havant Borough Council have a track record of working together over a 10 year period under existing partnership structures and local authority led collaborations such as the Partnership for Urban South Hampshire and Transport for South Hampshire. In addition, Solent LEP also has a strong tracked record in delivering schemes to unlock growth.

Senior Responsible Officer: Simon Moon.

G5 Confirm your commitment to maintain the asset post delivery.

After completion of its construction it is intended the proposed new link will be adopted for highway purposes by HCC. The remainder of the proposed built form will become the responsibility of the appointed developer.

G6 Set out the high level project stages.

Project Stage <2015-16 2015-16 2016-17 2017-18 2018-19 >2019

Planning consent conditions 2013-14

Procurement (3-6 months) 2014

Environmental mitigation strategy, habitat surveys, mitigation licence*

By Autumn 2014

Site clearance and habitat re-location* By Autumn 2014

Ground investigations, detailed design for highway and drainage, approvals from Highways Agency and Environment Agency (for realignment of Hermitage Stream and construction of bridge) (12 months)

By Autumn 2015

Construction – Carriageway, earthworks, bridge, bus gate, statutory diversions (12 months)

Oct 2015 – Mar 2017

(incl. 6 months float)

Construction of development sites, Phase 1** 2016-2018

Occupation of Phase 1 sites 2018+

Construction of development sites, Phase 2 2020-22

Occupation of Phase 2 sites 2022+

*Some initial site clearance required early in programme to allow access to site to carry out ground investigations. Vegetation clearance will have to be timed very sensitively due to the presence of dormouse (European protected species) on site, along with reptiles (including adders and their hibernacula), breeding birds and bats. No vegetation clearance should take place without a Natural England mitigation licence in place, which can take 3-4 months for preparation and approval.

** Actual development programme will be determined by market demand and occupiers requirements.

Page 17: V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

17

G7 Is the project likely to be publically acceptable?

Yes – Consultation undertaken in relation to the recent planning application (see below) resulted in a very positive response from statutory and non-statutory stakeholders. In particular, the Community Boards and the Development Consultative Forum support the proposed development of the site for employment uses and it was considered that adverse impacts could be addressed through design and mitigation solutions.

Concerns raised about access from the A3(M) have been addressed through design discussions with Hampshire County Council, the Highways Authority. The site is considered to be well located for access to the motorway network although there is concern about the impact on safety and congestion on the Strategic Road Network. There was considerable support for the east-west alignment to provide a public transport link between Hulbert Road and Woolston Road into Leigh Park.

The proposals have been further developed in discussion with a wide range of interests including the Hampshire County Council Highways Dept, the Highways Agency, Environment Agency, Natural England, Hampshire County Council Ecologist and officers of HBC.

G8 Has any consultation taken place or is any planned? If so, please summarise.

Havant Borough Council has led a lengthy historic consultation relating to the proposals for the Site which has been derived from policy proposals that have emerged from draft and final development plan documentation. For example the Site has been consulted upon in the context of the Core Strategy and other past iterations of the Local Plan, the supporting evidence bases, the 2007 Development Brief, the 2011 Masterplan proposal.

In addition, the following was carried out as part of the recent planning application:

The Indicative Masterplan was presented at joint Community Boards for Leigh Park, Havant and Bedhampton (20/06/2011); Waterlooville North and South (29/06/2011); and Warren Park Neighbourhood Forum (22/09/2011); and at the Development Consultative Forum (DCF) on 3rd October 2011.

An unmanned public exhibition was held at The Hub in Leigh Park between 3rd and 18th November and in the Plaza in the Atrium of the Havant Borough Council offices between 18th November and 7th December 2011. Feedback questionnaires were provided at the exhibition.

The proposals were also included on the Havant Borough Council and the PUSH websites.

A full report of the consultation process is included in the Statement of Community Involvement which accompanied the planning application: http://www5.havant.gov.uk/ACOLNETDCOnline/acolnetcgi.gov?ACTION=UNWRAP&RIPNAME=Root.PgeDocs&TheSystemkey=227407

G9 Has the project been successfully delivered elsewhere, and how transferable is the project to the Solent area?

There are many examples of similar schemes being delivered across the country. This scheme reflects the specific local circumstances, and there is no reason to assume that it will not be successfully delivered.

G10

Risk Likelihood (RAG)

Impact (RAG)

Comment / Mitigation

Market conditions (2016 onwards) may result in limited interest from developers, even if transport improvements are in place.

Low High There is considerable evidence demonstrating the need for good quality employment sites to attract inward investment and provide for expansion of existing businesses. As part of the Local Plan development process (early 2000s), Havant BC carried out a range of studies into the supply of and demand for employment land in the Borough. HBC considered that there was sufficient evidence available to justify the allocation of this site on the grounds that all other options had been considered and there were no other sites within Havant suitable for the use proposed or which could be delivered because of the land ownership. (Environmental Statement, 2012)

Demand and supply analysis has already been commissioned by PCC.

Hampshire County Council may fail to secure funding to deliver the improvements to the Asda Roundabout

Low Low Development of the site can commence and proceed without such improvements in place.

Page 18: V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

18

A Section 106 agreement may not be secured

Low High All relevant bodies are working towards resolution of matters by completion of the section 106 agreement by the 31

st July and a PPaA

entered into.

Rare bat species may be identified in the area

Medium Medium Rare bat species have been found 1.5km from the site in similar vegetation. If evidence is found on site, further habitat surveys may be required. Extra float provided in programme. Further mitigation studies being undertaken.

Delay in diversion of known services which results in delays to the programme and increased costs

Low Medium Undertake ground radar surveys during the design stage. Continue dialogue with utility companies and obtain programmes and their commitment. Undertake advanced works if feasible.

Increase in extent and cost of services diversions envisaged at bid stage.

Low Medium Ensure formal agreement formal agreement of works in place during the early part of delivery programme.

Changes to design after construction has commenced which could result in an extended programme and increased costs

Low Medium Include float within construction programme, early engagement with third parties and pro-actively operate the NEC early warning process.

Agreement of Land Department at Highways Agency.

Medium High A dialogue has commenced with the relevant party to secure necessary authorities are in place to enable the Section 106 agreement to be undertaken, but experience from other projects have highlighted risk of delay. Allow extra float in programme.

Section H: The Commercial Case

H1 What investment will this scheme lever in?

The estimated level of investment levered in (£74.873m) is based on the cost of building the employment sites for which planning permission has been granted, as follows:

Use Class Floorspace (bedrooms in the case of the hotel)

Cost / m2 gross internal floor area*

Cost / m2 gross floor area

Cost

B1 (offices, light industry) 18,580 m2 £1195 £1494 £27.753m

B2 (general industrial) 18,580 m2 £702 £826 £15.345m

B8 (storage and distribution) 9,290 m2 £603 £709 £6.590m

C1 (hotels) 95 bedrooms £1261 £1576 £8.786m

Phase 1 total £58.475m

B1 (offices, light industry) 6,132 m2 £1195 £1494 £9.159m

B2 (general industrial) 6,132 m2 £702 £826 £5.064m

B8 (storage and distribution) 3, 066 m2 £603 £709 £2.175m

Phase 2 total £16.398m

TOTAL £74.873m

*Cost rates from BCIS Online (http://service.bcis.co.uk/), including prelims. As used for DHF Environmental Statement (Atkins, Mar 2012).

The above figures exclude professional fees, finance costs and provision of new link road and inflation.

H2 What is the public investment private investment ratio?

Ratio = 8.8:1 (Private investment: £74.873m; Public investment = £8.540 million, see F1).

Page 19: V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

19

Section I: Monitoring & Evaluation

I1 Can the scheme be measured against these KPIs?

Net additional jobs created (directly or indirectly) or safeguarded in the Solent LTB area that can reasonably be linked to the transport intervention.

Yes No

Net additional housing or employment floorspace enabled as a consequence of the transport intervention (either directly or as part of a wider package of enabling measures).

Yes No

Private sector investment leveraged as a result of the delivery of the transport scheme (either directly or as part of a wider package of enabling measures).

Yes No

Local Gross Value Added (GVA) created or safeguarded.

Yes No

I2 Provide a short summary of how you will monitor and evaluate this project.

In addition to the above the following indicators will be monitored:

Mode share of journey to work trips

Bus patronage on services to DHF

Traffic flow, delay and accidents on local roads.

Number of private sector jobs created / safeguarded

Take up of employment by local residents

Other investment leveraged

Number of apprenticeships created

Section J: Declarations

J1 Senior Responsible Owner As Senior Responsible Owner for Dunsbury Hill Farm Link Road I hereby submit this request for prioritisation to the LTB on behalf of Portsmouth City Council and confirm that I have the necessary authority to do so. I confirm that I have read the supporting guidance and that Portsmouth City Council have the resources in place to develop a full transport business case should this proposal be short-listed and that Portsmouth City Council will have all the necessary statutory powers in place and resource to ensure the timescales in the application can be realised.

Name Simon Moon

Signed Signature provided with original

Position Head of Transport & Environment

Date 12th

June 2013

Page 20: V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

20

Figure A1: Site location map

Hulbert Road / Purbrook Way /

Asda Roundabout

Page 21: V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

21

Figure A2: Indicative Masterplan (including link road)

Source: Dunsbury Hill Farm Transport Assessment (Atkins, Mar 2012)

Page 22: V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

22

Figure A3: Cross borough bus service

Source: Dunsbury Hill Farm Transport Assessment (Atkins, Mar 2012)

Page 23: V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

23

Figure A4: Walking and cycling isochrones

Walking (400m, 800m, 1600m isochrones)

Cycling (2km, 5km, 8km isochrones)

Source: Dunsbury Hill Farm Transport Assessment (Atkins, Mar 2012)

Page 24: V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

24

Appendix B: Letters of support

Page 25: V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

25

Letter of support from Havant Borough Council

Page 26: V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

26

Letter of support from [private engineering firm], a potential investor

Confidential

Page 27: V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

27

Letter from PCC in relation to public transport provision, submitted as part of planning application

Source: Dunsbury Hill Farm Transport Assessment: Appendix H (Atkins, Mar 2012)

Page 28: V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

28

Correspondence from First Group, confirming that they would be willing to extend their services into the DHF site

Source: Dunsbury Hill Farm Transport Assessment Addendum: Appendix C (Atkins, Jan 2013)

Page 29: V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

29

Letter of none opposition from the Highways Agency, submitted as part of planning application

Page 30: V-8€¦ · Dunsbury Hill Farm is located on undeveloped (Greenfield) land between Waterlooville and Leigh Park on the north western side of Havant Borough (see Figure A1). The site

30