Pump Data Sheet
VP No. SEP-15-101-UW-P-41A-G-0001
Item No. UW-P-41A Page No. 1 OF 8 Rev. No. 3
Job No. 110670 Project Title Saudi Elastomers Project U&O, Carbon Black and MTBE Decomposition Unit Client Al-Jubail Petrochemical Company (KEMYA) Location Jubail Industrial City, KSA
No part of this document or the information it contains may be reproduced or transmitted in any form or by any means electronic or mechanical, including photocopying, recording, or by any information storage and retrieval system, without permission in writing from KEMYA or DAELIM
Pump Data Sheet Saudi Elastomers Project
U&O, Carbon Black and MTBE Decomposition Unit P.O. NO. PO-110670-15-101-001-A01 P.O. DESCRIPTION Centrifugal Pumps(API 610 10th, OH2)
ITEM NO. UW-P-41A ITEM DESCRIPTION Condensate Pumps with S.T DOCUMENT NO SEP-15-101-UW-P-41A-G-0001 DOCUMENT TITLE. Pump Data Sheet DAELIM INDUSTRIAL CO., LTD. SEOUL, KOREA Job. NO. 110670
A Approved without comments
AAN Approved As Noted
RFC Returned for Correction
U&O CB MTBE
SIGNED BY : DATE :
PURCHASER PERMISSION TO PROCEED OR REVIEW TAKEN ON VENDOR PRINTS SHALL NOT RELIEVE VENDOR FROM ITS RESPONSIBILITIES OR LIABILITIES UNDER THE PURCHASE ORDER.
SULZER KOREA
3 2014-02-14 ISSUED FOR APPROVAL W.H.CHOI W.H.CHOI S.H.CHA
2 2014-01-14 ISSUED FOR APPROVAL W.H.CHOI W.H.CHOI S.H.CHA
1 2013-08-29 ISSUED FOR APPROVAL Y.C.JO Y.C.JO S.H.CHA
0 2013-06-13 ISSUED FOR APPROVAL W.H.CHOI Y.C.JO K.J.LEE
REV DATE DESCRIPTION PREPARED BY CHECKED BY APPROVED BY
UTILITIES AND OFFSITES
Condensate Pumps
AL-JUBAIL PETROCHEMICAL COMPANY (KEMYA)
SAUDI ELASTOMERS PROJECT
EQUIPMENT DATA REQUISITION SHEETS
DOCUMENT NO.: SEP-15-101-UW-P-41A-G-0001
FOR
UW-P-41A
PROJECT NO.: 110670
BY
WHC
WHC
WHC
KJL
Issued for Approval
0
13-Jan-14
27-Aug-131
REV
13-Jun-13
3
2
17-Feb-14
DATE
YCJ
YCJ
YCJ
CHECKED
YCJWHC
DESCRIPTIONAPPR'D
KJL
KJL
Issued for Approval
Issued for Approval
Issued for Approval
KJL
SEP-15-101-UW-P-41A-G-0001_Pump Data Sheet_Rev.3.XLS
of
By: REV
1
2
3
4
5 1
6 NOTES: INFORMATION BELOW TO BE COMPLETED: BY PURCHASER BY MANUFACTURER BY MANUFACTURER OR PURCHASER
7
8 OPERATE IN SER./PAR.
9
10
11
12 2
13 2
14 2
15
16
17
18 / /
19
20
21 NPSHA
22 C MAX. C MIN.
23 @
24 bar MAX. bar MIN.
25 INTERMITTENT (STARTS/DAY)
26
27
28 LOCATION: (5.1.30) @29 MAX. cP
30
31
32 ELECTRIC AREA CLASSIFICATION (5.1.24 / 6.1.4)
33 CL GR DIV LIQUID (5.1.5) HAZARDOUS FLAMMABLE
34
35 SITE DATA (5.1.30)36
37 / MAX. MIN.
38 / IMPELLER TYPE
39 UNUSUAL CONDITIONS: (5.1.30) DUST FUMES EFFICIENCY40
41 STABLE
42 STEAM: TO43 MIN C C TO44 MAX C C 45 ELECTRICITY DRIVERS HEATING CONTROL
46 2
47
48
49 SYSTEM VOLTAGE DIP Other
50 COOLING WATER: (5.1.9) EST MAX SOUND POWER LEVEL
51 MAX. RETURN REMARKS:52 DESIGN
53 MAX ALLOW DP
m/h
m
2.1) Pump hydraulic power = 61.16 kW.2.2) Noise limit per Sabic SES S20-G01 and S20-G01-AE.2.3) See Remarks on page 7 for additional pump requirements.2.4) NPSHa includes a 0.9 m safety margin.
m
85
2.9
(5.1.16)
(5.1.10)
(5.1.16)db
212 max (SI units)
EST MAX SOUND PRESS. LEVEL
(5.1.11)SUCTION SPECIFIC SPEED
MAX. SOUND PRESS. LEVEL REQ'D db
db
MAX POWER @ RATED IMPELLER
NPSHR AT RATED CAPACITY
96.99 kW
290PREFERRED OPERATING REGION
ALLOWABLE OPERATING REGION
m/h
290
110.9
63.4
173.2
MAX HEAD @ RATED IMPELLER
63.4
KJL
m/h
CHLORIDE CONCENTRATION 0.01
WHC YCJ
Sulzer pumps
ELLIOTT
RELATIVE DENSITY (SPECIFIC GRAVITY):
MINIMUM CONTINUOUS FLOW:
110670-15-101-001
N/A
Appr'd:Chk'd:
0.663 1.013
%
Inquiry No.:SAP No.:
(6.5.2.4)ppm
NORMAL 88.5 100
Governing Case:
0.983
Design
429
Closed
66.7
mmIMPELLER DIA. RATED 533452
RATED POWER
N/A (5.12.1.9)
ppm
Sulzer pumps
(5.12.1.12)
bar [a]
SITE AND UTILITY DATA (5.1.3)MINMAXNORMAL
H2S CONCENTRATION
PERFORMANCE
1780 rpmRPM
OTHER
PROPOSAL CURVE NO. OHH 08-1-3-03
4.203 kJ/(kg.C)
C88.50.317 cPVISCOSITY
CORROSIVE/EROSIVE AGENT
MIN RETURN 3.5 bar[g]
38
7
TEMP. INLET
PRESS. NORM bar[g]
C
0.986 0.958
C
(6.1.5)80%
230
60
41
400bar[g]45
2.5 bar
52 C
9.5 bar[g]
PHASE
HERTZ
1
480 230
60
3
Hz 60
V
OTHER
UNHEATED
WINTERIZATION REQ'D
1
RELATIVE HUMIDITY:
Salt laden air, extended sandstorms, and high humidity.
UTILITY CONDITIONS:
MIN / MAX
VOLTS
10
PARALLEL OPERATION REQ'D (5.1.13)
4.53
m/h
DISCHARGE PRESSURE
SUCTION PRESSURE MAX./RATED
bar[g]
bar[g]0.525
9.17
STARTING CONDITIONS
RATEDm/h
bar [a]
OUTDOOR
UNDER ROOF
PARTIAL SIDES
HEATED
TROPICALIZATION REQ'D.
1.013BAROMETER
PROCESS VARIATIONS
1.21
NO. MOTOR DRIVEN GEAR ITEM NO.
GEAR PROVIDED BY
CAPACITY, NORMAL 231.8
OP. W/ PUMP NO.
OP. W/ PUMP NO.
Al-Jubail Petrochemical Co. (Kemya)
No. Req.:
MOTOR MOUNTED BY
Applicable To:
UW1-K-2013Saudi Elastomers Project - SEP Mfr.:
Supplier:
Ref. P&ID:
GEAR MOUNTED BY
GEAR DATA SHT. NO.
Serial No.:
MOTOR PROVIDED BY
GENERAL
6x8x21A-1-OHH PUMP SIZE
NO. STAGES OP. W/ PUMP NO.1
255
Case: Design
Service: Condensate Pumps with S.T
Site: Al-Jubail, KSA Model No.: 6x8x21A-1-OHH 4301301001-01-007-01 / 1316002-007-01
m/h
ELLIOTT
SEP-15-101-UW-P-41A-G-0015
TURBINE MOUNTED BY
TURBINE DATA SHT. NO.
7
PO-110670-15-101-001-A01
3
Item No.:
Revision: Date:
Page
P.O. No.:
17-Feb-14110670
UW1
UW-P-41A
2
Project No.:
Proc. No.:
Area/Unit:
DIFF. HEAD
barDIFFERENTIAL PRESSURE
m (Note 2.4)89.43
INSTRUMENT AIR: MAX/MIN PRESS
SEP Closed Loop Cooling Water System
bar[g]
CENTRIFUGAL PUMP (OH)DATASHEET
Type:
Client:
Project:
Centrifugal Pump
Purchase
NO. TURBINE DRIVEN
WATER SOURCE
(5.1.16)
0.279 cP
TURBINE ITEM NO. UW-PT-41A
TURBINE PROVIDED BY
0.199
C
ATM Condensate
SPECIFIC HEAT, Cp
1
MOTOR ITEM NO.
(3.5.2.6)
MOTOR DATA SHT. NO.
OPERATING CONDITIONS (5.1.3)
OTHER
PUMPING TEMPERATURE
0.01 ppm[v]
9.3 3.5
TYPE OR NAME OF LIQUID
LIQUID (5.1.3)
SITE AND UTILITY DATA (CONT'D)
CHLORIDE CONCENTRATION
C88.5
60
8.65
m
(5.1.4)
(5.1.4) bar [a]VAPOR PRESSURE 0.663
%100
HEATING
SHUTDOWN
bar[g]
bar[g]
DRIVERS
365bar[g]
91.68
THERMAL
kW
SEP-15-101-UW-P-41A-G-0001_Pump Data Sheet_Rev.3.XLS
SERVICE: CONT.
MIN0.463
RANGE OF AMBIENT TEMPS: MIN/MAX. 0.0
NORMAL
INDOOR
50.00
GRADE MEZZANINE
I CD
7.0
2
ALTITUDE m
(See Remark 7.9)
of
By: REV
1
2
3 APPLICABLE STANDARD: COUPLINGS: (6.2.2) DRIVER - PUMP4 MAKE
5 (SEE REMARKS)
6 PUMP TYPE: (4.1)7 OH2 OH3 OH6 OTHER
8 NOZZLE CONDITIONS: (5.4.2)9
10
11 SUCTION COUPLING BALANCED TO ISO 1940-1 G6.3 (6.2.3)
12 DISCHARGE COUPLING WITH PROPRIETARY CLAMPING DEVICE (6.2.11)
13 COUPLING PER ISO 14691 (6.2.4)
14 PRESSURE CASING CONNECTIONS: (5.4.3) COUPLING PER ISO 10441 (6.2.4)15 in NON SPARK COUPLING GUARD (6.2.14c) (metal construction)
16 DRAIN COUPLING GUARD STANDARD PER (6.2.14a)
17 VENT DRIVER HALF COUPLING MOUNTED BY: (3.2.11)
18 PUMP MFR. DRIVER MFR. PURCHASER
19 COUPLING PER API 671 (5.2.7)
20 BASEPLATES:21
22
23 CASING MOUNTING: ( SEE SEPARATE SHEET FOR VERTICALS)24 OTHER
25 CASING TYPE:26 SINGLE VOLUTE MULTIPLE VOLUTE DIFFUSER
27 CASE PRESSURE RATING:28 MAX ALLOWABLE WORKING PRESSURE
29
@ IMPELLER
30
HYDROTEST PRESSURE /
31 SUCT'N PRESS. REGIONS MUST BE DESIGNED FOR MAWP (5.3.6)
32 ROTATION: (VIEWED FROM COUPLING END)33 CW CCW /
34 IMPELLERS INDIVIDUALLY SECURED (5.2.2.2)
35 REMARKS: REDUCED HARDNESS MATERIALS REQ'D. (5.12.1.12)36 BOLT OH3 PUMP TO PAD/FOUNDATION (5.1.2.4) REMARKS:37 SHAFT:38
39 BEARING (TYPE/NUMBER):
40 /
41 /
42
43 LUBRICATION: (5.11.3,5.11.4)
44 REMARKS GREASE FLOOD RING OIL45 FLINGER PURGE OIL MIST PURE OIL MIST
46
47 API-610 API-614
48
49 REMARKS:50
51
52
100 C
ROTOR:
COMPONENT BALANCE TO ISO 1940 G1.0 (5.9.4.4)
bar[g]40.9
CENTERLINE IN-LINE
CONSTRUCTION (CONT)
Case: Governing Case:
KJLAppr'd:Chk'd:WHC YCJ
SIZE
Centrifugal Pump
OTHER
CENTRIFUGAL PUMP (OH)
API 610 10th EDITION
FLANGE
CONSTRUCTION
in
TYPENO. SIZE
DATASHEET
SES G01-S06 and G01-S06-AE
3006"
Type:
Flange with Valve
Self venting
13.5 kW / 100 RPM
LIMITED END FLOAT REQUIRED
MODEL
SES G01-S06
mm
Non Lubricated
1.5
7
3
UW1
110670Project No.:
Area/Unit:
Item No.: UW-P-41A17-Feb-14Revision: Date:
RATING (HP/100 RPM)
3Page
Design
PO-110670-15-101-001-A01P.O. No.:Proc. No.:
110670-15-101-001
SEP-15-101-UW-P-41A-G-0001_Pump Data Sheet_Rev.3.XLS
(APPENDIX M)
S-6
A743 Gr.CA40F A743 Gr.CA6NM
N/A
NON-GROUT CONSTRUCTION: (3.3.13/5.3.7.3.5)
(5.12.1.1)
CASE/IMPELLER WEAR RINGS
MATERIALS (5.12.1.1)
API BASEPLATE NUMBER
Design
SERVICE FACTOR
John Crane
LUBRICATION
250SPACER LENGTH
Inquiry No.:
TSKS-0135-X177-2500
SAP No.:
RF Top
8"
FAC'G
End
POSITION RATING
RF300
OTHER
-29
Baseplate to be suitable for epoxy grout, complete with verticalleveling screws, driver horizontal alignment jacking screws and twogrounding connections.
A216 Gr.WCB
COUPLING DIAPHAGMS (DISKS)
COUPLING SPACER/HUBS
MACHINED AND STUDDED CONNECTIONS (5.4.3.8)
CYLINDRICAL THREADS REQUIRED (5.4.3.3)
1 3/4
WARM-UP
N/A
mm
mm
60
241
N/A
MIN DESIGN METAL TEMP (5.12.4.1)
APPENDIX H CLASS
C
DIFFUSERS
BARREL/CASE A743 Gr.CA6NM
A276 Type. 420SHAFT
3.1. Bearing housing shall be provided with INPRO seals.3.2. Bearing/seal shall be removable without removing pump casing.
OIL VISC. ISO GRADE (5.2.6.5)
7315
REVIEW AND APPROVE THRUST BEARING SIZE (5.2.5.2.4)
CONSTANT LEVEL OILER PREFERENCE (SEE REMARKS) (5.10.2.2)
PRESSURE LUBE SYS (5.2.6)
THRUST Ball
BEARINGS AND LUBRICATION
RADIAL 6216Ball
bar[g]61.4
SPAN BETWEEN BEARING & IMPELLER mm320
SHAFT DIAMETER BETWEEN BEARINGS
SHAFT DIAMETER AT COUPLING
SPAN BETWEEN BEARING CENTERS
mm90
of
By: REV
1
2
3 VAPOR PRESSURE @
4
5 REMARKS /6 /
7 /
8 QUENCH FLUID:9
10
11 SEAL FLUSH PIPING: (2.7.3.19 AND APPENDIX D)12
13 TUBING CARBON STEEL
14 / PIPE STAINLESS STEEL
15
16 TUBING CARBON STEEL
17 PIPE STAINLESS STEEL 2
18 2
19 THREADED UNIONS SOCKET WELDED 2
20 FLANGED TUBE TYPE FITTINGS
21 mm PRESSURE SWITCH (PLAN 52/53) 2
22 SEAL CONSTRUCTION:23
24
25
26
27 GLAND TAPS: (2.7.3.14) REMARKS28
29
30 MANUFACTURER
31 TYPE
32 SEAL FLUIDS REQUIREM'T AND AVAILABLE FLUSH LIQUID: SIZE NO. OF RINGS33 NOTE: IF FLUSH LIQUID IS PUMPAGE LIQUID (AS IN FLUSH PIPING PACKING INJECTION REQUIRED
34 PLANS 11 TO 41), FOLLOWING FLUSH LIQUID DATA IS NOT REQ'D. FLOW
35 SUPPLY TEMPERATURE MAX/MIN / LANTERN RING
36 RELATIVE DENSITY (SPECIFIC GRAVITY) @
37 NAME OF FLUID COOLING WATER PIPING PLAN (3.5.4.1)
38 SPECIFIC HEAT, Cp COOLING WATER REQUIREMENTS
39 VAPOR PRESSURE @ SEAL JACKET/BRG HSG @
40 HAZARDOUS FLAMMABLE OTHER SEAL HEAT EXCHANGER @
41 FLOW RATE MAX/MIN / QUENCH @
42 PRESSURE REQUIRED MAX/MIN / TOTAL COOLING WATER
43 TEMPERATURE REQUIRED MAX/MIN / C.W. PIPING: TUBING PIPE FITTINGS
44 BARRIER/BUFFER FLUID (2.7.3.21): C.W. PIPING MATERIALS: 45 SUPPLY TEMPERATURE MAX/MIN / S.STEEL C.STEEL GALVANIZED
46 RELATIVE DENSITY (SPECIFIC GRAVITY) @ HEAT MEDIUM: STEAM OTHER
47 NAME OF FLUID TUBING PIPE
48 HEATING JACKET REQ'D.(5.8.9) COOLING REQ'D.
49 REMARKS
50 ADDITIONAL REMARKS:51
52
m/h
m/h
FLAMMABLE OTHER
DATASHEET
per SES G02-S01 and G02-S01-AE
Governing Case:
HAZARDOUS
DesignCase:
WHC YCJ Appr'd:
TEMPERATURE REQUIRED MAX/MIN
PRESSURE REQUIRED MAX/MIN
FLOW RATE MAX/MIN
110670-15-101-001Inquiry No.:
Design
MECHANICAL SEAL OR PACKING (CONT)
Chk'd:
Proc. No.:
Area/Unit:
P.O. No.:
7
3
UW1
Project No.:
Item No.:
17-Feb-14110670
UW-P-41A
PO-110670-15-101-001-A01
4
Date:Revision:
Page
bar[g]
C
CENTRIFUGAL PUMP (OH)
C
SAP No.:
KJL
BEARINGS AND LUBRICATION (CONT)
ELECTRICOIL HEATER REQ'D bar [a]
APPENDIX H SEAL CODE
Flowserve
NON-API 682 SEAL (2.7.2)
3.750/3.750 QBQW/QBQW
SEAL MANUFACTURER
SIZE AND TYPE
MECHANICAL SEAL OR PACKING
Type: Centrifugal Pump
OIL PRESS TO BE GREATER THAN COOLANT PRESS (5.2.6.2.b)
STEAM (2.9.2.9/5.2.6.3)
(2.11.1.1)
SEAL DATA: (2.7.2)
SEE ATTACHED API-682 DATA SHEET (2.7.2)
FLOW
SEAL CHAMBER SIZE (TABLE 2.3)
TEMPERATURE
1.2 m/h
C
bar[g]
MANUFACTURER CODE
.
PRESSURE 1.7
C2A1A2361
88.5
TOTAL LENGTH CLEAR LENGTH
GLAND MATERIAL
116 67 mm
COOLING (C)
SLEEVE MATERIAL UNS S31603
C
BARRIER/BUFF. (B)
LUBRICATION (G)
DRAIN (D)
JACKET REQUIRED (2.7.3.17)
LEAKAGE
AUX SEAL DEVICE (2.7.3.20)
m/h
bar[g]
C
C
J/(kg.C)
C
BAL'NCE FLUID (E)
PIPING ASSEMBLY: (3.5.2.10.1)
PRESSURE GAUGE (PLAN 52/53)
TEMP INDICATOR (PLANS 21, 22, 23, 32, 41)
TYPE
UNS S31603
HEATING (H)
FLUSH (F)
QUENCH (Q)
PUMPED FLUID (P)
FLOW RATE
NAME OF FLUID
API Plan 23
API Plan 61AUXILIARY FLUSH PLAN
SEAL FLUSH PIPING PLAN
Later
STEAM AND COOLING WATER PIPING
m/h
bar[g]
HEAT EXCHANGER (PLAN 52/53)
Later
N/A bar[g]
M(Cooler)
PACKING DATA: (APPENDIX C)
bar[g]
LEVEL SWITCH (PLAN 52/53) TYPE
LEVEL GAUGE (PLAN 52/53)
EXTERNAL FLUID INJECTION (X)
HEATING PIPING:
C
4.1) Seal shall be single cartridge API 682 type per SES G02-S01 and G02-S01-AE. 4.2) See page 2 for seal flush fluid properties.4.3) All case and auxiliary connections to be welded construction, double braced terminating at the baseplate edge in a valved andflanged connection rated per the pump discharge.
C
N/Abar [a]
SEP-15-101-UW-P-41A-G-0001_Pump Data Sheet_Rev.3.XLS
Cm/h
m/h
Later m/h
m/h
Item No.:
of
By: REV
1
2
3 REMARKS
4 VIBRATION:5 NONCONTACTING (API 670) TRANSDUCER
6 PROVISION FOR MOUNTING ONLY (2.9.2.11) MANUFACTURER'S STANDARD
7 FLAT SURFACE REQ'D (2.9.2.12) OTHER (SEE BELOW)
8 SEE ATTACHED API 670 DATA SHEET SPECIFICATION NO.
9 MONITORS AND CABLES (3.4.3.3) PUMP:10 REMARKS PUMP SURFACE PREPARATION
11 PRIMER
12 TEMPERATURE AND PRESSURE: FINISH COAT13 BASEPLATE: (6.3.17)14 BASEPLATE SURFACE PREPARATION
15 PRIMER
16 FINISH COAT
17
18 SHIPMENT: (4.4.1)19 DOMESTIC EXPORT EXPORT BOXING REQUIRED
20 OUTDOOR STORAGE MORE THAN 6 MONTHS
21 SPARE ROTOR ASSEMBLY PACKAGED FOR:22 HORIZONTAL STORAGE VERTICAL STORAGE
23 SPARE PARTS (TABLE 6.1) TYPE OF SHIPPING PREPARATION24 REMARKS
25
26
27 MOTOR DRIVEN:
28 WEIGHT OF PUMP
29 WEIGHT OF BASEPLATE
30 WEIGHT OF MOTOR
31 WEIGHT OF GEAR
32 TOTAL WEIGHT
33 TURBINE DRIVEN:
34 / / WEIGHT OF BASEPLATE
35 WEIGHT OF TURBINE
36 WEIGHT OF GEAR
37 TOTAL WEIGHT
38 REMARKS
39
40 COORDINATION MEETING REQUIRED (9.1.3)
41
42 OH3 BEARING HS6 LIFTER (8.1.2.6)
43 OUTLINE OF PROCEDURES FOR OPTIONAL TESTS (9.2.5)
44
45 UP
46
47 /
48 /
49
50
51
789 kg
kg
WEIGHTS
KJLAppr'd:Chk'd:
Acrylic Polyurethatne-Gloss
Design
SES T01-S01 and T01-S01-AE
Governing Case:
17-Feb-14
7
3
UW1 5
Project No.: Date:Revision:
Page
N/A
INSTALLATION LIST IN PROPOSAL (9.2.3L)
TORSIONAL ANALYSIS REPORT (5.9.2.6)
CONNECTION DESIGN APPROVAL (5.12.3.4)
OTHER PURCHASE REQUIREMENTS
kg
3500
930
kg5219
kg
kg
kg
kg
kg
Case:
DATASHEETCentrifugal Pump Design
WHC YCJ
P.O. No.:
Area/Unit:
Proc. No.:
110670
UW-P-41A
PO-110670-15-101-001-A01
110670-15-101-001Inquiry No.:SAP No.:
ELLIOT
TEMP GAUGES (WITH THERMOWELLS) (3.4.1.3)
OTHER
REMARKS
LOCATION
TURBINE DRIVE
START-UP NORMAL MAINTENANCETwo years operating spares and major capital spares, to include asa minimum one rotor assembly (rotor to include all rotating partsattached to the shaft).
MANUFACTURER
INSTRUMENTATION
Surface tolerant, Epoxy Mastic, Self PrimingSEE ATTACHED API-670 DATA SHEET
DETAILS OF LIFTING DEVICES (6.3.20) T01-S01 and T01-S01-AE
ACCELEROMETER
RADIAL BRG METAL TEMP THRUST BRG METAL TEMP
Surface tolerant, Epoxy Mastic, Self Priming
Provision Only
SURFACE PREPARATION AND PAINT
CENTRIFUGAL PUMP (OH)
Sa 2 1/2
Type:
SPECIFY
Sa 2 1/2
Acrylic Polyurethatne-Gloss
PRESSURE GAUGE TYPE (3.4.2.2)
PROVISION FOR INSTRUMENTS ONLY
MOTOR DRIVE (CONT) (3.1.5)
A
STARTING METHOD
INSULATION
BYRHH
FRAME
SERVICE FACTOR 1.15
V
TYPE
V
C
HORIZONTAL
110 kW rpm
VERTICAL
1780
VOLTS/PHASE/HERTZ
ENCLOSURE
LOCKED ROTOR AMPS
TEMPERATURE RISE
FULL LOAD AMPS
MINIMUM STARTING VOLTAGE (3.1.6)
VERTICAL THRUST CAPACITY
ISO 32
SLEEVE
LUBE
RADIAL
BEARINGS (TYPE / NUMBER):
kgf
A
REMARKS:
ANTI-FRICTION ANTI-FRICTION PROGRESS REPORTS REQUIRED (9.3.3)THRUST
SEP-15-101-UW-P-41A-G-0001_Pump Data Sheet_Rev.3.XLS
kgfkgf TORSIONAL ANALYSIS REQUIRED (5.9.2.1)
MOUNT SEAL RESERVOIR OFF BASEPLATE (3.5.1.4)SLEEVE
Item No.:
Project No.: Revision: Date:
Area/Unit: Page of
Proc. No.: P.O. No.:
By: REV
1 Type: Case: Governing Case:
2
3 TEST NON-WIT WIT OBSERVE
4 MAXIMUM DISCHARGE PRESSURE TO INCLUDE (5.3.2)
5
6 MECHANICAL RUN UNTIL OIL
7 TEMP.STABLE(7.3.4.7.1)
8 MANIFOLD PIPING TO SINGLE CONNECTION (6.5.1.6) MATERIAL CERTIFICATION REQUIRED (5.12.1.8)
9 CASING IMPELLER SHAFT
10 FLANGES REQ'D IN PLACE OF SOCKET WELD UNIONS (6.5.2.8) OTHER
11 CONNECTION BOLTING CASTING REPAIR PROCEDURE APPROVAL REQ'D (5.12.2.5)
12 PTFE COATING ASTM A153 GALVANIZED INSPECTION REQUIRED FOR CONNECTION WELDS (5.12.3.4e)
13 PAINTED SS MAG PARTICLE LIQUID PENETRANT
14 REMARKS: RADIOGRAPHIC ULTRASONIC
15 INSPECTION REQUIRED FOR CASTINGS (7.2.1.3/5.12.1.5)
16 REVIEW VENDORS QA PROGRAM (4.1.7) MAG PARTICLE LIQUID PENETRANT
17 PERFORMANCE CURVE APPROVAL RADIOGRAPHIC ULTRASONIC
18 SHOP INSPECTION (7.1.4) HARDNESS TEST REQUIRED FOR:
19 TEST WITH SUBSTITUTE SEAL (4.3.3.1.2) (7.2.2.3)
20 TEST NON-WIT WIT OBSERVE ADDITIONAL SUBSURFACE EXAMINATION FOR 7.2.1.3
21 HYDROSTATIC (4.3.2) FOR
22 PERFORMANCE (4.3.3) (Remark 6.2) METHOD
23 NPSH (4.3.4.1) (Remark 6.1)
24 COMPLETE UNIT TEST (4.3.4.2) (Rm 6.3)
25 SOUND LEVEL TEST (4.3.4.3)
26 CLEANLINESS PRIOR TO RADIOGRAPHIC ULTRASONIC
27 FINAL ASSEMBLY (4.2.3.1) ALTERNATE ACCEPTANCE CRITERIA (SEE REMARKS) (4.2.2.1) 3
28 NOZZLE LOAD TEST (3.3.6) WETTING AGENT HYDROTEST (4.3.2.5)
29 BRG HSG RESONANCE VENDOR SUBMIT TEST PROCEDURES (4.3.1.2/6.2.5)
30 TEST (4.3.4.5) RECORD FINAL ASSEMBLY RUNNING CLEARANCES
31 REMOVE/INSPECT INSPECTION CHECK-LIST (APPENDIX N) (4.1.6)
32 VENDOR KEEP REPAIR AND HT RECORDS (7.2.1.1c)
33 VENDOR SUBMIT TEST DATA WITHIN 24 HOURS (7.3.3.3e)
34 INCLUDE PLOTTED VIBRATION SPECTRA (5.9.3.3)
35 SUBMIT INSPECTION CHECK LIST (7.1.6)
36
37
38 REMARKS
39 3
40
41
42
43 3
44
45
46 PER EN 13445
47 PER ASME VIII
48
49
50
51
SAP No.: Inquiry No.:
Chk'd: Appr'd:
CENTRIFUGAL PUMP (OH) 110670-15-101-001
ADDITIONAL DATA REQUIRING 20 YEARS RETENTION(7.2.1.1f)
KJL
RETEST ON SEAL
Centrifugal Pump Design
110670
UW-P-41A
PO-110670-15-101-001-A01
Design
YCJWHC
17-Feb-14
7
3
UW1 6
(4.2.1.3)
ADDITIONAL INSPECTION REQUIRED FOR:
DATA (7.3.3.4d)
TRUE PEAK VELOCITY
HYDRODYNAMIC BEARINGS
OIL TEMP. STABLE(7.3.4.7.3)
4 HR. MECH. RUN AFTER
6.1) An NPSH test is required if the NPSH margin is less than 0.9meters (3 ft.). NPSHR shall be deterimined at each performance testpoint except shut-off.6.2) Performance test to be a minimum of 5 points from closed valve toend of curve. (ALL tests shall be certified.)6.3) Provide price option for witnesssing of complete unit test. Includeall contract equipment installed and mounted on the contract baseplate.
IMPACT TESTING (5.12.4.3)
QA INSPECTION AND TEST
LEAKAGE (7.3.3.2d)
4 HR. MECH. RUN TEST(7.3.4.7.2)
QA INSPECTION AND TEST (CONT'D)OTHER PURCHASER REQUIREMENTS (CONT)
MOUNTING PAD SURFACES(6.3.3)
CHECK FOR CO-PLANAR
SEP-15-101-UW-P-41A-G-0001_Pump Data Sheet_Rev.3.XLS
MAG PARTICLE LIQUID PENETRANT
ADDITIONAL REMARKS:
AFTER TEST (5.2.8.5)
TEST (4.3.4.4)
Vent Drain
AUXILIARY EQUIPMENT
Item No.:
Project No.: Revision: Date:
Area/Unit: Page of
Proc. No.: P.O. No.:
By: REV
1 Type: Case: Governing Case:
2 NOTES: INFORMATION BELOW TO BE COMPLETED: BY PURCHASER BY MANUFACTURER BY MANUFACTURER OR PURCHASER
3
4
5 THESE REFERENCES MUST BE LISTED BY THE MANUFACTURER
6
7
8
9 THESE REFERENCES MUST BE LISTED BY THE PURCHASER. (DEFAULT TO TABLE 10 IF NO PURCHASER PREFERENCE IS STATED)
10 ALTERNATE WELDING CODES AND STANDARDS (5.12.3.1)
11 Welding Requirement (Applicable Code or Standard)12
13
14
15
16
17
18
19 THESE REFERENCES MUST BE LISTED BY THE PURCHASER (DEFAULT TO TABLE 13 IF NO PURCHASER PREFERENCE IS STATED)
20 ALTERNATIVE MATERIAL INSPECTIONS AND ACCEPTANCE CRITERIA (SEE TABLE 13)
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
SOURCE OF MATERIAL PROPERTIES
Centrifugal Pump
CASTING FACTORS USED IN DESIGN ( 5.3.4) (TABLE 3) :
CENTRIFUGAL PUMP (OH) SAP No.:DATASHEET WHC
110670
Chk'd: YCJ
SME VIII, Div 1
Type of inspection Methods For fabrications
Postweld heat treatment
Postweld heat treatment of casing fabrication welds
Radiography
17-Feb-14
7
3
UW1
DesignDesign
Non-pressure retaining structural welding such as baseplates or supports
REMARKS
SME VIII, Div 1
MATERIAL INSPECTION (7.2.2.1)(7.2.1.3)
Ultrasonic inspection
Castings
Casing wear ring materials shall be harder than impeller wear ring material.
SEP-15-101-UW-P-41A-G-0001_Pump Data Sheet_Rev.3.XLS
7.1) Flange dimensions and drilling shall be in accordance with ASME B16.57.2) Condensate from the condensate tank is considered 'clean.' The combined flow to the tank consists of cleancondensate from process units and condensate from the activated carbon filter.7.3) Pumps shall have a continuous rising curve from rated point to shut-off. Shut-off head shall be within 110% and120% of the head at rated capacity. Pump head at shut-off greater than 120% of head at rated capacity shall requireSABIC approval.7.4) Rated capacity shall be between 80% and 110% of BEP capacity of the offered pump.7.5) The maximum impeller diameter for single stage overhung pump design, operating at 3600 rpm and higher shall be380 mm (15 inches).7.6) Auto start capability required for all pump drives to be initiated on low pressure.7.7) Pump motor and steam turbine drivers shall be sized for operation over the entire head capacity curve.7.8) Steam turbine power rating shall be 110% of the calculated rated power of the pump unless otherwise specified.7.9) Minimum continuous flow shall be within 15% and 50% of rated flow. Pump calculation used 30% of the normal flow.7.10) UW-PST-41A is to have shaft driven lube oil pumps and air coolers on emergency power.
Default per Table 10 Purchaser defined
ASME IX
UW-P-41A
PO-110670-15-101-001-A01
7
Inquiry No.:
Appr'd:
110670-15-101-001
KJL
WELDING AND REPAIRS (5.12.3)
PRESSURE VESSEL DESIGN CODE REFERENCES
AWS D1.1
Magnetic particle or liquid penetrant examination of the plate edges
Welder/operator qualification
Welding procedure qualification ASME IX
Magnetic particle inspection
Liquid penetrant inspection