PUMP PERFORMANCE CURVE
VP No. SEP-15-103-UU-P-49A/B/C-G-0008
Item No. UU-P-49A/B/C
Page No. 1 OF 2 Rev. No. 3
Job No. 110670
Project Title Saudi Elastomers Project U&O, Carbon Black and MTBE Decomposition Unit
Client Al-Jubail Petrochemical Company (KEMYA)
Location Jubail Industrial City, KSA
No part of this document or the information it contains may be reproduced or transmitted in any form or by any means electronic or mechanical, including photocopying, recording, or by any information storage and retrieval system, without permission in writing from KEMYA or DAELIM
PUMP PERFORMANCE CURVE
Saudi Elastomers Project U&O, Carbon Black and MTBE Decomposition Unit
P.O. NO. 110670-15-103-001-A01
P.O. DESCRIPTION SEAWATER PUMP(API 610, VS1)
ITEM NO. UU-P-49A/B/C
ITEM DESCRIPTION SEAWATER PUMP
DOCUMENT NO SEP-15-103-UU-P-49A/B/C-G-0008
DOCUMENT TITLE. PUMP PERFORMANCE CURVE
DAELIM INDUSTRIAL CO., LTD. SEOUL, KOREA
Job. NO. 110670
A Approved without comments
AAN Approved As Noted
RFC Returned for Correction
U&O CB MTBE
SIGNED BY : DATE :
PURCHASER PERMISSION TO PROCEED OR REVIEW TAKEN ON VENDOR PRINTS SHALL NOT RELIEVE VENDOR FROM ITS RESPONSIBILITIES OR LIABILITIES UNDER THE PURCHASE ORDER.
HHI
3 2013.08.24 FOR APPROVAL D.S.KIM J.G.ROH J.Y.AHN
2 2013.07.26 FOR APPROVAL D.S.KIM J.G.ROH J.Y.AHN
1 2013.04.20 FOR APPROVAL D.S.KIM E.H.LEE J.Y.AHN
0 2013.02.26 FOR APPROVAL D.S.LEE J.W.SHIN H.G.KIM
REV DATE DESCRIPTION PREPARED BY CHECKED BY APPROVED BY
1.08 cP
35 Q (m3/hr) H (m) RPM BHP (kW)
508
NPSHa (m) 12.7 PHASE
NPSHr (m) 9.0 3
PREP. BY
ESTIMATED TEST RESULT
CHK.BY
14
kW
4000 2300
VOLTAGE
86
POLE
2082
D.S.KIM J.Y.AHNJ.G.ROH
P.EFF(%)
LIQUID SEAWATER
KA1547-SWP-01
1200VKM
Hz
1.02
MOTOR60
CURVE No. :
DATE :
UU-P-49A/B/C
DRIVER TYPE
SERVICE
APR. BY
PUMPMODEL
SEAWATER PUMP
12347 52.2
SP. GR.
VISC.
TEMP.
PUMP PERFORMANCE CURVE
ITEM No.
SER No.SAUDI ELASTOMERS PJT(SEP)PROJECT
K3212-CV3608 Rev.1
2013. 08.24
0
10
20
30
40
50
60
70
80
90
100
0
10
20
30
40
50
60
70
80
90
100
0 2000 4000 6000 8000 10000 12000 14000 16000 18000 20000EFFIC
IEN
CY(%
)
TO
TAL H
EAD
(m)
CAPACITY(t/hr)
0
5
10
15
20
25
0
500
1000
1500
2000
2500
0 2000 4000 6000 8000 10000 12000 14000 16000 18000 20000
NPSH
(M)
SH
AFT P
OW
ER(k
W)
SHAFT POWER
NPSH-R
EFFICIENCY
TOTAL HEAD
MIN
.FLO
W :4940 m
3/h
r
MA
X. FLO
W :14816 m
3/h
r
MAX. DIA. : 1407 mm
MIN. DIA.: at 1273mm
ALLOWABLE OPERATING REGION
PREFERRED OPERATING REGION
- Flow rate : 12,347/hr
- Head : 52.2M at LLLL - Pressure at Discharge Nozzle : 4.7 barg - Efficiency : 86%