Utility Services Report
210557 NORTH SYDNEY PUBLIC SCHOOL
Client: Department of Education
Revision: P3
Date: 19/08/2021
210557 - NORTH SYDNEY PUBLIC SCHOOL
UTILITY SERVICES REPORT
REVISION P3 – 19/08/2021
DEPARTMENT OF EDUCATION
PAGE 2
REPORT INFORMATION
Project North Sydney Public School
Title Utility Services Report
Client Department of Education
Revision P3
Revision Date 19/08/2021
Prepared By LCI Consultants
Sydney
Level 4
73 Walker Street
North Sydney 2060
Sydney
ABN/ACN 92 124 107 973 / 124 107 973
Author Felicity Yu
REVISION SCHEDULE
Revision Date Issue Name Author Authorised
P1 16/08/21 SSDA Submission FY/RN/MB DDC
P2 17/08/21 SSDA Submission FY/RN/MB DDC
P3 19/08/21 SSDA Submission FY/RN/MB DDC
210557 - NORTH SYDNEY PUBLIC SCHOOL
UTILITY SERVICES REPORT
REVISION P3 – 19/08/2021
DEPARTMENT OF EDUCATION
PAGE 3
CONTENTS
1 Introduction ...................................................................................................................................................5
1.1 Project Description .................................................................................................................................................. 5
1.2 Design Guidelines and Standards ........................................................................................................................... 6
2 Electrical Utility Services................................................................................................................................7
2.1 Existing Supply Authority Infrastructure ................................................................................................................. 7
2.2 Proposed Electrical Infrastructure .......................................................................................................................... 8
2.3 Construction Period Services Continuity ................................................................................................................ 9
3 Telecommunications Carrier Services ..........................................................................................................10
3.1 Existing Telecommunication Infrastructure ......................................................................................................... 10
3.2 Proposed Telecommunication Infrastructure ...................................................................................................... 10
3.3 Construction Period Services Continuity .............................................................................................................. 11
4 Water, Gas and Sewer Utility Services ..........................................................................................................12
4.1 Existing Sydney Water and Jemena Infrastructure .............................................................................................. 12
4.2 Proposed Sydney Water and Jemena Infrastructure ........................................................................................... 14
4.3 Construction Period Services Continuity .............................................................................................................. 17
210557 - NORTH SYDNEY PUBLIC SCHOOL
UTILITY SERVICES REPORT
REVISION P3 – 19/08/2021
DEPARTMENT OF EDUCATION
PAGE 4
1 Introduction
LCI has been engaged by Department of Education to prepare the Electrical, Telecommunications, Water and Sewer
Utility Infrastructure Management Plan for the proposed upgrades to North Sydney Public School.
This report addresses the requirements outlined in the Planning Secretary’s Environmental Assessment
Requirements (SEARs) dated 24 December 2020 for State Significant Development Application 11869481 SEAR 14.
1.1 Project Description
This SSDA seeks consent for alterations and additions to the existing North Sydney Public School. The proposal
entails:
• Demolition of the existing hall (building B), Haven building (building C) and 6 temporary buildings;
• Construction of a three storey building comprising:
• staff administration rooms;
• 16 homebases
• a new library;
• hall;
• out of school hours care facilities;
• covered outdoor learning area;
• bicycle parking and end of trip facilities for staff; and
• services, amenities and access.
• New entry gate and forecourt from Bay Road;
• Internal refurbishment of building G ground floor from the existing library to 3 homebases;
• Capacity for an increase in student numbers from 869 to 1,012; and
• Associated tree removal, landscaping and excavation.
The proposal maintains:
• The gates and fence of former Crows Nest House including the entrance from Pacific Highway and Bay Road;
• Existing gate along McHatton Street;
• The outdoor play area to the east of Building A;
• Existing covered outdoor learning area adjacent to Building A;
• The basketball courts and staff carpark in the western portion of the site;
• The significant tree planting on all school boundaries;
• Buildings A, D and F noting minor internal refurbishments are being undertaken outside of the SSDA scope of
work (exempt development) to improve student amenities and canteen; and
• Building G noting ground floor internal refurbishment is proposed in the SSDA.
210557 - NORTH SYDNEY PUBLIC SCHOOL
UTILITY SERVICES REPORT
REVISION P3 – 19/08/2021
DEPARTMENT OF EDUCATION
PAGE 5
1.2 Design Guidelines and Standards
The Electrical services to this building will be designed in accordance with the following Guidelines and Australian
Standards:
• NSW Department of Education - Education Facilities Standards and Guidelines
• NSW Service and Installation Rules
• Ausgrid Network Standards and Electricity Supply Policies and Standards
• Sydney Water Design Standards
• Jemena Design Standards (AS/NZS 4645.1 – Gas Distribution Networks)
• Relevant Australian Standards
210557 - NORTH SYDNEY PUBLIC SCHOOL
UTILITY SERVICES REPORT
REVISION P3 – 19/08/2021
DEPARTMENT OF EDUCATION
PAGE 6
2 Electrical Utility Services
2.1 Existing Supply Authority Infrastructure
The Supply Authority to North Sydney Public School is Ausgrid. The existing Ausgrid HV network supplies the
school from a substation (S.79467) located near the junction between McHatton Street and Pacific Highway as
shown in figure 1 below.
Substation S.79467 is a 600kVA Kiosk type substation with a non-firm rating of 920amps. It currently provides
supply to the following low voltage distributors:
- Distributor No.1 is a spare panel (fuse-way rated to 400amps with no fuses installed)
- Distributor No.2 supplies McHatton St overhead network (fuse-way rated to 400amps with no fuses
installed) – normally open at substation
- Distributor No.3 supplies North Sydney Public School (fuse-way rated at 800amps with a 800amp fuse
installed) – an MDI reading on this distributor indicates a load of 292amps.
Figure 1 Ausgrid WebGIS Extract
210557 - NORTH SYDNEY PUBLIC SCHOOL
UTILITY SERVICES REPORT
REVISION P3 – 19/08/2021
DEPARTMENT OF EDUCATION
PAGE 7
Figure 2 Ausgrid Network Plan
As substation S.79467 supplies no other customers, the full 800amp supply is available to be utilised for the NSPS
upgrade.
A SSDA maximum demand calculation carried out to ESFG requirements and AS/NZS 3000 guidelines indicate the
load estimate for the new and existing buildings to be approximately 660Amps/Phase. This means an upgrade to
the existing HV infrastructure is not anticipated to be required.
Table 1 SSDA Maximum Demand calculation
2.2 Proposed Electrical Infrastructure
A new main distribution board (MDB) rated to 400amps is proposed to supply the two new Buildings I and J. The
location of the new MDB is currently planned to be within a dedicated electrical cupboard on level 1 of building I in
the corridor of the admin area. The MDB in building I will supply electrical distribution boards (EDB) for general
power and lighting final sub-circuits located on each floor, typically within a 25m radius in compliance with EFSG
North Sydney Public School Preliminary Maximum Demand
Building/Area kVA Amps per phaseExisting school maximum demand reading from Ausgrid 202 292
Buildings B, C, H, 5 x Temporary Demountables - to be demolished 63.88 -92.2
New Buildings I & J 271 392
New AC units installed 2020 (20 x total) 47 68
Subtotal 585 660
Total + Spare Capacity (20%) 702 792
210557 - NORTH SYDNEY PUBLIC SCHOOL
UTILITY SERVICES REPORT
REVISION P3 – 19/08/2021
DEPARTMENT OF EDUCATION
PAGE 8
requirements. It will also supply the new hall building J and any mechanical services switchboards and dedicated
hydraulic or fire services equipment.
Subject to further surveys of the electrical pits and inground conduits on site, the existing 400amp submain (4 x 1C
240mm2 XLPE/PVC + E) supplying the existing MDB in building B is proposed to be re-used for the new buildings I &
J. This will require a cable joint and extension of the submain to the new MDB location. This proposal is a departure
to the EFSG requirements as cable joints are not permitted, however due to the new condition of the submain
(installed 2019) and the proximity of the existing route we recommend to re-use this submain as a cost-effective
strategy.
Noting only 1 x 400amp circuit breaker space is available at the MSB and it is currently connected to the MDB in
building B, re-using the submain will also avoid costly modification works.
2.3 Construction Period Services Continuity
The existing MDB in building B currently supplies all other buildings on site (excluding building A):
• Building F: River Building
• Building G (DB-L)
• Link box 2 (Temporary Buildings D14580 and D13763)
• Building C: Haven Building
• Building B: Hall
• Building D: McHatton Building
Prior to demolition of building B, the existing outgoing supplies from the MDB will need to be relocated to another
source to maintain continuity of electrical supply to the school. The proposed works involves:
• Re-supply building G from existing DB-2 in building A or a spare circuit breaker space in the MSB as a
permanent solution
• Re-supply buildings D and F from spare circuit breaker spaces in the existing MSB as a permanent solution
• Re-supplying temporary buildings D14187 and D10493 subject to further survey confirming the existing cable
routes, as a temporary solution
Minimal disruption is expected during construction period. As such a detailed construction staging plan must be
coordinated with the key stakeholders to arrange any electrical shut-downs during school holidays if possible. The
relocation of electricity supplies as part of exempt development/early works package, not as part of this SSDA.
210557 - NORTH SYDNEY PUBLIC SCHOOL
UTILITY SERVICES REPORT
REVISION P3 – 19/08/2021
DEPARTMENT OF EDUCATION
PAGE 9
3 Telecommunications Carrier Services
3.1 Existing Telecommunication Infrastructure
The site has three existing comms lead-ins: two coming from McHatton Street and one from Bay Road. From the
Dial Before You Dig enquiry it is not clear who the provider from McHatton Street is, however from Bay Road the
provider is Uecomm. The diagram from the Dial Before You Dig enquiry is shown in Figure 3 below.
Figure 3: Existing Incoming Comms
3.2 Proposed Telecommunication Infrastructure
The intention is to retain the existing incoming comms route from Bay Road and one from McHatton Street. The
pits will be upgraded to meet the current NBN requirements and new conduits and pit provided to connect to
Building J, where the new Main Comms Room will be located. The proposed new comms lead-in route is identified
in Figure 4 below.
210557 - NORTH SYDNEY PUBLIC SCHOOL
UTILITY SERVICES REPORT
REVISION P3 – 19/08/2021
DEPARTMENT OF EDUCATION
PAGE 10
Figure 4: Proposed Comms Infrastructure
3.3 Construction Period Services Continuity
No disruption to telecommunication carrier services to other parts of the North Sydney Public School is expected
during construction. It is not proposed to construct new buildings over the existing telecommunications carrier
plant. Diversion of existing telecommunications services is not anticipated for the new building until towards the
end of construction, when the changeover can be managed outside of school operating hours.
Staging of communications services will be determined in accordance with the approved construction
methodology. The proposed SSDA design allows for early enabling works prior to commencement of the first stage
of construction works.
Prior to initiating any site work or shutdowns, communications contractors shall conduct a detailed site audit to
inspect the existing site infrastructure, equipment conditions, validate the existing services and associated cable
reticulation nominated in the existing as-built and project documentation where applicable, to ensure all
communications services are maintained and operational throughout the construction phase.
210557 - NORTH SYDNEY PUBLIC SCHOOL
UTILITY SERVICES REPORT
REVISION P3 – 19/08/2021
DEPARTMENT OF EDUCATION
PAGE 11
4 Water, Gas and Sewer Utility Services
4.1 Existing Sydney Water and Jemena Infrastructure
4.1.1 Potable Cold Water
There are three existing potable cold water connections to North Sydney Public School from the DN200 CICL water
main located on Bay Road. All three connections are sized at 50mm and reticulate through Authority Cold Water
meters to serve sanitary fixtures throughout the school.
There is no water main connection to the site to serve fire services (i.e. fire hydrant and fire sprinklers).
There is an existing easement in the middle of the school for the Authority Water Main sized at DN500 CICL.
Figure 5: Sydney Water DBYD Plan
Figure 6: Site Survey Plan
210557 - NORTH SYDNEY PUBLIC SCHOOL
UTILITY SERVICES REPORT
REVISION P3 – 19/08/2021
DEPARTMENT OF EDUCATION
PAGE 12
4.1.2 Gas Service
There is one existing gas connection to North Sydney Public School from the DN32 Nylon @ 210kPa gas main
located on Bay Road. The gas service reticulates throughout the school to serve the old gas space heaters (LB90
Gas Heaters) and hot plates in the canteen.
Figure 7: Jemena DBYD Plan
4.1.3 Sanitary Drainage Service
There are two existing sanitary drainage connections to North Sydney Public School. The first connection is located
on the DN225 VC pipe located on the corner of Bay Road and Pacific Highway (southeast corner of the school). The
second connection is located on the DN225 SGW pipe located on Bay Road (southwest corner of the school).
Both sanitary drainage connections reticulate throughout the school to serve sanitary fixtures.
210557 - NORTH SYDNEY PUBLIC SCHOOL
UTILITY SERVICES REPORT
REVISION P3 – 19/08/2021
DEPARTMENT OF EDUCATION
PAGE 13
Figure 8: Sydney Water Sewer DBYD Plan
4.2 Proposed Sydney Water and Jemena Infrastructure
4.2.1 Potable Cold Water
To comply with the Water Service Code of Australia (WSA-Part 03), the proposed development will require frontage
to a minimum DN150 water main. This is achieved by the existing DN200mm CICL water main located on Bay Road.
Based on initial investigations and site inspection of North Sydney Public School, three Authority water meters serve
the whole site. Further investigations will be required to detail (survey) each water service and what fixtures they
serve throughout the school.
SSDA design calculation on the proposed new buildings and existing buildings, we envisage a new water main
connection to serve potable cold water might not be required (subject to final survey results).
We have submitted a pressure and flow application to Sydney Water to investigate the hydraulic demands for the
water main. We are awaiting pressure and flow results to confirm sufficient pressure and flow to cater to the
development’s potable water and fire services demands. Due to the Greater Sydney lockdown because of the
COVID-19 outbreak some of Sydney Water activities are being prioritised and to expect delays due to availability of
resources.
The existing Sydney Water easement for the potable cold water main (DN500) CICL) is within the school. The
project will need to be discussed with a Sydney Water Coordinator once the architectural plans are finalised. A
Sydney Water Coordinator will need to be engaged to submit a Sydney Water Building Plan Approval to
investigate if the proposed buildings will impact Sydney Water assets or proposed building works over the
existing Sydney Water easement.
Initial discussions with a Sydney Water Coordinator will require them to conduct a site survey and asset peg out,
review architectural plans, review the structural plans and provide a Specialist Engineering Assessment on the
Sydney Water asset.
210557 - NORTH SYDNEY PUBLIC SCHOOL
UTILITY SERVICES REPORT
REVISION P3 – 19/08/2021
DEPARTMENT OF EDUCATION
PAGE 14
Figure 9: Sydney Water Diagram -Asset Zone of Influence
Figure 10: Sydney Water Easement and Building to be demolished
210557 - NORTH SYDNEY PUBLIC SCHOOL
UTILITY SERVICES REPORT
REVISION P3 – 19/08/2021
DEPARTMENT OF EDUCATION
PAGE 15
Figure 11: Sydney Water Easement and Proposed Buildings
4.2.2 Fire Services
Currently, North Sydney Public School does not appear to have a fire hydrant system installed as required by the
Building Code Australia (BCA). No fire hydrants or fire brigade booster assembly were located on the property
during the site inspection
As part of the works, a fire hydrant system will be required to be installed in accordance with the latest BCA,
AS2419.1-2005 and fire engineering requirements to provide coverage. A performance solution will be required for
the location of the fire hydrant booster as it will not be able to satisfy AS2419.1-2005 cl.7.3.(b) and
A new water main connection will be required and be extended from the DN200 CICL water main on Bay Road to
serve the fire hydrant system. The final water tapping location and size will be subject to both coordination of the
building layout and formal approval from Sydney Water.
4.2.3 Gas Service
There is one existing gas connection to North Sydney Public School from the DN32 Nylon @ 210kPa gas main
located on Bay Road.
In recent years the school has removed and still has in place old gas space heaters (LB90 Gas Heaters). The hot
plate in the canteen is used infrequently and as part of the canteen refurbishment we recommend installing electric
appliances.
The gas meter and service to the school will be removed and decommissioned in accordance with Jemena
Guidelines and AS/NZS 5601 requirements.
4.2.4 Sanitary Drainage System
In accordance with the Gravity Sewerage Code of Australia (WSA-Part 2), the proposed development will require
frontage to a minimum DN225mm sewer main to connect into.
210557 - NORTH SYDNEY PUBLIC SCHOOL
UTILITY SERVICES REPORT
REVISION P3 – 19/08/2021
DEPARTMENT OF EDUCATION
PAGE 16
The development currently has two (2) frontage to sewer mains, based on initial investigations and site inspection
of North Sydney Public School. Further investigations will be required to detail (survey) each sanitary drainage line,
depth and what fixtures they serve throughout the school.
SSDA design calculation on the proposed new buildings and existing buildings we envisaged a new sewer
connection might not be required (subject to final survey results).
Figure 12: Sydney Water Sewer Service Diagram
4.3 Construction Period Services Continuity
4.3.1 Potable Cold Water
Further investigations will be required to detail (survey) each water service, exact location and what fixtures they
serve throughout the school.
The SSDA design envisaged the connection point to proposed Building J & I will reticulate from the water meter
connection adjacent to Edward St.
The assumption is that this water meter currently feeds the existing demountable buildings (to be removed),
existing Hall (to be removed), Building H (to be removed) and Building D.
Prior to demolition of existing demountable buildings, Hall and Building H will need to be disconnected and capped
off. The water service to Building D will need a temporary water service subject to further survey confirming the
existing water service routes as a temporary solution.
210557 - NORTH SYDNEY PUBLIC SCHOOL
UTILITY SERVICES REPORT
REVISION P3 – 19/08/2021
DEPARTMENT OF EDUCATION
PAGE 17
4.3.2 Sanitary Drainage System
Further investigations will be required to detail (survey) each sanitary drainage line, depth, and what fixtures they
serve throughout the school.
The SSDA design envisaged the connection point to proposed Building J & I will reticulate to the sewer connection
located in the southeast corner of the school. The sanitary drainage line will reticulate in front of Building J & I,
existing Building G and adjacent to Bay Road.
The assumption is that this sanitary drainage line from the southeast corner of the school serves the existing
demountable buildings (to be removed) and the existing Hall (to be removed).
Prior to the demolition of existing demountable buildings and the Hall any sanitary drainage connections will need
to be disconnected and capped off.
210557 - NORTH SYDNEY PUBLIC SCHOOL
UTILITY SERVICES REPORT
REVISION P3 – 19/08/2021
DEPARTMENT OF EDUCATION
PAGE 18
A.1 Electrical Services Site Plan
GSPublisherVersion 1600.10.10.100
100
50
50 100 150mm @ A1
150m
m @
A1
SYDNEYLevel 3, 35 Spring StreetPO Box 1669Bondi Junction, NSW 2022
t. (02) 8383 5151e. [email protected]
www.fultontrotter.com.au
DIRECTORSGreg Isaac raia NSW 6855 QLD 2920Justine Ebzery raia QLD 3313John Ward raia VIC 18804 NSW 8371 QLD 3847Katerina Dracopoulos raia QLD 4529Mark Trotter fraia VIC 17691 NSW 4421 QLD 1870Paul Sekava raia NSW 7180 QLD 3108Paul Trotter fraia NSW 7177 QLD 2646Ryan Loveday raia QLD 4500
BRISBANESYDNEY
plot date: Monday, 9 August 2021, 6:48 PM file location: BIMcloud: SYDBIM23 - BIMcloud Basic for ARCHICAD 23/7068WA01 - North Sydney Public School Upgrade
REVISIONDRAWING NUMBER
PROJECT NUMBER CHECKEDDIRECTOR
PRO
JEC
TC
LIEN
T
SD-1001
Figured dimensions take precedence overscale dimensions. Contractors must verifyall dimensions on site before commencingany work or making shop drawings.
DR
AWIN
GAD
DR
ESS
BAY ROADWAVERTON, NSW
7068WA01
NORTH SYDNEY PUBLICSCHOOL
NSW DEPT OF EDUCATION(SCHOOLS INFRASTRUCTURE)
EXISTING & DEMOLITION SITEPLAN
JW
Copyright
This drawing shows design features and elements of a design prepared byFulton Trotter Architects and is to be used only for work authorised inwriting by the designers. It cannot be copied directly or indirectly, in wholeor in part, nor shall it be used for any other building purposes. Unauthoriseduse will be considered an infringement of these rights.
PHAS
E SCHEMATIC DESIGN
C
REV. DESCRIPTION DATE INIT.
C
B
A
CONSULTANT COORDINATION ISSUE
REVISED FACADE ISSUE
CONSULTANT COORDINATION ISSUE
09/08/2021
06/08/2021
02/08/2021
JH
BN
BN
EXISTING BUILDINGS
EXISTING SITE PLAN LEGEND
EXISTING PAVING
ELEMENTS TO BE DEMOLISHED
EXISTING SITE CONTOURS (500MM)
EXISTING TREES
TREES TO BE REMOVED
EXISTING LANDSCAPING
EXISTING FENCING
ROOF LINE (ABOVE)
82.00
78.00 79.00
80.00
81.00
86.00
87.00
88.00
88.00
85.00
84.00
83.00
CROSSINGPEDESTRIAN
BITUMEN CARPARK
NETBALL/BASKETBALL COURTS
BITUMENCOURT
TEMPORARYBUILDING
TEMPORARYBUILDING
BUILDINGF
(RIVER) HTEMPORARY
BUILDINGBUILDING B
(HALL)
BUILDING D(McHATTON)
BUILDINGA
(PACIFIC)
BUILDING GBUILDING C
(HAVEN)TEMPORARYBUILDING
TEMPORARYBUILDING
COVERED PLAY AREA &PLAY EQUIPMENT WOOD
SHAVINGS
COVERED PLAYAREA
COVERED PLAYAREA
BITUMEN PLAY AREA
BITUMEN
BITUMEN
BITUMEN
STEPPED SYNTHETIC AREA
GRASSED PLAY AREA &PLAY EQUIPMENT
CONCRETE PATH
SYNTHETIC PLAYAREA & EQUIPMENT
PLAYEQUIPMENT
PAVINGSEATING
AREA
BITUMEN
SYNTHETICPLAY AREA
PLAYEQUIPMENT
PAVINGSEATING
AREATEMPORARY
BUILDING
CONCRETE PATH
CONCRETE PATH
COVEREDAREA
SUBSTATION
M C H A T T O N S T R E E T
B A Y R O A D
PA
CI
FI
C
HI
GH
WA
Y
PLAN1DEMOLITION SITE PLANSCALE: 1:500
No.Date
DescriptionBy Chk
LCI CONSULTANTS(AUSTRALIA) PTY/LTD
LEVEL 4, 73 WALKER STREET,NORTH SYDNEY, NSW, 2060
ABN: 92 124 107 973
Services Consultant
Project
Drawing Title
Status
Scale @
Project No.
Drawing No. Rev
North Sydney Public SchoolBay Rd, Waverton NSW
ELECTRICAL/COMMSSERVICESEXISTING SITE PLAN
210557
1:500
210557-SKE-02 P3
CONCEPT A3
P1 CONCEPT FOR COORDINATION 28.07.21 FY/RN/GM DDC
P2 SCHEMATIC DESIGN 13.08.21 FY/RN/GM DDC
EL
ELEL
EXISTINGELECTRICAL PIT 1
EL
ELELELELELELELELELELELELELEL
EXISTINGELECTRICAL PIT 2
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EL
EXISTING AUSGRID KIOSK SUBSTATIONS79467 (600kVA) NON-FIRM RATING OF 920AMPS
SUPPLY OF 800A AVAILABLE TO NSPS
EXISTING MSB IS RATED TO 800ASPD SETTING TO BE INCREASED TO 800A
P1P2
P3
EL
EL
EL
EL
EL
EL
EL
EL
EXISTING MAIN SWITCHBOARD800A RATING (MANUFACTUREDMAY 2019)
DB-2
MDB
DB-HALL
DB-4
DB-3 & 3H
DB-C& CH
EL
EL
EL
ELDB-L
DB-3HB
D14187
D10493
D14419D14109LINKBOX1
LINKBOX2EL
EL
EL
EL EL
SWITCHBOARD
MAIN SWITCHBOARD
ELECTRICAL CONDUITS INGROUND
CABLE TRAY (IN BUILDING)
ELECTRICAL PIT
CABLE LINK BOXINGROUND
INDICATIVE LOCATIONS SHOWN - NOTTO BE SCALED. LOCATION OF EXISTINGEQUIPMENT, PIT/PIPE SUBJECT TODETAILED SITE SURVEY
TEL TEL TEL TEL TEL TEL TEL TEL
EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL
EXISTING CONSUMERMAINS 8 X 1C 300mm2XLPE/PVC
EXISTING 2 x 100mm 1 x 80mmELECTRICALCONDUITS
P3 SCHEMATIC DESIGN UPDATE 19.08.21 FY/RN/GM DDC
EXISTINGELECTRICAL PIT 3
210557 - NORTH SYDNEY PUBLIC SCHOOL
UTILITY SERVICES REPORT
REVISION P3 – 19/08/2021
DEPARTMENT OF EDUCATION
PAGE 19
A.2 Hydraulic Services Site Plan
GSPublisherVersion 1606.8.8.100
100
50
50 100 150mm @ A1
150m
m @
A1
SYDNEYLevel 3, 35 Spring StreetPO Box 1669Bondi Junction, NSW 2022
t. (02) 8383 5151e. [email protected]
www.fultontrotter.com.au
DIRECTORSGreg Isaac raia NSW 6855 QLD 2920Justine Ebzery raia QLD 3313John Ward raia VIC 18804 NSW 8371 QLD 3847Katerina Dracopoulos raia QLD 4529Mark Trotter fraia VIC 17691 NSW 4421 QLD 1870Paul Sekava raia NSW 7180 QLD 3108Paul Trotter fraia NSW 7177 QLD 2646Ryan Loveday raia QLD 4500
BRISBANESYDNEY
plot date: Monday, 16 August 2021, 10:11 AM file location: BIMcloud: SYDBIM23 - BIMcloud Basic for ARCHICAD 23/7068WA01 - North Sydney Public School Upgrade
REVISIONDRAWING NUMBER
PROJECT NUMBER CHECKEDDIRECTOR
PRO
JEC
TC
LIEN
T
SD-1002
Figured dimensions take precedence overscale dimensions. Contractors must verifyall dimensions on site before commencingany work or making shop drawings.
DR
AWIN
GAD
DR
ESS
BAY ROADWAVERTON, NSW
7068WA01
NORTH SYDNEY PUBLICSCHOOL
NSW DEPT OF EDUCATION(SCHOOLS INFRASTRUCTURE)
PROPOSED SITE PLAN
JW
Copyright
This drawing shows design features and elements of a design prepared byFulton Trotter Architects and is to be used only for work authorised inwriting by the designers. It cannot be copied directly or indirectly, in wholeor in part, nor shall it be used for any other building purposes. Unauthoriseduse will be considered an infringement of these rights.
PHAS
E SCHEMATIC DESIGN
E
REV. DESCRIPTION DATE INIT.
E
D
C
B
A
Draft SSDA Issue
CONSULTANT COORDINATION ISSUE
CONSULTANT COORDINATION ISSUE
REVISED FACADE ISSUE
CONSULTANT COORDINATION ISSUE
13/08/2021
11/08/2021
09/08/2021
06/08/2021
02/08/2021
BN
JH
JH
BN
BN82.00
78.00 79.00
80.00
81.00
86.00
87.00
88.00
88.00
85.00
84.00
83.00
6000
1SD-1105
1SD-1105
EXISTING BINSTORAGE AREAS
EXISTING BINSTORAGE AREAS
PROPOSED LANDSCAPE WORKSSHOWN IN HATCHED AREA.REFER TO LANDSCAPE DRAWINGS.
PROPOSED LANDSCAPE WORKSSHOWN IN HATCHED AREA.REFER TO LANDSCAPEDRAWINGS.
PROPOSED BICYCLEPARKING FOR 55 BIKES.REFER TO LANDSCAPEDRAWINGS.
1SD-1104
1SD-1104
2SD-1104
2SD-1104
3SD-1104
3SD-1104
PEDESTRIANENTRY
BALCONY
CROSSINGPEDESTRIAN
BITUMEN CARPARK
NETBALL/BASKETBALL COURTS
BITUMENCOURT
BUILDINGF
(RIVER)
BUILDING D(McHATTON)
BUILDINGA
(PACIFIC)
BUILDING G
COVERED PLAYAREA
COVERED PLAYAREA
BITUMEN
BITUMEN
BITUMEN
SYNTHETIC PLAYAREA & EQUIPMENT
PLAYEQUIPMENT
PAVINGSEATING
AREA
BITUMEN
SYNTHETICPLAY AREA
PLAYEQUIPMENT
PAVINGSEATING
AREA
CONCRETE PATH
CONCRETE PATH
COVEREDAREA
SUBSTATION
8150
PROPOSED LANDSCAPE WORKSSHOWN IN HATCHED AREA.REFER TO LANDSCAPE DRAWINGS.
RAINWATER TANK
OSD LOCATION
M C H A T T O N S T R E E T
B A Y R O A D
PA
CI
FI
C
HI
GH
WA
Y
BUILDING I
LIFTBUILDING JSTAIR
STAI
R
STAIR
STAIRRAMPRAMP RAMP
BRIDGE
STAIR
BALCONY
COLA
0.000
0.000
PROPOSED SITE PLAN LEGEND
PROPOSED SPOT LEVEL
EXISTING SPOT LEVEL
EXISTING PAVING
PROPOSED PAVING
EXISTING LANDSCAPING
EXISTING BUILDINGS
PROPOSED BUILDINGS (SSDA)
EXISTING FENCING
PROPOSED FENCING
EXISTING TREES
PROPOSED TREES
PROPOSED LANDSCAPING
WORKS UNDER OTHER APPROVALS(CDC / EXEMPT DEVELOPMENT)
PROPOSED SITE CONTOURS (500MM)
ROOF LINE (ABOVE)
PLAN1PROPOSED SITE PLANSCALE: 1:500
DF
DUAL HEAD EXTERNAL FIRE HYDRANT
THERE IS AN EXISTING SYDNEY WATER WATERMAIN SIZED AT 500MM AND EASEMENT LOCATEDINSIDE THE SCHOOL. A SYDNEY WATERCOORDINATOR WILL NEED TO BE ENGAGED TOSUBMIT A SYDNEY WATER BUILDING PLANAPPROVAL (SPECIALIST ENGINEERINGASSESSMENT) TO INVESTIGATE IF THE PROPOSEDNEW BUILDINGS WILL IMPACT SYDNEY WATERASSETS OR PROPOSED INGROUND SERVICESRETICULATION NEAR OR OVER THE EASEMENT.
PROPOSED LOCATION OF THE FIRE HYDRANTBOOSTER ASSEMBLY SIZED AT 2.5M LONG X 1MDEEP
SITE SEWER BOUNDARY TRAP.REQUIRED CONFIRMATION OF THESIZE AND INVERT LEVEL OF SITESEWER SYSTEM TO RETICULATE NEWDRAINAGE FROM NEW BUILDINGS ANDPROPOSED AMENDMENTS TOEXISTING BUILDINGS. LCIRECOMMENDS A "DEMAND AND LOADSANALYSIS" BE CALCULATED FOR THEWHOLE SITE.
SITE SEWER BOUNDARY TRAP.REQUIRED CONFIRMATION OF THE SIZEAND INVERT LEVEL OF SITE SEWERSYSTEM TO RETICULATE NEWDRAINAGE FROM NEW BUILDINGS ANDPROPOSED AMENDMENTS TO EXISTINGBUILDINGS. LCI RECOMMENDS A"DEMAND AND LOADS ANALYSIS" BECALCULATED FOR THE WHOLE SITE.
SITE WATER METER IS SIZED AT 50MM. LCIRECOMMENDS A "DEMAND AND LOADS ANALYSIS"BE CALCULATED FOR THE WHOLE SITE TOCONFIRM IF THE 50MM SERVICE IS SIZEDSUFFICIENTLY TO SERVE THE WHOLE SITE & NEWBUILDINGS.
THE FIRE HYDRANT SYSTEM WILL REQUIRE A NEWWATER MAIN CONNECTION TO THE 200MM CICL.WE WILL REQUIRE CONFIRMATION BY A SYDNEYWATER PRESSURE AND FLOW STATEMENT TOVERIFY THE WATER MAIN CAPACITY TO SERVETHE FIRE SERVICES FOR THE SCHOOL (WILL THEFIRE HYDRANT SYSTEM REQUIRE PUMPS ORTANKS). LCI HAS APPLIED TO SYDNEY WATER FORA PRESSURE AND FLOW STATEMENT
CW CW CW CW
CW
200mm CICL 200mm CICL
FH
FH
CW
CW
FIRE HYDRANT SERVICE TO RETICULATETHROUGH THE NEW BUILDING AT HIGHLEVEL
FIRE HYDRANT SERVICE TO RETICULATEINGROUND ONCE IT LEAVES THE NEW BUILDING
FIRE HYDRANT SERVICE TORETICULATE INGROUND
PROPOSED CONNECT POINT FOR THEWATER POINT SIZED AT 40MM (1.57L/S)
100mm
100mm
SDSDSDSDSDSD
SDSDSDSDSDSD
Sewer Starting Point RL 82.77Slab - 0.25Pipe Work- 0.2=I.L 82.32
Base of the Boundary Trap RL 78.780Site Measurement - 0.78=I.L 78.78
160m at 1/60 Fall = 2.666m
I.L 82.32- 2.666= I.L 79.654
PROPOSED NEW GREASE ARRESTOR SIZED2000L TO SERVE THE REFURBISHMENT OFTHE CANTEEN. OUTLET OF THE GREASEARRESTOR IS TO CONNECT INTO THEEXISTING SEWER LINE
PROPOSED NEW RAINWATER TANK SIZED AT25,000L, OVERFLOW FROM THE TANK IS TOCONNECT INTO THE PROPOSED SITE OSD TANK
No.Date
DescriptionBy Chk
LCI CONSULTANTS(AUSTRALIA) PTY/LTD
LEVEL 4, 73 WALKER STREET,NORTH SYDNEY, NSW, 2060
ABN: 92 124 107 973
Services Consultant
Project
Drawing Title
Status
Scale @
Project No.
Drawing No. Rev
North Sydney Public SchoolBay Rd, Waverton NSW
HYDRAULIC SERVICES
SITE PLAN
210557
1:500
210557-SKH-02 P2
CONCEPT A3
P1 CONCEPT FOR COORDINATION 28.07.21 MB DDC
P2 SCHEMATIC DESIGN 18.08.21 MB DDC
210557 - NORTH SYDNEY PUBLIC SCHOOL
UTILITY SERVICES REPORT
REVISION P3 – 19/08/2021
DEPARTMENT OF EDUCATION
PAGE 20