JON ES llP BRITISH COLUMBI/\ UTI! IT [S C(Hi1 M! SSlD N BENNETT Loyola G. Keough Direct Line: 403.298.3429 e-mail: [email protected] Our File No.: 54046-1 January 17, 2005 DAY :J- ~"'~'C 1~-/3 t",!' 7 .. -_._.~ "._~.~ ..._-_._- Ef'.JTCh ; iV\iE trerM?~. l J; tV 1mb 4500 Bankers Hall East 855 2nd Street 5W Calgary Alberta Canada T2P 4K7 Te/403.298.3100 Fax 403.265.7219 www.bennettjones.ca EXHIBIT NO. C17-13 British Columbia Utilities Commission 250, 900 Howe Street Vancouver, B.C. V6Z 2N3 AU: Mr. Robert Pellatt Commission Secretary Dear Mr. Pellatt: Re: British Columbia Hydro and Power Authority ("BC Hydro") Call for Tenders for Capacity on Vancouver Island Review of Electricity Purchase Agreement Project No. 3698354 Further to the Commission's Procedural Schedule, please find attached Duke Point Power Limited Partnership's Responses to the Information Requests of the BCUC. Should you have any questions regarding the above, please do not hesitate to contact the undersigned. Yours truly, BENNETTJONESLLP Loyola G. Keough cc: Registered Intervenors DMSLegal105404610000 I11975338vl

UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

JON E S llP

BRITISH COLUMBI UTI IT [S C(Hi1 M SSlD N

BENNETT

Loyola G KeoughDirect Line 4032983429e-mail keoughlbennettjonescaOur File No 54046-1

January 17 2005DAYJ-

~~C1~-3t 7 -__~ _~~ _-__-

EfJTCh iViE

trerM~ lJ tV 1mb

4500 Bankers Hall East

855 2nd Street 5W

Calgary Alberta

Canada T2P 4K7

Te4032983100

Fax 4032657219

wwwbennettjonesca

EXHIBIT NO C17-13

British Columbia Utilities Commission250 900 Howe StreetVancouver BCV6Z 2N3

AU Mr Robert PellattCommission Secretary

Dear Mr Pellatt

Re British Columbia Hydro and Power Authority (BC Hydro)Call for Tenders for Capacity on Vancouver IslandReview of Electricity Purchase AgreementProject No 3698354

Further to the Commissions Procedural Schedule please find attached Duke Point PowerLimited Partnerships Responses to the Information Requests of the BCUC

Should you have any questions regarding the above please do not hesitate to contact theundersigned

Yours truly

BENNETTJONESLLP

Loyola G Keough

cc Registered Intervenors

DMSLegal105404610000 I11975338vl

BRITISH COLUMBIA UTILITIES COMMISSION

BRITISH COLUMBIA HYDRO AND POWER AUTHORITYCALL FOR TENDERS FOR CAPACITY ON VANCOUVER ISLAND

REVIEW OF ELECTRICITY PURCHASE AGREEMENTPROJECT NO 3698354

DUKE POINT POWER LIMITED PARTNERSHIPINFORMATION RESPONSES TO THE BCUC

10 Reference Exhibit No C17 -6 DPPLP Evidence Filing January 6 2005

11 Page 1 A 1 Please support the statement that Pristine Power Inc is acompany experienced in the development of major power generationprojects and list by name location size and actual COD those powerprojects developed to successful operation by the corporate entity PristinePower Inc

Response 11 For clarity the experience referred to in the Evidence is theexperience of the principals of Pristine Power Inc

The CVs for the following principals are attached to Response 141below

Jeffry Myers President amp Chief Executive OfficerHarvie Campbell Executive Vice PresidentKen Spinner Vice President Engineering

Attached is also a project experience chart that lists the namelocation size and COD of major power projects with which theprincipals of Pristine Power Inc have experience

12 Page 1 A 1 Who are the shareholders of Pristine Power Inc

Response 12 50 of Pristine Power Inc is owned by the following principals andtwo of the five directors are appointed by this management team

Jeffry MyersHarvie CampbellKen SpinnerJulia CiccaglioneKevin Gilchrist

The remaining ownership is held by private investors

13 Page 2 A 1 Does 10 of the venture mean 10 of DPPLP If not 10of which entity

DMSLegal054046OOOO 1 1972044v3

Response 13

- 2 -

Yes 10 of DPPLP and Bastion Island Power Inc its GeneralPartner

14 Page 2 A2 Please identify the key team members the Projectmanagement personnel and other members of the highly qualified andexperienced team

141 Please provide the CVs of these personnel

142 Please provide evidence of the experience of Bibb and Cochrane inthe EPC of analogous power plants

Response 14

Duke Point Power LPBidder

Financial Adviso rMacquarie Bank

Debt ProvidersRoyal Bank of Canada

Independent EngineerBlack ampVeafch

G T LT SAGE Energy

141

Legal Advisors - ProjectBennett Jones LLPR

Leg al Advisors - Fin anceFarris Vaughn

Power CycleEngin eer

Attached are the CVs of the following key team members

Jeffry Myers President amp Chief Executive Officer Pristine PowerIncHarvie Campbell Executive Vice President Pristine Power IncKen Spinner Vice President Engineering Pristine Power IncJulia Ciccaglione Vice President Environment and EmissionsTrading Pristine Power IncNeil Stewart Site Project Manager

Please see the answer to BCUC IR 2701 for more documentationsupporting the arrangement and the personnel for commissioningstartup and operations

142 Please see attached pdf file for the requested information

DMSLegal05404600001 1972044v3

-3-

15 Page 3 A2 Please provide a rough breakdown of the $2 MM betweencash (or cash owed) and sweat equity

Response 15 DPP will have incurred direct development costs of approximately$2 million by mid-February 2005 This does not include the internalcosts or sweat equity of the sponsors or any costs from thevarious project stakeholders such as the EPC contractor the bankthe operations contractor etc All inclusive costs are estimated tobe well in excess of $2 million dollars over the period up to theaward and another $2 million over the three months from award tomid-February The above figures are conservative estimates

In addition to the expenses mentioned above DPP has made a $5million deposit related to the Asset Transfer Agreement and hasprovided development security of slightly over $30 million

16 Page 3 A3 Is sale of energy or capacity to Harmac or any party otherthan BC Hydro the intention of DPPLP

161 Are contractual arrangements with Harmac in place or underway

162 In DPPLPs opinion does BC Hydro have any contractual rightsunder its EPA to require DPPLP to sell this capacity or energy (orany part of it) to BC Hydro at any time

Response 16 Yes

161 No

162 Contractually BC Hydro has rights to 105 of 252 MW

17 Page 4 A3 How much additional capacity is available through duct firing

171 When will this capability be installed

172 What benefit if any will accrue to BC Hydro from such capability

173 If any of the plant components listed were upgraded to improveplant heat rate how would the resulting financial benefits be splitbetween BC Hydro and DPPLP

Response 17 Duct firing will provide approximately an additional 28-30Megawatts of capacity

171 All capacity will be operational by May 1 2007

172 The existence of capacity exceeding 105 of 252 MW providesextra insurance to BC Hydro that minor facility upsets in the

OMS Legal054046OOOO 1 19n044v3

- 4 -

operation of the plant will not adversely affect the availability of thecontracted capacity Such potential minor operational upsets willbe first absorbed by the additional duct fired capacity

173 The resulting costs and financial benefits would accrue 100 toDPPLP

18 Page 7 A7 DPPLP state there were no surprises in the CFT processPlease if and how DPPLP anticipated that the term of the EPA would bechanged from 10-25 years as in the original CFT documents to 25 yearsminimum with a BC Hydro unilateral option to extend to 35 years Pleasesimilarly explain why DPPLP expected that the Independent Revieweroriginally allowed to talk to bidders would later be forbidden to talk tobidders and vice-versa

Response 18 In the team members experience it is quite common for theoffering party to refine the terms of CFTRFP processes mid-course as objectives and constraints become better known and toreflect the input of potential bidders In DPPs view although therewere substantive changes to the EPA during the process theprocess itself reflected no dramatic departures from the originallyindicated path This comment also reflects the fact that all partieswere kept appraised of ongoing developments in order to ensurethat everyone remained on an equal footing Specifically thetransition to the 25-year term resulted in a term that is consistentwith the life of the assets With respect to the independentReviewer at the time that DPP became involved in the CFTprocess bidders were not able to communicate directly with theIndependent Reviewer

19 Page10A13

191 Is DPPLP taking the position that it was unaware that the BCUCmight reject the EPA if it found that as for VIGP BC Hydro hadfailed to demonstrate that this project is the most cost effectivesolution for the Vancouver Island capacity issue If so pleaseprovide evidence from the CFT documents that support thisposition

192 Is DPPLP taking the position that the terms and conditions of theEPA are irrelevant in the determination of whether this project is themost cost effective solution to the Vancouver Island capacity issueIf so please state why

193 Would DPPLP bid the same prices for the project if the terms andconditions of the EPA were (a) far harsher or (b) far looser asseen from the position of bidder

DMSLegal105404610000 111972044v3

-5 -

194 Philosophically is there a point of harshness in a CFT andEPA atwhich DPPLP would simply decline to bid

Response 191 No DPP notes that VIGP was not the result of a broad all-sources competitive process

192 No However DPP considers that the EPA must be considered inthe context of the market-based approach adopted for theacquisition of the needed capacity If it can be clearly shown thatthe EPA in its totality is fundamentally flawed then this findingshould be addressed by the Commission However DPP views apiecemeal revisiting of this EPA as inappropriate if not impossibleDPP is of the view that the most important aspect of any reviewbeing its fairness has been answered through the competitiveprocess as all bidders faced the same EPA Terms and Conditionsand consequently all bidders remained on an equal footing

The Commission could use this proceeding as an opportunity toprovide commentary for use in future competitive procurementprocesses in the Province

193 No any bid would obviously be influenced by the totality of thepackage offered by the EPA This is not solely a pricing issueBidders adopt technologies and configure their facilities to meet thetechnical requirements of the electrical system as reflected in anEPA This clearly would impact the quantum of the bid but itsprimary role is to ensure that the system adopts appropriatetechnology to meet its requirements

194 Depending on the circumstances yes

110 Under the terms of the DPPLP EPA please explain the extent to whichDPPLP is responsible for any Green House Gas charges fees orpenalties until 2010 and starting 2011 Please clarify whether DPPLPhas factored any such GHG liability into its bid price

Response 110 Under the EPA the project has accepted liability with respect toGreenhouse Gas charges fees or penalties for the life of theproject BC Hydro under the terms of the Asset TransferAgreement has committed to offset 50 of GHG emissions up toand including the year 2010

DPPLP has factored potential GHG liability into the bid pricebased on an in-depth review of the issue The project team spentconsiderable time reviewing understanding and assessing thepotential GHG liabilities from the facility Based on thisassessment the project incorporated an appropriate allowance forsuch potential liability

DMSLegal054046OOOO 1 1972044v3

JEFFRY M MYERS55 Springs ide StreetCalgary Alberta

T3Z 3M1

Residence (403) 246-6673Business (403) 444-5571Cellular (403) 813-3098

Email jmyerspristinepowerca

QUALIFIED BY

Twenty-five years experience in the downstream natural gas and independent power business including

bull Executive level management of all aspects of a major Canadian independent power businessbull Significant role in the management and partnership in two independent power startup businessesbull Major greenfield pipeline and storage project development to financingbull Development of independent power projects to financingbull Long-term natural gas and transportation acquisition and fuel planningbull Operations management and planning for natural gas pipeline and power assets

EXPERIENCE

President Pristine Power Inc January 2003-Present

Founder of Pristine a company formed to pursue environmentally responsible power projectdevelopments based on exploitation of proven technologies Development activities include thedevelopment of energy recovery generation projects from industrial waste heat compressed air energystorage projects and conventional gas-fired power projects This includes management of the successfultender for the 252MW Duke Point Power Project as a result of the Vl-CFT Pristine completed a privatefinancing in 2004 and generally undertakes early stage development activities at the risk of the Pristineshareholders and generally seeks venture backing as required for bidding purposes and to fund the latterstages of project development acquisition and construction

President Westcoast Power Inc December 1999 -July 2002

Responsible for management of all aspects of the Westcoast Energy Inc power business segmentincluding eight operating plants (six in North America two international)

Management of an operating fleet of approx 500 megawatts (MWs) three plants under construction (800MWs) in North America and one in China (50 MWs) Project development markets included Canadaand northern tier US markets including the WSCC MAIN ECAR NYPP PJM and NEPOOL reliabilityareas Responsibilities included relationship management with eight key project partners

The mandate included operating responsibility for all plants except one partner operated internationalasset and a staff of 250 not including corporate support staff Annual capital budget accountability ofapproximately C$250 million Westcoast Power contributed approximately 10 of after tax earningsand 20 of annual cash flow to Westcoast Energy (2001) results

Key Accomplishments

~ Successful development of four F class hybrid merchant power projects with aminimum of 50 of the spark spread risk locked in via long term bilateral contracts

Execution of two North American and one international construction project withinfinancial and performance parameters approved by the Westcoast Energy Board ofDirectors

~ Continued implementation of a self directed work team operations philosophythrough the staffing of two new operating plants

~ As a result of a re-alignment of corporate priorities led the development of themanaged growth strategy for Westcoast Power This resulted in the successfulconditional sale of the North American operating assets and a strategic review of thefuture of the power business at WestcoastFollowing the acquisition of Westcoast Energy by Duke Energy in March 2002directed the sale of all remaining Westcoast Power assets and the wind-up ofWestcoast Power

Vice President Business Development - Westcoast Energy February 1997-December 1999

Responsible for the development of North American pipeline and storage project initiatives (from early1997) and independent power projects (from mid 1998)

Key accomplishments~ Initiation and development of the TriState and Millennium pipeline projects~ Management of the acquisition of a significant share of the Alliance and Vector

pipeline projects~ Execution of the Westcoast Power hybrid merchant strategy and management of the

development of the successful Liberty and Bayside power project developments

PALLISER PIPELINE PROJECT

Project Manager - Westcoast Energy

February 1996-January 1997

Managed all aspects of the Palliser project a $350 million pipeline proposal by Westcoast Energyselected by PanCanadian Petroleum following an extensive industry Request for Approvals Palliser wasthe first major natural gas pipeline project in North America proposed to be developed and constructed atthe risk of the project partners

Responsibilities included selection and management of a multi-disciplinary team from Westcoast andPanCanadian and directing Palliser as an autonomous business unit responsible to the project OwnersCommittee

Filing of the Palliser project with the National Energy Board resulted in a competitive response andsubsequent wind-up of the project Westcoast Energy earned significant profit for on termination of theproject as a result of a success fee arrangement negotiated with PaqcCanadian

MARITIMES AND NORTHEAST PIPELINE PROJECTProject Manager - Westcoast Energy

1994 -1996

Developed Westcoast Energys interest in the project from initial concept with the Sable Offshore EnergyProject partners and managed all Canadian elements of the pipeline project

Reporting to Westcoast senior management and the project management committee selected a projectteam and directed system marketing community relations and all engineering and environmentrequirements of the project

Subsequent to the assignment to the Palliser Project Maritimes and Northeast was filed with the NationalEnergy Board and is on schedule for the original in-service date of November 1999

2

ST CLAIR PIPELINESManager Pipeline Business Development

1994

Following the acquisition of Union Gas by Westcoast Energy participated in the development of a storageand pipeline business development subsidiary

Responsibilities included a thorough review of project development potential in eastern Canada and theMidwest and Northeast United States Managed Unions participation in the Intercoastal project anddeveloped the Bluewater pipeline project

NORDIC POWER COGENERATION OF CANADAPresident

1990 - 1993

One of six key professionals hired by the founder of Nordic Power Inc to start up a new North Americanindependent power company

Managed all aspects of the $150 million 102 megawatt West Windsor power project from originalproposal to Ontario Hydro to financial closing West Windsor Power was commissioned in 1996 and isnow owned by an affiliate of Tractebel SA

Key responsibilities included initiation and closing of long-term agreements with Ontario Hydro steamhosts fuel suppliers and transporters and management of all government affairs

Tenure with Nordic also included greenfield power project development and fuel plan development atseveral sites in Canada and the United States

UNION GAS LIMITEDVarious Operations Positions

1987 -1990

Line and staff management assignments and summer employment in the field in three of Unions regionaloffices and head office culminated in the management of a total of 55 staff and an annual capital budgetof approximately $5 million

Participated as a middle manager in a major organization following an early retirement program thatresulted in operating cost reductions of over 20

EDUCATION

Honours Bachelor of Arts in Business AdministrationThe University of Western Ontario

Masters of Business AdministrationThe University of Windsor

3

1980

1992

HARVIE E CAMPBELL

354 Hawkview Manor Circle N WCalgary Alberta T3G 2Y7

Business 403-241-2436Cell 403-650-4584Fax 403-374-1871

e-mail Harviecampbellshawca

SENIOR CONSULTING BUSINESS DEVELOPMENT PROFESSIONAL

Project development consultant with over 20 years in the energy industry Experienced in the reviewassessment and development oflarge capital energy projects particularly independent power projects hasplayed a senior role in the development of over 1500 MWs of power facilities valued at over $15 billion

Proficient in all aspects of power generation development feasibility reviews market analysis projectmanagement fuel supply contracting execution financing and economics Skilled in facilitating businessdevelopment solutions Proven ability to direct successful development project management teams andenhance co-operation from all levels of an organization partners stakeholders and government agencies toincrease shareholder value and achieve business project development results Proven ability to get thedeal done

Mr Campbell currently operates a consulting firm (HEIAK Energy Inc) providing management services tothe Independent Power Industry

PROFESSIONAL EXPERIENCE

Vice President and CFOPristine Power Inc

2002 to Present

Founding partner of Pristine Power Inc a development company established to pursue the development ofprojects utilizing leading edge proven generation technologies with strong environmental characteristicsThe company focuss on the development of waste heat generation and storage related generationtechnologies such as Compressed Air Energy Storage (CAES)

Vice President (amp General Manager) DevelopmentWestcoast Power Inc Calgary Alberta

1998 to 2002

As Vice President Development for Westcoast Power held responsibility for all aspects of West coastsdevelopment activities within Canada the United States and overseas Responsibilities included projectconception overall management of a multidisciplinary development team including technical economicpublic relations environmental legal and financing Responsible for the negotiation of all contracts andassembling of project development teams Important accomplishments include

Harvie E Campbell

FREDERICKSON POWER PROJECT

2493 MW F Class Combined Cycle facility located near Tacoma WashingtonRole Vice PresidentExecutive Director

Page 2

Responsibilities included all aspects of project development including PNW regional plan for WestcoastPower regional screen acquisition of the Frederickson site formed development team arranged projectconstruction gas transportation electrical transmission offtake contracts interconnection etc

Project Highlights

bull Project accorded First mover status during the PNW power boom in 20002001bull Placed 20 year tolling contracts with three regional PUDs Benton Franklin and Grays Harbourbull Arranged gas transportation on the Westcoast and Northwest Pipeline systems and electrical

transmission to Big Eddy amp John Daybull Project was under budget and ahead of schedulebull Oversaw partial sale to a partner and final sale of Duke (Westcoast) interest to Epcor Powerbull Project is presently in commercial operation

ISLAND COGENERA TION PROJECT

250 MW F class CC Cogen facility (Alstom Gas Turbine) located in Campbell River HCRole Vice President

Project Highlights

bull Development phase of the ICPI was successfully completed while maintaining shareholder valuebull All project contracts and permits were completed and executedbull Purchase of Partners working interest after execution of all Project agreementsbull Lead successful non-recourse financing of facility

PUNCAKJA YA POWER PROJECT

395 MW project consisting of 60 diesel generators 3x 65 MW coal fired units and one 60 mile long transmissionline located at the Freeport MacMoran goldcopper mine in Irian Jaya Indonesia

Responsible for contracts including power offtake operations and technical completion with Freeport andestablishing operating regimen Also played a senior role in the USD $500 million financing of the project

Harvie E Campbell Page 3

In addition Mr Campbell has undertaken senior roles in the development and financing of the following projects

Ft Nelson Transmission Line (BC)McMahon Cogeneration Project (BC)Cantarell Nitrogen Injection Project (power component)WEI Gang Power Project (Shanghai)Lake Superior PowerFt Frances CogenerationWhitby CogenBayside Power

Director Energreen Inc

nla110 MW520 MW30MW

110MW110 MW50MW280 MW

While Vice President Development for Westcoast Power Mr Campbell also acted for Westcoast on theBoard of Energreen a power related subsidiary of Alliance Pipeline

Manager Investment Services GroupWestcoast Energy IncVancouver BC

1994 to 1998

Established a single group responsible for the financial analysis commercial review and contracting of allcapital projects within Westcoast Energy including Westcoast Power Westcoast International and theWestcoast Business Development Group (mostly Pipeline and storage related investments) Supportedproject contract negotiations financial analysis and financing on a host of projects including powergeneration pipeline petrochemical and fertilizer projects

Supervisorl Financial AnalystWestcoast Energy IncVancouver BC

1984 to 1993

Harvie E Campbell Page 4

From joining Westcoast Energy in 1984 as a financial analyst and economist Mr Campbell heldsuccessively more senior roles in the areas of planning development and financial analysis Heparticipated in the acquisition of several small oil amp gas production companies ICG Utilities and UnionGas in the late 1980s and early 1990s

EDUCATION

bull MA Economics 1984Simon Fraser University at Burnaby Bc

bull BA (Honours) Economics 1982University of AlbertaEdmonton Alberta

Mr Campbell is a past President (and currently Director) of the Independent Power Association of BritishColumbia and past Director of the Canadian Institute of Energy and the Vancouver Rowing Club Heresides in Calgary with his wife Ines and three children

References Available on Request

KENNETH W SPINNER

3040- 400 - 4th Ave SWCalgary AB T2P OJ4

403-444-5578

Technicalproject management and development professional with 23 years in the energy industryExperienced in the review technical assessment and development of independent power projects havebeen involved in the development engineering and construction on over 1000 megawatts of powerplants and project managed over $500 million in powerenergy projects

Proficient in all aspects of power generation developments feasibility reviews project managementproject engineering EPC contract negotiations and administration Proven ability to direct successfuldevelopment project management teams and enhance co-operation from all levels of an organizationpartners stakeholders and government agencies to increase shareholder value and achieve business project development management results

PROFESSIONAL EXPERIENCE

V P EngineeringPristine Power Inc

2003 to Present

Presently providing project managementdevelopment and technical support for all power generationdevelopments and projects Responsible for preliminary development engineering coordination of allengineering procurement and construction and contract negotiation and administration activities withinthe company

PresidentSpinergy Services Inc

1999 to 2003

Providing power generation consulting and developmentmanagement services to various clients throughoutCanada specifically Alberta British Columbia Saskatchewan and Eastern Canada Involved in various gas-firedand biomass project developments ranging from 25 Megawatts to 450 Megawatts as project development advisorConducted feasibility studiesproposals and economic feasibility reviews on a wide range of power developmentsin the energy forestry and coal industries On going in-house developments include gas-fired cogenerationbiomass generation combined heatcooling power facilities and energy storage opportunities

Executive Director Vice President (ICPI)Manager New Ventures Business DevelopmentFletcher Challenge Energy (FCE) Calgary Alberta

]997 to 1999

As Executive Director Vice President of the 250 megawatt Island Cogeneration Project Inc (ICPI)jointly-managed development of the ICPI project on Vancouver Island to development completion Directed negotiationteams for the power purchase agreement with BC Hydro steam sales agreements with Fletcher ChallengeCanada Paper Mill the engineering and construction contract and project permits

Pale]KENNETH W SPINNER

PROFESSIONAL EXPERIENCE (Continued)

Project Highlights

bull Development phase of the ICPl was successfully completed while maintaining shareholder valuebull All project contracts and permits were completed and executedbull Managed development team in Vancouver consisting of multi-disciplinary professionals legal

environmental and engineering consultantsbull Guided the environmental permitting process and obtained project approvalbull FCEs working interest in ICPI was successfully sold after execution of all Project agreementsbull Project is presently in commercial operation

ISLAND COGENERATION PROJECT - 250 MW- CAMPBELL RIVER BC

Vice PresidentWest Windsor Power - (PLC Windsor Ltd)Northstar Energy Corporation Calgary Alberta

1994 to 1997

Vice President ofPLC Windsor Ltd and Northstar Energys principal representative on the partnershipmanagement committee directly responsible for the 120 megawatt West Windsor Power project in WindsorOntario Responsible for overall project management project financial analysis and project capital budget

Project Highlights

bull Administered the implementation of all project contracts including engineering and construction contractgas supply and transportation agreements steam sales power purchase agreements and directed financialclosing activities at loan conversion Project was under budget and started up successfully in 1996

bull Maximized project value by cost control budgeting scheduling maintaining initial contract values andoptimizing economic parameters

bull Involved in the negotiation and implementation a $100 million EPC turnkey contract for the constructionand start-up of the facility

bull Project was managed to completion which included mobilization commissioning commercial operationsperformance testing and conversion to term financing

Pa2e 2KENNETH W SPINNER

PROFESSIONAL EXPERIENCE (Continued)

WEST WINDSOR POWER - 120 MW - WINDSOR ONTARIO

Manager EngineeringPowerlink Corporation (Subsidiary of Northstar Energy Corp) Portland Oregon

1992 to ]994

Responsible for all technical management and support for power project development activities in Canada USAand other international regions Supported project contract negotiations on the West Windsor Power Projectmanaged the engineering construction contract and operating agreement negotiations

Manager Facilities Engineering Sr Project Engineer Process EngineerNorthstar Energy Corporation Dome Petroleum Ltd Hudsons Bay Oil and Gas LtdCalgary Alberta

1980 to ]992

Managed oil and gas facilities development in Alberta and independent power development in Canada and theUSA Responsible for project management and process engineering on various oil and gas facilities and pipelines

EDUCATION

bull Bachelor of Science Chemical Engineering (Honours) 1980Queens University at Kingston Ontario

bull Cogeneration Development Course 1992Kingston Ontario

bull Cogeneration Power Plant Design and Optimization 1991Boston Massachusetts

bull Business Management Financial and Evaluation Courses 1986 to 1997

Pale 3

Project Experience Chart

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsHarvie Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren BakerCampbell Power Project Utilities Washington CCGT Electric Harbour EPCOR Power Power Resource

Puget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Puncakjaya Duke Irian Jaya 395 MW Diesel coal Mitsubishi PT Freeport 1997 Richard E Richard EPower Project Energy Indonesia fired Indonesia Coleman Coleman

PT Freeport PT FreeportIndonesia IndonesiaJI H R Rasuna JI H R RasunaSaid Kav X-7 No Said Kav X-7 No6 6Plaza 89 12th Plaza 89 12thFloor FloorJakarta 12940 Jakarta 12940

Lake Superior Great Sault St 110 MW Natural GE Ontario 1993 Colin Clark Bill RalphPower Project Lakes Marie Ont GasDistiliate Electricity Great Lakes OEFC

Power Finance Corp Power amp Brascan 416-325-80577059415651

McMahon Duke Taylor BC 115 MW Natural Gas Westinghouse BC Hydro 1993 Duane Rae Dawn FarrellCogeneration Energy Duke Energy BC Hydro

ATCO 4036991551ATCO

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsJeff Myers Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren Baker

Power Project Utilitiesl Washington CCGT Electric Harbour EPCOR Power Power ResourcePuget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Liberty Power Reliant Philadelphia 568 MW Natural Gas GE Pacific Gas 2002 Greg Kennedy Nowa merchantProject Energy PA CCGT and Electric - Reliant Energy plant

National 713-497-7490Energy Group(receivership)

West Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Ken Spinner Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsWest Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Julia S Ciccaglione Curriculum Vitae

CURRICULUM VITAE

JULIA S CICCAGLIONEEnvironment Specialist

3040400 4th Avenue SWCalgary AB Canada T2P OJ4

Tel (403)444-5538 email jciccaglionepristinepowerca

CAREER BRIEF

An environment specialist with extensive experience in project management impact assessmentstakeholder consultation policy analysis and climate change Additional expertise in internationaldevelopment projects including project monitoring and stakeholder facilitation Excellent communicationorganisation and writing skills Technical background in the biophysical sciences and economics Projectperformance measurement experience using Results Based Management (RBM)

EDUCA TION

MSc Geography 1998Soil Erosion Assessment Soil and Water Nutrient Loss Analysis Watershed ManagementUniversity of Calgary Calgary Alberta Canada

BSc Geography 1994University of Calgary Calgary Alberta CanadaConcentration Biogeography geomorphology

BA Economics 1991University of Calgary Calgary Alberta CanadaConcentration Petroleum economics

PROFESSIONAL EXPERTISE

Environmental Project ManagementPolicy AnalysisRegulatory AnalysisStakeholder amp Public Consultation

Impact AssessmentSustainable DevelopmentClimate ChangeEnvironmental Management

CAREER HISTORY

Domestic

1998- Pristine Power Inc Calgary Vice President Environment and Emissions TradingPresent Responsible for overall environmental project management regulatory compliance public

policy input and management of Pristines greenhouse gas strategy

Suncurrent Industries Ltd Calgary Senior Emissions Portfolio ConsultantResponsible for overall management of Suncurrents greenhouse gas credit portfolio

2

Alberta Energy Company (AEC) Ltd Calgary Wetland Vegetation Scientist IRISEnvironmental Systems Responsible for the design of a long-term (20 yr) Boreal wetlandvegetation monitoring program to determine the effects of groundwater withdrawal on wetlandvegetation Data gathered from the monitoring program to be utilised by Alberta EnvironmentalProtection for resource management decision making

Syncrude Canada Limited Calgary Environment Specialist and Project Manager IRISEnvironmental Systems Managed and co-ordinated a team of scientists responsible for thedelineation of forest types into commercial and non-commercial stands Derived informationwas used as input into Syncrudes reclamation and mine area conservation plan Specificproject management activities included conducting a needs assessment budget preparationand creation of a Terms of Reference

Environmental Impact Assessment amp Policy Specialist IRIS Environmental SystemsResponsible for the completion of environmental impact assessment projects Responsibilitiesincluded the identification of impacts mitigations cumulative effects and the management andco-ordination of multidisciplinary scientific teams Extensive liasing with government agenciesPolicy analysis included integrating environmental policy and statutory requirements withdevelopment initiatives Additional responsibilities included extensive stakeholder and publicconsultation The following is a list of completed environmental impact assessments

Skiing Louise Limited Banff National Park An Environmental Screening Report for thepurpose of withdrawing water from the Pipestone River and Corral Creek to accommodatesnowmaking fire-fighting and domestic water use activities Report considerations includedidentifying river hydrologic regimes potential impacts to aquatic ecosystems mitigationprocedures and cumulative effects assessment

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts associated with improvements to water intake systems in the Pipestone River andCorral Creek Specific report considerations included identifying impacts to aquaticecosystems

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts related to terrain modifications and replacement of snowmaking infrastructure on theUpper Wiwaxy ski run

The Lake Louise Inn Banff National Park Environmental Screening Report for theconstruction of new commercial accommodation in Lake Louise

Skoki Lodge Banff National Park Environmental Screening Report for the construction ofadditional staff housing at the Skoki Lodge National Historic Site

The Banff Centre Banff National Park Environmental Screening Report for the submissionof an Area Redevelopment Plan The project considered a strategic assessment includedthe identification of impacts resulting from proposed developments or redevelopments on thecampus of The Banff Centre

Ski Marmot Basin Jasper National Park Canada Part of a multi-disciplinary teamresponsible for the completion of a Comprehensive Study for the development of a chairlift andski runs in the Eagle Ridge area of Marmot Basin

Ski Marmot Basin Jasper National Park Canada Environmental Screening Reportspertaining to the installation of new sewage treatment facilities improvements to surfacedrainage and subsurface drainage

3

1995-1998

1990

Legislation Analyst IRIS Environmental Systems Alberta Economic DevelopmentCalgary AB Review and analysis of Alberta Provincial and Canadian Federal legislation todetermine land use laws and identify areas within the province which may have potential forfuture tourism development This information was used in the development of maps illustratingcurrent land uses and areas of potential future tourism development in Alberta

University of Calgary Department of Geography Canada Instructor i) Taught introductorygeography Topics included climatology geomorphology soils and vegetation hydrology remotesensing and air photo interpretation ii) Taught a senior level course in introductory vascular plantidentification plant taxonomy introductory wildlife identification and habitat associations and plantand wildlife responses to disturbances specific to the Canadian Grasslands Aspen ParklandMontane Sub-Alpine Alpine and Boreal Forest Ecoregions

Petro Canada Resources Incorporated Calgary Canada Junior Land ManagementRepresentative Responsible for the review of land agreements governing the operation of oiland gas properties Conducted an economic evaluation and reconciliation of predicted gas pricesversus actual market prices Additional work included site inspections of reclaimed coal propertiesin northeastern British Columbia

International

1998- Cuba Climate Change Emissions Baseline and Monitoring Plan Department of ForeignPresent Affairs 2002 and IntI Trade (DFAIT) Canada Project Manager Suncurrent Industries Ltd

Responsible for managing a climate change emissions baseline study and monitoring planfocused on the implementation of renewable and energy efficient technologies (wind and solarenergy high efficiency micro-turbines) in Cuba Baseline study was in accordance with thoserequirements for a Clean Development Mechanism

Egypt Environment Theme Project - Canadian International Development Agency (CIDA)Environment and Performance Measurement Specialist IRIS Environmental SystemsMember of the Performance Measurement Advisory team for the bilateral CIDA-EgyptEnvironment Theme Project (7 year project) Responsibilities included the measurement ofenvironment project and environment theme results Results to be consistent with Government ofCanada - CIDA policy programming goals including contributing to sustainable development inEgypt and stakeholder involvement in development initiatives Results Based Management(RBM) used as a measurement tool

Zimbabwe Victoria Falls Environmental Planning and Capacity Enhancement Project -Canadian International Development Agency (CIDA) Environment and PerformanceMeasurement Specialist IRIS Environmental Systems An RBM facilitator in an iterativesustainable-development project in Victoria Falls to promote environmentally sustainablecommunities Project focused on improving the capacity of local partners to participate effectivelyin the preparation and implementation of the Victoria Falls Master Plan and Local DevelopmentPlans Specific responsibilities included the development and facilitation of an RBM stakeholderworkshop held in Victoria Falls Zimbabwe Workshop emphasized participatory approaches andthe inclusion of gender equality in the identification and measurement of results

Egypt Environment Theme Project Canadian International Development Agency (CIDA)PolicyProgram Analyst IRIS Environmental Systems Member of the policyprogramanalysis team conducting a trends analysis of CIDAs programming in Egypt This analysisserved as an input into CIDAs planning and design of the new Egypt Country DevelopmentProgram Framework (CDPF) Data was obtained by surveying identified stakeholders in Egyptand Canada Results of the trends analysis were then correlated with CIDAs Egypt CountryDevelopment Policy Framework to reconcile its effectiveness and provide input for its futuredirection

4

1996-1990

Governments of Chad and Cameroon - World Bank Panel Review of PipelineDevelopment Research Assistant IRIS Environmental Systems Research assistant to theManagerCoordinator of the Expert Panel for the review of literature pertaining to biodiversity andwildlands ecology in the African savannah tropical forests and marine ecosystems

St Vincent and the Grenadines Caribbean Soil Erosion Research on DeforestedWatershed Areas Environmental Scientist Project Manager and Principle investigator intothe loss of soil water and nutrients associated with banana cultivated areas Secondary focus ofthe research was aimed at developing a land use management plan incorporating conservationfarming practices and the use of social forestry in the conservation of soil on severely erodedsteep-land agricultural areas In consideration with the socio-economic status of the areaformulated recommendations for appropriate farming practices at the micro-scale level

St Vincent and the Grenadines Caribbean Man and the Biosphere ProjectUNESCOEnvironmental Scientist Assistant Project Supervisor and Liaison between the University ofCalgary and the St Vincent Forestry Department Responsible for the implementation of varioussoil erosion research studies aimed at the quantification of soil water and nutrient loss associatedwith agroforestry and forestry plantation areas

ENVIRONMENTAL POLICYChair of the Energy Recovery Generation (ERG) Subgroup Clean Air Strategic Alliance Alberta

Advisor Centre for EnergyERG Input Electricity and Alternative Energy Division BC Ministry of Energy and Mines

ERG Input Climate Change Offset System Environment CanadaERG Input Treatment of Clean Energy Natural Resources Canada

COUNTRIES WORK EXPERIENCECanada Egypt Zimbabwe St Vincent and the Grenadines Chad and Cameroon Cuba

5

Selected Permitting Reports

1 A Wetlands Monitoring Plan Foster Creek Area Cold Lake Air Weapons Range AB 2001 Reportprepared for Alberta Energy Company Ltd

2 A Strategic Assessment of The Banff Centre Area Redevelopment Plan Banff National Park AB2000 Environmental Screening Report prepared for The Banff Centre

3 Permit to Withdraw Water from the Pipestone River and Corral Creek for the Purposes ofSnowmaking Fire-Fighting and Domestic Water Use the Lake Louise Ski Area Banff National ParkAB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

4 Improvements to Water Intakes on the Pipestone River and Corral Creek the Lake Louise Ski AreaBanff National Park AB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

5 Proposed Development of a Chairliff and Ski Runs on Eagle Ridge the Marmot Basin Ski AreaJasper National Park AB 1999 Comprehensive Study Report prepared for Ski Marmot Basin

6 An Application for New Staff Accommodations at Skoki Lodge Banff National Park AB 2000Environmental Screening Report prepared for Skiing Louise Ltd

7 An Application for New Commercial Accommodations at the Lake Louise Inn Banff National ParkAB 2000 Report prepared for the Lake Louise Inn

8 Improvements to Surface Drainage at the Marmot Basin Ski Area Jasper National Park AB 1998Environmental Screening Report prepared for Ski Marmot Basin

9 Improvements to Subsurface Drainage at the Marmot Basin Ski Area Jasper National Park AB1998 Environmental Screening Report prepared for Ski Marmot Basin

10 Improvements to Sewage Treatment Facilities and Effluent Disposal at the Marmot Basin Ski AreaJasper National Park AB 1998 Environmental Screening Report prepared for Ski Marmot Basin

Other Reports

11 Legislative and Policy Factors Influencing Tourism Development in Alberta 2000 Report preparedfor Alberta Economic Development and Alberta Economic Development Authority TourismCommittee

12 Egypt Country Development Policy Framework (CDPF) Assessment 1999 Report prepared for theCanadian International Development Agency Hull Quebec

13 Egypt Country Development Policy Framework (CDPF) Assessment Presentation 1999Presentation prepared for the Canadian International Development Agency Hull Quebec

14 Monitoring Mission Reports Egypt Environment Theme Reports prepared for the CanadianInternational Development Agency Hull Quebec

15 A Pre-Disturbance Vegetation Classification for the Disturbed Portion of the Syncrude DevelopmentArea Mildred Lake AB 1998 Report prepared for Syncrude Canada Ltd

16 Characterization of Soil Erosion Processes and Nutrient Losses Associated with Previously ForestedAreas the Colonarie River Watershed St Vincent West Indies 1998 A Masters Thesis preparedfor the University of Calgary

6

Stakeholder Consultation

1 Zimbabwe-Canada Environmental Planning Exchange Mission 2001 Organized and coordinated anexchange mission held in Banff AB for the CIDA Zimbabwe Environmental Planning and CapacityEnhancement Project

2 Strategic Assessment of The Banff Centre Area Redevelopment Plan 2000 Conducted stakeholderconsultations via a public open house forum

3 Results Based Management as a Project Management Tool 1999 Conducted a workshop in VictoriaFalls Zimbabwe for the Environmental Planning and Capacity Enhancement Project

7

Neil StewartRR 3 SimcoeOntario CanadaN3Y 4K2

OBJECTIVE ProjectConstruction Management

emailphone

fax

nmsproj ectskwiccom519-426-2239519-426-2674

1991-Date

1990-1991

1988-1990

JPRomC1r amp CONsect1[RUCnON MIANAGEMJENT sectJERVJ[CJEsect

Project amp Construction Management services including Project DevelopmentProject strategy Contract negotiations Contract Management Industrial RelationsGovernment liaison Profit amp Loss accountability

Plans of execution project controls budgets planning evaluations safety labourrelations and business development Project amp Site management coordinationprocedures administration methods and site organization Managed andcoordinated information flow tofrom Client(s) Engineer(s) and Contractor(s)

Projects includeWestcoast Energy 55mw Whitby Cogen Bayside 280 mw RepowerEcodyne Ltd MOU contract management amp coordinationUnited Parcel Services Canada Hamilton Air Hub ProjectINCO Nickle Foam and Nickle Disc ProjectsBayer AG Nicklehydroxide and Tungsten Carbide ProjectsMacMillen Bloedel Secondary Fibre Recycling Project

Fluor Daniel Canada LtdResident Construction Manager Central Division

Provide support to Business Units for construction managementservicesresponsible for industrial relations safety quality personnel development andmethods Initiated and established field organizations roles and responsibilitiessite procedures fab shop contractorsupplier planning budgetsfinancial and clientrelations to support critical contract schedules

Projects includeProctor amp Gamble Ultra Project MFord Canada Winn 88 Paint PlantINCO S02 Abatement Project

Ellis Don LtdProject Manager Resident site manager accountable for the process coordinationof $500M GMSUZUKI (CAMI) grass roots automotive plant in Ingersoll ON

Directed 1800 unionized trades (peak workforce) and managed lump-sum projecton schedule and under budget Developed and maintained Oriental and NorthAmerican client trust relationships Surpassed project expectations in labourrelations and safety Profit and Loss accountability

1986-1988

1985-1986

1984-1985

1983-1984

1981-1983

1978-1981

1974-1978

1973-1974

1969-1973

EDUCATION

UMA SpantecGeneral SuperintendentDirected and supervised lump-sum contracts Interfaced with engineering andclient organizations to produce responsive quality services and safe profitablecontracts

Projects includedLabatts Brewers various capital projectsConsumers Glass hot amp cold end shut downsUnivofWaterloo construction management servicesDomtar paper board expansion

Glen Curtis Company Construction SuperintendentConstruction management of Canadian Occidentals 65m cfPdgrass roots sour gas plant in Mezeppa Alberta

Ennisteel Co Ltd Toronto ON Project SupervisorUltramars 1500 million barrel terminal

Self-employed OntarioShip yard construction amp generation facilities

Petrosar Inc Sarnia ON Area SuperintendentClient rep responsible for $650 Million HFOU project

Fluor Canada Corp Alberta Mechanical SupervisorAGCL 1200 tpd Methanol plantAquitaine Canada 650m cfPd sour gas plantEsso Canada Cold Lake Project amp Judy Creek

Arthur GMcKee Inc Nanticoke ON Area SupervisorTexaco 120000 bpd grass roots refinery

SteIco Inc Hamilton ON

JewittVallee Simcoe ONOntario Hydro 4000 MW Thermal generationStelco LEW steel plantDomtar Mill expansionTrent Valley Quarry modernization

MacMaster University 1976-77 (night school)Mohawk College 1971-72 (night school)

SELF DEVELOPMENT -project management-construction management-basic computers-industrial relations-WinWin strategies

-WHMIS-safety amp compensation-KT amp decisions-team management-personnel administration

PERSONAL

REFERENCES

DOB February 24 1950

On request

CITIZENSHIP Canadian

Cochrane Engineering Ltd

Statement of Qualifications

Power Generation Facilities

Cochrane Engineering Ltd200 - 1770 W7th Avenue

Vancouver Be V6J 4Y6Phone 604-736-5421 Fax 604-736-1519

Email receptioncochrane-groupca

COCHRAR

Cochrane Engineering LtdGeneral Qualifications

TABLE OF CONTENTS

Section

Section

Section

10 COMPANY BACKGROUND11 Multi-Disciplinary Design12 Quality Assurance

20 SUMMARY OF RECENT RELEVANT EXPERIENCE21 Recent Relevant Projects Completed22 Projects Currently in Progress23 Cochrane Group - Other Relevant Experience

30 ENGINEERINGmiddot TOOLS

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Sandhill Energy CenterAusti n Texas

Calpine Combined Cycle Power PlantGoldendale Washington

10 COMPANY BACKGROUND

The Cochrane Group of companies including Cochrane Engineeringprovides integrated engineering architecture planning and projectmanagement services for a wide variety of projects It was formed in1996 through the merger of Cochrane Engineering a Calgary firm inoperation since 1972 and the PBK Group which had providedarchitectural and engineering services in Vancouver since 1937 Ouraffiliation with the Cochrane Group affords us access to the expertiseof over 350 personnel consisting of project managers technicalpersonnel and administrative staff in six offices across Canada Italso lends access to other Cochrane Group firms including PBKArchitects Inc which has provided design services for many industrialprojects in Canada and abroad Cochrane Engineering and PBKArchitects have significant experience providing services for clients inthe power coal mining and process industries

Cochrane Engineerings power division has successfully exporteddesign services through out North and South America In the last twoyears this division has provided mechanical processinstrumentation architectural electrical civil and structural designservices for projects totaling over 1000 MW of power generationThe construction cost for these projects exceeds $1 billion

11 Multi-Disciplinary DesignCochrane Group is a fully integrated multi-disciplinary design groupservicing the power sector with in-house architectural capabilitiesGE7FA experience and combined cycle process experts enabling usto provide comprehensive one stop shopping The CochraneGroups multi-disciplinary design team includes

bull Cochrane Engineering Ltd andbull PBK Architects Inc

Cochrane Engineering Ltd is a multi-discipline engineering firmspecializing in the design of combined cycle power plants simplecycle power plants and industrial projects We also supplyengineering resources for PBK architects

PBK Architects Inc specializes in the design of industrial facilitiesoffices maintenance shops warehouses institutional buildings andrecreational sport facilities PBK provides the architectural servicesto Cochrane for our power projects Signature projects include BCPlace GM Place Horseshoe Bay Ferry Terminal upgrade and

1-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 2: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

BRITISH COLUMBIA UTILITIES COMMISSION

BRITISH COLUMBIA HYDRO AND POWER AUTHORITYCALL FOR TENDERS FOR CAPACITY ON VANCOUVER ISLAND

REVIEW OF ELECTRICITY PURCHASE AGREEMENTPROJECT NO 3698354

DUKE POINT POWER LIMITED PARTNERSHIPINFORMATION RESPONSES TO THE BCUC

10 Reference Exhibit No C17 -6 DPPLP Evidence Filing January 6 2005

11 Page 1 A 1 Please support the statement that Pristine Power Inc is acompany experienced in the development of major power generationprojects and list by name location size and actual COD those powerprojects developed to successful operation by the corporate entity PristinePower Inc

Response 11 For clarity the experience referred to in the Evidence is theexperience of the principals of Pristine Power Inc

The CVs for the following principals are attached to Response 141below

Jeffry Myers President amp Chief Executive OfficerHarvie Campbell Executive Vice PresidentKen Spinner Vice President Engineering

Attached is also a project experience chart that lists the namelocation size and COD of major power projects with which theprincipals of Pristine Power Inc have experience

12 Page 1 A 1 Who are the shareholders of Pristine Power Inc

Response 12 50 of Pristine Power Inc is owned by the following principals andtwo of the five directors are appointed by this management team

Jeffry MyersHarvie CampbellKen SpinnerJulia CiccaglioneKevin Gilchrist

The remaining ownership is held by private investors

13 Page 2 A 1 Does 10 of the venture mean 10 of DPPLP If not 10of which entity

DMSLegal054046OOOO 1 1972044v3

Response 13

- 2 -

Yes 10 of DPPLP and Bastion Island Power Inc its GeneralPartner

14 Page 2 A2 Please identify the key team members the Projectmanagement personnel and other members of the highly qualified andexperienced team

141 Please provide the CVs of these personnel

142 Please provide evidence of the experience of Bibb and Cochrane inthe EPC of analogous power plants

Response 14

Duke Point Power LPBidder

Financial Adviso rMacquarie Bank

Debt ProvidersRoyal Bank of Canada

Independent EngineerBlack ampVeafch

G T LT SAGE Energy

141

Legal Advisors - ProjectBennett Jones LLPR

Leg al Advisors - Fin anceFarris Vaughn

Power CycleEngin eer

Attached are the CVs of the following key team members

Jeffry Myers President amp Chief Executive Officer Pristine PowerIncHarvie Campbell Executive Vice President Pristine Power IncKen Spinner Vice President Engineering Pristine Power IncJulia Ciccaglione Vice President Environment and EmissionsTrading Pristine Power IncNeil Stewart Site Project Manager

Please see the answer to BCUC IR 2701 for more documentationsupporting the arrangement and the personnel for commissioningstartup and operations

142 Please see attached pdf file for the requested information

DMSLegal05404600001 1972044v3

-3-

15 Page 3 A2 Please provide a rough breakdown of the $2 MM betweencash (or cash owed) and sweat equity

Response 15 DPP will have incurred direct development costs of approximately$2 million by mid-February 2005 This does not include the internalcosts or sweat equity of the sponsors or any costs from thevarious project stakeholders such as the EPC contractor the bankthe operations contractor etc All inclusive costs are estimated tobe well in excess of $2 million dollars over the period up to theaward and another $2 million over the three months from award tomid-February The above figures are conservative estimates

In addition to the expenses mentioned above DPP has made a $5million deposit related to the Asset Transfer Agreement and hasprovided development security of slightly over $30 million

16 Page 3 A3 Is sale of energy or capacity to Harmac or any party otherthan BC Hydro the intention of DPPLP

161 Are contractual arrangements with Harmac in place or underway

162 In DPPLPs opinion does BC Hydro have any contractual rightsunder its EPA to require DPPLP to sell this capacity or energy (orany part of it) to BC Hydro at any time

Response 16 Yes

161 No

162 Contractually BC Hydro has rights to 105 of 252 MW

17 Page 4 A3 How much additional capacity is available through duct firing

171 When will this capability be installed

172 What benefit if any will accrue to BC Hydro from such capability

173 If any of the plant components listed were upgraded to improveplant heat rate how would the resulting financial benefits be splitbetween BC Hydro and DPPLP

Response 17 Duct firing will provide approximately an additional 28-30Megawatts of capacity

171 All capacity will be operational by May 1 2007

172 The existence of capacity exceeding 105 of 252 MW providesextra insurance to BC Hydro that minor facility upsets in the

OMS Legal054046OOOO 1 19n044v3

- 4 -

operation of the plant will not adversely affect the availability of thecontracted capacity Such potential minor operational upsets willbe first absorbed by the additional duct fired capacity

173 The resulting costs and financial benefits would accrue 100 toDPPLP

18 Page 7 A7 DPPLP state there were no surprises in the CFT processPlease if and how DPPLP anticipated that the term of the EPA would bechanged from 10-25 years as in the original CFT documents to 25 yearsminimum with a BC Hydro unilateral option to extend to 35 years Pleasesimilarly explain why DPPLP expected that the Independent Revieweroriginally allowed to talk to bidders would later be forbidden to talk tobidders and vice-versa

Response 18 In the team members experience it is quite common for theoffering party to refine the terms of CFTRFP processes mid-course as objectives and constraints become better known and toreflect the input of potential bidders In DPPs view although therewere substantive changes to the EPA during the process theprocess itself reflected no dramatic departures from the originallyindicated path This comment also reflects the fact that all partieswere kept appraised of ongoing developments in order to ensurethat everyone remained on an equal footing Specifically thetransition to the 25-year term resulted in a term that is consistentwith the life of the assets With respect to the independentReviewer at the time that DPP became involved in the CFTprocess bidders were not able to communicate directly with theIndependent Reviewer

19 Page10A13

191 Is DPPLP taking the position that it was unaware that the BCUCmight reject the EPA if it found that as for VIGP BC Hydro hadfailed to demonstrate that this project is the most cost effectivesolution for the Vancouver Island capacity issue If so pleaseprovide evidence from the CFT documents that support thisposition

192 Is DPPLP taking the position that the terms and conditions of theEPA are irrelevant in the determination of whether this project is themost cost effective solution to the Vancouver Island capacity issueIf so please state why

193 Would DPPLP bid the same prices for the project if the terms andconditions of the EPA were (a) far harsher or (b) far looser asseen from the position of bidder

DMSLegal105404610000 111972044v3

-5 -

194 Philosophically is there a point of harshness in a CFT andEPA atwhich DPPLP would simply decline to bid

Response 191 No DPP notes that VIGP was not the result of a broad all-sources competitive process

192 No However DPP considers that the EPA must be considered inthe context of the market-based approach adopted for theacquisition of the needed capacity If it can be clearly shown thatthe EPA in its totality is fundamentally flawed then this findingshould be addressed by the Commission However DPP views apiecemeal revisiting of this EPA as inappropriate if not impossibleDPP is of the view that the most important aspect of any reviewbeing its fairness has been answered through the competitiveprocess as all bidders faced the same EPA Terms and Conditionsand consequently all bidders remained on an equal footing

The Commission could use this proceeding as an opportunity toprovide commentary for use in future competitive procurementprocesses in the Province

193 No any bid would obviously be influenced by the totality of thepackage offered by the EPA This is not solely a pricing issueBidders adopt technologies and configure their facilities to meet thetechnical requirements of the electrical system as reflected in anEPA This clearly would impact the quantum of the bid but itsprimary role is to ensure that the system adopts appropriatetechnology to meet its requirements

194 Depending on the circumstances yes

110 Under the terms of the DPPLP EPA please explain the extent to whichDPPLP is responsible for any Green House Gas charges fees orpenalties until 2010 and starting 2011 Please clarify whether DPPLPhas factored any such GHG liability into its bid price

Response 110 Under the EPA the project has accepted liability with respect toGreenhouse Gas charges fees or penalties for the life of theproject BC Hydro under the terms of the Asset TransferAgreement has committed to offset 50 of GHG emissions up toand including the year 2010

DPPLP has factored potential GHG liability into the bid pricebased on an in-depth review of the issue The project team spentconsiderable time reviewing understanding and assessing thepotential GHG liabilities from the facility Based on thisassessment the project incorporated an appropriate allowance forsuch potential liability

DMSLegal054046OOOO 1 1972044v3

JEFFRY M MYERS55 Springs ide StreetCalgary Alberta

T3Z 3M1

Residence (403) 246-6673Business (403) 444-5571Cellular (403) 813-3098

Email jmyerspristinepowerca

QUALIFIED BY

Twenty-five years experience in the downstream natural gas and independent power business including

bull Executive level management of all aspects of a major Canadian independent power businessbull Significant role in the management and partnership in two independent power startup businessesbull Major greenfield pipeline and storage project development to financingbull Development of independent power projects to financingbull Long-term natural gas and transportation acquisition and fuel planningbull Operations management and planning for natural gas pipeline and power assets

EXPERIENCE

President Pristine Power Inc January 2003-Present

Founder of Pristine a company formed to pursue environmentally responsible power projectdevelopments based on exploitation of proven technologies Development activities include thedevelopment of energy recovery generation projects from industrial waste heat compressed air energystorage projects and conventional gas-fired power projects This includes management of the successfultender for the 252MW Duke Point Power Project as a result of the Vl-CFT Pristine completed a privatefinancing in 2004 and generally undertakes early stage development activities at the risk of the Pristineshareholders and generally seeks venture backing as required for bidding purposes and to fund the latterstages of project development acquisition and construction

President Westcoast Power Inc December 1999 -July 2002

Responsible for management of all aspects of the Westcoast Energy Inc power business segmentincluding eight operating plants (six in North America two international)

Management of an operating fleet of approx 500 megawatts (MWs) three plants under construction (800MWs) in North America and one in China (50 MWs) Project development markets included Canadaand northern tier US markets including the WSCC MAIN ECAR NYPP PJM and NEPOOL reliabilityareas Responsibilities included relationship management with eight key project partners

The mandate included operating responsibility for all plants except one partner operated internationalasset and a staff of 250 not including corporate support staff Annual capital budget accountability ofapproximately C$250 million Westcoast Power contributed approximately 10 of after tax earningsand 20 of annual cash flow to Westcoast Energy (2001) results

Key Accomplishments

~ Successful development of four F class hybrid merchant power projects with aminimum of 50 of the spark spread risk locked in via long term bilateral contracts

Execution of two North American and one international construction project withinfinancial and performance parameters approved by the Westcoast Energy Board ofDirectors

~ Continued implementation of a self directed work team operations philosophythrough the staffing of two new operating plants

~ As a result of a re-alignment of corporate priorities led the development of themanaged growth strategy for Westcoast Power This resulted in the successfulconditional sale of the North American operating assets and a strategic review of thefuture of the power business at WestcoastFollowing the acquisition of Westcoast Energy by Duke Energy in March 2002directed the sale of all remaining Westcoast Power assets and the wind-up ofWestcoast Power

Vice President Business Development - Westcoast Energy February 1997-December 1999

Responsible for the development of North American pipeline and storage project initiatives (from early1997) and independent power projects (from mid 1998)

Key accomplishments~ Initiation and development of the TriState and Millennium pipeline projects~ Management of the acquisition of a significant share of the Alliance and Vector

pipeline projects~ Execution of the Westcoast Power hybrid merchant strategy and management of the

development of the successful Liberty and Bayside power project developments

PALLISER PIPELINE PROJECT

Project Manager - Westcoast Energy

February 1996-January 1997

Managed all aspects of the Palliser project a $350 million pipeline proposal by Westcoast Energyselected by PanCanadian Petroleum following an extensive industry Request for Approvals Palliser wasthe first major natural gas pipeline project in North America proposed to be developed and constructed atthe risk of the project partners

Responsibilities included selection and management of a multi-disciplinary team from Westcoast andPanCanadian and directing Palliser as an autonomous business unit responsible to the project OwnersCommittee

Filing of the Palliser project with the National Energy Board resulted in a competitive response andsubsequent wind-up of the project Westcoast Energy earned significant profit for on termination of theproject as a result of a success fee arrangement negotiated with PaqcCanadian

MARITIMES AND NORTHEAST PIPELINE PROJECTProject Manager - Westcoast Energy

1994 -1996

Developed Westcoast Energys interest in the project from initial concept with the Sable Offshore EnergyProject partners and managed all Canadian elements of the pipeline project

Reporting to Westcoast senior management and the project management committee selected a projectteam and directed system marketing community relations and all engineering and environmentrequirements of the project

Subsequent to the assignment to the Palliser Project Maritimes and Northeast was filed with the NationalEnergy Board and is on schedule for the original in-service date of November 1999

2

ST CLAIR PIPELINESManager Pipeline Business Development

1994

Following the acquisition of Union Gas by Westcoast Energy participated in the development of a storageand pipeline business development subsidiary

Responsibilities included a thorough review of project development potential in eastern Canada and theMidwest and Northeast United States Managed Unions participation in the Intercoastal project anddeveloped the Bluewater pipeline project

NORDIC POWER COGENERATION OF CANADAPresident

1990 - 1993

One of six key professionals hired by the founder of Nordic Power Inc to start up a new North Americanindependent power company

Managed all aspects of the $150 million 102 megawatt West Windsor power project from originalproposal to Ontario Hydro to financial closing West Windsor Power was commissioned in 1996 and isnow owned by an affiliate of Tractebel SA

Key responsibilities included initiation and closing of long-term agreements with Ontario Hydro steamhosts fuel suppliers and transporters and management of all government affairs

Tenure with Nordic also included greenfield power project development and fuel plan development atseveral sites in Canada and the United States

UNION GAS LIMITEDVarious Operations Positions

1987 -1990

Line and staff management assignments and summer employment in the field in three of Unions regionaloffices and head office culminated in the management of a total of 55 staff and an annual capital budgetof approximately $5 million

Participated as a middle manager in a major organization following an early retirement program thatresulted in operating cost reductions of over 20

EDUCATION

Honours Bachelor of Arts in Business AdministrationThe University of Western Ontario

Masters of Business AdministrationThe University of Windsor

3

1980

1992

HARVIE E CAMPBELL

354 Hawkview Manor Circle N WCalgary Alberta T3G 2Y7

Business 403-241-2436Cell 403-650-4584Fax 403-374-1871

e-mail Harviecampbellshawca

SENIOR CONSULTING BUSINESS DEVELOPMENT PROFESSIONAL

Project development consultant with over 20 years in the energy industry Experienced in the reviewassessment and development oflarge capital energy projects particularly independent power projects hasplayed a senior role in the development of over 1500 MWs of power facilities valued at over $15 billion

Proficient in all aspects of power generation development feasibility reviews market analysis projectmanagement fuel supply contracting execution financing and economics Skilled in facilitating businessdevelopment solutions Proven ability to direct successful development project management teams andenhance co-operation from all levels of an organization partners stakeholders and government agencies toincrease shareholder value and achieve business project development results Proven ability to get thedeal done

Mr Campbell currently operates a consulting firm (HEIAK Energy Inc) providing management services tothe Independent Power Industry

PROFESSIONAL EXPERIENCE

Vice President and CFOPristine Power Inc

2002 to Present

Founding partner of Pristine Power Inc a development company established to pursue the development ofprojects utilizing leading edge proven generation technologies with strong environmental characteristicsThe company focuss on the development of waste heat generation and storage related generationtechnologies such as Compressed Air Energy Storage (CAES)

Vice President (amp General Manager) DevelopmentWestcoast Power Inc Calgary Alberta

1998 to 2002

As Vice President Development for Westcoast Power held responsibility for all aspects of West coastsdevelopment activities within Canada the United States and overseas Responsibilities included projectconception overall management of a multidisciplinary development team including technical economicpublic relations environmental legal and financing Responsible for the negotiation of all contracts andassembling of project development teams Important accomplishments include

Harvie E Campbell

FREDERICKSON POWER PROJECT

2493 MW F Class Combined Cycle facility located near Tacoma WashingtonRole Vice PresidentExecutive Director

Page 2

Responsibilities included all aspects of project development including PNW regional plan for WestcoastPower regional screen acquisition of the Frederickson site formed development team arranged projectconstruction gas transportation electrical transmission offtake contracts interconnection etc

Project Highlights

bull Project accorded First mover status during the PNW power boom in 20002001bull Placed 20 year tolling contracts with three regional PUDs Benton Franklin and Grays Harbourbull Arranged gas transportation on the Westcoast and Northwest Pipeline systems and electrical

transmission to Big Eddy amp John Daybull Project was under budget and ahead of schedulebull Oversaw partial sale to a partner and final sale of Duke (Westcoast) interest to Epcor Powerbull Project is presently in commercial operation

ISLAND COGENERA TION PROJECT

250 MW F class CC Cogen facility (Alstom Gas Turbine) located in Campbell River HCRole Vice President

Project Highlights

bull Development phase of the ICPI was successfully completed while maintaining shareholder valuebull All project contracts and permits were completed and executedbull Purchase of Partners working interest after execution of all Project agreementsbull Lead successful non-recourse financing of facility

PUNCAKJA YA POWER PROJECT

395 MW project consisting of 60 diesel generators 3x 65 MW coal fired units and one 60 mile long transmissionline located at the Freeport MacMoran goldcopper mine in Irian Jaya Indonesia

Responsible for contracts including power offtake operations and technical completion with Freeport andestablishing operating regimen Also played a senior role in the USD $500 million financing of the project

Harvie E Campbell Page 3

In addition Mr Campbell has undertaken senior roles in the development and financing of the following projects

Ft Nelson Transmission Line (BC)McMahon Cogeneration Project (BC)Cantarell Nitrogen Injection Project (power component)WEI Gang Power Project (Shanghai)Lake Superior PowerFt Frances CogenerationWhitby CogenBayside Power

Director Energreen Inc

nla110 MW520 MW30MW

110MW110 MW50MW280 MW

While Vice President Development for Westcoast Power Mr Campbell also acted for Westcoast on theBoard of Energreen a power related subsidiary of Alliance Pipeline

Manager Investment Services GroupWestcoast Energy IncVancouver BC

1994 to 1998

Established a single group responsible for the financial analysis commercial review and contracting of allcapital projects within Westcoast Energy including Westcoast Power Westcoast International and theWestcoast Business Development Group (mostly Pipeline and storage related investments) Supportedproject contract negotiations financial analysis and financing on a host of projects including powergeneration pipeline petrochemical and fertilizer projects

Supervisorl Financial AnalystWestcoast Energy IncVancouver BC

1984 to 1993

Harvie E Campbell Page 4

From joining Westcoast Energy in 1984 as a financial analyst and economist Mr Campbell heldsuccessively more senior roles in the areas of planning development and financial analysis Heparticipated in the acquisition of several small oil amp gas production companies ICG Utilities and UnionGas in the late 1980s and early 1990s

EDUCATION

bull MA Economics 1984Simon Fraser University at Burnaby Bc

bull BA (Honours) Economics 1982University of AlbertaEdmonton Alberta

Mr Campbell is a past President (and currently Director) of the Independent Power Association of BritishColumbia and past Director of the Canadian Institute of Energy and the Vancouver Rowing Club Heresides in Calgary with his wife Ines and three children

References Available on Request

KENNETH W SPINNER

3040- 400 - 4th Ave SWCalgary AB T2P OJ4

403-444-5578

Technicalproject management and development professional with 23 years in the energy industryExperienced in the review technical assessment and development of independent power projects havebeen involved in the development engineering and construction on over 1000 megawatts of powerplants and project managed over $500 million in powerenergy projects

Proficient in all aspects of power generation developments feasibility reviews project managementproject engineering EPC contract negotiations and administration Proven ability to direct successfuldevelopment project management teams and enhance co-operation from all levels of an organizationpartners stakeholders and government agencies to increase shareholder value and achieve business project development management results

PROFESSIONAL EXPERIENCE

V P EngineeringPristine Power Inc

2003 to Present

Presently providing project managementdevelopment and technical support for all power generationdevelopments and projects Responsible for preliminary development engineering coordination of allengineering procurement and construction and contract negotiation and administration activities withinthe company

PresidentSpinergy Services Inc

1999 to 2003

Providing power generation consulting and developmentmanagement services to various clients throughoutCanada specifically Alberta British Columbia Saskatchewan and Eastern Canada Involved in various gas-firedand biomass project developments ranging from 25 Megawatts to 450 Megawatts as project development advisorConducted feasibility studiesproposals and economic feasibility reviews on a wide range of power developmentsin the energy forestry and coal industries On going in-house developments include gas-fired cogenerationbiomass generation combined heatcooling power facilities and energy storage opportunities

Executive Director Vice President (ICPI)Manager New Ventures Business DevelopmentFletcher Challenge Energy (FCE) Calgary Alberta

]997 to 1999

As Executive Director Vice President of the 250 megawatt Island Cogeneration Project Inc (ICPI)jointly-managed development of the ICPI project on Vancouver Island to development completion Directed negotiationteams for the power purchase agreement with BC Hydro steam sales agreements with Fletcher ChallengeCanada Paper Mill the engineering and construction contract and project permits

Pale]KENNETH W SPINNER

PROFESSIONAL EXPERIENCE (Continued)

Project Highlights

bull Development phase of the ICPl was successfully completed while maintaining shareholder valuebull All project contracts and permits were completed and executedbull Managed development team in Vancouver consisting of multi-disciplinary professionals legal

environmental and engineering consultantsbull Guided the environmental permitting process and obtained project approvalbull FCEs working interest in ICPI was successfully sold after execution of all Project agreementsbull Project is presently in commercial operation

ISLAND COGENERATION PROJECT - 250 MW- CAMPBELL RIVER BC

Vice PresidentWest Windsor Power - (PLC Windsor Ltd)Northstar Energy Corporation Calgary Alberta

1994 to 1997

Vice President ofPLC Windsor Ltd and Northstar Energys principal representative on the partnershipmanagement committee directly responsible for the 120 megawatt West Windsor Power project in WindsorOntario Responsible for overall project management project financial analysis and project capital budget

Project Highlights

bull Administered the implementation of all project contracts including engineering and construction contractgas supply and transportation agreements steam sales power purchase agreements and directed financialclosing activities at loan conversion Project was under budget and started up successfully in 1996

bull Maximized project value by cost control budgeting scheduling maintaining initial contract values andoptimizing economic parameters

bull Involved in the negotiation and implementation a $100 million EPC turnkey contract for the constructionand start-up of the facility

bull Project was managed to completion which included mobilization commissioning commercial operationsperformance testing and conversion to term financing

Pa2e 2KENNETH W SPINNER

PROFESSIONAL EXPERIENCE (Continued)

WEST WINDSOR POWER - 120 MW - WINDSOR ONTARIO

Manager EngineeringPowerlink Corporation (Subsidiary of Northstar Energy Corp) Portland Oregon

1992 to ]994

Responsible for all technical management and support for power project development activities in Canada USAand other international regions Supported project contract negotiations on the West Windsor Power Projectmanaged the engineering construction contract and operating agreement negotiations

Manager Facilities Engineering Sr Project Engineer Process EngineerNorthstar Energy Corporation Dome Petroleum Ltd Hudsons Bay Oil and Gas LtdCalgary Alberta

1980 to ]992

Managed oil and gas facilities development in Alberta and independent power development in Canada and theUSA Responsible for project management and process engineering on various oil and gas facilities and pipelines

EDUCATION

bull Bachelor of Science Chemical Engineering (Honours) 1980Queens University at Kingston Ontario

bull Cogeneration Development Course 1992Kingston Ontario

bull Cogeneration Power Plant Design and Optimization 1991Boston Massachusetts

bull Business Management Financial and Evaluation Courses 1986 to 1997

Pale 3

Project Experience Chart

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsHarvie Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren BakerCampbell Power Project Utilities Washington CCGT Electric Harbour EPCOR Power Power Resource

Puget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Puncakjaya Duke Irian Jaya 395 MW Diesel coal Mitsubishi PT Freeport 1997 Richard E Richard EPower Project Energy Indonesia fired Indonesia Coleman Coleman

PT Freeport PT FreeportIndonesia IndonesiaJI H R Rasuna JI H R RasunaSaid Kav X-7 No Said Kav X-7 No6 6Plaza 89 12th Plaza 89 12thFloor FloorJakarta 12940 Jakarta 12940

Lake Superior Great Sault St 110 MW Natural GE Ontario 1993 Colin Clark Bill RalphPower Project Lakes Marie Ont GasDistiliate Electricity Great Lakes OEFC

Power Finance Corp Power amp Brascan 416-325-80577059415651

McMahon Duke Taylor BC 115 MW Natural Gas Westinghouse BC Hydro 1993 Duane Rae Dawn FarrellCogeneration Energy Duke Energy BC Hydro

ATCO 4036991551ATCO

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsJeff Myers Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren Baker

Power Project Utilitiesl Washington CCGT Electric Harbour EPCOR Power Power ResourcePuget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Liberty Power Reliant Philadelphia 568 MW Natural Gas GE Pacific Gas 2002 Greg Kennedy Nowa merchantProject Energy PA CCGT and Electric - Reliant Energy plant

National 713-497-7490Energy Group(receivership)

West Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Ken Spinner Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsWest Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Julia S Ciccaglione Curriculum Vitae

CURRICULUM VITAE

JULIA S CICCAGLIONEEnvironment Specialist

3040400 4th Avenue SWCalgary AB Canada T2P OJ4

Tel (403)444-5538 email jciccaglionepristinepowerca

CAREER BRIEF

An environment specialist with extensive experience in project management impact assessmentstakeholder consultation policy analysis and climate change Additional expertise in internationaldevelopment projects including project monitoring and stakeholder facilitation Excellent communicationorganisation and writing skills Technical background in the biophysical sciences and economics Projectperformance measurement experience using Results Based Management (RBM)

EDUCA TION

MSc Geography 1998Soil Erosion Assessment Soil and Water Nutrient Loss Analysis Watershed ManagementUniversity of Calgary Calgary Alberta Canada

BSc Geography 1994University of Calgary Calgary Alberta CanadaConcentration Biogeography geomorphology

BA Economics 1991University of Calgary Calgary Alberta CanadaConcentration Petroleum economics

PROFESSIONAL EXPERTISE

Environmental Project ManagementPolicy AnalysisRegulatory AnalysisStakeholder amp Public Consultation

Impact AssessmentSustainable DevelopmentClimate ChangeEnvironmental Management

CAREER HISTORY

Domestic

1998- Pristine Power Inc Calgary Vice President Environment and Emissions TradingPresent Responsible for overall environmental project management regulatory compliance public

policy input and management of Pristines greenhouse gas strategy

Suncurrent Industries Ltd Calgary Senior Emissions Portfolio ConsultantResponsible for overall management of Suncurrents greenhouse gas credit portfolio

2

Alberta Energy Company (AEC) Ltd Calgary Wetland Vegetation Scientist IRISEnvironmental Systems Responsible for the design of a long-term (20 yr) Boreal wetlandvegetation monitoring program to determine the effects of groundwater withdrawal on wetlandvegetation Data gathered from the monitoring program to be utilised by Alberta EnvironmentalProtection for resource management decision making

Syncrude Canada Limited Calgary Environment Specialist and Project Manager IRISEnvironmental Systems Managed and co-ordinated a team of scientists responsible for thedelineation of forest types into commercial and non-commercial stands Derived informationwas used as input into Syncrudes reclamation and mine area conservation plan Specificproject management activities included conducting a needs assessment budget preparationand creation of a Terms of Reference

Environmental Impact Assessment amp Policy Specialist IRIS Environmental SystemsResponsible for the completion of environmental impact assessment projects Responsibilitiesincluded the identification of impacts mitigations cumulative effects and the management andco-ordination of multidisciplinary scientific teams Extensive liasing with government agenciesPolicy analysis included integrating environmental policy and statutory requirements withdevelopment initiatives Additional responsibilities included extensive stakeholder and publicconsultation The following is a list of completed environmental impact assessments

Skiing Louise Limited Banff National Park An Environmental Screening Report for thepurpose of withdrawing water from the Pipestone River and Corral Creek to accommodatesnowmaking fire-fighting and domestic water use activities Report considerations includedidentifying river hydrologic regimes potential impacts to aquatic ecosystems mitigationprocedures and cumulative effects assessment

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts associated with improvements to water intake systems in the Pipestone River andCorral Creek Specific report considerations included identifying impacts to aquaticecosystems

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts related to terrain modifications and replacement of snowmaking infrastructure on theUpper Wiwaxy ski run

The Lake Louise Inn Banff National Park Environmental Screening Report for theconstruction of new commercial accommodation in Lake Louise

Skoki Lodge Banff National Park Environmental Screening Report for the construction ofadditional staff housing at the Skoki Lodge National Historic Site

The Banff Centre Banff National Park Environmental Screening Report for the submissionof an Area Redevelopment Plan The project considered a strategic assessment includedthe identification of impacts resulting from proposed developments or redevelopments on thecampus of The Banff Centre

Ski Marmot Basin Jasper National Park Canada Part of a multi-disciplinary teamresponsible for the completion of a Comprehensive Study for the development of a chairlift andski runs in the Eagle Ridge area of Marmot Basin

Ski Marmot Basin Jasper National Park Canada Environmental Screening Reportspertaining to the installation of new sewage treatment facilities improvements to surfacedrainage and subsurface drainage

3

1995-1998

1990

Legislation Analyst IRIS Environmental Systems Alberta Economic DevelopmentCalgary AB Review and analysis of Alberta Provincial and Canadian Federal legislation todetermine land use laws and identify areas within the province which may have potential forfuture tourism development This information was used in the development of maps illustratingcurrent land uses and areas of potential future tourism development in Alberta

University of Calgary Department of Geography Canada Instructor i) Taught introductorygeography Topics included climatology geomorphology soils and vegetation hydrology remotesensing and air photo interpretation ii) Taught a senior level course in introductory vascular plantidentification plant taxonomy introductory wildlife identification and habitat associations and plantand wildlife responses to disturbances specific to the Canadian Grasslands Aspen ParklandMontane Sub-Alpine Alpine and Boreal Forest Ecoregions

Petro Canada Resources Incorporated Calgary Canada Junior Land ManagementRepresentative Responsible for the review of land agreements governing the operation of oiland gas properties Conducted an economic evaluation and reconciliation of predicted gas pricesversus actual market prices Additional work included site inspections of reclaimed coal propertiesin northeastern British Columbia

International

1998- Cuba Climate Change Emissions Baseline and Monitoring Plan Department of ForeignPresent Affairs 2002 and IntI Trade (DFAIT) Canada Project Manager Suncurrent Industries Ltd

Responsible for managing a climate change emissions baseline study and monitoring planfocused on the implementation of renewable and energy efficient technologies (wind and solarenergy high efficiency micro-turbines) in Cuba Baseline study was in accordance with thoserequirements for a Clean Development Mechanism

Egypt Environment Theme Project - Canadian International Development Agency (CIDA)Environment and Performance Measurement Specialist IRIS Environmental SystemsMember of the Performance Measurement Advisory team for the bilateral CIDA-EgyptEnvironment Theme Project (7 year project) Responsibilities included the measurement ofenvironment project and environment theme results Results to be consistent with Government ofCanada - CIDA policy programming goals including contributing to sustainable development inEgypt and stakeholder involvement in development initiatives Results Based Management(RBM) used as a measurement tool

Zimbabwe Victoria Falls Environmental Planning and Capacity Enhancement Project -Canadian International Development Agency (CIDA) Environment and PerformanceMeasurement Specialist IRIS Environmental Systems An RBM facilitator in an iterativesustainable-development project in Victoria Falls to promote environmentally sustainablecommunities Project focused on improving the capacity of local partners to participate effectivelyin the preparation and implementation of the Victoria Falls Master Plan and Local DevelopmentPlans Specific responsibilities included the development and facilitation of an RBM stakeholderworkshop held in Victoria Falls Zimbabwe Workshop emphasized participatory approaches andthe inclusion of gender equality in the identification and measurement of results

Egypt Environment Theme Project Canadian International Development Agency (CIDA)PolicyProgram Analyst IRIS Environmental Systems Member of the policyprogramanalysis team conducting a trends analysis of CIDAs programming in Egypt This analysisserved as an input into CIDAs planning and design of the new Egypt Country DevelopmentProgram Framework (CDPF) Data was obtained by surveying identified stakeholders in Egyptand Canada Results of the trends analysis were then correlated with CIDAs Egypt CountryDevelopment Policy Framework to reconcile its effectiveness and provide input for its futuredirection

4

1996-1990

Governments of Chad and Cameroon - World Bank Panel Review of PipelineDevelopment Research Assistant IRIS Environmental Systems Research assistant to theManagerCoordinator of the Expert Panel for the review of literature pertaining to biodiversity andwildlands ecology in the African savannah tropical forests and marine ecosystems

St Vincent and the Grenadines Caribbean Soil Erosion Research on DeforestedWatershed Areas Environmental Scientist Project Manager and Principle investigator intothe loss of soil water and nutrients associated with banana cultivated areas Secondary focus ofthe research was aimed at developing a land use management plan incorporating conservationfarming practices and the use of social forestry in the conservation of soil on severely erodedsteep-land agricultural areas In consideration with the socio-economic status of the areaformulated recommendations for appropriate farming practices at the micro-scale level

St Vincent and the Grenadines Caribbean Man and the Biosphere ProjectUNESCOEnvironmental Scientist Assistant Project Supervisor and Liaison between the University ofCalgary and the St Vincent Forestry Department Responsible for the implementation of varioussoil erosion research studies aimed at the quantification of soil water and nutrient loss associatedwith agroforestry and forestry plantation areas

ENVIRONMENTAL POLICYChair of the Energy Recovery Generation (ERG) Subgroup Clean Air Strategic Alliance Alberta

Advisor Centre for EnergyERG Input Electricity and Alternative Energy Division BC Ministry of Energy and Mines

ERG Input Climate Change Offset System Environment CanadaERG Input Treatment of Clean Energy Natural Resources Canada

COUNTRIES WORK EXPERIENCECanada Egypt Zimbabwe St Vincent and the Grenadines Chad and Cameroon Cuba

5

Selected Permitting Reports

1 A Wetlands Monitoring Plan Foster Creek Area Cold Lake Air Weapons Range AB 2001 Reportprepared for Alberta Energy Company Ltd

2 A Strategic Assessment of The Banff Centre Area Redevelopment Plan Banff National Park AB2000 Environmental Screening Report prepared for The Banff Centre

3 Permit to Withdraw Water from the Pipestone River and Corral Creek for the Purposes ofSnowmaking Fire-Fighting and Domestic Water Use the Lake Louise Ski Area Banff National ParkAB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

4 Improvements to Water Intakes on the Pipestone River and Corral Creek the Lake Louise Ski AreaBanff National Park AB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

5 Proposed Development of a Chairliff and Ski Runs on Eagle Ridge the Marmot Basin Ski AreaJasper National Park AB 1999 Comprehensive Study Report prepared for Ski Marmot Basin

6 An Application for New Staff Accommodations at Skoki Lodge Banff National Park AB 2000Environmental Screening Report prepared for Skiing Louise Ltd

7 An Application for New Commercial Accommodations at the Lake Louise Inn Banff National ParkAB 2000 Report prepared for the Lake Louise Inn

8 Improvements to Surface Drainage at the Marmot Basin Ski Area Jasper National Park AB 1998Environmental Screening Report prepared for Ski Marmot Basin

9 Improvements to Subsurface Drainage at the Marmot Basin Ski Area Jasper National Park AB1998 Environmental Screening Report prepared for Ski Marmot Basin

10 Improvements to Sewage Treatment Facilities and Effluent Disposal at the Marmot Basin Ski AreaJasper National Park AB 1998 Environmental Screening Report prepared for Ski Marmot Basin

Other Reports

11 Legislative and Policy Factors Influencing Tourism Development in Alberta 2000 Report preparedfor Alberta Economic Development and Alberta Economic Development Authority TourismCommittee

12 Egypt Country Development Policy Framework (CDPF) Assessment 1999 Report prepared for theCanadian International Development Agency Hull Quebec

13 Egypt Country Development Policy Framework (CDPF) Assessment Presentation 1999Presentation prepared for the Canadian International Development Agency Hull Quebec

14 Monitoring Mission Reports Egypt Environment Theme Reports prepared for the CanadianInternational Development Agency Hull Quebec

15 A Pre-Disturbance Vegetation Classification for the Disturbed Portion of the Syncrude DevelopmentArea Mildred Lake AB 1998 Report prepared for Syncrude Canada Ltd

16 Characterization of Soil Erosion Processes and Nutrient Losses Associated with Previously ForestedAreas the Colonarie River Watershed St Vincent West Indies 1998 A Masters Thesis preparedfor the University of Calgary

6

Stakeholder Consultation

1 Zimbabwe-Canada Environmental Planning Exchange Mission 2001 Organized and coordinated anexchange mission held in Banff AB for the CIDA Zimbabwe Environmental Planning and CapacityEnhancement Project

2 Strategic Assessment of The Banff Centre Area Redevelopment Plan 2000 Conducted stakeholderconsultations via a public open house forum

3 Results Based Management as a Project Management Tool 1999 Conducted a workshop in VictoriaFalls Zimbabwe for the Environmental Planning and Capacity Enhancement Project

7

Neil StewartRR 3 SimcoeOntario CanadaN3Y 4K2

OBJECTIVE ProjectConstruction Management

emailphone

fax

nmsproj ectskwiccom519-426-2239519-426-2674

1991-Date

1990-1991

1988-1990

JPRomC1r amp CONsect1[RUCnON MIANAGEMJENT sectJERVJ[CJEsect

Project amp Construction Management services including Project DevelopmentProject strategy Contract negotiations Contract Management Industrial RelationsGovernment liaison Profit amp Loss accountability

Plans of execution project controls budgets planning evaluations safety labourrelations and business development Project amp Site management coordinationprocedures administration methods and site organization Managed andcoordinated information flow tofrom Client(s) Engineer(s) and Contractor(s)

Projects includeWestcoast Energy 55mw Whitby Cogen Bayside 280 mw RepowerEcodyne Ltd MOU contract management amp coordinationUnited Parcel Services Canada Hamilton Air Hub ProjectINCO Nickle Foam and Nickle Disc ProjectsBayer AG Nicklehydroxide and Tungsten Carbide ProjectsMacMillen Bloedel Secondary Fibre Recycling Project

Fluor Daniel Canada LtdResident Construction Manager Central Division

Provide support to Business Units for construction managementservicesresponsible for industrial relations safety quality personnel development andmethods Initiated and established field organizations roles and responsibilitiessite procedures fab shop contractorsupplier planning budgetsfinancial and clientrelations to support critical contract schedules

Projects includeProctor amp Gamble Ultra Project MFord Canada Winn 88 Paint PlantINCO S02 Abatement Project

Ellis Don LtdProject Manager Resident site manager accountable for the process coordinationof $500M GMSUZUKI (CAMI) grass roots automotive plant in Ingersoll ON

Directed 1800 unionized trades (peak workforce) and managed lump-sum projecton schedule and under budget Developed and maintained Oriental and NorthAmerican client trust relationships Surpassed project expectations in labourrelations and safety Profit and Loss accountability

1986-1988

1985-1986

1984-1985

1983-1984

1981-1983

1978-1981

1974-1978

1973-1974

1969-1973

EDUCATION

UMA SpantecGeneral SuperintendentDirected and supervised lump-sum contracts Interfaced with engineering andclient organizations to produce responsive quality services and safe profitablecontracts

Projects includedLabatts Brewers various capital projectsConsumers Glass hot amp cold end shut downsUnivofWaterloo construction management servicesDomtar paper board expansion

Glen Curtis Company Construction SuperintendentConstruction management of Canadian Occidentals 65m cfPdgrass roots sour gas plant in Mezeppa Alberta

Ennisteel Co Ltd Toronto ON Project SupervisorUltramars 1500 million barrel terminal

Self-employed OntarioShip yard construction amp generation facilities

Petrosar Inc Sarnia ON Area SuperintendentClient rep responsible for $650 Million HFOU project

Fluor Canada Corp Alberta Mechanical SupervisorAGCL 1200 tpd Methanol plantAquitaine Canada 650m cfPd sour gas plantEsso Canada Cold Lake Project amp Judy Creek

Arthur GMcKee Inc Nanticoke ON Area SupervisorTexaco 120000 bpd grass roots refinery

SteIco Inc Hamilton ON

JewittVallee Simcoe ONOntario Hydro 4000 MW Thermal generationStelco LEW steel plantDomtar Mill expansionTrent Valley Quarry modernization

MacMaster University 1976-77 (night school)Mohawk College 1971-72 (night school)

SELF DEVELOPMENT -project management-construction management-basic computers-industrial relations-WinWin strategies

-WHMIS-safety amp compensation-KT amp decisions-team management-personnel administration

PERSONAL

REFERENCES

DOB February 24 1950

On request

CITIZENSHIP Canadian

Cochrane Engineering Ltd

Statement of Qualifications

Power Generation Facilities

Cochrane Engineering Ltd200 - 1770 W7th Avenue

Vancouver Be V6J 4Y6Phone 604-736-5421 Fax 604-736-1519

Email receptioncochrane-groupca

COCHRAR

Cochrane Engineering LtdGeneral Qualifications

TABLE OF CONTENTS

Section

Section

Section

10 COMPANY BACKGROUND11 Multi-Disciplinary Design12 Quality Assurance

20 SUMMARY OF RECENT RELEVANT EXPERIENCE21 Recent Relevant Projects Completed22 Projects Currently in Progress23 Cochrane Group - Other Relevant Experience

30 ENGINEERINGmiddot TOOLS

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Sandhill Energy CenterAusti n Texas

Calpine Combined Cycle Power PlantGoldendale Washington

10 COMPANY BACKGROUND

The Cochrane Group of companies including Cochrane Engineeringprovides integrated engineering architecture planning and projectmanagement services for a wide variety of projects It was formed in1996 through the merger of Cochrane Engineering a Calgary firm inoperation since 1972 and the PBK Group which had providedarchitectural and engineering services in Vancouver since 1937 Ouraffiliation with the Cochrane Group affords us access to the expertiseof over 350 personnel consisting of project managers technicalpersonnel and administrative staff in six offices across Canada Italso lends access to other Cochrane Group firms including PBKArchitects Inc which has provided design services for many industrialprojects in Canada and abroad Cochrane Engineering and PBKArchitects have significant experience providing services for clients inthe power coal mining and process industries

Cochrane Engineerings power division has successfully exporteddesign services through out North and South America In the last twoyears this division has provided mechanical processinstrumentation architectural electrical civil and structural designservices for projects totaling over 1000 MW of power generationThe construction cost for these projects exceeds $1 billion

11 Multi-Disciplinary DesignCochrane Group is a fully integrated multi-disciplinary design groupservicing the power sector with in-house architectural capabilitiesGE7FA experience and combined cycle process experts enabling usto provide comprehensive one stop shopping The CochraneGroups multi-disciplinary design team includes

bull Cochrane Engineering Ltd andbull PBK Architects Inc

Cochrane Engineering Ltd is a multi-discipline engineering firmspecializing in the design of combined cycle power plants simplecycle power plants and industrial projects We also supplyengineering resources for PBK architects

PBK Architects Inc specializes in the design of industrial facilitiesoffices maintenance shops warehouses institutional buildings andrecreational sport facilities PBK provides the architectural servicesto Cochrane for our power projects Signature projects include BCPlace GM Place Horseshoe Bay Ferry Terminal upgrade and

1-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 3: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

Response 13

- 2 -

Yes 10 of DPPLP and Bastion Island Power Inc its GeneralPartner

14 Page 2 A2 Please identify the key team members the Projectmanagement personnel and other members of the highly qualified andexperienced team

141 Please provide the CVs of these personnel

142 Please provide evidence of the experience of Bibb and Cochrane inthe EPC of analogous power plants

Response 14

Duke Point Power LPBidder

Financial Adviso rMacquarie Bank

Debt ProvidersRoyal Bank of Canada

Independent EngineerBlack ampVeafch

G T LT SAGE Energy

141

Legal Advisors - ProjectBennett Jones LLPR

Leg al Advisors - Fin anceFarris Vaughn

Power CycleEngin eer

Attached are the CVs of the following key team members

Jeffry Myers President amp Chief Executive Officer Pristine PowerIncHarvie Campbell Executive Vice President Pristine Power IncKen Spinner Vice President Engineering Pristine Power IncJulia Ciccaglione Vice President Environment and EmissionsTrading Pristine Power IncNeil Stewart Site Project Manager

Please see the answer to BCUC IR 2701 for more documentationsupporting the arrangement and the personnel for commissioningstartup and operations

142 Please see attached pdf file for the requested information

DMSLegal05404600001 1972044v3

-3-

15 Page 3 A2 Please provide a rough breakdown of the $2 MM betweencash (or cash owed) and sweat equity

Response 15 DPP will have incurred direct development costs of approximately$2 million by mid-February 2005 This does not include the internalcosts or sweat equity of the sponsors or any costs from thevarious project stakeholders such as the EPC contractor the bankthe operations contractor etc All inclusive costs are estimated tobe well in excess of $2 million dollars over the period up to theaward and another $2 million over the three months from award tomid-February The above figures are conservative estimates

In addition to the expenses mentioned above DPP has made a $5million deposit related to the Asset Transfer Agreement and hasprovided development security of slightly over $30 million

16 Page 3 A3 Is sale of energy or capacity to Harmac or any party otherthan BC Hydro the intention of DPPLP

161 Are contractual arrangements with Harmac in place or underway

162 In DPPLPs opinion does BC Hydro have any contractual rightsunder its EPA to require DPPLP to sell this capacity or energy (orany part of it) to BC Hydro at any time

Response 16 Yes

161 No

162 Contractually BC Hydro has rights to 105 of 252 MW

17 Page 4 A3 How much additional capacity is available through duct firing

171 When will this capability be installed

172 What benefit if any will accrue to BC Hydro from such capability

173 If any of the plant components listed were upgraded to improveplant heat rate how would the resulting financial benefits be splitbetween BC Hydro and DPPLP

Response 17 Duct firing will provide approximately an additional 28-30Megawatts of capacity

171 All capacity will be operational by May 1 2007

172 The existence of capacity exceeding 105 of 252 MW providesextra insurance to BC Hydro that minor facility upsets in the

OMS Legal054046OOOO 1 19n044v3

- 4 -

operation of the plant will not adversely affect the availability of thecontracted capacity Such potential minor operational upsets willbe first absorbed by the additional duct fired capacity

173 The resulting costs and financial benefits would accrue 100 toDPPLP

18 Page 7 A7 DPPLP state there were no surprises in the CFT processPlease if and how DPPLP anticipated that the term of the EPA would bechanged from 10-25 years as in the original CFT documents to 25 yearsminimum with a BC Hydro unilateral option to extend to 35 years Pleasesimilarly explain why DPPLP expected that the Independent Revieweroriginally allowed to talk to bidders would later be forbidden to talk tobidders and vice-versa

Response 18 In the team members experience it is quite common for theoffering party to refine the terms of CFTRFP processes mid-course as objectives and constraints become better known and toreflect the input of potential bidders In DPPs view although therewere substantive changes to the EPA during the process theprocess itself reflected no dramatic departures from the originallyindicated path This comment also reflects the fact that all partieswere kept appraised of ongoing developments in order to ensurethat everyone remained on an equal footing Specifically thetransition to the 25-year term resulted in a term that is consistentwith the life of the assets With respect to the independentReviewer at the time that DPP became involved in the CFTprocess bidders were not able to communicate directly with theIndependent Reviewer

19 Page10A13

191 Is DPPLP taking the position that it was unaware that the BCUCmight reject the EPA if it found that as for VIGP BC Hydro hadfailed to demonstrate that this project is the most cost effectivesolution for the Vancouver Island capacity issue If so pleaseprovide evidence from the CFT documents that support thisposition

192 Is DPPLP taking the position that the terms and conditions of theEPA are irrelevant in the determination of whether this project is themost cost effective solution to the Vancouver Island capacity issueIf so please state why

193 Would DPPLP bid the same prices for the project if the terms andconditions of the EPA were (a) far harsher or (b) far looser asseen from the position of bidder

DMSLegal105404610000 111972044v3

-5 -

194 Philosophically is there a point of harshness in a CFT andEPA atwhich DPPLP would simply decline to bid

Response 191 No DPP notes that VIGP was not the result of a broad all-sources competitive process

192 No However DPP considers that the EPA must be considered inthe context of the market-based approach adopted for theacquisition of the needed capacity If it can be clearly shown thatthe EPA in its totality is fundamentally flawed then this findingshould be addressed by the Commission However DPP views apiecemeal revisiting of this EPA as inappropriate if not impossibleDPP is of the view that the most important aspect of any reviewbeing its fairness has been answered through the competitiveprocess as all bidders faced the same EPA Terms and Conditionsand consequently all bidders remained on an equal footing

The Commission could use this proceeding as an opportunity toprovide commentary for use in future competitive procurementprocesses in the Province

193 No any bid would obviously be influenced by the totality of thepackage offered by the EPA This is not solely a pricing issueBidders adopt technologies and configure their facilities to meet thetechnical requirements of the electrical system as reflected in anEPA This clearly would impact the quantum of the bid but itsprimary role is to ensure that the system adopts appropriatetechnology to meet its requirements

194 Depending on the circumstances yes

110 Under the terms of the DPPLP EPA please explain the extent to whichDPPLP is responsible for any Green House Gas charges fees orpenalties until 2010 and starting 2011 Please clarify whether DPPLPhas factored any such GHG liability into its bid price

Response 110 Under the EPA the project has accepted liability with respect toGreenhouse Gas charges fees or penalties for the life of theproject BC Hydro under the terms of the Asset TransferAgreement has committed to offset 50 of GHG emissions up toand including the year 2010

DPPLP has factored potential GHG liability into the bid pricebased on an in-depth review of the issue The project team spentconsiderable time reviewing understanding and assessing thepotential GHG liabilities from the facility Based on thisassessment the project incorporated an appropriate allowance forsuch potential liability

DMSLegal054046OOOO 1 1972044v3

JEFFRY M MYERS55 Springs ide StreetCalgary Alberta

T3Z 3M1

Residence (403) 246-6673Business (403) 444-5571Cellular (403) 813-3098

Email jmyerspristinepowerca

QUALIFIED BY

Twenty-five years experience in the downstream natural gas and independent power business including

bull Executive level management of all aspects of a major Canadian independent power businessbull Significant role in the management and partnership in two independent power startup businessesbull Major greenfield pipeline and storage project development to financingbull Development of independent power projects to financingbull Long-term natural gas and transportation acquisition and fuel planningbull Operations management and planning for natural gas pipeline and power assets

EXPERIENCE

President Pristine Power Inc January 2003-Present

Founder of Pristine a company formed to pursue environmentally responsible power projectdevelopments based on exploitation of proven technologies Development activities include thedevelopment of energy recovery generation projects from industrial waste heat compressed air energystorage projects and conventional gas-fired power projects This includes management of the successfultender for the 252MW Duke Point Power Project as a result of the Vl-CFT Pristine completed a privatefinancing in 2004 and generally undertakes early stage development activities at the risk of the Pristineshareholders and generally seeks venture backing as required for bidding purposes and to fund the latterstages of project development acquisition and construction

President Westcoast Power Inc December 1999 -July 2002

Responsible for management of all aspects of the Westcoast Energy Inc power business segmentincluding eight operating plants (six in North America two international)

Management of an operating fleet of approx 500 megawatts (MWs) three plants under construction (800MWs) in North America and one in China (50 MWs) Project development markets included Canadaand northern tier US markets including the WSCC MAIN ECAR NYPP PJM and NEPOOL reliabilityareas Responsibilities included relationship management with eight key project partners

The mandate included operating responsibility for all plants except one partner operated internationalasset and a staff of 250 not including corporate support staff Annual capital budget accountability ofapproximately C$250 million Westcoast Power contributed approximately 10 of after tax earningsand 20 of annual cash flow to Westcoast Energy (2001) results

Key Accomplishments

~ Successful development of four F class hybrid merchant power projects with aminimum of 50 of the spark spread risk locked in via long term bilateral contracts

Execution of two North American and one international construction project withinfinancial and performance parameters approved by the Westcoast Energy Board ofDirectors

~ Continued implementation of a self directed work team operations philosophythrough the staffing of two new operating plants

~ As a result of a re-alignment of corporate priorities led the development of themanaged growth strategy for Westcoast Power This resulted in the successfulconditional sale of the North American operating assets and a strategic review of thefuture of the power business at WestcoastFollowing the acquisition of Westcoast Energy by Duke Energy in March 2002directed the sale of all remaining Westcoast Power assets and the wind-up ofWestcoast Power

Vice President Business Development - Westcoast Energy February 1997-December 1999

Responsible for the development of North American pipeline and storage project initiatives (from early1997) and independent power projects (from mid 1998)

Key accomplishments~ Initiation and development of the TriState and Millennium pipeline projects~ Management of the acquisition of a significant share of the Alliance and Vector

pipeline projects~ Execution of the Westcoast Power hybrid merchant strategy and management of the

development of the successful Liberty and Bayside power project developments

PALLISER PIPELINE PROJECT

Project Manager - Westcoast Energy

February 1996-January 1997

Managed all aspects of the Palliser project a $350 million pipeline proposal by Westcoast Energyselected by PanCanadian Petroleum following an extensive industry Request for Approvals Palliser wasthe first major natural gas pipeline project in North America proposed to be developed and constructed atthe risk of the project partners

Responsibilities included selection and management of a multi-disciplinary team from Westcoast andPanCanadian and directing Palliser as an autonomous business unit responsible to the project OwnersCommittee

Filing of the Palliser project with the National Energy Board resulted in a competitive response andsubsequent wind-up of the project Westcoast Energy earned significant profit for on termination of theproject as a result of a success fee arrangement negotiated with PaqcCanadian

MARITIMES AND NORTHEAST PIPELINE PROJECTProject Manager - Westcoast Energy

1994 -1996

Developed Westcoast Energys interest in the project from initial concept with the Sable Offshore EnergyProject partners and managed all Canadian elements of the pipeline project

Reporting to Westcoast senior management and the project management committee selected a projectteam and directed system marketing community relations and all engineering and environmentrequirements of the project

Subsequent to the assignment to the Palliser Project Maritimes and Northeast was filed with the NationalEnergy Board and is on schedule for the original in-service date of November 1999

2

ST CLAIR PIPELINESManager Pipeline Business Development

1994

Following the acquisition of Union Gas by Westcoast Energy participated in the development of a storageand pipeline business development subsidiary

Responsibilities included a thorough review of project development potential in eastern Canada and theMidwest and Northeast United States Managed Unions participation in the Intercoastal project anddeveloped the Bluewater pipeline project

NORDIC POWER COGENERATION OF CANADAPresident

1990 - 1993

One of six key professionals hired by the founder of Nordic Power Inc to start up a new North Americanindependent power company

Managed all aspects of the $150 million 102 megawatt West Windsor power project from originalproposal to Ontario Hydro to financial closing West Windsor Power was commissioned in 1996 and isnow owned by an affiliate of Tractebel SA

Key responsibilities included initiation and closing of long-term agreements with Ontario Hydro steamhosts fuel suppliers and transporters and management of all government affairs

Tenure with Nordic also included greenfield power project development and fuel plan development atseveral sites in Canada and the United States

UNION GAS LIMITEDVarious Operations Positions

1987 -1990

Line and staff management assignments and summer employment in the field in three of Unions regionaloffices and head office culminated in the management of a total of 55 staff and an annual capital budgetof approximately $5 million

Participated as a middle manager in a major organization following an early retirement program thatresulted in operating cost reductions of over 20

EDUCATION

Honours Bachelor of Arts in Business AdministrationThe University of Western Ontario

Masters of Business AdministrationThe University of Windsor

3

1980

1992

HARVIE E CAMPBELL

354 Hawkview Manor Circle N WCalgary Alberta T3G 2Y7

Business 403-241-2436Cell 403-650-4584Fax 403-374-1871

e-mail Harviecampbellshawca

SENIOR CONSULTING BUSINESS DEVELOPMENT PROFESSIONAL

Project development consultant with over 20 years in the energy industry Experienced in the reviewassessment and development oflarge capital energy projects particularly independent power projects hasplayed a senior role in the development of over 1500 MWs of power facilities valued at over $15 billion

Proficient in all aspects of power generation development feasibility reviews market analysis projectmanagement fuel supply contracting execution financing and economics Skilled in facilitating businessdevelopment solutions Proven ability to direct successful development project management teams andenhance co-operation from all levels of an organization partners stakeholders and government agencies toincrease shareholder value and achieve business project development results Proven ability to get thedeal done

Mr Campbell currently operates a consulting firm (HEIAK Energy Inc) providing management services tothe Independent Power Industry

PROFESSIONAL EXPERIENCE

Vice President and CFOPristine Power Inc

2002 to Present

Founding partner of Pristine Power Inc a development company established to pursue the development ofprojects utilizing leading edge proven generation technologies with strong environmental characteristicsThe company focuss on the development of waste heat generation and storage related generationtechnologies such as Compressed Air Energy Storage (CAES)

Vice President (amp General Manager) DevelopmentWestcoast Power Inc Calgary Alberta

1998 to 2002

As Vice President Development for Westcoast Power held responsibility for all aspects of West coastsdevelopment activities within Canada the United States and overseas Responsibilities included projectconception overall management of a multidisciplinary development team including technical economicpublic relations environmental legal and financing Responsible for the negotiation of all contracts andassembling of project development teams Important accomplishments include

Harvie E Campbell

FREDERICKSON POWER PROJECT

2493 MW F Class Combined Cycle facility located near Tacoma WashingtonRole Vice PresidentExecutive Director

Page 2

Responsibilities included all aspects of project development including PNW regional plan for WestcoastPower regional screen acquisition of the Frederickson site formed development team arranged projectconstruction gas transportation electrical transmission offtake contracts interconnection etc

Project Highlights

bull Project accorded First mover status during the PNW power boom in 20002001bull Placed 20 year tolling contracts with three regional PUDs Benton Franklin and Grays Harbourbull Arranged gas transportation on the Westcoast and Northwest Pipeline systems and electrical

transmission to Big Eddy amp John Daybull Project was under budget and ahead of schedulebull Oversaw partial sale to a partner and final sale of Duke (Westcoast) interest to Epcor Powerbull Project is presently in commercial operation

ISLAND COGENERA TION PROJECT

250 MW F class CC Cogen facility (Alstom Gas Turbine) located in Campbell River HCRole Vice President

Project Highlights

bull Development phase of the ICPI was successfully completed while maintaining shareholder valuebull All project contracts and permits were completed and executedbull Purchase of Partners working interest after execution of all Project agreementsbull Lead successful non-recourse financing of facility

PUNCAKJA YA POWER PROJECT

395 MW project consisting of 60 diesel generators 3x 65 MW coal fired units and one 60 mile long transmissionline located at the Freeport MacMoran goldcopper mine in Irian Jaya Indonesia

Responsible for contracts including power offtake operations and technical completion with Freeport andestablishing operating regimen Also played a senior role in the USD $500 million financing of the project

Harvie E Campbell Page 3

In addition Mr Campbell has undertaken senior roles in the development and financing of the following projects

Ft Nelson Transmission Line (BC)McMahon Cogeneration Project (BC)Cantarell Nitrogen Injection Project (power component)WEI Gang Power Project (Shanghai)Lake Superior PowerFt Frances CogenerationWhitby CogenBayside Power

Director Energreen Inc

nla110 MW520 MW30MW

110MW110 MW50MW280 MW

While Vice President Development for Westcoast Power Mr Campbell also acted for Westcoast on theBoard of Energreen a power related subsidiary of Alliance Pipeline

Manager Investment Services GroupWestcoast Energy IncVancouver BC

1994 to 1998

Established a single group responsible for the financial analysis commercial review and contracting of allcapital projects within Westcoast Energy including Westcoast Power Westcoast International and theWestcoast Business Development Group (mostly Pipeline and storage related investments) Supportedproject contract negotiations financial analysis and financing on a host of projects including powergeneration pipeline petrochemical and fertilizer projects

Supervisorl Financial AnalystWestcoast Energy IncVancouver BC

1984 to 1993

Harvie E Campbell Page 4

From joining Westcoast Energy in 1984 as a financial analyst and economist Mr Campbell heldsuccessively more senior roles in the areas of planning development and financial analysis Heparticipated in the acquisition of several small oil amp gas production companies ICG Utilities and UnionGas in the late 1980s and early 1990s

EDUCATION

bull MA Economics 1984Simon Fraser University at Burnaby Bc

bull BA (Honours) Economics 1982University of AlbertaEdmonton Alberta

Mr Campbell is a past President (and currently Director) of the Independent Power Association of BritishColumbia and past Director of the Canadian Institute of Energy and the Vancouver Rowing Club Heresides in Calgary with his wife Ines and three children

References Available on Request

KENNETH W SPINNER

3040- 400 - 4th Ave SWCalgary AB T2P OJ4

403-444-5578

Technicalproject management and development professional with 23 years in the energy industryExperienced in the review technical assessment and development of independent power projects havebeen involved in the development engineering and construction on over 1000 megawatts of powerplants and project managed over $500 million in powerenergy projects

Proficient in all aspects of power generation developments feasibility reviews project managementproject engineering EPC contract negotiations and administration Proven ability to direct successfuldevelopment project management teams and enhance co-operation from all levels of an organizationpartners stakeholders and government agencies to increase shareholder value and achieve business project development management results

PROFESSIONAL EXPERIENCE

V P EngineeringPristine Power Inc

2003 to Present

Presently providing project managementdevelopment and technical support for all power generationdevelopments and projects Responsible for preliminary development engineering coordination of allengineering procurement and construction and contract negotiation and administration activities withinthe company

PresidentSpinergy Services Inc

1999 to 2003

Providing power generation consulting and developmentmanagement services to various clients throughoutCanada specifically Alberta British Columbia Saskatchewan and Eastern Canada Involved in various gas-firedand biomass project developments ranging from 25 Megawatts to 450 Megawatts as project development advisorConducted feasibility studiesproposals and economic feasibility reviews on a wide range of power developmentsin the energy forestry and coal industries On going in-house developments include gas-fired cogenerationbiomass generation combined heatcooling power facilities and energy storage opportunities

Executive Director Vice President (ICPI)Manager New Ventures Business DevelopmentFletcher Challenge Energy (FCE) Calgary Alberta

]997 to 1999

As Executive Director Vice President of the 250 megawatt Island Cogeneration Project Inc (ICPI)jointly-managed development of the ICPI project on Vancouver Island to development completion Directed negotiationteams for the power purchase agreement with BC Hydro steam sales agreements with Fletcher ChallengeCanada Paper Mill the engineering and construction contract and project permits

Pale]KENNETH W SPINNER

PROFESSIONAL EXPERIENCE (Continued)

Project Highlights

bull Development phase of the ICPl was successfully completed while maintaining shareholder valuebull All project contracts and permits were completed and executedbull Managed development team in Vancouver consisting of multi-disciplinary professionals legal

environmental and engineering consultantsbull Guided the environmental permitting process and obtained project approvalbull FCEs working interest in ICPI was successfully sold after execution of all Project agreementsbull Project is presently in commercial operation

ISLAND COGENERATION PROJECT - 250 MW- CAMPBELL RIVER BC

Vice PresidentWest Windsor Power - (PLC Windsor Ltd)Northstar Energy Corporation Calgary Alberta

1994 to 1997

Vice President ofPLC Windsor Ltd and Northstar Energys principal representative on the partnershipmanagement committee directly responsible for the 120 megawatt West Windsor Power project in WindsorOntario Responsible for overall project management project financial analysis and project capital budget

Project Highlights

bull Administered the implementation of all project contracts including engineering and construction contractgas supply and transportation agreements steam sales power purchase agreements and directed financialclosing activities at loan conversion Project was under budget and started up successfully in 1996

bull Maximized project value by cost control budgeting scheduling maintaining initial contract values andoptimizing economic parameters

bull Involved in the negotiation and implementation a $100 million EPC turnkey contract for the constructionand start-up of the facility

bull Project was managed to completion which included mobilization commissioning commercial operationsperformance testing and conversion to term financing

Pa2e 2KENNETH W SPINNER

PROFESSIONAL EXPERIENCE (Continued)

WEST WINDSOR POWER - 120 MW - WINDSOR ONTARIO

Manager EngineeringPowerlink Corporation (Subsidiary of Northstar Energy Corp) Portland Oregon

1992 to ]994

Responsible for all technical management and support for power project development activities in Canada USAand other international regions Supported project contract negotiations on the West Windsor Power Projectmanaged the engineering construction contract and operating agreement negotiations

Manager Facilities Engineering Sr Project Engineer Process EngineerNorthstar Energy Corporation Dome Petroleum Ltd Hudsons Bay Oil and Gas LtdCalgary Alberta

1980 to ]992

Managed oil and gas facilities development in Alberta and independent power development in Canada and theUSA Responsible for project management and process engineering on various oil and gas facilities and pipelines

EDUCATION

bull Bachelor of Science Chemical Engineering (Honours) 1980Queens University at Kingston Ontario

bull Cogeneration Development Course 1992Kingston Ontario

bull Cogeneration Power Plant Design and Optimization 1991Boston Massachusetts

bull Business Management Financial and Evaluation Courses 1986 to 1997

Pale 3

Project Experience Chart

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsHarvie Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren BakerCampbell Power Project Utilities Washington CCGT Electric Harbour EPCOR Power Power Resource

Puget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Puncakjaya Duke Irian Jaya 395 MW Diesel coal Mitsubishi PT Freeport 1997 Richard E Richard EPower Project Energy Indonesia fired Indonesia Coleman Coleman

PT Freeport PT FreeportIndonesia IndonesiaJI H R Rasuna JI H R RasunaSaid Kav X-7 No Said Kav X-7 No6 6Plaza 89 12th Plaza 89 12thFloor FloorJakarta 12940 Jakarta 12940

Lake Superior Great Sault St 110 MW Natural GE Ontario 1993 Colin Clark Bill RalphPower Project Lakes Marie Ont GasDistiliate Electricity Great Lakes OEFC

Power Finance Corp Power amp Brascan 416-325-80577059415651

McMahon Duke Taylor BC 115 MW Natural Gas Westinghouse BC Hydro 1993 Duane Rae Dawn FarrellCogeneration Energy Duke Energy BC Hydro

ATCO 4036991551ATCO

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsJeff Myers Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren Baker

Power Project Utilitiesl Washington CCGT Electric Harbour EPCOR Power Power ResourcePuget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Liberty Power Reliant Philadelphia 568 MW Natural Gas GE Pacific Gas 2002 Greg Kennedy Nowa merchantProject Energy PA CCGT and Electric - Reliant Energy plant

National 713-497-7490Energy Group(receivership)

West Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Ken Spinner Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsWest Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Julia S Ciccaglione Curriculum Vitae

CURRICULUM VITAE

JULIA S CICCAGLIONEEnvironment Specialist

3040400 4th Avenue SWCalgary AB Canada T2P OJ4

Tel (403)444-5538 email jciccaglionepristinepowerca

CAREER BRIEF

An environment specialist with extensive experience in project management impact assessmentstakeholder consultation policy analysis and climate change Additional expertise in internationaldevelopment projects including project monitoring and stakeholder facilitation Excellent communicationorganisation and writing skills Technical background in the biophysical sciences and economics Projectperformance measurement experience using Results Based Management (RBM)

EDUCA TION

MSc Geography 1998Soil Erosion Assessment Soil and Water Nutrient Loss Analysis Watershed ManagementUniversity of Calgary Calgary Alberta Canada

BSc Geography 1994University of Calgary Calgary Alberta CanadaConcentration Biogeography geomorphology

BA Economics 1991University of Calgary Calgary Alberta CanadaConcentration Petroleum economics

PROFESSIONAL EXPERTISE

Environmental Project ManagementPolicy AnalysisRegulatory AnalysisStakeholder amp Public Consultation

Impact AssessmentSustainable DevelopmentClimate ChangeEnvironmental Management

CAREER HISTORY

Domestic

1998- Pristine Power Inc Calgary Vice President Environment and Emissions TradingPresent Responsible for overall environmental project management regulatory compliance public

policy input and management of Pristines greenhouse gas strategy

Suncurrent Industries Ltd Calgary Senior Emissions Portfolio ConsultantResponsible for overall management of Suncurrents greenhouse gas credit portfolio

2

Alberta Energy Company (AEC) Ltd Calgary Wetland Vegetation Scientist IRISEnvironmental Systems Responsible for the design of a long-term (20 yr) Boreal wetlandvegetation monitoring program to determine the effects of groundwater withdrawal on wetlandvegetation Data gathered from the monitoring program to be utilised by Alberta EnvironmentalProtection for resource management decision making

Syncrude Canada Limited Calgary Environment Specialist and Project Manager IRISEnvironmental Systems Managed and co-ordinated a team of scientists responsible for thedelineation of forest types into commercial and non-commercial stands Derived informationwas used as input into Syncrudes reclamation and mine area conservation plan Specificproject management activities included conducting a needs assessment budget preparationand creation of a Terms of Reference

Environmental Impact Assessment amp Policy Specialist IRIS Environmental SystemsResponsible for the completion of environmental impact assessment projects Responsibilitiesincluded the identification of impacts mitigations cumulative effects and the management andco-ordination of multidisciplinary scientific teams Extensive liasing with government agenciesPolicy analysis included integrating environmental policy and statutory requirements withdevelopment initiatives Additional responsibilities included extensive stakeholder and publicconsultation The following is a list of completed environmental impact assessments

Skiing Louise Limited Banff National Park An Environmental Screening Report for thepurpose of withdrawing water from the Pipestone River and Corral Creek to accommodatesnowmaking fire-fighting and domestic water use activities Report considerations includedidentifying river hydrologic regimes potential impacts to aquatic ecosystems mitigationprocedures and cumulative effects assessment

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts associated with improvements to water intake systems in the Pipestone River andCorral Creek Specific report considerations included identifying impacts to aquaticecosystems

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts related to terrain modifications and replacement of snowmaking infrastructure on theUpper Wiwaxy ski run

The Lake Louise Inn Banff National Park Environmental Screening Report for theconstruction of new commercial accommodation in Lake Louise

Skoki Lodge Banff National Park Environmental Screening Report for the construction ofadditional staff housing at the Skoki Lodge National Historic Site

The Banff Centre Banff National Park Environmental Screening Report for the submissionof an Area Redevelopment Plan The project considered a strategic assessment includedthe identification of impacts resulting from proposed developments or redevelopments on thecampus of The Banff Centre

Ski Marmot Basin Jasper National Park Canada Part of a multi-disciplinary teamresponsible for the completion of a Comprehensive Study for the development of a chairlift andski runs in the Eagle Ridge area of Marmot Basin

Ski Marmot Basin Jasper National Park Canada Environmental Screening Reportspertaining to the installation of new sewage treatment facilities improvements to surfacedrainage and subsurface drainage

3

1995-1998

1990

Legislation Analyst IRIS Environmental Systems Alberta Economic DevelopmentCalgary AB Review and analysis of Alberta Provincial and Canadian Federal legislation todetermine land use laws and identify areas within the province which may have potential forfuture tourism development This information was used in the development of maps illustratingcurrent land uses and areas of potential future tourism development in Alberta

University of Calgary Department of Geography Canada Instructor i) Taught introductorygeography Topics included climatology geomorphology soils and vegetation hydrology remotesensing and air photo interpretation ii) Taught a senior level course in introductory vascular plantidentification plant taxonomy introductory wildlife identification and habitat associations and plantand wildlife responses to disturbances specific to the Canadian Grasslands Aspen ParklandMontane Sub-Alpine Alpine and Boreal Forest Ecoregions

Petro Canada Resources Incorporated Calgary Canada Junior Land ManagementRepresentative Responsible for the review of land agreements governing the operation of oiland gas properties Conducted an economic evaluation and reconciliation of predicted gas pricesversus actual market prices Additional work included site inspections of reclaimed coal propertiesin northeastern British Columbia

International

1998- Cuba Climate Change Emissions Baseline and Monitoring Plan Department of ForeignPresent Affairs 2002 and IntI Trade (DFAIT) Canada Project Manager Suncurrent Industries Ltd

Responsible for managing a climate change emissions baseline study and monitoring planfocused on the implementation of renewable and energy efficient technologies (wind and solarenergy high efficiency micro-turbines) in Cuba Baseline study was in accordance with thoserequirements for a Clean Development Mechanism

Egypt Environment Theme Project - Canadian International Development Agency (CIDA)Environment and Performance Measurement Specialist IRIS Environmental SystemsMember of the Performance Measurement Advisory team for the bilateral CIDA-EgyptEnvironment Theme Project (7 year project) Responsibilities included the measurement ofenvironment project and environment theme results Results to be consistent with Government ofCanada - CIDA policy programming goals including contributing to sustainable development inEgypt and stakeholder involvement in development initiatives Results Based Management(RBM) used as a measurement tool

Zimbabwe Victoria Falls Environmental Planning and Capacity Enhancement Project -Canadian International Development Agency (CIDA) Environment and PerformanceMeasurement Specialist IRIS Environmental Systems An RBM facilitator in an iterativesustainable-development project in Victoria Falls to promote environmentally sustainablecommunities Project focused on improving the capacity of local partners to participate effectivelyin the preparation and implementation of the Victoria Falls Master Plan and Local DevelopmentPlans Specific responsibilities included the development and facilitation of an RBM stakeholderworkshop held in Victoria Falls Zimbabwe Workshop emphasized participatory approaches andthe inclusion of gender equality in the identification and measurement of results

Egypt Environment Theme Project Canadian International Development Agency (CIDA)PolicyProgram Analyst IRIS Environmental Systems Member of the policyprogramanalysis team conducting a trends analysis of CIDAs programming in Egypt This analysisserved as an input into CIDAs planning and design of the new Egypt Country DevelopmentProgram Framework (CDPF) Data was obtained by surveying identified stakeholders in Egyptand Canada Results of the trends analysis were then correlated with CIDAs Egypt CountryDevelopment Policy Framework to reconcile its effectiveness and provide input for its futuredirection

4

1996-1990

Governments of Chad and Cameroon - World Bank Panel Review of PipelineDevelopment Research Assistant IRIS Environmental Systems Research assistant to theManagerCoordinator of the Expert Panel for the review of literature pertaining to biodiversity andwildlands ecology in the African savannah tropical forests and marine ecosystems

St Vincent and the Grenadines Caribbean Soil Erosion Research on DeforestedWatershed Areas Environmental Scientist Project Manager and Principle investigator intothe loss of soil water and nutrients associated with banana cultivated areas Secondary focus ofthe research was aimed at developing a land use management plan incorporating conservationfarming practices and the use of social forestry in the conservation of soil on severely erodedsteep-land agricultural areas In consideration with the socio-economic status of the areaformulated recommendations for appropriate farming practices at the micro-scale level

St Vincent and the Grenadines Caribbean Man and the Biosphere ProjectUNESCOEnvironmental Scientist Assistant Project Supervisor and Liaison between the University ofCalgary and the St Vincent Forestry Department Responsible for the implementation of varioussoil erosion research studies aimed at the quantification of soil water and nutrient loss associatedwith agroforestry and forestry plantation areas

ENVIRONMENTAL POLICYChair of the Energy Recovery Generation (ERG) Subgroup Clean Air Strategic Alliance Alberta

Advisor Centre for EnergyERG Input Electricity and Alternative Energy Division BC Ministry of Energy and Mines

ERG Input Climate Change Offset System Environment CanadaERG Input Treatment of Clean Energy Natural Resources Canada

COUNTRIES WORK EXPERIENCECanada Egypt Zimbabwe St Vincent and the Grenadines Chad and Cameroon Cuba

5

Selected Permitting Reports

1 A Wetlands Monitoring Plan Foster Creek Area Cold Lake Air Weapons Range AB 2001 Reportprepared for Alberta Energy Company Ltd

2 A Strategic Assessment of The Banff Centre Area Redevelopment Plan Banff National Park AB2000 Environmental Screening Report prepared for The Banff Centre

3 Permit to Withdraw Water from the Pipestone River and Corral Creek for the Purposes ofSnowmaking Fire-Fighting and Domestic Water Use the Lake Louise Ski Area Banff National ParkAB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

4 Improvements to Water Intakes on the Pipestone River and Corral Creek the Lake Louise Ski AreaBanff National Park AB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

5 Proposed Development of a Chairliff and Ski Runs on Eagle Ridge the Marmot Basin Ski AreaJasper National Park AB 1999 Comprehensive Study Report prepared for Ski Marmot Basin

6 An Application for New Staff Accommodations at Skoki Lodge Banff National Park AB 2000Environmental Screening Report prepared for Skiing Louise Ltd

7 An Application for New Commercial Accommodations at the Lake Louise Inn Banff National ParkAB 2000 Report prepared for the Lake Louise Inn

8 Improvements to Surface Drainage at the Marmot Basin Ski Area Jasper National Park AB 1998Environmental Screening Report prepared for Ski Marmot Basin

9 Improvements to Subsurface Drainage at the Marmot Basin Ski Area Jasper National Park AB1998 Environmental Screening Report prepared for Ski Marmot Basin

10 Improvements to Sewage Treatment Facilities and Effluent Disposal at the Marmot Basin Ski AreaJasper National Park AB 1998 Environmental Screening Report prepared for Ski Marmot Basin

Other Reports

11 Legislative and Policy Factors Influencing Tourism Development in Alberta 2000 Report preparedfor Alberta Economic Development and Alberta Economic Development Authority TourismCommittee

12 Egypt Country Development Policy Framework (CDPF) Assessment 1999 Report prepared for theCanadian International Development Agency Hull Quebec

13 Egypt Country Development Policy Framework (CDPF) Assessment Presentation 1999Presentation prepared for the Canadian International Development Agency Hull Quebec

14 Monitoring Mission Reports Egypt Environment Theme Reports prepared for the CanadianInternational Development Agency Hull Quebec

15 A Pre-Disturbance Vegetation Classification for the Disturbed Portion of the Syncrude DevelopmentArea Mildred Lake AB 1998 Report prepared for Syncrude Canada Ltd

16 Characterization of Soil Erosion Processes and Nutrient Losses Associated with Previously ForestedAreas the Colonarie River Watershed St Vincent West Indies 1998 A Masters Thesis preparedfor the University of Calgary

6

Stakeholder Consultation

1 Zimbabwe-Canada Environmental Planning Exchange Mission 2001 Organized and coordinated anexchange mission held in Banff AB for the CIDA Zimbabwe Environmental Planning and CapacityEnhancement Project

2 Strategic Assessment of The Banff Centre Area Redevelopment Plan 2000 Conducted stakeholderconsultations via a public open house forum

3 Results Based Management as a Project Management Tool 1999 Conducted a workshop in VictoriaFalls Zimbabwe for the Environmental Planning and Capacity Enhancement Project

7

Neil StewartRR 3 SimcoeOntario CanadaN3Y 4K2

OBJECTIVE ProjectConstruction Management

emailphone

fax

nmsproj ectskwiccom519-426-2239519-426-2674

1991-Date

1990-1991

1988-1990

JPRomC1r amp CONsect1[RUCnON MIANAGEMJENT sectJERVJ[CJEsect

Project amp Construction Management services including Project DevelopmentProject strategy Contract negotiations Contract Management Industrial RelationsGovernment liaison Profit amp Loss accountability

Plans of execution project controls budgets planning evaluations safety labourrelations and business development Project amp Site management coordinationprocedures administration methods and site organization Managed andcoordinated information flow tofrom Client(s) Engineer(s) and Contractor(s)

Projects includeWestcoast Energy 55mw Whitby Cogen Bayside 280 mw RepowerEcodyne Ltd MOU contract management amp coordinationUnited Parcel Services Canada Hamilton Air Hub ProjectINCO Nickle Foam and Nickle Disc ProjectsBayer AG Nicklehydroxide and Tungsten Carbide ProjectsMacMillen Bloedel Secondary Fibre Recycling Project

Fluor Daniel Canada LtdResident Construction Manager Central Division

Provide support to Business Units for construction managementservicesresponsible for industrial relations safety quality personnel development andmethods Initiated and established field organizations roles and responsibilitiessite procedures fab shop contractorsupplier planning budgetsfinancial and clientrelations to support critical contract schedules

Projects includeProctor amp Gamble Ultra Project MFord Canada Winn 88 Paint PlantINCO S02 Abatement Project

Ellis Don LtdProject Manager Resident site manager accountable for the process coordinationof $500M GMSUZUKI (CAMI) grass roots automotive plant in Ingersoll ON

Directed 1800 unionized trades (peak workforce) and managed lump-sum projecton schedule and under budget Developed and maintained Oriental and NorthAmerican client trust relationships Surpassed project expectations in labourrelations and safety Profit and Loss accountability

1986-1988

1985-1986

1984-1985

1983-1984

1981-1983

1978-1981

1974-1978

1973-1974

1969-1973

EDUCATION

UMA SpantecGeneral SuperintendentDirected and supervised lump-sum contracts Interfaced with engineering andclient organizations to produce responsive quality services and safe profitablecontracts

Projects includedLabatts Brewers various capital projectsConsumers Glass hot amp cold end shut downsUnivofWaterloo construction management servicesDomtar paper board expansion

Glen Curtis Company Construction SuperintendentConstruction management of Canadian Occidentals 65m cfPdgrass roots sour gas plant in Mezeppa Alberta

Ennisteel Co Ltd Toronto ON Project SupervisorUltramars 1500 million barrel terminal

Self-employed OntarioShip yard construction amp generation facilities

Petrosar Inc Sarnia ON Area SuperintendentClient rep responsible for $650 Million HFOU project

Fluor Canada Corp Alberta Mechanical SupervisorAGCL 1200 tpd Methanol plantAquitaine Canada 650m cfPd sour gas plantEsso Canada Cold Lake Project amp Judy Creek

Arthur GMcKee Inc Nanticoke ON Area SupervisorTexaco 120000 bpd grass roots refinery

SteIco Inc Hamilton ON

JewittVallee Simcoe ONOntario Hydro 4000 MW Thermal generationStelco LEW steel plantDomtar Mill expansionTrent Valley Quarry modernization

MacMaster University 1976-77 (night school)Mohawk College 1971-72 (night school)

SELF DEVELOPMENT -project management-construction management-basic computers-industrial relations-WinWin strategies

-WHMIS-safety amp compensation-KT amp decisions-team management-personnel administration

PERSONAL

REFERENCES

DOB February 24 1950

On request

CITIZENSHIP Canadian

Cochrane Engineering Ltd

Statement of Qualifications

Power Generation Facilities

Cochrane Engineering Ltd200 - 1770 W7th Avenue

Vancouver Be V6J 4Y6Phone 604-736-5421 Fax 604-736-1519

Email receptioncochrane-groupca

COCHRAR

Cochrane Engineering LtdGeneral Qualifications

TABLE OF CONTENTS

Section

Section

Section

10 COMPANY BACKGROUND11 Multi-Disciplinary Design12 Quality Assurance

20 SUMMARY OF RECENT RELEVANT EXPERIENCE21 Recent Relevant Projects Completed22 Projects Currently in Progress23 Cochrane Group - Other Relevant Experience

30 ENGINEERINGmiddot TOOLS

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Sandhill Energy CenterAusti n Texas

Calpine Combined Cycle Power PlantGoldendale Washington

10 COMPANY BACKGROUND

The Cochrane Group of companies including Cochrane Engineeringprovides integrated engineering architecture planning and projectmanagement services for a wide variety of projects It was formed in1996 through the merger of Cochrane Engineering a Calgary firm inoperation since 1972 and the PBK Group which had providedarchitectural and engineering services in Vancouver since 1937 Ouraffiliation with the Cochrane Group affords us access to the expertiseof over 350 personnel consisting of project managers technicalpersonnel and administrative staff in six offices across Canada Italso lends access to other Cochrane Group firms including PBKArchitects Inc which has provided design services for many industrialprojects in Canada and abroad Cochrane Engineering and PBKArchitects have significant experience providing services for clients inthe power coal mining and process industries

Cochrane Engineerings power division has successfully exporteddesign services through out North and South America In the last twoyears this division has provided mechanical processinstrumentation architectural electrical civil and structural designservices for projects totaling over 1000 MW of power generationThe construction cost for these projects exceeds $1 billion

11 Multi-Disciplinary DesignCochrane Group is a fully integrated multi-disciplinary design groupservicing the power sector with in-house architectural capabilitiesGE7FA experience and combined cycle process experts enabling usto provide comprehensive one stop shopping The CochraneGroups multi-disciplinary design team includes

bull Cochrane Engineering Ltd andbull PBK Architects Inc

Cochrane Engineering Ltd is a multi-discipline engineering firmspecializing in the design of combined cycle power plants simplecycle power plants and industrial projects We also supplyengineering resources for PBK architects

PBK Architects Inc specializes in the design of industrial facilitiesoffices maintenance shops warehouses institutional buildings andrecreational sport facilities PBK provides the architectural servicesto Cochrane for our power projects Signature projects include BCPlace GM Place Horseshoe Bay Ferry Terminal upgrade and

1-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 4: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

-3-

15 Page 3 A2 Please provide a rough breakdown of the $2 MM betweencash (or cash owed) and sweat equity

Response 15 DPP will have incurred direct development costs of approximately$2 million by mid-February 2005 This does not include the internalcosts or sweat equity of the sponsors or any costs from thevarious project stakeholders such as the EPC contractor the bankthe operations contractor etc All inclusive costs are estimated tobe well in excess of $2 million dollars over the period up to theaward and another $2 million over the three months from award tomid-February The above figures are conservative estimates

In addition to the expenses mentioned above DPP has made a $5million deposit related to the Asset Transfer Agreement and hasprovided development security of slightly over $30 million

16 Page 3 A3 Is sale of energy or capacity to Harmac or any party otherthan BC Hydro the intention of DPPLP

161 Are contractual arrangements with Harmac in place or underway

162 In DPPLPs opinion does BC Hydro have any contractual rightsunder its EPA to require DPPLP to sell this capacity or energy (orany part of it) to BC Hydro at any time

Response 16 Yes

161 No

162 Contractually BC Hydro has rights to 105 of 252 MW

17 Page 4 A3 How much additional capacity is available through duct firing

171 When will this capability be installed

172 What benefit if any will accrue to BC Hydro from such capability

173 If any of the plant components listed were upgraded to improveplant heat rate how would the resulting financial benefits be splitbetween BC Hydro and DPPLP

Response 17 Duct firing will provide approximately an additional 28-30Megawatts of capacity

171 All capacity will be operational by May 1 2007

172 The existence of capacity exceeding 105 of 252 MW providesextra insurance to BC Hydro that minor facility upsets in the

OMS Legal054046OOOO 1 19n044v3

- 4 -

operation of the plant will not adversely affect the availability of thecontracted capacity Such potential minor operational upsets willbe first absorbed by the additional duct fired capacity

173 The resulting costs and financial benefits would accrue 100 toDPPLP

18 Page 7 A7 DPPLP state there were no surprises in the CFT processPlease if and how DPPLP anticipated that the term of the EPA would bechanged from 10-25 years as in the original CFT documents to 25 yearsminimum with a BC Hydro unilateral option to extend to 35 years Pleasesimilarly explain why DPPLP expected that the Independent Revieweroriginally allowed to talk to bidders would later be forbidden to talk tobidders and vice-versa

Response 18 In the team members experience it is quite common for theoffering party to refine the terms of CFTRFP processes mid-course as objectives and constraints become better known and toreflect the input of potential bidders In DPPs view although therewere substantive changes to the EPA during the process theprocess itself reflected no dramatic departures from the originallyindicated path This comment also reflects the fact that all partieswere kept appraised of ongoing developments in order to ensurethat everyone remained on an equal footing Specifically thetransition to the 25-year term resulted in a term that is consistentwith the life of the assets With respect to the independentReviewer at the time that DPP became involved in the CFTprocess bidders were not able to communicate directly with theIndependent Reviewer

19 Page10A13

191 Is DPPLP taking the position that it was unaware that the BCUCmight reject the EPA if it found that as for VIGP BC Hydro hadfailed to demonstrate that this project is the most cost effectivesolution for the Vancouver Island capacity issue If so pleaseprovide evidence from the CFT documents that support thisposition

192 Is DPPLP taking the position that the terms and conditions of theEPA are irrelevant in the determination of whether this project is themost cost effective solution to the Vancouver Island capacity issueIf so please state why

193 Would DPPLP bid the same prices for the project if the terms andconditions of the EPA were (a) far harsher or (b) far looser asseen from the position of bidder

DMSLegal105404610000 111972044v3

-5 -

194 Philosophically is there a point of harshness in a CFT andEPA atwhich DPPLP would simply decline to bid

Response 191 No DPP notes that VIGP was not the result of a broad all-sources competitive process

192 No However DPP considers that the EPA must be considered inthe context of the market-based approach adopted for theacquisition of the needed capacity If it can be clearly shown thatthe EPA in its totality is fundamentally flawed then this findingshould be addressed by the Commission However DPP views apiecemeal revisiting of this EPA as inappropriate if not impossibleDPP is of the view that the most important aspect of any reviewbeing its fairness has been answered through the competitiveprocess as all bidders faced the same EPA Terms and Conditionsand consequently all bidders remained on an equal footing

The Commission could use this proceeding as an opportunity toprovide commentary for use in future competitive procurementprocesses in the Province

193 No any bid would obviously be influenced by the totality of thepackage offered by the EPA This is not solely a pricing issueBidders adopt technologies and configure their facilities to meet thetechnical requirements of the electrical system as reflected in anEPA This clearly would impact the quantum of the bid but itsprimary role is to ensure that the system adopts appropriatetechnology to meet its requirements

194 Depending on the circumstances yes

110 Under the terms of the DPPLP EPA please explain the extent to whichDPPLP is responsible for any Green House Gas charges fees orpenalties until 2010 and starting 2011 Please clarify whether DPPLPhas factored any such GHG liability into its bid price

Response 110 Under the EPA the project has accepted liability with respect toGreenhouse Gas charges fees or penalties for the life of theproject BC Hydro under the terms of the Asset TransferAgreement has committed to offset 50 of GHG emissions up toand including the year 2010

DPPLP has factored potential GHG liability into the bid pricebased on an in-depth review of the issue The project team spentconsiderable time reviewing understanding and assessing thepotential GHG liabilities from the facility Based on thisassessment the project incorporated an appropriate allowance forsuch potential liability

DMSLegal054046OOOO 1 1972044v3

JEFFRY M MYERS55 Springs ide StreetCalgary Alberta

T3Z 3M1

Residence (403) 246-6673Business (403) 444-5571Cellular (403) 813-3098

Email jmyerspristinepowerca

QUALIFIED BY

Twenty-five years experience in the downstream natural gas and independent power business including

bull Executive level management of all aspects of a major Canadian independent power businessbull Significant role in the management and partnership in two independent power startup businessesbull Major greenfield pipeline and storage project development to financingbull Development of independent power projects to financingbull Long-term natural gas and transportation acquisition and fuel planningbull Operations management and planning for natural gas pipeline and power assets

EXPERIENCE

President Pristine Power Inc January 2003-Present

Founder of Pristine a company formed to pursue environmentally responsible power projectdevelopments based on exploitation of proven technologies Development activities include thedevelopment of energy recovery generation projects from industrial waste heat compressed air energystorage projects and conventional gas-fired power projects This includes management of the successfultender for the 252MW Duke Point Power Project as a result of the Vl-CFT Pristine completed a privatefinancing in 2004 and generally undertakes early stage development activities at the risk of the Pristineshareholders and generally seeks venture backing as required for bidding purposes and to fund the latterstages of project development acquisition and construction

President Westcoast Power Inc December 1999 -July 2002

Responsible for management of all aspects of the Westcoast Energy Inc power business segmentincluding eight operating plants (six in North America two international)

Management of an operating fleet of approx 500 megawatts (MWs) three plants under construction (800MWs) in North America and one in China (50 MWs) Project development markets included Canadaand northern tier US markets including the WSCC MAIN ECAR NYPP PJM and NEPOOL reliabilityareas Responsibilities included relationship management with eight key project partners

The mandate included operating responsibility for all plants except one partner operated internationalasset and a staff of 250 not including corporate support staff Annual capital budget accountability ofapproximately C$250 million Westcoast Power contributed approximately 10 of after tax earningsand 20 of annual cash flow to Westcoast Energy (2001) results

Key Accomplishments

~ Successful development of four F class hybrid merchant power projects with aminimum of 50 of the spark spread risk locked in via long term bilateral contracts

Execution of two North American and one international construction project withinfinancial and performance parameters approved by the Westcoast Energy Board ofDirectors

~ Continued implementation of a self directed work team operations philosophythrough the staffing of two new operating plants

~ As a result of a re-alignment of corporate priorities led the development of themanaged growth strategy for Westcoast Power This resulted in the successfulconditional sale of the North American operating assets and a strategic review of thefuture of the power business at WestcoastFollowing the acquisition of Westcoast Energy by Duke Energy in March 2002directed the sale of all remaining Westcoast Power assets and the wind-up ofWestcoast Power

Vice President Business Development - Westcoast Energy February 1997-December 1999

Responsible for the development of North American pipeline and storage project initiatives (from early1997) and independent power projects (from mid 1998)

Key accomplishments~ Initiation and development of the TriState and Millennium pipeline projects~ Management of the acquisition of a significant share of the Alliance and Vector

pipeline projects~ Execution of the Westcoast Power hybrid merchant strategy and management of the

development of the successful Liberty and Bayside power project developments

PALLISER PIPELINE PROJECT

Project Manager - Westcoast Energy

February 1996-January 1997

Managed all aspects of the Palliser project a $350 million pipeline proposal by Westcoast Energyselected by PanCanadian Petroleum following an extensive industry Request for Approvals Palliser wasthe first major natural gas pipeline project in North America proposed to be developed and constructed atthe risk of the project partners

Responsibilities included selection and management of a multi-disciplinary team from Westcoast andPanCanadian and directing Palliser as an autonomous business unit responsible to the project OwnersCommittee

Filing of the Palliser project with the National Energy Board resulted in a competitive response andsubsequent wind-up of the project Westcoast Energy earned significant profit for on termination of theproject as a result of a success fee arrangement negotiated with PaqcCanadian

MARITIMES AND NORTHEAST PIPELINE PROJECTProject Manager - Westcoast Energy

1994 -1996

Developed Westcoast Energys interest in the project from initial concept with the Sable Offshore EnergyProject partners and managed all Canadian elements of the pipeline project

Reporting to Westcoast senior management and the project management committee selected a projectteam and directed system marketing community relations and all engineering and environmentrequirements of the project

Subsequent to the assignment to the Palliser Project Maritimes and Northeast was filed with the NationalEnergy Board and is on schedule for the original in-service date of November 1999

2

ST CLAIR PIPELINESManager Pipeline Business Development

1994

Following the acquisition of Union Gas by Westcoast Energy participated in the development of a storageand pipeline business development subsidiary

Responsibilities included a thorough review of project development potential in eastern Canada and theMidwest and Northeast United States Managed Unions participation in the Intercoastal project anddeveloped the Bluewater pipeline project

NORDIC POWER COGENERATION OF CANADAPresident

1990 - 1993

One of six key professionals hired by the founder of Nordic Power Inc to start up a new North Americanindependent power company

Managed all aspects of the $150 million 102 megawatt West Windsor power project from originalproposal to Ontario Hydro to financial closing West Windsor Power was commissioned in 1996 and isnow owned by an affiliate of Tractebel SA

Key responsibilities included initiation and closing of long-term agreements with Ontario Hydro steamhosts fuel suppliers and transporters and management of all government affairs

Tenure with Nordic also included greenfield power project development and fuel plan development atseveral sites in Canada and the United States

UNION GAS LIMITEDVarious Operations Positions

1987 -1990

Line and staff management assignments and summer employment in the field in three of Unions regionaloffices and head office culminated in the management of a total of 55 staff and an annual capital budgetof approximately $5 million

Participated as a middle manager in a major organization following an early retirement program thatresulted in operating cost reductions of over 20

EDUCATION

Honours Bachelor of Arts in Business AdministrationThe University of Western Ontario

Masters of Business AdministrationThe University of Windsor

3

1980

1992

HARVIE E CAMPBELL

354 Hawkview Manor Circle N WCalgary Alberta T3G 2Y7

Business 403-241-2436Cell 403-650-4584Fax 403-374-1871

e-mail Harviecampbellshawca

SENIOR CONSULTING BUSINESS DEVELOPMENT PROFESSIONAL

Project development consultant with over 20 years in the energy industry Experienced in the reviewassessment and development oflarge capital energy projects particularly independent power projects hasplayed a senior role in the development of over 1500 MWs of power facilities valued at over $15 billion

Proficient in all aspects of power generation development feasibility reviews market analysis projectmanagement fuel supply contracting execution financing and economics Skilled in facilitating businessdevelopment solutions Proven ability to direct successful development project management teams andenhance co-operation from all levels of an organization partners stakeholders and government agencies toincrease shareholder value and achieve business project development results Proven ability to get thedeal done

Mr Campbell currently operates a consulting firm (HEIAK Energy Inc) providing management services tothe Independent Power Industry

PROFESSIONAL EXPERIENCE

Vice President and CFOPristine Power Inc

2002 to Present

Founding partner of Pristine Power Inc a development company established to pursue the development ofprojects utilizing leading edge proven generation technologies with strong environmental characteristicsThe company focuss on the development of waste heat generation and storage related generationtechnologies such as Compressed Air Energy Storage (CAES)

Vice President (amp General Manager) DevelopmentWestcoast Power Inc Calgary Alberta

1998 to 2002

As Vice President Development for Westcoast Power held responsibility for all aspects of West coastsdevelopment activities within Canada the United States and overseas Responsibilities included projectconception overall management of a multidisciplinary development team including technical economicpublic relations environmental legal and financing Responsible for the negotiation of all contracts andassembling of project development teams Important accomplishments include

Harvie E Campbell

FREDERICKSON POWER PROJECT

2493 MW F Class Combined Cycle facility located near Tacoma WashingtonRole Vice PresidentExecutive Director

Page 2

Responsibilities included all aspects of project development including PNW regional plan for WestcoastPower regional screen acquisition of the Frederickson site formed development team arranged projectconstruction gas transportation electrical transmission offtake contracts interconnection etc

Project Highlights

bull Project accorded First mover status during the PNW power boom in 20002001bull Placed 20 year tolling contracts with three regional PUDs Benton Franklin and Grays Harbourbull Arranged gas transportation on the Westcoast and Northwest Pipeline systems and electrical

transmission to Big Eddy amp John Daybull Project was under budget and ahead of schedulebull Oversaw partial sale to a partner and final sale of Duke (Westcoast) interest to Epcor Powerbull Project is presently in commercial operation

ISLAND COGENERA TION PROJECT

250 MW F class CC Cogen facility (Alstom Gas Turbine) located in Campbell River HCRole Vice President

Project Highlights

bull Development phase of the ICPI was successfully completed while maintaining shareholder valuebull All project contracts and permits were completed and executedbull Purchase of Partners working interest after execution of all Project agreementsbull Lead successful non-recourse financing of facility

PUNCAKJA YA POWER PROJECT

395 MW project consisting of 60 diesel generators 3x 65 MW coal fired units and one 60 mile long transmissionline located at the Freeport MacMoran goldcopper mine in Irian Jaya Indonesia

Responsible for contracts including power offtake operations and technical completion with Freeport andestablishing operating regimen Also played a senior role in the USD $500 million financing of the project

Harvie E Campbell Page 3

In addition Mr Campbell has undertaken senior roles in the development and financing of the following projects

Ft Nelson Transmission Line (BC)McMahon Cogeneration Project (BC)Cantarell Nitrogen Injection Project (power component)WEI Gang Power Project (Shanghai)Lake Superior PowerFt Frances CogenerationWhitby CogenBayside Power

Director Energreen Inc

nla110 MW520 MW30MW

110MW110 MW50MW280 MW

While Vice President Development for Westcoast Power Mr Campbell also acted for Westcoast on theBoard of Energreen a power related subsidiary of Alliance Pipeline

Manager Investment Services GroupWestcoast Energy IncVancouver BC

1994 to 1998

Established a single group responsible for the financial analysis commercial review and contracting of allcapital projects within Westcoast Energy including Westcoast Power Westcoast International and theWestcoast Business Development Group (mostly Pipeline and storage related investments) Supportedproject contract negotiations financial analysis and financing on a host of projects including powergeneration pipeline petrochemical and fertilizer projects

Supervisorl Financial AnalystWestcoast Energy IncVancouver BC

1984 to 1993

Harvie E Campbell Page 4

From joining Westcoast Energy in 1984 as a financial analyst and economist Mr Campbell heldsuccessively more senior roles in the areas of planning development and financial analysis Heparticipated in the acquisition of several small oil amp gas production companies ICG Utilities and UnionGas in the late 1980s and early 1990s

EDUCATION

bull MA Economics 1984Simon Fraser University at Burnaby Bc

bull BA (Honours) Economics 1982University of AlbertaEdmonton Alberta

Mr Campbell is a past President (and currently Director) of the Independent Power Association of BritishColumbia and past Director of the Canadian Institute of Energy and the Vancouver Rowing Club Heresides in Calgary with his wife Ines and three children

References Available on Request

KENNETH W SPINNER

3040- 400 - 4th Ave SWCalgary AB T2P OJ4

403-444-5578

Technicalproject management and development professional with 23 years in the energy industryExperienced in the review technical assessment and development of independent power projects havebeen involved in the development engineering and construction on over 1000 megawatts of powerplants and project managed over $500 million in powerenergy projects

Proficient in all aspects of power generation developments feasibility reviews project managementproject engineering EPC contract negotiations and administration Proven ability to direct successfuldevelopment project management teams and enhance co-operation from all levels of an organizationpartners stakeholders and government agencies to increase shareholder value and achieve business project development management results

PROFESSIONAL EXPERIENCE

V P EngineeringPristine Power Inc

2003 to Present

Presently providing project managementdevelopment and technical support for all power generationdevelopments and projects Responsible for preliminary development engineering coordination of allengineering procurement and construction and contract negotiation and administration activities withinthe company

PresidentSpinergy Services Inc

1999 to 2003

Providing power generation consulting and developmentmanagement services to various clients throughoutCanada specifically Alberta British Columbia Saskatchewan and Eastern Canada Involved in various gas-firedand biomass project developments ranging from 25 Megawatts to 450 Megawatts as project development advisorConducted feasibility studiesproposals and economic feasibility reviews on a wide range of power developmentsin the energy forestry and coal industries On going in-house developments include gas-fired cogenerationbiomass generation combined heatcooling power facilities and energy storage opportunities

Executive Director Vice President (ICPI)Manager New Ventures Business DevelopmentFletcher Challenge Energy (FCE) Calgary Alberta

]997 to 1999

As Executive Director Vice President of the 250 megawatt Island Cogeneration Project Inc (ICPI)jointly-managed development of the ICPI project on Vancouver Island to development completion Directed negotiationteams for the power purchase agreement with BC Hydro steam sales agreements with Fletcher ChallengeCanada Paper Mill the engineering and construction contract and project permits

Pale]KENNETH W SPINNER

PROFESSIONAL EXPERIENCE (Continued)

Project Highlights

bull Development phase of the ICPl was successfully completed while maintaining shareholder valuebull All project contracts and permits were completed and executedbull Managed development team in Vancouver consisting of multi-disciplinary professionals legal

environmental and engineering consultantsbull Guided the environmental permitting process and obtained project approvalbull FCEs working interest in ICPI was successfully sold after execution of all Project agreementsbull Project is presently in commercial operation

ISLAND COGENERATION PROJECT - 250 MW- CAMPBELL RIVER BC

Vice PresidentWest Windsor Power - (PLC Windsor Ltd)Northstar Energy Corporation Calgary Alberta

1994 to 1997

Vice President ofPLC Windsor Ltd and Northstar Energys principal representative on the partnershipmanagement committee directly responsible for the 120 megawatt West Windsor Power project in WindsorOntario Responsible for overall project management project financial analysis and project capital budget

Project Highlights

bull Administered the implementation of all project contracts including engineering and construction contractgas supply and transportation agreements steam sales power purchase agreements and directed financialclosing activities at loan conversion Project was under budget and started up successfully in 1996

bull Maximized project value by cost control budgeting scheduling maintaining initial contract values andoptimizing economic parameters

bull Involved in the negotiation and implementation a $100 million EPC turnkey contract for the constructionand start-up of the facility

bull Project was managed to completion which included mobilization commissioning commercial operationsperformance testing and conversion to term financing

Pa2e 2KENNETH W SPINNER

PROFESSIONAL EXPERIENCE (Continued)

WEST WINDSOR POWER - 120 MW - WINDSOR ONTARIO

Manager EngineeringPowerlink Corporation (Subsidiary of Northstar Energy Corp) Portland Oregon

1992 to ]994

Responsible for all technical management and support for power project development activities in Canada USAand other international regions Supported project contract negotiations on the West Windsor Power Projectmanaged the engineering construction contract and operating agreement negotiations

Manager Facilities Engineering Sr Project Engineer Process EngineerNorthstar Energy Corporation Dome Petroleum Ltd Hudsons Bay Oil and Gas LtdCalgary Alberta

1980 to ]992

Managed oil and gas facilities development in Alberta and independent power development in Canada and theUSA Responsible for project management and process engineering on various oil and gas facilities and pipelines

EDUCATION

bull Bachelor of Science Chemical Engineering (Honours) 1980Queens University at Kingston Ontario

bull Cogeneration Development Course 1992Kingston Ontario

bull Cogeneration Power Plant Design and Optimization 1991Boston Massachusetts

bull Business Management Financial and Evaluation Courses 1986 to 1997

Pale 3

Project Experience Chart

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsHarvie Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren BakerCampbell Power Project Utilities Washington CCGT Electric Harbour EPCOR Power Power Resource

Puget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Puncakjaya Duke Irian Jaya 395 MW Diesel coal Mitsubishi PT Freeport 1997 Richard E Richard EPower Project Energy Indonesia fired Indonesia Coleman Coleman

PT Freeport PT FreeportIndonesia IndonesiaJI H R Rasuna JI H R RasunaSaid Kav X-7 No Said Kav X-7 No6 6Plaza 89 12th Plaza 89 12thFloor FloorJakarta 12940 Jakarta 12940

Lake Superior Great Sault St 110 MW Natural GE Ontario 1993 Colin Clark Bill RalphPower Project Lakes Marie Ont GasDistiliate Electricity Great Lakes OEFC

Power Finance Corp Power amp Brascan 416-325-80577059415651

McMahon Duke Taylor BC 115 MW Natural Gas Westinghouse BC Hydro 1993 Duane Rae Dawn FarrellCogeneration Energy Duke Energy BC Hydro

ATCO 4036991551ATCO

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsJeff Myers Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren Baker

Power Project Utilitiesl Washington CCGT Electric Harbour EPCOR Power Power ResourcePuget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Liberty Power Reliant Philadelphia 568 MW Natural Gas GE Pacific Gas 2002 Greg Kennedy Nowa merchantProject Energy PA CCGT and Electric - Reliant Energy plant

National 713-497-7490Energy Group(receivership)

West Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Ken Spinner Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsWest Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Julia S Ciccaglione Curriculum Vitae

CURRICULUM VITAE

JULIA S CICCAGLIONEEnvironment Specialist

3040400 4th Avenue SWCalgary AB Canada T2P OJ4

Tel (403)444-5538 email jciccaglionepristinepowerca

CAREER BRIEF

An environment specialist with extensive experience in project management impact assessmentstakeholder consultation policy analysis and climate change Additional expertise in internationaldevelopment projects including project monitoring and stakeholder facilitation Excellent communicationorganisation and writing skills Technical background in the biophysical sciences and economics Projectperformance measurement experience using Results Based Management (RBM)

EDUCA TION

MSc Geography 1998Soil Erosion Assessment Soil and Water Nutrient Loss Analysis Watershed ManagementUniversity of Calgary Calgary Alberta Canada

BSc Geography 1994University of Calgary Calgary Alberta CanadaConcentration Biogeography geomorphology

BA Economics 1991University of Calgary Calgary Alberta CanadaConcentration Petroleum economics

PROFESSIONAL EXPERTISE

Environmental Project ManagementPolicy AnalysisRegulatory AnalysisStakeholder amp Public Consultation

Impact AssessmentSustainable DevelopmentClimate ChangeEnvironmental Management

CAREER HISTORY

Domestic

1998- Pristine Power Inc Calgary Vice President Environment and Emissions TradingPresent Responsible for overall environmental project management regulatory compliance public

policy input and management of Pristines greenhouse gas strategy

Suncurrent Industries Ltd Calgary Senior Emissions Portfolio ConsultantResponsible for overall management of Suncurrents greenhouse gas credit portfolio

2

Alberta Energy Company (AEC) Ltd Calgary Wetland Vegetation Scientist IRISEnvironmental Systems Responsible for the design of a long-term (20 yr) Boreal wetlandvegetation monitoring program to determine the effects of groundwater withdrawal on wetlandvegetation Data gathered from the monitoring program to be utilised by Alberta EnvironmentalProtection for resource management decision making

Syncrude Canada Limited Calgary Environment Specialist and Project Manager IRISEnvironmental Systems Managed and co-ordinated a team of scientists responsible for thedelineation of forest types into commercial and non-commercial stands Derived informationwas used as input into Syncrudes reclamation and mine area conservation plan Specificproject management activities included conducting a needs assessment budget preparationand creation of a Terms of Reference

Environmental Impact Assessment amp Policy Specialist IRIS Environmental SystemsResponsible for the completion of environmental impact assessment projects Responsibilitiesincluded the identification of impacts mitigations cumulative effects and the management andco-ordination of multidisciplinary scientific teams Extensive liasing with government agenciesPolicy analysis included integrating environmental policy and statutory requirements withdevelopment initiatives Additional responsibilities included extensive stakeholder and publicconsultation The following is a list of completed environmental impact assessments

Skiing Louise Limited Banff National Park An Environmental Screening Report for thepurpose of withdrawing water from the Pipestone River and Corral Creek to accommodatesnowmaking fire-fighting and domestic water use activities Report considerations includedidentifying river hydrologic regimes potential impacts to aquatic ecosystems mitigationprocedures and cumulative effects assessment

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts associated with improvements to water intake systems in the Pipestone River andCorral Creek Specific report considerations included identifying impacts to aquaticecosystems

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts related to terrain modifications and replacement of snowmaking infrastructure on theUpper Wiwaxy ski run

The Lake Louise Inn Banff National Park Environmental Screening Report for theconstruction of new commercial accommodation in Lake Louise

Skoki Lodge Banff National Park Environmental Screening Report for the construction ofadditional staff housing at the Skoki Lodge National Historic Site

The Banff Centre Banff National Park Environmental Screening Report for the submissionof an Area Redevelopment Plan The project considered a strategic assessment includedthe identification of impacts resulting from proposed developments or redevelopments on thecampus of The Banff Centre

Ski Marmot Basin Jasper National Park Canada Part of a multi-disciplinary teamresponsible for the completion of a Comprehensive Study for the development of a chairlift andski runs in the Eagle Ridge area of Marmot Basin

Ski Marmot Basin Jasper National Park Canada Environmental Screening Reportspertaining to the installation of new sewage treatment facilities improvements to surfacedrainage and subsurface drainage

3

1995-1998

1990

Legislation Analyst IRIS Environmental Systems Alberta Economic DevelopmentCalgary AB Review and analysis of Alberta Provincial and Canadian Federal legislation todetermine land use laws and identify areas within the province which may have potential forfuture tourism development This information was used in the development of maps illustratingcurrent land uses and areas of potential future tourism development in Alberta

University of Calgary Department of Geography Canada Instructor i) Taught introductorygeography Topics included climatology geomorphology soils and vegetation hydrology remotesensing and air photo interpretation ii) Taught a senior level course in introductory vascular plantidentification plant taxonomy introductory wildlife identification and habitat associations and plantand wildlife responses to disturbances specific to the Canadian Grasslands Aspen ParklandMontane Sub-Alpine Alpine and Boreal Forest Ecoregions

Petro Canada Resources Incorporated Calgary Canada Junior Land ManagementRepresentative Responsible for the review of land agreements governing the operation of oiland gas properties Conducted an economic evaluation and reconciliation of predicted gas pricesversus actual market prices Additional work included site inspections of reclaimed coal propertiesin northeastern British Columbia

International

1998- Cuba Climate Change Emissions Baseline and Monitoring Plan Department of ForeignPresent Affairs 2002 and IntI Trade (DFAIT) Canada Project Manager Suncurrent Industries Ltd

Responsible for managing a climate change emissions baseline study and monitoring planfocused on the implementation of renewable and energy efficient technologies (wind and solarenergy high efficiency micro-turbines) in Cuba Baseline study was in accordance with thoserequirements for a Clean Development Mechanism

Egypt Environment Theme Project - Canadian International Development Agency (CIDA)Environment and Performance Measurement Specialist IRIS Environmental SystemsMember of the Performance Measurement Advisory team for the bilateral CIDA-EgyptEnvironment Theme Project (7 year project) Responsibilities included the measurement ofenvironment project and environment theme results Results to be consistent with Government ofCanada - CIDA policy programming goals including contributing to sustainable development inEgypt and stakeholder involvement in development initiatives Results Based Management(RBM) used as a measurement tool

Zimbabwe Victoria Falls Environmental Planning and Capacity Enhancement Project -Canadian International Development Agency (CIDA) Environment and PerformanceMeasurement Specialist IRIS Environmental Systems An RBM facilitator in an iterativesustainable-development project in Victoria Falls to promote environmentally sustainablecommunities Project focused on improving the capacity of local partners to participate effectivelyin the preparation and implementation of the Victoria Falls Master Plan and Local DevelopmentPlans Specific responsibilities included the development and facilitation of an RBM stakeholderworkshop held in Victoria Falls Zimbabwe Workshop emphasized participatory approaches andthe inclusion of gender equality in the identification and measurement of results

Egypt Environment Theme Project Canadian International Development Agency (CIDA)PolicyProgram Analyst IRIS Environmental Systems Member of the policyprogramanalysis team conducting a trends analysis of CIDAs programming in Egypt This analysisserved as an input into CIDAs planning and design of the new Egypt Country DevelopmentProgram Framework (CDPF) Data was obtained by surveying identified stakeholders in Egyptand Canada Results of the trends analysis were then correlated with CIDAs Egypt CountryDevelopment Policy Framework to reconcile its effectiveness and provide input for its futuredirection

4

1996-1990

Governments of Chad and Cameroon - World Bank Panel Review of PipelineDevelopment Research Assistant IRIS Environmental Systems Research assistant to theManagerCoordinator of the Expert Panel for the review of literature pertaining to biodiversity andwildlands ecology in the African savannah tropical forests and marine ecosystems

St Vincent and the Grenadines Caribbean Soil Erosion Research on DeforestedWatershed Areas Environmental Scientist Project Manager and Principle investigator intothe loss of soil water and nutrients associated with banana cultivated areas Secondary focus ofthe research was aimed at developing a land use management plan incorporating conservationfarming practices and the use of social forestry in the conservation of soil on severely erodedsteep-land agricultural areas In consideration with the socio-economic status of the areaformulated recommendations for appropriate farming practices at the micro-scale level

St Vincent and the Grenadines Caribbean Man and the Biosphere ProjectUNESCOEnvironmental Scientist Assistant Project Supervisor and Liaison between the University ofCalgary and the St Vincent Forestry Department Responsible for the implementation of varioussoil erosion research studies aimed at the quantification of soil water and nutrient loss associatedwith agroforestry and forestry plantation areas

ENVIRONMENTAL POLICYChair of the Energy Recovery Generation (ERG) Subgroup Clean Air Strategic Alliance Alberta

Advisor Centre for EnergyERG Input Electricity and Alternative Energy Division BC Ministry of Energy and Mines

ERG Input Climate Change Offset System Environment CanadaERG Input Treatment of Clean Energy Natural Resources Canada

COUNTRIES WORK EXPERIENCECanada Egypt Zimbabwe St Vincent and the Grenadines Chad and Cameroon Cuba

5

Selected Permitting Reports

1 A Wetlands Monitoring Plan Foster Creek Area Cold Lake Air Weapons Range AB 2001 Reportprepared for Alberta Energy Company Ltd

2 A Strategic Assessment of The Banff Centre Area Redevelopment Plan Banff National Park AB2000 Environmental Screening Report prepared for The Banff Centre

3 Permit to Withdraw Water from the Pipestone River and Corral Creek for the Purposes ofSnowmaking Fire-Fighting and Domestic Water Use the Lake Louise Ski Area Banff National ParkAB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

4 Improvements to Water Intakes on the Pipestone River and Corral Creek the Lake Louise Ski AreaBanff National Park AB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

5 Proposed Development of a Chairliff and Ski Runs on Eagle Ridge the Marmot Basin Ski AreaJasper National Park AB 1999 Comprehensive Study Report prepared for Ski Marmot Basin

6 An Application for New Staff Accommodations at Skoki Lodge Banff National Park AB 2000Environmental Screening Report prepared for Skiing Louise Ltd

7 An Application for New Commercial Accommodations at the Lake Louise Inn Banff National ParkAB 2000 Report prepared for the Lake Louise Inn

8 Improvements to Surface Drainage at the Marmot Basin Ski Area Jasper National Park AB 1998Environmental Screening Report prepared for Ski Marmot Basin

9 Improvements to Subsurface Drainage at the Marmot Basin Ski Area Jasper National Park AB1998 Environmental Screening Report prepared for Ski Marmot Basin

10 Improvements to Sewage Treatment Facilities and Effluent Disposal at the Marmot Basin Ski AreaJasper National Park AB 1998 Environmental Screening Report prepared for Ski Marmot Basin

Other Reports

11 Legislative and Policy Factors Influencing Tourism Development in Alberta 2000 Report preparedfor Alberta Economic Development and Alberta Economic Development Authority TourismCommittee

12 Egypt Country Development Policy Framework (CDPF) Assessment 1999 Report prepared for theCanadian International Development Agency Hull Quebec

13 Egypt Country Development Policy Framework (CDPF) Assessment Presentation 1999Presentation prepared for the Canadian International Development Agency Hull Quebec

14 Monitoring Mission Reports Egypt Environment Theme Reports prepared for the CanadianInternational Development Agency Hull Quebec

15 A Pre-Disturbance Vegetation Classification for the Disturbed Portion of the Syncrude DevelopmentArea Mildred Lake AB 1998 Report prepared for Syncrude Canada Ltd

16 Characterization of Soil Erosion Processes and Nutrient Losses Associated with Previously ForestedAreas the Colonarie River Watershed St Vincent West Indies 1998 A Masters Thesis preparedfor the University of Calgary

6

Stakeholder Consultation

1 Zimbabwe-Canada Environmental Planning Exchange Mission 2001 Organized and coordinated anexchange mission held in Banff AB for the CIDA Zimbabwe Environmental Planning and CapacityEnhancement Project

2 Strategic Assessment of The Banff Centre Area Redevelopment Plan 2000 Conducted stakeholderconsultations via a public open house forum

3 Results Based Management as a Project Management Tool 1999 Conducted a workshop in VictoriaFalls Zimbabwe for the Environmental Planning and Capacity Enhancement Project

7

Neil StewartRR 3 SimcoeOntario CanadaN3Y 4K2

OBJECTIVE ProjectConstruction Management

emailphone

fax

nmsproj ectskwiccom519-426-2239519-426-2674

1991-Date

1990-1991

1988-1990

JPRomC1r amp CONsect1[RUCnON MIANAGEMJENT sectJERVJ[CJEsect

Project amp Construction Management services including Project DevelopmentProject strategy Contract negotiations Contract Management Industrial RelationsGovernment liaison Profit amp Loss accountability

Plans of execution project controls budgets planning evaluations safety labourrelations and business development Project amp Site management coordinationprocedures administration methods and site organization Managed andcoordinated information flow tofrom Client(s) Engineer(s) and Contractor(s)

Projects includeWestcoast Energy 55mw Whitby Cogen Bayside 280 mw RepowerEcodyne Ltd MOU contract management amp coordinationUnited Parcel Services Canada Hamilton Air Hub ProjectINCO Nickle Foam and Nickle Disc ProjectsBayer AG Nicklehydroxide and Tungsten Carbide ProjectsMacMillen Bloedel Secondary Fibre Recycling Project

Fluor Daniel Canada LtdResident Construction Manager Central Division

Provide support to Business Units for construction managementservicesresponsible for industrial relations safety quality personnel development andmethods Initiated and established field organizations roles and responsibilitiessite procedures fab shop contractorsupplier planning budgetsfinancial and clientrelations to support critical contract schedules

Projects includeProctor amp Gamble Ultra Project MFord Canada Winn 88 Paint PlantINCO S02 Abatement Project

Ellis Don LtdProject Manager Resident site manager accountable for the process coordinationof $500M GMSUZUKI (CAMI) grass roots automotive plant in Ingersoll ON

Directed 1800 unionized trades (peak workforce) and managed lump-sum projecton schedule and under budget Developed and maintained Oriental and NorthAmerican client trust relationships Surpassed project expectations in labourrelations and safety Profit and Loss accountability

1986-1988

1985-1986

1984-1985

1983-1984

1981-1983

1978-1981

1974-1978

1973-1974

1969-1973

EDUCATION

UMA SpantecGeneral SuperintendentDirected and supervised lump-sum contracts Interfaced with engineering andclient organizations to produce responsive quality services and safe profitablecontracts

Projects includedLabatts Brewers various capital projectsConsumers Glass hot amp cold end shut downsUnivofWaterloo construction management servicesDomtar paper board expansion

Glen Curtis Company Construction SuperintendentConstruction management of Canadian Occidentals 65m cfPdgrass roots sour gas plant in Mezeppa Alberta

Ennisteel Co Ltd Toronto ON Project SupervisorUltramars 1500 million barrel terminal

Self-employed OntarioShip yard construction amp generation facilities

Petrosar Inc Sarnia ON Area SuperintendentClient rep responsible for $650 Million HFOU project

Fluor Canada Corp Alberta Mechanical SupervisorAGCL 1200 tpd Methanol plantAquitaine Canada 650m cfPd sour gas plantEsso Canada Cold Lake Project amp Judy Creek

Arthur GMcKee Inc Nanticoke ON Area SupervisorTexaco 120000 bpd grass roots refinery

SteIco Inc Hamilton ON

JewittVallee Simcoe ONOntario Hydro 4000 MW Thermal generationStelco LEW steel plantDomtar Mill expansionTrent Valley Quarry modernization

MacMaster University 1976-77 (night school)Mohawk College 1971-72 (night school)

SELF DEVELOPMENT -project management-construction management-basic computers-industrial relations-WinWin strategies

-WHMIS-safety amp compensation-KT amp decisions-team management-personnel administration

PERSONAL

REFERENCES

DOB February 24 1950

On request

CITIZENSHIP Canadian

Cochrane Engineering Ltd

Statement of Qualifications

Power Generation Facilities

Cochrane Engineering Ltd200 - 1770 W7th Avenue

Vancouver Be V6J 4Y6Phone 604-736-5421 Fax 604-736-1519

Email receptioncochrane-groupca

COCHRAR

Cochrane Engineering LtdGeneral Qualifications

TABLE OF CONTENTS

Section

Section

Section

10 COMPANY BACKGROUND11 Multi-Disciplinary Design12 Quality Assurance

20 SUMMARY OF RECENT RELEVANT EXPERIENCE21 Recent Relevant Projects Completed22 Projects Currently in Progress23 Cochrane Group - Other Relevant Experience

30 ENGINEERINGmiddot TOOLS

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Sandhill Energy CenterAusti n Texas

Calpine Combined Cycle Power PlantGoldendale Washington

10 COMPANY BACKGROUND

The Cochrane Group of companies including Cochrane Engineeringprovides integrated engineering architecture planning and projectmanagement services for a wide variety of projects It was formed in1996 through the merger of Cochrane Engineering a Calgary firm inoperation since 1972 and the PBK Group which had providedarchitectural and engineering services in Vancouver since 1937 Ouraffiliation with the Cochrane Group affords us access to the expertiseof over 350 personnel consisting of project managers technicalpersonnel and administrative staff in six offices across Canada Italso lends access to other Cochrane Group firms including PBKArchitects Inc which has provided design services for many industrialprojects in Canada and abroad Cochrane Engineering and PBKArchitects have significant experience providing services for clients inthe power coal mining and process industries

Cochrane Engineerings power division has successfully exporteddesign services through out North and South America In the last twoyears this division has provided mechanical processinstrumentation architectural electrical civil and structural designservices for projects totaling over 1000 MW of power generationThe construction cost for these projects exceeds $1 billion

11 Multi-Disciplinary DesignCochrane Group is a fully integrated multi-disciplinary design groupservicing the power sector with in-house architectural capabilitiesGE7FA experience and combined cycle process experts enabling usto provide comprehensive one stop shopping The CochraneGroups multi-disciplinary design team includes

bull Cochrane Engineering Ltd andbull PBK Architects Inc

Cochrane Engineering Ltd is a multi-discipline engineering firmspecializing in the design of combined cycle power plants simplecycle power plants and industrial projects We also supplyengineering resources for PBK architects

PBK Architects Inc specializes in the design of industrial facilitiesoffices maintenance shops warehouses institutional buildings andrecreational sport facilities PBK provides the architectural servicesto Cochrane for our power projects Signature projects include BCPlace GM Place Horseshoe Bay Ferry Terminal upgrade and

1-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 5: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

- 4 -

operation of the plant will not adversely affect the availability of thecontracted capacity Such potential minor operational upsets willbe first absorbed by the additional duct fired capacity

173 The resulting costs and financial benefits would accrue 100 toDPPLP

18 Page 7 A7 DPPLP state there were no surprises in the CFT processPlease if and how DPPLP anticipated that the term of the EPA would bechanged from 10-25 years as in the original CFT documents to 25 yearsminimum with a BC Hydro unilateral option to extend to 35 years Pleasesimilarly explain why DPPLP expected that the Independent Revieweroriginally allowed to talk to bidders would later be forbidden to talk tobidders and vice-versa

Response 18 In the team members experience it is quite common for theoffering party to refine the terms of CFTRFP processes mid-course as objectives and constraints become better known and toreflect the input of potential bidders In DPPs view although therewere substantive changes to the EPA during the process theprocess itself reflected no dramatic departures from the originallyindicated path This comment also reflects the fact that all partieswere kept appraised of ongoing developments in order to ensurethat everyone remained on an equal footing Specifically thetransition to the 25-year term resulted in a term that is consistentwith the life of the assets With respect to the independentReviewer at the time that DPP became involved in the CFTprocess bidders were not able to communicate directly with theIndependent Reviewer

19 Page10A13

191 Is DPPLP taking the position that it was unaware that the BCUCmight reject the EPA if it found that as for VIGP BC Hydro hadfailed to demonstrate that this project is the most cost effectivesolution for the Vancouver Island capacity issue If so pleaseprovide evidence from the CFT documents that support thisposition

192 Is DPPLP taking the position that the terms and conditions of theEPA are irrelevant in the determination of whether this project is themost cost effective solution to the Vancouver Island capacity issueIf so please state why

193 Would DPPLP bid the same prices for the project if the terms andconditions of the EPA were (a) far harsher or (b) far looser asseen from the position of bidder

DMSLegal105404610000 111972044v3

-5 -

194 Philosophically is there a point of harshness in a CFT andEPA atwhich DPPLP would simply decline to bid

Response 191 No DPP notes that VIGP was not the result of a broad all-sources competitive process

192 No However DPP considers that the EPA must be considered inthe context of the market-based approach adopted for theacquisition of the needed capacity If it can be clearly shown thatthe EPA in its totality is fundamentally flawed then this findingshould be addressed by the Commission However DPP views apiecemeal revisiting of this EPA as inappropriate if not impossibleDPP is of the view that the most important aspect of any reviewbeing its fairness has been answered through the competitiveprocess as all bidders faced the same EPA Terms and Conditionsand consequently all bidders remained on an equal footing

The Commission could use this proceeding as an opportunity toprovide commentary for use in future competitive procurementprocesses in the Province

193 No any bid would obviously be influenced by the totality of thepackage offered by the EPA This is not solely a pricing issueBidders adopt technologies and configure their facilities to meet thetechnical requirements of the electrical system as reflected in anEPA This clearly would impact the quantum of the bid but itsprimary role is to ensure that the system adopts appropriatetechnology to meet its requirements

194 Depending on the circumstances yes

110 Under the terms of the DPPLP EPA please explain the extent to whichDPPLP is responsible for any Green House Gas charges fees orpenalties until 2010 and starting 2011 Please clarify whether DPPLPhas factored any such GHG liability into its bid price

Response 110 Under the EPA the project has accepted liability with respect toGreenhouse Gas charges fees or penalties for the life of theproject BC Hydro under the terms of the Asset TransferAgreement has committed to offset 50 of GHG emissions up toand including the year 2010

DPPLP has factored potential GHG liability into the bid pricebased on an in-depth review of the issue The project team spentconsiderable time reviewing understanding and assessing thepotential GHG liabilities from the facility Based on thisassessment the project incorporated an appropriate allowance forsuch potential liability

DMSLegal054046OOOO 1 1972044v3

JEFFRY M MYERS55 Springs ide StreetCalgary Alberta

T3Z 3M1

Residence (403) 246-6673Business (403) 444-5571Cellular (403) 813-3098

Email jmyerspristinepowerca

QUALIFIED BY

Twenty-five years experience in the downstream natural gas and independent power business including

bull Executive level management of all aspects of a major Canadian independent power businessbull Significant role in the management and partnership in two independent power startup businessesbull Major greenfield pipeline and storage project development to financingbull Development of independent power projects to financingbull Long-term natural gas and transportation acquisition and fuel planningbull Operations management and planning for natural gas pipeline and power assets

EXPERIENCE

President Pristine Power Inc January 2003-Present

Founder of Pristine a company formed to pursue environmentally responsible power projectdevelopments based on exploitation of proven technologies Development activities include thedevelopment of energy recovery generation projects from industrial waste heat compressed air energystorage projects and conventional gas-fired power projects This includes management of the successfultender for the 252MW Duke Point Power Project as a result of the Vl-CFT Pristine completed a privatefinancing in 2004 and generally undertakes early stage development activities at the risk of the Pristineshareholders and generally seeks venture backing as required for bidding purposes and to fund the latterstages of project development acquisition and construction

President Westcoast Power Inc December 1999 -July 2002

Responsible for management of all aspects of the Westcoast Energy Inc power business segmentincluding eight operating plants (six in North America two international)

Management of an operating fleet of approx 500 megawatts (MWs) three plants under construction (800MWs) in North America and one in China (50 MWs) Project development markets included Canadaand northern tier US markets including the WSCC MAIN ECAR NYPP PJM and NEPOOL reliabilityareas Responsibilities included relationship management with eight key project partners

The mandate included operating responsibility for all plants except one partner operated internationalasset and a staff of 250 not including corporate support staff Annual capital budget accountability ofapproximately C$250 million Westcoast Power contributed approximately 10 of after tax earningsand 20 of annual cash flow to Westcoast Energy (2001) results

Key Accomplishments

~ Successful development of four F class hybrid merchant power projects with aminimum of 50 of the spark spread risk locked in via long term bilateral contracts

Execution of two North American and one international construction project withinfinancial and performance parameters approved by the Westcoast Energy Board ofDirectors

~ Continued implementation of a self directed work team operations philosophythrough the staffing of two new operating plants

~ As a result of a re-alignment of corporate priorities led the development of themanaged growth strategy for Westcoast Power This resulted in the successfulconditional sale of the North American operating assets and a strategic review of thefuture of the power business at WestcoastFollowing the acquisition of Westcoast Energy by Duke Energy in March 2002directed the sale of all remaining Westcoast Power assets and the wind-up ofWestcoast Power

Vice President Business Development - Westcoast Energy February 1997-December 1999

Responsible for the development of North American pipeline and storage project initiatives (from early1997) and independent power projects (from mid 1998)

Key accomplishments~ Initiation and development of the TriState and Millennium pipeline projects~ Management of the acquisition of a significant share of the Alliance and Vector

pipeline projects~ Execution of the Westcoast Power hybrid merchant strategy and management of the

development of the successful Liberty and Bayside power project developments

PALLISER PIPELINE PROJECT

Project Manager - Westcoast Energy

February 1996-January 1997

Managed all aspects of the Palliser project a $350 million pipeline proposal by Westcoast Energyselected by PanCanadian Petroleum following an extensive industry Request for Approvals Palliser wasthe first major natural gas pipeline project in North America proposed to be developed and constructed atthe risk of the project partners

Responsibilities included selection and management of a multi-disciplinary team from Westcoast andPanCanadian and directing Palliser as an autonomous business unit responsible to the project OwnersCommittee

Filing of the Palliser project with the National Energy Board resulted in a competitive response andsubsequent wind-up of the project Westcoast Energy earned significant profit for on termination of theproject as a result of a success fee arrangement negotiated with PaqcCanadian

MARITIMES AND NORTHEAST PIPELINE PROJECTProject Manager - Westcoast Energy

1994 -1996

Developed Westcoast Energys interest in the project from initial concept with the Sable Offshore EnergyProject partners and managed all Canadian elements of the pipeline project

Reporting to Westcoast senior management and the project management committee selected a projectteam and directed system marketing community relations and all engineering and environmentrequirements of the project

Subsequent to the assignment to the Palliser Project Maritimes and Northeast was filed with the NationalEnergy Board and is on schedule for the original in-service date of November 1999

2

ST CLAIR PIPELINESManager Pipeline Business Development

1994

Following the acquisition of Union Gas by Westcoast Energy participated in the development of a storageand pipeline business development subsidiary

Responsibilities included a thorough review of project development potential in eastern Canada and theMidwest and Northeast United States Managed Unions participation in the Intercoastal project anddeveloped the Bluewater pipeline project

NORDIC POWER COGENERATION OF CANADAPresident

1990 - 1993

One of six key professionals hired by the founder of Nordic Power Inc to start up a new North Americanindependent power company

Managed all aspects of the $150 million 102 megawatt West Windsor power project from originalproposal to Ontario Hydro to financial closing West Windsor Power was commissioned in 1996 and isnow owned by an affiliate of Tractebel SA

Key responsibilities included initiation and closing of long-term agreements with Ontario Hydro steamhosts fuel suppliers and transporters and management of all government affairs

Tenure with Nordic also included greenfield power project development and fuel plan development atseveral sites in Canada and the United States

UNION GAS LIMITEDVarious Operations Positions

1987 -1990

Line and staff management assignments and summer employment in the field in three of Unions regionaloffices and head office culminated in the management of a total of 55 staff and an annual capital budgetof approximately $5 million

Participated as a middle manager in a major organization following an early retirement program thatresulted in operating cost reductions of over 20

EDUCATION

Honours Bachelor of Arts in Business AdministrationThe University of Western Ontario

Masters of Business AdministrationThe University of Windsor

3

1980

1992

HARVIE E CAMPBELL

354 Hawkview Manor Circle N WCalgary Alberta T3G 2Y7

Business 403-241-2436Cell 403-650-4584Fax 403-374-1871

e-mail Harviecampbellshawca

SENIOR CONSULTING BUSINESS DEVELOPMENT PROFESSIONAL

Project development consultant with over 20 years in the energy industry Experienced in the reviewassessment and development oflarge capital energy projects particularly independent power projects hasplayed a senior role in the development of over 1500 MWs of power facilities valued at over $15 billion

Proficient in all aspects of power generation development feasibility reviews market analysis projectmanagement fuel supply contracting execution financing and economics Skilled in facilitating businessdevelopment solutions Proven ability to direct successful development project management teams andenhance co-operation from all levels of an organization partners stakeholders and government agencies toincrease shareholder value and achieve business project development results Proven ability to get thedeal done

Mr Campbell currently operates a consulting firm (HEIAK Energy Inc) providing management services tothe Independent Power Industry

PROFESSIONAL EXPERIENCE

Vice President and CFOPristine Power Inc

2002 to Present

Founding partner of Pristine Power Inc a development company established to pursue the development ofprojects utilizing leading edge proven generation technologies with strong environmental characteristicsThe company focuss on the development of waste heat generation and storage related generationtechnologies such as Compressed Air Energy Storage (CAES)

Vice President (amp General Manager) DevelopmentWestcoast Power Inc Calgary Alberta

1998 to 2002

As Vice President Development for Westcoast Power held responsibility for all aspects of West coastsdevelopment activities within Canada the United States and overseas Responsibilities included projectconception overall management of a multidisciplinary development team including technical economicpublic relations environmental legal and financing Responsible for the negotiation of all contracts andassembling of project development teams Important accomplishments include

Harvie E Campbell

FREDERICKSON POWER PROJECT

2493 MW F Class Combined Cycle facility located near Tacoma WashingtonRole Vice PresidentExecutive Director

Page 2

Responsibilities included all aspects of project development including PNW regional plan for WestcoastPower regional screen acquisition of the Frederickson site formed development team arranged projectconstruction gas transportation electrical transmission offtake contracts interconnection etc

Project Highlights

bull Project accorded First mover status during the PNW power boom in 20002001bull Placed 20 year tolling contracts with three regional PUDs Benton Franklin and Grays Harbourbull Arranged gas transportation on the Westcoast and Northwest Pipeline systems and electrical

transmission to Big Eddy amp John Daybull Project was under budget and ahead of schedulebull Oversaw partial sale to a partner and final sale of Duke (Westcoast) interest to Epcor Powerbull Project is presently in commercial operation

ISLAND COGENERA TION PROJECT

250 MW F class CC Cogen facility (Alstom Gas Turbine) located in Campbell River HCRole Vice President

Project Highlights

bull Development phase of the ICPI was successfully completed while maintaining shareholder valuebull All project contracts and permits were completed and executedbull Purchase of Partners working interest after execution of all Project agreementsbull Lead successful non-recourse financing of facility

PUNCAKJA YA POWER PROJECT

395 MW project consisting of 60 diesel generators 3x 65 MW coal fired units and one 60 mile long transmissionline located at the Freeport MacMoran goldcopper mine in Irian Jaya Indonesia

Responsible for contracts including power offtake operations and technical completion with Freeport andestablishing operating regimen Also played a senior role in the USD $500 million financing of the project

Harvie E Campbell Page 3

In addition Mr Campbell has undertaken senior roles in the development and financing of the following projects

Ft Nelson Transmission Line (BC)McMahon Cogeneration Project (BC)Cantarell Nitrogen Injection Project (power component)WEI Gang Power Project (Shanghai)Lake Superior PowerFt Frances CogenerationWhitby CogenBayside Power

Director Energreen Inc

nla110 MW520 MW30MW

110MW110 MW50MW280 MW

While Vice President Development for Westcoast Power Mr Campbell also acted for Westcoast on theBoard of Energreen a power related subsidiary of Alliance Pipeline

Manager Investment Services GroupWestcoast Energy IncVancouver BC

1994 to 1998

Established a single group responsible for the financial analysis commercial review and contracting of allcapital projects within Westcoast Energy including Westcoast Power Westcoast International and theWestcoast Business Development Group (mostly Pipeline and storage related investments) Supportedproject contract negotiations financial analysis and financing on a host of projects including powergeneration pipeline petrochemical and fertilizer projects

Supervisorl Financial AnalystWestcoast Energy IncVancouver BC

1984 to 1993

Harvie E Campbell Page 4

From joining Westcoast Energy in 1984 as a financial analyst and economist Mr Campbell heldsuccessively more senior roles in the areas of planning development and financial analysis Heparticipated in the acquisition of several small oil amp gas production companies ICG Utilities and UnionGas in the late 1980s and early 1990s

EDUCATION

bull MA Economics 1984Simon Fraser University at Burnaby Bc

bull BA (Honours) Economics 1982University of AlbertaEdmonton Alberta

Mr Campbell is a past President (and currently Director) of the Independent Power Association of BritishColumbia and past Director of the Canadian Institute of Energy and the Vancouver Rowing Club Heresides in Calgary with his wife Ines and three children

References Available on Request

KENNETH W SPINNER

3040- 400 - 4th Ave SWCalgary AB T2P OJ4

403-444-5578

Technicalproject management and development professional with 23 years in the energy industryExperienced in the review technical assessment and development of independent power projects havebeen involved in the development engineering and construction on over 1000 megawatts of powerplants and project managed over $500 million in powerenergy projects

Proficient in all aspects of power generation developments feasibility reviews project managementproject engineering EPC contract negotiations and administration Proven ability to direct successfuldevelopment project management teams and enhance co-operation from all levels of an organizationpartners stakeholders and government agencies to increase shareholder value and achieve business project development management results

PROFESSIONAL EXPERIENCE

V P EngineeringPristine Power Inc

2003 to Present

Presently providing project managementdevelopment and technical support for all power generationdevelopments and projects Responsible for preliminary development engineering coordination of allengineering procurement and construction and contract negotiation and administration activities withinthe company

PresidentSpinergy Services Inc

1999 to 2003

Providing power generation consulting and developmentmanagement services to various clients throughoutCanada specifically Alberta British Columbia Saskatchewan and Eastern Canada Involved in various gas-firedand biomass project developments ranging from 25 Megawatts to 450 Megawatts as project development advisorConducted feasibility studiesproposals and economic feasibility reviews on a wide range of power developmentsin the energy forestry and coal industries On going in-house developments include gas-fired cogenerationbiomass generation combined heatcooling power facilities and energy storage opportunities

Executive Director Vice President (ICPI)Manager New Ventures Business DevelopmentFletcher Challenge Energy (FCE) Calgary Alberta

]997 to 1999

As Executive Director Vice President of the 250 megawatt Island Cogeneration Project Inc (ICPI)jointly-managed development of the ICPI project on Vancouver Island to development completion Directed negotiationteams for the power purchase agreement with BC Hydro steam sales agreements with Fletcher ChallengeCanada Paper Mill the engineering and construction contract and project permits

Pale]KENNETH W SPINNER

PROFESSIONAL EXPERIENCE (Continued)

Project Highlights

bull Development phase of the ICPl was successfully completed while maintaining shareholder valuebull All project contracts and permits were completed and executedbull Managed development team in Vancouver consisting of multi-disciplinary professionals legal

environmental and engineering consultantsbull Guided the environmental permitting process and obtained project approvalbull FCEs working interest in ICPI was successfully sold after execution of all Project agreementsbull Project is presently in commercial operation

ISLAND COGENERATION PROJECT - 250 MW- CAMPBELL RIVER BC

Vice PresidentWest Windsor Power - (PLC Windsor Ltd)Northstar Energy Corporation Calgary Alberta

1994 to 1997

Vice President ofPLC Windsor Ltd and Northstar Energys principal representative on the partnershipmanagement committee directly responsible for the 120 megawatt West Windsor Power project in WindsorOntario Responsible for overall project management project financial analysis and project capital budget

Project Highlights

bull Administered the implementation of all project contracts including engineering and construction contractgas supply and transportation agreements steam sales power purchase agreements and directed financialclosing activities at loan conversion Project was under budget and started up successfully in 1996

bull Maximized project value by cost control budgeting scheduling maintaining initial contract values andoptimizing economic parameters

bull Involved in the negotiation and implementation a $100 million EPC turnkey contract for the constructionand start-up of the facility

bull Project was managed to completion which included mobilization commissioning commercial operationsperformance testing and conversion to term financing

Pa2e 2KENNETH W SPINNER

PROFESSIONAL EXPERIENCE (Continued)

WEST WINDSOR POWER - 120 MW - WINDSOR ONTARIO

Manager EngineeringPowerlink Corporation (Subsidiary of Northstar Energy Corp) Portland Oregon

1992 to ]994

Responsible for all technical management and support for power project development activities in Canada USAand other international regions Supported project contract negotiations on the West Windsor Power Projectmanaged the engineering construction contract and operating agreement negotiations

Manager Facilities Engineering Sr Project Engineer Process EngineerNorthstar Energy Corporation Dome Petroleum Ltd Hudsons Bay Oil and Gas LtdCalgary Alberta

1980 to ]992

Managed oil and gas facilities development in Alberta and independent power development in Canada and theUSA Responsible for project management and process engineering on various oil and gas facilities and pipelines

EDUCATION

bull Bachelor of Science Chemical Engineering (Honours) 1980Queens University at Kingston Ontario

bull Cogeneration Development Course 1992Kingston Ontario

bull Cogeneration Power Plant Design and Optimization 1991Boston Massachusetts

bull Business Management Financial and Evaluation Courses 1986 to 1997

Pale 3

Project Experience Chart

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsHarvie Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren BakerCampbell Power Project Utilities Washington CCGT Electric Harbour EPCOR Power Power Resource

Puget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Puncakjaya Duke Irian Jaya 395 MW Diesel coal Mitsubishi PT Freeport 1997 Richard E Richard EPower Project Energy Indonesia fired Indonesia Coleman Coleman

PT Freeport PT FreeportIndonesia IndonesiaJI H R Rasuna JI H R RasunaSaid Kav X-7 No Said Kav X-7 No6 6Plaza 89 12th Plaza 89 12thFloor FloorJakarta 12940 Jakarta 12940

Lake Superior Great Sault St 110 MW Natural GE Ontario 1993 Colin Clark Bill RalphPower Project Lakes Marie Ont GasDistiliate Electricity Great Lakes OEFC

Power Finance Corp Power amp Brascan 416-325-80577059415651

McMahon Duke Taylor BC 115 MW Natural Gas Westinghouse BC Hydro 1993 Duane Rae Dawn FarrellCogeneration Energy Duke Energy BC Hydro

ATCO 4036991551ATCO

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsJeff Myers Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren Baker

Power Project Utilitiesl Washington CCGT Electric Harbour EPCOR Power Power ResourcePuget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Liberty Power Reliant Philadelphia 568 MW Natural Gas GE Pacific Gas 2002 Greg Kennedy Nowa merchantProject Energy PA CCGT and Electric - Reliant Energy plant

National 713-497-7490Energy Group(receivership)

West Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Ken Spinner Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsWest Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Julia S Ciccaglione Curriculum Vitae

CURRICULUM VITAE

JULIA S CICCAGLIONEEnvironment Specialist

3040400 4th Avenue SWCalgary AB Canada T2P OJ4

Tel (403)444-5538 email jciccaglionepristinepowerca

CAREER BRIEF

An environment specialist with extensive experience in project management impact assessmentstakeholder consultation policy analysis and climate change Additional expertise in internationaldevelopment projects including project monitoring and stakeholder facilitation Excellent communicationorganisation and writing skills Technical background in the biophysical sciences and economics Projectperformance measurement experience using Results Based Management (RBM)

EDUCA TION

MSc Geography 1998Soil Erosion Assessment Soil and Water Nutrient Loss Analysis Watershed ManagementUniversity of Calgary Calgary Alberta Canada

BSc Geography 1994University of Calgary Calgary Alberta CanadaConcentration Biogeography geomorphology

BA Economics 1991University of Calgary Calgary Alberta CanadaConcentration Petroleum economics

PROFESSIONAL EXPERTISE

Environmental Project ManagementPolicy AnalysisRegulatory AnalysisStakeholder amp Public Consultation

Impact AssessmentSustainable DevelopmentClimate ChangeEnvironmental Management

CAREER HISTORY

Domestic

1998- Pristine Power Inc Calgary Vice President Environment and Emissions TradingPresent Responsible for overall environmental project management regulatory compliance public

policy input and management of Pristines greenhouse gas strategy

Suncurrent Industries Ltd Calgary Senior Emissions Portfolio ConsultantResponsible for overall management of Suncurrents greenhouse gas credit portfolio

2

Alberta Energy Company (AEC) Ltd Calgary Wetland Vegetation Scientist IRISEnvironmental Systems Responsible for the design of a long-term (20 yr) Boreal wetlandvegetation monitoring program to determine the effects of groundwater withdrawal on wetlandvegetation Data gathered from the monitoring program to be utilised by Alberta EnvironmentalProtection for resource management decision making

Syncrude Canada Limited Calgary Environment Specialist and Project Manager IRISEnvironmental Systems Managed and co-ordinated a team of scientists responsible for thedelineation of forest types into commercial and non-commercial stands Derived informationwas used as input into Syncrudes reclamation and mine area conservation plan Specificproject management activities included conducting a needs assessment budget preparationand creation of a Terms of Reference

Environmental Impact Assessment amp Policy Specialist IRIS Environmental SystemsResponsible for the completion of environmental impact assessment projects Responsibilitiesincluded the identification of impacts mitigations cumulative effects and the management andco-ordination of multidisciplinary scientific teams Extensive liasing with government agenciesPolicy analysis included integrating environmental policy and statutory requirements withdevelopment initiatives Additional responsibilities included extensive stakeholder and publicconsultation The following is a list of completed environmental impact assessments

Skiing Louise Limited Banff National Park An Environmental Screening Report for thepurpose of withdrawing water from the Pipestone River and Corral Creek to accommodatesnowmaking fire-fighting and domestic water use activities Report considerations includedidentifying river hydrologic regimes potential impacts to aquatic ecosystems mitigationprocedures and cumulative effects assessment

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts associated with improvements to water intake systems in the Pipestone River andCorral Creek Specific report considerations included identifying impacts to aquaticecosystems

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts related to terrain modifications and replacement of snowmaking infrastructure on theUpper Wiwaxy ski run

The Lake Louise Inn Banff National Park Environmental Screening Report for theconstruction of new commercial accommodation in Lake Louise

Skoki Lodge Banff National Park Environmental Screening Report for the construction ofadditional staff housing at the Skoki Lodge National Historic Site

The Banff Centre Banff National Park Environmental Screening Report for the submissionof an Area Redevelopment Plan The project considered a strategic assessment includedthe identification of impacts resulting from proposed developments or redevelopments on thecampus of The Banff Centre

Ski Marmot Basin Jasper National Park Canada Part of a multi-disciplinary teamresponsible for the completion of a Comprehensive Study for the development of a chairlift andski runs in the Eagle Ridge area of Marmot Basin

Ski Marmot Basin Jasper National Park Canada Environmental Screening Reportspertaining to the installation of new sewage treatment facilities improvements to surfacedrainage and subsurface drainage

3

1995-1998

1990

Legislation Analyst IRIS Environmental Systems Alberta Economic DevelopmentCalgary AB Review and analysis of Alberta Provincial and Canadian Federal legislation todetermine land use laws and identify areas within the province which may have potential forfuture tourism development This information was used in the development of maps illustratingcurrent land uses and areas of potential future tourism development in Alberta

University of Calgary Department of Geography Canada Instructor i) Taught introductorygeography Topics included climatology geomorphology soils and vegetation hydrology remotesensing and air photo interpretation ii) Taught a senior level course in introductory vascular plantidentification plant taxonomy introductory wildlife identification and habitat associations and plantand wildlife responses to disturbances specific to the Canadian Grasslands Aspen ParklandMontane Sub-Alpine Alpine and Boreal Forest Ecoregions

Petro Canada Resources Incorporated Calgary Canada Junior Land ManagementRepresentative Responsible for the review of land agreements governing the operation of oiland gas properties Conducted an economic evaluation and reconciliation of predicted gas pricesversus actual market prices Additional work included site inspections of reclaimed coal propertiesin northeastern British Columbia

International

1998- Cuba Climate Change Emissions Baseline and Monitoring Plan Department of ForeignPresent Affairs 2002 and IntI Trade (DFAIT) Canada Project Manager Suncurrent Industries Ltd

Responsible for managing a climate change emissions baseline study and monitoring planfocused on the implementation of renewable and energy efficient technologies (wind and solarenergy high efficiency micro-turbines) in Cuba Baseline study was in accordance with thoserequirements for a Clean Development Mechanism

Egypt Environment Theme Project - Canadian International Development Agency (CIDA)Environment and Performance Measurement Specialist IRIS Environmental SystemsMember of the Performance Measurement Advisory team for the bilateral CIDA-EgyptEnvironment Theme Project (7 year project) Responsibilities included the measurement ofenvironment project and environment theme results Results to be consistent with Government ofCanada - CIDA policy programming goals including contributing to sustainable development inEgypt and stakeholder involvement in development initiatives Results Based Management(RBM) used as a measurement tool

Zimbabwe Victoria Falls Environmental Planning and Capacity Enhancement Project -Canadian International Development Agency (CIDA) Environment and PerformanceMeasurement Specialist IRIS Environmental Systems An RBM facilitator in an iterativesustainable-development project in Victoria Falls to promote environmentally sustainablecommunities Project focused on improving the capacity of local partners to participate effectivelyin the preparation and implementation of the Victoria Falls Master Plan and Local DevelopmentPlans Specific responsibilities included the development and facilitation of an RBM stakeholderworkshop held in Victoria Falls Zimbabwe Workshop emphasized participatory approaches andthe inclusion of gender equality in the identification and measurement of results

Egypt Environment Theme Project Canadian International Development Agency (CIDA)PolicyProgram Analyst IRIS Environmental Systems Member of the policyprogramanalysis team conducting a trends analysis of CIDAs programming in Egypt This analysisserved as an input into CIDAs planning and design of the new Egypt Country DevelopmentProgram Framework (CDPF) Data was obtained by surveying identified stakeholders in Egyptand Canada Results of the trends analysis were then correlated with CIDAs Egypt CountryDevelopment Policy Framework to reconcile its effectiveness and provide input for its futuredirection

4

1996-1990

Governments of Chad and Cameroon - World Bank Panel Review of PipelineDevelopment Research Assistant IRIS Environmental Systems Research assistant to theManagerCoordinator of the Expert Panel for the review of literature pertaining to biodiversity andwildlands ecology in the African savannah tropical forests and marine ecosystems

St Vincent and the Grenadines Caribbean Soil Erosion Research on DeforestedWatershed Areas Environmental Scientist Project Manager and Principle investigator intothe loss of soil water and nutrients associated with banana cultivated areas Secondary focus ofthe research was aimed at developing a land use management plan incorporating conservationfarming practices and the use of social forestry in the conservation of soil on severely erodedsteep-land agricultural areas In consideration with the socio-economic status of the areaformulated recommendations for appropriate farming practices at the micro-scale level

St Vincent and the Grenadines Caribbean Man and the Biosphere ProjectUNESCOEnvironmental Scientist Assistant Project Supervisor and Liaison between the University ofCalgary and the St Vincent Forestry Department Responsible for the implementation of varioussoil erosion research studies aimed at the quantification of soil water and nutrient loss associatedwith agroforestry and forestry plantation areas

ENVIRONMENTAL POLICYChair of the Energy Recovery Generation (ERG) Subgroup Clean Air Strategic Alliance Alberta

Advisor Centre for EnergyERG Input Electricity and Alternative Energy Division BC Ministry of Energy and Mines

ERG Input Climate Change Offset System Environment CanadaERG Input Treatment of Clean Energy Natural Resources Canada

COUNTRIES WORK EXPERIENCECanada Egypt Zimbabwe St Vincent and the Grenadines Chad and Cameroon Cuba

5

Selected Permitting Reports

1 A Wetlands Monitoring Plan Foster Creek Area Cold Lake Air Weapons Range AB 2001 Reportprepared for Alberta Energy Company Ltd

2 A Strategic Assessment of The Banff Centre Area Redevelopment Plan Banff National Park AB2000 Environmental Screening Report prepared for The Banff Centre

3 Permit to Withdraw Water from the Pipestone River and Corral Creek for the Purposes ofSnowmaking Fire-Fighting and Domestic Water Use the Lake Louise Ski Area Banff National ParkAB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

4 Improvements to Water Intakes on the Pipestone River and Corral Creek the Lake Louise Ski AreaBanff National Park AB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

5 Proposed Development of a Chairliff and Ski Runs on Eagle Ridge the Marmot Basin Ski AreaJasper National Park AB 1999 Comprehensive Study Report prepared for Ski Marmot Basin

6 An Application for New Staff Accommodations at Skoki Lodge Banff National Park AB 2000Environmental Screening Report prepared for Skiing Louise Ltd

7 An Application for New Commercial Accommodations at the Lake Louise Inn Banff National ParkAB 2000 Report prepared for the Lake Louise Inn

8 Improvements to Surface Drainage at the Marmot Basin Ski Area Jasper National Park AB 1998Environmental Screening Report prepared for Ski Marmot Basin

9 Improvements to Subsurface Drainage at the Marmot Basin Ski Area Jasper National Park AB1998 Environmental Screening Report prepared for Ski Marmot Basin

10 Improvements to Sewage Treatment Facilities and Effluent Disposal at the Marmot Basin Ski AreaJasper National Park AB 1998 Environmental Screening Report prepared for Ski Marmot Basin

Other Reports

11 Legislative and Policy Factors Influencing Tourism Development in Alberta 2000 Report preparedfor Alberta Economic Development and Alberta Economic Development Authority TourismCommittee

12 Egypt Country Development Policy Framework (CDPF) Assessment 1999 Report prepared for theCanadian International Development Agency Hull Quebec

13 Egypt Country Development Policy Framework (CDPF) Assessment Presentation 1999Presentation prepared for the Canadian International Development Agency Hull Quebec

14 Monitoring Mission Reports Egypt Environment Theme Reports prepared for the CanadianInternational Development Agency Hull Quebec

15 A Pre-Disturbance Vegetation Classification for the Disturbed Portion of the Syncrude DevelopmentArea Mildred Lake AB 1998 Report prepared for Syncrude Canada Ltd

16 Characterization of Soil Erosion Processes and Nutrient Losses Associated with Previously ForestedAreas the Colonarie River Watershed St Vincent West Indies 1998 A Masters Thesis preparedfor the University of Calgary

6

Stakeholder Consultation

1 Zimbabwe-Canada Environmental Planning Exchange Mission 2001 Organized and coordinated anexchange mission held in Banff AB for the CIDA Zimbabwe Environmental Planning and CapacityEnhancement Project

2 Strategic Assessment of The Banff Centre Area Redevelopment Plan 2000 Conducted stakeholderconsultations via a public open house forum

3 Results Based Management as a Project Management Tool 1999 Conducted a workshop in VictoriaFalls Zimbabwe for the Environmental Planning and Capacity Enhancement Project

7

Neil StewartRR 3 SimcoeOntario CanadaN3Y 4K2

OBJECTIVE ProjectConstruction Management

emailphone

fax

nmsproj ectskwiccom519-426-2239519-426-2674

1991-Date

1990-1991

1988-1990

JPRomC1r amp CONsect1[RUCnON MIANAGEMJENT sectJERVJ[CJEsect

Project amp Construction Management services including Project DevelopmentProject strategy Contract negotiations Contract Management Industrial RelationsGovernment liaison Profit amp Loss accountability

Plans of execution project controls budgets planning evaluations safety labourrelations and business development Project amp Site management coordinationprocedures administration methods and site organization Managed andcoordinated information flow tofrom Client(s) Engineer(s) and Contractor(s)

Projects includeWestcoast Energy 55mw Whitby Cogen Bayside 280 mw RepowerEcodyne Ltd MOU contract management amp coordinationUnited Parcel Services Canada Hamilton Air Hub ProjectINCO Nickle Foam and Nickle Disc ProjectsBayer AG Nicklehydroxide and Tungsten Carbide ProjectsMacMillen Bloedel Secondary Fibre Recycling Project

Fluor Daniel Canada LtdResident Construction Manager Central Division

Provide support to Business Units for construction managementservicesresponsible for industrial relations safety quality personnel development andmethods Initiated and established field organizations roles and responsibilitiessite procedures fab shop contractorsupplier planning budgetsfinancial and clientrelations to support critical contract schedules

Projects includeProctor amp Gamble Ultra Project MFord Canada Winn 88 Paint PlantINCO S02 Abatement Project

Ellis Don LtdProject Manager Resident site manager accountable for the process coordinationof $500M GMSUZUKI (CAMI) grass roots automotive plant in Ingersoll ON

Directed 1800 unionized trades (peak workforce) and managed lump-sum projecton schedule and under budget Developed and maintained Oriental and NorthAmerican client trust relationships Surpassed project expectations in labourrelations and safety Profit and Loss accountability

1986-1988

1985-1986

1984-1985

1983-1984

1981-1983

1978-1981

1974-1978

1973-1974

1969-1973

EDUCATION

UMA SpantecGeneral SuperintendentDirected and supervised lump-sum contracts Interfaced with engineering andclient organizations to produce responsive quality services and safe profitablecontracts

Projects includedLabatts Brewers various capital projectsConsumers Glass hot amp cold end shut downsUnivofWaterloo construction management servicesDomtar paper board expansion

Glen Curtis Company Construction SuperintendentConstruction management of Canadian Occidentals 65m cfPdgrass roots sour gas plant in Mezeppa Alberta

Ennisteel Co Ltd Toronto ON Project SupervisorUltramars 1500 million barrel terminal

Self-employed OntarioShip yard construction amp generation facilities

Petrosar Inc Sarnia ON Area SuperintendentClient rep responsible for $650 Million HFOU project

Fluor Canada Corp Alberta Mechanical SupervisorAGCL 1200 tpd Methanol plantAquitaine Canada 650m cfPd sour gas plantEsso Canada Cold Lake Project amp Judy Creek

Arthur GMcKee Inc Nanticoke ON Area SupervisorTexaco 120000 bpd grass roots refinery

SteIco Inc Hamilton ON

JewittVallee Simcoe ONOntario Hydro 4000 MW Thermal generationStelco LEW steel plantDomtar Mill expansionTrent Valley Quarry modernization

MacMaster University 1976-77 (night school)Mohawk College 1971-72 (night school)

SELF DEVELOPMENT -project management-construction management-basic computers-industrial relations-WinWin strategies

-WHMIS-safety amp compensation-KT amp decisions-team management-personnel administration

PERSONAL

REFERENCES

DOB February 24 1950

On request

CITIZENSHIP Canadian

Cochrane Engineering Ltd

Statement of Qualifications

Power Generation Facilities

Cochrane Engineering Ltd200 - 1770 W7th Avenue

Vancouver Be V6J 4Y6Phone 604-736-5421 Fax 604-736-1519

Email receptioncochrane-groupca

COCHRAR

Cochrane Engineering LtdGeneral Qualifications

TABLE OF CONTENTS

Section

Section

Section

10 COMPANY BACKGROUND11 Multi-Disciplinary Design12 Quality Assurance

20 SUMMARY OF RECENT RELEVANT EXPERIENCE21 Recent Relevant Projects Completed22 Projects Currently in Progress23 Cochrane Group - Other Relevant Experience

30 ENGINEERINGmiddot TOOLS

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Sandhill Energy CenterAusti n Texas

Calpine Combined Cycle Power PlantGoldendale Washington

10 COMPANY BACKGROUND

The Cochrane Group of companies including Cochrane Engineeringprovides integrated engineering architecture planning and projectmanagement services for a wide variety of projects It was formed in1996 through the merger of Cochrane Engineering a Calgary firm inoperation since 1972 and the PBK Group which had providedarchitectural and engineering services in Vancouver since 1937 Ouraffiliation with the Cochrane Group affords us access to the expertiseof over 350 personnel consisting of project managers technicalpersonnel and administrative staff in six offices across Canada Italso lends access to other Cochrane Group firms including PBKArchitects Inc which has provided design services for many industrialprojects in Canada and abroad Cochrane Engineering and PBKArchitects have significant experience providing services for clients inthe power coal mining and process industries

Cochrane Engineerings power division has successfully exporteddesign services through out North and South America In the last twoyears this division has provided mechanical processinstrumentation architectural electrical civil and structural designservices for projects totaling over 1000 MW of power generationThe construction cost for these projects exceeds $1 billion

11 Multi-Disciplinary DesignCochrane Group is a fully integrated multi-disciplinary design groupservicing the power sector with in-house architectural capabilitiesGE7FA experience and combined cycle process experts enabling usto provide comprehensive one stop shopping The CochraneGroups multi-disciplinary design team includes

bull Cochrane Engineering Ltd andbull PBK Architects Inc

Cochrane Engineering Ltd is a multi-discipline engineering firmspecializing in the design of combined cycle power plants simplecycle power plants and industrial projects We also supplyengineering resources for PBK architects

PBK Architects Inc specializes in the design of industrial facilitiesoffices maintenance shops warehouses institutional buildings andrecreational sport facilities PBK provides the architectural servicesto Cochrane for our power projects Signature projects include BCPlace GM Place Horseshoe Bay Ferry Terminal upgrade and

1-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 6: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

-5 -

194 Philosophically is there a point of harshness in a CFT andEPA atwhich DPPLP would simply decline to bid

Response 191 No DPP notes that VIGP was not the result of a broad all-sources competitive process

192 No However DPP considers that the EPA must be considered inthe context of the market-based approach adopted for theacquisition of the needed capacity If it can be clearly shown thatthe EPA in its totality is fundamentally flawed then this findingshould be addressed by the Commission However DPP views apiecemeal revisiting of this EPA as inappropriate if not impossibleDPP is of the view that the most important aspect of any reviewbeing its fairness has been answered through the competitiveprocess as all bidders faced the same EPA Terms and Conditionsand consequently all bidders remained on an equal footing

The Commission could use this proceeding as an opportunity toprovide commentary for use in future competitive procurementprocesses in the Province

193 No any bid would obviously be influenced by the totality of thepackage offered by the EPA This is not solely a pricing issueBidders adopt technologies and configure their facilities to meet thetechnical requirements of the electrical system as reflected in anEPA This clearly would impact the quantum of the bid but itsprimary role is to ensure that the system adopts appropriatetechnology to meet its requirements

194 Depending on the circumstances yes

110 Under the terms of the DPPLP EPA please explain the extent to whichDPPLP is responsible for any Green House Gas charges fees orpenalties until 2010 and starting 2011 Please clarify whether DPPLPhas factored any such GHG liability into its bid price

Response 110 Under the EPA the project has accepted liability with respect toGreenhouse Gas charges fees or penalties for the life of theproject BC Hydro under the terms of the Asset TransferAgreement has committed to offset 50 of GHG emissions up toand including the year 2010

DPPLP has factored potential GHG liability into the bid pricebased on an in-depth review of the issue The project team spentconsiderable time reviewing understanding and assessing thepotential GHG liabilities from the facility Based on thisassessment the project incorporated an appropriate allowance forsuch potential liability

DMSLegal054046OOOO 1 1972044v3

JEFFRY M MYERS55 Springs ide StreetCalgary Alberta

T3Z 3M1

Residence (403) 246-6673Business (403) 444-5571Cellular (403) 813-3098

Email jmyerspristinepowerca

QUALIFIED BY

Twenty-five years experience in the downstream natural gas and independent power business including

bull Executive level management of all aspects of a major Canadian independent power businessbull Significant role in the management and partnership in two independent power startup businessesbull Major greenfield pipeline and storage project development to financingbull Development of independent power projects to financingbull Long-term natural gas and transportation acquisition and fuel planningbull Operations management and planning for natural gas pipeline and power assets

EXPERIENCE

President Pristine Power Inc January 2003-Present

Founder of Pristine a company formed to pursue environmentally responsible power projectdevelopments based on exploitation of proven technologies Development activities include thedevelopment of energy recovery generation projects from industrial waste heat compressed air energystorage projects and conventional gas-fired power projects This includes management of the successfultender for the 252MW Duke Point Power Project as a result of the Vl-CFT Pristine completed a privatefinancing in 2004 and generally undertakes early stage development activities at the risk of the Pristineshareholders and generally seeks venture backing as required for bidding purposes and to fund the latterstages of project development acquisition and construction

President Westcoast Power Inc December 1999 -July 2002

Responsible for management of all aspects of the Westcoast Energy Inc power business segmentincluding eight operating plants (six in North America two international)

Management of an operating fleet of approx 500 megawatts (MWs) three plants under construction (800MWs) in North America and one in China (50 MWs) Project development markets included Canadaand northern tier US markets including the WSCC MAIN ECAR NYPP PJM and NEPOOL reliabilityareas Responsibilities included relationship management with eight key project partners

The mandate included operating responsibility for all plants except one partner operated internationalasset and a staff of 250 not including corporate support staff Annual capital budget accountability ofapproximately C$250 million Westcoast Power contributed approximately 10 of after tax earningsand 20 of annual cash flow to Westcoast Energy (2001) results

Key Accomplishments

~ Successful development of four F class hybrid merchant power projects with aminimum of 50 of the spark spread risk locked in via long term bilateral contracts

Execution of two North American and one international construction project withinfinancial and performance parameters approved by the Westcoast Energy Board ofDirectors

~ Continued implementation of a self directed work team operations philosophythrough the staffing of two new operating plants

~ As a result of a re-alignment of corporate priorities led the development of themanaged growth strategy for Westcoast Power This resulted in the successfulconditional sale of the North American operating assets and a strategic review of thefuture of the power business at WestcoastFollowing the acquisition of Westcoast Energy by Duke Energy in March 2002directed the sale of all remaining Westcoast Power assets and the wind-up ofWestcoast Power

Vice President Business Development - Westcoast Energy February 1997-December 1999

Responsible for the development of North American pipeline and storage project initiatives (from early1997) and independent power projects (from mid 1998)

Key accomplishments~ Initiation and development of the TriState and Millennium pipeline projects~ Management of the acquisition of a significant share of the Alliance and Vector

pipeline projects~ Execution of the Westcoast Power hybrid merchant strategy and management of the

development of the successful Liberty and Bayside power project developments

PALLISER PIPELINE PROJECT

Project Manager - Westcoast Energy

February 1996-January 1997

Managed all aspects of the Palliser project a $350 million pipeline proposal by Westcoast Energyselected by PanCanadian Petroleum following an extensive industry Request for Approvals Palliser wasthe first major natural gas pipeline project in North America proposed to be developed and constructed atthe risk of the project partners

Responsibilities included selection and management of a multi-disciplinary team from Westcoast andPanCanadian and directing Palliser as an autonomous business unit responsible to the project OwnersCommittee

Filing of the Palliser project with the National Energy Board resulted in a competitive response andsubsequent wind-up of the project Westcoast Energy earned significant profit for on termination of theproject as a result of a success fee arrangement negotiated with PaqcCanadian

MARITIMES AND NORTHEAST PIPELINE PROJECTProject Manager - Westcoast Energy

1994 -1996

Developed Westcoast Energys interest in the project from initial concept with the Sable Offshore EnergyProject partners and managed all Canadian elements of the pipeline project

Reporting to Westcoast senior management and the project management committee selected a projectteam and directed system marketing community relations and all engineering and environmentrequirements of the project

Subsequent to the assignment to the Palliser Project Maritimes and Northeast was filed with the NationalEnergy Board and is on schedule for the original in-service date of November 1999

2

ST CLAIR PIPELINESManager Pipeline Business Development

1994

Following the acquisition of Union Gas by Westcoast Energy participated in the development of a storageand pipeline business development subsidiary

Responsibilities included a thorough review of project development potential in eastern Canada and theMidwest and Northeast United States Managed Unions participation in the Intercoastal project anddeveloped the Bluewater pipeline project

NORDIC POWER COGENERATION OF CANADAPresident

1990 - 1993

One of six key professionals hired by the founder of Nordic Power Inc to start up a new North Americanindependent power company

Managed all aspects of the $150 million 102 megawatt West Windsor power project from originalproposal to Ontario Hydro to financial closing West Windsor Power was commissioned in 1996 and isnow owned by an affiliate of Tractebel SA

Key responsibilities included initiation and closing of long-term agreements with Ontario Hydro steamhosts fuel suppliers and transporters and management of all government affairs

Tenure with Nordic also included greenfield power project development and fuel plan development atseveral sites in Canada and the United States

UNION GAS LIMITEDVarious Operations Positions

1987 -1990

Line and staff management assignments and summer employment in the field in three of Unions regionaloffices and head office culminated in the management of a total of 55 staff and an annual capital budgetof approximately $5 million

Participated as a middle manager in a major organization following an early retirement program thatresulted in operating cost reductions of over 20

EDUCATION

Honours Bachelor of Arts in Business AdministrationThe University of Western Ontario

Masters of Business AdministrationThe University of Windsor

3

1980

1992

HARVIE E CAMPBELL

354 Hawkview Manor Circle N WCalgary Alberta T3G 2Y7

Business 403-241-2436Cell 403-650-4584Fax 403-374-1871

e-mail Harviecampbellshawca

SENIOR CONSULTING BUSINESS DEVELOPMENT PROFESSIONAL

Project development consultant with over 20 years in the energy industry Experienced in the reviewassessment and development oflarge capital energy projects particularly independent power projects hasplayed a senior role in the development of over 1500 MWs of power facilities valued at over $15 billion

Proficient in all aspects of power generation development feasibility reviews market analysis projectmanagement fuel supply contracting execution financing and economics Skilled in facilitating businessdevelopment solutions Proven ability to direct successful development project management teams andenhance co-operation from all levels of an organization partners stakeholders and government agencies toincrease shareholder value and achieve business project development results Proven ability to get thedeal done

Mr Campbell currently operates a consulting firm (HEIAK Energy Inc) providing management services tothe Independent Power Industry

PROFESSIONAL EXPERIENCE

Vice President and CFOPristine Power Inc

2002 to Present

Founding partner of Pristine Power Inc a development company established to pursue the development ofprojects utilizing leading edge proven generation technologies with strong environmental characteristicsThe company focuss on the development of waste heat generation and storage related generationtechnologies such as Compressed Air Energy Storage (CAES)

Vice President (amp General Manager) DevelopmentWestcoast Power Inc Calgary Alberta

1998 to 2002

As Vice President Development for Westcoast Power held responsibility for all aspects of West coastsdevelopment activities within Canada the United States and overseas Responsibilities included projectconception overall management of a multidisciplinary development team including technical economicpublic relations environmental legal and financing Responsible for the negotiation of all contracts andassembling of project development teams Important accomplishments include

Harvie E Campbell

FREDERICKSON POWER PROJECT

2493 MW F Class Combined Cycle facility located near Tacoma WashingtonRole Vice PresidentExecutive Director

Page 2

Responsibilities included all aspects of project development including PNW regional plan for WestcoastPower regional screen acquisition of the Frederickson site formed development team arranged projectconstruction gas transportation electrical transmission offtake contracts interconnection etc

Project Highlights

bull Project accorded First mover status during the PNW power boom in 20002001bull Placed 20 year tolling contracts with three regional PUDs Benton Franklin and Grays Harbourbull Arranged gas transportation on the Westcoast and Northwest Pipeline systems and electrical

transmission to Big Eddy amp John Daybull Project was under budget and ahead of schedulebull Oversaw partial sale to a partner and final sale of Duke (Westcoast) interest to Epcor Powerbull Project is presently in commercial operation

ISLAND COGENERA TION PROJECT

250 MW F class CC Cogen facility (Alstom Gas Turbine) located in Campbell River HCRole Vice President

Project Highlights

bull Development phase of the ICPI was successfully completed while maintaining shareholder valuebull All project contracts and permits were completed and executedbull Purchase of Partners working interest after execution of all Project agreementsbull Lead successful non-recourse financing of facility

PUNCAKJA YA POWER PROJECT

395 MW project consisting of 60 diesel generators 3x 65 MW coal fired units and one 60 mile long transmissionline located at the Freeport MacMoran goldcopper mine in Irian Jaya Indonesia

Responsible for contracts including power offtake operations and technical completion with Freeport andestablishing operating regimen Also played a senior role in the USD $500 million financing of the project

Harvie E Campbell Page 3

In addition Mr Campbell has undertaken senior roles in the development and financing of the following projects

Ft Nelson Transmission Line (BC)McMahon Cogeneration Project (BC)Cantarell Nitrogen Injection Project (power component)WEI Gang Power Project (Shanghai)Lake Superior PowerFt Frances CogenerationWhitby CogenBayside Power

Director Energreen Inc

nla110 MW520 MW30MW

110MW110 MW50MW280 MW

While Vice President Development for Westcoast Power Mr Campbell also acted for Westcoast on theBoard of Energreen a power related subsidiary of Alliance Pipeline

Manager Investment Services GroupWestcoast Energy IncVancouver BC

1994 to 1998

Established a single group responsible for the financial analysis commercial review and contracting of allcapital projects within Westcoast Energy including Westcoast Power Westcoast International and theWestcoast Business Development Group (mostly Pipeline and storage related investments) Supportedproject contract negotiations financial analysis and financing on a host of projects including powergeneration pipeline petrochemical and fertilizer projects

Supervisorl Financial AnalystWestcoast Energy IncVancouver BC

1984 to 1993

Harvie E Campbell Page 4

From joining Westcoast Energy in 1984 as a financial analyst and economist Mr Campbell heldsuccessively more senior roles in the areas of planning development and financial analysis Heparticipated in the acquisition of several small oil amp gas production companies ICG Utilities and UnionGas in the late 1980s and early 1990s

EDUCATION

bull MA Economics 1984Simon Fraser University at Burnaby Bc

bull BA (Honours) Economics 1982University of AlbertaEdmonton Alberta

Mr Campbell is a past President (and currently Director) of the Independent Power Association of BritishColumbia and past Director of the Canadian Institute of Energy and the Vancouver Rowing Club Heresides in Calgary with his wife Ines and three children

References Available on Request

KENNETH W SPINNER

3040- 400 - 4th Ave SWCalgary AB T2P OJ4

403-444-5578

Technicalproject management and development professional with 23 years in the energy industryExperienced in the review technical assessment and development of independent power projects havebeen involved in the development engineering and construction on over 1000 megawatts of powerplants and project managed over $500 million in powerenergy projects

Proficient in all aspects of power generation developments feasibility reviews project managementproject engineering EPC contract negotiations and administration Proven ability to direct successfuldevelopment project management teams and enhance co-operation from all levels of an organizationpartners stakeholders and government agencies to increase shareholder value and achieve business project development management results

PROFESSIONAL EXPERIENCE

V P EngineeringPristine Power Inc

2003 to Present

Presently providing project managementdevelopment and technical support for all power generationdevelopments and projects Responsible for preliminary development engineering coordination of allengineering procurement and construction and contract negotiation and administration activities withinthe company

PresidentSpinergy Services Inc

1999 to 2003

Providing power generation consulting and developmentmanagement services to various clients throughoutCanada specifically Alberta British Columbia Saskatchewan and Eastern Canada Involved in various gas-firedand biomass project developments ranging from 25 Megawatts to 450 Megawatts as project development advisorConducted feasibility studiesproposals and economic feasibility reviews on a wide range of power developmentsin the energy forestry and coal industries On going in-house developments include gas-fired cogenerationbiomass generation combined heatcooling power facilities and energy storage opportunities

Executive Director Vice President (ICPI)Manager New Ventures Business DevelopmentFletcher Challenge Energy (FCE) Calgary Alberta

]997 to 1999

As Executive Director Vice President of the 250 megawatt Island Cogeneration Project Inc (ICPI)jointly-managed development of the ICPI project on Vancouver Island to development completion Directed negotiationteams for the power purchase agreement with BC Hydro steam sales agreements with Fletcher ChallengeCanada Paper Mill the engineering and construction contract and project permits

Pale]KENNETH W SPINNER

PROFESSIONAL EXPERIENCE (Continued)

Project Highlights

bull Development phase of the ICPl was successfully completed while maintaining shareholder valuebull All project contracts and permits were completed and executedbull Managed development team in Vancouver consisting of multi-disciplinary professionals legal

environmental and engineering consultantsbull Guided the environmental permitting process and obtained project approvalbull FCEs working interest in ICPI was successfully sold after execution of all Project agreementsbull Project is presently in commercial operation

ISLAND COGENERATION PROJECT - 250 MW- CAMPBELL RIVER BC

Vice PresidentWest Windsor Power - (PLC Windsor Ltd)Northstar Energy Corporation Calgary Alberta

1994 to 1997

Vice President ofPLC Windsor Ltd and Northstar Energys principal representative on the partnershipmanagement committee directly responsible for the 120 megawatt West Windsor Power project in WindsorOntario Responsible for overall project management project financial analysis and project capital budget

Project Highlights

bull Administered the implementation of all project contracts including engineering and construction contractgas supply and transportation agreements steam sales power purchase agreements and directed financialclosing activities at loan conversion Project was under budget and started up successfully in 1996

bull Maximized project value by cost control budgeting scheduling maintaining initial contract values andoptimizing economic parameters

bull Involved in the negotiation and implementation a $100 million EPC turnkey contract for the constructionand start-up of the facility

bull Project was managed to completion which included mobilization commissioning commercial operationsperformance testing and conversion to term financing

Pa2e 2KENNETH W SPINNER

PROFESSIONAL EXPERIENCE (Continued)

WEST WINDSOR POWER - 120 MW - WINDSOR ONTARIO

Manager EngineeringPowerlink Corporation (Subsidiary of Northstar Energy Corp) Portland Oregon

1992 to ]994

Responsible for all technical management and support for power project development activities in Canada USAand other international regions Supported project contract negotiations on the West Windsor Power Projectmanaged the engineering construction contract and operating agreement negotiations

Manager Facilities Engineering Sr Project Engineer Process EngineerNorthstar Energy Corporation Dome Petroleum Ltd Hudsons Bay Oil and Gas LtdCalgary Alberta

1980 to ]992

Managed oil and gas facilities development in Alberta and independent power development in Canada and theUSA Responsible for project management and process engineering on various oil and gas facilities and pipelines

EDUCATION

bull Bachelor of Science Chemical Engineering (Honours) 1980Queens University at Kingston Ontario

bull Cogeneration Development Course 1992Kingston Ontario

bull Cogeneration Power Plant Design and Optimization 1991Boston Massachusetts

bull Business Management Financial and Evaluation Courses 1986 to 1997

Pale 3

Project Experience Chart

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsHarvie Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren BakerCampbell Power Project Utilities Washington CCGT Electric Harbour EPCOR Power Power Resource

Puget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Puncakjaya Duke Irian Jaya 395 MW Diesel coal Mitsubishi PT Freeport 1997 Richard E Richard EPower Project Energy Indonesia fired Indonesia Coleman Coleman

PT Freeport PT FreeportIndonesia IndonesiaJI H R Rasuna JI H R RasunaSaid Kav X-7 No Said Kav X-7 No6 6Plaza 89 12th Plaza 89 12thFloor FloorJakarta 12940 Jakarta 12940

Lake Superior Great Sault St 110 MW Natural GE Ontario 1993 Colin Clark Bill RalphPower Project Lakes Marie Ont GasDistiliate Electricity Great Lakes OEFC

Power Finance Corp Power amp Brascan 416-325-80577059415651

McMahon Duke Taylor BC 115 MW Natural Gas Westinghouse BC Hydro 1993 Duane Rae Dawn FarrellCogeneration Energy Duke Energy BC Hydro

ATCO 4036991551ATCO

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsJeff Myers Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren Baker

Power Project Utilitiesl Washington CCGT Electric Harbour EPCOR Power Power ResourcePuget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Liberty Power Reliant Philadelphia 568 MW Natural Gas GE Pacific Gas 2002 Greg Kennedy Nowa merchantProject Energy PA CCGT and Electric - Reliant Energy plant

National 713-497-7490Energy Group(receivership)

West Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Ken Spinner Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsWest Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Julia S Ciccaglione Curriculum Vitae

CURRICULUM VITAE

JULIA S CICCAGLIONEEnvironment Specialist

3040400 4th Avenue SWCalgary AB Canada T2P OJ4

Tel (403)444-5538 email jciccaglionepristinepowerca

CAREER BRIEF

An environment specialist with extensive experience in project management impact assessmentstakeholder consultation policy analysis and climate change Additional expertise in internationaldevelopment projects including project monitoring and stakeholder facilitation Excellent communicationorganisation and writing skills Technical background in the biophysical sciences and economics Projectperformance measurement experience using Results Based Management (RBM)

EDUCA TION

MSc Geography 1998Soil Erosion Assessment Soil and Water Nutrient Loss Analysis Watershed ManagementUniversity of Calgary Calgary Alberta Canada

BSc Geography 1994University of Calgary Calgary Alberta CanadaConcentration Biogeography geomorphology

BA Economics 1991University of Calgary Calgary Alberta CanadaConcentration Petroleum economics

PROFESSIONAL EXPERTISE

Environmental Project ManagementPolicy AnalysisRegulatory AnalysisStakeholder amp Public Consultation

Impact AssessmentSustainable DevelopmentClimate ChangeEnvironmental Management

CAREER HISTORY

Domestic

1998- Pristine Power Inc Calgary Vice President Environment and Emissions TradingPresent Responsible for overall environmental project management regulatory compliance public

policy input and management of Pristines greenhouse gas strategy

Suncurrent Industries Ltd Calgary Senior Emissions Portfolio ConsultantResponsible for overall management of Suncurrents greenhouse gas credit portfolio

2

Alberta Energy Company (AEC) Ltd Calgary Wetland Vegetation Scientist IRISEnvironmental Systems Responsible for the design of a long-term (20 yr) Boreal wetlandvegetation monitoring program to determine the effects of groundwater withdrawal on wetlandvegetation Data gathered from the monitoring program to be utilised by Alberta EnvironmentalProtection for resource management decision making

Syncrude Canada Limited Calgary Environment Specialist and Project Manager IRISEnvironmental Systems Managed and co-ordinated a team of scientists responsible for thedelineation of forest types into commercial and non-commercial stands Derived informationwas used as input into Syncrudes reclamation and mine area conservation plan Specificproject management activities included conducting a needs assessment budget preparationand creation of a Terms of Reference

Environmental Impact Assessment amp Policy Specialist IRIS Environmental SystemsResponsible for the completion of environmental impact assessment projects Responsibilitiesincluded the identification of impacts mitigations cumulative effects and the management andco-ordination of multidisciplinary scientific teams Extensive liasing with government agenciesPolicy analysis included integrating environmental policy and statutory requirements withdevelopment initiatives Additional responsibilities included extensive stakeholder and publicconsultation The following is a list of completed environmental impact assessments

Skiing Louise Limited Banff National Park An Environmental Screening Report for thepurpose of withdrawing water from the Pipestone River and Corral Creek to accommodatesnowmaking fire-fighting and domestic water use activities Report considerations includedidentifying river hydrologic regimes potential impacts to aquatic ecosystems mitigationprocedures and cumulative effects assessment

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts associated with improvements to water intake systems in the Pipestone River andCorral Creek Specific report considerations included identifying impacts to aquaticecosystems

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts related to terrain modifications and replacement of snowmaking infrastructure on theUpper Wiwaxy ski run

The Lake Louise Inn Banff National Park Environmental Screening Report for theconstruction of new commercial accommodation in Lake Louise

Skoki Lodge Banff National Park Environmental Screening Report for the construction ofadditional staff housing at the Skoki Lodge National Historic Site

The Banff Centre Banff National Park Environmental Screening Report for the submissionof an Area Redevelopment Plan The project considered a strategic assessment includedthe identification of impacts resulting from proposed developments or redevelopments on thecampus of The Banff Centre

Ski Marmot Basin Jasper National Park Canada Part of a multi-disciplinary teamresponsible for the completion of a Comprehensive Study for the development of a chairlift andski runs in the Eagle Ridge area of Marmot Basin

Ski Marmot Basin Jasper National Park Canada Environmental Screening Reportspertaining to the installation of new sewage treatment facilities improvements to surfacedrainage and subsurface drainage

3

1995-1998

1990

Legislation Analyst IRIS Environmental Systems Alberta Economic DevelopmentCalgary AB Review and analysis of Alberta Provincial and Canadian Federal legislation todetermine land use laws and identify areas within the province which may have potential forfuture tourism development This information was used in the development of maps illustratingcurrent land uses and areas of potential future tourism development in Alberta

University of Calgary Department of Geography Canada Instructor i) Taught introductorygeography Topics included climatology geomorphology soils and vegetation hydrology remotesensing and air photo interpretation ii) Taught a senior level course in introductory vascular plantidentification plant taxonomy introductory wildlife identification and habitat associations and plantand wildlife responses to disturbances specific to the Canadian Grasslands Aspen ParklandMontane Sub-Alpine Alpine and Boreal Forest Ecoregions

Petro Canada Resources Incorporated Calgary Canada Junior Land ManagementRepresentative Responsible for the review of land agreements governing the operation of oiland gas properties Conducted an economic evaluation and reconciliation of predicted gas pricesversus actual market prices Additional work included site inspections of reclaimed coal propertiesin northeastern British Columbia

International

1998- Cuba Climate Change Emissions Baseline and Monitoring Plan Department of ForeignPresent Affairs 2002 and IntI Trade (DFAIT) Canada Project Manager Suncurrent Industries Ltd

Responsible for managing a climate change emissions baseline study and monitoring planfocused on the implementation of renewable and energy efficient technologies (wind and solarenergy high efficiency micro-turbines) in Cuba Baseline study was in accordance with thoserequirements for a Clean Development Mechanism

Egypt Environment Theme Project - Canadian International Development Agency (CIDA)Environment and Performance Measurement Specialist IRIS Environmental SystemsMember of the Performance Measurement Advisory team for the bilateral CIDA-EgyptEnvironment Theme Project (7 year project) Responsibilities included the measurement ofenvironment project and environment theme results Results to be consistent with Government ofCanada - CIDA policy programming goals including contributing to sustainable development inEgypt and stakeholder involvement in development initiatives Results Based Management(RBM) used as a measurement tool

Zimbabwe Victoria Falls Environmental Planning and Capacity Enhancement Project -Canadian International Development Agency (CIDA) Environment and PerformanceMeasurement Specialist IRIS Environmental Systems An RBM facilitator in an iterativesustainable-development project in Victoria Falls to promote environmentally sustainablecommunities Project focused on improving the capacity of local partners to participate effectivelyin the preparation and implementation of the Victoria Falls Master Plan and Local DevelopmentPlans Specific responsibilities included the development and facilitation of an RBM stakeholderworkshop held in Victoria Falls Zimbabwe Workshop emphasized participatory approaches andthe inclusion of gender equality in the identification and measurement of results

Egypt Environment Theme Project Canadian International Development Agency (CIDA)PolicyProgram Analyst IRIS Environmental Systems Member of the policyprogramanalysis team conducting a trends analysis of CIDAs programming in Egypt This analysisserved as an input into CIDAs planning and design of the new Egypt Country DevelopmentProgram Framework (CDPF) Data was obtained by surveying identified stakeholders in Egyptand Canada Results of the trends analysis were then correlated with CIDAs Egypt CountryDevelopment Policy Framework to reconcile its effectiveness and provide input for its futuredirection

4

1996-1990

Governments of Chad and Cameroon - World Bank Panel Review of PipelineDevelopment Research Assistant IRIS Environmental Systems Research assistant to theManagerCoordinator of the Expert Panel for the review of literature pertaining to biodiversity andwildlands ecology in the African savannah tropical forests and marine ecosystems

St Vincent and the Grenadines Caribbean Soil Erosion Research on DeforestedWatershed Areas Environmental Scientist Project Manager and Principle investigator intothe loss of soil water and nutrients associated with banana cultivated areas Secondary focus ofthe research was aimed at developing a land use management plan incorporating conservationfarming practices and the use of social forestry in the conservation of soil on severely erodedsteep-land agricultural areas In consideration with the socio-economic status of the areaformulated recommendations for appropriate farming practices at the micro-scale level

St Vincent and the Grenadines Caribbean Man and the Biosphere ProjectUNESCOEnvironmental Scientist Assistant Project Supervisor and Liaison between the University ofCalgary and the St Vincent Forestry Department Responsible for the implementation of varioussoil erosion research studies aimed at the quantification of soil water and nutrient loss associatedwith agroforestry and forestry plantation areas

ENVIRONMENTAL POLICYChair of the Energy Recovery Generation (ERG) Subgroup Clean Air Strategic Alliance Alberta

Advisor Centre for EnergyERG Input Electricity and Alternative Energy Division BC Ministry of Energy and Mines

ERG Input Climate Change Offset System Environment CanadaERG Input Treatment of Clean Energy Natural Resources Canada

COUNTRIES WORK EXPERIENCECanada Egypt Zimbabwe St Vincent and the Grenadines Chad and Cameroon Cuba

5

Selected Permitting Reports

1 A Wetlands Monitoring Plan Foster Creek Area Cold Lake Air Weapons Range AB 2001 Reportprepared for Alberta Energy Company Ltd

2 A Strategic Assessment of The Banff Centre Area Redevelopment Plan Banff National Park AB2000 Environmental Screening Report prepared for The Banff Centre

3 Permit to Withdraw Water from the Pipestone River and Corral Creek for the Purposes ofSnowmaking Fire-Fighting and Domestic Water Use the Lake Louise Ski Area Banff National ParkAB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

4 Improvements to Water Intakes on the Pipestone River and Corral Creek the Lake Louise Ski AreaBanff National Park AB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

5 Proposed Development of a Chairliff and Ski Runs on Eagle Ridge the Marmot Basin Ski AreaJasper National Park AB 1999 Comprehensive Study Report prepared for Ski Marmot Basin

6 An Application for New Staff Accommodations at Skoki Lodge Banff National Park AB 2000Environmental Screening Report prepared for Skiing Louise Ltd

7 An Application for New Commercial Accommodations at the Lake Louise Inn Banff National ParkAB 2000 Report prepared for the Lake Louise Inn

8 Improvements to Surface Drainage at the Marmot Basin Ski Area Jasper National Park AB 1998Environmental Screening Report prepared for Ski Marmot Basin

9 Improvements to Subsurface Drainage at the Marmot Basin Ski Area Jasper National Park AB1998 Environmental Screening Report prepared for Ski Marmot Basin

10 Improvements to Sewage Treatment Facilities and Effluent Disposal at the Marmot Basin Ski AreaJasper National Park AB 1998 Environmental Screening Report prepared for Ski Marmot Basin

Other Reports

11 Legislative and Policy Factors Influencing Tourism Development in Alberta 2000 Report preparedfor Alberta Economic Development and Alberta Economic Development Authority TourismCommittee

12 Egypt Country Development Policy Framework (CDPF) Assessment 1999 Report prepared for theCanadian International Development Agency Hull Quebec

13 Egypt Country Development Policy Framework (CDPF) Assessment Presentation 1999Presentation prepared for the Canadian International Development Agency Hull Quebec

14 Monitoring Mission Reports Egypt Environment Theme Reports prepared for the CanadianInternational Development Agency Hull Quebec

15 A Pre-Disturbance Vegetation Classification for the Disturbed Portion of the Syncrude DevelopmentArea Mildred Lake AB 1998 Report prepared for Syncrude Canada Ltd

16 Characterization of Soil Erosion Processes and Nutrient Losses Associated with Previously ForestedAreas the Colonarie River Watershed St Vincent West Indies 1998 A Masters Thesis preparedfor the University of Calgary

6

Stakeholder Consultation

1 Zimbabwe-Canada Environmental Planning Exchange Mission 2001 Organized and coordinated anexchange mission held in Banff AB for the CIDA Zimbabwe Environmental Planning and CapacityEnhancement Project

2 Strategic Assessment of The Banff Centre Area Redevelopment Plan 2000 Conducted stakeholderconsultations via a public open house forum

3 Results Based Management as a Project Management Tool 1999 Conducted a workshop in VictoriaFalls Zimbabwe for the Environmental Planning and Capacity Enhancement Project

7

Neil StewartRR 3 SimcoeOntario CanadaN3Y 4K2

OBJECTIVE ProjectConstruction Management

emailphone

fax

nmsproj ectskwiccom519-426-2239519-426-2674

1991-Date

1990-1991

1988-1990

JPRomC1r amp CONsect1[RUCnON MIANAGEMJENT sectJERVJ[CJEsect

Project amp Construction Management services including Project DevelopmentProject strategy Contract negotiations Contract Management Industrial RelationsGovernment liaison Profit amp Loss accountability

Plans of execution project controls budgets planning evaluations safety labourrelations and business development Project amp Site management coordinationprocedures administration methods and site organization Managed andcoordinated information flow tofrom Client(s) Engineer(s) and Contractor(s)

Projects includeWestcoast Energy 55mw Whitby Cogen Bayside 280 mw RepowerEcodyne Ltd MOU contract management amp coordinationUnited Parcel Services Canada Hamilton Air Hub ProjectINCO Nickle Foam and Nickle Disc ProjectsBayer AG Nicklehydroxide and Tungsten Carbide ProjectsMacMillen Bloedel Secondary Fibre Recycling Project

Fluor Daniel Canada LtdResident Construction Manager Central Division

Provide support to Business Units for construction managementservicesresponsible for industrial relations safety quality personnel development andmethods Initiated and established field organizations roles and responsibilitiessite procedures fab shop contractorsupplier planning budgetsfinancial and clientrelations to support critical contract schedules

Projects includeProctor amp Gamble Ultra Project MFord Canada Winn 88 Paint PlantINCO S02 Abatement Project

Ellis Don LtdProject Manager Resident site manager accountable for the process coordinationof $500M GMSUZUKI (CAMI) grass roots automotive plant in Ingersoll ON

Directed 1800 unionized trades (peak workforce) and managed lump-sum projecton schedule and under budget Developed and maintained Oriental and NorthAmerican client trust relationships Surpassed project expectations in labourrelations and safety Profit and Loss accountability

1986-1988

1985-1986

1984-1985

1983-1984

1981-1983

1978-1981

1974-1978

1973-1974

1969-1973

EDUCATION

UMA SpantecGeneral SuperintendentDirected and supervised lump-sum contracts Interfaced with engineering andclient organizations to produce responsive quality services and safe profitablecontracts

Projects includedLabatts Brewers various capital projectsConsumers Glass hot amp cold end shut downsUnivofWaterloo construction management servicesDomtar paper board expansion

Glen Curtis Company Construction SuperintendentConstruction management of Canadian Occidentals 65m cfPdgrass roots sour gas plant in Mezeppa Alberta

Ennisteel Co Ltd Toronto ON Project SupervisorUltramars 1500 million barrel terminal

Self-employed OntarioShip yard construction amp generation facilities

Petrosar Inc Sarnia ON Area SuperintendentClient rep responsible for $650 Million HFOU project

Fluor Canada Corp Alberta Mechanical SupervisorAGCL 1200 tpd Methanol plantAquitaine Canada 650m cfPd sour gas plantEsso Canada Cold Lake Project amp Judy Creek

Arthur GMcKee Inc Nanticoke ON Area SupervisorTexaco 120000 bpd grass roots refinery

SteIco Inc Hamilton ON

JewittVallee Simcoe ONOntario Hydro 4000 MW Thermal generationStelco LEW steel plantDomtar Mill expansionTrent Valley Quarry modernization

MacMaster University 1976-77 (night school)Mohawk College 1971-72 (night school)

SELF DEVELOPMENT -project management-construction management-basic computers-industrial relations-WinWin strategies

-WHMIS-safety amp compensation-KT amp decisions-team management-personnel administration

PERSONAL

REFERENCES

DOB February 24 1950

On request

CITIZENSHIP Canadian

Cochrane Engineering Ltd

Statement of Qualifications

Power Generation Facilities

Cochrane Engineering Ltd200 - 1770 W7th Avenue

Vancouver Be V6J 4Y6Phone 604-736-5421 Fax 604-736-1519

Email receptioncochrane-groupca

COCHRAR

Cochrane Engineering LtdGeneral Qualifications

TABLE OF CONTENTS

Section

Section

Section

10 COMPANY BACKGROUND11 Multi-Disciplinary Design12 Quality Assurance

20 SUMMARY OF RECENT RELEVANT EXPERIENCE21 Recent Relevant Projects Completed22 Projects Currently in Progress23 Cochrane Group - Other Relevant Experience

30 ENGINEERINGmiddot TOOLS

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Sandhill Energy CenterAusti n Texas

Calpine Combined Cycle Power PlantGoldendale Washington

10 COMPANY BACKGROUND

The Cochrane Group of companies including Cochrane Engineeringprovides integrated engineering architecture planning and projectmanagement services for a wide variety of projects It was formed in1996 through the merger of Cochrane Engineering a Calgary firm inoperation since 1972 and the PBK Group which had providedarchitectural and engineering services in Vancouver since 1937 Ouraffiliation with the Cochrane Group affords us access to the expertiseof over 350 personnel consisting of project managers technicalpersonnel and administrative staff in six offices across Canada Italso lends access to other Cochrane Group firms including PBKArchitects Inc which has provided design services for many industrialprojects in Canada and abroad Cochrane Engineering and PBKArchitects have significant experience providing services for clients inthe power coal mining and process industries

Cochrane Engineerings power division has successfully exporteddesign services through out North and South America In the last twoyears this division has provided mechanical processinstrumentation architectural electrical civil and structural designservices for projects totaling over 1000 MW of power generationThe construction cost for these projects exceeds $1 billion

11 Multi-Disciplinary DesignCochrane Group is a fully integrated multi-disciplinary design groupservicing the power sector with in-house architectural capabilitiesGE7FA experience and combined cycle process experts enabling usto provide comprehensive one stop shopping The CochraneGroups multi-disciplinary design team includes

bull Cochrane Engineering Ltd andbull PBK Architects Inc

Cochrane Engineering Ltd is a multi-discipline engineering firmspecializing in the design of combined cycle power plants simplecycle power plants and industrial projects We also supplyengineering resources for PBK architects

PBK Architects Inc specializes in the design of industrial facilitiesoffices maintenance shops warehouses institutional buildings andrecreational sport facilities PBK provides the architectural servicesto Cochrane for our power projects Signature projects include BCPlace GM Place Horseshoe Bay Ferry Terminal upgrade and

1-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 7: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

JEFFRY M MYERS55 Springs ide StreetCalgary Alberta

T3Z 3M1

Residence (403) 246-6673Business (403) 444-5571Cellular (403) 813-3098

Email jmyerspristinepowerca

QUALIFIED BY

Twenty-five years experience in the downstream natural gas and independent power business including

bull Executive level management of all aspects of a major Canadian independent power businessbull Significant role in the management and partnership in two independent power startup businessesbull Major greenfield pipeline and storage project development to financingbull Development of independent power projects to financingbull Long-term natural gas and transportation acquisition and fuel planningbull Operations management and planning for natural gas pipeline and power assets

EXPERIENCE

President Pristine Power Inc January 2003-Present

Founder of Pristine a company formed to pursue environmentally responsible power projectdevelopments based on exploitation of proven technologies Development activities include thedevelopment of energy recovery generation projects from industrial waste heat compressed air energystorage projects and conventional gas-fired power projects This includes management of the successfultender for the 252MW Duke Point Power Project as a result of the Vl-CFT Pristine completed a privatefinancing in 2004 and generally undertakes early stage development activities at the risk of the Pristineshareholders and generally seeks venture backing as required for bidding purposes and to fund the latterstages of project development acquisition and construction

President Westcoast Power Inc December 1999 -July 2002

Responsible for management of all aspects of the Westcoast Energy Inc power business segmentincluding eight operating plants (six in North America two international)

Management of an operating fleet of approx 500 megawatts (MWs) three plants under construction (800MWs) in North America and one in China (50 MWs) Project development markets included Canadaand northern tier US markets including the WSCC MAIN ECAR NYPP PJM and NEPOOL reliabilityareas Responsibilities included relationship management with eight key project partners

The mandate included operating responsibility for all plants except one partner operated internationalasset and a staff of 250 not including corporate support staff Annual capital budget accountability ofapproximately C$250 million Westcoast Power contributed approximately 10 of after tax earningsand 20 of annual cash flow to Westcoast Energy (2001) results

Key Accomplishments

~ Successful development of four F class hybrid merchant power projects with aminimum of 50 of the spark spread risk locked in via long term bilateral contracts

Execution of two North American and one international construction project withinfinancial and performance parameters approved by the Westcoast Energy Board ofDirectors

~ Continued implementation of a self directed work team operations philosophythrough the staffing of two new operating plants

~ As a result of a re-alignment of corporate priorities led the development of themanaged growth strategy for Westcoast Power This resulted in the successfulconditional sale of the North American operating assets and a strategic review of thefuture of the power business at WestcoastFollowing the acquisition of Westcoast Energy by Duke Energy in March 2002directed the sale of all remaining Westcoast Power assets and the wind-up ofWestcoast Power

Vice President Business Development - Westcoast Energy February 1997-December 1999

Responsible for the development of North American pipeline and storage project initiatives (from early1997) and independent power projects (from mid 1998)

Key accomplishments~ Initiation and development of the TriState and Millennium pipeline projects~ Management of the acquisition of a significant share of the Alliance and Vector

pipeline projects~ Execution of the Westcoast Power hybrid merchant strategy and management of the

development of the successful Liberty and Bayside power project developments

PALLISER PIPELINE PROJECT

Project Manager - Westcoast Energy

February 1996-January 1997

Managed all aspects of the Palliser project a $350 million pipeline proposal by Westcoast Energyselected by PanCanadian Petroleum following an extensive industry Request for Approvals Palliser wasthe first major natural gas pipeline project in North America proposed to be developed and constructed atthe risk of the project partners

Responsibilities included selection and management of a multi-disciplinary team from Westcoast andPanCanadian and directing Palliser as an autonomous business unit responsible to the project OwnersCommittee

Filing of the Palliser project with the National Energy Board resulted in a competitive response andsubsequent wind-up of the project Westcoast Energy earned significant profit for on termination of theproject as a result of a success fee arrangement negotiated with PaqcCanadian

MARITIMES AND NORTHEAST PIPELINE PROJECTProject Manager - Westcoast Energy

1994 -1996

Developed Westcoast Energys interest in the project from initial concept with the Sable Offshore EnergyProject partners and managed all Canadian elements of the pipeline project

Reporting to Westcoast senior management and the project management committee selected a projectteam and directed system marketing community relations and all engineering and environmentrequirements of the project

Subsequent to the assignment to the Palliser Project Maritimes and Northeast was filed with the NationalEnergy Board and is on schedule for the original in-service date of November 1999

2

ST CLAIR PIPELINESManager Pipeline Business Development

1994

Following the acquisition of Union Gas by Westcoast Energy participated in the development of a storageand pipeline business development subsidiary

Responsibilities included a thorough review of project development potential in eastern Canada and theMidwest and Northeast United States Managed Unions participation in the Intercoastal project anddeveloped the Bluewater pipeline project

NORDIC POWER COGENERATION OF CANADAPresident

1990 - 1993

One of six key professionals hired by the founder of Nordic Power Inc to start up a new North Americanindependent power company

Managed all aspects of the $150 million 102 megawatt West Windsor power project from originalproposal to Ontario Hydro to financial closing West Windsor Power was commissioned in 1996 and isnow owned by an affiliate of Tractebel SA

Key responsibilities included initiation and closing of long-term agreements with Ontario Hydro steamhosts fuel suppliers and transporters and management of all government affairs

Tenure with Nordic also included greenfield power project development and fuel plan development atseveral sites in Canada and the United States

UNION GAS LIMITEDVarious Operations Positions

1987 -1990

Line and staff management assignments and summer employment in the field in three of Unions regionaloffices and head office culminated in the management of a total of 55 staff and an annual capital budgetof approximately $5 million

Participated as a middle manager in a major organization following an early retirement program thatresulted in operating cost reductions of over 20

EDUCATION

Honours Bachelor of Arts in Business AdministrationThe University of Western Ontario

Masters of Business AdministrationThe University of Windsor

3

1980

1992

HARVIE E CAMPBELL

354 Hawkview Manor Circle N WCalgary Alberta T3G 2Y7

Business 403-241-2436Cell 403-650-4584Fax 403-374-1871

e-mail Harviecampbellshawca

SENIOR CONSULTING BUSINESS DEVELOPMENT PROFESSIONAL

Project development consultant with over 20 years in the energy industry Experienced in the reviewassessment and development oflarge capital energy projects particularly independent power projects hasplayed a senior role in the development of over 1500 MWs of power facilities valued at over $15 billion

Proficient in all aspects of power generation development feasibility reviews market analysis projectmanagement fuel supply contracting execution financing and economics Skilled in facilitating businessdevelopment solutions Proven ability to direct successful development project management teams andenhance co-operation from all levels of an organization partners stakeholders and government agencies toincrease shareholder value and achieve business project development results Proven ability to get thedeal done

Mr Campbell currently operates a consulting firm (HEIAK Energy Inc) providing management services tothe Independent Power Industry

PROFESSIONAL EXPERIENCE

Vice President and CFOPristine Power Inc

2002 to Present

Founding partner of Pristine Power Inc a development company established to pursue the development ofprojects utilizing leading edge proven generation technologies with strong environmental characteristicsThe company focuss on the development of waste heat generation and storage related generationtechnologies such as Compressed Air Energy Storage (CAES)

Vice President (amp General Manager) DevelopmentWestcoast Power Inc Calgary Alberta

1998 to 2002

As Vice President Development for Westcoast Power held responsibility for all aspects of West coastsdevelopment activities within Canada the United States and overseas Responsibilities included projectconception overall management of a multidisciplinary development team including technical economicpublic relations environmental legal and financing Responsible for the negotiation of all contracts andassembling of project development teams Important accomplishments include

Harvie E Campbell

FREDERICKSON POWER PROJECT

2493 MW F Class Combined Cycle facility located near Tacoma WashingtonRole Vice PresidentExecutive Director

Page 2

Responsibilities included all aspects of project development including PNW regional plan for WestcoastPower regional screen acquisition of the Frederickson site formed development team arranged projectconstruction gas transportation electrical transmission offtake contracts interconnection etc

Project Highlights

bull Project accorded First mover status during the PNW power boom in 20002001bull Placed 20 year tolling contracts with three regional PUDs Benton Franklin and Grays Harbourbull Arranged gas transportation on the Westcoast and Northwest Pipeline systems and electrical

transmission to Big Eddy amp John Daybull Project was under budget and ahead of schedulebull Oversaw partial sale to a partner and final sale of Duke (Westcoast) interest to Epcor Powerbull Project is presently in commercial operation

ISLAND COGENERA TION PROJECT

250 MW F class CC Cogen facility (Alstom Gas Turbine) located in Campbell River HCRole Vice President

Project Highlights

bull Development phase of the ICPI was successfully completed while maintaining shareholder valuebull All project contracts and permits were completed and executedbull Purchase of Partners working interest after execution of all Project agreementsbull Lead successful non-recourse financing of facility

PUNCAKJA YA POWER PROJECT

395 MW project consisting of 60 diesel generators 3x 65 MW coal fired units and one 60 mile long transmissionline located at the Freeport MacMoran goldcopper mine in Irian Jaya Indonesia

Responsible for contracts including power offtake operations and technical completion with Freeport andestablishing operating regimen Also played a senior role in the USD $500 million financing of the project

Harvie E Campbell Page 3

In addition Mr Campbell has undertaken senior roles in the development and financing of the following projects

Ft Nelson Transmission Line (BC)McMahon Cogeneration Project (BC)Cantarell Nitrogen Injection Project (power component)WEI Gang Power Project (Shanghai)Lake Superior PowerFt Frances CogenerationWhitby CogenBayside Power

Director Energreen Inc

nla110 MW520 MW30MW

110MW110 MW50MW280 MW

While Vice President Development for Westcoast Power Mr Campbell also acted for Westcoast on theBoard of Energreen a power related subsidiary of Alliance Pipeline

Manager Investment Services GroupWestcoast Energy IncVancouver BC

1994 to 1998

Established a single group responsible for the financial analysis commercial review and contracting of allcapital projects within Westcoast Energy including Westcoast Power Westcoast International and theWestcoast Business Development Group (mostly Pipeline and storage related investments) Supportedproject contract negotiations financial analysis and financing on a host of projects including powergeneration pipeline petrochemical and fertilizer projects

Supervisorl Financial AnalystWestcoast Energy IncVancouver BC

1984 to 1993

Harvie E Campbell Page 4

From joining Westcoast Energy in 1984 as a financial analyst and economist Mr Campbell heldsuccessively more senior roles in the areas of planning development and financial analysis Heparticipated in the acquisition of several small oil amp gas production companies ICG Utilities and UnionGas in the late 1980s and early 1990s

EDUCATION

bull MA Economics 1984Simon Fraser University at Burnaby Bc

bull BA (Honours) Economics 1982University of AlbertaEdmonton Alberta

Mr Campbell is a past President (and currently Director) of the Independent Power Association of BritishColumbia and past Director of the Canadian Institute of Energy and the Vancouver Rowing Club Heresides in Calgary with his wife Ines and three children

References Available on Request

KENNETH W SPINNER

3040- 400 - 4th Ave SWCalgary AB T2P OJ4

403-444-5578

Technicalproject management and development professional with 23 years in the energy industryExperienced in the review technical assessment and development of independent power projects havebeen involved in the development engineering and construction on over 1000 megawatts of powerplants and project managed over $500 million in powerenergy projects

Proficient in all aspects of power generation developments feasibility reviews project managementproject engineering EPC contract negotiations and administration Proven ability to direct successfuldevelopment project management teams and enhance co-operation from all levels of an organizationpartners stakeholders and government agencies to increase shareholder value and achieve business project development management results

PROFESSIONAL EXPERIENCE

V P EngineeringPristine Power Inc

2003 to Present

Presently providing project managementdevelopment and technical support for all power generationdevelopments and projects Responsible for preliminary development engineering coordination of allengineering procurement and construction and contract negotiation and administration activities withinthe company

PresidentSpinergy Services Inc

1999 to 2003

Providing power generation consulting and developmentmanagement services to various clients throughoutCanada specifically Alberta British Columbia Saskatchewan and Eastern Canada Involved in various gas-firedand biomass project developments ranging from 25 Megawatts to 450 Megawatts as project development advisorConducted feasibility studiesproposals and economic feasibility reviews on a wide range of power developmentsin the energy forestry and coal industries On going in-house developments include gas-fired cogenerationbiomass generation combined heatcooling power facilities and energy storage opportunities

Executive Director Vice President (ICPI)Manager New Ventures Business DevelopmentFletcher Challenge Energy (FCE) Calgary Alberta

]997 to 1999

As Executive Director Vice President of the 250 megawatt Island Cogeneration Project Inc (ICPI)jointly-managed development of the ICPI project on Vancouver Island to development completion Directed negotiationteams for the power purchase agreement with BC Hydro steam sales agreements with Fletcher ChallengeCanada Paper Mill the engineering and construction contract and project permits

Pale]KENNETH W SPINNER

PROFESSIONAL EXPERIENCE (Continued)

Project Highlights

bull Development phase of the ICPl was successfully completed while maintaining shareholder valuebull All project contracts and permits were completed and executedbull Managed development team in Vancouver consisting of multi-disciplinary professionals legal

environmental and engineering consultantsbull Guided the environmental permitting process and obtained project approvalbull FCEs working interest in ICPI was successfully sold after execution of all Project agreementsbull Project is presently in commercial operation

ISLAND COGENERATION PROJECT - 250 MW- CAMPBELL RIVER BC

Vice PresidentWest Windsor Power - (PLC Windsor Ltd)Northstar Energy Corporation Calgary Alberta

1994 to 1997

Vice President ofPLC Windsor Ltd and Northstar Energys principal representative on the partnershipmanagement committee directly responsible for the 120 megawatt West Windsor Power project in WindsorOntario Responsible for overall project management project financial analysis and project capital budget

Project Highlights

bull Administered the implementation of all project contracts including engineering and construction contractgas supply and transportation agreements steam sales power purchase agreements and directed financialclosing activities at loan conversion Project was under budget and started up successfully in 1996

bull Maximized project value by cost control budgeting scheduling maintaining initial contract values andoptimizing economic parameters

bull Involved in the negotiation and implementation a $100 million EPC turnkey contract for the constructionand start-up of the facility

bull Project was managed to completion which included mobilization commissioning commercial operationsperformance testing and conversion to term financing

Pa2e 2KENNETH W SPINNER

PROFESSIONAL EXPERIENCE (Continued)

WEST WINDSOR POWER - 120 MW - WINDSOR ONTARIO

Manager EngineeringPowerlink Corporation (Subsidiary of Northstar Energy Corp) Portland Oregon

1992 to ]994

Responsible for all technical management and support for power project development activities in Canada USAand other international regions Supported project contract negotiations on the West Windsor Power Projectmanaged the engineering construction contract and operating agreement negotiations

Manager Facilities Engineering Sr Project Engineer Process EngineerNorthstar Energy Corporation Dome Petroleum Ltd Hudsons Bay Oil and Gas LtdCalgary Alberta

1980 to ]992

Managed oil and gas facilities development in Alberta and independent power development in Canada and theUSA Responsible for project management and process engineering on various oil and gas facilities and pipelines

EDUCATION

bull Bachelor of Science Chemical Engineering (Honours) 1980Queens University at Kingston Ontario

bull Cogeneration Development Course 1992Kingston Ontario

bull Cogeneration Power Plant Design and Optimization 1991Boston Massachusetts

bull Business Management Financial and Evaluation Courses 1986 to 1997

Pale 3

Project Experience Chart

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsHarvie Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren BakerCampbell Power Project Utilities Washington CCGT Electric Harbour EPCOR Power Power Resource

Puget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Puncakjaya Duke Irian Jaya 395 MW Diesel coal Mitsubishi PT Freeport 1997 Richard E Richard EPower Project Energy Indonesia fired Indonesia Coleman Coleman

PT Freeport PT FreeportIndonesia IndonesiaJI H R Rasuna JI H R RasunaSaid Kav X-7 No Said Kav X-7 No6 6Plaza 89 12th Plaza 89 12thFloor FloorJakarta 12940 Jakarta 12940

Lake Superior Great Sault St 110 MW Natural GE Ontario 1993 Colin Clark Bill RalphPower Project Lakes Marie Ont GasDistiliate Electricity Great Lakes OEFC

Power Finance Corp Power amp Brascan 416-325-80577059415651

McMahon Duke Taylor BC 115 MW Natural Gas Westinghouse BC Hydro 1993 Duane Rae Dawn FarrellCogeneration Energy Duke Energy BC Hydro

ATCO 4036991551ATCO

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsJeff Myers Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren Baker

Power Project Utilitiesl Washington CCGT Electric Harbour EPCOR Power Power ResourcePuget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Liberty Power Reliant Philadelphia 568 MW Natural Gas GE Pacific Gas 2002 Greg Kennedy Nowa merchantProject Energy PA CCGT and Electric - Reliant Energy plant

National 713-497-7490Energy Group(receivership)

West Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Ken Spinner Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsWest Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Julia S Ciccaglione Curriculum Vitae

CURRICULUM VITAE

JULIA S CICCAGLIONEEnvironment Specialist

3040400 4th Avenue SWCalgary AB Canada T2P OJ4

Tel (403)444-5538 email jciccaglionepristinepowerca

CAREER BRIEF

An environment specialist with extensive experience in project management impact assessmentstakeholder consultation policy analysis and climate change Additional expertise in internationaldevelopment projects including project monitoring and stakeholder facilitation Excellent communicationorganisation and writing skills Technical background in the biophysical sciences and economics Projectperformance measurement experience using Results Based Management (RBM)

EDUCA TION

MSc Geography 1998Soil Erosion Assessment Soil and Water Nutrient Loss Analysis Watershed ManagementUniversity of Calgary Calgary Alberta Canada

BSc Geography 1994University of Calgary Calgary Alberta CanadaConcentration Biogeography geomorphology

BA Economics 1991University of Calgary Calgary Alberta CanadaConcentration Petroleum economics

PROFESSIONAL EXPERTISE

Environmental Project ManagementPolicy AnalysisRegulatory AnalysisStakeholder amp Public Consultation

Impact AssessmentSustainable DevelopmentClimate ChangeEnvironmental Management

CAREER HISTORY

Domestic

1998- Pristine Power Inc Calgary Vice President Environment and Emissions TradingPresent Responsible for overall environmental project management regulatory compliance public

policy input and management of Pristines greenhouse gas strategy

Suncurrent Industries Ltd Calgary Senior Emissions Portfolio ConsultantResponsible for overall management of Suncurrents greenhouse gas credit portfolio

2

Alberta Energy Company (AEC) Ltd Calgary Wetland Vegetation Scientist IRISEnvironmental Systems Responsible for the design of a long-term (20 yr) Boreal wetlandvegetation monitoring program to determine the effects of groundwater withdrawal on wetlandvegetation Data gathered from the monitoring program to be utilised by Alberta EnvironmentalProtection for resource management decision making

Syncrude Canada Limited Calgary Environment Specialist and Project Manager IRISEnvironmental Systems Managed and co-ordinated a team of scientists responsible for thedelineation of forest types into commercial and non-commercial stands Derived informationwas used as input into Syncrudes reclamation and mine area conservation plan Specificproject management activities included conducting a needs assessment budget preparationand creation of a Terms of Reference

Environmental Impact Assessment amp Policy Specialist IRIS Environmental SystemsResponsible for the completion of environmental impact assessment projects Responsibilitiesincluded the identification of impacts mitigations cumulative effects and the management andco-ordination of multidisciplinary scientific teams Extensive liasing with government agenciesPolicy analysis included integrating environmental policy and statutory requirements withdevelopment initiatives Additional responsibilities included extensive stakeholder and publicconsultation The following is a list of completed environmental impact assessments

Skiing Louise Limited Banff National Park An Environmental Screening Report for thepurpose of withdrawing water from the Pipestone River and Corral Creek to accommodatesnowmaking fire-fighting and domestic water use activities Report considerations includedidentifying river hydrologic regimes potential impacts to aquatic ecosystems mitigationprocedures and cumulative effects assessment

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts associated with improvements to water intake systems in the Pipestone River andCorral Creek Specific report considerations included identifying impacts to aquaticecosystems

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts related to terrain modifications and replacement of snowmaking infrastructure on theUpper Wiwaxy ski run

The Lake Louise Inn Banff National Park Environmental Screening Report for theconstruction of new commercial accommodation in Lake Louise

Skoki Lodge Banff National Park Environmental Screening Report for the construction ofadditional staff housing at the Skoki Lodge National Historic Site

The Banff Centre Banff National Park Environmental Screening Report for the submissionof an Area Redevelopment Plan The project considered a strategic assessment includedthe identification of impacts resulting from proposed developments or redevelopments on thecampus of The Banff Centre

Ski Marmot Basin Jasper National Park Canada Part of a multi-disciplinary teamresponsible for the completion of a Comprehensive Study for the development of a chairlift andski runs in the Eagle Ridge area of Marmot Basin

Ski Marmot Basin Jasper National Park Canada Environmental Screening Reportspertaining to the installation of new sewage treatment facilities improvements to surfacedrainage and subsurface drainage

3

1995-1998

1990

Legislation Analyst IRIS Environmental Systems Alberta Economic DevelopmentCalgary AB Review and analysis of Alberta Provincial and Canadian Federal legislation todetermine land use laws and identify areas within the province which may have potential forfuture tourism development This information was used in the development of maps illustratingcurrent land uses and areas of potential future tourism development in Alberta

University of Calgary Department of Geography Canada Instructor i) Taught introductorygeography Topics included climatology geomorphology soils and vegetation hydrology remotesensing and air photo interpretation ii) Taught a senior level course in introductory vascular plantidentification plant taxonomy introductory wildlife identification and habitat associations and plantand wildlife responses to disturbances specific to the Canadian Grasslands Aspen ParklandMontane Sub-Alpine Alpine and Boreal Forest Ecoregions

Petro Canada Resources Incorporated Calgary Canada Junior Land ManagementRepresentative Responsible for the review of land agreements governing the operation of oiland gas properties Conducted an economic evaluation and reconciliation of predicted gas pricesversus actual market prices Additional work included site inspections of reclaimed coal propertiesin northeastern British Columbia

International

1998- Cuba Climate Change Emissions Baseline and Monitoring Plan Department of ForeignPresent Affairs 2002 and IntI Trade (DFAIT) Canada Project Manager Suncurrent Industries Ltd

Responsible for managing a climate change emissions baseline study and monitoring planfocused on the implementation of renewable and energy efficient technologies (wind and solarenergy high efficiency micro-turbines) in Cuba Baseline study was in accordance with thoserequirements for a Clean Development Mechanism

Egypt Environment Theme Project - Canadian International Development Agency (CIDA)Environment and Performance Measurement Specialist IRIS Environmental SystemsMember of the Performance Measurement Advisory team for the bilateral CIDA-EgyptEnvironment Theme Project (7 year project) Responsibilities included the measurement ofenvironment project and environment theme results Results to be consistent with Government ofCanada - CIDA policy programming goals including contributing to sustainable development inEgypt and stakeholder involvement in development initiatives Results Based Management(RBM) used as a measurement tool

Zimbabwe Victoria Falls Environmental Planning and Capacity Enhancement Project -Canadian International Development Agency (CIDA) Environment and PerformanceMeasurement Specialist IRIS Environmental Systems An RBM facilitator in an iterativesustainable-development project in Victoria Falls to promote environmentally sustainablecommunities Project focused on improving the capacity of local partners to participate effectivelyin the preparation and implementation of the Victoria Falls Master Plan and Local DevelopmentPlans Specific responsibilities included the development and facilitation of an RBM stakeholderworkshop held in Victoria Falls Zimbabwe Workshop emphasized participatory approaches andthe inclusion of gender equality in the identification and measurement of results

Egypt Environment Theme Project Canadian International Development Agency (CIDA)PolicyProgram Analyst IRIS Environmental Systems Member of the policyprogramanalysis team conducting a trends analysis of CIDAs programming in Egypt This analysisserved as an input into CIDAs planning and design of the new Egypt Country DevelopmentProgram Framework (CDPF) Data was obtained by surveying identified stakeholders in Egyptand Canada Results of the trends analysis were then correlated with CIDAs Egypt CountryDevelopment Policy Framework to reconcile its effectiveness and provide input for its futuredirection

4

1996-1990

Governments of Chad and Cameroon - World Bank Panel Review of PipelineDevelopment Research Assistant IRIS Environmental Systems Research assistant to theManagerCoordinator of the Expert Panel for the review of literature pertaining to biodiversity andwildlands ecology in the African savannah tropical forests and marine ecosystems

St Vincent and the Grenadines Caribbean Soil Erosion Research on DeforestedWatershed Areas Environmental Scientist Project Manager and Principle investigator intothe loss of soil water and nutrients associated with banana cultivated areas Secondary focus ofthe research was aimed at developing a land use management plan incorporating conservationfarming practices and the use of social forestry in the conservation of soil on severely erodedsteep-land agricultural areas In consideration with the socio-economic status of the areaformulated recommendations for appropriate farming practices at the micro-scale level

St Vincent and the Grenadines Caribbean Man and the Biosphere ProjectUNESCOEnvironmental Scientist Assistant Project Supervisor and Liaison between the University ofCalgary and the St Vincent Forestry Department Responsible for the implementation of varioussoil erosion research studies aimed at the quantification of soil water and nutrient loss associatedwith agroforestry and forestry plantation areas

ENVIRONMENTAL POLICYChair of the Energy Recovery Generation (ERG) Subgroup Clean Air Strategic Alliance Alberta

Advisor Centre for EnergyERG Input Electricity and Alternative Energy Division BC Ministry of Energy and Mines

ERG Input Climate Change Offset System Environment CanadaERG Input Treatment of Clean Energy Natural Resources Canada

COUNTRIES WORK EXPERIENCECanada Egypt Zimbabwe St Vincent and the Grenadines Chad and Cameroon Cuba

5

Selected Permitting Reports

1 A Wetlands Monitoring Plan Foster Creek Area Cold Lake Air Weapons Range AB 2001 Reportprepared for Alberta Energy Company Ltd

2 A Strategic Assessment of The Banff Centre Area Redevelopment Plan Banff National Park AB2000 Environmental Screening Report prepared for The Banff Centre

3 Permit to Withdraw Water from the Pipestone River and Corral Creek for the Purposes ofSnowmaking Fire-Fighting and Domestic Water Use the Lake Louise Ski Area Banff National ParkAB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

4 Improvements to Water Intakes on the Pipestone River and Corral Creek the Lake Louise Ski AreaBanff National Park AB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

5 Proposed Development of a Chairliff and Ski Runs on Eagle Ridge the Marmot Basin Ski AreaJasper National Park AB 1999 Comprehensive Study Report prepared for Ski Marmot Basin

6 An Application for New Staff Accommodations at Skoki Lodge Banff National Park AB 2000Environmental Screening Report prepared for Skiing Louise Ltd

7 An Application for New Commercial Accommodations at the Lake Louise Inn Banff National ParkAB 2000 Report prepared for the Lake Louise Inn

8 Improvements to Surface Drainage at the Marmot Basin Ski Area Jasper National Park AB 1998Environmental Screening Report prepared for Ski Marmot Basin

9 Improvements to Subsurface Drainage at the Marmot Basin Ski Area Jasper National Park AB1998 Environmental Screening Report prepared for Ski Marmot Basin

10 Improvements to Sewage Treatment Facilities and Effluent Disposal at the Marmot Basin Ski AreaJasper National Park AB 1998 Environmental Screening Report prepared for Ski Marmot Basin

Other Reports

11 Legislative and Policy Factors Influencing Tourism Development in Alberta 2000 Report preparedfor Alberta Economic Development and Alberta Economic Development Authority TourismCommittee

12 Egypt Country Development Policy Framework (CDPF) Assessment 1999 Report prepared for theCanadian International Development Agency Hull Quebec

13 Egypt Country Development Policy Framework (CDPF) Assessment Presentation 1999Presentation prepared for the Canadian International Development Agency Hull Quebec

14 Monitoring Mission Reports Egypt Environment Theme Reports prepared for the CanadianInternational Development Agency Hull Quebec

15 A Pre-Disturbance Vegetation Classification for the Disturbed Portion of the Syncrude DevelopmentArea Mildred Lake AB 1998 Report prepared for Syncrude Canada Ltd

16 Characterization of Soil Erosion Processes and Nutrient Losses Associated with Previously ForestedAreas the Colonarie River Watershed St Vincent West Indies 1998 A Masters Thesis preparedfor the University of Calgary

6

Stakeholder Consultation

1 Zimbabwe-Canada Environmental Planning Exchange Mission 2001 Organized and coordinated anexchange mission held in Banff AB for the CIDA Zimbabwe Environmental Planning and CapacityEnhancement Project

2 Strategic Assessment of The Banff Centre Area Redevelopment Plan 2000 Conducted stakeholderconsultations via a public open house forum

3 Results Based Management as a Project Management Tool 1999 Conducted a workshop in VictoriaFalls Zimbabwe for the Environmental Planning and Capacity Enhancement Project

7

Neil StewartRR 3 SimcoeOntario CanadaN3Y 4K2

OBJECTIVE ProjectConstruction Management

emailphone

fax

nmsproj ectskwiccom519-426-2239519-426-2674

1991-Date

1990-1991

1988-1990

JPRomC1r amp CONsect1[RUCnON MIANAGEMJENT sectJERVJ[CJEsect

Project amp Construction Management services including Project DevelopmentProject strategy Contract negotiations Contract Management Industrial RelationsGovernment liaison Profit amp Loss accountability

Plans of execution project controls budgets planning evaluations safety labourrelations and business development Project amp Site management coordinationprocedures administration methods and site organization Managed andcoordinated information flow tofrom Client(s) Engineer(s) and Contractor(s)

Projects includeWestcoast Energy 55mw Whitby Cogen Bayside 280 mw RepowerEcodyne Ltd MOU contract management amp coordinationUnited Parcel Services Canada Hamilton Air Hub ProjectINCO Nickle Foam and Nickle Disc ProjectsBayer AG Nicklehydroxide and Tungsten Carbide ProjectsMacMillen Bloedel Secondary Fibre Recycling Project

Fluor Daniel Canada LtdResident Construction Manager Central Division

Provide support to Business Units for construction managementservicesresponsible for industrial relations safety quality personnel development andmethods Initiated and established field organizations roles and responsibilitiessite procedures fab shop contractorsupplier planning budgetsfinancial and clientrelations to support critical contract schedules

Projects includeProctor amp Gamble Ultra Project MFord Canada Winn 88 Paint PlantINCO S02 Abatement Project

Ellis Don LtdProject Manager Resident site manager accountable for the process coordinationof $500M GMSUZUKI (CAMI) grass roots automotive plant in Ingersoll ON

Directed 1800 unionized trades (peak workforce) and managed lump-sum projecton schedule and under budget Developed and maintained Oriental and NorthAmerican client trust relationships Surpassed project expectations in labourrelations and safety Profit and Loss accountability

1986-1988

1985-1986

1984-1985

1983-1984

1981-1983

1978-1981

1974-1978

1973-1974

1969-1973

EDUCATION

UMA SpantecGeneral SuperintendentDirected and supervised lump-sum contracts Interfaced with engineering andclient organizations to produce responsive quality services and safe profitablecontracts

Projects includedLabatts Brewers various capital projectsConsumers Glass hot amp cold end shut downsUnivofWaterloo construction management servicesDomtar paper board expansion

Glen Curtis Company Construction SuperintendentConstruction management of Canadian Occidentals 65m cfPdgrass roots sour gas plant in Mezeppa Alberta

Ennisteel Co Ltd Toronto ON Project SupervisorUltramars 1500 million barrel terminal

Self-employed OntarioShip yard construction amp generation facilities

Petrosar Inc Sarnia ON Area SuperintendentClient rep responsible for $650 Million HFOU project

Fluor Canada Corp Alberta Mechanical SupervisorAGCL 1200 tpd Methanol plantAquitaine Canada 650m cfPd sour gas plantEsso Canada Cold Lake Project amp Judy Creek

Arthur GMcKee Inc Nanticoke ON Area SupervisorTexaco 120000 bpd grass roots refinery

SteIco Inc Hamilton ON

JewittVallee Simcoe ONOntario Hydro 4000 MW Thermal generationStelco LEW steel plantDomtar Mill expansionTrent Valley Quarry modernization

MacMaster University 1976-77 (night school)Mohawk College 1971-72 (night school)

SELF DEVELOPMENT -project management-construction management-basic computers-industrial relations-WinWin strategies

-WHMIS-safety amp compensation-KT amp decisions-team management-personnel administration

PERSONAL

REFERENCES

DOB February 24 1950

On request

CITIZENSHIP Canadian

Cochrane Engineering Ltd

Statement of Qualifications

Power Generation Facilities

Cochrane Engineering Ltd200 - 1770 W7th Avenue

Vancouver Be V6J 4Y6Phone 604-736-5421 Fax 604-736-1519

Email receptioncochrane-groupca

COCHRAR

Cochrane Engineering LtdGeneral Qualifications

TABLE OF CONTENTS

Section

Section

Section

10 COMPANY BACKGROUND11 Multi-Disciplinary Design12 Quality Assurance

20 SUMMARY OF RECENT RELEVANT EXPERIENCE21 Recent Relevant Projects Completed22 Projects Currently in Progress23 Cochrane Group - Other Relevant Experience

30 ENGINEERINGmiddot TOOLS

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Sandhill Energy CenterAusti n Texas

Calpine Combined Cycle Power PlantGoldendale Washington

10 COMPANY BACKGROUND

The Cochrane Group of companies including Cochrane Engineeringprovides integrated engineering architecture planning and projectmanagement services for a wide variety of projects It was formed in1996 through the merger of Cochrane Engineering a Calgary firm inoperation since 1972 and the PBK Group which had providedarchitectural and engineering services in Vancouver since 1937 Ouraffiliation with the Cochrane Group affords us access to the expertiseof over 350 personnel consisting of project managers technicalpersonnel and administrative staff in six offices across Canada Italso lends access to other Cochrane Group firms including PBKArchitects Inc which has provided design services for many industrialprojects in Canada and abroad Cochrane Engineering and PBKArchitects have significant experience providing services for clients inthe power coal mining and process industries

Cochrane Engineerings power division has successfully exporteddesign services through out North and South America In the last twoyears this division has provided mechanical processinstrumentation architectural electrical civil and structural designservices for projects totaling over 1000 MW of power generationThe construction cost for these projects exceeds $1 billion

11 Multi-Disciplinary DesignCochrane Group is a fully integrated multi-disciplinary design groupservicing the power sector with in-house architectural capabilitiesGE7FA experience and combined cycle process experts enabling usto provide comprehensive one stop shopping The CochraneGroups multi-disciplinary design team includes

bull Cochrane Engineering Ltd andbull PBK Architects Inc

Cochrane Engineering Ltd is a multi-discipline engineering firmspecializing in the design of combined cycle power plants simplecycle power plants and industrial projects We also supplyengineering resources for PBK architects

PBK Architects Inc specializes in the design of industrial facilitiesoffices maintenance shops warehouses institutional buildings andrecreational sport facilities PBK provides the architectural servicesto Cochrane for our power projects Signature projects include BCPlace GM Place Horseshoe Bay Ferry Terminal upgrade and

1-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 8: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

Execution of two North American and one international construction project withinfinancial and performance parameters approved by the Westcoast Energy Board ofDirectors

~ Continued implementation of a self directed work team operations philosophythrough the staffing of two new operating plants

~ As a result of a re-alignment of corporate priorities led the development of themanaged growth strategy for Westcoast Power This resulted in the successfulconditional sale of the North American operating assets and a strategic review of thefuture of the power business at WestcoastFollowing the acquisition of Westcoast Energy by Duke Energy in March 2002directed the sale of all remaining Westcoast Power assets and the wind-up ofWestcoast Power

Vice President Business Development - Westcoast Energy February 1997-December 1999

Responsible for the development of North American pipeline and storage project initiatives (from early1997) and independent power projects (from mid 1998)

Key accomplishments~ Initiation and development of the TriState and Millennium pipeline projects~ Management of the acquisition of a significant share of the Alliance and Vector

pipeline projects~ Execution of the Westcoast Power hybrid merchant strategy and management of the

development of the successful Liberty and Bayside power project developments

PALLISER PIPELINE PROJECT

Project Manager - Westcoast Energy

February 1996-January 1997

Managed all aspects of the Palliser project a $350 million pipeline proposal by Westcoast Energyselected by PanCanadian Petroleum following an extensive industry Request for Approvals Palliser wasthe first major natural gas pipeline project in North America proposed to be developed and constructed atthe risk of the project partners

Responsibilities included selection and management of a multi-disciplinary team from Westcoast andPanCanadian and directing Palliser as an autonomous business unit responsible to the project OwnersCommittee

Filing of the Palliser project with the National Energy Board resulted in a competitive response andsubsequent wind-up of the project Westcoast Energy earned significant profit for on termination of theproject as a result of a success fee arrangement negotiated with PaqcCanadian

MARITIMES AND NORTHEAST PIPELINE PROJECTProject Manager - Westcoast Energy

1994 -1996

Developed Westcoast Energys interest in the project from initial concept with the Sable Offshore EnergyProject partners and managed all Canadian elements of the pipeline project

Reporting to Westcoast senior management and the project management committee selected a projectteam and directed system marketing community relations and all engineering and environmentrequirements of the project

Subsequent to the assignment to the Palliser Project Maritimes and Northeast was filed with the NationalEnergy Board and is on schedule for the original in-service date of November 1999

2

ST CLAIR PIPELINESManager Pipeline Business Development

1994

Following the acquisition of Union Gas by Westcoast Energy participated in the development of a storageand pipeline business development subsidiary

Responsibilities included a thorough review of project development potential in eastern Canada and theMidwest and Northeast United States Managed Unions participation in the Intercoastal project anddeveloped the Bluewater pipeline project

NORDIC POWER COGENERATION OF CANADAPresident

1990 - 1993

One of six key professionals hired by the founder of Nordic Power Inc to start up a new North Americanindependent power company

Managed all aspects of the $150 million 102 megawatt West Windsor power project from originalproposal to Ontario Hydro to financial closing West Windsor Power was commissioned in 1996 and isnow owned by an affiliate of Tractebel SA

Key responsibilities included initiation and closing of long-term agreements with Ontario Hydro steamhosts fuel suppliers and transporters and management of all government affairs

Tenure with Nordic also included greenfield power project development and fuel plan development atseveral sites in Canada and the United States

UNION GAS LIMITEDVarious Operations Positions

1987 -1990

Line and staff management assignments and summer employment in the field in three of Unions regionaloffices and head office culminated in the management of a total of 55 staff and an annual capital budgetof approximately $5 million

Participated as a middle manager in a major organization following an early retirement program thatresulted in operating cost reductions of over 20

EDUCATION

Honours Bachelor of Arts in Business AdministrationThe University of Western Ontario

Masters of Business AdministrationThe University of Windsor

3

1980

1992

HARVIE E CAMPBELL

354 Hawkview Manor Circle N WCalgary Alberta T3G 2Y7

Business 403-241-2436Cell 403-650-4584Fax 403-374-1871

e-mail Harviecampbellshawca

SENIOR CONSULTING BUSINESS DEVELOPMENT PROFESSIONAL

Project development consultant with over 20 years in the energy industry Experienced in the reviewassessment and development oflarge capital energy projects particularly independent power projects hasplayed a senior role in the development of over 1500 MWs of power facilities valued at over $15 billion

Proficient in all aspects of power generation development feasibility reviews market analysis projectmanagement fuel supply contracting execution financing and economics Skilled in facilitating businessdevelopment solutions Proven ability to direct successful development project management teams andenhance co-operation from all levels of an organization partners stakeholders and government agencies toincrease shareholder value and achieve business project development results Proven ability to get thedeal done

Mr Campbell currently operates a consulting firm (HEIAK Energy Inc) providing management services tothe Independent Power Industry

PROFESSIONAL EXPERIENCE

Vice President and CFOPristine Power Inc

2002 to Present

Founding partner of Pristine Power Inc a development company established to pursue the development ofprojects utilizing leading edge proven generation technologies with strong environmental characteristicsThe company focuss on the development of waste heat generation and storage related generationtechnologies such as Compressed Air Energy Storage (CAES)

Vice President (amp General Manager) DevelopmentWestcoast Power Inc Calgary Alberta

1998 to 2002

As Vice President Development for Westcoast Power held responsibility for all aspects of West coastsdevelopment activities within Canada the United States and overseas Responsibilities included projectconception overall management of a multidisciplinary development team including technical economicpublic relations environmental legal and financing Responsible for the negotiation of all contracts andassembling of project development teams Important accomplishments include

Harvie E Campbell

FREDERICKSON POWER PROJECT

2493 MW F Class Combined Cycle facility located near Tacoma WashingtonRole Vice PresidentExecutive Director

Page 2

Responsibilities included all aspects of project development including PNW regional plan for WestcoastPower regional screen acquisition of the Frederickson site formed development team arranged projectconstruction gas transportation electrical transmission offtake contracts interconnection etc

Project Highlights

bull Project accorded First mover status during the PNW power boom in 20002001bull Placed 20 year tolling contracts with three regional PUDs Benton Franklin and Grays Harbourbull Arranged gas transportation on the Westcoast and Northwest Pipeline systems and electrical

transmission to Big Eddy amp John Daybull Project was under budget and ahead of schedulebull Oversaw partial sale to a partner and final sale of Duke (Westcoast) interest to Epcor Powerbull Project is presently in commercial operation

ISLAND COGENERA TION PROJECT

250 MW F class CC Cogen facility (Alstom Gas Turbine) located in Campbell River HCRole Vice President

Project Highlights

bull Development phase of the ICPI was successfully completed while maintaining shareholder valuebull All project contracts and permits were completed and executedbull Purchase of Partners working interest after execution of all Project agreementsbull Lead successful non-recourse financing of facility

PUNCAKJA YA POWER PROJECT

395 MW project consisting of 60 diesel generators 3x 65 MW coal fired units and one 60 mile long transmissionline located at the Freeport MacMoran goldcopper mine in Irian Jaya Indonesia

Responsible for contracts including power offtake operations and technical completion with Freeport andestablishing operating regimen Also played a senior role in the USD $500 million financing of the project

Harvie E Campbell Page 3

In addition Mr Campbell has undertaken senior roles in the development and financing of the following projects

Ft Nelson Transmission Line (BC)McMahon Cogeneration Project (BC)Cantarell Nitrogen Injection Project (power component)WEI Gang Power Project (Shanghai)Lake Superior PowerFt Frances CogenerationWhitby CogenBayside Power

Director Energreen Inc

nla110 MW520 MW30MW

110MW110 MW50MW280 MW

While Vice President Development for Westcoast Power Mr Campbell also acted for Westcoast on theBoard of Energreen a power related subsidiary of Alliance Pipeline

Manager Investment Services GroupWestcoast Energy IncVancouver BC

1994 to 1998

Established a single group responsible for the financial analysis commercial review and contracting of allcapital projects within Westcoast Energy including Westcoast Power Westcoast International and theWestcoast Business Development Group (mostly Pipeline and storage related investments) Supportedproject contract negotiations financial analysis and financing on a host of projects including powergeneration pipeline petrochemical and fertilizer projects

Supervisorl Financial AnalystWestcoast Energy IncVancouver BC

1984 to 1993

Harvie E Campbell Page 4

From joining Westcoast Energy in 1984 as a financial analyst and economist Mr Campbell heldsuccessively more senior roles in the areas of planning development and financial analysis Heparticipated in the acquisition of several small oil amp gas production companies ICG Utilities and UnionGas in the late 1980s and early 1990s

EDUCATION

bull MA Economics 1984Simon Fraser University at Burnaby Bc

bull BA (Honours) Economics 1982University of AlbertaEdmonton Alberta

Mr Campbell is a past President (and currently Director) of the Independent Power Association of BritishColumbia and past Director of the Canadian Institute of Energy and the Vancouver Rowing Club Heresides in Calgary with his wife Ines and three children

References Available on Request

KENNETH W SPINNER

3040- 400 - 4th Ave SWCalgary AB T2P OJ4

403-444-5578

Technicalproject management and development professional with 23 years in the energy industryExperienced in the review technical assessment and development of independent power projects havebeen involved in the development engineering and construction on over 1000 megawatts of powerplants and project managed over $500 million in powerenergy projects

Proficient in all aspects of power generation developments feasibility reviews project managementproject engineering EPC contract negotiations and administration Proven ability to direct successfuldevelopment project management teams and enhance co-operation from all levels of an organizationpartners stakeholders and government agencies to increase shareholder value and achieve business project development management results

PROFESSIONAL EXPERIENCE

V P EngineeringPristine Power Inc

2003 to Present

Presently providing project managementdevelopment and technical support for all power generationdevelopments and projects Responsible for preliminary development engineering coordination of allengineering procurement and construction and contract negotiation and administration activities withinthe company

PresidentSpinergy Services Inc

1999 to 2003

Providing power generation consulting and developmentmanagement services to various clients throughoutCanada specifically Alberta British Columbia Saskatchewan and Eastern Canada Involved in various gas-firedand biomass project developments ranging from 25 Megawatts to 450 Megawatts as project development advisorConducted feasibility studiesproposals and economic feasibility reviews on a wide range of power developmentsin the energy forestry and coal industries On going in-house developments include gas-fired cogenerationbiomass generation combined heatcooling power facilities and energy storage opportunities

Executive Director Vice President (ICPI)Manager New Ventures Business DevelopmentFletcher Challenge Energy (FCE) Calgary Alberta

]997 to 1999

As Executive Director Vice President of the 250 megawatt Island Cogeneration Project Inc (ICPI)jointly-managed development of the ICPI project on Vancouver Island to development completion Directed negotiationteams for the power purchase agreement with BC Hydro steam sales agreements with Fletcher ChallengeCanada Paper Mill the engineering and construction contract and project permits

Pale]KENNETH W SPINNER

PROFESSIONAL EXPERIENCE (Continued)

Project Highlights

bull Development phase of the ICPl was successfully completed while maintaining shareholder valuebull All project contracts and permits were completed and executedbull Managed development team in Vancouver consisting of multi-disciplinary professionals legal

environmental and engineering consultantsbull Guided the environmental permitting process and obtained project approvalbull FCEs working interest in ICPI was successfully sold after execution of all Project agreementsbull Project is presently in commercial operation

ISLAND COGENERATION PROJECT - 250 MW- CAMPBELL RIVER BC

Vice PresidentWest Windsor Power - (PLC Windsor Ltd)Northstar Energy Corporation Calgary Alberta

1994 to 1997

Vice President ofPLC Windsor Ltd and Northstar Energys principal representative on the partnershipmanagement committee directly responsible for the 120 megawatt West Windsor Power project in WindsorOntario Responsible for overall project management project financial analysis and project capital budget

Project Highlights

bull Administered the implementation of all project contracts including engineering and construction contractgas supply and transportation agreements steam sales power purchase agreements and directed financialclosing activities at loan conversion Project was under budget and started up successfully in 1996

bull Maximized project value by cost control budgeting scheduling maintaining initial contract values andoptimizing economic parameters

bull Involved in the negotiation and implementation a $100 million EPC turnkey contract for the constructionand start-up of the facility

bull Project was managed to completion which included mobilization commissioning commercial operationsperformance testing and conversion to term financing

Pa2e 2KENNETH W SPINNER

PROFESSIONAL EXPERIENCE (Continued)

WEST WINDSOR POWER - 120 MW - WINDSOR ONTARIO

Manager EngineeringPowerlink Corporation (Subsidiary of Northstar Energy Corp) Portland Oregon

1992 to ]994

Responsible for all technical management and support for power project development activities in Canada USAand other international regions Supported project contract negotiations on the West Windsor Power Projectmanaged the engineering construction contract and operating agreement negotiations

Manager Facilities Engineering Sr Project Engineer Process EngineerNorthstar Energy Corporation Dome Petroleum Ltd Hudsons Bay Oil and Gas LtdCalgary Alberta

1980 to ]992

Managed oil and gas facilities development in Alberta and independent power development in Canada and theUSA Responsible for project management and process engineering on various oil and gas facilities and pipelines

EDUCATION

bull Bachelor of Science Chemical Engineering (Honours) 1980Queens University at Kingston Ontario

bull Cogeneration Development Course 1992Kingston Ontario

bull Cogeneration Power Plant Design and Optimization 1991Boston Massachusetts

bull Business Management Financial and Evaluation Courses 1986 to 1997

Pale 3

Project Experience Chart

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsHarvie Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren BakerCampbell Power Project Utilities Washington CCGT Electric Harbour EPCOR Power Power Resource

Puget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Puncakjaya Duke Irian Jaya 395 MW Diesel coal Mitsubishi PT Freeport 1997 Richard E Richard EPower Project Energy Indonesia fired Indonesia Coleman Coleman

PT Freeport PT FreeportIndonesia IndonesiaJI H R Rasuna JI H R RasunaSaid Kav X-7 No Said Kav X-7 No6 6Plaza 89 12th Plaza 89 12thFloor FloorJakarta 12940 Jakarta 12940

Lake Superior Great Sault St 110 MW Natural GE Ontario 1993 Colin Clark Bill RalphPower Project Lakes Marie Ont GasDistiliate Electricity Great Lakes OEFC

Power Finance Corp Power amp Brascan 416-325-80577059415651

McMahon Duke Taylor BC 115 MW Natural Gas Westinghouse BC Hydro 1993 Duane Rae Dawn FarrellCogeneration Energy Duke Energy BC Hydro

ATCO 4036991551ATCO

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsJeff Myers Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren Baker

Power Project Utilitiesl Washington CCGT Electric Harbour EPCOR Power Power ResourcePuget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Liberty Power Reliant Philadelphia 568 MW Natural Gas GE Pacific Gas 2002 Greg Kennedy Nowa merchantProject Energy PA CCGT and Electric - Reliant Energy plant

National 713-497-7490Energy Group(receivership)

West Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Ken Spinner Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsWest Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Julia S Ciccaglione Curriculum Vitae

CURRICULUM VITAE

JULIA S CICCAGLIONEEnvironment Specialist

3040400 4th Avenue SWCalgary AB Canada T2P OJ4

Tel (403)444-5538 email jciccaglionepristinepowerca

CAREER BRIEF

An environment specialist with extensive experience in project management impact assessmentstakeholder consultation policy analysis and climate change Additional expertise in internationaldevelopment projects including project monitoring and stakeholder facilitation Excellent communicationorganisation and writing skills Technical background in the biophysical sciences and economics Projectperformance measurement experience using Results Based Management (RBM)

EDUCA TION

MSc Geography 1998Soil Erosion Assessment Soil and Water Nutrient Loss Analysis Watershed ManagementUniversity of Calgary Calgary Alberta Canada

BSc Geography 1994University of Calgary Calgary Alberta CanadaConcentration Biogeography geomorphology

BA Economics 1991University of Calgary Calgary Alberta CanadaConcentration Petroleum economics

PROFESSIONAL EXPERTISE

Environmental Project ManagementPolicy AnalysisRegulatory AnalysisStakeholder amp Public Consultation

Impact AssessmentSustainable DevelopmentClimate ChangeEnvironmental Management

CAREER HISTORY

Domestic

1998- Pristine Power Inc Calgary Vice President Environment and Emissions TradingPresent Responsible for overall environmental project management regulatory compliance public

policy input and management of Pristines greenhouse gas strategy

Suncurrent Industries Ltd Calgary Senior Emissions Portfolio ConsultantResponsible for overall management of Suncurrents greenhouse gas credit portfolio

2

Alberta Energy Company (AEC) Ltd Calgary Wetland Vegetation Scientist IRISEnvironmental Systems Responsible for the design of a long-term (20 yr) Boreal wetlandvegetation monitoring program to determine the effects of groundwater withdrawal on wetlandvegetation Data gathered from the monitoring program to be utilised by Alberta EnvironmentalProtection for resource management decision making

Syncrude Canada Limited Calgary Environment Specialist and Project Manager IRISEnvironmental Systems Managed and co-ordinated a team of scientists responsible for thedelineation of forest types into commercial and non-commercial stands Derived informationwas used as input into Syncrudes reclamation and mine area conservation plan Specificproject management activities included conducting a needs assessment budget preparationand creation of a Terms of Reference

Environmental Impact Assessment amp Policy Specialist IRIS Environmental SystemsResponsible for the completion of environmental impact assessment projects Responsibilitiesincluded the identification of impacts mitigations cumulative effects and the management andco-ordination of multidisciplinary scientific teams Extensive liasing with government agenciesPolicy analysis included integrating environmental policy and statutory requirements withdevelopment initiatives Additional responsibilities included extensive stakeholder and publicconsultation The following is a list of completed environmental impact assessments

Skiing Louise Limited Banff National Park An Environmental Screening Report for thepurpose of withdrawing water from the Pipestone River and Corral Creek to accommodatesnowmaking fire-fighting and domestic water use activities Report considerations includedidentifying river hydrologic regimes potential impacts to aquatic ecosystems mitigationprocedures and cumulative effects assessment

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts associated with improvements to water intake systems in the Pipestone River andCorral Creek Specific report considerations included identifying impacts to aquaticecosystems

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts related to terrain modifications and replacement of snowmaking infrastructure on theUpper Wiwaxy ski run

The Lake Louise Inn Banff National Park Environmental Screening Report for theconstruction of new commercial accommodation in Lake Louise

Skoki Lodge Banff National Park Environmental Screening Report for the construction ofadditional staff housing at the Skoki Lodge National Historic Site

The Banff Centre Banff National Park Environmental Screening Report for the submissionof an Area Redevelopment Plan The project considered a strategic assessment includedthe identification of impacts resulting from proposed developments or redevelopments on thecampus of The Banff Centre

Ski Marmot Basin Jasper National Park Canada Part of a multi-disciplinary teamresponsible for the completion of a Comprehensive Study for the development of a chairlift andski runs in the Eagle Ridge area of Marmot Basin

Ski Marmot Basin Jasper National Park Canada Environmental Screening Reportspertaining to the installation of new sewage treatment facilities improvements to surfacedrainage and subsurface drainage

3

1995-1998

1990

Legislation Analyst IRIS Environmental Systems Alberta Economic DevelopmentCalgary AB Review and analysis of Alberta Provincial and Canadian Federal legislation todetermine land use laws and identify areas within the province which may have potential forfuture tourism development This information was used in the development of maps illustratingcurrent land uses and areas of potential future tourism development in Alberta

University of Calgary Department of Geography Canada Instructor i) Taught introductorygeography Topics included climatology geomorphology soils and vegetation hydrology remotesensing and air photo interpretation ii) Taught a senior level course in introductory vascular plantidentification plant taxonomy introductory wildlife identification and habitat associations and plantand wildlife responses to disturbances specific to the Canadian Grasslands Aspen ParklandMontane Sub-Alpine Alpine and Boreal Forest Ecoregions

Petro Canada Resources Incorporated Calgary Canada Junior Land ManagementRepresentative Responsible for the review of land agreements governing the operation of oiland gas properties Conducted an economic evaluation and reconciliation of predicted gas pricesversus actual market prices Additional work included site inspections of reclaimed coal propertiesin northeastern British Columbia

International

1998- Cuba Climate Change Emissions Baseline and Monitoring Plan Department of ForeignPresent Affairs 2002 and IntI Trade (DFAIT) Canada Project Manager Suncurrent Industries Ltd

Responsible for managing a climate change emissions baseline study and monitoring planfocused on the implementation of renewable and energy efficient technologies (wind and solarenergy high efficiency micro-turbines) in Cuba Baseline study was in accordance with thoserequirements for a Clean Development Mechanism

Egypt Environment Theme Project - Canadian International Development Agency (CIDA)Environment and Performance Measurement Specialist IRIS Environmental SystemsMember of the Performance Measurement Advisory team for the bilateral CIDA-EgyptEnvironment Theme Project (7 year project) Responsibilities included the measurement ofenvironment project and environment theme results Results to be consistent with Government ofCanada - CIDA policy programming goals including contributing to sustainable development inEgypt and stakeholder involvement in development initiatives Results Based Management(RBM) used as a measurement tool

Zimbabwe Victoria Falls Environmental Planning and Capacity Enhancement Project -Canadian International Development Agency (CIDA) Environment and PerformanceMeasurement Specialist IRIS Environmental Systems An RBM facilitator in an iterativesustainable-development project in Victoria Falls to promote environmentally sustainablecommunities Project focused on improving the capacity of local partners to participate effectivelyin the preparation and implementation of the Victoria Falls Master Plan and Local DevelopmentPlans Specific responsibilities included the development and facilitation of an RBM stakeholderworkshop held in Victoria Falls Zimbabwe Workshop emphasized participatory approaches andthe inclusion of gender equality in the identification and measurement of results

Egypt Environment Theme Project Canadian International Development Agency (CIDA)PolicyProgram Analyst IRIS Environmental Systems Member of the policyprogramanalysis team conducting a trends analysis of CIDAs programming in Egypt This analysisserved as an input into CIDAs planning and design of the new Egypt Country DevelopmentProgram Framework (CDPF) Data was obtained by surveying identified stakeholders in Egyptand Canada Results of the trends analysis were then correlated with CIDAs Egypt CountryDevelopment Policy Framework to reconcile its effectiveness and provide input for its futuredirection

4

1996-1990

Governments of Chad and Cameroon - World Bank Panel Review of PipelineDevelopment Research Assistant IRIS Environmental Systems Research assistant to theManagerCoordinator of the Expert Panel for the review of literature pertaining to biodiversity andwildlands ecology in the African savannah tropical forests and marine ecosystems

St Vincent and the Grenadines Caribbean Soil Erosion Research on DeforestedWatershed Areas Environmental Scientist Project Manager and Principle investigator intothe loss of soil water and nutrients associated with banana cultivated areas Secondary focus ofthe research was aimed at developing a land use management plan incorporating conservationfarming practices and the use of social forestry in the conservation of soil on severely erodedsteep-land agricultural areas In consideration with the socio-economic status of the areaformulated recommendations for appropriate farming practices at the micro-scale level

St Vincent and the Grenadines Caribbean Man and the Biosphere ProjectUNESCOEnvironmental Scientist Assistant Project Supervisor and Liaison between the University ofCalgary and the St Vincent Forestry Department Responsible for the implementation of varioussoil erosion research studies aimed at the quantification of soil water and nutrient loss associatedwith agroforestry and forestry plantation areas

ENVIRONMENTAL POLICYChair of the Energy Recovery Generation (ERG) Subgroup Clean Air Strategic Alliance Alberta

Advisor Centre for EnergyERG Input Electricity and Alternative Energy Division BC Ministry of Energy and Mines

ERG Input Climate Change Offset System Environment CanadaERG Input Treatment of Clean Energy Natural Resources Canada

COUNTRIES WORK EXPERIENCECanada Egypt Zimbabwe St Vincent and the Grenadines Chad and Cameroon Cuba

5

Selected Permitting Reports

1 A Wetlands Monitoring Plan Foster Creek Area Cold Lake Air Weapons Range AB 2001 Reportprepared for Alberta Energy Company Ltd

2 A Strategic Assessment of The Banff Centre Area Redevelopment Plan Banff National Park AB2000 Environmental Screening Report prepared for The Banff Centre

3 Permit to Withdraw Water from the Pipestone River and Corral Creek for the Purposes ofSnowmaking Fire-Fighting and Domestic Water Use the Lake Louise Ski Area Banff National ParkAB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

4 Improvements to Water Intakes on the Pipestone River and Corral Creek the Lake Louise Ski AreaBanff National Park AB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

5 Proposed Development of a Chairliff and Ski Runs on Eagle Ridge the Marmot Basin Ski AreaJasper National Park AB 1999 Comprehensive Study Report prepared for Ski Marmot Basin

6 An Application for New Staff Accommodations at Skoki Lodge Banff National Park AB 2000Environmental Screening Report prepared for Skiing Louise Ltd

7 An Application for New Commercial Accommodations at the Lake Louise Inn Banff National ParkAB 2000 Report prepared for the Lake Louise Inn

8 Improvements to Surface Drainage at the Marmot Basin Ski Area Jasper National Park AB 1998Environmental Screening Report prepared for Ski Marmot Basin

9 Improvements to Subsurface Drainage at the Marmot Basin Ski Area Jasper National Park AB1998 Environmental Screening Report prepared for Ski Marmot Basin

10 Improvements to Sewage Treatment Facilities and Effluent Disposal at the Marmot Basin Ski AreaJasper National Park AB 1998 Environmental Screening Report prepared for Ski Marmot Basin

Other Reports

11 Legislative and Policy Factors Influencing Tourism Development in Alberta 2000 Report preparedfor Alberta Economic Development and Alberta Economic Development Authority TourismCommittee

12 Egypt Country Development Policy Framework (CDPF) Assessment 1999 Report prepared for theCanadian International Development Agency Hull Quebec

13 Egypt Country Development Policy Framework (CDPF) Assessment Presentation 1999Presentation prepared for the Canadian International Development Agency Hull Quebec

14 Monitoring Mission Reports Egypt Environment Theme Reports prepared for the CanadianInternational Development Agency Hull Quebec

15 A Pre-Disturbance Vegetation Classification for the Disturbed Portion of the Syncrude DevelopmentArea Mildred Lake AB 1998 Report prepared for Syncrude Canada Ltd

16 Characterization of Soil Erosion Processes and Nutrient Losses Associated with Previously ForestedAreas the Colonarie River Watershed St Vincent West Indies 1998 A Masters Thesis preparedfor the University of Calgary

6

Stakeholder Consultation

1 Zimbabwe-Canada Environmental Planning Exchange Mission 2001 Organized and coordinated anexchange mission held in Banff AB for the CIDA Zimbabwe Environmental Planning and CapacityEnhancement Project

2 Strategic Assessment of The Banff Centre Area Redevelopment Plan 2000 Conducted stakeholderconsultations via a public open house forum

3 Results Based Management as a Project Management Tool 1999 Conducted a workshop in VictoriaFalls Zimbabwe for the Environmental Planning and Capacity Enhancement Project

7

Neil StewartRR 3 SimcoeOntario CanadaN3Y 4K2

OBJECTIVE ProjectConstruction Management

emailphone

fax

nmsproj ectskwiccom519-426-2239519-426-2674

1991-Date

1990-1991

1988-1990

JPRomC1r amp CONsect1[RUCnON MIANAGEMJENT sectJERVJ[CJEsect

Project amp Construction Management services including Project DevelopmentProject strategy Contract negotiations Contract Management Industrial RelationsGovernment liaison Profit amp Loss accountability

Plans of execution project controls budgets planning evaluations safety labourrelations and business development Project amp Site management coordinationprocedures administration methods and site organization Managed andcoordinated information flow tofrom Client(s) Engineer(s) and Contractor(s)

Projects includeWestcoast Energy 55mw Whitby Cogen Bayside 280 mw RepowerEcodyne Ltd MOU contract management amp coordinationUnited Parcel Services Canada Hamilton Air Hub ProjectINCO Nickle Foam and Nickle Disc ProjectsBayer AG Nicklehydroxide and Tungsten Carbide ProjectsMacMillen Bloedel Secondary Fibre Recycling Project

Fluor Daniel Canada LtdResident Construction Manager Central Division

Provide support to Business Units for construction managementservicesresponsible for industrial relations safety quality personnel development andmethods Initiated and established field organizations roles and responsibilitiessite procedures fab shop contractorsupplier planning budgetsfinancial and clientrelations to support critical contract schedules

Projects includeProctor amp Gamble Ultra Project MFord Canada Winn 88 Paint PlantINCO S02 Abatement Project

Ellis Don LtdProject Manager Resident site manager accountable for the process coordinationof $500M GMSUZUKI (CAMI) grass roots automotive plant in Ingersoll ON

Directed 1800 unionized trades (peak workforce) and managed lump-sum projecton schedule and under budget Developed and maintained Oriental and NorthAmerican client trust relationships Surpassed project expectations in labourrelations and safety Profit and Loss accountability

1986-1988

1985-1986

1984-1985

1983-1984

1981-1983

1978-1981

1974-1978

1973-1974

1969-1973

EDUCATION

UMA SpantecGeneral SuperintendentDirected and supervised lump-sum contracts Interfaced with engineering andclient organizations to produce responsive quality services and safe profitablecontracts

Projects includedLabatts Brewers various capital projectsConsumers Glass hot amp cold end shut downsUnivofWaterloo construction management servicesDomtar paper board expansion

Glen Curtis Company Construction SuperintendentConstruction management of Canadian Occidentals 65m cfPdgrass roots sour gas plant in Mezeppa Alberta

Ennisteel Co Ltd Toronto ON Project SupervisorUltramars 1500 million barrel terminal

Self-employed OntarioShip yard construction amp generation facilities

Petrosar Inc Sarnia ON Area SuperintendentClient rep responsible for $650 Million HFOU project

Fluor Canada Corp Alberta Mechanical SupervisorAGCL 1200 tpd Methanol plantAquitaine Canada 650m cfPd sour gas plantEsso Canada Cold Lake Project amp Judy Creek

Arthur GMcKee Inc Nanticoke ON Area SupervisorTexaco 120000 bpd grass roots refinery

SteIco Inc Hamilton ON

JewittVallee Simcoe ONOntario Hydro 4000 MW Thermal generationStelco LEW steel plantDomtar Mill expansionTrent Valley Quarry modernization

MacMaster University 1976-77 (night school)Mohawk College 1971-72 (night school)

SELF DEVELOPMENT -project management-construction management-basic computers-industrial relations-WinWin strategies

-WHMIS-safety amp compensation-KT amp decisions-team management-personnel administration

PERSONAL

REFERENCES

DOB February 24 1950

On request

CITIZENSHIP Canadian

Cochrane Engineering Ltd

Statement of Qualifications

Power Generation Facilities

Cochrane Engineering Ltd200 - 1770 W7th Avenue

Vancouver Be V6J 4Y6Phone 604-736-5421 Fax 604-736-1519

Email receptioncochrane-groupca

COCHRAR

Cochrane Engineering LtdGeneral Qualifications

TABLE OF CONTENTS

Section

Section

Section

10 COMPANY BACKGROUND11 Multi-Disciplinary Design12 Quality Assurance

20 SUMMARY OF RECENT RELEVANT EXPERIENCE21 Recent Relevant Projects Completed22 Projects Currently in Progress23 Cochrane Group - Other Relevant Experience

30 ENGINEERINGmiddot TOOLS

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Sandhill Energy CenterAusti n Texas

Calpine Combined Cycle Power PlantGoldendale Washington

10 COMPANY BACKGROUND

The Cochrane Group of companies including Cochrane Engineeringprovides integrated engineering architecture planning and projectmanagement services for a wide variety of projects It was formed in1996 through the merger of Cochrane Engineering a Calgary firm inoperation since 1972 and the PBK Group which had providedarchitectural and engineering services in Vancouver since 1937 Ouraffiliation with the Cochrane Group affords us access to the expertiseof over 350 personnel consisting of project managers technicalpersonnel and administrative staff in six offices across Canada Italso lends access to other Cochrane Group firms including PBKArchitects Inc which has provided design services for many industrialprojects in Canada and abroad Cochrane Engineering and PBKArchitects have significant experience providing services for clients inthe power coal mining and process industries

Cochrane Engineerings power division has successfully exporteddesign services through out North and South America In the last twoyears this division has provided mechanical processinstrumentation architectural electrical civil and structural designservices for projects totaling over 1000 MW of power generationThe construction cost for these projects exceeds $1 billion

11 Multi-Disciplinary DesignCochrane Group is a fully integrated multi-disciplinary design groupservicing the power sector with in-house architectural capabilitiesGE7FA experience and combined cycle process experts enabling usto provide comprehensive one stop shopping The CochraneGroups multi-disciplinary design team includes

bull Cochrane Engineering Ltd andbull PBK Architects Inc

Cochrane Engineering Ltd is a multi-discipline engineering firmspecializing in the design of combined cycle power plants simplecycle power plants and industrial projects We also supplyengineering resources for PBK architects

PBK Architects Inc specializes in the design of industrial facilitiesoffices maintenance shops warehouses institutional buildings andrecreational sport facilities PBK provides the architectural servicesto Cochrane for our power projects Signature projects include BCPlace GM Place Horseshoe Bay Ferry Terminal upgrade and

1-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 9: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

ST CLAIR PIPELINESManager Pipeline Business Development

1994

Following the acquisition of Union Gas by Westcoast Energy participated in the development of a storageand pipeline business development subsidiary

Responsibilities included a thorough review of project development potential in eastern Canada and theMidwest and Northeast United States Managed Unions participation in the Intercoastal project anddeveloped the Bluewater pipeline project

NORDIC POWER COGENERATION OF CANADAPresident

1990 - 1993

One of six key professionals hired by the founder of Nordic Power Inc to start up a new North Americanindependent power company

Managed all aspects of the $150 million 102 megawatt West Windsor power project from originalproposal to Ontario Hydro to financial closing West Windsor Power was commissioned in 1996 and isnow owned by an affiliate of Tractebel SA

Key responsibilities included initiation and closing of long-term agreements with Ontario Hydro steamhosts fuel suppliers and transporters and management of all government affairs

Tenure with Nordic also included greenfield power project development and fuel plan development atseveral sites in Canada and the United States

UNION GAS LIMITEDVarious Operations Positions

1987 -1990

Line and staff management assignments and summer employment in the field in three of Unions regionaloffices and head office culminated in the management of a total of 55 staff and an annual capital budgetof approximately $5 million

Participated as a middle manager in a major organization following an early retirement program thatresulted in operating cost reductions of over 20

EDUCATION

Honours Bachelor of Arts in Business AdministrationThe University of Western Ontario

Masters of Business AdministrationThe University of Windsor

3

1980

1992

HARVIE E CAMPBELL

354 Hawkview Manor Circle N WCalgary Alberta T3G 2Y7

Business 403-241-2436Cell 403-650-4584Fax 403-374-1871

e-mail Harviecampbellshawca

SENIOR CONSULTING BUSINESS DEVELOPMENT PROFESSIONAL

Project development consultant with over 20 years in the energy industry Experienced in the reviewassessment and development oflarge capital energy projects particularly independent power projects hasplayed a senior role in the development of over 1500 MWs of power facilities valued at over $15 billion

Proficient in all aspects of power generation development feasibility reviews market analysis projectmanagement fuel supply contracting execution financing and economics Skilled in facilitating businessdevelopment solutions Proven ability to direct successful development project management teams andenhance co-operation from all levels of an organization partners stakeholders and government agencies toincrease shareholder value and achieve business project development results Proven ability to get thedeal done

Mr Campbell currently operates a consulting firm (HEIAK Energy Inc) providing management services tothe Independent Power Industry

PROFESSIONAL EXPERIENCE

Vice President and CFOPristine Power Inc

2002 to Present

Founding partner of Pristine Power Inc a development company established to pursue the development ofprojects utilizing leading edge proven generation technologies with strong environmental characteristicsThe company focuss on the development of waste heat generation and storage related generationtechnologies such as Compressed Air Energy Storage (CAES)

Vice President (amp General Manager) DevelopmentWestcoast Power Inc Calgary Alberta

1998 to 2002

As Vice President Development for Westcoast Power held responsibility for all aspects of West coastsdevelopment activities within Canada the United States and overseas Responsibilities included projectconception overall management of a multidisciplinary development team including technical economicpublic relations environmental legal and financing Responsible for the negotiation of all contracts andassembling of project development teams Important accomplishments include

Harvie E Campbell

FREDERICKSON POWER PROJECT

2493 MW F Class Combined Cycle facility located near Tacoma WashingtonRole Vice PresidentExecutive Director

Page 2

Responsibilities included all aspects of project development including PNW regional plan for WestcoastPower regional screen acquisition of the Frederickson site formed development team arranged projectconstruction gas transportation electrical transmission offtake contracts interconnection etc

Project Highlights

bull Project accorded First mover status during the PNW power boom in 20002001bull Placed 20 year tolling contracts with three regional PUDs Benton Franklin and Grays Harbourbull Arranged gas transportation on the Westcoast and Northwest Pipeline systems and electrical

transmission to Big Eddy amp John Daybull Project was under budget and ahead of schedulebull Oversaw partial sale to a partner and final sale of Duke (Westcoast) interest to Epcor Powerbull Project is presently in commercial operation

ISLAND COGENERA TION PROJECT

250 MW F class CC Cogen facility (Alstom Gas Turbine) located in Campbell River HCRole Vice President

Project Highlights

bull Development phase of the ICPI was successfully completed while maintaining shareholder valuebull All project contracts and permits were completed and executedbull Purchase of Partners working interest after execution of all Project agreementsbull Lead successful non-recourse financing of facility

PUNCAKJA YA POWER PROJECT

395 MW project consisting of 60 diesel generators 3x 65 MW coal fired units and one 60 mile long transmissionline located at the Freeport MacMoran goldcopper mine in Irian Jaya Indonesia

Responsible for contracts including power offtake operations and technical completion with Freeport andestablishing operating regimen Also played a senior role in the USD $500 million financing of the project

Harvie E Campbell Page 3

In addition Mr Campbell has undertaken senior roles in the development and financing of the following projects

Ft Nelson Transmission Line (BC)McMahon Cogeneration Project (BC)Cantarell Nitrogen Injection Project (power component)WEI Gang Power Project (Shanghai)Lake Superior PowerFt Frances CogenerationWhitby CogenBayside Power

Director Energreen Inc

nla110 MW520 MW30MW

110MW110 MW50MW280 MW

While Vice President Development for Westcoast Power Mr Campbell also acted for Westcoast on theBoard of Energreen a power related subsidiary of Alliance Pipeline

Manager Investment Services GroupWestcoast Energy IncVancouver BC

1994 to 1998

Established a single group responsible for the financial analysis commercial review and contracting of allcapital projects within Westcoast Energy including Westcoast Power Westcoast International and theWestcoast Business Development Group (mostly Pipeline and storage related investments) Supportedproject contract negotiations financial analysis and financing on a host of projects including powergeneration pipeline petrochemical and fertilizer projects

Supervisorl Financial AnalystWestcoast Energy IncVancouver BC

1984 to 1993

Harvie E Campbell Page 4

From joining Westcoast Energy in 1984 as a financial analyst and economist Mr Campbell heldsuccessively more senior roles in the areas of planning development and financial analysis Heparticipated in the acquisition of several small oil amp gas production companies ICG Utilities and UnionGas in the late 1980s and early 1990s

EDUCATION

bull MA Economics 1984Simon Fraser University at Burnaby Bc

bull BA (Honours) Economics 1982University of AlbertaEdmonton Alberta

Mr Campbell is a past President (and currently Director) of the Independent Power Association of BritishColumbia and past Director of the Canadian Institute of Energy and the Vancouver Rowing Club Heresides in Calgary with his wife Ines and three children

References Available on Request

KENNETH W SPINNER

3040- 400 - 4th Ave SWCalgary AB T2P OJ4

403-444-5578

Technicalproject management and development professional with 23 years in the energy industryExperienced in the review technical assessment and development of independent power projects havebeen involved in the development engineering and construction on over 1000 megawatts of powerplants and project managed over $500 million in powerenergy projects

Proficient in all aspects of power generation developments feasibility reviews project managementproject engineering EPC contract negotiations and administration Proven ability to direct successfuldevelopment project management teams and enhance co-operation from all levels of an organizationpartners stakeholders and government agencies to increase shareholder value and achieve business project development management results

PROFESSIONAL EXPERIENCE

V P EngineeringPristine Power Inc

2003 to Present

Presently providing project managementdevelopment and technical support for all power generationdevelopments and projects Responsible for preliminary development engineering coordination of allengineering procurement and construction and contract negotiation and administration activities withinthe company

PresidentSpinergy Services Inc

1999 to 2003

Providing power generation consulting and developmentmanagement services to various clients throughoutCanada specifically Alberta British Columbia Saskatchewan and Eastern Canada Involved in various gas-firedand biomass project developments ranging from 25 Megawatts to 450 Megawatts as project development advisorConducted feasibility studiesproposals and economic feasibility reviews on a wide range of power developmentsin the energy forestry and coal industries On going in-house developments include gas-fired cogenerationbiomass generation combined heatcooling power facilities and energy storage opportunities

Executive Director Vice President (ICPI)Manager New Ventures Business DevelopmentFletcher Challenge Energy (FCE) Calgary Alberta

]997 to 1999

As Executive Director Vice President of the 250 megawatt Island Cogeneration Project Inc (ICPI)jointly-managed development of the ICPI project on Vancouver Island to development completion Directed negotiationteams for the power purchase agreement with BC Hydro steam sales agreements with Fletcher ChallengeCanada Paper Mill the engineering and construction contract and project permits

Pale]KENNETH W SPINNER

PROFESSIONAL EXPERIENCE (Continued)

Project Highlights

bull Development phase of the ICPl was successfully completed while maintaining shareholder valuebull All project contracts and permits were completed and executedbull Managed development team in Vancouver consisting of multi-disciplinary professionals legal

environmental and engineering consultantsbull Guided the environmental permitting process and obtained project approvalbull FCEs working interest in ICPI was successfully sold after execution of all Project agreementsbull Project is presently in commercial operation

ISLAND COGENERATION PROJECT - 250 MW- CAMPBELL RIVER BC

Vice PresidentWest Windsor Power - (PLC Windsor Ltd)Northstar Energy Corporation Calgary Alberta

1994 to 1997

Vice President ofPLC Windsor Ltd and Northstar Energys principal representative on the partnershipmanagement committee directly responsible for the 120 megawatt West Windsor Power project in WindsorOntario Responsible for overall project management project financial analysis and project capital budget

Project Highlights

bull Administered the implementation of all project contracts including engineering and construction contractgas supply and transportation agreements steam sales power purchase agreements and directed financialclosing activities at loan conversion Project was under budget and started up successfully in 1996

bull Maximized project value by cost control budgeting scheduling maintaining initial contract values andoptimizing economic parameters

bull Involved in the negotiation and implementation a $100 million EPC turnkey contract for the constructionand start-up of the facility

bull Project was managed to completion which included mobilization commissioning commercial operationsperformance testing and conversion to term financing

Pa2e 2KENNETH W SPINNER

PROFESSIONAL EXPERIENCE (Continued)

WEST WINDSOR POWER - 120 MW - WINDSOR ONTARIO

Manager EngineeringPowerlink Corporation (Subsidiary of Northstar Energy Corp) Portland Oregon

1992 to ]994

Responsible for all technical management and support for power project development activities in Canada USAand other international regions Supported project contract negotiations on the West Windsor Power Projectmanaged the engineering construction contract and operating agreement negotiations

Manager Facilities Engineering Sr Project Engineer Process EngineerNorthstar Energy Corporation Dome Petroleum Ltd Hudsons Bay Oil and Gas LtdCalgary Alberta

1980 to ]992

Managed oil and gas facilities development in Alberta and independent power development in Canada and theUSA Responsible for project management and process engineering on various oil and gas facilities and pipelines

EDUCATION

bull Bachelor of Science Chemical Engineering (Honours) 1980Queens University at Kingston Ontario

bull Cogeneration Development Course 1992Kingston Ontario

bull Cogeneration Power Plant Design and Optimization 1991Boston Massachusetts

bull Business Management Financial and Evaluation Courses 1986 to 1997

Pale 3

Project Experience Chart

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsHarvie Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren BakerCampbell Power Project Utilities Washington CCGT Electric Harbour EPCOR Power Power Resource

Puget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Puncakjaya Duke Irian Jaya 395 MW Diesel coal Mitsubishi PT Freeport 1997 Richard E Richard EPower Project Energy Indonesia fired Indonesia Coleman Coleman

PT Freeport PT FreeportIndonesia IndonesiaJI H R Rasuna JI H R RasunaSaid Kav X-7 No Said Kav X-7 No6 6Plaza 89 12th Plaza 89 12thFloor FloorJakarta 12940 Jakarta 12940

Lake Superior Great Sault St 110 MW Natural GE Ontario 1993 Colin Clark Bill RalphPower Project Lakes Marie Ont GasDistiliate Electricity Great Lakes OEFC

Power Finance Corp Power amp Brascan 416-325-80577059415651

McMahon Duke Taylor BC 115 MW Natural Gas Westinghouse BC Hydro 1993 Duane Rae Dawn FarrellCogeneration Energy Duke Energy BC Hydro

ATCO 4036991551ATCO

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsJeff Myers Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren Baker

Power Project Utilitiesl Washington CCGT Electric Harbour EPCOR Power Power ResourcePuget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Liberty Power Reliant Philadelphia 568 MW Natural Gas GE Pacific Gas 2002 Greg Kennedy Nowa merchantProject Energy PA CCGT and Electric - Reliant Energy plant

National 713-497-7490Energy Group(receivership)

West Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Ken Spinner Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsWest Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Julia S Ciccaglione Curriculum Vitae

CURRICULUM VITAE

JULIA S CICCAGLIONEEnvironment Specialist

3040400 4th Avenue SWCalgary AB Canada T2P OJ4

Tel (403)444-5538 email jciccaglionepristinepowerca

CAREER BRIEF

An environment specialist with extensive experience in project management impact assessmentstakeholder consultation policy analysis and climate change Additional expertise in internationaldevelopment projects including project monitoring and stakeholder facilitation Excellent communicationorganisation and writing skills Technical background in the biophysical sciences and economics Projectperformance measurement experience using Results Based Management (RBM)

EDUCA TION

MSc Geography 1998Soil Erosion Assessment Soil and Water Nutrient Loss Analysis Watershed ManagementUniversity of Calgary Calgary Alberta Canada

BSc Geography 1994University of Calgary Calgary Alberta CanadaConcentration Biogeography geomorphology

BA Economics 1991University of Calgary Calgary Alberta CanadaConcentration Petroleum economics

PROFESSIONAL EXPERTISE

Environmental Project ManagementPolicy AnalysisRegulatory AnalysisStakeholder amp Public Consultation

Impact AssessmentSustainable DevelopmentClimate ChangeEnvironmental Management

CAREER HISTORY

Domestic

1998- Pristine Power Inc Calgary Vice President Environment and Emissions TradingPresent Responsible for overall environmental project management regulatory compliance public

policy input and management of Pristines greenhouse gas strategy

Suncurrent Industries Ltd Calgary Senior Emissions Portfolio ConsultantResponsible for overall management of Suncurrents greenhouse gas credit portfolio

2

Alberta Energy Company (AEC) Ltd Calgary Wetland Vegetation Scientist IRISEnvironmental Systems Responsible for the design of a long-term (20 yr) Boreal wetlandvegetation monitoring program to determine the effects of groundwater withdrawal on wetlandvegetation Data gathered from the monitoring program to be utilised by Alberta EnvironmentalProtection for resource management decision making

Syncrude Canada Limited Calgary Environment Specialist and Project Manager IRISEnvironmental Systems Managed and co-ordinated a team of scientists responsible for thedelineation of forest types into commercial and non-commercial stands Derived informationwas used as input into Syncrudes reclamation and mine area conservation plan Specificproject management activities included conducting a needs assessment budget preparationand creation of a Terms of Reference

Environmental Impact Assessment amp Policy Specialist IRIS Environmental SystemsResponsible for the completion of environmental impact assessment projects Responsibilitiesincluded the identification of impacts mitigations cumulative effects and the management andco-ordination of multidisciplinary scientific teams Extensive liasing with government agenciesPolicy analysis included integrating environmental policy and statutory requirements withdevelopment initiatives Additional responsibilities included extensive stakeholder and publicconsultation The following is a list of completed environmental impact assessments

Skiing Louise Limited Banff National Park An Environmental Screening Report for thepurpose of withdrawing water from the Pipestone River and Corral Creek to accommodatesnowmaking fire-fighting and domestic water use activities Report considerations includedidentifying river hydrologic regimes potential impacts to aquatic ecosystems mitigationprocedures and cumulative effects assessment

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts associated with improvements to water intake systems in the Pipestone River andCorral Creek Specific report considerations included identifying impacts to aquaticecosystems

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts related to terrain modifications and replacement of snowmaking infrastructure on theUpper Wiwaxy ski run

The Lake Louise Inn Banff National Park Environmental Screening Report for theconstruction of new commercial accommodation in Lake Louise

Skoki Lodge Banff National Park Environmental Screening Report for the construction ofadditional staff housing at the Skoki Lodge National Historic Site

The Banff Centre Banff National Park Environmental Screening Report for the submissionof an Area Redevelopment Plan The project considered a strategic assessment includedthe identification of impacts resulting from proposed developments or redevelopments on thecampus of The Banff Centre

Ski Marmot Basin Jasper National Park Canada Part of a multi-disciplinary teamresponsible for the completion of a Comprehensive Study for the development of a chairlift andski runs in the Eagle Ridge area of Marmot Basin

Ski Marmot Basin Jasper National Park Canada Environmental Screening Reportspertaining to the installation of new sewage treatment facilities improvements to surfacedrainage and subsurface drainage

3

1995-1998

1990

Legislation Analyst IRIS Environmental Systems Alberta Economic DevelopmentCalgary AB Review and analysis of Alberta Provincial and Canadian Federal legislation todetermine land use laws and identify areas within the province which may have potential forfuture tourism development This information was used in the development of maps illustratingcurrent land uses and areas of potential future tourism development in Alberta

University of Calgary Department of Geography Canada Instructor i) Taught introductorygeography Topics included climatology geomorphology soils and vegetation hydrology remotesensing and air photo interpretation ii) Taught a senior level course in introductory vascular plantidentification plant taxonomy introductory wildlife identification and habitat associations and plantand wildlife responses to disturbances specific to the Canadian Grasslands Aspen ParklandMontane Sub-Alpine Alpine and Boreal Forest Ecoregions

Petro Canada Resources Incorporated Calgary Canada Junior Land ManagementRepresentative Responsible for the review of land agreements governing the operation of oiland gas properties Conducted an economic evaluation and reconciliation of predicted gas pricesversus actual market prices Additional work included site inspections of reclaimed coal propertiesin northeastern British Columbia

International

1998- Cuba Climate Change Emissions Baseline and Monitoring Plan Department of ForeignPresent Affairs 2002 and IntI Trade (DFAIT) Canada Project Manager Suncurrent Industries Ltd

Responsible for managing a climate change emissions baseline study and monitoring planfocused on the implementation of renewable and energy efficient technologies (wind and solarenergy high efficiency micro-turbines) in Cuba Baseline study was in accordance with thoserequirements for a Clean Development Mechanism

Egypt Environment Theme Project - Canadian International Development Agency (CIDA)Environment and Performance Measurement Specialist IRIS Environmental SystemsMember of the Performance Measurement Advisory team for the bilateral CIDA-EgyptEnvironment Theme Project (7 year project) Responsibilities included the measurement ofenvironment project and environment theme results Results to be consistent with Government ofCanada - CIDA policy programming goals including contributing to sustainable development inEgypt and stakeholder involvement in development initiatives Results Based Management(RBM) used as a measurement tool

Zimbabwe Victoria Falls Environmental Planning and Capacity Enhancement Project -Canadian International Development Agency (CIDA) Environment and PerformanceMeasurement Specialist IRIS Environmental Systems An RBM facilitator in an iterativesustainable-development project in Victoria Falls to promote environmentally sustainablecommunities Project focused on improving the capacity of local partners to participate effectivelyin the preparation and implementation of the Victoria Falls Master Plan and Local DevelopmentPlans Specific responsibilities included the development and facilitation of an RBM stakeholderworkshop held in Victoria Falls Zimbabwe Workshop emphasized participatory approaches andthe inclusion of gender equality in the identification and measurement of results

Egypt Environment Theme Project Canadian International Development Agency (CIDA)PolicyProgram Analyst IRIS Environmental Systems Member of the policyprogramanalysis team conducting a trends analysis of CIDAs programming in Egypt This analysisserved as an input into CIDAs planning and design of the new Egypt Country DevelopmentProgram Framework (CDPF) Data was obtained by surveying identified stakeholders in Egyptand Canada Results of the trends analysis were then correlated with CIDAs Egypt CountryDevelopment Policy Framework to reconcile its effectiveness and provide input for its futuredirection

4

1996-1990

Governments of Chad and Cameroon - World Bank Panel Review of PipelineDevelopment Research Assistant IRIS Environmental Systems Research assistant to theManagerCoordinator of the Expert Panel for the review of literature pertaining to biodiversity andwildlands ecology in the African savannah tropical forests and marine ecosystems

St Vincent and the Grenadines Caribbean Soil Erosion Research on DeforestedWatershed Areas Environmental Scientist Project Manager and Principle investigator intothe loss of soil water and nutrients associated with banana cultivated areas Secondary focus ofthe research was aimed at developing a land use management plan incorporating conservationfarming practices and the use of social forestry in the conservation of soil on severely erodedsteep-land agricultural areas In consideration with the socio-economic status of the areaformulated recommendations for appropriate farming practices at the micro-scale level

St Vincent and the Grenadines Caribbean Man and the Biosphere ProjectUNESCOEnvironmental Scientist Assistant Project Supervisor and Liaison between the University ofCalgary and the St Vincent Forestry Department Responsible for the implementation of varioussoil erosion research studies aimed at the quantification of soil water and nutrient loss associatedwith agroforestry and forestry plantation areas

ENVIRONMENTAL POLICYChair of the Energy Recovery Generation (ERG) Subgroup Clean Air Strategic Alliance Alberta

Advisor Centre for EnergyERG Input Electricity and Alternative Energy Division BC Ministry of Energy and Mines

ERG Input Climate Change Offset System Environment CanadaERG Input Treatment of Clean Energy Natural Resources Canada

COUNTRIES WORK EXPERIENCECanada Egypt Zimbabwe St Vincent and the Grenadines Chad and Cameroon Cuba

5

Selected Permitting Reports

1 A Wetlands Monitoring Plan Foster Creek Area Cold Lake Air Weapons Range AB 2001 Reportprepared for Alberta Energy Company Ltd

2 A Strategic Assessment of The Banff Centre Area Redevelopment Plan Banff National Park AB2000 Environmental Screening Report prepared for The Banff Centre

3 Permit to Withdraw Water from the Pipestone River and Corral Creek for the Purposes ofSnowmaking Fire-Fighting and Domestic Water Use the Lake Louise Ski Area Banff National ParkAB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

4 Improvements to Water Intakes on the Pipestone River and Corral Creek the Lake Louise Ski AreaBanff National Park AB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

5 Proposed Development of a Chairliff and Ski Runs on Eagle Ridge the Marmot Basin Ski AreaJasper National Park AB 1999 Comprehensive Study Report prepared for Ski Marmot Basin

6 An Application for New Staff Accommodations at Skoki Lodge Banff National Park AB 2000Environmental Screening Report prepared for Skiing Louise Ltd

7 An Application for New Commercial Accommodations at the Lake Louise Inn Banff National ParkAB 2000 Report prepared for the Lake Louise Inn

8 Improvements to Surface Drainage at the Marmot Basin Ski Area Jasper National Park AB 1998Environmental Screening Report prepared for Ski Marmot Basin

9 Improvements to Subsurface Drainage at the Marmot Basin Ski Area Jasper National Park AB1998 Environmental Screening Report prepared for Ski Marmot Basin

10 Improvements to Sewage Treatment Facilities and Effluent Disposal at the Marmot Basin Ski AreaJasper National Park AB 1998 Environmental Screening Report prepared for Ski Marmot Basin

Other Reports

11 Legislative and Policy Factors Influencing Tourism Development in Alberta 2000 Report preparedfor Alberta Economic Development and Alberta Economic Development Authority TourismCommittee

12 Egypt Country Development Policy Framework (CDPF) Assessment 1999 Report prepared for theCanadian International Development Agency Hull Quebec

13 Egypt Country Development Policy Framework (CDPF) Assessment Presentation 1999Presentation prepared for the Canadian International Development Agency Hull Quebec

14 Monitoring Mission Reports Egypt Environment Theme Reports prepared for the CanadianInternational Development Agency Hull Quebec

15 A Pre-Disturbance Vegetation Classification for the Disturbed Portion of the Syncrude DevelopmentArea Mildred Lake AB 1998 Report prepared for Syncrude Canada Ltd

16 Characterization of Soil Erosion Processes and Nutrient Losses Associated with Previously ForestedAreas the Colonarie River Watershed St Vincent West Indies 1998 A Masters Thesis preparedfor the University of Calgary

6

Stakeholder Consultation

1 Zimbabwe-Canada Environmental Planning Exchange Mission 2001 Organized and coordinated anexchange mission held in Banff AB for the CIDA Zimbabwe Environmental Planning and CapacityEnhancement Project

2 Strategic Assessment of The Banff Centre Area Redevelopment Plan 2000 Conducted stakeholderconsultations via a public open house forum

3 Results Based Management as a Project Management Tool 1999 Conducted a workshop in VictoriaFalls Zimbabwe for the Environmental Planning and Capacity Enhancement Project

7

Neil StewartRR 3 SimcoeOntario CanadaN3Y 4K2

OBJECTIVE ProjectConstruction Management

emailphone

fax

nmsproj ectskwiccom519-426-2239519-426-2674

1991-Date

1990-1991

1988-1990

JPRomC1r amp CONsect1[RUCnON MIANAGEMJENT sectJERVJ[CJEsect

Project amp Construction Management services including Project DevelopmentProject strategy Contract negotiations Contract Management Industrial RelationsGovernment liaison Profit amp Loss accountability

Plans of execution project controls budgets planning evaluations safety labourrelations and business development Project amp Site management coordinationprocedures administration methods and site organization Managed andcoordinated information flow tofrom Client(s) Engineer(s) and Contractor(s)

Projects includeWestcoast Energy 55mw Whitby Cogen Bayside 280 mw RepowerEcodyne Ltd MOU contract management amp coordinationUnited Parcel Services Canada Hamilton Air Hub ProjectINCO Nickle Foam and Nickle Disc ProjectsBayer AG Nicklehydroxide and Tungsten Carbide ProjectsMacMillen Bloedel Secondary Fibre Recycling Project

Fluor Daniel Canada LtdResident Construction Manager Central Division

Provide support to Business Units for construction managementservicesresponsible for industrial relations safety quality personnel development andmethods Initiated and established field organizations roles and responsibilitiessite procedures fab shop contractorsupplier planning budgetsfinancial and clientrelations to support critical contract schedules

Projects includeProctor amp Gamble Ultra Project MFord Canada Winn 88 Paint PlantINCO S02 Abatement Project

Ellis Don LtdProject Manager Resident site manager accountable for the process coordinationof $500M GMSUZUKI (CAMI) grass roots automotive plant in Ingersoll ON

Directed 1800 unionized trades (peak workforce) and managed lump-sum projecton schedule and under budget Developed and maintained Oriental and NorthAmerican client trust relationships Surpassed project expectations in labourrelations and safety Profit and Loss accountability

1986-1988

1985-1986

1984-1985

1983-1984

1981-1983

1978-1981

1974-1978

1973-1974

1969-1973

EDUCATION

UMA SpantecGeneral SuperintendentDirected and supervised lump-sum contracts Interfaced with engineering andclient organizations to produce responsive quality services and safe profitablecontracts

Projects includedLabatts Brewers various capital projectsConsumers Glass hot amp cold end shut downsUnivofWaterloo construction management servicesDomtar paper board expansion

Glen Curtis Company Construction SuperintendentConstruction management of Canadian Occidentals 65m cfPdgrass roots sour gas plant in Mezeppa Alberta

Ennisteel Co Ltd Toronto ON Project SupervisorUltramars 1500 million barrel terminal

Self-employed OntarioShip yard construction amp generation facilities

Petrosar Inc Sarnia ON Area SuperintendentClient rep responsible for $650 Million HFOU project

Fluor Canada Corp Alberta Mechanical SupervisorAGCL 1200 tpd Methanol plantAquitaine Canada 650m cfPd sour gas plantEsso Canada Cold Lake Project amp Judy Creek

Arthur GMcKee Inc Nanticoke ON Area SupervisorTexaco 120000 bpd grass roots refinery

SteIco Inc Hamilton ON

JewittVallee Simcoe ONOntario Hydro 4000 MW Thermal generationStelco LEW steel plantDomtar Mill expansionTrent Valley Quarry modernization

MacMaster University 1976-77 (night school)Mohawk College 1971-72 (night school)

SELF DEVELOPMENT -project management-construction management-basic computers-industrial relations-WinWin strategies

-WHMIS-safety amp compensation-KT amp decisions-team management-personnel administration

PERSONAL

REFERENCES

DOB February 24 1950

On request

CITIZENSHIP Canadian

Cochrane Engineering Ltd

Statement of Qualifications

Power Generation Facilities

Cochrane Engineering Ltd200 - 1770 W7th Avenue

Vancouver Be V6J 4Y6Phone 604-736-5421 Fax 604-736-1519

Email receptioncochrane-groupca

COCHRAR

Cochrane Engineering LtdGeneral Qualifications

TABLE OF CONTENTS

Section

Section

Section

10 COMPANY BACKGROUND11 Multi-Disciplinary Design12 Quality Assurance

20 SUMMARY OF RECENT RELEVANT EXPERIENCE21 Recent Relevant Projects Completed22 Projects Currently in Progress23 Cochrane Group - Other Relevant Experience

30 ENGINEERINGmiddot TOOLS

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Sandhill Energy CenterAusti n Texas

Calpine Combined Cycle Power PlantGoldendale Washington

10 COMPANY BACKGROUND

The Cochrane Group of companies including Cochrane Engineeringprovides integrated engineering architecture planning and projectmanagement services for a wide variety of projects It was formed in1996 through the merger of Cochrane Engineering a Calgary firm inoperation since 1972 and the PBK Group which had providedarchitectural and engineering services in Vancouver since 1937 Ouraffiliation with the Cochrane Group affords us access to the expertiseof over 350 personnel consisting of project managers technicalpersonnel and administrative staff in six offices across Canada Italso lends access to other Cochrane Group firms including PBKArchitects Inc which has provided design services for many industrialprojects in Canada and abroad Cochrane Engineering and PBKArchitects have significant experience providing services for clients inthe power coal mining and process industries

Cochrane Engineerings power division has successfully exporteddesign services through out North and South America In the last twoyears this division has provided mechanical processinstrumentation architectural electrical civil and structural designservices for projects totaling over 1000 MW of power generationThe construction cost for these projects exceeds $1 billion

11 Multi-Disciplinary DesignCochrane Group is a fully integrated multi-disciplinary design groupservicing the power sector with in-house architectural capabilitiesGE7FA experience and combined cycle process experts enabling usto provide comprehensive one stop shopping The CochraneGroups multi-disciplinary design team includes

bull Cochrane Engineering Ltd andbull PBK Architects Inc

Cochrane Engineering Ltd is a multi-discipline engineering firmspecializing in the design of combined cycle power plants simplecycle power plants and industrial projects We also supplyengineering resources for PBK architects

PBK Architects Inc specializes in the design of industrial facilitiesoffices maintenance shops warehouses institutional buildings andrecreational sport facilities PBK provides the architectural servicesto Cochrane for our power projects Signature projects include BCPlace GM Place Horseshoe Bay Ferry Terminal upgrade and

1-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 10: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

HARVIE E CAMPBELL

354 Hawkview Manor Circle N WCalgary Alberta T3G 2Y7

Business 403-241-2436Cell 403-650-4584Fax 403-374-1871

e-mail Harviecampbellshawca

SENIOR CONSULTING BUSINESS DEVELOPMENT PROFESSIONAL

Project development consultant with over 20 years in the energy industry Experienced in the reviewassessment and development oflarge capital energy projects particularly independent power projects hasplayed a senior role in the development of over 1500 MWs of power facilities valued at over $15 billion

Proficient in all aspects of power generation development feasibility reviews market analysis projectmanagement fuel supply contracting execution financing and economics Skilled in facilitating businessdevelopment solutions Proven ability to direct successful development project management teams andenhance co-operation from all levels of an organization partners stakeholders and government agencies toincrease shareholder value and achieve business project development results Proven ability to get thedeal done

Mr Campbell currently operates a consulting firm (HEIAK Energy Inc) providing management services tothe Independent Power Industry

PROFESSIONAL EXPERIENCE

Vice President and CFOPristine Power Inc

2002 to Present

Founding partner of Pristine Power Inc a development company established to pursue the development ofprojects utilizing leading edge proven generation technologies with strong environmental characteristicsThe company focuss on the development of waste heat generation and storage related generationtechnologies such as Compressed Air Energy Storage (CAES)

Vice President (amp General Manager) DevelopmentWestcoast Power Inc Calgary Alberta

1998 to 2002

As Vice President Development for Westcoast Power held responsibility for all aspects of West coastsdevelopment activities within Canada the United States and overseas Responsibilities included projectconception overall management of a multidisciplinary development team including technical economicpublic relations environmental legal and financing Responsible for the negotiation of all contracts andassembling of project development teams Important accomplishments include

Harvie E Campbell

FREDERICKSON POWER PROJECT

2493 MW F Class Combined Cycle facility located near Tacoma WashingtonRole Vice PresidentExecutive Director

Page 2

Responsibilities included all aspects of project development including PNW regional plan for WestcoastPower regional screen acquisition of the Frederickson site formed development team arranged projectconstruction gas transportation electrical transmission offtake contracts interconnection etc

Project Highlights

bull Project accorded First mover status during the PNW power boom in 20002001bull Placed 20 year tolling contracts with three regional PUDs Benton Franklin and Grays Harbourbull Arranged gas transportation on the Westcoast and Northwest Pipeline systems and electrical

transmission to Big Eddy amp John Daybull Project was under budget and ahead of schedulebull Oversaw partial sale to a partner and final sale of Duke (Westcoast) interest to Epcor Powerbull Project is presently in commercial operation

ISLAND COGENERA TION PROJECT

250 MW F class CC Cogen facility (Alstom Gas Turbine) located in Campbell River HCRole Vice President

Project Highlights

bull Development phase of the ICPI was successfully completed while maintaining shareholder valuebull All project contracts and permits were completed and executedbull Purchase of Partners working interest after execution of all Project agreementsbull Lead successful non-recourse financing of facility

PUNCAKJA YA POWER PROJECT

395 MW project consisting of 60 diesel generators 3x 65 MW coal fired units and one 60 mile long transmissionline located at the Freeport MacMoran goldcopper mine in Irian Jaya Indonesia

Responsible for contracts including power offtake operations and technical completion with Freeport andestablishing operating regimen Also played a senior role in the USD $500 million financing of the project

Harvie E Campbell Page 3

In addition Mr Campbell has undertaken senior roles in the development and financing of the following projects

Ft Nelson Transmission Line (BC)McMahon Cogeneration Project (BC)Cantarell Nitrogen Injection Project (power component)WEI Gang Power Project (Shanghai)Lake Superior PowerFt Frances CogenerationWhitby CogenBayside Power

Director Energreen Inc

nla110 MW520 MW30MW

110MW110 MW50MW280 MW

While Vice President Development for Westcoast Power Mr Campbell also acted for Westcoast on theBoard of Energreen a power related subsidiary of Alliance Pipeline

Manager Investment Services GroupWestcoast Energy IncVancouver BC

1994 to 1998

Established a single group responsible for the financial analysis commercial review and contracting of allcapital projects within Westcoast Energy including Westcoast Power Westcoast International and theWestcoast Business Development Group (mostly Pipeline and storage related investments) Supportedproject contract negotiations financial analysis and financing on a host of projects including powergeneration pipeline petrochemical and fertilizer projects

Supervisorl Financial AnalystWestcoast Energy IncVancouver BC

1984 to 1993

Harvie E Campbell Page 4

From joining Westcoast Energy in 1984 as a financial analyst and economist Mr Campbell heldsuccessively more senior roles in the areas of planning development and financial analysis Heparticipated in the acquisition of several small oil amp gas production companies ICG Utilities and UnionGas in the late 1980s and early 1990s

EDUCATION

bull MA Economics 1984Simon Fraser University at Burnaby Bc

bull BA (Honours) Economics 1982University of AlbertaEdmonton Alberta

Mr Campbell is a past President (and currently Director) of the Independent Power Association of BritishColumbia and past Director of the Canadian Institute of Energy and the Vancouver Rowing Club Heresides in Calgary with his wife Ines and three children

References Available on Request

KENNETH W SPINNER

3040- 400 - 4th Ave SWCalgary AB T2P OJ4

403-444-5578

Technicalproject management and development professional with 23 years in the energy industryExperienced in the review technical assessment and development of independent power projects havebeen involved in the development engineering and construction on over 1000 megawatts of powerplants and project managed over $500 million in powerenergy projects

Proficient in all aspects of power generation developments feasibility reviews project managementproject engineering EPC contract negotiations and administration Proven ability to direct successfuldevelopment project management teams and enhance co-operation from all levels of an organizationpartners stakeholders and government agencies to increase shareholder value and achieve business project development management results

PROFESSIONAL EXPERIENCE

V P EngineeringPristine Power Inc

2003 to Present

Presently providing project managementdevelopment and technical support for all power generationdevelopments and projects Responsible for preliminary development engineering coordination of allengineering procurement and construction and contract negotiation and administration activities withinthe company

PresidentSpinergy Services Inc

1999 to 2003

Providing power generation consulting and developmentmanagement services to various clients throughoutCanada specifically Alberta British Columbia Saskatchewan and Eastern Canada Involved in various gas-firedand biomass project developments ranging from 25 Megawatts to 450 Megawatts as project development advisorConducted feasibility studiesproposals and economic feasibility reviews on a wide range of power developmentsin the energy forestry and coal industries On going in-house developments include gas-fired cogenerationbiomass generation combined heatcooling power facilities and energy storage opportunities

Executive Director Vice President (ICPI)Manager New Ventures Business DevelopmentFletcher Challenge Energy (FCE) Calgary Alberta

]997 to 1999

As Executive Director Vice President of the 250 megawatt Island Cogeneration Project Inc (ICPI)jointly-managed development of the ICPI project on Vancouver Island to development completion Directed negotiationteams for the power purchase agreement with BC Hydro steam sales agreements with Fletcher ChallengeCanada Paper Mill the engineering and construction contract and project permits

Pale]KENNETH W SPINNER

PROFESSIONAL EXPERIENCE (Continued)

Project Highlights

bull Development phase of the ICPl was successfully completed while maintaining shareholder valuebull All project contracts and permits were completed and executedbull Managed development team in Vancouver consisting of multi-disciplinary professionals legal

environmental and engineering consultantsbull Guided the environmental permitting process and obtained project approvalbull FCEs working interest in ICPI was successfully sold after execution of all Project agreementsbull Project is presently in commercial operation

ISLAND COGENERATION PROJECT - 250 MW- CAMPBELL RIVER BC

Vice PresidentWest Windsor Power - (PLC Windsor Ltd)Northstar Energy Corporation Calgary Alberta

1994 to 1997

Vice President ofPLC Windsor Ltd and Northstar Energys principal representative on the partnershipmanagement committee directly responsible for the 120 megawatt West Windsor Power project in WindsorOntario Responsible for overall project management project financial analysis and project capital budget

Project Highlights

bull Administered the implementation of all project contracts including engineering and construction contractgas supply and transportation agreements steam sales power purchase agreements and directed financialclosing activities at loan conversion Project was under budget and started up successfully in 1996

bull Maximized project value by cost control budgeting scheduling maintaining initial contract values andoptimizing economic parameters

bull Involved in the negotiation and implementation a $100 million EPC turnkey contract for the constructionand start-up of the facility

bull Project was managed to completion which included mobilization commissioning commercial operationsperformance testing and conversion to term financing

Pa2e 2KENNETH W SPINNER

PROFESSIONAL EXPERIENCE (Continued)

WEST WINDSOR POWER - 120 MW - WINDSOR ONTARIO

Manager EngineeringPowerlink Corporation (Subsidiary of Northstar Energy Corp) Portland Oregon

1992 to ]994

Responsible for all technical management and support for power project development activities in Canada USAand other international regions Supported project contract negotiations on the West Windsor Power Projectmanaged the engineering construction contract and operating agreement negotiations

Manager Facilities Engineering Sr Project Engineer Process EngineerNorthstar Energy Corporation Dome Petroleum Ltd Hudsons Bay Oil and Gas LtdCalgary Alberta

1980 to ]992

Managed oil and gas facilities development in Alberta and independent power development in Canada and theUSA Responsible for project management and process engineering on various oil and gas facilities and pipelines

EDUCATION

bull Bachelor of Science Chemical Engineering (Honours) 1980Queens University at Kingston Ontario

bull Cogeneration Development Course 1992Kingston Ontario

bull Cogeneration Power Plant Design and Optimization 1991Boston Massachusetts

bull Business Management Financial and Evaluation Courses 1986 to 1997

Pale 3

Project Experience Chart

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsHarvie Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren BakerCampbell Power Project Utilities Washington CCGT Electric Harbour EPCOR Power Power Resource

Puget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Puncakjaya Duke Irian Jaya 395 MW Diesel coal Mitsubishi PT Freeport 1997 Richard E Richard EPower Project Energy Indonesia fired Indonesia Coleman Coleman

PT Freeport PT FreeportIndonesia IndonesiaJI H R Rasuna JI H R RasunaSaid Kav X-7 No Said Kav X-7 No6 6Plaza 89 12th Plaza 89 12thFloor FloorJakarta 12940 Jakarta 12940

Lake Superior Great Sault St 110 MW Natural GE Ontario 1993 Colin Clark Bill RalphPower Project Lakes Marie Ont GasDistiliate Electricity Great Lakes OEFC

Power Finance Corp Power amp Brascan 416-325-80577059415651

McMahon Duke Taylor BC 115 MW Natural Gas Westinghouse BC Hydro 1993 Duane Rae Dawn FarrellCogeneration Energy Duke Energy BC Hydro

ATCO 4036991551ATCO

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsJeff Myers Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren Baker

Power Project Utilitiesl Washington CCGT Electric Harbour EPCOR Power Power ResourcePuget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Liberty Power Reliant Philadelphia 568 MW Natural Gas GE Pacific Gas 2002 Greg Kennedy Nowa merchantProject Energy PA CCGT and Electric - Reliant Energy plant

National 713-497-7490Energy Group(receivership)

West Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Ken Spinner Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsWest Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Julia S Ciccaglione Curriculum Vitae

CURRICULUM VITAE

JULIA S CICCAGLIONEEnvironment Specialist

3040400 4th Avenue SWCalgary AB Canada T2P OJ4

Tel (403)444-5538 email jciccaglionepristinepowerca

CAREER BRIEF

An environment specialist with extensive experience in project management impact assessmentstakeholder consultation policy analysis and climate change Additional expertise in internationaldevelopment projects including project monitoring and stakeholder facilitation Excellent communicationorganisation and writing skills Technical background in the biophysical sciences and economics Projectperformance measurement experience using Results Based Management (RBM)

EDUCA TION

MSc Geography 1998Soil Erosion Assessment Soil and Water Nutrient Loss Analysis Watershed ManagementUniversity of Calgary Calgary Alberta Canada

BSc Geography 1994University of Calgary Calgary Alberta CanadaConcentration Biogeography geomorphology

BA Economics 1991University of Calgary Calgary Alberta CanadaConcentration Petroleum economics

PROFESSIONAL EXPERTISE

Environmental Project ManagementPolicy AnalysisRegulatory AnalysisStakeholder amp Public Consultation

Impact AssessmentSustainable DevelopmentClimate ChangeEnvironmental Management

CAREER HISTORY

Domestic

1998- Pristine Power Inc Calgary Vice President Environment and Emissions TradingPresent Responsible for overall environmental project management regulatory compliance public

policy input and management of Pristines greenhouse gas strategy

Suncurrent Industries Ltd Calgary Senior Emissions Portfolio ConsultantResponsible for overall management of Suncurrents greenhouse gas credit portfolio

2

Alberta Energy Company (AEC) Ltd Calgary Wetland Vegetation Scientist IRISEnvironmental Systems Responsible for the design of a long-term (20 yr) Boreal wetlandvegetation monitoring program to determine the effects of groundwater withdrawal on wetlandvegetation Data gathered from the monitoring program to be utilised by Alberta EnvironmentalProtection for resource management decision making

Syncrude Canada Limited Calgary Environment Specialist and Project Manager IRISEnvironmental Systems Managed and co-ordinated a team of scientists responsible for thedelineation of forest types into commercial and non-commercial stands Derived informationwas used as input into Syncrudes reclamation and mine area conservation plan Specificproject management activities included conducting a needs assessment budget preparationand creation of a Terms of Reference

Environmental Impact Assessment amp Policy Specialist IRIS Environmental SystemsResponsible for the completion of environmental impact assessment projects Responsibilitiesincluded the identification of impacts mitigations cumulative effects and the management andco-ordination of multidisciplinary scientific teams Extensive liasing with government agenciesPolicy analysis included integrating environmental policy and statutory requirements withdevelopment initiatives Additional responsibilities included extensive stakeholder and publicconsultation The following is a list of completed environmental impact assessments

Skiing Louise Limited Banff National Park An Environmental Screening Report for thepurpose of withdrawing water from the Pipestone River and Corral Creek to accommodatesnowmaking fire-fighting and domestic water use activities Report considerations includedidentifying river hydrologic regimes potential impacts to aquatic ecosystems mitigationprocedures and cumulative effects assessment

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts associated with improvements to water intake systems in the Pipestone River andCorral Creek Specific report considerations included identifying impacts to aquaticecosystems

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts related to terrain modifications and replacement of snowmaking infrastructure on theUpper Wiwaxy ski run

The Lake Louise Inn Banff National Park Environmental Screening Report for theconstruction of new commercial accommodation in Lake Louise

Skoki Lodge Banff National Park Environmental Screening Report for the construction ofadditional staff housing at the Skoki Lodge National Historic Site

The Banff Centre Banff National Park Environmental Screening Report for the submissionof an Area Redevelopment Plan The project considered a strategic assessment includedthe identification of impacts resulting from proposed developments or redevelopments on thecampus of The Banff Centre

Ski Marmot Basin Jasper National Park Canada Part of a multi-disciplinary teamresponsible for the completion of a Comprehensive Study for the development of a chairlift andski runs in the Eagle Ridge area of Marmot Basin

Ski Marmot Basin Jasper National Park Canada Environmental Screening Reportspertaining to the installation of new sewage treatment facilities improvements to surfacedrainage and subsurface drainage

3

1995-1998

1990

Legislation Analyst IRIS Environmental Systems Alberta Economic DevelopmentCalgary AB Review and analysis of Alberta Provincial and Canadian Federal legislation todetermine land use laws and identify areas within the province which may have potential forfuture tourism development This information was used in the development of maps illustratingcurrent land uses and areas of potential future tourism development in Alberta

University of Calgary Department of Geography Canada Instructor i) Taught introductorygeography Topics included climatology geomorphology soils and vegetation hydrology remotesensing and air photo interpretation ii) Taught a senior level course in introductory vascular plantidentification plant taxonomy introductory wildlife identification and habitat associations and plantand wildlife responses to disturbances specific to the Canadian Grasslands Aspen ParklandMontane Sub-Alpine Alpine and Boreal Forest Ecoregions

Petro Canada Resources Incorporated Calgary Canada Junior Land ManagementRepresentative Responsible for the review of land agreements governing the operation of oiland gas properties Conducted an economic evaluation and reconciliation of predicted gas pricesversus actual market prices Additional work included site inspections of reclaimed coal propertiesin northeastern British Columbia

International

1998- Cuba Climate Change Emissions Baseline and Monitoring Plan Department of ForeignPresent Affairs 2002 and IntI Trade (DFAIT) Canada Project Manager Suncurrent Industries Ltd

Responsible for managing a climate change emissions baseline study and monitoring planfocused on the implementation of renewable and energy efficient technologies (wind and solarenergy high efficiency micro-turbines) in Cuba Baseline study was in accordance with thoserequirements for a Clean Development Mechanism

Egypt Environment Theme Project - Canadian International Development Agency (CIDA)Environment and Performance Measurement Specialist IRIS Environmental SystemsMember of the Performance Measurement Advisory team for the bilateral CIDA-EgyptEnvironment Theme Project (7 year project) Responsibilities included the measurement ofenvironment project and environment theme results Results to be consistent with Government ofCanada - CIDA policy programming goals including contributing to sustainable development inEgypt and stakeholder involvement in development initiatives Results Based Management(RBM) used as a measurement tool

Zimbabwe Victoria Falls Environmental Planning and Capacity Enhancement Project -Canadian International Development Agency (CIDA) Environment and PerformanceMeasurement Specialist IRIS Environmental Systems An RBM facilitator in an iterativesustainable-development project in Victoria Falls to promote environmentally sustainablecommunities Project focused on improving the capacity of local partners to participate effectivelyin the preparation and implementation of the Victoria Falls Master Plan and Local DevelopmentPlans Specific responsibilities included the development and facilitation of an RBM stakeholderworkshop held in Victoria Falls Zimbabwe Workshop emphasized participatory approaches andthe inclusion of gender equality in the identification and measurement of results

Egypt Environment Theme Project Canadian International Development Agency (CIDA)PolicyProgram Analyst IRIS Environmental Systems Member of the policyprogramanalysis team conducting a trends analysis of CIDAs programming in Egypt This analysisserved as an input into CIDAs planning and design of the new Egypt Country DevelopmentProgram Framework (CDPF) Data was obtained by surveying identified stakeholders in Egyptand Canada Results of the trends analysis were then correlated with CIDAs Egypt CountryDevelopment Policy Framework to reconcile its effectiveness and provide input for its futuredirection

4

1996-1990

Governments of Chad and Cameroon - World Bank Panel Review of PipelineDevelopment Research Assistant IRIS Environmental Systems Research assistant to theManagerCoordinator of the Expert Panel for the review of literature pertaining to biodiversity andwildlands ecology in the African savannah tropical forests and marine ecosystems

St Vincent and the Grenadines Caribbean Soil Erosion Research on DeforestedWatershed Areas Environmental Scientist Project Manager and Principle investigator intothe loss of soil water and nutrients associated with banana cultivated areas Secondary focus ofthe research was aimed at developing a land use management plan incorporating conservationfarming practices and the use of social forestry in the conservation of soil on severely erodedsteep-land agricultural areas In consideration with the socio-economic status of the areaformulated recommendations for appropriate farming practices at the micro-scale level

St Vincent and the Grenadines Caribbean Man and the Biosphere ProjectUNESCOEnvironmental Scientist Assistant Project Supervisor and Liaison between the University ofCalgary and the St Vincent Forestry Department Responsible for the implementation of varioussoil erosion research studies aimed at the quantification of soil water and nutrient loss associatedwith agroforestry and forestry plantation areas

ENVIRONMENTAL POLICYChair of the Energy Recovery Generation (ERG) Subgroup Clean Air Strategic Alliance Alberta

Advisor Centre for EnergyERG Input Electricity and Alternative Energy Division BC Ministry of Energy and Mines

ERG Input Climate Change Offset System Environment CanadaERG Input Treatment of Clean Energy Natural Resources Canada

COUNTRIES WORK EXPERIENCECanada Egypt Zimbabwe St Vincent and the Grenadines Chad and Cameroon Cuba

5

Selected Permitting Reports

1 A Wetlands Monitoring Plan Foster Creek Area Cold Lake Air Weapons Range AB 2001 Reportprepared for Alberta Energy Company Ltd

2 A Strategic Assessment of The Banff Centre Area Redevelopment Plan Banff National Park AB2000 Environmental Screening Report prepared for The Banff Centre

3 Permit to Withdraw Water from the Pipestone River and Corral Creek for the Purposes ofSnowmaking Fire-Fighting and Domestic Water Use the Lake Louise Ski Area Banff National ParkAB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

4 Improvements to Water Intakes on the Pipestone River and Corral Creek the Lake Louise Ski AreaBanff National Park AB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

5 Proposed Development of a Chairliff and Ski Runs on Eagle Ridge the Marmot Basin Ski AreaJasper National Park AB 1999 Comprehensive Study Report prepared for Ski Marmot Basin

6 An Application for New Staff Accommodations at Skoki Lodge Banff National Park AB 2000Environmental Screening Report prepared for Skiing Louise Ltd

7 An Application for New Commercial Accommodations at the Lake Louise Inn Banff National ParkAB 2000 Report prepared for the Lake Louise Inn

8 Improvements to Surface Drainage at the Marmot Basin Ski Area Jasper National Park AB 1998Environmental Screening Report prepared for Ski Marmot Basin

9 Improvements to Subsurface Drainage at the Marmot Basin Ski Area Jasper National Park AB1998 Environmental Screening Report prepared for Ski Marmot Basin

10 Improvements to Sewage Treatment Facilities and Effluent Disposal at the Marmot Basin Ski AreaJasper National Park AB 1998 Environmental Screening Report prepared for Ski Marmot Basin

Other Reports

11 Legislative and Policy Factors Influencing Tourism Development in Alberta 2000 Report preparedfor Alberta Economic Development and Alberta Economic Development Authority TourismCommittee

12 Egypt Country Development Policy Framework (CDPF) Assessment 1999 Report prepared for theCanadian International Development Agency Hull Quebec

13 Egypt Country Development Policy Framework (CDPF) Assessment Presentation 1999Presentation prepared for the Canadian International Development Agency Hull Quebec

14 Monitoring Mission Reports Egypt Environment Theme Reports prepared for the CanadianInternational Development Agency Hull Quebec

15 A Pre-Disturbance Vegetation Classification for the Disturbed Portion of the Syncrude DevelopmentArea Mildred Lake AB 1998 Report prepared for Syncrude Canada Ltd

16 Characterization of Soil Erosion Processes and Nutrient Losses Associated with Previously ForestedAreas the Colonarie River Watershed St Vincent West Indies 1998 A Masters Thesis preparedfor the University of Calgary

6

Stakeholder Consultation

1 Zimbabwe-Canada Environmental Planning Exchange Mission 2001 Organized and coordinated anexchange mission held in Banff AB for the CIDA Zimbabwe Environmental Planning and CapacityEnhancement Project

2 Strategic Assessment of The Banff Centre Area Redevelopment Plan 2000 Conducted stakeholderconsultations via a public open house forum

3 Results Based Management as a Project Management Tool 1999 Conducted a workshop in VictoriaFalls Zimbabwe for the Environmental Planning and Capacity Enhancement Project

7

Neil StewartRR 3 SimcoeOntario CanadaN3Y 4K2

OBJECTIVE ProjectConstruction Management

emailphone

fax

nmsproj ectskwiccom519-426-2239519-426-2674

1991-Date

1990-1991

1988-1990

JPRomC1r amp CONsect1[RUCnON MIANAGEMJENT sectJERVJ[CJEsect

Project amp Construction Management services including Project DevelopmentProject strategy Contract negotiations Contract Management Industrial RelationsGovernment liaison Profit amp Loss accountability

Plans of execution project controls budgets planning evaluations safety labourrelations and business development Project amp Site management coordinationprocedures administration methods and site organization Managed andcoordinated information flow tofrom Client(s) Engineer(s) and Contractor(s)

Projects includeWestcoast Energy 55mw Whitby Cogen Bayside 280 mw RepowerEcodyne Ltd MOU contract management amp coordinationUnited Parcel Services Canada Hamilton Air Hub ProjectINCO Nickle Foam and Nickle Disc ProjectsBayer AG Nicklehydroxide and Tungsten Carbide ProjectsMacMillen Bloedel Secondary Fibre Recycling Project

Fluor Daniel Canada LtdResident Construction Manager Central Division

Provide support to Business Units for construction managementservicesresponsible for industrial relations safety quality personnel development andmethods Initiated and established field organizations roles and responsibilitiessite procedures fab shop contractorsupplier planning budgetsfinancial and clientrelations to support critical contract schedules

Projects includeProctor amp Gamble Ultra Project MFord Canada Winn 88 Paint PlantINCO S02 Abatement Project

Ellis Don LtdProject Manager Resident site manager accountable for the process coordinationof $500M GMSUZUKI (CAMI) grass roots automotive plant in Ingersoll ON

Directed 1800 unionized trades (peak workforce) and managed lump-sum projecton schedule and under budget Developed and maintained Oriental and NorthAmerican client trust relationships Surpassed project expectations in labourrelations and safety Profit and Loss accountability

1986-1988

1985-1986

1984-1985

1983-1984

1981-1983

1978-1981

1974-1978

1973-1974

1969-1973

EDUCATION

UMA SpantecGeneral SuperintendentDirected and supervised lump-sum contracts Interfaced with engineering andclient organizations to produce responsive quality services and safe profitablecontracts

Projects includedLabatts Brewers various capital projectsConsumers Glass hot amp cold end shut downsUnivofWaterloo construction management servicesDomtar paper board expansion

Glen Curtis Company Construction SuperintendentConstruction management of Canadian Occidentals 65m cfPdgrass roots sour gas plant in Mezeppa Alberta

Ennisteel Co Ltd Toronto ON Project SupervisorUltramars 1500 million barrel terminal

Self-employed OntarioShip yard construction amp generation facilities

Petrosar Inc Sarnia ON Area SuperintendentClient rep responsible for $650 Million HFOU project

Fluor Canada Corp Alberta Mechanical SupervisorAGCL 1200 tpd Methanol plantAquitaine Canada 650m cfPd sour gas plantEsso Canada Cold Lake Project amp Judy Creek

Arthur GMcKee Inc Nanticoke ON Area SupervisorTexaco 120000 bpd grass roots refinery

SteIco Inc Hamilton ON

JewittVallee Simcoe ONOntario Hydro 4000 MW Thermal generationStelco LEW steel plantDomtar Mill expansionTrent Valley Quarry modernization

MacMaster University 1976-77 (night school)Mohawk College 1971-72 (night school)

SELF DEVELOPMENT -project management-construction management-basic computers-industrial relations-WinWin strategies

-WHMIS-safety amp compensation-KT amp decisions-team management-personnel administration

PERSONAL

REFERENCES

DOB February 24 1950

On request

CITIZENSHIP Canadian

Cochrane Engineering Ltd

Statement of Qualifications

Power Generation Facilities

Cochrane Engineering Ltd200 - 1770 W7th Avenue

Vancouver Be V6J 4Y6Phone 604-736-5421 Fax 604-736-1519

Email receptioncochrane-groupca

COCHRAR

Cochrane Engineering LtdGeneral Qualifications

TABLE OF CONTENTS

Section

Section

Section

10 COMPANY BACKGROUND11 Multi-Disciplinary Design12 Quality Assurance

20 SUMMARY OF RECENT RELEVANT EXPERIENCE21 Recent Relevant Projects Completed22 Projects Currently in Progress23 Cochrane Group - Other Relevant Experience

30 ENGINEERINGmiddot TOOLS

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Sandhill Energy CenterAusti n Texas

Calpine Combined Cycle Power PlantGoldendale Washington

10 COMPANY BACKGROUND

The Cochrane Group of companies including Cochrane Engineeringprovides integrated engineering architecture planning and projectmanagement services for a wide variety of projects It was formed in1996 through the merger of Cochrane Engineering a Calgary firm inoperation since 1972 and the PBK Group which had providedarchitectural and engineering services in Vancouver since 1937 Ouraffiliation with the Cochrane Group affords us access to the expertiseof over 350 personnel consisting of project managers technicalpersonnel and administrative staff in six offices across Canada Italso lends access to other Cochrane Group firms including PBKArchitects Inc which has provided design services for many industrialprojects in Canada and abroad Cochrane Engineering and PBKArchitects have significant experience providing services for clients inthe power coal mining and process industries

Cochrane Engineerings power division has successfully exporteddesign services through out North and South America In the last twoyears this division has provided mechanical processinstrumentation architectural electrical civil and structural designservices for projects totaling over 1000 MW of power generationThe construction cost for these projects exceeds $1 billion

11 Multi-Disciplinary DesignCochrane Group is a fully integrated multi-disciplinary design groupservicing the power sector with in-house architectural capabilitiesGE7FA experience and combined cycle process experts enabling usto provide comprehensive one stop shopping The CochraneGroups multi-disciplinary design team includes

bull Cochrane Engineering Ltd andbull PBK Architects Inc

Cochrane Engineering Ltd is a multi-discipline engineering firmspecializing in the design of combined cycle power plants simplecycle power plants and industrial projects We also supplyengineering resources for PBK architects

PBK Architects Inc specializes in the design of industrial facilitiesoffices maintenance shops warehouses institutional buildings andrecreational sport facilities PBK provides the architectural servicesto Cochrane for our power projects Signature projects include BCPlace GM Place Horseshoe Bay Ferry Terminal upgrade and

1-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 11: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

Harvie E Campbell

FREDERICKSON POWER PROJECT

2493 MW F Class Combined Cycle facility located near Tacoma WashingtonRole Vice PresidentExecutive Director

Page 2

Responsibilities included all aspects of project development including PNW regional plan for WestcoastPower regional screen acquisition of the Frederickson site formed development team arranged projectconstruction gas transportation electrical transmission offtake contracts interconnection etc

Project Highlights

bull Project accorded First mover status during the PNW power boom in 20002001bull Placed 20 year tolling contracts with three regional PUDs Benton Franklin and Grays Harbourbull Arranged gas transportation on the Westcoast and Northwest Pipeline systems and electrical

transmission to Big Eddy amp John Daybull Project was under budget and ahead of schedulebull Oversaw partial sale to a partner and final sale of Duke (Westcoast) interest to Epcor Powerbull Project is presently in commercial operation

ISLAND COGENERA TION PROJECT

250 MW F class CC Cogen facility (Alstom Gas Turbine) located in Campbell River HCRole Vice President

Project Highlights

bull Development phase of the ICPI was successfully completed while maintaining shareholder valuebull All project contracts and permits were completed and executedbull Purchase of Partners working interest after execution of all Project agreementsbull Lead successful non-recourse financing of facility

PUNCAKJA YA POWER PROJECT

395 MW project consisting of 60 diesel generators 3x 65 MW coal fired units and one 60 mile long transmissionline located at the Freeport MacMoran goldcopper mine in Irian Jaya Indonesia

Responsible for contracts including power offtake operations and technical completion with Freeport andestablishing operating regimen Also played a senior role in the USD $500 million financing of the project

Harvie E Campbell Page 3

In addition Mr Campbell has undertaken senior roles in the development and financing of the following projects

Ft Nelson Transmission Line (BC)McMahon Cogeneration Project (BC)Cantarell Nitrogen Injection Project (power component)WEI Gang Power Project (Shanghai)Lake Superior PowerFt Frances CogenerationWhitby CogenBayside Power

Director Energreen Inc

nla110 MW520 MW30MW

110MW110 MW50MW280 MW

While Vice President Development for Westcoast Power Mr Campbell also acted for Westcoast on theBoard of Energreen a power related subsidiary of Alliance Pipeline

Manager Investment Services GroupWestcoast Energy IncVancouver BC

1994 to 1998

Established a single group responsible for the financial analysis commercial review and contracting of allcapital projects within Westcoast Energy including Westcoast Power Westcoast International and theWestcoast Business Development Group (mostly Pipeline and storage related investments) Supportedproject contract negotiations financial analysis and financing on a host of projects including powergeneration pipeline petrochemical and fertilizer projects

Supervisorl Financial AnalystWestcoast Energy IncVancouver BC

1984 to 1993

Harvie E Campbell Page 4

From joining Westcoast Energy in 1984 as a financial analyst and economist Mr Campbell heldsuccessively more senior roles in the areas of planning development and financial analysis Heparticipated in the acquisition of several small oil amp gas production companies ICG Utilities and UnionGas in the late 1980s and early 1990s

EDUCATION

bull MA Economics 1984Simon Fraser University at Burnaby Bc

bull BA (Honours) Economics 1982University of AlbertaEdmonton Alberta

Mr Campbell is a past President (and currently Director) of the Independent Power Association of BritishColumbia and past Director of the Canadian Institute of Energy and the Vancouver Rowing Club Heresides in Calgary with his wife Ines and three children

References Available on Request

KENNETH W SPINNER

3040- 400 - 4th Ave SWCalgary AB T2P OJ4

403-444-5578

Technicalproject management and development professional with 23 years in the energy industryExperienced in the review technical assessment and development of independent power projects havebeen involved in the development engineering and construction on over 1000 megawatts of powerplants and project managed over $500 million in powerenergy projects

Proficient in all aspects of power generation developments feasibility reviews project managementproject engineering EPC contract negotiations and administration Proven ability to direct successfuldevelopment project management teams and enhance co-operation from all levels of an organizationpartners stakeholders and government agencies to increase shareholder value and achieve business project development management results

PROFESSIONAL EXPERIENCE

V P EngineeringPristine Power Inc

2003 to Present

Presently providing project managementdevelopment and technical support for all power generationdevelopments and projects Responsible for preliminary development engineering coordination of allengineering procurement and construction and contract negotiation and administration activities withinthe company

PresidentSpinergy Services Inc

1999 to 2003

Providing power generation consulting and developmentmanagement services to various clients throughoutCanada specifically Alberta British Columbia Saskatchewan and Eastern Canada Involved in various gas-firedand biomass project developments ranging from 25 Megawatts to 450 Megawatts as project development advisorConducted feasibility studiesproposals and economic feasibility reviews on a wide range of power developmentsin the energy forestry and coal industries On going in-house developments include gas-fired cogenerationbiomass generation combined heatcooling power facilities and energy storage opportunities

Executive Director Vice President (ICPI)Manager New Ventures Business DevelopmentFletcher Challenge Energy (FCE) Calgary Alberta

]997 to 1999

As Executive Director Vice President of the 250 megawatt Island Cogeneration Project Inc (ICPI)jointly-managed development of the ICPI project on Vancouver Island to development completion Directed negotiationteams for the power purchase agreement with BC Hydro steam sales agreements with Fletcher ChallengeCanada Paper Mill the engineering and construction contract and project permits

Pale]KENNETH W SPINNER

PROFESSIONAL EXPERIENCE (Continued)

Project Highlights

bull Development phase of the ICPl was successfully completed while maintaining shareholder valuebull All project contracts and permits were completed and executedbull Managed development team in Vancouver consisting of multi-disciplinary professionals legal

environmental and engineering consultantsbull Guided the environmental permitting process and obtained project approvalbull FCEs working interest in ICPI was successfully sold after execution of all Project agreementsbull Project is presently in commercial operation

ISLAND COGENERATION PROJECT - 250 MW- CAMPBELL RIVER BC

Vice PresidentWest Windsor Power - (PLC Windsor Ltd)Northstar Energy Corporation Calgary Alberta

1994 to 1997

Vice President ofPLC Windsor Ltd and Northstar Energys principal representative on the partnershipmanagement committee directly responsible for the 120 megawatt West Windsor Power project in WindsorOntario Responsible for overall project management project financial analysis and project capital budget

Project Highlights

bull Administered the implementation of all project contracts including engineering and construction contractgas supply and transportation agreements steam sales power purchase agreements and directed financialclosing activities at loan conversion Project was under budget and started up successfully in 1996

bull Maximized project value by cost control budgeting scheduling maintaining initial contract values andoptimizing economic parameters

bull Involved in the negotiation and implementation a $100 million EPC turnkey contract for the constructionand start-up of the facility

bull Project was managed to completion which included mobilization commissioning commercial operationsperformance testing and conversion to term financing

Pa2e 2KENNETH W SPINNER

PROFESSIONAL EXPERIENCE (Continued)

WEST WINDSOR POWER - 120 MW - WINDSOR ONTARIO

Manager EngineeringPowerlink Corporation (Subsidiary of Northstar Energy Corp) Portland Oregon

1992 to ]994

Responsible for all technical management and support for power project development activities in Canada USAand other international regions Supported project contract negotiations on the West Windsor Power Projectmanaged the engineering construction contract and operating agreement negotiations

Manager Facilities Engineering Sr Project Engineer Process EngineerNorthstar Energy Corporation Dome Petroleum Ltd Hudsons Bay Oil and Gas LtdCalgary Alberta

1980 to ]992

Managed oil and gas facilities development in Alberta and independent power development in Canada and theUSA Responsible for project management and process engineering on various oil and gas facilities and pipelines

EDUCATION

bull Bachelor of Science Chemical Engineering (Honours) 1980Queens University at Kingston Ontario

bull Cogeneration Development Course 1992Kingston Ontario

bull Cogeneration Power Plant Design and Optimization 1991Boston Massachusetts

bull Business Management Financial and Evaluation Courses 1986 to 1997

Pale 3

Project Experience Chart

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsHarvie Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren BakerCampbell Power Project Utilities Washington CCGT Electric Harbour EPCOR Power Power Resource

Puget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Puncakjaya Duke Irian Jaya 395 MW Diesel coal Mitsubishi PT Freeport 1997 Richard E Richard EPower Project Energy Indonesia fired Indonesia Coleman Coleman

PT Freeport PT FreeportIndonesia IndonesiaJI H R Rasuna JI H R RasunaSaid Kav X-7 No Said Kav X-7 No6 6Plaza 89 12th Plaza 89 12thFloor FloorJakarta 12940 Jakarta 12940

Lake Superior Great Sault St 110 MW Natural GE Ontario 1993 Colin Clark Bill RalphPower Project Lakes Marie Ont GasDistiliate Electricity Great Lakes OEFC

Power Finance Corp Power amp Brascan 416-325-80577059415651

McMahon Duke Taylor BC 115 MW Natural Gas Westinghouse BC Hydro 1993 Duane Rae Dawn FarrellCogeneration Energy Duke Energy BC Hydro

ATCO 4036991551ATCO

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsJeff Myers Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren Baker

Power Project Utilitiesl Washington CCGT Electric Harbour EPCOR Power Power ResourcePuget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Liberty Power Reliant Philadelphia 568 MW Natural Gas GE Pacific Gas 2002 Greg Kennedy Nowa merchantProject Energy PA CCGT and Electric - Reliant Energy plant

National 713-497-7490Energy Group(receivership)

West Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Ken Spinner Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsWest Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Julia S Ciccaglione Curriculum Vitae

CURRICULUM VITAE

JULIA S CICCAGLIONEEnvironment Specialist

3040400 4th Avenue SWCalgary AB Canada T2P OJ4

Tel (403)444-5538 email jciccaglionepristinepowerca

CAREER BRIEF

An environment specialist with extensive experience in project management impact assessmentstakeholder consultation policy analysis and climate change Additional expertise in internationaldevelopment projects including project monitoring and stakeholder facilitation Excellent communicationorganisation and writing skills Technical background in the biophysical sciences and economics Projectperformance measurement experience using Results Based Management (RBM)

EDUCA TION

MSc Geography 1998Soil Erosion Assessment Soil and Water Nutrient Loss Analysis Watershed ManagementUniversity of Calgary Calgary Alberta Canada

BSc Geography 1994University of Calgary Calgary Alberta CanadaConcentration Biogeography geomorphology

BA Economics 1991University of Calgary Calgary Alberta CanadaConcentration Petroleum economics

PROFESSIONAL EXPERTISE

Environmental Project ManagementPolicy AnalysisRegulatory AnalysisStakeholder amp Public Consultation

Impact AssessmentSustainable DevelopmentClimate ChangeEnvironmental Management

CAREER HISTORY

Domestic

1998- Pristine Power Inc Calgary Vice President Environment and Emissions TradingPresent Responsible for overall environmental project management regulatory compliance public

policy input and management of Pristines greenhouse gas strategy

Suncurrent Industries Ltd Calgary Senior Emissions Portfolio ConsultantResponsible for overall management of Suncurrents greenhouse gas credit portfolio

2

Alberta Energy Company (AEC) Ltd Calgary Wetland Vegetation Scientist IRISEnvironmental Systems Responsible for the design of a long-term (20 yr) Boreal wetlandvegetation monitoring program to determine the effects of groundwater withdrawal on wetlandvegetation Data gathered from the monitoring program to be utilised by Alberta EnvironmentalProtection for resource management decision making

Syncrude Canada Limited Calgary Environment Specialist and Project Manager IRISEnvironmental Systems Managed and co-ordinated a team of scientists responsible for thedelineation of forest types into commercial and non-commercial stands Derived informationwas used as input into Syncrudes reclamation and mine area conservation plan Specificproject management activities included conducting a needs assessment budget preparationand creation of a Terms of Reference

Environmental Impact Assessment amp Policy Specialist IRIS Environmental SystemsResponsible for the completion of environmental impact assessment projects Responsibilitiesincluded the identification of impacts mitigations cumulative effects and the management andco-ordination of multidisciplinary scientific teams Extensive liasing with government agenciesPolicy analysis included integrating environmental policy and statutory requirements withdevelopment initiatives Additional responsibilities included extensive stakeholder and publicconsultation The following is a list of completed environmental impact assessments

Skiing Louise Limited Banff National Park An Environmental Screening Report for thepurpose of withdrawing water from the Pipestone River and Corral Creek to accommodatesnowmaking fire-fighting and domestic water use activities Report considerations includedidentifying river hydrologic regimes potential impacts to aquatic ecosystems mitigationprocedures and cumulative effects assessment

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts associated with improvements to water intake systems in the Pipestone River andCorral Creek Specific report considerations included identifying impacts to aquaticecosystems

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts related to terrain modifications and replacement of snowmaking infrastructure on theUpper Wiwaxy ski run

The Lake Louise Inn Banff National Park Environmental Screening Report for theconstruction of new commercial accommodation in Lake Louise

Skoki Lodge Banff National Park Environmental Screening Report for the construction ofadditional staff housing at the Skoki Lodge National Historic Site

The Banff Centre Banff National Park Environmental Screening Report for the submissionof an Area Redevelopment Plan The project considered a strategic assessment includedthe identification of impacts resulting from proposed developments or redevelopments on thecampus of The Banff Centre

Ski Marmot Basin Jasper National Park Canada Part of a multi-disciplinary teamresponsible for the completion of a Comprehensive Study for the development of a chairlift andski runs in the Eagle Ridge area of Marmot Basin

Ski Marmot Basin Jasper National Park Canada Environmental Screening Reportspertaining to the installation of new sewage treatment facilities improvements to surfacedrainage and subsurface drainage

3

1995-1998

1990

Legislation Analyst IRIS Environmental Systems Alberta Economic DevelopmentCalgary AB Review and analysis of Alberta Provincial and Canadian Federal legislation todetermine land use laws and identify areas within the province which may have potential forfuture tourism development This information was used in the development of maps illustratingcurrent land uses and areas of potential future tourism development in Alberta

University of Calgary Department of Geography Canada Instructor i) Taught introductorygeography Topics included climatology geomorphology soils and vegetation hydrology remotesensing and air photo interpretation ii) Taught a senior level course in introductory vascular plantidentification plant taxonomy introductory wildlife identification and habitat associations and plantand wildlife responses to disturbances specific to the Canadian Grasslands Aspen ParklandMontane Sub-Alpine Alpine and Boreal Forest Ecoregions

Petro Canada Resources Incorporated Calgary Canada Junior Land ManagementRepresentative Responsible for the review of land agreements governing the operation of oiland gas properties Conducted an economic evaluation and reconciliation of predicted gas pricesversus actual market prices Additional work included site inspections of reclaimed coal propertiesin northeastern British Columbia

International

1998- Cuba Climate Change Emissions Baseline and Monitoring Plan Department of ForeignPresent Affairs 2002 and IntI Trade (DFAIT) Canada Project Manager Suncurrent Industries Ltd

Responsible for managing a climate change emissions baseline study and monitoring planfocused on the implementation of renewable and energy efficient technologies (wind and solarenergy high efficiency micro-turbines) in Cuba Baseline study was in accordance with thoserequirements for a Clean Development Mechanism

Egypt Environment Theme Project - Canadian International Development Agency (CIDA)Environment and Performance Measurement Specialist IRIS Environmental SystemsMember of the Performance Measurement Advisory team for the bilateral CIDA-EgyptEnvironment Theme Project (7 year project) Responsibilities included the measurement ofenvironment project and environment theme results Results to be consistent with Government ofCanada - CIDA policy programming goals including contributing to sustainable development inEgypt and stakeholder involvement in development initiatives Results Based Management(RBM) used as a measurement tool

Zimbabwe Victoria Falls Environmental Planning and Capacity Enhancement Project -Canadian International Development Agency (CIDA) Environment and PerformanceMeasurement Specialist IRIS Environmental Systems An RBM facilitator in an iterativesustainable-development project in Victoria Falls to promote environmentally sustainablecommunities Project focused on improving the capacity of local partners to participate effectivelyin the preparation and implementation of the Victoria Falls Master Plan and Local DevelopmentPlans Specific responsibilities included the development and facilitation of an RBM stakeholderworkshop held in Victoria Falls Zimbabwe Workshop emphasized participatory approaches andthe inclusion of gender equality in the identification and measurement of results

Egypt Environment Theme Project Canadian International Development Agency (CIDA)PolicyProgram Analyst IRIS Environmental Systems Member of the policyprogramanalysis team conducting a trends analysis of CIDAs programming in Egypt This analysisserved as an input into CIDAs planning and design of the new Egypt Country DevelopmentProgram Framework (CDPF) Data was obtained by surveying identified stakeholders in Egyptand Canada Results of the trends analysis were then correlated with CIDAs Egypt CountryDevelopment Policy Framework to reconcile its effectiveness and provide input for its futuredirection

4

1996-1990

Governments of Chad and Cameroon - World Bank Panel Review of PipelineDevelopment Research Assistant IRIS Environmental Systems Research assistant to theManagerCoordinator of the Expert Panel for the review of literature pertaining to biodiversity andwildlands ecology in the African savannah tropical forests and marine ecosystems

St Vincent and the Grenadines Caribbean Soil Erosion Research on DeforestedWatershed Areas Environmental Scientist Project Manager and Principle investigator intothe loss of soil water and nutrients associated with banana cultivated areas Secondary focus ofthe research was aimed at developing a land use management plan incorporating conservationfarming practices and the use of social forestry in the conservation of soil on severely erodedsteep-land agricultural areas In consideration with the socio-economic status of the areaformulated recommendations for appropriate farming practices at the micro-scale level

St Vincent and the Grenadines Caribbean Man and the Biosphere ProjectUNESCOEnvironmental Scientist Assistant Project Supervisor and Liaison between the University ofCalgary and the St Vincent Forestry Department Responsible for the implementation of varioussoil erosion research studies aimed at the quantification of soil water and nutrient loss associatedwith agroforestry and forestry plantation areas

ENVIRONMENTAL POLICYChair of the Energy Recovery Generation (ERG) Subgroup Clean Air Strategic Alliance Alberta

Advisor Centre for EnergyERG Input Electricity and Alternative Energy Division BC Ministry of Energy and Mines

ERG Input Climate Change Offset System Environment CanadaERG Input Treatment of Clean Energy Natural Resources Canada

COUNTRIES WORK EXPERIENCECanada Egypt Zimbabwe St Vincent and the Grenadines Chad and Cameroon Cuba

5

Selected Permitting Reports

1 A Wetlands Monitoring Plan Foster Creek Area Cold Lake Air Weapons Range AB 2001 Reportprepared for Alberta Energy Company Ltd

2 A Strategic Assessment of The Banff Centre Area Redevelopment Plan Banff National Park AB2000 Environmental Screening Report prepared for The Banff Centre

3 Permit to Withdraw Water from the Pipestone River and Corral Creek for the Purposes ofSnowmaking Fire-Fighting and Domestic Water Use the Lake Louise Ski Area Banff National ParkAB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

4 Improvements to Water Intakes on the Pipestone River and Corral Creek the Lake Louise Ski AreaBanff National Park AB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

5 Proposed Development of a Chairliff and Ski Runs on Eagle Ridge the Marmot Basin Ski AreaJasper National Park AB 1999 Comprehensive Study Report prepared for Ski Marmot Basin

6 An Application for New Staff Accommodations at Skoki Lodge Banff National Park AB 2000Environmental Screening Report prepared for Skiing Louise Ltd

7 An Application for New Commercial Accommodations at the Lake Louise Inn Banff National ParkAB 2000 Report prepared for the Lake Louise Inn

8 Improvements to Surface Drainage at the Marmot Basin Ski Area Jasper National Park AB 1998Environmental Screening Report prepared for Ski Marmot Basin

9 Improvements to Subsurface Drainage at the Marmot Basin Ski Area Jasper National Park AB1998 Environmental Screening Report prepared for Ski Marmot Basin

10 Improvements to Sewage Treatment Facilities and Effluent Disposal at the Marmot Basin Ski AreaJasper National Park AB 1998 Environmental Screening Report prepared for Ski Marmot Basin

Other Reports

11 Legislative and Policy Factors Influencing Tourism Development in Alberta 2000 Report preparedfor Alberta Economic Development and Alberta Economic Development Authority TourismCommittee

12 Egypt Country Development Policy Framework (CDPF) Assessment 1999 Report prepared for theCanadian International Development Agency Hull Quebec

13 Egypt Country Development Policy Framework (CDPF) Assessment Presentation 1999Presentation prepared for the Canadian International Development Agency Hull Quebec

14 Monitoring Mission Reports Egypt Environment Theme Reports prepared for the CanadianInternational Development Agency Hull Quebec

15 A Pre-Disturbance Vegetation Classification for the Disturbed Portion of the Syncrude DevelopmentArea Mildred Lake AB 1998 Report prepared for Syncrude Canada Ltd

16 Characterization of Soil Erosion Processes and Nutrient Losses Associated with Previously ForestedAreas the Colonarie River Watershed St Vincent West Indies 1998 A Masters Thesis preparedfor the University of Calgary

6

Stakeholder Consultation

1 Zimbabwe-Canada Environmental Planning Exchange Mission 2001 Organized and coordinated anexchange mission held in Banff AB for the CIDA Zimbabwe Environmental Planning and CapacityEnhancement Project

2 Strategic Assessment of The Banff Centre Area Redevelopment Plan 2000 Conducted stakeholderconsultations via a public open house forum

3 Results Based Management as a Project Management Tool 1999 Conducted a workshop in VictoriaFalls Zimbabwe for the Environmental Planning and Capacity Enhancement Project

7

Neil StewartRR 3 SimcoeOntario CanadaN3Y 4K2

OBJECTIVE ProjectConstruction Management

emailphone

fax

nmsproj ectskwiccom519-426-2239519-426-2674

1991-Date

1990-1991

1988-1990

JPRomC1r amp CONsect1[RUCnON MIANAGEMJENT sectJERVJ[CJEsect

Project amp Construction Management services including Project DevelopmentProject strategy Contract negotiations Contract Management Industrial RelationsGovernment liaison Profit amp Loss accountability

Plans of execution project controls budgets planning evaluations safety labourrelations and business development Project amp Site management coordinationprocedures administration methods and site organization Managed andcoordinated information flow tofrom Client(s) Engineer(s) and Contractor(s)

Projects includeWestcoast Energy 55mw Whitby Cogen Bayside 280 mw RepowerEcodyne Ltd MOU contract management amp coordinationUnited Parcel Services Canada Hamilton Air Hub ProjectINCO Nickle Foam and Nickle Disc ProjectsBayer AG Nicklehydroxide and Tungsten Carbide ProjectsMacMillen Bloedel Secondary Fibre Recycling Project

Fluor Daniel Canada LtdResident Construction Manager Central Division

Provide support to Business Units for construction managementservicesresponsible for industrial relations safety quality personnel development andmethods Initiated and established field organizations roles and responsibilitiessite procedures fab shop contractorsupplier planning budgetsfinancial and clientrelations to support critical contract schedules

Projects includeProctor amp Gamble Ultra Project MFord Canada Winn 88 Paint PlantINCO S02 Abatement Project

Ellis Don LtdProject Manager Resident site manager accountable for the process coordinationof $500M GMSUZUKI (CAMI) grass roots automotive plant in Ingersoll ON

Directed 1800 unionized trades (peak workforce) and managed lump-sum projecton schedule and under budget Developed and maintained Oriental and NorthAmerican client trust relationships Surpassed project expectations in labourrelations and safety Profit and Loss accountability

1986-1988

1985-1986

1984-1985

1983-1984

1981-1983

1978-1981

1974-1978

1973-1974

1969-1973

EDUCATION

UMA SpantecGeneral SuperintendentDirected and supervised lump-sum contracts Interfaced with engineering andclient organizations to produce responsive quality services and safe profitablecontracts

Projects includedLabatts Brewers various capital projectsConsumers Glass hot amp cold end shut downsUnivofWaterloo construction management servicesDomtar paper board expansion

Glen Curtis Company Construction SuperintendentConstruction management of Canadian Occidentals 65m cfPdgrass roots sour gas plant in Mezeppa Alberta

Ennisteel Co Ltd Toronto ON Project SupervisorUltramars 1500 million barrel terminal

Self-employed OntarioShip yard construction amp generation facilities

Petrosar Inc Sarnia ON Area SuperintendentClient rep responsible for $650 Million HFOU project

Fluor Canada Corp Alberta Mechanical SupervisorAGCL 1200 tpd Methanol plantAquitaine Canada 650m cfPd sour gas plantEsso Canada Cold Lake Project amp Judy Creek

Arthur GMcKee Inc Nanticoke ON Area SupervisorTexaco 120000 bpd grass roots refinery

SteIco Inc Hamilton ON

JewittVallee Simcoe ONOntario Hydro 4000 MW Thermal generationStelco LEW steel plantDomtar Mill expansionTrent Valley Quarry modernization

MacMaster University 1976-77 (night school)Mohawk College 1971-72 (night school)

SELF DEVELOPMENT -project management-construction management-basic computers-industrial relations-WinWin strategies

-WHMIS-safety amp compensation-KT amp decisions-team management-personnel administration

PERSONAL

REFERENCES

DOB February 24 1950

On request

CITIZENSHIP Canadian

Cochrane Engineering Ltd

Statement of Qualifications

Power Generation Facilities

Cochrane Engineering Ltd200 - 1770 W7th Avenue

Vancouver Be V6J 4Y6Phone 604-736-5421 Fax 604-736-1519

Email receptioncochrane-groupca

COCHRAR

Cochrane Engineering LtdGeneral Qualifications

TABLE OF CONTENTS

Section

Section

Section

10 COMPANY BACKGROUND11 Multi-Disciplinary Design12 Quality Assurance

20 SUMMARY OF RECENT RELEVANT EXPERIENCE21 Recent Relevant Projects Completed22 Projects Currently in Progress23 Cochrane Group - Other Relevant Experience

30 ENGINEERINGmiddot TOOLS

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Sandhill Energy CenterAusti n Texas

Calpine Combined Cycle Power PlantGoldendale Washington

10 COMPANY BACKGROUND

The Cochrane Group of companies including Cochrane Engineeringprovides integrated engineering architecture planning and projectmanagement services for a wide variety of projects It was formed in1996 through the merger of Cochrane Engineering a Calgary firm inoperation since 1972 and the PBK Group which had providedarchitectural and engineering services in Vancouver since 1937 Ouraffiliation with the Cochrane Group affords us access to the expertiseof over 350 personnel consisting of project managers technicalpersonnel and administrative staff in six offices across Canada Italso lends access to other Cochrane Group firms including PBKArchitects Inc which has provided design services for many industrialprojects in Canada and abroad Cochrane Engineering and PBKArchitects have significant experience providing services for clients inthe power coal mining and process industries

Cochrane Engineerings power division has successfully exporteddesign services through out North and South America In the last twoyears this division has provided mechanical processinstrumentation architectural electrical civil and structural designservices for projects totaling over 1000 MW of power generationThe construction cost for these projects exceeds $1 billion

11 Multi-Disciplinary DesignCochrane Group is a fully integrated multi-disciplinary design groupservicing the power sector with in-house architectural capabilitiesGE7FA experience and combined cycle process experts enabling usto provide comprehensive one stop shopping The CochraneGroups multi-disciplinary design team includes

bull Cochrane Engineering Ltd andbull PBK Architects Inc

Cochrane Engineering Ltd is a multi-discipline engineering firmspecializing in the design of combined cycle power plants simplecycle power plants and industrial projects We also supplyengineering resources for PBK architects

PBK Architects Inc specializes in the design of industrial facilitiesoffices maintenance shops warehouses institutional buildings andrecreational sport facilities PBK provides the architectural servicesto Cochrane for our power projects Signature projects include BCPlace GM Place Horseshoe Bay Ferry Terminal upgrade and

1-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 12: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

Harvie E Campbell Page 3

In addition Mr Campbell has undertaken senior roles in the development and financing of the following projects

Ft Nelson Transmission Line (BC)McMahon Cogeneration Project (BC)Cantarell Nitrogen Injection Project (power component)WEI Gang Power Project (Shanghai)Lake Superior PowerFt Frances CogenerationWhitby CogenBayside Power

Director Energreen Inc

nla110 MW520 MW30MW

110MW110 MW50MW280 MW

While Vice President Development for Westcoast Power Mr Campbell also acted for Westcoast on theBoard of Energreen a power related subsidiary of Alliance Pipeline

Manager Investment Services GroupWestcoast Energy IncVancouver BC

1994 to 1998

Established a single group responsible for the financial analysis commercial review and contracting of allcapital projects within Westcoast Energy including Westcoast Power Westcoast International and theWestcoast Business Development Group (mostly Pipeline and storage related investments) Supportedproject contract negotiations financial analysis and financing on a host of projects including powergeneration pipeline petrochemical and fertilizer projects

Supervisorl Financial AnalystWestcoast Energy IncVancouver BC

1984 to 1993

Harvie E Campbell Page 4

From joining Westcoast Energy in 1984 as a financial analyst and economist Mr Campbell heldsuccessively more senior roles in the areas of planning development and financial analysis Heparticipated in the acquisition of several small oil amp gas production companies ICG Utilities and UnionGas in the late 1980s and early 1990s

EDUCATION

bull MA Economics 1984Simon Fraser University at Burnaby Bc

bull BA (Honours) Economics 1982University of AlbertaEdmonton Alberta

Mr Campbell is a past President (and currently Director) of the Independent Power Association of BritishColumbia and past Director of the Canadian Institute of Energy and the Vancouver Rowing Club Heresides in Calgary with his wife Ines and three children

References Available on Request

KENNETH W SPINNER

3040- 400 - 4th Ave SWCalgary AB T2P OJ4

403-444-5578

Technicalproject management and development professional with 23 years in the energy industryExperienced in the review technical assessment and development of independent power projects havebeen involved in the development engineering and construction on over 1000 megawatts of powerplants and project managed over $500 million in powerenergy projects

Proficient in all aspects of power generation developments feasibility reviews project managementproject engineering EPC contract negotiations and administration Proven ability to direct successfuldevelopment project management teams and enhance co-operation from all levels of an organizationpartners stakeholders and government agencies to increase shareholder value and achieve business project development management results

PROFESSIONAL EXPERIENCE

V P EngineeringPristine Power Inc

2003 to Present

Presently providing project managementdevelopment and technical support for all power generationdevelopments and projects Responsible for preliminary development engineering coordination of allengineering procurement and construction and contract negotiation and administration activities withinthe company

PresidentSpinergy Services Inc

1999 to 2003

Providing power generation consulting and developmentmanagement services to various clients throughoutCanada specifically Alberta British Columbia Saskatchewan and Eastern Canada Involved in various gas-firedand biomass project developments ranging from 25 Megawatts to 450 Megawatts as project development advisorConducted feasibility studiesproposals and economic feasibility reviews on a wide range of power developmentsin the energy forestry and coal industries On going in-house developments include gas-fired cogenerationbiomass generation combined heatcooling power facilities and energy storage opportunities

Executive Director Vice President (ICPI)Manager New Ventures Business DevelopmentFletcher Challenge Energy (FCE) Calgary Alberta

]997 to 1999

As Executive Director Vice President of the 250 megawatt Island Cogeneration Project Inc (ICPI)jointly-managed development of the ICPI project on Vancouver Island to development completion Directed negotiationteams for the power purchase agreement with BC Hydro steam sales agreements with Fletcher ChallengeCanada Paper Mill the engineering and construction contract and project permits

Pale]KENNETH W SPINNER

PROFESSIONAL EXPERIENCE (Continued)

Project Highlights

bull Development phase of the ICPl was successfully completed while maintaining shareholder valuebull All project contracts and permits were completed and executedbull Managed development team in Vancouver consisting of multi-disciplinary professionals legal

environmental and engineering consultantsbull Guided the environmental permitting process and obtained project approvalbull FCEs working interest in ICPI was successfully sold after execution of all Project agreementsbull Project is presently in commercial operation

ISLAND COGENERATION PROJECT - 250 MW- CAMPBELL RIVER BC

Vice PresidentWest Windsor Power - (PLC Windsor Ltd)Northstar Energy Corporation Calgary Alberta

1994 to 1997

Vice President ofPLC Windsor Ltd and Northstar Energys principal representative on the partnershipmanagement committee directly responsible for the 120 megawatt West Windsor Power project in WindsorOntario Responsible for overall project management project financial analysis and project capital budget

Project Highlights

bull Administered the implementation of all project contracts including engineering and construction contractgas supply and transportation agreements steam sales power purchase agreements and directed financialclosing activities at loan conversion Project was under budget and started up successfully in 1996

bull Maximized project value by cost control budgeting scheduling maintaining initial contract values andoptimizing economic parameters

bull Involved in the negotiation and implementation a $100 million EPC turnkey contract for the constructionand start-up of the facility

bull Project was managed to completion which included mobilization commissioning commercial operationsperformance testing and conversion to term financing

Pa2e 2KENNETH W SPINNER

PROFESSIONAL EXPERIENCE (Continued)

WEST WINDSOR POWER - 120 MW - WINDSOR ONTARIO

Manager EngineeringPowerlink Corporation (Subsidiary of Northstar Energy Corp) Portland Oregon

1992 to ]994

Responsible for all technical management and support for power project development activities in Canada USAand other international regions Supported project contract negotiations on the West Windsor Power Projectmanaged the engineering construction contract and operating agreement negotiations

Manager Facilities Engineering Sr Project Engineer Process EngineerNorthstar Energy Corporation Dome Petroleum Ltd Hudsons Bay Oil and Gas LtdCalgary Alberta

1980 to ]992

Managed oil and gas facilities development in Alberta and independent power development in Canada and theUSA Responsible for project management and process engineering on various oil and gas facilities and pipelines

EDUCATION

bull Bachelor of Science Chemical Engineering (Honours) 1980Queens University at Kingston Ontario

bull Cogeneration Development Course 1992Kingston Ontario

bull Cogeneration Power Plant Design and Optimization 1991Boston Massachusetts

bull Business Management Financial and Evaluation Courses 1986 to 1997

Pale 3

Project Experience Chart

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsHarvie Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren BakerCampbell Power Project Utilities Washington CCGT Electric Harbour EPCOR Power Power Resource

Puget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Puncakjaya Duke Irian Jaya 395 MW Diesel coal Mitsubishi PT Freeport 1997 Richard E Richard EPower Project Energy Indonesia fired Indonesia Coleman Coleman

PT Freeport PT FreeportIndonesia IndonesiaJI H R Rasuna JI H R RasunaSaid Kav X-7 No Said Kav X-7 No6 6Plaza 89 12th Plaza 89 12thFloor FloorJakarta 12940 Jakarta 12940

Lake Superior Great Sault St 110 MW Natural GE Ontario 1993 Colin Clark Bill RalphPower Project Lakes Marie Ont GasDistiliate Electricity Great Lakes OEFC

Power Finance Corp Power amp Brascan 416-325-80577059415651

McMahon Duke Taylor BC 115 MW Natural Gas Westinghouse BC Hydro 1993 Duane Rae Dawn FarrellCogeneration Energy Duke Energy BC Hydro

ATCO 4036991551ATCO

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsJeff Myers Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren Baker

Power Project Utilitiesl Washington CCGT Electric Harbour EPCOR Power Power ResourcePuget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Liberty Power Reliant Philadelphia 568 MW Natural Gas GE Pacific Gas 2002 Greg Kennedy Nowa merchantProject Energy PA CCGT and Electric - Reliant Energy plant

National 713-497-7490Energy Group(receivership)

West Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Ken Spinner Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsWest Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Julia S Ciccaglione Curriculum Vitae

CURRICULUM VITAE

JULIA S CICCAGLIONEEnvironment Specialist

3040400 4th Avenue SWCalgary AB Canada T2P OJ4

Tel (403)444-5538 email jciccaglionepristinepowerca

CAREER BRIEF

An environment specialist with extensive experience in project management impact assessmentstakeholder consultation policy analysis and climate change Additional expertise in internationaldevelopment projects including project monitoring and stakeholder facilitation Excellent communicationorganisation and writing skills Technical background in the biophysical sciences and economics Projectperformance measurement experience using Results Based Management (RBM)

EDUCA TION

MSc Geography 1998Soil Erosion Assessment Soil and Water Nutrient Loss Analysis Watershed ManagementUniversity of Calgary Calgary Alberta Canada

BSc Geography 1994University of Calgary Calgary Alberta CanadaConcentration Biogeography geomorphology

BA Economics 1991University of Calgary Calgary Alberta CanadaConcentration Petroleum economics

PROFESSIONAL EXPERTISE

Environmental Project ManagementPolicy AnalysisRegulatory AnalysisStakeholder amp Public Consultation

Impact AssessmentSustainable DevelopmentClimate ChangeEnvironmental Management

CAREER HISTORY

Domestic

1998- Pristine Power Inc Calgary Vice President Environment and Emissions TradingPresent Responsible for overall environmental project management regulatory compliance public

policy input and management of Pristines greenhouse gas strategy

Suncurrent Industries Ltd Calgary Senior Emissions Portfolio ConsultantResponsible for overall management of Suncurrents greenhouse gas credit portfolio

2

Alberta Energy Company (AEC) Ltd Calgary Wetland Vegetation Scientist IRISEnvironmental Systems Responsible for the design of a long-term (20 yr) Boreal wetlandvegetation monitoring program to determine the effects of groundwater withdrawal on wetlandvegetation Data gathered from the monitoring program to be utilised by Alberta EnvironmentalProtection for resource management decision making

Syncrude Canada Limited Calgary Environment Specialist and Project Manager IRISEnvironmental Systems Managed and co-ordinated a team of scientists responsible for thedelineation of forest types into commercial and non-commercial stands Derived informationwas used as input into Syncrudes reclamation and mine area conservation plan Specificproject management activities included conducting a needs assessment budget preparationand creation of a Terms of Reference

Environmental Impact Assessment amp Policy Specialist IRIS Environmental SystemsResponsible for the completion of environmental impact assessment projects Responsibilitiesincluded the identification of impacts mitigations cumulative effects and the management andco-ordination of multidisciplinary scientific teams Extensive liasing with government agenciesPolicy analysis included integrating environmental policy and statutory requirements withdevelopment initiatives Additional responsibilities included extensive stakeholder and publicconsultation The following is a list of completed environmental impact assessments

Skiing Louise Limited Banff National Park An Environmental Screening Report for thepurpose of withdrawing water from the Pipestone River and Corral Creek to accommodatesnowmaking fire-fighting and domestic water use activities Report considerations includedidentifying river hydrologic regimes potential impacts to aquatic ecosystems mitigationprocedures and cumulative effects assessment

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts associated with improvements to water intake systems in the Pipestone River andCorral Creek Specific report considerations included identifying impacts to aquaticecosystems

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts related to terrain modifications and replacement of snowmaking infrastructure on theUpper Wiwaxy ski run

The Lake Louise Inn Banff National Park Environmental Screening Report for theconstruction of new commercial accommodation in Lake Louise

Skoki Lodge Banff National Park Environmental Screening Report for the construction ofadditional staff housing at the Skoki Lodge National Historic Site

The Banff Centre Banff National Park Environmental Screening Report for the submissionof an Area Redevelopment Plan The project considered a strategic assessment includedthe identification of impacts resulting from proposed developments or redevelopments on thecampus of The Banff Centre

Ski Marmot Basin Jasper National Park Canada Part of a multi-disciplinary teamresponsible for the completion of a Comprehensive Study for the development of a chairlift andski runs in the Eagle Ridge area of Marmot Basin

Ski Marmot Basin Jasper National Park Canada Environmental Screening Reportspertaining to the installation of new sewage treatment facilities improvements to surfacedrainage and subsurface drainage

3

1995-1998

1990

Legislation Analyst IRIS Environmental Systems Alberta Economic DevelopmentCalgary AB Review and analysis of Alberta Provincial and Canadian Federal legislation todetermine land use laws and identify areas within the province which may have potential forfuture tourism development This information was used in the development of maps illustratingcurrent land uses and areas of potential future tourism development in Alberta

University of Calgary Department of Geography Canada Instructor i) Taught introductorygeography Topics included climatology geomorphology soils and vegetation hydrology remotesensing and air photo interpretation ii) Taught a senior level course in introductory vascular plantidentification plant taxonomy introductory wildlife identification and habitat associations and plantand wildlife responses to disturbances specific to the Canadian Grasslands Aspen ParklandMontane Sub-Alpine Alpine and Boreal Forest Ecoregions

Petro Canada Resources Incorporated Calgary Canada Junior Land ManagementRepresentative Responsible for the review of land agreements governing the operation of oiland gas properties Conducted an economic evaluation and reconciliation of predicted gas pricesversus actual market prices Additional work included site inspections of reclaimed coal propertiesin northeastern British Columbia

International

1998- Cuba Climate Change Emissions Baseline and Monitoring Plan Department of ForeignPresent Affairs 2002 and IntI Trade (DFAIT) Canada Project Manager Suncurrent Industries Ltd

Responsible for managing a climate change emissions baseline study and monitoring planfocused on the implementation of renewable and energy efficient technologies (wind and solarenergy high efficiency micro-turbines) in Cuba Baseline study was in accordance with thoserequirements for a Clean Development Mechanism

Egypt Environment Theme Project - Canadian International Development Agency (CIDA)Environment and Performance Measurement Specialist IRIS Environmental SystemsMember of the Performance Measurement Advisory team for the bilateral CIDA-EgyptEnvironment Theme Project (7 year project) Responsibilities included the measurement ofenvironment project and environment theme results Results to be consistent with Government ofCanada - CIDA policy programming goals including contributing to sustainable development inEgypt and stakeholder involvement in development initiatives Results Based Management(RBM) used as a measurement tool

Zimbabwe Victoria Falls Environmental Planning and Capacity Enhancement Project -Canadian International Development Agency (CIDA) Environment and PerformanceMeasurement Specialist IRIS Environmental Systems An RBM facilitator in an iterativesustainable-development project in Victoria Falls to promote environmentally sustainablecommunities Project focused on improving the capacity of local partners to participate effectivelyin the preparation and implementation of the Victoria Falls Master Plan and Local DevelopmentPlans Specific responsibilities included the development and facilitation of an RBM stakeholderworkshop held in Victoria Falls Zimbabwe Workshop emphasized participatory approaches andthe inclusion of gender equality in the identification and measurement of results

Egypt Environment Theme Project Canadian International Development Agency (CIDA)PolicyProgram Analyst IRIS Environmental Systems Member of the policyprogramanalysis team conducting a trends analysis of CIDAs programming in Egypt This analysisserved as an input into CIDAs planning and design of the new Egypt Country DevelopmentProgram Framework (CDPF) Data was obtained by surveying identified stakeholders in Egyptand Canada Results of the trends analysis were then correlated with CIDAs Egypt CountryDevelopment Policy Framework to reconcile its effectiveness and provide input for its futuredirection

4

1996-1990

Governments of Chad and Cameroon - World Bank Panel Review of PipelineDevelopment Research Assistant IRIS Environmental Systems Research assistant to theManagerCoordinator of the Expert Panel for the review of literature pertaining to biodiversity andwildlands ecology in the African savannah tropical forests and marine ecosystems

St Vincent and the Grenadines Caribbean Soil Erosion Research on DeforestedWatershed Areas Environmental Scientist Project Manager and Principle investigator intothe loss of soil water and nutrients associated with banana cultivated areas Secondary focus ofthe research was aimed at developing a land use management plan incorporating conservationfarming practices and the use of social forestry in the conservation of soil on severely erodedsteep-land agricultural areas In consideration with the socio-economic status of the areaformulated recommendations for appropriate farming practices at the micro-scale level

St Vincent and the Grenadines Caribbean Man and the Biosphere ProjectUNESCOEnvironmental Scientist Assistant Project Supervisor and Liaison between the University ofCalgary and the St Vincent Forestry Department Responsible for the implementation of varioussoil erosion research studies aimed at the quantification of soil water and nutrient loss associatedwith agroforestry and forestry plantation areas

ENVIRONMENTAL POLICYChair of the Energy Recovery Generation (ERG) Subgroup Clean Air Strategic Alliance Alberta

Advisor Centre for EnergyERG Input Electricity and Alternative Energy Division BC Ministry of Energy and Mines

ERG Input Climate Change Offset System Environment CanadaERG Input Treatment of Clean Energy Natural Resources Canada

COUNTRIES WORK EXPERIENCECanada Egypt Zimbabwe St Vincent and the Grenadines Chad and Cameroon Cuba

5

Selected Permitting Reports

1 A Wetlands Monitoring Plan Foster Creek Area Cold Lake Air Weapons Range AB 2001 Reportprepared for Alberta Energy Company Ltd

2 A Strategic Assessment of The Banff Centre Area Redevelopment Plan Banff National Park AB2000 Environmental Screening Report prepared for The Banff Centre

3 Permit to Withdraw Water from the Pipestone River and Corral Creek for the Purposes ofSnowmaking Fire-Fighting and Domestic Water Use the Lake Louise Ski Area Banff National ParkAB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

4 Improvements to Water Intakes on the Pipestone River and Corral Creek the Lake Louise Ski AreaBanff National Park AB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

5 Proposed Development of a Chairliff and Ski Runs on Eagle Ridge the Marmot Basin Ski AreaJasper National Park AB 1999 Comprehensive Study Report prepared for Ski Marmot Basin

6 An Application for New Staff Accommodations at Skoki Lodge Banff National Park AB 2000Environmental Screening Report prepared for Skiing Louise Ltd

7 An Application for New Commercial Accommodations at the Lake Louise Inn Banff National ParkAB 2000 Report prepared for the Lake Louise Inn

8 Improvements to Surface Drainage at the Marmot Basin Ski Area Jasper National Park AB 1998Environmental Screening Report prepared for Ski Marmot Basin

9 Improvements to Subsurface Drainage at the Marmot Basin Ski Area Jasper National Park AB1998 Environmental Screening Report prepared for Ski Marmot Basin

10 Improvements to Sewage Treatment Facilities and Effluent Disposal at the Marmot Basin Ski AreaJasper National Park AB 1998 Environmental Screening Report prepared for Ski Marmot Basin

Other Reports

11 Legislative and Policy Factors Influencing Tourism Development in Alberta 2000 Report preparedfor Alberta Economic Development and Alberta Economic Development Authority TourismCommittee

12 Egypt Country Development Policy Framework (CDPF) Assessment 1999 Report prepared for theCanadian International Development Agency Hull Quebec

13 Egypt Country Development Policy Framework (CDPF) Assessment Presentation 1999Presentation prepared for the Canadian International Development Agency Hull Quebec

14 Monitoring Mission Reports Egypt Environment Theme Reports prepared for the CanadianInternational Development Agency Hull Quebec

15 A Pre-Disturbance Vegetation Classification for the Disturbed Portion of the Syncrude DevelopmentArea Mildred Lake AB 1998 Report prepared for Syncrude Canada Ltd

16 Characterization of Soil Erosion Processes and Nutrient Losses Associated with Previously ForestedAreas the Colonarie River Watershed St Vincent West Indies 1998 A Masters Thesis preparedfor the University of Calgary

6

Stakeholder Consultation

1 Zimbabwe-Canada Environmental Planning Exchange Mission 2001 Organized and coordinated anexchange mission held in Banff AB for the CIDA Zimbabwe Environmental Planning and CapacityEnhancement Project

2 Strategic Assessment of The Banff Centre Area Redevelopment Plan 2000 Conducted stakeholderconsultations via a public open house forum

3 Results Based Management as a Project Management Tool 1999 Conducted a workshop in VictoriaFalls Zimbabwe for the Environmental Planning and Capacity Enhancement Project

7

Neil StewartRR 3 SimcoeOntario CanadaN3Y 4K2

OBJECTIVE ProjectConstruction Management

emailphone

fax

nmsproj ectskwiccom519-426-2239519-426-2674

1991-Date

1990-1991

1988-1990

JPRomC1r amp CONsect1[RUCnON MIANAGEMJENT sectJERVJ[CJEsect

Project amp Construction Management services including Project DevelopmentProject strategy Contract negotiations Contract Management Industrial RelationsGovernment liaison Profit amp Loss accountability

Plans of execution project controls budgets planning evaluations safety labourrelations and business development Project amp Site management coordinationprocedures administration methods and site organization Managed andcoordinated information flow tofrom Client(s) Engineer(s) and Contractor(s)

Projects includeWestcoast Energy 55mw Whitby Cogen Bayside 280 mw RepowerEcodyne Ltd MOU contract management amp coordinationUnited Parcel Services Canada Hamilton Air Hub ProjectINCO Nickle Foam and Nickle Disc ProjectsBayer AG Nicklehydroxide and Tungsten Carbide ProjectsMacMillen Bloedel Secondary Fibre Recycling Project

Fluor Daniel Canada LtdResident Construction Manager Central Division

Provide support to Business Units for construction managementservicesresponsible for industrial relations safety quality personnel development andmethods Initiated and established field organizations roles and responsibilitiessite procedures fab shop contractorsupplier planning budgetsfinancial and clientrelations to support critical contract schedules

Projects includeProctor amp Gamble Ultra Project MFord Canada Winn 88 Paint PlantINCO S02 Abatement Project

Ellis Don LtdProject Manager Resident site manager accountable for the process coordinationof $500M GMSUZUKI (CAMI) grass roots automotive plant in Ingersoll ON

Directed 1800 unionized trades (peak workforce) and managed lump-sum projecton schedule and under budget Developed and maintained Oriental and NorthAmerican client trust relationships Surpassed project expectations in labourrelations and safety Profit and Loss accountability

1986-1988

1985-1986

1984-1985

1983-1984

1981-1983

1978-1981

1974-1978

1973-1974

1969-1973

EDUCATION

UMA SpantecGeneral SuperintendentDirected and supervised lump-sum contracts Interfaced with engineering andclient organizations to produce responsive quality services and safe profitablecontracts

Projects includedLabatts Brewers various capital projectsConsumers Glass hot amp cold end shut downsUnivofWaterloo construction management servicesDomtar paper board expansion

Glen Curtis Company Construction SuperintendentConstruction management of Canadian Occidentals 65m cfPdgrass roots sour gas plant in Mezeppa Alberta

Ennisteel Co Ltd Toronto ON Project SupervisorUltramars 1500 million barrel terminal

Self-employed OntarioShip yard construction amp generation facilities

Petrosar Inc Sarnia ON Area SuperintendentClient rep responsible for $650 Million HFOU project

Fluor Canada Corp Alberta Mechanical SupervisorAGCL 1200 tpd Methanol plantAquitaine Canada 650m cfPd sour gas plantEsso Canada Cold Lake Project amp Judy Creek

Arthur GMcKee Inc Nanticoke ON Area SupervisorTexaco 120000 bpd grass roots refinery

SteIco Inc Hamilton ON

JewittVallee Simcoe ONOntario Hydro 4000 MW Thermal generationStelco LEW steel plantDomtar Mill expansionTrent Valley Quarry modernization

MacMaster University 1976-77 (night school)Mohawk College 1971-72 (night school)

SELF DEVELOPMENT -project management-construction management-basic computers-industrial relations-WinWin strategies

-WHMIS-safety amp compensation-KT amp decisions-team management-personnel administration

PERSONAL

REFERENCES

DOB February 24 1950

On request

CITIZENSHIP Canadian

Cochrane Engineering Ltd

Statement of Qualifications

Power Generation Facilities

Cochrane Engineering Ltd200 - 1770 W7th Avenue

Vancouver Be V6J 4Y6Phone 604-736-5421 Fax 604-736-1519

Email receptioncochrane-groupca

COCHRAR

Cochrane Engineering LtdGeneral Qualifications

TABLE OF CONTENTS

Section

Section

Section

10 COMPANY BACKGROUND11 Multi-Disciplinary Design12 Quality Assurance

20 SUMMARY OF RECENT RELEVANT EXPERIENCE21 Recent Relevant Projects Completed22 Projects Currently in Progress23 Cochrane Group - Other Relevant Experience

30 ENGINEERINGmiddot TOOLS

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Sandhill Energy CenterAusti n Texas

Calpine Combined Cycle Power PlantGoldendale Washington

10 COMPANY BACKGROUND

The Cochrane Group of companies including Cochrane Engineeringprovides integrated engineering architecture planning and projectmanagement services for a wide variety of projects It was formed in1996 through the merger of Cochrane Engineering a Calgary firm inoperation since 1972 and the PBK Group which had providedarchitectural and engineering services in Vancouver since 1937 Ouraffiliation with the Cochrane Group affords us access to the expertiseof over 350 personnel consisting of project managers technicalpersonnel and administrative staff in six offices across Canada Italso lends access to other Cochrane Group firms including PBKArchitects Inc which has provided design services for many industrialprojects in Canada and abroad Cochrane Engineering and PBKArchitects have significant experience providing services for clients inthe power coal mining and process industries

Cochrane Engineerings power division has successfully exporteddesign services through out North and South America In the last twoyears this division has provided mechanical processinstrumentation architectural electrical civil and structural designservices for projects totaling over 1000 MW of power generationThe construction cost for these projects exceeds $1 billion

11 Multi-Disciplinary DesignCochrane Group is a fully integrated multi-disciplinary design groupservicing the power sector with in-house architectural capabilitiesGE7FA experience and combined cycle process experts enabling usto provide comprehensive one stop shopping The CochraneGroups multi-disciplinary design team includes

bull Cochrane Engineering Ltd andbull PBK Architects Inc

Cochrane Engineering Ltd is a multi-discipline engineering firmspecializing in the design of combined cycle power plants simplecycle power plants and industrial projects We also supplyengineering resources for PBK architects

PBK Architects Inc specializes in the design of industrial facilitiesoffices maintenance shops warehouses institutional buildings andrecreational sport facilities PBK provides the architectural servicesto Cochrane for our power projects Signature projects include BCPlace GM Place Horseshoe Bay Ferry Terminal upgrade and

1-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 13: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

Harvie E Campbell Page 4

From joining Westcoast Energy in 1984 as a financial analyst and economist Mr Campbell heldsuccessively more senior roles in the areas of planning development and financial analysis Heparticipated in the acquisition of several small oil amp gas production companies ICG Utilities and UnionGas in the late 1980s and early 1990s

EDUCATION

bull MA Economics 1984Simon Fraser University at Burnaby Bc

bull BA (Honours) Economics 1982University of AlbertaEdmonton Alberta

Mr Campbell is a past President (and currently Director) of the Independent Power Association of BritishColumbia and past Director of the Canadian Institute of Energy and the Vancouver Rowing Club Heresides in Calgary with his wife Ines and three children

References Available on Request

KENNETH W SPINNER

3040- 400 - 4th Ave SWCalgary AB T2P OJ4

403-444-5578

Technicalproject management and development professional with 23 years in the energy industryExperienced in the review technical assessment and development of independent power projects havebeen involved in the development engineering and construction on over 1000 megawatts of powerplants and project managed over $500 million in powerenergy projects

Proficient in all aspects of power generation developments feasibility reviews project managementproject engineering EPC contract negotiations and administration Proven ability to direct successfuldevelopment project management teams and enhance co-operation from all levels of an organizationpartners stakeholders and government agencies to increase shareholder value and achieve business project development management results

PROFESSIONAL EXPERIENCE

V P EngineeringPristine Power Inc

2003 to Present

Presently providing project managementdevelopment and technical support for all power generationdevelopments and projects Responsible for preliminary development engineering coordination of allengineering procurement and construction and contract negotiation and administration activities withinthe company

PresidentSpinergy Services Inc

1999 to 2003

Providing power generation consulting and developmentmanagement services to various clients throughoutCanada specifically Alberta British Columbia Saskatchewan and Eastern Canada Involved in various gas-firedand biomass project developments ranging from 25 Megawatts to 450 Megawatts as project development advisorConducted feasibility studiesproposals and economic feasibility reviews on a wide range of power developmentsin the energy forestry and coal industries On going in-house developments include gas-fired cogenerationbiomass generation combined heatcooling power facilities and energy storage opportunities

Executive Director Vice President (ICPI)Manager New Ventures Business DevelopmentFletcher Challenge Energy (FCE) Calgary Alberta

]997 to 1999

As Executive Director Vice President of the 250 megawatt Island Cogeneration Project Inc (ICPI)jointly-managed development of the ICPI project on Vancouver Island to development completion Directed negotiationteams for the power purchase agreement with BC Hydro steam sales agreements with Fletcher ChallengeCanada Paper Mill the engineering and construction contract and project permits

Pale]KENNETH W SPINNER

PROFESSIONAL EXPERIENCE (Continued)

Project Highlights

bull Development phase of the ICPl was successfully completed while maintaining shareholder valuebull All project contracts and permits were completed and executedbull Managed development team in Vancouver consisting of multi-disciplinary professionals legal

environmental and engineering consultantsbull Guided the environmental permitting process and obtained project approvalbull FCEs working interest in ICPI was successfully sold after execution of all Project agreementsbull Project is presently in commercial operation

ISLAND COGENERATION PROJECT - 250 MW- CAMPBELL RIVER BC

Vice PresidentWest Windsor Power - (PLC Windsor Ltd)Northstar Energy Corporation Calgary Alberta

1994 to 1997

Vice President ofPLC Windsor Ltd and Northstar Energys principal representative on the partnershipmanagement committee directly responsible for the 120 megawatt West Windsor Power project in WindsorOntario Responsible for overall project management project financial analysis and project capital budget

Project Highlights

bull Administered the implementation of all project contracts including engineering and construction contractgas supply and transportation agreements steam sales power purchase agreements and directed financialclosing activities at loan conversion Project was under budget and started up successfully in 1996

bull Maximized project value by cost control budgeting scheduling maintaining initial contract values andoptimizing economic parameters

bull Involved in the negotiation and implementation a $100 million EPC turnkey contract for the constructionand start-up of the facility

bull Project was managed to completion which included mobilization commissioning commercial operationsperformance testing and conversion to term financing

Pa2e 2KENNETH W SPINNER

PROFESSIONAL EXPERIENCE (Continued)

WEST WINDSOR POWER - 120 MW - WINDSOR ONTARIO

Manager EngineeringPowerlink Corporation (Subsidiary of Northstar Energy Corp) Portland Oregon

1992 to ]994

Responsible for all technical management and support for power project development activities in Canada USAand other international regions Supported project contract negotiations on the West Windsor Power Projectmanaged the engineering construction contract and operating agreement negotiations

Manager Facilities Engineering Sr Project Engineer Process EngineerNorthstar Energy Corporation Dome Petroleum Ltd Hudsons Bay Oil and Gas LtdCalgary Alberta

1980 to ]992

Managed oil and gas facilities development in Alberta and independent power development in Canada and theUSA Responsible for project management and process engineering on various oil and gas facilities and pipelines

EDUCATION

bull Bachelor of Science Chemical Engineering (Honours) 1980Queens University at Kingston Ontario

bull Cogeneration Development Course 1992Kingston Ontario

bull Cogeneration Power Plant Design and Optimization 1991Boston Massachusetts

bull Business Management Financial and Evaluation Courses 1986 to 1997

Pale 3

Project Experience Chart

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsHarvie Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren BakerCampbell Power Project Utilities Washington CCGT Electric Harbour EPCOR Power Power Resource

Puget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Puncakjaya Duke Irian Jaya 395 MW Diesel coal Mitsubishi PT Freeport 1997 Richard E Richard EPower Project Energy Indonesia fired Indonesia Coleman Coleman

PT Freeport PT FreeportIndonesia IndonesiaJI H R Rasuna JI H R RasunaSaid Kav X-7 No Said Kav X-7 No6 6Plaza 89 12th Plaza 89 12thFloor FloorJakarta 12940 Jakarta 12940

Lake Superior Great Sault St 110 MW Natural GE Ontario 1993 Colin Clark Bill RalphPower Project Lakes Marie Ont GasDistiliate Electricity Great Lakes OEFC

Power Finance Corp Power amp Brascan 416-325-80577059415651

McMahon Duke Taylor BC 115 MW Natural Gas Westinghouse BC Hydro 1993 Duane Rae Dawn FarrellCogeneration Energy Duke Energy BC Hydro

ATCO 4036991551ATCO

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsJeff Myers Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren Baker

Power Project Utilitiesl Washington CCGT Electric Harbour EPCOR Power Power ResourcePuget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Liberty Power Reliant Philadelphia 568 MW Natural Gas GE Pacific Gas 2002 Greg Kennedy Nowa merchantProject Energy PA CCGT and Electric - Reliant Energy plant

National 713-497-7490Energy Group(receivership)

West Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Ken Spinner Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsWest Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Julia S Ciccaglione Curriculum Vitae

CURRICULUM VITAE

JULIA S CICCAGLIONEEnvironment Specialist

3040400 4th Avenue SWCalgary AB Canada T2P OJ4

Tel (403)444-5538 email jciccaglionepristinepowerca

CAREER BRIEF

An environment specialist with extensive experience in project management impact assessmentstakeholder consultation policy analysis and climate change Additional expertise in internationaldevelopment projects including project monitoring and stakeholder facilitation Excellent communicationorganisation and writing skills Technical background in the biophysical sciences and economics Projectperformance measurement experience using Results Based Management (RBM)

EDUCA TION

MSc Geography 1998Soil Erosion Assessment Soil and Water Nutrient Loss Analysis Watershed ManagementUniversity of Calgary Calgary Alberta Canada

BSc Geography 1994University of Calgary Calgary Alberta CanadaConcentration Biogeography geomorphology

BA Economics 1991University of Calgary Calgary Alberta CanadaConcentration Petroleum economics

PROFESSIONAL EXPERTISE

Environmental Project ManagementPolicy AnalysisRegulatory AnalysisStakeholder amp Public Consultation

Impact AssessmentSustainable DevelopmentClimate ChangeEnvironmental Management

CAREER HISTORY

Domestic

1998- Pristine Power Inc Calgary Vice President Environment and Emissions TradingPresent Responsible for overall environmental project management regulatory compliance public

policy input and management of Pristines greenhouse gas strategy

Suncurrent Industries Ltd Calgary Senior Emissions Portfolio ConsultantResponsible for overall management of Suncurrents greenhouse gas credit portfolio

2

Alberta Energy Company (AEC) Ltd Calgary Wetland Vegetation Scientist IRISEnvironmental Systems Responsible for the design of a long-term (20 yr) Boreal wetlandvegetation monitoring program to determine the effects of groundwater withdrawal on wetlandvegetation Data gathered from the monitoring program to be utilised by Alberta EnvironmentalProtection for resource management decision making

Syncrude Canada Limited Calgary Environment Specialist and Project Manager IRISEnvironmental Systems Managed and co-ordinated a team of scientists responsible for thedelineation of forest types into commercial and non-commercial stands Derived informationwas used as input into Syncrudes reclamation and mine area conservation plan Specificproject management activities included conducting a needs assessment budget preparationand creation of a Terms of Reference

Environmental Impact Assessment amp Policy Specialist IRIS Environmental SystemsResponsible for the completion of environmental impact assessment projects Responsibilitiesincluded the identification of impacts mitigations cumulative effects and the management andco-ordination of multidisciplinary scientific teams Extensive liasing with government agenciesPolicy analysis included integrating environmental policy and statutory requirements withdevelopment initiatives Additional responsibilities included extensive stakeholder and publicconsultation The following is a list of completed environmental impact assessments

Skiing Louise Limited Banff National Park An Environmental Screening Report for thepurpose of withdrawing water from the Pipestone River and Corral Creek to accommodatesnowmaking fire-fighting and domestic water use activities Report considerations includedidentifying river hydrologic regimes potential impacts to aquatic ecosystems mitigationprocedures and cumulative effects assessment

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts associated with improvements to water intake systems in the Pipestone River andCorral Creek Specific report considerations included identifying impacts to aquaticecosystems

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts related to terrain modifications and replacement of snowmaking infrastructure on theUpper Wiwaxy ski run

The Lake Louise Inn Banff National Park Environmental Screening Report for theconstruction of new commercial accommodation in Lake Louise

Skoki Lodge Banff National Park Environmental Screening Report for the construction ofadditional staff housing at the Skoki Lodge National Historic Site

The Banff Centre Banff National Park Environmental Screening Report for the submissionof an Area Redevelopment Plan The project considered a strategic assessment includedthe identification of impacts resulting from proposed developments or redevelopments on thecampus of The Banff Centre

Ski Marmot Basin Jasper National Park Canada Part of a multi-disciplinary teamresponsible for the completion of a Comprehensive Study for the development of a chairlift andski runs in the Eagle Ridge area of Marmot Basin

Ski Marmot Basin Jasper National Park Canada Environmental Screening Reportspertaining to the installation of new sewage treatment facilities improvements to surfacedrainage and subsurface drainage

3

1995-1998

1990

Legislation Analyst IRIS Environmental Systems Alberta Economic DevelopmentCalgary AB Review and analysis of Alberta Provincial and Canadian Federal legislation todetermine land use laws and identify areas within the province which may have potential forfuture tourism development This information was used in the development of maps illustratingcurrent land uses and areas of potential future tourism development in Alberta

University of Calgary Department of Geography Canada Instructor i) Taught introductorygeography Topics included climatology geomorphology soils and vegetation hydrology remotesensing and air photo interpretation ii) Taught a senior level course in introductory vascular plantidentification plant taxonomy introductory wildlife identification and habitat associations and plantand wildlife responses to disturbances specific to the Canadian Grasslands Aspen ParklandMontane Sub-Alpine Alpine and Boreal Forest Ecoregions

Petro Canada Resources Incorporated Calgary Canada Junior Land ManagementRepresentative Responsible for the review of land agreements governing the operation of oiland gas properties Conducted an economic evaluation and reconciliation of predicted gas pricesversus actual market prices Additional work included site inspections of reclaimed coal propertiesin northeastern British Columbia

International

1998- Cuba Climate Change Emissions Baseline and Monitoring Plan Department of ForeignPresent Affairs 2002 and IntI Trade (DFAIT) Canada Project Manager Suncurrent Industries Ltd

Responsible for managing a climate change emissions baseline study and monitoring planfocused on the implementation of renewable and energy efficient technologies (wind and solarenergy high efficiency micro-turbines) in Cuba Baseline study was in accordance with thoserequirements for a Clean Development Mechanism

Egypt Environment Theme Project - Canadian International Development Agency (CIDA)Environment and Performance Measurement Specialist IRIS Environmental SystemsMember of the Performance Measurement Advisory team for the bilateral CIDA-EgyptEnvironment Theme Project (7 year project) Responsibilities included the measurement ofenvironment project and environment theme results Results to be consistent with Government ofCanada - CIDA policy programming goals including contributing to sustainable development inEgypt and stakeholder involvement in development initiatives Results Based Management(RBM) used as a measurement tool

Zimbabwe Victoria Falls Environmental Planning and Capacity Enhancement Project -Canadian International Development Agency (CIDA) Environment and PerformanceMeasurement Specialist IRIS Environmental Systems An RBM facilitator in an iterativesustainable-development project in Victoria Falls to promote environmentally sustainablecommunities Project focused on improving the capacity of local partners to participate effectivelyin the preparation and implementation of the Victoria Falls Master Plan and Local DevelopmentPlans Specific responsibilities included the development and facilitation of an RBM stakeholderworkshop held in Victoria Falls Zimbabwe Workshop emphasized participatory approaches andthe inclusion of gender equality in the identification and measurement of results

Egypt Environment Theme Project Canadian International Development Agency (CIDA)PolicyProgram Analyst IRIS Environmental Systems Member of the policyprogramanalysis team conducting a trends analysis of CIDAs programming in Egypt This analysisserved as an input into CIDAs planning and design of the new Egypt Country DevelopmentProgram Framework (CDPF) Data was obtained by surveying identified stakeholders in Egyptand Canada Results of the trends analysis were then correlated with CIDAs Egypt CountryDevelopment Policy Framework to reconcile its effectiveness and provide input for its futuredirection

4

1996-1990

Governments of Chad and Cameroon - World Bank Panel Review of PipelineDevelopment Research Assistant IRIS Environmental Systems Research assistant to theManagerCoordinator of the Expert Panel for the review of literature pertaining to biodiversity andwildlands ecology in the African savannah tropical forests and marine ecosystems

St Vincent and the Grenadines Caribbean Soil Erosion Research on DeforestedWatershed Areas Environmental Scientist Project Manager and Principle investigator intothe loss of soil water and nutrients associated with banana cultivated areas Secondary focus ofthe research was aimed at developing a land use management plan incorporating conservationfarming practices and the use of social forestry in the conservation of soil on severely erodedsteep-land agricultural areas In consideration with the socio-economic status of the areaformulated recommendations for appropriate farming practices at the micro-scale level

St Vincent and the Grenadines Caribbean Man and the Biosphere ProjectUNESCOEnvironmental Scientist Assistant Project Supervisor and Liaison between the University ofCalgary and the St Vincent Forestry Department Responsible for the implementation of varioussoil erosion research studies aimed at the quantification of soil water and nutrient loss associatedwith agroforestry and forestry plantation areas

ENVIRONMENTAL POLICYChair of the Energy Recovery Generation (ERG) Subgroup Clean Air Strategic Alliance Alberta

Advisor Centre for EnergyERG Input Electricity and Alternative Energy Division BC Ministry of Energy and Mines

ERG Input Climate Change Offset System Environment CanadaERG Input Treatment of Clean Energy Natural Resources Canada

COUNTRIES WORK EXPERIENCECanada Egypt Zimbabwe St Vincent and the Grenadines Chad and Cameroon Cuba

5

Selected Permitting Reports

1 A Wetlands Monitoring Plan Foster Creek Area Cold Lake Air Weapons Range AB 2001 Reportprepared for Alberta Energy Company Ltd

2 A Strategic Assessment of The Banff Centre Area Redevelopment Plan Banff National Park AB2000 Environmental Screening Report prepared for The Banff Centre

3 Permit to Withdraw Water from the Pipestone River and Corral Creek for the Purposes ofSnowmaking Fire-Fighting and Domestic Water Use the Lake Louise Ski Area Banff National ParkAB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

4 Improvements to Water Intakes on the Pipestone River and Corral Creek the Lake Louise Ski AreaBanff National Park AB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

5 Proposed Development of a Chairliff and Ski Runs on Eagle Ridge the Marmot Basin Ski AreaJasper National Park AB 1999 Comprehensive Study Report prepared for Ski Marmot Basin

6 An Application for New Staff Accommodations at Skoki Lodge Banff National Park AB 2000Environmental Screening Report prepared for Skiing Louise Ltd

7 An Application for New Commercial Accommodations at the Lake Louise Inn Banff National ParkAB 2000 Report prepared for the Lake Louise Inn

8 Improvements to Surface Drainage at the Marmot Basin Ski Area Jasper National Park AB 1998Environmental Screening Report prepared for Ski Marmot Basin

9 Improvements to Subsurface Drainage at the Marmot Basin Ski Area Jasper National Park AB1998 Environmental Screening Report prepared for Ski Marmot Basin

10 Improvements to Sewage Treatment Facilities and Effluent Disposal at the Marmot Basin Ski AreaJasper National Park AB 1998 Environmental Screening Report prepared for Ski Marmot Basin

Other Reports

11 Legislative and Policy Factors Influencing Tourism Development in Alberta 2000 Report preparedfor Alberta Economic Development and Alberta Economic Development Authority TourismCommittee

12 Egypt Country Development Policy Framework (CDPF) Assessment 1999 Report prepared for theCanadian International Development Agency Hull Quebec

13 Egypt Country Development Policy Framework (CDPF) Assessment Presentation 1999Presentation prepared for the Canadian International Development Agency Hull Quebec

14 Monitoring Mission Reports Egypt Environment Theme Reports prepared for the CanadianInternational Development Agency Hull Quebec

15 A Pre-Disturbance Vegetation Classification for the Disturbed Portion of the Syncrude DevelopmentArea Mildred Lake AB 1998 Report prepared for Syncrude Canada Ltd

16 Characterization of Soil Erosion Processes and Nutrient Losses Associated with Previously ForestedAreas the Colonarie River Watershed St Vincent West Indies 1998 A Masters Thesis preparedfor the University of Calgary

6

Stakeholder Consultation

1 Zimbabwe-Canada Environmental Planning Exchange Mission 2001 Organized and coordinated anexchange mission held in Banff AB for the CIDA Zimbabwe Environmental Planning and CapacityEnhancement Project

2 Strategic Assessment of The Banff Centre Area Redevelopment Plan 2000 Conducted stakeholderconsultations via a public open house forum

3 Results Based Management as a Project Management Tool 1999 Conducted a workshop in VictoriaFalls Zimbabwe for the Environmental Planning and Capacity Enhancement Project

7

Neil StewartRR 3 SimcoeOntario CanadaN3Y 4K2

OBJECTIVE ProjectConstruction Management

emailphone

fax

nmsproj ectskwiccom519-426-2239519-426-2674

1991-Date

1990-1991

1988-1990

JPRomC1r amp CONsect1[RUCnON MIANAGEMJENT sectJERVJ[CJEsect

Project amp Construction Management services including Project DevelopmentProject strategy Contract negotiations Contract Management Industrial RelationsGovernment liaison Profit amp Loss accountability

Plans of execution project controls budgets planning evaluations safety labourrelations and business development Project amp Site management coordinationprocedures administration methods and site organization Managed andcoordinated information flow tofrom Client(s) Engineer(s) and Contractor(s)

Projects includeWestcoast Energy 55mw Whitby Cogen Bayside 280 mw RepowerEcodyne Ltd MOU contract management amp coordinationUnited Parcel Services Canada Hamilton Air Hub ProjectINCO Nickle Foam and Nickle Disc ProjectsBayer AG Nicklehydroxide and Tungsten Carbide ProjectsMacMillen Bloedel Secondary Fibre Recycling Project

Fluor Daniel Canada LtdResident Construction Manager Central Division

Provide support to Business Units for construction managementservicesresponsible for industrial relations safety quality personnel development andmethods Initiated and established field organizations roles and responsibilitiessite procedures fab shop contractorsupplier planning budgetsfinancial and clientrelations to support critical contract schedules

Projects includeProctor amp Gamble Ultra Project MFord Canada Winn 88 Paint PlantINCO S02 Abatement Project

Ellis Don LtdProject Manager Resident site manager accountable for the process coordinationof $500M GMSUZUKI (CAMI) grass roots automotive plant in Ingersoll ON

Directed 1800 unionized trades (peak workforce) and managed lump-sum projecton schedule and under budget Developed and maintained Oriental and NorthAmerican client trust relationships Surpassed project expectations in labourrelations and safety Profit and Loss accountability

1986-1988

1985-1986

1984-1985

1983-1984

1981-1983

1978-1981

1974-1978

1973-1974

1969-1973

EDUCATION

UMA SpantecGeneral SuperintendentDirected and supervised lump-sum contracts Interfaced with engineering andclient organizations to produce responsive quality services and safe profitablecontracts

Projects includedLabatts Brewers various capital projectsConsumers Glass hot amp cold end shut downsUnivofWaterloo construction management servicesDomtar paper board expansion

Glen Curtis Company Construction SuperintendentConstruction management of Canadian Occidentals 65m cfPdgrass roots sour gas plant in Mezeppa Alberta

Ennisteel Co Ltd Toronto ON Project SupervisorUltramars 1500 million barrel terminal

Self-employed OntarioShip yard construction amp generation facilities

Petrosar Inc Sarnia ON Area SuperintendentClient rep responsible for $650 Million HFOU project

Fluor Canada Corp Alberta Mechanical SupervisorAGCL 1200 tpd Methanol plantAquitaine Canada 650m cfPd sour gas plantEsso Canada Cold Lake Project amp Judy Creek

Arthur GMcKee Inc Nanticoke ON Area SupervisorTexaco 120000 bpd grass roots refinery

SteIco Inc Hamilton ON

JewittVallee Simcoe ONOntario Hydro 4000 MW Thermal generationStelco LEW steel plantDomtar Mill expansionTrent Valley Quarry modernization

MacMaster University 1976-77 (night school)Mohawk College 1971-72 (night school)

SELF DEVELOPMENT -project management-construction management-basic computers-industrial relations-WinWin strategies

-WHMIS-safety amp compensation-KT amp decisions-team management-personnel administration

PERSONAL

REFERENCES

DOB February 24 1950

On request

CITIZENSHIP Canadian

Cochrane Engineering Ltd

Statement of Qualifications

Power Generation Facilities

Cochrane Engineering Ltd200 - 1770 W7th Avenue

Vancouver Be V6J 4Y6Phone 604-736-5421 Fax 604-736-1519

Email receptioncochrane-groupca

COCHRAR

Cochrane Engineering LtdGeneral Qualifications

TABLE OF CONTENTS

Section

Section

Section

10 COMPANY BACKGROUND11 Multi-Disciplinary Design12 Quality Assurance

20 SUMMARY OF RECENT RELEVANT EXPERIENCE21 Recent Relevant Projects Completed22 Projects Currently in Progress23 Cochrane Group - Other Relevant Experience

30 ENGINEERINGmiddot TOOLS

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Sandhill Energy CenterAusti n Texas

Calpine Combined Cycle Power PlantGoldendale Washington

10 COMPANY BACKGROUND

The Cochrane Group of companies including Cochrane Engineeringprovides integrated engineering architecture planning and projectmanagement services for a wide variety of projects It was formed in1996 through the merger of Cochrane Engineering a Calgary firm inoperation since 1972 and the PBK Group which had providedarchitectural and engineering services in Vancouver since 1937 Ouraffiliation with the Cochrane Group affords us access to the expertiseof over 350 personnel consisting of project managers technicalpersonnel and administrative staff in six offices across Canada Italso lends access to other Cochrane Group firms including PBKArchitects Inc which has provided design services for many industrialprojects in Canada and abroad Cochrane Engineering and PBKArchitects have significant experience providing services for clients inthe power coal mining and process industries

Cochrane Engineerings power division has successfully exporteddesign services through out North and South America In the last twoyears this division has provided mechanical processinstrumentation architectural electrical civil and structural designservices for projects totaling over 1000 MW of power generationThe construction cost for these projects exceeds $1 billion

11 Multi-Disciplinary DesignCochrane Group is a fully integrated multi-disciplinary design groupservicing the power sector with in-house architectural capabilitiesGE7FA experience and combined cycle process experts enabling usto provide comprehensive one stop shopping The CochraneGroups multi-disciplinary design team includes

bull Cochrane Engineering Ltd andbull PBK Architects Inc

Cochrane Engineering Ltd is a multi-discipline engineering firmspecializing in the design of combined cycle power plants simplecycle power plants and industrial projects We also supplyengineering resources for PBK architects

PBK Architects Inc specializes in the design of industrial facilitiesoffices maintenance shops warehouses institutional buildings andrecreational sport facilities PBK provides the architectural servicesto Cochrane for our power projects Signature projects include BCPlace GM Place Horseshoe Bay Ferry Terminal upgrade and

1-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 14: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

KENNETH W SPINNER

3040- 400 - 4th Ave SWCalgary AB T2P OJ4

403-444-5578

Technicalproject management and development professional with 23 years in the energy industryExperienced in the review technical assessment and development of independent power projects havebeen involved in the development engineering and construction on over 1000 megawatts of powerplants and project managed over $500 million in powerenergy projects

Proficient in all aspects of power generation developments feasibility reviews project managementproject engineering EPC contract negotiations and administration Proven ability to direct successfuldevelopment project management teams and enhance co-operation from all levels of an organizationpartners stakeholders and government agencies to increase shareholder value and achieve business project development management results

PROFESSIONAL EXPERIENCE

V P EngineeringPristine Power Inc

2003 to Present

Presently providing project managementdevelopment and technical support for all power generationdevelopments and projects Responsible for preliminary development engineering coordination of allengineering procurement and construction and contract negotiation and administration activities withinthe company

PresidentSpinergy Services Inc

1999 to 2003

Providing power generation consulting and developmentmanagement services to various clients throughoutCanada specifically Alberta British Columbia Saskatchewan and Eastern Canada Involved in various gas-firedand biomass project developments ranging from 25 Megawatts to 450 Megawatts as project development advisorConducted feasibility studiesproposals and economic feasibility reviews on a wide range of power developmentsin the energy forestry and coal industries On going in-house developments include gas-fired cogenerationbiomass generation combined heatcooling power facilities and energy storage opportunities

Executive Director Vice President (ICPI)Manager New Ventures Business DevelopmentFletcher Challenge Energy (FCE) Calgary Alberta

]997 to 1999

As Executive Director Vice President of the 250 megawatt Island Cogeneration Project Inc (ICPI)jointly-managed development of the ICPI project on Vancouver Island to development completion Directed negotiationteams for the power purchase agreement with BC Hydro steam sales agreements with Fletcher ChallengeCanada Paper Mill the engineering and construction contract and project permits

Pale]KENNETH W SPINNER

PROFESSIONAL EXPERIENCE (Continued)

Project Highlights

bull Development phase of the ICPl was successfully completed while maintaining shareholder valuebull All project contracts and permits were completed and executedbull Managed development team in Vancouver consisting of multi-disciplinary professionals legal

environmental and engineering consultantsbull Guided the environmental permitting process and obtained project approvalbull FCEs working interest in ICPI was successfully sold after execution of all Project agreementsbull Project is presently in commercial operation

ISLAND COGENERATION PROJECT - 250 MW- CAMPBELL RIVER BC

Vice PresidentWest Windsor Power - (PLC Windsor Ltd)Northstar Energy Corporation Calgary Alberta

1994 to 1997

Vice President ofPLC Windsor Ltd and Northstar Energys principal representative on the partnershipmanagement committee directly responsible for the 120 megawatt West Windsor Power project in WindsorOntario Responsible for overall project management project financial analysis and project capital budget

Project Highlights

bull Administered the implementation of all project contracts including engineering and construction contractgas supply and transportation agreements steam sales power purchase agreements and directed financialclosing activities at loan conversion Project was under budget and started up successfully in 1996

bull Maximized project value by cost control budgeting scheduling maintaining initial contract values andoptimizing economic parameters

bull Involved in the negotiation and implementation a $100 million EPC turnkey contract for the constructionand start-up of the facility

bull Project was managed to completion which included mobilization commissioning commercial operationsperformance testing and conversion to term financing

Pa2e 2KENNETH W SPINNER

PROFESSIONAL EXPERIENCE (Continued)

WEST WINDSOR POWER - 120 MW - WINDSOR ONTARIO

Manager EngineeringPowerlink Corporation (Subsidiary of Northstar Energy Corp) Portland Oregon

1992 to ]994

Responsible for all technical management and support for power project development activities in Canada USAand other international regions Supported project contract negotiations on the West Windsor Power Projectmanaged the engineering construction contract and operating agreement negotiations

Manager Facilities Engineering Sr Project Engineer Process EngineerNorthstar Energy Corporation Dome Petroleum Ltd Hudsons Bay Oil and Gas LtdCalgary Alberta

1980 to ]992

Managed oil and gas facilities development in Alberta and independent power development in Canada and theUSA Responsible for project management and process engineering on various oil and gas facilities and pipelines

EDUCATION

bull Bachelor of Science Chemical Engineering (Honours) 1980Queens University at Kingston Ontario

bull Cogeneration Development Course 1992Kingston Ontario

bull Cogeneration Power Plant Design and Optimization 1991Boston Massachusetts

bull Business Management Financial and Evaluation Courses 1986 to 1997

Pale 3

Project Experience Chart

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsHarvie Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren BakerCampbell Power Project Utilities Washington CCGT Electric Harbour EPCOR Power Power Resource

Puget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Puncakjaya Duke Irian Jaya 395 MW Diesel coal Mitsubishi PT Freeport 1997 Richard E Richard EPower Project Energy Indonesia fired Indonesia Coleman Coleman

PT Freeport PT FreeportIndonesia IndonesiaJI H R Rasuna JI H R RasunaSaid Kav X-7 No Said Kav X-7 No6 6Plaza 89 12th Plaza 89 12thFloor FloorJakarta 12940 Jakarta 12940

Lake Superior Great Sault St 110 MW Natural GE Ontario 1993 Colin Clark Bill RalphPower Project Lakes Marie Ont GasDistiliate Electricity Great Lakes OEFC

Power Finance Corp Power amp Brascan 416-325-80577059415651

McMahon Duke Taylor BC 115 MW Natural Gas Westinghouse BC Hydro 1993 Duane Rae Dawn FarrellCogeneration Energy Duke Energy BC Hydro

ATCO 4036991551ATCO

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsJeff Myers Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren Baker

Power Project Utilitiesl Washington CCGT Electric Harbour EPCOR Power Power ResourcePuget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Liberty Power Reliant Philadelphia 568 MW Natural Gas GE Pacific Gas 2002 Greg Kennedy Nowa merchantProject Energy PA CCGT and Electric - Reliant Energy plant

National 713-497-7490Energy Group(receivership)

West Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Ken Spinner Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsWest Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Julia S Ciccaglione Curriculum Vitae

CURRICULUM VITAE

JULIA S CICCAGLIONEEnvironment Specialist

3040400 4th Avenue SWCalgary AB Canada T2P OJ4

Tel (403)444-5538 email jciccaglionepristinepowerca

CAREER BRIEF

An environment specialist with extensive experience in project management impact assessmentstakeholder consultation policy analysis and climate change Additional expertise in internationaldevelopment projects including project monitoring and stakeholder facilitation Excellent communicationorganisation and writing skills Technical background in the biophysical sciences and economics Projectperformance measurement experience using Results Based Management (RBM)

EDUCA TION

MSc Geography 1998Soil Erosion Assessment Soil and Water Nutrient Loss Analysis Watershed ManagementUniversity of Calgary Calgary Alberta Canada

BSc Geography 1994University of Calgary Calgary Alberta CanadaConcentration Biogeography geomorphology

BA Economics 1991University of Calgary Calgary Alberta CanadaConcentration Petroleum economics

PROFESSIONAL EXPERTISE

Environmental Project ManagementPolicy AnalysisRegulatory AnalysisStakeholder amp Public Consultation

Impact AssessmentSustainable DevelopmentClimate ChangeEnvironmental Management

CAREER HISTORY

Domestic

1998- Pristine Power Inc Calgary Vice President Environment and Emissions TradingPresent Responsible for overall environmental project management regulatory compliance public

policy input and management of Pristines greenhouse gas strategy

Suncurrent Industries Ltd Calgary Senior Emissions Portfolio ConsultantResponsible for overall management of Suncurrents greenhouse gas credit portfolio

2

Alberta Energy Company (AEC) Ltd Calgary Wetland Vegetation Scientist IRISEnvironmental Systems Responsible for the design of a long-term (20 yr) Boreal wetlandvegetation monitoring program to determine the effects of groundwater withdrawal on wetlandvegetation Data gathered from the monitoring program to be utilised by Alberta EnvironmentalProtection for resource management decision making

Syncrude Canada Limited Calgary Environment Specialist and Project Manager IRISEnvironmental Systems Managed and co-ordinated a team of scientists responsible for thedelineation of forest types into commercial and non-commercial stands Derived informationwas used as input into Syncrudes reclamation and mine area conservation plan Specificproject management activities included conducting a needs assessment budget preparationand creation of a Terms of Reference

Environmental Impact Assessment amp Policy Specialist IRIS Environmental SystemsResponsible for the completion of environmental impact assessment projects Responsibilitiesincluded the identification of impacts mitigations cumulative effects and the management andco-ordination of multidisciplinary scientific teams Extensive liasing with government agenciesPolicy analysis included integrating environmental policy and statutory requirements withdevelopment initiatives Additional responsibilities included extensive stakeholder and publicconsultation The following is a list of completed environmental impact assessments

Skiing Louise Limited Banff National Park An Environmental Screening Report for thepurpose of withdrawing water from the Pipestone River and Corral Creek to accommodatesnowmaking fire-fighting and domestic water use activities Report considerations includedidentifying river hydrologic regimes potential impacts to aquatic ecosystems mitigationprocedures and cumulative effects assessment

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts associated with improvements to water intake systems in the Pipestone River andCorral Creek Specific report considerations included identifying impacts to aquaticecosystems

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts related to terrain modifications and replacement of snowmaking infrastructure on theUpper Wiwaxy ski run

The Lake Louise Inn Banff National Park Environmental Screening Report for theconstruction of new commercial accommodation in Lake Louise

Skoki Lodge Banff National Park Environmental Screening Report for the construction ofadditional staff housing at the Skoki Lodge National Historic Site

The Banff Centre Banff National Park Environmental Screening Report for the submissionof an Area Redevelopment Plan The project considered a strategic assessment includedthe identification of impacts resulting from proposed developments or redevelopments on thecampus of The Banff Centre

Ski Marmot Basin Jasper National Park Canada Part of a multi-disciplinary teamresponsible for the completion of a Comprehensive Study for the development of a chairlift andski runs in the Eagle Ridge area of Marmot Basin

Ski Marmot Basin Jasper National Park Canada Environmental Screening Reportspertaining to the installation of new sewage treatment facilities improvements to surfacedrainage and subsurface drainage

3

1995-1998

1990

Legislation Analyst IRIS Environmental Systems Alberta Economic DevelopmentCalgary AB Review and analysis of Alberta Provincial and Canadian Federal legislation todetermine land use laws and identify areas within the province which may have potential forfuture tourism development This information was used in the development of maps illustratingcurrent land uses and areas of potential future tourism development in Alberta

University of Calgary Department of Geography Canada Instructor i) Taught introductorygeography Topics included climatology geomorphology soils and vegetation hydrology remotesensing and air photo interpretation ii) Taught a senior level course in introductory vascular plantidentification plant taxonomy introductory wildlife identification and habitat associations and plantand wildlife responses to disturbances specific to the Canadian Grasslands Aspen ParklandMontane Sub-Alpine Alpine and Boreal Forest Ecoregions

Petro Canada Resources Incorporated Calgary Canada Junior Land ManagementRepresentative Responsible for the review of land agreements governing the operation of oiland gas properties Conducted an economic evaluation and reconciliation of predicted gas pricesversus actual market prices Additional work included site inspections of reclaimed coal propertiesin northeastern British Columbia

International

1998- Cuba Climate Change Emissions Baseline and Monitoring Plan Department of ForeignPresent Affairs 2002 and IntI Trade (DFAIT) Canada Project Manager Suncurrent Industries Ltd

Responsible for managing a climate change emissions baseline study and monitoring planfocused on the implementation of renewable and energy efficient technologies (wind and solarenergy high efficiency micro-turbines) in Cuba Baseline study was in accordance with thoserequirements for a Clean Development Mechanism

Egypt Environment Theme Project - Canadian International Development Agency (CIDA)Environment and Performance Measurement Specialist IRIS Environmental SystemsMember of the Performance Measurement Advisory team for the bilateral CIDA-EgyptEnvironment Theme Project (7 year project) Responsibilities included the measurement ofenvironment project and environment theme results Results to be consistent with Government ofCanada - CIDA policy programming goals including contributing to sustainable development inEgypt and stakeholder involvement in development initiatives Results Based Management(RBM) used as a measurement tool

Zimbabwe Victoria Falls Environmental Planning and Capacity Enhancement Project -Canadian International Development Agency (CIDA) Environment and PerformanceMeasurement Specialist IRIS Environmental Systems An RBM facilitator in an iterativesustainable-development project in Victoria Falls to promote environmentally sustainablecommunities Project focused on improving the capacity of local partners to participate effectivelyin the preparation and implementation of the Victoria Falls Master Plan and Local DevelopmentPlans Specific responsibilities included the development and facilitation of an RBM stakeholderworkshop held in Victoria Falls Zimbabwe Workshop emphasized participatory approaches andthe inclusion of gender equality in the identification and measurement of results

Egypt Environment Theme Project Canadian International Development Agency (CIDA)PolicyProgram Analyst IRIS Environmental Systems Member of the policyprogramanalysis team conducting a trends analysis of CIDAs programming in Egypt This analysisserved as an input into CIDAs planning and design of the new Egypt Country DevelopmentProgram Framework (CDPF) Data was obtained by surveying identified stakeholders in Egyptand Canada Results of the trends analysis were then correlated with CIDAs Egypt CountryDevelopment Policy Framework to reconcile its effectiveness and provide input for its futuredirection

4

1996-1990

Governments of Chad and Cameroon - World Bank Panel Review of PipelineDevelopment Research Assistant IRIS Environmental Systems Research assistant to theManagerCoordinator of the Expert Panel for the review of literature pertaining to biodiversity andwildlands ecology in the African savannah tropical forests and marine ecosystems

St Vincent and the Grenadines Caribbean Soil Erosion Research on DeforestedWatershed Areas Environmental Scientist Project Manager and Principle investigator intothe loss of soil water and nutrients associated with banana cultivated areas Secondary focus ofthe research was aimed at developing a land use management plan incorporating conservationfarming practices and the use of social forestry in the conservation of soil on severely erodedsteep-land agricultural areas In consideration with the socio-economic status of the areaformulated recommendations for appropriate farming practices at the micro-scale level

St Vincent and the Grenadines Caribbean Man and the Biosphere ProjectUNESCOEnvironmental Scientist Assistant Project Supervisor and Liaison between the University ofCalgary and the St Vincent Forestry Department Responsible for the implementation of varioussoil erosion research studies aimed at the quantification of soil water and nutrient loss associatedwith agroforestry and forestry plantation areas

ENVIRONMENTAL POLICYChair of the Energy Recovery Generation (ERG) Subgroup Clean Air Strategic Alliance Alberta

Advisor Centre for EnergyERG Input Electricity and Alternative Energy Division BC Ministry of Energy and Mines

ERG Input Climate Change Offset System Environment CanadaERG Input Treatment of Clean Energy Natural Resources Canada

COUNTRIES WORK EXPERIENCECanada Egypt Zimbabwe St Vincent and the Grenadines Chad and Cameroon Cuba

5

Selected Permitting Reports

1 A Wetlands Monitoring Plan Foster Creek Area Cold Lake Air Weapons Range AB 2001 Reportprepared for Alberta Energy Company Ltd

2 A Strategic Assessment of The Banff Centre Area Redevelopment Plan Banff National Park AB2000 Environmental Screening Report prepared for The Banff Centre

3 Permit to Withdraw Water from the Pipestone River and Corral Creek for the Purposes ofSnowmaking Fire-Fighting and Domestic Water Use the Lake Louise Ski Area Banff National ParkAB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

4 Improvements to Water Intakes on the Pipestone River and Corral Creek the Lake Louise Ski AreaBanff National Park AB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

5 Proposed Development of a Chairliff and Ski Runs on Eagle Ridge the Marmot Basin Ski AreaJasper National Park AB 1999 Comprehensive Study Report prepared for Ski Marmot Basin

6 An Application for New Staff Accommodations at Skoki Lodge Banff National Park AB 2000Environmental Screening Report prepared for Skiing Louise Ltd

7 An Application for New Commercial Accommodations at the Lake Louise Inn Banff National ParkAB 2000 Report prepared for the Lake Louise Inn

8 Improvements to Surface Drainage at the Marmot Basin Ski Area Jasper National Park AB 1998Environmental Screening Report prepared for Ski Marmot Basin

9 Improvements to Subsurface Drainage at the Marmot Basin Ski Area Jasper National Park AB1998 Environmental Screening Report prepared for Ski Marmot Basin

10 Improvements to Sewage Treatment Facilities and Effluent Disposal at the Marmot Basin Ski AreaJasper National Park AB 1998 Environmental Screening Report prepared for Ski Marmot Basin

Other Reports

11 Legislative and Policy Factors Influencing Tourism Development in Alberta 2000 Report preparedfor Alberta Economic Development and Alberta Economic Development Authority TourismCommittee

12 Egypt Country Development Policy Framework (CDPF) Assessment 1999 Report prepared for theCanadian International Development Agency Hull Quebec

13 Egypt Country Development Policy Framework (CDPF) Assessment Presentation 1999Presentation prepared for the Canadian International Development Agency Hull Quebec

14 Monitoring Mission Reports Egypt Environment Theme Reports prepared for the CanadianInternational Development Agency Hull Quebec

15 A Pre-Disturbance Vegetation Classification for the Disturbed Portion of the Syncrude DevelopmentArea Mildred Lake AB 1998 Report prepared for Syncrude Canada Ltd

16 Characterization of Soil Erosion Processes and Nutrient Losses Associated with Previously ForestedAreas the Colonarie River Watershed St Vincent West Indies 1998 A Masters Thesis preparedfor the University of Calgary

6

Stakeholder Consultation

1 Zimbabwe-Canada Environmental Planning Exchange Mission 2001 Organized and coordinated anexchange mission held in Banff AB for the CIDA Zimbabwe Environmental Planning and CapacityEnhancement Project

2 Strategic Assessment of The Banff Centre Area Redevelopment Plan 2000 Conducted stakeholderconsultations via a public open house forum

3 Results Based Management as a Project Management Tool 1999 Conducted a workshop in VictoriaFalls Zimbabwe for the Environmental Planning and Capacity Enhancement Project

7

Neil StewartRR 3 SimcoeOntario CanadaN3Y 4K2

OBJECTIVE ProjectConstruction Management

emailphone

fax

nmsproj ectskwiccom519-426-2239519-426-2674

1991-Date

1990-1991

1988-1990

JPRomC1r amp CONsect1[RUCnON MIANAGEMJENT sectJERVJ[CJEsect

Project amp Construction Management services including Project DevelopmentProject strategy Contract negotiations Contract Management Industrial RelationsGovernment liaison Profit amp Loss accountability

Plans of execution project controls budgets planning evaluations safety labourrelations and business development Project amp Site management coordinationprocedures administration methods and site organization Managed andcoordinated information flow tofrom Client(s) Engineer(s) and Contractor(s)

Projects includeWestcoast Energy 55mw Whitby Cogen Bayside 280 mw RepowerEcodyne Ltd MOU contract management amp coordinationUnited Parcel Services Canada Hamilton Air Hub ProjectINCO Nickle Foam and Nickle Disc ProjectsBayer AG Nicklehydroxide and Tungsten Carbide ProjectsMacMillen Bloedel Secondary Fibre Recycling Project

Fluor Daniel Canada LtdResident Construction Manager Central Division

Provide support to Business Units for construction managementservicesresponsible for industrial relations safety quality personnel development andmethods Initiated and established field organizations roles and responsibilitiessite procedures fab shop contractorsupplier planning budgetsfinancial and clientrelations to support critical contract schedules

Projects includeProctor amp Gamble Ultra Project MFord Canada Winn 88 Paint PlantINCO S02 Abatement Project

Ellis Don LtdProject Manager Resident site manager accountable for the process coordinationof $500M GMSUZUKI (CAMI) grass roots automotive plant in Ingersoll ON

Directed 1800 unionized trades (peak workforce) and managed lump-sum projecton schedule and under budget Developed and maintained Oriental and NorthAmerican client trust relationships Surpassed project expectations in labourrelations and safety Profit and Loss accountability

1986-1988

1985-1986

1984-1985

1983-1984

1981-1983

1978-1981

1974-1978

1973-1974

1969-1973

EDUCATION

UMA SpantecGeneral SuperintendentDirected and supervised lump-sum contracts Interfaced with engineering andclient organizations to produce responsive quality services and safe profitablecontracts

Projects includedLabatts Brewers various capital projectsConsumers Glass hot amp cold end shut downsUnivofWaterloo construction management servicesDomtar paper board expansion

Glen Curtis Company Construction SuperintendentConstruction management of Canadian Occidentals 65m cfPdgrass roots sour gas plant in Mezeppa Alberta

Ennisteel Co Ltd Toronto ON Project SupervisorUltramars 1500 million barrel terminal

Self-employed OntarioShip yard construction amp generation facilities

Petrosar Inc Sarnia ON Area SuperintendentClient rep responsible for $650 Million HFOU project

Fluor Canada Corp Alberta Mechanical SupervisorAGCL 1200 tpd Methanol plantAquitaine Canada 650m cfPd sour gas plantEsso Canada Cold Lake Project amp Judy Creek

Arthur GMcKee Inc Nanticoke ON Area SupervisorTexaco 120000 bpd grass roots refinery

SteIco Inc Hamilton ON

JewittVallee Simcoe ONOntario Hydro 4000 MW Thermal generationStelco LEW steel plantDomtar Mill expansionTrent Valley Quarry modernization

MacMaster University 1976-77 (night school)Mohawk College 1971-72 (night school)

SELF DEVELOPMENT -project management-construction management-basic computers-industrial relations-WinWin strategies

-WHMIS-safety amp compensation-KT amp decisions-team management-personnel administration

PERSONAL

REFERENCES

DOB February 24 1950

On request

CITIZENSHIP Canadian

Cochrane Engineering Ltd

Statement of Qualifications

Power Generation Facilities

Cochrane Engineering Ltd200 - 1770 W7th Avenue

Vancouver Be V6J 4Y6Phone 604-736-5421 Fax 604-736-1519

Email receptioncochrane-groupca

COCHRAR

Cochrane Engineering LtdGeneral Qualifications

TABLE OF CONTENTS

Section

Section

Section

10 COMPANY BACKGROUND11 Multi-Disciplinary Design12 Quality Assurance

20 SUMMARY OF RECENT RELEVANT EXPERIENCE21 Recent Relevant Projects Completed22 Projects Currently in Progress23 Cochrane Group - Other Relevant Experience

30 ENGINEERINGmiddot TOOLS

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Sandhill Energy CenterAusti n Texas

Calpine Combined Cycle Power PlantGoldendale Washington

10 COMPANY BACKGROUND

The Cochrane Group of companies including Cochrane Engineeringprovides integrated engineering architecture planning and projectmanagement services for a wide variety of projects It was formed in1996 through the merger of Cochrane Engineering a Calgary firm inoperation since 1972 and the PBK Group which had providedarchitectural and engineering services in Vancouver since 1937 Ouraffiliation with the Cochrane Group affords us access to the expertiseof over 350 personnel consisting of project managers technicalpersonnel and administrative staff in six offices across Canada Italso lends access to other Cochrane Group firms including PBKArchitects Inc which has provided design services for many industrialprojects in Canada and abroad Cochrane Engineering and PBKArchitects have significant experience providing services for clients inthe power coal mining and process industries

Cochrane Engineerings power division has successfully exporteddesign services through out North and South America In the last twoyears this division has provided mechanical processinstrumentation architectural electrical civil and structural designservices for projects totaling over 1000 MW of power generationThe construction cost for these projects exceeds $1 billion

11 Multi-Disciplinary DesignCochrane Group is a fully integrated multi-disciplinary design groupservicing the power sector with in-house architectural capabilitiesGE7FA experience and combined cycle process experts enabling usto provide comprehensive one stop shopping The CochraneGroups multi-disciplinary design team includes

bull Cochrane Engineering Ltd andbull PBK Architects Inc

Cochrane Engineering Ltd is a multi-discipline engineering firmspecializing in the design of combined cycle power plants simplecycle power plants and industrial projects We also supplyengineering resources for PBK architects

PBK Architects Inc specializes in the design of industrial facilitiesoffices maintenance shops warehouses institutional buildings andrecreational sport facilities PBK provides the architectural servicesto Cochrane for our power projects Signature projects include BCPlace GM Place Horseshoe Bay Ferry Terminal upgrade and

1-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 15: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

PROFESSIONAL EXPERIENCE (Continued)

Project Highlights

bull Development phase of the ICPl was successfully completed while maintaining shareholder valuebull All project contracts and permits were completed and executedbull Managed development team in Vancouver consisting of multi-disciplinary professionals legal

environmental and engineering consultantsbull Guided the environmental permitting process and obtained project approvalbull FCEs working interest in ICPI was successfully sold after execution of all Project agreementsbull Project is presently in commercial operation

ISLAND COGENERATION PROJECT - 250 MW- CAMPBELL RIVER BC

Vice PresidentWest Windsor Power - (PLC Windsor Ltd)Northstar Energy Corporation Calgary Alberta

1994 to 1997

Vice President ofPLC Windsor Ltd and Northstar Energys principal representative on the partnershipmanagement committee directly responsible for the 120 megawatt West Windsor Power project in WindsorOntario Responsible for overall project management project financial analysis and project capital budget

Project Highlights

bull Administered the implementation of all project contracts including engineering and construction contractgas supply and transportation agreements steam sales power purchase agreements and directed financialclosing activities at loan conversion Project was under budget and started up successfully in 1996

bull Maximized project value by cost control budgeting scheduling maintaining initial contract values andoptimizing economic parameters

bull Involved in the negotiation and implementation a $100 million EPC turnkey contract for the constructionand start-up of the facility

bull Project was managed to completion which included mobilization commissioning commercial operationsperformance testing and conversion to term financing

Pa2e 2KENNETH W SPINNER

PROFESSIONAL EXPERIENCE (Continued)

WEST WINDSOR POWER - 120 MW - WINDSOR ONTARIO

Manager EngineeringPowerlink Corporation (Subsidiary of Northstar Energy Corp) Portland Oregon

1992 to ]994

Responsible for all technical management and support for power project development activities in Canada USAand other international regions Supported project contract negotiations on the West Windsor Power Projectmanaged the engineering construction contract and operating agreement negotiations

Manager Facilities Engineering Sr Project Engineer Process EngineerNorthstar Energy Corporation Dome Petroleum Ltd Hudsons Bay Oil and Gas LtdCalgary Alberta

1980 to ]992

Managed oil and gas facilities development in Alberta and independent power development in Canada and theUSA Responsible for project management and process engineering on various oil and gas facilities and pipelines

EDUCATION

bull Bachelor of Science Chemical Engineering (Honours) 1980Queens University at Kingston Ontario

bull Cogeneration Development Course 1992Kingston Ontario

bull Cogeneration Power Plant Design and Optimization 1991Boston Massachusetts

bull Business Management Financial and Evaluation Courses 1986 to 1997

Pale 3

Project Experience Chart

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsHarvie Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren BakerCampbell Power Project Utilities Washington CCGT Electric Harbour EPCOR Power Power Resource

Puget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Puncakjaya Duke Irian Jaya 395 MW Diesel coal Mitsubishi PT Freeport 1997 Richard E Richard EPower Project Energy Indonesia fired Indonesia Coleman Coleman

PT Freeport PT FreeportIndonesia IndonesiaJI H R Rasuna JI H R RasunaSaid Kav X-7 No Said Kav X-7 No6 6Plaza 89 12th Plaza 89 12thFloor FloorJakarta 12940 Jakarta 12940

Lake Superior Great Sault St 110 MW Natural GE Ontario 1993 Colin Clark Bill RalphPower Project Lakes Marie Ont GasDistiliate Electricity Great Lakes OEFC

Power Finance Corp Power amp Brascan 416-325-80577059415651

McMahon Duke Taylor BC 115 MW Natural Gas Westinghouse BC Hydro 1993 Duane Rae Dawn FarrellCogeneration Energy Duke Energy BC Hydro

ATCO 4036991551ATCO

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsJeff Myers Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren Baker

Power Project Utilitiesl Washington CCGT Electric Harbour EPCOR Power Power ResourcePuget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Liberty Power Reliant Philadelphia 568 MW Natural Gas GE Pacific Gas 2002 Greg Kennedy Nowa merchantProject Energy PA CCGT and Electric - Reliant Energy plant

National 713-497-7490Energy Group(receivership)

West Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Ken Spinner Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsWest Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Julia S Ciccaglione Curriculum Vitae

CURRICULUM VITAE

JULIA S CICCAGLIONEEnvironment Specialist

3040400 4th Avenue SWCalgary AB Canada T2P OJ4

Tel (403)444-5538 email jciccaglionepristinepowerca

CAREER BRIEF

An environment specialist with extensive experience in project management impact assessmentstakeholder consultation policy analysis and climate change Additional expertise in internationaldevelopment projects including project monitoring and stakeholder facilitation Excellent communicationorganisation and writing skills Technical background in the biophysical sciences and economics Projectperformance measurement experience using Results Based Management (RBM)

EDUCA TION

MSc Geography 1998Soil Erosion Assessment Soil and Water Nutrient Loss Analysis Watershed ManagementUniversity of Calgary Calgary Alberta Canada

BSc Geography 1994University of Calgary Calgary Alberta CanadaConcentration Biogeography geomorphology

BA Economics 1991University of Calgary Calgary Alberta CanadaConcentration Petroleum economics

PROFESSIONAL EXPERTISE

Environmental Project ManagementPolicy AnalysisRegulatory AnalysisStakeholder amp Public Consultation

Impact AssessmentSustainable DevelopmentClimate ChangeEnvironmental Management

CAREER HISTORY

Domestic

1998- Pristine Power Inc Calgary Vice President Environment and Emissions TradingPresent Responsible for overall environmental project management regulatory compliance public

policy input and management of Pristines greenhouse gas strategy

Suncurrent Industries Ltd Calgary Senior Emissions Portfolio ConsultantResponsible for overall management of Suncurrents greenhouse gas credit portfolio

2

Alberta Energy Company (AEC) Ltd Calgary Wetland Vegetation Scientist IRISEnvironmental Systems Responsible for the design of a long-term (20 yr) Boreal wetlandvegetation monitoring program to determine the effects of groundwater withdrawal on wetlandvegetation Data gathered from the monitoring program to be utilised by Alberta EnvironmentalProtection for resource management decision making

Syncrude Canada Limited Calgary Environment Specialist and Project Manager IRISEnvironmental Systems Managed and co-ordinated a team of scientists responsible for thedelineation of forest types into commercial and non-commercial stands Derived informationwas used as input into Syncrudes reclamation and mine area conservation plan Specificproject management activities included conducting a needs assessment budget preparationand creation of a Terms of Reference

Environmental Impact Assessment amp Policy Specialist IRIS Environmental SystemsResponsible for the completion of environmental impact assessment projects Responsibilitiesincluded the identification of impacts mitigations cumulative effects and the management andco-ordination of multidisciplinary scientific teams Extensive liasing with government agenciesPolicy analysis included integrating environmental policy and statutory requirements withdevelopment initiatives Additional responsibilities included extensive stakeholder and publicconsultation The following is a list of completed environmental impact assessments

Skiing Louise Limited Banff National Park An Environmental Screening Report for thepurpose of withdrawing water from the Pipestone River and Corral Creek to accommodatesnowmaking fire-fighting and domestic water use activities Report considerations includedidentifying river hydrologic regimes potential impacts to aquatic ecosystems mitigationprocedures and cumulative effects assessment

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts associated with improvements to water intake systems in the Pipestone River andCorral Creek Specific report considerations included identifying impacts to aquaticecosystems

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts related to terrain modifications and replacement of snowmaking infrastructure on theUpper Wiwaxy ski run

The Lake Louise Inn Banff National Park Environmental Screening Report for theconstruction of new commercial accommodation in Lake Louise

Skoki Lodge Banff National Park Environmental Screening Report for the construction ofadditional staff housing at the Skoki Lodge National Historic Site

The Banff Centre Banff National Park Environmental Screening Report for the submissionof an Area Redevelopment Plan The project considered a strategic assessment includedthe identification of impacts resulting from proposed developments or redevelopments on thecampus of The Banff Centre

Ski Marmot Basin Jasper National Park Canada Part of a multi-disciplinary teamresponsible for the completion of a Comprehensive Study for the development of a chairlift andski runs in the Eagle Ridge area of Marmot Basin

Ski Marmot Basin Jasper National Park Canada Environmental Screening Reportspertaining to the installation of new sewage treatment facilities improvements to surfacedrainage and subsurface drainage

3

1995-1998

1990

Legislation Analyst IRIS Environmental Systems Alberta Economic DevelopmentCalgary AB Review and analysis of Alberta Provincial and Canadian Federal legislation todetermine land use laws and identify areas within the province which may have potential forfuture tourism development This information was used in the development of maps illustratingcurrent land uses and areas of potential future tourism development in Alberta

University of Calgary Department of Geography Canada Instructor i) Taught introductorygeography Topics included climatology geomorphology soils and vegetation hydrology remotesensing and air photo interpretation ii) Taught a senior level course in introductory vascular plantidentification plant taxonomy introductory wildlife identification and habitat associations and plantand wildlife responses to disturbances specific to the Canadian Grasslands Aspen ParklandMontane Sub-Alpine Alpine and Boreal Forest Ecoregions

Petro Canada Resources Incorporated Calgary Canada Junior Land ManagementRepresentative Responsible for the review of land agreements governing the operation of oiland gas properties Conducted an economic evaluation and reconciliation of predicted gas pricesversus actual market prices Additional work included site inspections of reclaimed coal propertiesin northeastern British Columbia

International

1998- Cuba Climate Change Emissions Baseline and Monitoring Plan Department of ForeignPresent Affairs 2002 and IntI Trade (DFAIT) Canada Project Manager Suncurrent Industries Ltd

Responsible for managing a climate change emissions baseline study and monitoring planfocused on the implementation of renewable and energy efficient technologies (wind and solarenergy high efficiency micro-turbines) in Cuba Baseline study was in accordance with thoserequirements for a Clean Development Mechanism

Egypt Environment Theme Project - Canadian International Development Agency (CIDA)Environment and Performance Measurement Specialist IRIS Environmental SystemsMember of the Performance Measurement Advisory team for the bilateral CIDA-EgyptEnvironment Theme Project (7 year project) Responsibilities included the measurement ofenvironment project and environment theme results Results to be consistent with Government ofCanada - CIDA policy programming goals including contributing to sustainable development inEgypt and stakeholder involvement in development initiatives Results Based Management(RBM) used as a measurement tool

Zimbabwe Victoria Falls Environmental Planning and Capacity Enhancement Project -Canadian International Development Agency (CIDA) Environment and PerformanceMeasurement Specialist IRIS Environmental Systems An RBM facilitator in an iterativesustainable-development project in Victoria Falls to promote environmentally sustainablecommunities Project focused on improving the capacity of local partners to participate effectivelyin the preparation and implementation of the Victoria Falls Master Plan and Local DevelopmentPlans Specific responsibilities included the development and facilitation of an RBM stakeholderworkshop held in Victoria Falls Zimbabwe Workshop emphasized participatory approaches andthe inclusion of gender equality in the identification and measurement of results

Egypt Environment Theme Project Canadian International Development Agency (CIDA)PolicyProgram Analyst IRIS Environmental Systems Member of the policyprogramanalysis team conducting a trends analysis of CIDAs programming in Egypt This analysisserved as an input into CIDAs planning and design of the new Egypt Country DevelopmentProgram Framework (CDPF) Data was obtained by surveying identified stakeholders in Egyptand Canada Results of the trends analysis were then correlated with CIDAs Egypt CountryDevelopment Policy Framework to reconcile its effectiveness and provide input for its futuredirection

4

1996-1990

Governments of Chad and Cameroon - World Bank Panel Review of PipelineDevelopment Research Assistant IRIS Environmental Systems Research assistant to theManagerCoordinator of the Expert Panel for the review of literature pertaining to biodiversity andwildlands ecology in the African savannah tropical forests and marine ecosystems

St Vincent and the Grenadines Caribbean Soil Erosion Research on DeforestedWatershed Areas Environmental Scientist Project Manager and Principle investigator intothe loss of soil water and nutrients associated with banana cultivated areas Secondary focus ofthe research was aimed at developing a land use management plan incorporating conservationfarming practices and the use of social forestry in the conservation of soil on severely erodedsteep-land agricultural areas In consideration with the socio-economic status of the areaformulated recommendations for appropriate farming practices at the micro-scale level

St Vincent and the Grenadines Caribbean Man and the Biosphere ProjectUNESCOEnvironmental Scientist Assistant Project Supervisor and Liaison between the University ofCalgary and the St Vincent Forestry Department Responsible for the implementation of varioussoil erosion research studies aimed at the quantification of soil water and nutrient loss associatedwith agroforestry and forestry plantation areas

ENVIRONMENTAL POLICYChair of the Energy Recovery Generation (ERG) Subgroup Clean Air Strategic Alliance Alberta

Advisor Centre for EnergyERG Input Electricity and Alternative Energy Division BC Ministry of Energy and Mines

ERG Input Climate Change Offset System Environment CanadaERG Input Treatment of Clean Energy Natural Resources Canada

COUNTRIES WORK EXPERIENCECanada Egypt Zimbabwe St Vincent and the Grenadines Chad and Cameroon Cuba

5

Selected Permitting Reports

1 A Wetlands Monitoring Plan Foster Creek Area Cold Lake Air Weapons Range AB 2001 Reportprepared for Alberta Energy Company Ltd

2 A Strategic Assessment of The Banff Centre Area Redevelopment Plan Banff National Park AB2000 Environmental Screening Report prepared for The Banff Centre

3 Permit to Withdraw Water from the Pipestone River and Corral Creek for the Purposes ofSnowmaking Fire-Fighting and Domestic Water Use the Lake Louise Ski Area Banff National ParkAB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

4 Improvements to Water Intakes on the Pipestone River and Corral Creek the Lake Louise Ski AreaBanff National Park AB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

5 Proposed Development of a Chairliff and Ski Runs on Eagle Ridge the Marmot Basin Ski AreaJasper National Park AB 1999 Comprehensive Study Report prepared for Ski Marmot Basin

6 An Application for New Staff Accommodations at Skoki Lodge Banff National Park AB 2000Environmental Screening Report prepared for Skiing Louise Ltd

7 An Application for New Commercial Accommodations at the Lake Louise Inn Banff National ParkAB 2000 Report prepared for the Lake Louise Inn

8 Improvements to Surface Drainage at the Marmot Basin Ski Area Jasper National Park AB 1998Environmental Screening Report prepared for Ski Marmot Basin

9 Improvements to Subsurface Drainage at the Marmot Basin Ski Area Jasper National Park AB1998 Environmental Screening Report prepared for Ski Marmot Basin

10 Improvements to Sewage Treatment Facilities and Effluent Disposal at the Marmot Basin Ski AreaJasper National Park AB 1998 Environmental Screening Report prepared for Ski Marmot Basin

Other Reports

11 Legislative and Policy Factors Influencing Tourism Development in Alberta 2000 Report preparedfor Alberta Economic Development and Alberta Economic Development Authority TourismCommittee

12 Egypt Country Development Policy Framework (CDPF) Assessment 1999 Report prepared for theCanadian International Development Agency Hull Quebec

13 Egypt Country Development Policy Framework (CDPF) Assessment Presentation 1999Presentation prepared for the Canadian International Development Agency Hull Quebec

14 Monitoring Mission Reports Egypt Environment Theme Reports prepared for the CanadianInternational Development Agency Hull Quebec

15 A Pre-Disturbance Vegetation Classification for the Disturbed Portion of the Syncrude DevelopmentArea Mildred Lake AB 1998 Report prepared for Syncrude Canada Ltd

16 Characterization of Soil Erosion Processes and Nutrient Losses Associated with Previously ForestedAreas the Colonarie River Watershed St Vincent West Indies 1998 A Masters Thesis preparedfor the University of Calgary

6

Stakeholder Consultation

1 Zimbabwe-Canada Environmental Planning Exchange Mission 2001 Organized and coordinated anexchange mission held in Banff AB for the CIDA Zimbabwe Environmental Planning and CapacityEnhancement Project

2 Strategic Assessment of The Banff Centre Area Redevelopment Plan 2000 Conducted stakeholderconsultations via a public open house forum

3 Results Based Management as a Project Management Tool 1999 Conducted a workshop in VictoriaFalls Zimbabwe for the Environmental Planning and Capacity Enhancement Project

7

Neil StewartRR 3 SimcoeOntario CanadaN3Y 4K2

OBJECTIVE ProjectConstruction Management

emailphone

fax

nmsproj ectskwiccom519-426-2239519-426-2674

1991-Date

1990-1991

1988-1990

JPRomC1r amp CONsect1[RUCnON MIANAGEMJENT sectJERVJ[CJEsect

Project amp Construction Management services including Project DevelopmentProject strategy Contract negotiations Contract Management Industrial RelationsGovernment liaison Profit amp Loss accountability

Plans of execution project controls budgets planning evaluations safety labourrelations and business development Project amp Site management coordinationprocedures administration methods and site organization Managed andcoordinated information flow tofrom Client(s) Engineer(s) and Contractor(s)

Projects includeWestcoast Energy 55mw Whitby Cogen Bayside 280 mw RepowerEcodyne Ltd MOU contract management amp coordinationUnited Parcel Services Canada Hamilton Air Hub ProjectINCO Nickle Foam and Nickle Disc ProjectsBayer AG Nicklehydroxide and Tungsten Carbide ProjectsMacMillen Bloedel Secondary Fibre Recycling Project

Fluor Daniel Canada LtdResident Construction Manager Central Division

Provide support to Business Units for construction managementservicesresponsible for industrial relations safety quality personnel development andmethods Initiated and established field organizations roles and responsibilitiessite procedures fab shop contractorsupplier planning budgetsfinancial and clientrelations to support critical contract schedules

Projects includeProctor amp Gamble Ultra Project MFord Canada Winn 88 Paint PlantINCO S02 Abatement Project

Ellis Don LtdProject Manager Resident site manager accountable for the process coordinationof $500M GMSUZUKI (CAMI) grass roots automotive plant in Ingersoll ON

Directed 1800 unionized trades (peak workforce) and managed lump-sum projecton schedule and under budget Developed and maintained Oriental and NorthAmerican client trust relationships Surpassed project expectations in labourrelations and safety Profit and Loss accountability

1986-1988

1985-1986

1984-1985

1983-1984

1981-1983

1978-1981

1974-1978

1973-1974

1969-1973

EDUCATION

UMA SpantecGeneral SuperintendentDirected and supervised lump-sum contracts Interfaced with engineering andclient organizations to produce responsive quality services and safe profitablecontracts

Projects includedLabatts Brewers various capital projectsConsumers Glass hot amp cold end shut downsUnivofWaterloo construction management servicesDomtar paper board expansion

Glen Curtis Company Construction SuperintendentConstruction management of Canadian Occidentals 65m cfPdgrass roots sour gas plant in Mezeppa Alberta

Ennisteel Co Ltd Toronto ON Project SupervisorUltramars 1500 million barrel terminal

Self-employed OntarioShip yard construction amp generation facilities

Petrosar Inc Sarnia ON Area SuperintendentClient rep responsible for $650 Million HFOU project

Fluor Canada Corp Alberta Mechanical SupervisorAGCL 1200 tpd Methanol plantAquitaine Canada 650m cfPd sour gas plantEsso Canada Cold Lake Project amp Judy Creek

Arthur GMcKee Inc Nanticoke ON Area SupervisorTexaco 120000 bpd grass roots refinery

SteIco Inc Hamilton ON

JewittVallee Simcoe ONOntario Hydro 4000 MW Thermal generationStelco LEW steel plantDomtar Mill expansionTrent Valley Quarry modernization

MacMaster University 1976-77 (night school)Mohawk College 1971-72 (night school)

SELF DEVELOPMENT -project management-construction management-basic computers-industrial relations-WinWin strategies

-WHMIS-safety amp compensation-KT amp decisions-team management-personnel administration

PERSONAL

REFERENCES

DOB February 24 1950

On request

CITIZENSHIP Canadian

Cochrane Engineering Ltd

Statement of Qualifications

Power Generation Facilities

Cochrane Engineering Ltd200 - 1770 W7th Avenue

Vancouver Be V6J 4Y6Phone 604-736-5421 Fax 604-736-1519

Email receptioncochrane-groupca

COCHRAR

Cochrane Engineering LtdGeneral Qualifications

TABLE OF CONTENTS

Section

Section

Section

10 COMPANY BACKGROUND11 Multi-Disciplinary Design12 Quality Assurance

20 SUMMARY OF RECENT RELEVANT EXPERIENCE21 Recent Relevant Projects Completed22 Projects Currently in Progress23 Cochrane Group - Other Relevant Experience

30 ENGINEERINGmiddot TOOLS

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Sandhill Energy CenterAusti n Texas

Calpine Combined Cycle Power PlantGoldendale Washington

10 COMPANY BACKGROUND

The Cochrane Group of companies including Cochrane Engineeringprovides integrated engineering architecture planning and projectmanagement services for a wide variety of projects It was formed in1996 through the merger of Cochrane Engineering a Calgary firm inoperation since 1972 and the PBK Group which had providedarchitectural and engineering services in Vancouver since 1937 Ouraffiliation with the Cochrane Group affords us access to the expertiseof over 350 personnel consisting of project managers technicalpersonnel and administrative staff in six offices across Canada Italso lends access to other Cochrane Group firms including PBKArchitects Inc which has provided design services for many industrialprojects in Canada and abroad Cochrane Engineering and PBKArchitects have significant experience providing services for clients inthe power coal mining and process industries

Cochrane Engineerings power division has successfully exporteddesign services through out North and South America In the last twoyears this division has provided mechanical processinstrumentation architectural electrical civil and structural designservices for projects totaling over 1000 MW of power generationThe construction cost for these projects exceeds $1 billion

11 Multi-Disciplinary DesignCochrane Group is a fully integrated multi-disciplinary design groupservicing the power sector with in-house architectural capabilitiesGE7FA experience and combined cycle process experts enabling usto provide comprehensive one stop shopping The CochraneGroups multi-disciplinary design team includes

bull Cochrane Engineering Ltd andbull PBK Architects Inc

Cochrane Engineering Ltd is a multi-discipline engineering firmspecializing in the design of combined cycle power plants simplecycle power plants and industrial projects We also supplyengineering resources for PBK architects

PBK Architects Inc specializes in the design of industrial facilitiesoffices maintenance shops warehouses institutional buildings andrecreational sport facilities PBK provides the architectural servicesto Cochrane for our power projects Signature projects include BCPlace GM Place Horseshoe Bay Ferry Terminal upgrade and

1-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 16: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

PROFESSIONAL EXPERIENCE (Continued)

WEST WINDSOR POWER - 120 MW - WINDSOR ONTARIO

Manager EngineeringPowerlink Corporation (Subsidiary of Northstar Energy Corp) Portland Oregon

1992 to ]994

Responsible for all technical management and support for power project development activities in Canada USAand other international regions Supported project contract negotiations on the West Windsor Power Projectmanaged the engineering construction contract and operating agreement negotiations

Manager Facilities Engineering Sr Project Engineer Process EngineerNorthstar Energy Corporation Dome Petroleum Ltd Hudsons Bay Oil and Gas LtdCalgary Alberta

1980 to ]992

Managed oil and gas facilities development in Alberta and independent power development in Canada and theUSA Responsible for project management and process engineering on various oil and gas facilities and pipelines

EDUCATION

bull Bachelor of Science Chemical Engineering (Honours) 1980Queens University at Kingston Ontario

bull Cogeneration Development Course 1992Kingston Ontario

bull Cogeneration Power Plant Design and Optimization 1991Boston Massachusetts

bull Business Management Financial and Evaluation Courses 1986 to 1997

Pale 3

Project Experience Chart

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsHarvie Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren BakerCampbell Power Project Utilities Washington CCGT Electric Harbour EPCOR Power Power Resource

Puget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Puncakjaya Duke Irian Jaya 395 MW Diesel coal Mitsubishi PT Freeport 1997 Richard E Richard EPower Project Energy Indonesia fired Indonesia Coleman Coleman

PT Freeport PT FreeportIndonesia IndonesiaJI H R Rasuna JI H R RasunaSaid Kav X-7 No Said Kav X-7 No6 6Plaza 89 12th Plaza 89 12thFloor FloorJakarta 12940 Jakarta 12940

Lake Superior Great Sault St 110 MW Natural GE Ontario 1993 Colin Clark Bill RalphPower Project Lakes Marie Ont GasDistiliate Electricity Great Lakes OEFC

Power Finance Corp Power amp Brascan 416-325-80577059415651

McMahon Duke Taylor BC 115 MW Natural Gas Westinghouse BC Hydro 1993 Duane Rae Dawn FarrellCogeneration Energy Duke Energy BC Hydro

ATCO 4036991551ATCO

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsJeff Myers Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren Baker

Power Project Utilitiesl Washington CCGT Electric Harbour EPCOR Power Power ResourcePuget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Liberty Power Reliant Philadelphia 568 MW Natural Gas GE Pacific Gas 2002 Greg Kennedy Nowa merchantProject Energy PA CCGT and Electric - Reliant Energy plant

National 713-497-7490Energy Group(receivership)

West Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Ken Spinner Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsWest Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Julia S Ciccaglione Curriculum Vitae

CURRICULUM VITAE

JULIA S CICCAGLIONEEnvironment Specialist

3040400 4th Avenue SWCalgary AB Canada T2P OJ4

Tel (403)444-5538 email jciccaglionepristinepowerca

CAREER BRIEF

An environment specialist with extensive experience in project management impact assessmentstakeholder consultation policy analysis and climate change Additional expertise in internationaldevelopment projects including project monitoring and stakeholder facilitation Excellent communicationorganisation and writing skills Technical background in the biophysical sciences and economics Projectperformance measurement experience using Results Based Management (RBM)

EDUCA TION

MSc Geography 1998Soil Erosion Assessment Soil and Water Nutrient Loss Analysis Watershed ManagementUniversity of Calgary Calgary Alberta Canada

BSc Geography 1994University of Calgary Calgary Alberta CanadaConcentration Biogeography geomorphology

BA Economics 1991University of Calgary Calgary Alberta CanadaConcentration Petroleum economics

PROFESSIONAL EXPERTISE

Environmental Project ManagementPolicy AnalysisRegulatory AnalysisStakeholder amp Public Consultation

Impact AssessmentSustainable DevelopmentClimate ChangeEnvironmental Management

CAREER HISTORY

Domestic

1998- Pristine Power Inc Calgary Vice President Environment and Emissions TradingPresent Responsible for overall environmental project management regulatory compliance public

policy input and management of Pristines greenhouse gas strategy

Suncurrent Industries Ltd Calgary Senior Emissions Portfolio ConsultantResponsible for overall management of Suncurrents greenhouse gas credit portfolio

2

Alberta Energy Company (AEC) Ltd Calgary Wetland Vegetation Scientist IRISEnvironmental Systems Responsible for the design of a long-term (20 yr) Boreal wetlandvegetation monitoring program to determine the effects of groundwater withdrawal on wetlandvegetation Data gathered from the monitoring program to be utilised by Alberta EnvironmentalProtection for resource management decision making

Syncrude Canada Limited Calgary Environment Specialist and Project Manager IRISEnvironmental Systems Managed and co-ordinated a team of scientists responsible for thedelineation of forest types into commercial and non-commercial stands Derived informationwas used as input into Syncrudes reclamation and mine area conservation plan Specificproject management activities included conducting a needs assessment budget preparationand creation of a Terms of Reference

Environmental Impact Assessment amp Policy Specialist IRIS Environmental SystemsResponsible for the completion of environmental impact assessment projects Responsibilitiesincluded the identification of impacts mitigations cumulative effects and the management andco-ordination of multidisciplinary scientific teams Extensive liasing with government agenciesPolicy analysis included integrating environmental policy and statutory requirements withdevelopment initiatives Additional responsibilities included extensive stakeholder and publicconsultation The following is a list of completed environmental impact assessments

Skiing Louise Limited Banff National Park An Environmental Screening Report for thepurpose of withdrawing water from the Pipestone River and Corral Creek to accommodatesnowmaking fire-fighting and domestic water use activities Report considerations includedidentifying river hydrologic regimes potential impacts to aquatic ecosystems mitigationprocedures and cumulative effects assessment

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts associated with improvements to water intake systems in the Pipestone River andCorral Creek Specific report considerations included identifying impacts to aquaticecosystems

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts related to terrain modifications and replacement of snowmaking infrastructure on theUpper Wiwaxy ski run

The Lake Louise Inn Banff National Park Environmental Screening Report for theconstruction of new commercial accommodation in Lake Louise

Skoki Lodge Banff National Park Environmental Screening Report for the construction ofadditional staff housing at the Skoki Lodge National Historic Site

The Banff Centre Banff National Park Environmental Screening Report for the submissionof an Area Redevelopment Plan The project considered a strategic assessment includedthe identification of impacts resulting from proposed developments or redevelopments on thecampus of The Banff Centre

Ski Marmot Basin Jasper National Park Canada Part of a multi-disciplinary teamresponsible for the completion of a Comprehensive Study for the development of a chairlift andski runs in the Eagle Ridge area of Marmot Basin

Ski Marmot Basin Jasper National Park Canada Environmental Screening Reportspertaining to the installation of new sewage treatment facilities improvements to surfacedrainage and subsurface drainage

3

1995-1998

1990

Legislation Analyst IRIS Environmental Systems Alberta Economic DevelopmentCalgary AB Review and analysis of Alberta Provincial and Canadian Federal legislation todetermine land use laws and identify areas within the province which may have potential forfuture tourism development This information was used in the development of maps illustratingcurrent land uses and areas of potential future tourism development in Alberta

University of Calgary Department of Geography Canada Instructor i) Taught introductorygeography Topics included climatology geomorphology soils and vegetation hydrology remotesensing and air photo interpretation ii) Taught a senior level course in introductory vascular plantidentification plant taxonomy introductory wildlife identification and habitat associations and plantand wildlife responses to disturbances specific to the Canadian Grasslands Aspen ParklandMontane Sub-Alpine Alpine and Boreal Forest Ecoregions

Petro Canada Resources Incorporated Calgary Canada Junior Land ManagementRepresentative Responsible for the review of land agreements governing the operation of oiland gas properties Conducted an economic evaluation and reconciliation of predicted gas pricesversus actual market prices Additional work included site inspections of reclaimed coal propertiesin northeastern British Columbia

International

1998- Cuba Climate Change Emissions Baseline and Monitoring Plan Department of ForeignPresent Affairs 2002 and IntI Trade (DFAIT) Canada Project Manager Suncurrent Industries Ltd

Responsible for managing a climate change emissions baseline study and monitoring planfocused on the implementation of renewable and energy efficient technologies (wind and solarenergy high efficiency micro-turbines) in Cuba Baseline study was in accordance with thoserequirements for a Clean Development Mechanism

Egypt Environment Theme Project - Canadian International Development Agency (CIDA)Environment and Performance Measurement Specialist IRIS Environmental SystemsMember of the Performance Measurement Advisory team for the bilateral CIDA-EgyptEnvironment Theme Project (7 year project) Responsibilities included the measurement ofenvironment project and environment theme results Results to be consistent with Government ofCanada - CIDA policy programming goals including contributing to sustainable development inEgypt and stakeholder involvement in development initiatives Results Based Management(RBM) used as a measurement tool

Zimbabwe Victoria Falls Environmental Planning and Capacity Enhancement Project -Canadian International Development Agency (CIDA) Environment and PerformanceMeasurement Specialist IRIS Environmental Systems An RBM facilitator in an iterativesustainable-development project in Victoria Falls to promote environmentally sustainablecommunities Project focused on improving the capacity of local partners to participate effectivelyin the preparation and implementation of the Victoria Falls Master Plan and Local DevelopmentPlans Specific responsibilities included the development and facilitation of an RBM stakeholderworkshop held in Victoria Falls Zimbabwe Workshop emphasized participatory approaches andthe inclusion of gender equality in the identification and measurement of results

Egypt Environment Theme Project Canadian International Development Agency (CIDA)PolicyProgram Analyst IRIS Environmental Systems Member of the policyprogramanalysis team conducting a trends analysis of CIDAs programming in Egypt This analysisserved as an input into CIDAs planning and design of the new Egypt Country DevelopmentProgram Framework (CDPF) Data was obtained by surveying identified stakeholders in Egyptand Canada Results of the trends analysis were then correlated with CIDAs Egypt CountryDevelopment Policy Framework to reconcile its effectiveness and provide input for its futuredirection

4

1996-1990

Governments of Chad and Cameroon - World Bank Panel Review of PipelineDevelopment Research Assistant IRIS Environmental Systems Research assistant to theManagerCoordinator of the Expert Panel for the review of literature pertaining to biodiversity andwildlands ecology in the African savannah tropical forests and marine ecosystems

St Vincent and the Grenadines Caribbean Soil Erosion Research on DeforestedWatershed Areas Environmental Scientist Project Manager and Principle investigator intothe loss of soil water and nutrients associated with banana cultivated areas Secondary focus ofthe research was aimed at developing a land use management plan incorporating conservationfarming practices and the use of social forestry in the conservation of soil on severely erodedsteep-land agricultural areas In consideration with the socio-economic status of the areaformulated recommendations for appropriate farming practices at the micro-scale level

St Vincent and the Grenadines Caribbean Man and the Biosphere ProjectUNESCOEnvironmental Scientist Assistant Project Supervisor and Liaison between the University ofCalgary and the St Vincent Forestry Department Responsible for the implementation of varioussoil erosion research studies aimed at the quantification of soil water and nutrient loss associatedwith agroforestry and forestry plantation areas

ENVIRONMENTAL POLICYChair of the Energy Recovery Generation (ERG) Subgroup Clean Air Strategic Alliance Alberta

Advisor Centre for EnergyERG Input Electricity and Alternative Energy Division BC Ministry of Energy and Mines

ERG Input Climate Change Offset System Environment CanadaERG Input Treatment of Clean Energy Natural Resources Canada

COUNTRIES WORK EXPERIENCECanada Egypt Zimbabwe St Vincent and the Grenadines Chad and Cameroon Cuba

5

Selected Permitting Reports

1 A Wetlands Monitoring Plan Foster Creek Area Cold Lake Air Weapons Range AB 2001 Reportprepared for Alberta Energy Company Ltd

2 A Strategic Assessment of The Banff Centre Area Redevelopment Plan Banff National Park AB2000 Environmental Screening Report prepared for The Banff Centre

3 Permit to Withdraw Water from the Pipestone River and Corral Creek for the Purposes ofSnowmaking Fire-Fighting and Domestic Water Use the Lake Louise Ski Area Banff National ParkAB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

4 Improvements to Water Intakes on the Pipestone River and Corral Creek the Lake Louise Ski AreaBanff National Park AB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

5 Proposed Development of a Chairliff and Ski Runs on Eagle Ridge the Marmot Basin Ski AreaJasper National Park AB 1999 Comprehensive Study Report prepared for Ski Marmot Basin

6 An Application for New Staff Accommodations at Skoki Lodge Banff National Park AB 2000Environmental Screening Report prepared for Skiing Louise Ltd

7 An Application for New Commercial Accommodations at the Lake Louise Inn Banff National ParkAB 2000 Report prepared for the Lake Louise Inn

8 Improvements to Surface Drainage at the Marmot Basin Ski Area Jasper National Park AB 1998Environmental Screening Report prepared for Ski Marmot Basin

9 Improvements to Subsurface Drainage at the Marmot Basin Ski Area Jasper National Park AB1998 Environmental Screening Report prepared for Ski Marmot Basin

10 Improvements to Sewage Treatment Facilities and Effluent Disposal at the Marmot Basin Ski AreaJasper National Park AB 1998 Environmental Screening Report prepared for Ski Marmot Basin

Other Reports

11 Legislative and Policy Factors Influencing Tourism Development in Alberta 2000 Report preparedfor Alberta Economic Development and Alberta Economic Development Authority TourismCommittee

12 Egypt Country Development Policy Framework (CDPF) Assessment 1999 Report prepared for theCanadian International Development Agency Hull Quebec

13 Egypt Country Development Policy Framework (CDPF) Assessment Presentation 1999Presentation prepared for the Canadian International Development Agency Hull Quebec

14 Monitoring Mission Reports Egypt Environment Theme Reports prepared for the CanadianInternational Development Agency Hull Quebec

15 A Pre-Disturbance Vegetation Classification for the Disturbed Portion of the Syncrude DevelopmentArea Mildred Lake AB 1998 Report prepared for Syncrude Canada Ltd

16 Characterization of Soil Erosion Processes and Nutrient Losses Associated with Previously ForestedAreas the Colonarie River Watershed St Vincent West Indies 1998 A Masters Thesis preparedfor the University of Calgary

6

Stakeholder Consultation

1 Zimbabwe-Canada Environmental Planning Exchange Mission 2001 Organized and coordinated anexchange mission held in Banff AB for the CIDA Zimbabwe Environmental Planning and CapacityEnhancement Project

2 Strategic Assessment of The Banff Centre Area Redevelopment Plan 2000 Conducted stakeholderconsultations via a public open house forum

3 Results Based Management as a Project Management Tool 1999 Conducted a workshop in VictoriaFalls Zimbabwe for the Environmental Planning and Capacity Enhancement Project

7

Neil StewartRR 3 SimcoeOntario CanadaN3Y 4K2

OBJECTIVE ProjectConstruction Management

emailphone

fax

nmsproj ectskwiccom519-426-2239519-426-2674

1991-Date

1990-1991

1988-1990

JPRomC1r amp CONsect1[RUCnON MIANAGEMJENT sectJERVJ[CJEsect

Project amp Construction Management services including Project DevelopmentProject strategy Contract negotiations Contract Management Industrial RelationsGovernment liaison Profit amp Loss accountability

Plans of execution project controls budgets planning evaluations safety labourrelations and business development Project amp Site management coordinationprocedures administration methods and site organization Managed andcoordinated information flow tofrom Client(s) Engineer(s) and Contractor(s)

Projects includeWestcoast Energy 55mw Whitby Cogen Bayside 280 mw RepowerEcodyne Ltd MOU contract management amp coordinationUnited Parcel Services Canada Hamilton Air Hub ProjectINCO Nickle Foam and Nickle Disc ProjectsBayer AG Nicklehydroxide and Tungsten Carbide ProjectsMacMillen Bloedel Secondary Fibre Recycling Project

Fluor Daniel Canada LtdResident Construction Manager Central Division

Provide support to Business Units for construction managementservicesresponsible for industrial relations safety quality personnel development andmethods Initiated and established field organizations roles and responsibilitiessite procedures fab shop contractorsupplier planning budgetsfinancial and clientrelations to support critical contract schedules

Projects includeProctor amp Gamble Ultra Project MFord Canada Winn 88 Paint PlantINCO S02 Abatement Project

Ellis Don LtdProject Manager Resident site manager accountable for the process coordinationof $500M GMSUZUKI (CAMI) grass roots automotive plant in Ingersoll ON

Directed 1800 unionized trades (peak workforce) and managed lump-sum projecton schedule and under budget Developed and maintained Oriental and NorthAmerican client trust relationships Surpassed project expectations in labourrelations and safety Profit and Loss accountability

1986-1988

1985-1986

1984-1985

1983-1984

1981-1983

1978-1981

1974-1978

1973-1974

1969-1973

EDUCATION

UMA SpantecGeneral SuperintendentDirected and supervised lump-sum contracts Interfaced with engineering andclient organizations to produce responsive quality services and safe profitablecontracts

Projects includedLabatts Brewers various capital projectsConsumers Glass hot amp cold end shut downsUnivofWaterloo construction management servicesDomtar paper board expansion

Glen Curtis Company Construction SuperintendentConstruction management of Canadian Occidentals 65m cfPdgrass roots sour gas plant in Mezeppa Alberta

Ennisteel Co Ltd Toronto ON Project SupervisorUltramars 1500 million barrel terminal

Self-employed OntarioShip yard construction amp generation facilities

Petrosar Inc Sarnia ON Area SuperintendentClient rep responsible for $650 Million HFOU project

Fluor Canada Corp Alberta Mechanical SupervisorAGCL 1200 tpd Methanol plantAquitaine Canada 650m cfPd sour gas plantEsso Canada Cold Lake Project amp Judy Creek

Arthur GMcKee Inc Nanticoke ON Area SupervisorTexaco 120000 bpd grass roots refinery

SteIco Inc Hamilton ON

JewittVallee Simcoe ONOntario Hydro 4000 MW Thermal generationStelco LEW steel plantDomtar Mill expansionTrent Valley Quarry modernization

MacMaster University 1976-77 (night school)Mohawk College 1971-72 (night school)

SELF DEVELOPMENT -project management-construction management-basic computers-industrial relations-WinWin strategies

-WHMIS-safety amp compensation-KT amp decisions-team management-personnel administration

PERSONAL

REFERENCES

DOB February 24 1950

On request

CITIZENSHIP Canadian

Cochrane Engineering Ltd

Statement of Qualifications

Power Generation Facilities

Cochrane Engineering Ltd200 - 1770 W7th Avenue

Vancouver Be V6J 4Y6Phone 604-736-5421 Fax 604-736-1519

Email receptioncochrane-groupca

COCHRAR

Cochrane Engineering LtdGeneral Qualifications

TABLE OF CONTENTS

Section

Section

Section

10 COMPANY BACKGROUND11 Multi-Disciplinary Design12 Quality Assurance

20 SUMMARY OF RECENT RELEVANT EXPERIENCE21 Recent Relevant Projects Completed22 Projects Currently in Progress23 Cochrane Group - Other Relevant Experience

30 ENGINEERINGmiddot TOOLS

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Sandhill Energy CenterAusti n Texas

Calpine Combined Cycle Power PlantGoldendale Washington

10 COMPANY BACKGROUND

The Cochrane Group of companies including Cochrane Engineeringprovides integrated engineering architecture planning and projectmanagement services for a wide variety of projects It was formed in1996 through the merger of Cochrane Engineering a Calgary firm inoperation since 1972 and the PBK Group which had providedarchitectural and engineering services in Vancouver since 1937 Ouraffiliation with the Cochrane Group affords us access to the expertiseof over 350 personnel consisting of project managers technicalpersonnel and administrative staff in six offices across Canada Italso lends access to other Cochrane Group firms including PBKArchitects Inc which has provided design services for many industrialprojects in Canada and abroad Cochrane Engineering and PBKArchitects have significant experience providing services for clients inthe power coal mining and process industries

Cochrane Engineerings power division has successfully exporteddesign services through out North and South America In the last twoyears this division has provided mechanical processinstrumentation architectural electrical civil and structural designservices for projects totaling over 1000 MW of power generationThe construction cost for these projects exceeds $1 billion

11 Multi-Disciplinary DesignCochrane Group is a fully integrated multi-disciplinary design groupservicing the power sector with in-house architectural capabilitiesGE7FA experience and combined cycle process experts enabling usto provide comprehensive one stop shopping The CochraneGroups multi-disciplinary design team includes

bull Cochrane Engineering Ltd andbull PBK Architects Inc

Cochrane Engineering Ltd is a multi-discipline engineering firmspecializing in the design of combined cycle power plants simplecycle power plants and industrial projects We also supplyengineering resources for PBK architects

PBK Architects Inc specializes in the design of industrial facilitiesoffices maintenance shops warehouses institutional buildings andrecreational sport facilities PBK provides the architectural servicesto Cochrane for our power projects Signature projects include BCPlace GM Place Horseshoe Bay Ferry Terminal upgrade and

1-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 17: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

Project Experience Chart

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsHarvie Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren BakerCampbell Power Project Utilities Washington CCGT Electric Harbour EPCOR Power Power Resource

Puget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Puncakjaya Duke Irian Jaya 395 MW Diesel coal Mitsubishi PT Freeport 1997 Richard E Richard EPower Project Energy Indonesia fired Indonesia Coleman Coleman

PT Freeport PT FreeportIndonesia IndonesiaJI H R Rasuna JI H R RasunaSaid Kav X-7 No Said Kav X-7 No6 6Plaza 89 12th Plaza 89 12thFloor FloorJakarta 12940 Jakarta 12940

Lake Superior Great Sault St 110 MW Natural GE Ontario 1993 Colin Clark Bill RalphPower Project Lakes Marie Ont GasDistiliate Electricity Great Lakes OEFC

Power Finance Corp Power amp Brascan 416-325-80577059415651

McMahon Duke Taylor BC 115 MW Natural Gas Westinghouse BC Hydro 1993 Duane Rae Dawn FarrellCogeneration Energy Duke Energy BC Hydro

ATCO 4036991551ATCO

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsJeff Myers Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren Baker

Power Project Utilitiesl Washington CCGT Electric Harbour EPCOR Power Power ResourcePuget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Liberty Power Reliant Philadelphia 568 MW Natural Gas GE Pacific Gas 2002 Greg Kennedy Nowa merchantProject Energy PA CCGT and Electric - Reliant Energy plant

National 713-497-7490Energy Group(receivership)

West Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Ken Spinner Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsWest Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Julia S Ciccaglione Curriculum Vitae

CURRICULUM VITAE

JULIA S CICCAGLIONEEnvironment Specialist

3040400 4th Avenue SWCalgary AB Canada T2P OJ4

Tel (403)444-5538 email jciccaglionepristinepowerca

CAREER BRIEF

An environment specialist with extensive experience in project management impact assessmentstakeholder consultation policy analysis and climate change Additional expertise in internationaldevelopment projects including project monitoring and stakeholder facilitation Excellent communicationorganisation and writing skills Technical background in the biophysical sciences and economics Projectperformance measurement experience using Results Based Management (RBM)

EDUCA TION

MSc Geography 1998Soil Erosion Assessment Soil and Water Nutrient Loss Analysis Watershed ManagementUniversity of Calgary Calgary Alberta Canada

BSc Geography 1994University of Calgary Calgary Alberta CanadaConcentration Biogeography geomorphology

BA Economics 1991University of Calgary Calgary Alberta CanadaConcentration Petroleum economics

PROFESSIONAL EXPERTISE

Environmental Project ManagementPolicy AnalysisRegulatory AnalysisStakeholder amp Public Consultation

Impact AssessmentSustainable DevelopmentClimate ChangeEnvironmental Management

CAREER HISTORY

Domestic

1998- Pristine Power Inc Calgary Vice President Environment and Emissions TradingPresent Responsible for overall environmental project management regulatory compliance public

policy input and management of Pristines greenhouse gas strategy

Suncurrent Industries Ltd Calgary Senior Emissions Portfolio ConsultantResponsible for overall management of Suncurrents greenhouse gas credit portfolio

2

Alberta Energy Company (AEC) Ltd Calgary Wetland Vegetation Scientist IRISEnvironmental Systems Responsible for the design of a long-term (20 yr) Boreal wetlandvegetation monitoring program to determine the effects of groundwater withdrawal on wetlandvegetation Data gathered from the monitoring program to be utilised by Alberta EnvironmentalProtection for resource management decision making

Syncrude Canada Limited Calgary Environment Specialist and Project Manager IRISEnvironmental Systems Managed and co-ordinated a team of scientists responsible for thedelineation of forest types into commercial and non-commercial stands Derived informationwas used as input into Syncrudes reclamation and mine area conservation plan Specificproject management activities included conducting a needs assessment budget preparationand creation of a Terms of Reference

Environmental Impact Assessment amp Policy Specialist IRIS Environmental SystemsResponsible for the completion of environmental impact assessment projects Responsibilitiesincluded the identification of impacts mitigations cumulative effects and the management andco-ordination of multidisciplinary scientific teams Extensive liasing with government agenciesPolicy analysis included integrating environmental policy and statutory requirements withdevelopment initiatives Additional responsibilities included extensive stakeholder and publicconsultation The following is a list of completed environmental impact assessments

Skiing Louise Limited Banff National Park An Environmental Screening Report for thepurpose of withdrawing water from the Pipestone River and Corral Creek to accommodatesnowmaking fire-fighting and domestic water use activities Report considerations includedidentifying river hydrologic regimes potential impacts to aquatic ecosystems mitigationprocedures and cumulative effects assessment

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts associated with improvements to water intake systems in the Pipestone River andCorral Creek Specific report considerations included identifying impacts to aquaticecosystems

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts related to terrain modifications and replacement of snowmaking infrastructure on theUpper Wiwaxy ski run

The Lake Louise Inn Banff National Park Environmental Screening Report for theconstruction of new commercial accommodation in Lake Louise

Skoki Lodge Banff National Park Environmental Screening Report for the construction ofadditional staff housing at the Skoki Lodge National Historic Site

The Banff Centre Banff National Park Environmental Screening Report for the submissionof an Area Redevelopment Plan The project considered a strategic assessment includedthe identification of impacts resulting from proposed developments or redevelopments on thecampus of The Banff Centre

Ski Marmot Basin Jasper National Park Canada Part of a multi-disciplinary teamresponsible for the completion of a Comprehensive Study for the development of a chairlift andski runs in the Eagle Ridge area of Marmot Basin

Ski Marmot Basin Jasper National Park Canada Environmental Screening Reportspertaining to the installation of new sewage treatment facilities improvements to surfacedrainage and subsurface drainage

3

1995-1998

1990

Legislation Analyst IRIS Environmental Systems Alberta Economic DevelopmentCalgary AB Review and analysis of Alberta Provincial and Canadian Federal legislation todetermine land use laws and identify areas within the province which may have potential forfuture tourism development This information was used in the development of maps illustratingcurrent land uses and areas of potential future tourism development in Alberta

University of Calgary Department of Geography Canada Instructor i) Taught introductorygeography Topics included climatology geomorphology soils and vegetation hydrology remotesensing and air photo interpretation ii) Taught a senior level course in introductory vascular plantidentification plant taxonomy introductory wildlife identification and habitat associations and plantand wildlife responses to disturbances specific to the Canadian Grasslands Aspen ParklandMontane Sub-Alpine Alpine and Boreal Forest Ecoregions

Petro Canada Resources Incorporated Calgary Canada Junior Land ManagementRepresentative Responsible for the review of land agreements governing the operation of oiland gas properties Conducted an economic evaluation and reconciliation of predicted gas pricesversus actual market prices Additional work included site inspections of reclaimed coal propertiesin northeastern British Columbia

International

1998- Cuba Climate Change Emissions Baseline and Monitoring Plan Department of ForeignPresent Affairs 2002 and IntI Trade (DFAIT) Canada Project Manager Suncurrent Industries Ltd

Responsible for managing a climate change emissions baseline study and monitoring planfocused on the implementation of renewable and energy efficient technologies (wind and solarenergy high efficiency micro-turbines) in Cuba Baseline study was in accordance with thoserequirements for a Clean Development Mechanism

Egypt Environment Theme Project - Canadian International Development Agency (CIDA)Environment and Performance Measurement Specialist IRIS Environmental SystemsMember of the Performance Measurement Advisory team for the bilateral CIDA-EgyptEnvironment Theme Project (7 year project) Responsibilities included the measurement ofenvironment project and environment theme results Results to be consistent with Government ofCanada - CIDA policy programming goals including contributing to sustainable development inEgypt and stakeholder involvement in development initiatives Results Based Management(RBM) used as a measurement tool

Zimbabwe Victoria Falls Environmental Planning and Capacity Enhancement Project -Canadian International Development Agency (CIDA) Environment and PerformanceMeasurement Specialist IRIS Environmental Systems An RBM facilitator in an iterativesustainable-development project in Victoria Falls to promote environmentally sustainablecommunities Project focused on improving the capacity of local partners to participate effectivelyin the preparation and implementation of the Victoria Falls Master Plan and Local DevelopmentPlans Specific responsibilities included the development and facilitation of an RBM stakeholderworkshop held in Victoria Falls Zimbabwe Workshop emphasized participatory approaches andthe inclusion of gender equality in the identification and measurement of results

Egypt Environment Theme Project Canadian International Development Agency (CIDA)PolicyProgram Analyst IRIS Environmental Systems Member of the policyprogramanalysis team conducting a trends analysis of CIDAs programming in Egypt This analysisserved as an input into CIDAs planning and design of the new Egypt Country DevelopmentProgram Framework (CDPF) Data was obtained by surveying identified stakeholders in Egyptand Canada Results of the trends analysis were then correlated with CIDAs Egypt CountryDevelopment Policy Framework to reconcile its effectiveness and provide input for its futuredirection

4

1996-1990

Governments of Chad and Cameroon - World Bank Panel Review of PipelineDevelopment Research Assistant IRIS Environmental Systems Research assistant to theManagerCoordinator of the Expert Panel for the review of literature pertaining to biodiversity andwildlands ecology in the African savannah tropical forests and marine ecosystems

St Vincent and the Grenadines Caribbean Soil Erosion Research on DeforestedWatershed Areas Environmental Scientist Project Manager and Principle investigator intothe loss of soil water and nutrients associated with banana cultivated areas Secondary focus ofthe research was aimed at developing a land use management plan incorporating conservationfarming practices and the use of social forestry in the conservation of soil on severely erodedsteep-land agricultural areas In consideration with the socio-economic status of the areaformulated recommendations for appropriate farming practices at the micro-scale level

St Vincent and the Grenadines Caribbean Man and the Biosphere ProjectUNESCOEnvironmental Scientist Assistant Project Supervisor and Liaison between the University ofCalgary and the St Vincent Forestry Department Responsible for the implementation of varioussoil erosion research studies aimed at the quantification of soil water and nutrient loss associatedwith agroforestry and forestry plantation areas

ENVIRONMENTAL POLICYChair of the Energy Recovery Generation (ERG) Subgroup Clean Air Strategic Alliance Alberta

Advisor Centre for EnergyERG Input Electricity and Alternative Energy Division BC Ministry of Energy and Mines

ERG Input Climate Change Offset System Environment CanadaERG Input Treatment of Clean Energy Natural Resources Canada

COUNTRIES WORK EXPERIENCECanada Egypt Zimbabwe St Vincent and the Grenadines Chad and Cameroon Cuba

5

Selected Permitting Reports

1 A Wetlands Monitoring Plan Foster Creek Area Cold Lake Air Weapons Range AB 2001 Reportprepared for Alberta Energy Company Ltd

2 A Strategic Assessment of The Banff Centre Area Redevelopment Plan Banff National Park AB2000 Environmental Screening Report prepared for The Banff Centre

3 Permit to Withdraw Water from the Pipestone River and Corral Creek for the Purposes ofSnowmaking Fire-Fighting and Domestic Water Use the Lake Louise Ski Area Banff National ParkAB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

4 Improvements to Water Intakes on the Pipestone River and Corral Creek the Lake Louise Ski AreaBanff National Park AB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

5 Proposed Development of a Chairliff and Ski Runs on Eagle Ridge the Marmot Basin Ski AreaJasper National Park AB 1999 Comprehensive Study Report prepared for Ski Marmot Basin

6 An Application for New Staff Accommodations at Skoki Lodge Banff National Park AB 2000Environmental Screening Report prepared for Skiing Louise Ltd

7 An Application for New Commercial Accommodations at the Lake Louise Inn Banff National ParkAB 2000 Report prepared for the Lake Louise Inn

8 Improvements to Surface Drainage at the Marmot Basin Ski Area Jasper National Park AB 1998Environmental Screening Report prepared for Ski Marmot Basin

9 Improvements to Subsurface Drainage at the Marmot Basin Ski Area Jasper National Park AB1998 Environmental Screening Report prepared for Ski Marmot Basin

10 Improvements to Sewage Treatment Facilities and Effluent Disposal at the Marmot Basin Ski AreaJasper National Park AB 1998 Environmental Screening Report prepared for Ski Marmot Basin

Other Reports

11 Legislative and Policy Factors Influencing Tourism Development in Alberta 2000 Report preparedfor Alberta Economic Development and Alberta Economic Development Authority TourismCommittee

12 Egypt Country Development Policy Framework (CDPF) Assessment 1999 Report prepared for theCanadian International Development Agency Hull Quebec

13 Egypt Country Development Policy Framework (CDPF) Assessment Presentation 1999Presentation prepared for the Canadian International Development Agency Hull Quebec

14 Monitoring Mission Reports Egypt Environment Theme Reports prepared for the CanadianInternational Development Agency Hull Quebec

15 A Pre-Disturbance Vegetation Classification for the Disturbed Portion of the Syncrude DevelopmentArea Mildred Lake AB 1998 Report prepared for Syncrude Canada Ltd

16 Characterization of Soil Erosion Processes and Nutrient Losses Associated with Previously ForestedAreas the Colonarie River Watershed St Vincent West Indies 1998 A Masters Thesis preparedfor the University of Calgary

6

Stakeholder Consultation

1 Zimbabwe-Canada Environmental Planning Exchange Mission 2001 Organized and coordinated anexchange mission held in Banff AB for the CIDA Zimbabwe Environmental Planning and CapacityEnhancement Project

2 Strategic Assessment of The Banff Centre Area Redevelopment Plan 2000 Conducted stakeholderconsultations via a public open house forum

3 Results Based Management as a Project Management Tool 1999 Conducted a workshop in VictoriaFalls Zimbabwe for the Environmental Planning and Capacity Enhancement Project

7

Neil StewartRR 3 SimcoeOntario CanadaN3Y 4K2

OBJECTIVE ProjectConstruction Management

emailphone

fax

nmsproj ectskwiccom519-426-2239519-426-2674

1991-Date

1990-1991

1988-1990

JPRomC1r amp CONsect1[RUCnON MIANAGEMJENT sectJERVJ[CJEsect

Project amp Construction Management services including Project DevelopmentProject strategy Contract negotiations Contract Management Industrial RelationsGovernment liaison Profit amp Loss accountability

Plans of execution project controls budgets planning evaluations safety labourrelations and business development Project amp Site management coordinationprocedures administration methods and site organization Managed andcoordinated information flow tofrom Client(s) Engineer(s) and Contractor(s)

Projects includeWestcoast Energy 55mw Whitby Cogen Bayside 280 mw RepowerEcodyne Ltd MOU contract management amp coordinationUnited Parcel Services Canada Hamilton Air Hub ProjectINCO Nickle Foam and Nickle Disc ProjectsBayer AG Nicklehydroxide and Tungsten Carbide ProjectsMacMillen Bloedel Secondary Fibre Recycling Project

Fluor Daniel Canada LtdResident Construction Manager Central Division

Provide support to Business Units for construction managementservicesresponsible for industrial relations safety quality personnel development andmethods Initiated and established field organizations roles and responsibilitiessite procedures fab shop contractorsupplier planning budgetsfinancial and clientrelations to support critical contract schedules

Projects includeProctor amp Gamble Ultra Project MFord Canada Winn 88 Paint PlantINCO S02 Abatement Project

Ellis Don LtdProject Manager Resident site manager accountable for the process coordinationof $500M GMSUZUKI (CAMI) grass roots automotive plant in Ingersoll ON

Directed 1800 unionized trades (peak workforce) and managed lump-sum projecton schedule and under budget Developed and maintained Oriental and NorthAmerican client trust relationships Surpassed project expectations in labourrelations and safety Profit and Loss accountability

1986-1988

1985-1986

1984-1985

1983-1984

1981-1983

1978-1981

1974-1978

1973-1974

1969-1973

EDUCATION

UMA SpantecGeneral SuperintendentDirected and supervised lump-sum contracts Interfaced with engineering andclient organizations to produce responsive quality services and safe profitablecontracts

Projects includedLabatts Brewers various capital projectsConsumers Glass hot amp cold end shut downsUnivofWaterloo construction management servicesDomtar paper board expansion

Glen Curtis Company Construction SuperintendentConstruction management of Canadian Occidentals 65m cfPdgrass roots sour gas plant in Mezeppa Alberta

Ennisteel Co Ltd Toronto ON Project SupervisorUltramars 1500 million barrel terminal

Self-employed OntarioShip yard construction amp generation facilities

Petrosar Inc Sarnia ON Area SuperintendentClient rep responsible for $650 Million HFOU project

Fluor Canada Corp Alberta Mechanical SupervisorAGCL 1200 tpd Methanol plantAquitaine Canada 650m cfPd sour gas plantEsso Canada Cold Lake Project amp Judy Creek

Arthur GMcKee Inc Nanticoke ON Area SupervisorTexaco 120000 bpd grass roots refinery

SteIco Inc Hamilton ON

JewittVallee Simcoe ONOntario Hydro 4000 MW Thermal generationStelco LEW steel plantDomtar Mill expansionTrent Valley Quarry modernization

MacMaster University 1976-77 (night school)Mohawk College 1971-72 (night school)

SELF DEVELOPMENT -project management-construction management-basic computers-industrial relations-WinWin strategies

-WHMIS-safety amp compensation-KT amp decisions-team management-personnel administration

PERSONAL

REFERENCES

DOB February 24 1950

On request

CITIZENSHIP Canadian

Cochrane Engineering Ltd

Statement of Qualifications

Power Generation Facilities

Cochrane Engineering Ltd200 - 1770 W7th Avenue

Vancouver Be V6J 4Y6Phone 604-736-5421 Fax 604-736-1519

Email receptioncochrane-groupca

COCHRAR

Cochrane Engineering LtdGeneral Qualifications

TABLE OF CONTENTS

Section

Section

Section

10 COMPANY BACKGROUND11 Multi-Disciplinary Design12 Quality Assurance

20 SUMMARY OF RECENT RELEVANT EXPERIENCE21 Recent Relevant Projects Completed22 Projects Currently in Progress23 Cochrane Group - Other Relevant Experience

30 ENGINEERINGmiddot TOOLS

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Sandhill Energy CenterAusti n Texas

Calpine Combined Cycle Power PlantGoldendale Washington

10 COMPANY BACKGROUND

The Cochrane Group of companies including Cochrane Engineeringprovides integrated engineering architecture planning and projectmanagement services for a wide variety of projects It was formed in1996 through the merger of Cochrane Engineering a Calgary firm inoperation since 1972 and the PBK Group which had providedarchitectural and engineering services in Vancouver since 1937 Ouraffiliation with the Cochrane Group affords us access to the expertiseof over 350 personnel consisting of project managers technicalpersonnel and administrative staff in six offices across Canada Italso lends access to other Cochrane Group firms including PBKArchitects Inc which has provided design services for many industrialprojects in Canada and abroad Cochrane Engineering and PBKArchitects have significant experience providing services for clients inthe power coal mining and process industries

Cochrane Engineerings power division has successfully exporteddesign services through out North and South America In the last twoyears this division has provided mechanical processinstrumentation architectural electrical civil and structural designservices for projects totaling over 1000 MW of power generationThe construction cost for these projects exceeds $1 billion

11 Multi-Disciplinary DesignCochrane Group is a fully integrated multi-disciplinary design groupservicing the power sector with in-house architectural capabilitiesGE7FA experience and combined cycle process experts enabling usto provide comprehensive one stop shopping The CochraneGroups multi-disciplinary design team includes

bull Cochrane Engineering Ltd andbull PBK Architects Inc

Cochrane Engineering Ltd is a multi-discipline engineering firmspecializing in the design of combined cycle power plants simplecycle power plants and industrial projects We also supplyengineering resources for PBK architects

PBK Architects Inc specializes in the design of industrial facilitiesoffices maintenance shops warehouses institutional buildings andrecreational sport facilities PBK provides the architectural servicesto Cochrane for our power projects Signature projects include BCPlace GM Place Horseshoe Bay Ferry Terminal upgrade and

1-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 18: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsJeff Myers Frederickson EPCOR Tacoma 249 MW Natural Gas General Grays 2002 Chris Heffring Loren Baker

Power Project Utilitiesl Washington CCGT Electric Harbour EPCOR Power Power ResourcePuget Benton and Development ManagersSound Richland Corp Bellevue WashEnergy PUDs and 7804123190 4254519123

Puget SoundEnergy

Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Liberty Power Reliant Philadelphia 568 MW Natural Gas GE Pacific Gas 2002 Greg Kennedy Nowa merchantProject Energy PA CCGT and Electric - Reliant Energy plant

National 713-497-7490Energy Group(receivership)

West Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Ken Spinner Island Calpine Campbell 240 MW Natural Gas Alstom BC Hydro 2001 Toby Austin Dawn FarrellCogeneration Energy River BC CCGT Calpine Power BC HydroProject Trust Income Fund

4037813148

Bayside Power Duke Saint John 270 MW Natural Gas Alstom New 2001 Brad Porlier Darrell BishopProject Energy NB CCGT GTGeneral Brunswick Duke Energy New Brunswick

Electric ST Power - winter North America PowerMerchant - 713-627-4600 506-458-4327summer

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsWest Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Julia S Ciccaglione Curriculum Vitae

CURRICULUM VITAE

JULIA S CICCAGLIONEEnvironment Specialist

3040400 4th Avenue SWCalgary AB Canada T2P OJ4

Tel (403)444-5538 email jciccaglionepristinepowerca

CAREER BRIEF

An environment specialist with extensive experience in project management impact assessmentstakeholder consultation policy analysis and climate change Additional expertise in internationaldevelopment projects including project monitoring and stakeholder facilitation Excellent communicationorganisation and writing skills Technical background in the biophysical sciences and economics Projectperformance measurement experience using Results Based Management (RBM)

EDUCA TION

MSc Geography 1998Soil Erosion Assessment Soil and Water Nutrient Loss Analysis Watershed ManagementUniversity of Calgary Calgary Alberta Canada

BSc Geography 1994University of Calgary Calgary Alberta CanadaConcentration Biogeography geomorphology

BA Economics 1991University of Calgary Calgary Alberta CanadaConcentration Petroleum economics

PROFESSIONAL EXPERTISE

Environmental Project ManagementPolicy AnalysisRegulatory AnalysisStakeholder amp Public Consultation

Impact AssessmentSustainable DevelopmentClimate ChangeEnvironmental Management

CAREER HISTORY

Domestic

1998- Pristine Power Inc Calgary Vice President Environment and Emissions TradingPresent Responsible for overall environmental project management regulatory compliance public

policy input and management of Pristines greenhouse gas strategy

Suncurrent Industries Ltd Calgary Senior Emissions Portfolio ConsultantResponsible for overall management of Suncurrents greenhouse gas credit portfolio

2

Alberta Energy Company (AEC) Ltd Calgary Wetland Vegetation Scientist IRISEnvironmental Systems Responsible for the design of a long-term (20 yr) Boreal wetlandvegetation monitoring program to determine the effects of groundwater withdrawal on wetlandvegetation Data gathered from the monitoring program to be utilised by Alberta EnvironmentalProtection for resource management decision making

Syncrude Canada Limited Calgary Environment Specialist and Project Manager IRISEnvironmental Systems Managed and co-ordinated a team of scientists responsible for thedelineation of forest types into commercial and non-commercial stands Derived informationwas used as input into Syncrudes reclamation and mine area conservation plan Specificproject management activities included conducting a needs assessment budget preparationand creation of a Terms of Reference

Environmental Impact Assessment amp Policy Specialist IRIS Environmental SystemsResponsible for the completion of environmental impact assessment projects Responsibilitiesincluded the identification of impacts mitigations cumulative effects and the management andco-ordination of multidisciplinary scientific teams Extensive liasing with government agenciesPolicy analysis included integrating environmental policy and statutory requirements withdevelopment initiatives Additional responsibilities included extensive stakeholder and publicconsultation The following is a list of completed environmental impact assessments

Skiing Louise Limited Banff National Park An Environmental Screening Report for thepurpose of withdrawing water from the Pipestone River and Corral Creek to accommodatesnowmaking fire-fighting and domestic water use activities Report considerations includedidentifying river hydrologic regimes potential impacts to aquatic ecosystems mitigationprocedures and cumulative effects assessment

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts associated with improvements to water intake systems in the Pipestone River andCorral Creek Specific report considerations included identifying impacts to aquaticecosystems

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts related to terrain modifications and replacement of snowmaking infrastructure on theUpper Wiwaxy ski run

The Lake Louise Inn Banff National Park Environmental Screening Report for theconstruction of new commercial accommodation in Lake Louise

Skoki Lodge Banff National Park Environmental Screening Report for the construction ofadditional staff housing at the Skoki Lodge National Historic Site

The Banff Centre Banff National Park Environmental Screening Report for the submissionof an Area Redevelopment Plan The project considered a strategic assessment includedthe identification of impacts resulting from proposed developments or redevelopments on thecampus of The Banff Centre

Ski Marmot Basin Jasper National Park Canada Part of a multi-disciplinary teamresponsible for the completion of a Comprehensive Study for the development of a chairlift andski runs in the Eagle Ridge area of Marmot Basin

Ski Marmot Basin Jasper National Park Canada Environmental Screening Reportspertaining to the installation of new sewage treatment facilities improvements to surfacedrainage and subsurface drainage

3

1995-1998

1990

Legislation Analyst IRIS Environmental Systems Alberta Economic DevelopmentCalgary AB Review and analysis of Alberta Provincial and Canadian Federal legislation todetermine land use laws and identify areas within the province which may have potential forfuture tourism development This information was used in the development of maps illustratingcurrent land uses and areas of potential future tourism development in Alberta

University of Calgary Department of Geography Canada Instructor i) Taught introductorygeography Topics included climatology geomorphology soils and vegetation hydrology remotesensing and air photo interpretation ii) Taught a senior level course in introductory vascular plantidentification plant taxonomy introductory wildlife identification and habitat associations and plantand wildlife responses to disturbances specific to the Canadian Grasslands Aspen ParklandMontane Sub-Alpine Alpine and Boreal Forest Ecoregions

Petro Canada Resources Incorporated Calgary Canada Junior Land ManagementRepresentative Responsible for the review of land agreements governing the operation of oiland gas properties Conducted an economic evaluation and reconciliation of predicted gas pricesversus actual market prices Additional work included site inspections of reclaimed coal propertiesin northeastern British Columbia

International

1998- Cuba Climate Change Emissions Baseline and Monitoring Plan Department of ForeignPresent Affairs 2002 and IntI Trade (DFAIT) Canada Project Manager Suncurrent Industries Ltd

Responsible for managing a climate change emissions baseline study and monitoring planfocused on the implementation of renewable and energy efficient technologies (wind and solarenergy high efficiency micro-turbines) in Cuba Baseline study was in accordance with thoserequirements for a Clean Development Mechanism

Egypt Environment Theme Project - Canadian International Development Agency (CIDA)Environment and Performance Measurement Specialist IRIS Environmental SystemsMember of the Performance Measurement Advisory team for the bilateral CIDA-EgyptEnvironment Theme Project (7 year project) Responsibilities included the measurement ofenvironment project and environment theme results Results to be consistent with Government ofCanada - CIDA policy programming goals including contributing to sustainable development inEgypt and stakeholder involvement in development initiatives Results Based Management(RBM) used as a measurement tool

Zimbabwe Victoria Falls Environmental Planning and Capacity Enhancement Project -Canadian International Development Agency (CIDA) Environment and PerformanceMeasurement Specialist IRIS Environmental Systems An RBM facilitator in an iterativesustainable-development project in Victoria Falls to promote environmentally sustainablecommunities Project focused on improving the capacity of local partners to participate effectivelyin the preparation and implementation of the Victoria Falls Master Plan and Local DevelopmentPlans Specific responsibilities included the development and facilitation of an RBM stakeholderworkshop held in Victoria Falls Zimbabwe Workshop emphasized participatory approaches andthe inclusion of gender equality in the identification and measurement of results

Egypt Environment Theme Project Canadian International Development Agency (CIDA)PolicyProgram Analyst IRIS Environmental Systems Member of the policyprogramanalysis team conducting a trends analysis of CIDAs programming in Egypt This analysisserved as an input into CIDAs planning and design of the new Egypt Country DevelopmentProgram Framework (CDPF) Data was obtained by surveying identified stakeholders in Egyptand Canada Results of the trends analysis were then correlated with CIDAs Egypt CountryDevelopment Policy Framework to reconcile its effectiveness and provide input for its futuredirection

4

1996-1990

Governments of Chad and Cameroon - World Bank Panel Review of PipelineDevelopment Research Assistant IRIS Environmental Systems Research assistant to theManagerCoordinator of the Expert Panel for the review of literature pertaining to biodiversity andwildlands ecology in the African savannah tropical forests and marine ecosystems

St Vincent and the Grenadines Caribbean Soil Erosion Research on DeforestedWatershed Areas Environmental Scientist Project Manager and Principle investigator intothe loss of soil water and nutrients associated with banana cultivated areas Secondary focus ofthe research was aimed at developing a land use management plan incorporating conservationfarming practices and the use of social forestry in the conservation of soil on severely erodedsteep-land agricultural areas In consideration with the socio-economic status of the areaformulated recommendations for appropriate farming practices at the micro-scale level

St Vincent and the Grenadines Caribbean Man and the Biosphere ProjectUNESCOEnvironmental Scientist Assistant Project Supervisor and Liaison between the University ofCalgary and the St Vincent Forestry Department Responsible for the implementation of varioussoil erosion research studies aimed at the quantification of soil water and nutrient loss associatedwith agroforestry and forestry plantation areas

ENVIRONMENTAL POLICYChair of the Energy Recovery Generation (ERG) Subgroup Clean Air Strategic Alliance Alberta

Advisor Centre for EnergyERG Input Electricity and Alternative Energy Division BC Ministry of Energy and Mines

ERG Input Climate Change Offset System Environment CanadaERG Input Treatment of Clean Energy Natural Resources Canada

COUNTRIES WORK EXPERIENCECanada Egypt Zimbabwe St Vincent and the Grenadines Chad and Cameroon Cuba

5

Selected Permitting Reports

1 A Wetlands Monitoring Plan Foster Creek Area Cold Lake Air Weapons Range AB 2001 Reportprepared for Alberta Energy Company Ltd

2 A Strategic Assessment of The Banff Centre Area Redevelopment Plan Banff National Park AB2000 Environmental Screening Report prepared for The Banff Centre

3 Permit to Withdraw Water from the Pipestone River and Corral Creek for the Purposes ofSnowmaking Fire-Fighting and Domestic Water Use the Lake Louise Ski Area Banff National ParkAB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

4 Improvements to Water Intakes on the Pipestone River and Corral Creek the Lake Louise Ski AreaBanff National Park AB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

5 Proposed Development of a Chairliff and Ski Runs on Eagle Ridge the Marmot Basin Ski AreaJasper National Park AB 1999 Comprehensive Study Report prepared for Ski Marmot Basin

6 An Application for New Staff Accommodations at Skoki Lodge Banff National Park AB 2000Environmental Screening Report prepared for Skiing Louise Ltd

7 An Application for New Commercial Accommodations at the Lake Louise Inn Banff National ParkAB 2000 Report prepared for the Lake Louise Inn

8 Improvements to Surface Drainage at the Marmot Basin Ski Area Jasper National Park AB 1998Environmental Screening Report prepared for Ski Marmot Basin

9 Improvements to Subsurface Drainage at the Marmot Basin Ski Area Jasper National Park AB1998 Environmental Screening Report prepared for Ski Marmot Basin

10 Improvements to Sewage Treatment Facilities and Effluent Disposal at the Marmot Basin Ski AreaJasper National Park AB 1998 Environmental Screening Report prepared for Ski Marmot Basin

Other Reports

11 Legislative and Policy Factors Influencing Tourism Development in Alberta 2000 Report preparedfor Alberta Economic Development and Alberta Economic Development Authority TourismCommittee

12 Egypt Country Development Policy Framework (CDPF) Assessment 1999 Report prepared for theCanadian International Development Agency Hull Quebec

13 Egypt Country Development Policy Framework (CDPF) Assessment Presentation 1999Presentation prepared for the Canadian International Development Agency Hull Quebec

14 Monitoring Mission Reports Egypt Environment Theme Reports prepared for the CanadianInternational Development Agency Hull Quebec

15 A Pre-Disturbance Vegetation Classification for the Disturbed Portion of the Syncrude DevelopmentArea Mildred Lake AB 1998 Report prepared for Syncrude Canada Ltd

16 Characterization of Soil Erosion Processes and Nutrient Losses Associated with Previously ForestedAreas the Colonarie River Watershed St Vincent West Indies 1998 A Masters Thesis preparedfor the University of Calgary

6

Stakeholder Consultation

1 Zimbabwe-Canada Environmental Planning Exchange Mission 2001 Organized and coordinated anexchange mission held in Banff AB for the CIDA Zimbabwe Environmental Planning and CapacityEnhancement Project

2 Strategic Assessment of The Banff Centre Area Redevelopment Plan 2000 Conducted stakeholderconsultations via a public open house forum

3 Results Based Management as a Project Management Tool 1999 Conducted a workshop in VictoriaFalls Zimbabwe for the Environmental Planning and Capacity Enhancement Project

7

Neil StewartRR 3 SimcoeOntario CanadaN3Y 4K2

OBJECTIVE ProjectConstruction Management

emailphone

fax

nmsproj ectskwiccom519-426-2239519-426-2674

1991-Date

1990-1991

1988-1990

JPRomC1r amp CONsect1[RUCnON MIANAGEMJENT sectJERVJ[CJEsect

Project amp Construction Management services including Project DevelopmentProject strategy Contract negotiations Contract Management Industrial RelationsGovernment liaison Profit amp Loss accountability

Plans of execution project controls budgets planning evaluations safety labourrelations and business development Project amp Site management coordinationprocedures administration methods and site organization Managed andcoordinated information flow tofrom Client(s) Engineer(s) and Contractor(s)

Projects includeWestcoast Energy 55mw Whitby Cogen Bayside 280 mw RepowerEcodyne Ltd MOU contract management amp coordinationUnited Parcel Services Canada Hamilton Air Hub ProjectINCO Nickle Foam and Nickle Disc ProjectsBayer AG Nicklehydroxide and Tungsten Carbide ProjectsMacMillen Bloedel Secondary Fibre Recycling Project

Fluor Daniel Canada LtdResident Construction Manager Central Division

Provide support to Business Units for construction managementservicesresponsible for industrial relations safety quality personnel development andmethods Initiated and established field organizations roles and responsibilitiessite procedures fab shop contractorsupplier planning budgetsfinancial and clientrelations to support critical contract schedules

Projects includeProctor amp Gamble Ultra Project MFord Canada Winn 88 Paint PlantINCO S02 Abatement Project

Ellis Don LtdProject Manager Resident site manager accountable for the process coordinationof $500M GMSUZUKI (CAMI) grass roots automotive plant in Ingersoll ON

Directed 1800 unionized trades (peak workforce) and managed lump-sum projecton schedule and under budget Developed and maintained Oriental and NorthAmerican client trust relationships Surpassed project expectations in labourrelations and safety Profit and Loss accountability

1986-1988

1985-1986

1984-1985

1983-1984

1981-1983

1978-1981

1974-1978

1973-1974

1969-1973

EDUCATION

UMA SpantecGeneral SuperintendentDirected and supervised lump-sum contracts Interfaced with engineering andclient organizations to produce responsive quality services and safe profitablecontracts

Projects includedLabatts Brewers various capital projectsConsumers Glass hot amp cold end shut downsUnivofWaterloo construction management servicesDomtar paper board expansion

Glen Curtis Company Construction SuperintendentConstruction management of Canadian Occidentals 65m cfPdgrass roots sour gas plant in Mezeppa Alberta

Ennisteel Co Ltd Toronto ON Project SupervisorUltramars 1500 million barrel terminal

Self-employed OntarioShip yard construction amp generation facilities

Petrosar Inc Sarnia ON Area SuperintendentClient rep responsible for $650 Million HFOU project

Fluor Canada Corp Alberta Mechanical SupervisorAGCL 1200 tpd Methanol plantAquitaine Canada 650m cfPd sour gas plantEsso Canada Cold Lake Project amp Judy Creek

Arthur GMcKee Inc Nanticoke ON Area SupervisorTexaco 120000 bpd grass roots refinery

SteIco Inc Hamilton ON

JewittVallee Simcoe ONOntario Hydro 4000 MW Thermal generationStelco LEW steel plantDomtar Mill expansionTrent Valley Quarry modernization

MacMaster University 1976-77 (night school)Mohawk College 1971-72 (night school)

SELF DEVELOPMENT -project management-construction management-basic computers-industrial relations-WinWin strategies

-WHMIS-safety amp compensation-KT amp decisions-team management-personnel administration

PERSONAL

REFERENCES

DOB February 24 1950

On request

CITIZENSHIP Canadian

Cochrane Engineering Ltd

Statement of Qualifications

Power Generation Facilities

Cochrane Engineering Ltd200 - 1770 W7th Avenue

Vancouver Be V6J 4Y6Phone 604-736-5421 Fax 604-736-1519

Email receptioncochrane-groupca

COCHRAR

Cochrane Engineering LtdGeneral Qualifications

TABLE OF CONTENTS

Section

Section

Section

10 COMPANY BACKGROUND11 Multi-Disciplinary Design12 Quality Assurance

20 SUMMARY OF RECENT RELEVANT EXPERIENCE21 Recent Relevant Projects Completed22 Projects Currently in Progress23 Cochrane Group - Other Relevant Experience

30 ENGINEERINGmiddot TOOLS

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Sandhill Energy CenterAusti n Texas

Calpine Combined Cycle Power PlantGoldendale Washington

10 COMPANY BACKGROUND

The Cochrane Group of companies including Cochrane Engineeringprovides integrated engineering architecture planning and projectmanagement services for a wide variety of projects It was formed in1996 through the merger of Cochrane Engineering a Calgary firm inoperation since 1972 and the PBK Group which had providedarchitectural and engineering services in Vancouver since 1937 Ouraffiliation with the Cochrane Group affords us access to the expertiseof over 350 personnel consisting of project managers technicalpersonnel and administrative staff in six offices across Canada Italso lends access to other Cochrane Group firms including PBKArchitects Inc which has provided design services for many industrialprojects in Canada and abroad Cochrane Engineering and PBKArchitects have significant experience providing services for clients inthe power coal mining and process industries

Cochrane Engineerings power division has successfully exporteddesign services through out North and South America In the last twoyears this division has provided mechanical processinstrumentation architectural electrical civil and structural designservices for projects totaling over 1000 MW of power generationThe construction cost for these projects exceeds $1 billion

11 Multi-Disciplinary DesignCochrane Group is a fully integrated multi-disciplinary design groupservicing the power sector with in-house architectural capabilitiesGE7FA experience and combined cycle process experts enabling usto provide comprehensive one stop shopping The CochraneGroups multi-disciplinary design team includes

bull Cochrane Engineering Ltd andbull PBK Architects Inc

Cochrane Engineering Ltd is a multi-discipline engineering firmspecializing in the design of combined cycle power plants simplecycle power plants and industrial projects We also supplyengineering resources for PBK architects

PBK Architects Inc specializes in the design of industrial facilitiesoffices maintenance shops warehouses institutional buildings andrecreational sport facilities PBK provides the architectural servicesto Cochrane for our power projects Signature projects include BCPlace GM Place Horseshoe Bay Ferry Terminal upgrade and

1-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 19: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

Team Member Project Name Owner Location Installed Technologyl Primary Power COD Project Contact Power PurchaserCapacity Fuel Type Equipment Purchaser Contact

MfrsWest Windsor Tractebel Windsor 105 MW Natural Gas ABB (Alstom) Ontario 1996 Paul Cavicchi Bill RalphPower North Ontario CCGT Electricity Tractebel North OEFC

America Finance America 416-325-8057Corporation 713-552-2501

Julia S Ciccaglione Curriculum Vitae

CURRICULUM VITAE

JULIA S CICCAGLIONEEnvironment Specialist

3040400 4th Avenue SWCalgary AB Canada T2P OJ4

Tel (403)444-5538 email jciccaglionepristinepowerca

CAREER BRIEF

An environment specialist with extensive experience in project management impact assessmentstakeholder consultation policy analysis and climate change Additional expertise in internationaldevelopment projects including project monitoring and stakeholder facilitation Excellent communicationorganisation and writing skills Technical background in the biophysical sciences and economics Projectperformance measurement experience using Results Based Management (RBM)

EDUCA TION

MSc Geography 1998Soil Erosion Assessment Soil and Water Nutrient Loss Analysis Watershed ManagementUniversity of Calgary Calgary Alberta Canada

BSc Geography 1994University of Calgary Calgary Alberta CanadaConcentration Biogeography geomorphology

BA Economics 1991University of Calgary Calgary Alberta CanadaConcentration Petroleum economics

PROFESSIONAL EXPERTISE

Environmental Project ManagementPolicy AnalysisRegulatory AnalysisStakeholder amp Public Consultation

Impact AssessmentSustainable DevelopmentClimate ChangeEnvironmental Management

CAREER HISTORY

Domestic

1998- Pristine Power Inc Calgary Vice President Environment and Emissions TradingPresent Responsible for overall environmental project management regulatory compliance public

policy input and management of Pristines greenhouse gas strategy

Suncurrent Industries Ltd Calgary Senior Emissions Portfolio ConsultantResponsible for overall management of Suncurrents greenhouse gas credit portfolio

2

Alberta Energy Company (AEC) Ltd Calgary Wetland Vegetation Scientist IRISEnvironmental Systems Responsible for the design of a long-term (20 yr) Boreal wetlandvegetation monitoring program to determine the effects of groundwater withdrawal on wetlandvegetation Data gathered from the monitoring program to be utilised by Alberta EnvironmentalProtection for resource management decision making

Syncrude Canada Limited Calgary Environment Specialist and Project Manager IRISEnvironmental Systems Managed and co-ordinated a team of scientists responsible for thedelineation of forest types into commercial and non-commercial stands Derived informationwas used as input into Syncrudes reclamation and mine area conservation plan Specificproject management activities included conducting a needs assessment budget preparationand creation of a Terms of Reference

Environmental Impact Assessment amp Policy Specialist IRIS Environmental SystemsResponsible for the completion of environmental impact assessment projects Responsibilitiesincluded the identification of impacts mitigations cumulative effects and the management andco-ordination of multidisciplinary scientific teams Extensive liasing with government agenciesPolicy analysis included integrating environmental policy and statutory requirements withdevelopment initiatives Additional responsibilities included extensive stakeholder and publicconsultation The following is a list of completed environmental impact assessments

Skiing Louise Limited Banff National Park An Environmental Screening Report for thepurpose of withdrawing water from the Pipestone River and Corral Creek to accommodatesnowmaking fire-fighting and domestic water use activities Report considerations includedidentifying river hydrologic regimes potential impacts to aquatic ecosystems mitigationprocedures and cumulative effects assessment

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts associated with improvements to water intake systems in the Pipestone River andCorral Creek Specific report considerations included identifying impacts to aquaticecosystems

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts related to terrain modifications and replacement of snowmaking infrastructure on theUpper Wiwaxy ski run

The Lake Louise Inn Banff National Park Environmental Screening Report for theconstruction of new commercial accommodation in Lake Louise

Skoki Lodge Banff National Park Environmental Screening Report for the construction ofadditional staff housing at the Skoki Lodge National Historic Site

The Banff Centre Banff National Park Environmental Screening Report for the submissionof an Area Redevelopment Plan The project considered a strategic assessment includedthe identification of impacts resulting from proposed developments or redevelopments on thecampus of The Banff Centre

Ski Marmot Basin Jasper National Park Canada Part of a multi-disciplinary teamresponsible for the completion of a Comprehensive Study for the development of a chairlift andski runs in the Eagle Ridge area of Marmot Basin

Ski Marmot Basin Jasper National Park Canada Environmental Screening Reportspertaining to the installation of new sewage treatment facilities improvements to surfacedrainage and subsurface drainage

3

1995-1998

1990

Legislation Analyst IRIS Environmental Systems Alberta Economic DevelopmentCalgary AB Review and analysis of Alberta Provincial and Canadian Federal legislation todetermine land use laws and identify areas within the province which may have potential forfuture tourism development This information was used in the development of maps illustratingcurrent land uses and areas of potential future tourism development in Alberta

University of Calgary Department of Geography Canada Instructor i) Taught introductorygeography Topics included climatology geomorphology soils and vegetation hydrology remotesensing and air photo interpretation ii) Taught a senior level course in introductory vascular plantidentification plant taxonomy introductory wildlife identification and habitat associations and plantand wildlife responses to disturbances specific to the Canadian Grasslands Aspen ParklandMontane Sub-Alpine Alpine and Boreal Forest Ecoregions

Petro Canada Resources Incorporated Calgary Canada Junior Land ManagementRepresentative Responsible for the review of land agreements governing the operation of oiland gas properties Conducted an economic evaluation and reconciliation of predicted gas pricesversus actual market prices Additional work included site inspections of reclaimed coal propertiesin northeastern British Columbia

International

1998- Cuba Climate Change Emissions Baseline and Monitoring Plan Department of ForeignPresent Affairs 2002 and IntI Trade (DFAIT) Canada Project Manager Suncurrent Industries Ltd

Responsible for managing a climate change emissions baseline study and monitoring planfocused on the implementation of renewable and energy efficient technologies (wind and solarenergy high efficiency micro-turbines) in Cuba Baseline study was in accordance with thoserequirements for a Clean Development Mechanism

Egypt Environment Theme Project - Canadian International Development Agency (CIDA)Environment and Performance Measurement Specialist IRIS Environmental SystemsMember of the Performance Measurement Advisory team for the bilateral CIDA-EgyptEnvironment Theme Project (7 year project) Responsibilities included the measurement ofenvironment project and environment theme results Results to be consistent with Government ofCanada - CIDA policy programming goals including contributing to sustainable development inEgypt and stakeholder involvement in development initiatives Results Based Management(RBM) used as a measurement tool

Zimbabwe Victoria Falls Environmental Planning and Capacity Enhancement Project -Canadian International Development Agency (CIDA) Environment and PerformanceMeasurement Specialist IRIS Environmental Systems An RBM facilitator in an iterativesustainable-development project in Victoria Falls to promote environmentally sustainablecommunities Project focused on improving the capacity of local partners to participate effectivelyin the preparation and implementation of the Victoria Falls Master Plan and Local DevelopmentPlans Specific responsibilities included the development and facilitation of an RBM stakeholderworkshop held in Victoria Falls Zimbabwe Workshop emphasized participatory approaches andthe inclusion of gender equality in the identification and measurement of results

Egypt Environment Theme Project Canadian International Development Agency (CIDA)PolicyProgram Analyst IRIS Environmental Systems Member of the policyprogramanalysis team conducting a trends analysis of CIDAs programming in Egypt This analysisserved as an input into CIDAs planning and design of the new Egypt Country DevelopmentProgram Framework (CDPF) Data was obtained by surveying identified stakeholders in Egyptand Canada Results of the trends analysis were then correlated with CIDAs Egypt CountryDevelopment Policy Framework to reconcile its effectiveness and provide input for its futuredirection

4

1996-1990

Governments of Chad and Cameroon - World Bank Panel Review of PipelineDevelopment Research Assistant IRIS Environmental Systems Research assistant to theManagerCoordinator of the Expert Panel for the review of literature pertaining to biodiversity andwildlands ecology in the African savannah tropical forests and marine ecosystems

St Vincent and the Grenadines Caribbean Soil Erosion Research on DeforestedWatershed Areas Environmental Scientist Project Manager and Principle investigator intothe loss of soil water and nutrients associated with banana cultivated areas Secondary focus ofthe research was aimed at developing a land use management plan incorporating conservationfarming practices and the use of social forestry in the conservation of soil on severely erodedsteep-land agricultural areas In consideration with the socio-economic status of the areaformulated recommendations for appropriate farming practices at the micro-scale level

St Vincent and the Grenadines Caribbean Man and the Biosphere ProjectUNESCOEnvironmental Scientist Assistant Project Supervisor and Liaison between the University ofCalgary and the St Vincent Forestry Department Responsible for the implementation of varioussoil erosion research studies aimed at the quantification of soil water and nutrient loss associatedwith agroforestry and forestry plantation areas

ENVIRONMENTAL POLICYChair of the Energy Recovery Generation (ERG) Subgroup Clean Air Strategic Alliance Alberta

Advisor Centre for EnergyERG Input Electricity and Alternative Energy Division BC Ministry of Energy and Mines

ERG Input Climate Change Offset System Environment CanadaERG Input Treatment of Clean Energy Natural Resources Canada

COUNTRIES WORK EXPERIENCECanada Egypt Zimbabwe St Vincent and the Grenadines Chad and Cameroon Cuba

5

Selected Permitting Reports

1 A Wetlands Monitoring Plan Foster Creek Area Cold Lake Air Weapons Range AB 2001 Reportprepared for Alberta Energy Company Ltd

2 A Strategic Assessment of The Banff Centre Area Redevelopment Plan Banff National Park AB2000 Environmental Screening Report prepared for The Banff Centre

3 Permit to Withdraw Water from the Pipestone River and Corral Creek for the Purposes ofSnowmaking Fire-Fighting and Domestic Water Use the Lake Louise Ski Area Banff National ParkAB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

4 Improvements to Water Intakes on the Pipestone River and Corral Creek the Lake Louise Ski AreaBanff National Park AB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

5 Proposed Development of a Chairliff and Ski Runs on Eagle Ridge the Marmot Basin Ski AreaJasper National Park AB 1999 Comprehensive Study Report prepared for Ski Marmot Basin

6 An Application for New Staff Accommodations at Skoki Lodge Banff National Park AB 2000Environmental Screening Report prepared for Skiing Louise Ltd

7 An Application for New Commercial Accommodations at the Lake Louise Inn Banff National ParkAB 2000 Report prepared for the Lake Louise Inn

8 Improvements to Surface Drainage at the Marmot Basin Ski Area Jasper National Park AB 1998Environmental Screening Report prepared for Ski Marmot Basin

9 Improvements to Subsurface Drainage at the Marmot Basin Ski Area Jasper National Park AB1998 Environmental Screening Report prepared for Ski Marmot Basin

10 Improvements to Sewage Treatment Facilities and Effluent Disposal at the Marmot Basin Ski AreaJasper National Park AB 1998 Environmental Screening Report prepared for Ski Marmot Basin

Other Reports

11 Legislative and Policy Factors Influencing Tourism Development in Alberta 2000 Report preparedfor Alberta Economic Development and Alberta Economic Development Authority TourismCommittee

12 Egypt Country Development Policy Framework (CDPF) Assessment 1999 Report prepared for theCanadian International Development Agency Hull Quebec

13 Egypt Country Development Policy Framework (CDPF) Assessment Presentation 1999Presentation prepared for the Canadian International Development Agency Hull Quebec

14 Monitoring Mission Reports Egypt Environment Theme Reports prepared for the CanadianInternational Development Agency Hull Quebec

15 A Pre-Disturbance Vegetation Classification for the Disturbed Portion of the Syncrude DevelopmentArea Mildred Lake AB 1998 Report prepared for Syncrude Canada Ltd

16 Characterization of Soil Erosion Processes and Nutrient Losses Associated with Previously ForestedAreas the Colonarie River Watershed St Vincent West Indies 1998 A Masters Thesis preparedfor the University of Calgary

6

Stakeholder Consultation

1 Zimbabwe-Canada Environmental Planning Exchange Mission 2001 Organized and coordinated anexchange mission held in Banff AB for the CIDA Zimbabwe Environmental Planning and CapacityEnhancement Project

2 Strategic Assessment of The Banff Centre Area Redevelopment Plan 2000 Conducted stakeholderconsultations via a public open house forum

3 Results Based Management as a Project Management Tool 1999 Conducted a workshop in VictoriaFalls Zimbabwe for the Environmental Planning and Capacity Enhancement Project

7

Neil StewartRR 3 SimcoeOntario CanadaN3Y 4K2

OBJECTIVE ProjectConstruction Management

emailphone

fax

nmsproj ectskwiccom519-426-2239519-426-2674

1991-Date

1990-1991

1988-1990

JPRomC1r amp CONsect1[RUCnON MIANAGEMJENT sectJERVJ[CJEsect

Project amp Construction Management services including Project DevelopmentProject strategy Contract negotiations Contract Management Industrial RelationsGovernment liaison Profit amp Loss accountability

Plans of execution project controls budgets planning evaluations safety labourrelations and business development Project amp Site management coordinationprocedures administration methods and site organization Managed andcoordinated information flow tofrom Client(s) Engineer(s) and Contractor(s)

Projects includeWestcoast Energy 55mw Whitby Cogen Bayside 280 mw RepowerEcodyne Ltd MOU contract management amp coordinationUnited Parcel Services Canada Hamilton Air Hub ProjectINCO Nickle Foam and Nickle Disc ProjectsBayer AG Nicklehydroxide and Tungsten Carbide ProjectsMacMillen Bloedel Secondary Fibre Recycling Project

Fluor Daniel Canada LtdResident Construction Manager Central Division

Provide support to Business Units for construction managementservicesresponsible for industrial relations safety quality personnel development andmethods Initiated and established field organizations roles and responsibilitiessite procedures fab shop contractorsupplier planning budgetsfinancial and clientrelations to support critical contract schedules

Projects includeProctor amp Gamble Ultra Project MFord Canada Winn 88 Paint PlantINCO S02 Abatement Project

Ellis Don LtdProject Manager Resident site manager accountable for the process coordinationof $500M GMSUZUKI (CAMI) grass roots automotive plant in Ingersoll ON

Directed 1800 unionized trades (peak workforce) and managed lump-sum projecton schedule and under budget Developed and maintained Oriental and NorthAmerican client trust relationships Surpassed project expectations in labourrelations and safety Profit and Loss accountability

1986-1988

1985-1986

1984-1985

1983-1984

1981-1983

1978-1981

1974-1978

1973-1974

1969-1973

EDUCATION

UMA SpantecGeneral SuperintendentDirected and supervised lump-sum contracts Interfaced with engineering andclient organizations to produce responsive quality services and safe profitablecontracts

Projects includedLabatts Brewers various capital projectsConsumers Glass hot amp cold end shut downsUnivofWaterloo construction management servicesDomtar paper board expansion

Glen Curtis Company Construction SuperintendentConstruction management of Canadian Occidentals 65m cfPdgrass roots sour gas plant in Mezeppa Alberta

Ennisteel Co Ltd Toronto ON Project SupervisorUltramars 1500 million barrel terminal

Self-employed OntarioShip yard construction amp generation facilities

Petrosar Inc Sarnia ON Area SuperintendentClient rep responsible for $650 Million HFOU project

Fluor Canada Corp Alberta Mechanical SupervisorAGCL 1200 tpd Methanol plantAquitaine Canada 650m cfPd sour gas plantEsso Canada Cold Lake Project amp Judy Creek

Arthur GMcKee Inc Nanticoke ON Area SupervisorTexaco 120000 bpd grass roots refinery

SteIco Inc Hamilton ON

JewittVallee Simcoe ONOntario Hydro 4000 MW Thermal generationStelco LEW steel plantDomtar Mill expansionTrent Valley Quarry modernization

MacMaster University 1976-77 (night school)Mohawk College 1971-72 (night school)

SELF DEVELOPMENT -project management-construction management-basic computers-industrial relations-WinWin strategies

-WHMIS-safety amp compensation-KT amp decisions-team management-personnel administration

PERSONAL

REFERENCES

DOB February 24 1950

On request

CITIZENSHIP Canadian

Cochrane Engineering Ltd

Statement of Qualifications

Power Generation Facilities

Cochrane Engineering Ltd200 - 1770 W7th Avenue

Vancouver Be V6J 4Y6Phone 604-736-5421 Fax 604-736-1519

Email receptioncochrane-groupca

COCHRAR

Cochrane Engineering LtdGeneral Qualifications

TABLE OF CONTENTS

Section

Section

Section

10 COMPANY BACKGROUND11 Multi-Disciplinary Design12 Quality Assurance

20 SUMMARY OF RECENT RELEVANT EXPERIENCE21 Recent Relevant Projects Completed22 Projects Currently in Progress23 Cochrane Group - Other Relevant Experience

30 ENGINEERINGmiddot TOOLS

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Sandhill Energy CenterAusti n Texas

Calpine Combined Cycle Power PlantGoldendale Washington

10 COMPANY BACKGROUND

The Cochrane Group of companies including Cochrane Engineeringprovides integrated engineering architecture planning and projectmanagement services for a wide variety of projects It was formed in1996 through the merger of Cochrane Engineering a Calgary firm inoperation since 1972 and the PBK Group which had providedarchitectural and engineering services in Vancouver since 1937 Ouraffiliation with the Cochrane Group affords us access to the expertiseof over 350 personnel consisting of project managers technicalpersonnel and administrative staff in six offices across Canada Italso lends access to other Cochrane Group firms including PBKArchitects Inc which has provided design services for many industrialprojects in Canada and abroad Cochrane Engineering and PBKArchitects have significant experience providing services for clients inthe power coal mining and process industries

Cochrane Engineerings power division has successfully exporteddesign services through out North and South America In the last twoyears this division has provided mechanical processinstrumentation architectural electrical civil and structural designservices for projects totaling over 1000 MW of power generationThe construction cost for these projects exceeds $1 billion

11 Multi-Disciplinary DesignCochrane Group is a fully integrated multi-disciplinary design groupservicing the power sector with in-house architectural capabilitiesGE7FA experience and combined cycle process experts enabling usto provide comprehensive one stop shopping The CochraneGroups multi-disciplinary design team includes

bull Cochrane Engineering Ltd andbull PBK Architects Inc

Cochrane Engineering Ltd is a multi-discipline engineering firmspecializing in the design of combined cycle power plants simplecycle power plants and industrial projects We also supplyengineering resources for PBK architects

PBK Architects Inc specializes in the design of industrial facilitiesoffices maintenance shops warehouses institutional buildings andrecreational sport facilities PBK provides the architectural servicesto Cochrane for our power projects Signature projects include BCPlace GM Place Horseshoe Bay Ferry Terminal upgrade and

1-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 20: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

Julia S Ciccaglione Curriculum Vitae

CURRICULUM VITAE

JULIA S CICCAGLIONEEnvironment Specialist

3040400 4th Avenue SWCalgary AB Canada T2P OJ4

Tel (403)444-5538 email jciccaglionepristinepowerca

CAREER BRIEF

An environment specialist with extensive experience in project management impact assessmentstakeholder consultation policy analysis and climate change Additional expertise in internationaldevelopment projects including project monitoring and stakeholder facilitation Excellent communicationorganisation and writing skills Technical background in the biophysical sciences and economics Projectperformance measurement experience using Results Based Management (RBM)

EDUCA TION

MSc Geography 1998Soil Erosion Assessment Soil and Water Nutrient Loss Analysis Watershed ManagementUniversity of Calgary Calgary Alberta Canada

BSc Geography 1994University of Calgary Calgary Alberta CanadaConcentration Biogeography geomorphology

BA Economics 1991University of Calgary Calgary Alberta CanadaConcentration Petroleum economics

PROFESSIONAL EXPERTISE

Environmental Project ManagementPolicy AnalysisRegulatory AnalysisStakeholder amp Public Consultation

Impact AssessmentSustainable DevelopmentClimate ChangeEnvironmental Management

CAREER HISTORY

Domestic

1998- Pristine Power Inc Calgary Vice President Environment and Emissions TradingPresent Responsible for overall environmental project management regulatory compliance public

policy input and management of Pristines greenhouse gas strategy

Suncurrent Industries Ltd Calgary Senior Emissions Portfolio ConsultantResponsible for overall management of Suncurrents greenhouse gas credit portfolio

2

Alberta Energy Company (AEC) Ltd Calgary Wetland Vegetation Scientist IRISEnvironmental Systems Responsible for the design of a long-term (20 yr) Boreal wetlandvegetation monitoring program to determine the effects of groundwater withdrawal on wetlandvegetation Data gathered from the monitoring program to be utilised by Alberta EnvironmentalProtection for resource management decision making

Syncrude Canada Limited Calgary Environment Specialist and Project Manager IRISEnvironmental Systems Managed and co-ordinated a team of scientists responsible for thedelineation of forest types into commercial and non-commercial stands Derived informationwas used as input into Syncrudes reclamation and mine area conservation plan Specificproject management activities included conducting a needs assessment budget preparationand creation of a Terms of Reference

Environmental Impact Assessment amp Policy Specialist IRIS Environmental SystemsResponsible for the completion of environmental impact assessment projects Responsibilitiesincluded the identification of impacts mitigations cumulative effects and the management andco-ordination of multidisciplinary scientific teams Extensive liasing with government agenciesPolicy analysis included integrating environmental policy and statutory requirements withdevelopment initiatives Additional responsibilities included extensive stakeholder and publicconsultation The following is a list of completed environmental impact assessments

Skiing Louise Limited Banff National Park An Environmental Screening Report for thepurpose of withdrawing water from the Pipestone River and Corral Creek to accommodatesnowmaking fire-fighting and domestic water use activities Report considerations includedidentifying river hydrologic regimes potential impacts to aquatic ecosystems mitigationprocedures and cumulative effects assessment

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts associated with improvements to water intake systems in the Pipestone River andCorral Creek Specific report considerations included identifying impacts to aquaticecosystems

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts related to terrain modifications and replacement of snowmaking infrastructure on theUpper Wiwaxy ski run

The Lake Louise Inn Banff National Park Environmental Screening Report for theconstruction of new commercial accommodation in Lake Louise

Skoki Lodge Banff National Park Environmental Screening Report for the construction ofadditional staff housing at the Skoki Lodge National Historic Site

The Banff Centre Banff National Park Environmental Screening Report for the submissionof an Area Redevelopment Plan The project considered a strategic assessment includedthe identification of impacts resulting from proposed developments or redevelopments on thecampus of The Banff Centre

Ski Marmot Basin Jasper National Park Canada Part of a multi-disciplinary teamresponsible for the completion of a Comprehensive Study for the development of a chairlift andski runs in the Eagle Ridge area of Marmot Basin

Ski Marmot Basin Jasper National Park Canada Environmental Screening Reportspertaining to the installation of new sewage treatment facilities improvements to surfacedrainage and subsurface drainage

3

1995-1998

1990

Legislation Analyst IRIS Environmental Systems Alberta Economic DevelopmentCalgary AB Review and analysis of Alberta Provincial and Canadian Federal legislation todetermine land use laws and identify areas within the province which may have potential forfuture tourism development This information was used in the development of maps illustratingcurrent land uses and areas of potential future tourism development in Alberta

University of Calgary Department of Geography Canada Instructor i) Taught introductorygeography Topics included climatology geomorphology soils and vegetation hydrology remotesensing and air photo interpretation ii) Taught a senior level course in introductory vascular plantidentification plant taxonomy introductory wildlife identification and habitat associations and plantand wildlife responses to disturbances specific to the Canadian Grasslands Aspen ParklandMontane Sub-Alpine Alpine and Boreal Forest Ecoregions

Petro Canada Resources Incorporated Calgary Canada Junior Land ManagementRepresentative Responsible for the review of land agreements governing the operation of oiland gas properties Conducted an economic evaluation and reconciliation of predicted gas pricesversus actual market prices Additional work included site inspections of reclaimed coal propertiesin northeastern British Columbia

International

1998- Cuba Climate Change Emissions Baseline and Monitoring Plan Department of ForeignPresent Affairs 2002 and IntI Trade (DFAIT) Canada Project Manager Suncurrent Industries Ltd

Responsible for managing a climate change emissions baseline study and monitoring planfocused on the implementation of renewable and energy efficient technologies (wind and solarenergy high efficiency micro-turbines) in Cuba Baseline study was in accordance with thoserequirements for a Clean Development Mechanism

Egypt Environment Theme Project - Canadian International Development Agency (CIDA)Environment and Performance Measurement Specialist IRIS Environmental SystemsMember of the Performance Measurement Advisory team for the bilateral CIDA-EgyptEnvironment Theme Project (7 year project) Responsibilities included the measurement ofenvironment project and environment theme results Results to be consistent with Government ofCanada - CIDA policy programming goals including contributing to sustainable development inEgypt and stakeholder involvement in development initiatives Results Based Management(RBM) used as a measurement tool

Zimbabwe Victoria Falls Environmental Planning and Capacity Enhancement Project -Canadian International Development Agency (CIDA) Environment and PerformanceMeasurement Specialist IRIS Environmental Systems An RBM facilitator in an iterativesustainable-development project in Victoria Falls to promote environmentally sustainablecommunities Project focused on improving the capacity of local partners to participate effectivelyin the preparation and implementation of the Victoria Falls Master Plan and Local DevelopmentPlans Specific responsibilities included the development and facilitation of an RBM stakeholderworkshop held in Victoria Falls Zimbabwe Workshop emphasized participatory approaches andthe inclusion of gender equality in the identification and measurement of results

Egypt Environment Theme Project Canadian International Development Agency (CIDA)PolicyProgram Analyst IRIS Environmental Systems Member of the policyprogramanalysis team conducting a trends analysis of CIDAs programming in Egypt This analysisserved as an input into CIDAs planning and design of the new Egypt Country DevelopmentProgram Framework (CDPF) Data was obtained by surveying identified stakeholders in Egyptand Canada Results of the trends analysis were then correlated with CIDAs Egypt CountryDevelopment Policy Framework to reconcile its effectiveness and provide input for its futuredirection

4

1996-1990

Governments of Chad and Cameroon - World Bank Panel Review of PipelineDevelopment Research Assistant IRIS Environmental Systems Research assistant to theManagerCoordinator of the Expert Panel for the review of literature pertaining to biodiversity andwildlands ecology in the African savannah tropical forests and marine ecosystems

St Vincent and the Grenadines Caribbean Soil Erosion Research on DeforestedWatershed Areas Environmental Scientist Project Manager and Principle investigator intothe loss of soil water and nutrients associated with banana cultivated areas Secondary focus ofthe research was aimed at developing a land use management plan incorporating conservationfarming practices and the use of social forestry in the conservation of soil on severely erodedsteep-land agricultural areas In consideration with the socio-economic status of the areaformulated recommendations for appropriate farming practices at the micro-scale level

St Vincent and the Grenadines Caribbean Man and the Biosphere ProjectUNESCOEnvironmental Scientist Assistant Project Supervisor and Liaison between the University ofCalgary and the St Vincent Forestry Department Responsible for the implementation of varioussoil erosion research studies aimed at the quantification of soil water and nutrient loss associatedwith agroforestry and forestry plantation areas

ENVIRONMENTAL POLICYChair of the Energy Recovery Generation (ERG) Subgroup Clean Air Strategic Alliance Alberta

Advisor Centre for EnergyERG Input Electricity and Alternative Energy Division BC Ministry of Energy and Mines

ERG Input Climate Change Offset System Environment CanadaERG Input Treatment of Clean Energy Natural Resources Canada

COUNTRIES WORK EXPERIENCECanada Egypt Zimbabwe St Vincent and the Grenadines Chad and Cameroon Cuba

5

Selected Permitting Reports

1 A Wetlands Monitoring Plan Foster Creek Area Cold Lake Air Weapons Range AB 2001 Reportprepared for Alberta Energy Company Ltd

2 A Strategic Assessment of The Banff Centre Area Redevelopment Plan Banff National Park AB2000 Environmental Screening Report prepared for The Banff Centre

3 Permit to Withdraw Water from the Pipestone River and Corral Creek for the Purposes ofSnowmaking Fire-Fighting and Domestic Water Use the Lake Louise Ski Area Banff National ParkAB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

4 Improvements to Water Intakes on the Pipestone River and Corral Creek the Lake Louise Ski AreaBanff National Park AB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

5 Proposed Development of a Chairliff and Ski Runs on Eagle Ridge the Marmot Basin Ski AreaJasper National Park AB 1999 Comprehensive Study Report prepared for Ski Marmot Basin

6 An Application for New Staff Accommodations at Skoki Lodge Banff National Park AB 2000Environmental Screening Report prepared for Skiing Louise Ltd

7 An Application for New Commercial Accommodations at the Lake Louise Inn Banff National ParkAB 2000 Report prepared for the Lake Louise Inn

8 Improvements to Surface Drainage at the Marmot Basin Ski Area Jasper National Park AB 1998Environmental Screening Report prepared for Ski Marmot Basin

9 Improvements to Subsurface Drainage at the Marmot Basin Ski Area Jasper National Park AB1998 Environmental Screening Report prepared for Ski Marmot Basin

10 Improvements to Sewage Treatment Facilities and Effluent Disposal at the Marmot Basin Ski AreaJasper National Park AB 1998 Environmental Screening Report prepared for Ski Marmot Basin

Other Reports

11 Legislative and Policy Factors Influencing Tourism Development in Alberta 2000 Report preparedfor Alberta Economic Development and Alberta Economic Development Authority TourismCommittee

12 Egypt Country Development Policy Framework (CDPF) Assessment 1999 Report prepared for theCanadian International Development Agency Hull Quebec

13 Egypt Country Development Policy Framework (CDPF) Assessment Presentation 1999Presentation prepared for the Canadian International Development Agency Hull Quebec

14 Monitoring Mission Reports Egypt Environment Theme Reports prepared for the CanadianInternational Development Agency Hull Quebec

15 A Pre-Disturbance Vegetation Classification for the Disturbed Portion of the Syncrude DevelopmentArea Mildred Lake AB 1998 Report prepared for Syncrude Canada Ltd

16 Characterization of Soil Erosion Processes and Nutrient Losses Associated with Previously ForestedAreas the Colonarie River Watershed St Vincent West Indies 1998 A Masters Thesis preparedfor the University of Calgary

6

Stakeholder Consultation

1 Zimbabwe-Canada Environmental Planning Exchange Mission 2001 Organized and coordinated anexchange mission held in Banff AB for the CIDA Zimbabwe Environmental Planning and CapacityEnhancement Project

2 Strategic Assessment of The Banff Centre Area Redevelopment Plan 2000 Conducted stakeholderconsultations via a public open house forum

3 Results Based Management as a Project Management Tool 1999 Conducted a workshop in VictoriaFalls Zimbabwe for the Environmental Planning and Capacity Enhancement Project

7

Neil StewartRR 3 SimcoeOntario CanadaN3Y 4K2

OBJECTIVE ProjectConstruction Management

emailphone

fax

nmsproj ectskwiccom519-426-2239519-426-2674

1991-Date

1990-1991

1988-1990

JPRomC1r amp CONsect1[RUCnON MIANAGEMJENT sectJERVJ[CJEsect

Project amp Construction Management services including Project DevelopmentProject strategy Contract negotiations Contract Management Industrial RelationsGovernment liaison Profit amp Loss accountability

Plans of execution project controls budgets planning evaluations safety labourrelations and business development Project amp Site management coordinationprocedures administration methods and site organization Managed andcoordinated information flow tofrom Client(s) Engineer(s) and Contractor(s)

Projects includeWestcoast Energy 55mw Whitby Cogen Bayside 280 mw RepowerEcodyne Ltd MOU contract management amp coordinationUnited Parcel Services Canada Hamilton Air Hub ProjectINCO Nickle Foam and Nickle Disc ProjectsBayer AG Nicklehydroxide and Tungsten Carbide ProjectsMacMillen Bloedel Secondary Fibre Recycling Project

Fluor Daniel Canada LtdResident Construction Manager Central Division

Provide support to Business Units for construction managementservicesresponsible for industrial relations safety quality personnel development andmethods Initiated and established field organizations roles and responsibilitiessite procedures fab shop contractorsupplier planning budgetsfinancial and clientrelations to support critical contract schedules

Projects includeProctor amp Gamble Ultra Project MFord Canada Winn 88 Paint PlantINCO S02 Abatement Project

Ellis Don LtdProject Manager Resident site manager accountable for the process coordinationof $500M GMSUZUKI (CAMI) grass roots automotive plant in Ingersoll ON

Directed 1800 unionized trades (peak workforce) and managed lump-sum projecton schedule and under budget Developed and maintained Oriental and NorthAmerican client trust relationships Surpassed project expectations in labourrelations and safety Profit and Loss accountability

1986-1988

1985-1986

1984-1985

1983-1984

1981-1983

1978-1981

1974-1978

1973-1974

1969-1973

EDUCATION

UMA SpantecGeneral SuperintendentDirected and supervised lump-sum contracts Interfaced with engineering andclient organizations to produce responsive quality services and safe profitablecontracts

Projects includedLabatts Brewers various capital projectsConsumers Glass hot amp cold end shut downsUnivofWaterloo construction management servicesDomtar paper board expansion

Glen Curtis Company Construction SuperintendentConstruction management of Canadian Occidentals 65m cfPdgrass roots sour gas plant in Mezeppa Alberta

Ennisteel Co Ltd Toronto ON Project SupervisorUltramars 1500 million barrel terminal

Self-employed OntarioShip yard construction amp generation facilities

Petrosar Inc Sarnia ON Area SuperintendentClient rep responsible for $650 Million HFOU project

Fluor Canada Corp Alberta Mechanical SupervisorAGCL 1200 tpd Methanol plantAquitaine Canada 650m cfPd sour gas plantEsso Canada Cold Lake Project amp Judy Creek

Arthur GMcKee Inc Nanticoke ON Area SupervisorTexaco 120000 bpd grass roots refinery

SteIco Inc Hamilton ON

JewittVallee Simcoe ONOntario Hydro 4000 MW Thermal generationStelco LEW steel plantDomtar Mill expansionTrent Valley Quarry modernization

MacMaster University 1976-77 (night school)Mohawk College 1971-72 (night school)

SELF DEVELOPMENT -project management-construction management-basic computers-industrial relations-WinWin strategies

-WHMIS-safety amp compensation-KT amp decisions-team management-personnel administration

PERSONAL

REFERENCES

DOB February 24 1950

On request

CITIZENSHIP Canadian

Cochrane Engineering Ltd

Statement of Qualifications

Power Generation Facilities

Cochrane Engineering Ltd200 - 1770 W7th Avenue

Vancouver Be V6J 4Y6Phone 604-736-5421 Fax 604-736-1519

Email receptioncochrane-groupca

COCHRAR

Cochrane Engineering LtdGeneral Qualifications

TABLE OF CONTENTS

Section

Section

Section

10 COMPANY BACKGROUND11 Multi-Disciplinary Design12 Quality Assurance

20 SUMMARY OF RECENT RELEVANT EXPERIENCE21 Recent Relevant Projects Completed22 Projects Currently in Progress23 Cochrane Group - Other Relevant Experience

30 ENGINEERINGmiddot TOOLS

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Sandhill Energy CenterAusti n Texas

Calpine Combined Cycle Power PlantGoldendale Washington

10 COMPANY BACKGROUND

The Cochrane Group of companies including Cochrane Engineeringprovides integrated engineering architecture planning and projectmanagement services for a wide variety of projects It was formed in1996 through the merger of Cochrane Engineering a Calgary firm inoperation since 1972 and the PBK Group which had providedarchitectural and engineering services in Vancouver since 1937 Ouraffiliation with the Cochrane Group affords us access to the expertiseof over 350 personnel consisting of project managers technicalpersonnel and administrative staff in six offices across Canada Italso lends access to other Cochrane Group firms including PBKArchitects Inc which has provided design services for many industrialprojects in Canada and abroad Cochrane Engineering and PBKArchitects have significant experience providing services for clients inthe power coal mining and process industries

Cochrane Engineerings power division has successfully exporteddesign services through out North and South America In the last twoyears this division has provided mechanical processinstrumentation architectural electrical civil and structural designservices for projects totaling over 1000 MW of power generationThe construction cost for these projects exceeds $1 billion

11 Multi-Disciplinary DesignCochrane Group is a fully integrated multi-disciplinary design groupservicing the power sector with in-house architectural capabilitiesGE7FA experience and combined cycle process experts enabling usto provide comprehensive one stop shopping The CochraneGroups multi-disciplinary design team includes

bull Cochrane Engineering Ltd andbull PBK Architects Inc

Cochrane Engineering Ltd is a multi-discipline engineering firmspecializing in the design of combined cycle power plants simplecycle power plants and industrial projects We also supplyengineering resources for PBK architects

PBK Architects Inc specializes in the design of industrial facilitiesoffices maintenance shops warehouses institutional buildings andrecreational sport facilities PBK provides the architectural servicesto Cochrane for our power projects Signature projects include BCPlace GM Place Horseshoe Bay Ferry Terminal upgrade and

1-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 21: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

Alberta Energy Company (AEC) Ltd Calgary Wetland Vegetation Scientist IRISEnvironmental Systems Responsible for the design of a long-term (20 yr) Boreal wetlandvegetation monitoring program to determine the effects of groundwater withdrawal on wetlandvegetation Data gathered from the monitoring program to be utilised by Alberta EnvironmentalProtection for resource management decision making

Syncrude Canada Limited Calgary Environment Specialist and Project Manager IRISEnvironmental Systems Managed and co-ordinated a team of scientists responsible for thedelineation of forest types into commercial and non-commercial stands Derived informationwas used as input into Syncrudes reclamation and mine area conservation plan Specificproject management activities included conducting a needs assessment budget preparationand creation of a Terms of Reference

Environmental Impact Assessment amp Policy Specialist IRIS Environmental SystemsResponsible for the completion of environmental impact assessment projects Responsibilitiesincluded the identification of impacts mitigations cumulative effects and the management andco-ordination of multidisciplinary scientific teams Extensive liasing with government agenciesPolicy analysis included integrating environmental policy and statutory requirements withdevelopment initiatives Additional responsibilities included extensive stakeholder and publicconsultation The following is a list of completed environmental impact assessments

Skiing Louise Limited Banff National Park An Environmental Screening Report for thepurpose of withdrawing water from the Pipestone River and Corral Creek to accommodatesnowmaking fire-fighting and domestic water use activities Report considerations includedidentifying river hydrologic regimes potential impacts to aquatic ecosystems mitigationprocedures and cumulative effects assessment

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts associated with improvements to water intake systems in the Pipestone River andCorral Creek Specific report considerations included identifying impacts to aquaticecosystems

Skiing Louise Limited Banff National Park Environmental Screening Report assessing theimpacts related to terrain modifications and replacement of snowmaking infrastructure on theUpper Wiwaxy ski run

The Lake Louise Inn Banff National Park Environmental Screening Report for theconstruction of new commercial accommodation in Lake Louise

Skoki Lodge Banff National Park Environmental Screening Report for the construction ofadditional staff housing at the Skoki Lodge National Historic Site

The Banff Centre Banff National Park Environmental Screening Report for the submissionof an Area Redevelopment Plan The project considered a strategic assessment includedthe identification of impacts resulting from proposed developments or redevelopments on thecampus of The Banff Centre

Ski Marmot Basin Jasper National Park Canada Part of a multi-disciplinary teamresponsible for the completion of a Comprehensive Study for the development of a chairlift andski runs in the Eagle Ridge area of Marmot Basin

Ski Marmot Basin Jasper National Park Canada Environmental Screening Reportspertaining to the installation of new sewage treatment facilities improvements to surfacedrainage and subsurface drainage

3

1995-1998

1990

Legislation Analyst IRIS Environmental Systems Alberta Economic DevelopmentCalgary AB Review and analysis of Alberta Provincial and Canadian Federal legislation todetermine land use laws and identify areas within the province which may have potential forfuture tourism development This information was used in the development of maps illustratingcurrent land uses and areas of potential future tourism development in Alberta

University of Calgary Department of Geography Canada Instructor i) Taught introductorygeography Topics included climatology geomorphology soils and vegetation hydrology remotesensing and air photo interpretation ii) Taught a senior level course in introductory vascular plantidentification plant taxonomy introductory wildlife identification and habitat associations and plantand wildlife responses to disturbances specific to the Canadian Grasslands Aspen ParklandMontane Sub-Alpine Alpine and Boreal Forest Ecoregions

Petro Canada Resources Incorporated Calgary Canada Junior Land ManagementRepresentative Responsible for the review of land agreements governing the operation of oiland gas properties Conducted an economic evaluation and reconciliation of predicted gas pricesversus actual market prices Additional work included site inspections of reclaimed coal propertiesin northeastern British Columbia

International

1998- Cuba Climate Change Emissions Baseline and Monitoring Plan Department of ForeignPresent Affairs 2002 and IntI Trade (DFAIT) Canada Project Manager Suncurrent Industries Ltd

Responsible for managing a climate change emissions baseline study and monitoring planfocused on the implementation of renewable and energy efficient technologies (wind and solarenergy high efficiency micro-turbines) in Cuba Baseline study was in accordance with thoserequirements for a Clean Development Mechanism

Egypt Environment Theme Project - Canadian International Development Agency (CIDA)Environment and Performance Measurement Specialist IRIS Environmental SystemsMember of the Performance Measurement Advisory team for the bilateral CIDA-EgyptEnvironment Theme Project (7 year project) Responsibilities included the measurement ofenvironment project and environment theme results Results to be consistent with Government ofCanada - CIDA policy programming goals including contributing to sustainable development inEgypt and stakeholder involvement in development initiatives Results Based Management(RBM) used as a measurement tool

Zimbabwe Victoria Falls Environmental Planning and Capacity Enhancement Project -Canadian International Development Agency (CIDA) Environment and PerformanceMeasurement Specialist IRIS Environmental Systems An RBM facilitator in an iterativesustainable-development project in Victoria Falls to promote environmentally sustainablecommunities Project focused on improving the capacity of local partners to participate effectivelyin the preparation and implementation of the Victoria Falls Master Plan and Local DevelopmentPlans Specific responsibilities included the development and facilitation of an RBM stakeholderworkshop held in Victoria Falls Zimbabwe Workshop emphasized participatory approaches andthe inclusion of gender equality in the identification and measurement of results

Egypt Environment Theme Project Canadian International Development Agency (CIDA)PolicyProgram Analyst IRIS Environmental Systems Member of the policyprogramanalysis team conducting a trends analysis of CIDAs programming in Egypt This analysisserved as an input into CIDAs planning and design of the new Egypt Country DevelopmentProgram Framework (CDPF) Data was obtained by surveying identified stakeholders in Egyptand Canada Results of the trends analysis were then correlated with CIDAs Egypt CountryDevelopment Policy Framework to reconcile its effectiveness and provide input for its futuredirection

4

1996-1990

Governments of Chad and Cameroon - World Bank Panel Review of PipelineDevelopment Research Assistant IRIS Environmental Systems Research assistant to theManagerCoordinator of the Expert Panel for the review of literature pertaining to biodiversity andwildlands ecology in the African savannah tropical forests and marine ecosystems

St Vincent and the Grenadines Caribbean Soil Erosion Research on DeforestedWatershed Areas Environmental Scientist Project Manager and Principle investigator intothe loss of soil water and nutrients associated with banana cultivated areas Secondary focus ofthe research was aimed at developing a land use management plan incorporating conservationfarming practices and the use of social forestry in the conservation of soil on severely erodedsteep-land agricultural areas In consideration with the socio-economic status of the areaformulated recommendations for appropriate farming practices at the micro-scale level

St Vincent and the Grenadines Caribbean Man and the Biosphere ProjectUNESCOEnvironmental Scientist Assistant Project Supervisor and Liaison between the University ofCalgary and the St Vincent Forestry Department Responsible for the implementation of varioussoil erosion research studies aimed at the quantification of soil water and nutrient loss associatedwith agroforestry and forestry plantation areas

ENVIRONMENTAL POLICYChair of the Energy Recovery Generation (ERG) Subgroup Clean Air Strategic Alliance Alberta

Advisor Centre for EnergyERG Input Electricity and Alternative Energy Division BC Ministry of Energy and Mines

ERG Input Climate Change Offset System Environment CanadaERG Input Treatment of Clean Energy Natural Resources Canada

COUNTRIES WORK EXPERIENCECanada Egypt Zimbabwe St Vincent and the Grenadines Chad and Cameroon Cuba

5

Selected Permitting Reports

1 A Wetlands Monitoring Plan Foster Creek Area Cold Lake Air Weapons Range AB 2001 Reportprepared for Alberta Energy Company Ltd

2 A Strategic Assessment of The Banff Centre Area Redevelopment Plan Banff National Park AB2000 Environmental Screening Report prepared for The Banff Centre

3 Permit to Withdraw Water from the Pipestone River and Corral Creek for the Purposes ofSnowmaking Fire-Fighting and Domestic Water Use the Lake Louise Ski Area Banff National ParkAB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

4 Improvements to Water Intakes on the Pipestone River and Corral Creek the Lake Louise Ski AreaBanff National Park AB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

5 Proposed Development of a Chairliff and Ski Runs on Eagle Ridge the Marmot Basin Ski AreaJasper National Park AB 1999 Comprehensive Study Report prepared for Ski Marmot Basin

6 An Application for New Staff Accommodations at Skoki Lodge Banff National Park AB 2000Environmental Screening Report prepared for Skiing Louise Ltd

7 An Application for New Commercial Accommodations at the Lake Louise Inn Banff National ParkAB 2000 Report prepared for the Lake Louise Inn

8 Improvements to Surface Drainage at the Marmot Basin Ski Area Jasper National Park AB 1998Environmental Screening Report prepared for Ski Marmot Basin

9 Improvements to Subsurface Drainage at the Marmot Basin Ski Area Jasper National Park AB1998 Environmental Screening Report prepared for Ski Marmot Basin

10 Improvements to Sewage Treatment Facilities and Effluent Disposal at the Marmot Basin Ski AreaJasper National Park AB 1998 Environmental Screening Report prepared for Ski Marmot Basin

Other Reports

11 Legislative and Policy Factors Influencing Tourism Development in Alberta 2000 Report preparedfor Alberta Economic Development and Alberta Economic Development Authority TourismCommittee

12 Egypt Country Development Policy Framework (CDPF) Assessment 1999 Report prepared for theCanadian International Development Agency Hull Quebec

13 Egypt Country Development Policy Framework (CDPF) Assessment Presentation 1999Presentation prepared for the Canadian International Development Agency Hull Quebec

14 Monitoring Mission Reports Egypt Environment Theme Reports prepared for the CanadianInternational Development Agency Hull Quebec

15 A Pre-Disturbance Vegetation Classification for the Disturbed Portion of the Syncrude DevelopmentArea Mildred Lake AB 1998 Report prepared for Syncrude Canada Ltd

16 Characterization of Soil Erosion Processes and Nutrient Losses Associated with Previously ForestedAreas the Colonarie River Watershed St Vincent West Indies 1998 A Masters Thesis preparedfor the University of Calgary

6

Stakeholder Consultation

1 Zimbabwe-Canada Environmental Planning Exchange Mission 2001 Organized and coordinated anexchange mission held in Banff AB for the CIDA Zimbabwe Environmental Planning and CapacityEnhancement Project

2 Strategic Assessment of The Banff Centre Area Redevelopment Plan 2000 Conducted stakeholderconsultations via a public open house forum

3 Results Based Management as a Project Management Tool 1999 Conducted a workshop in VictoriaFalls Zimbabwe for the Environmental Planning and Capacity Enhancement Project

7

Neil StewartRR 3 SimcoeOntario CanadaN3Y 4K2

OBJECTIVE ProjectConstruction Management

emailphone

fax

nmsproj ectskwiccom519-426-2239519-426-2674

1991-Date

1990-1991

1988-1990

JPRomC1r amp CONsect1[RUCnON MIANAGEMJENT sectJERVJ[CJEsect

Project amp Construction Management services including Project DevelopmentProject strategy Contract negotiations Contract Management Industrial RelationsGovernment liaison Profit amp Loss accountability

Plans of execution project controls budgets planning evaluations safety labourrelations and business development Project amp Site management coordinationprocedures administration methods and site organization Managed andcoordinated information flow tofrom Client(s) Engineer(s) and Contractor(s)

Projects includeWestcoast Energy 55mw Whitby Cogen Bayside 280 mw RepowerEcodyne Ltd MOU contract management amp coordinationUnited Parcel Services Canada Hamilton Air Hub ProjectINCO Nickle Foam and Nickle Disc ProjectsBayer AG Nicklehydroxide and Tungsten Carbide ProjectsMacMillen Bloedel Secondary Fibre Recycling Project

Fluor Daniel Canada LtdResident Construction Manager Central Division

Provide support to Business Units for construction managementservicesresponsible for industrial relations safety quality personnel development andmethods Initiated and established field organizations roles and responsibilitiessite procedures fab shop contractorsupplier planning budgetsfinancial and clientrelations to support critical contract schedules

Projects includeProctor amp Gamble Ultra Project MFord Canada Winn 88 Paint PlantINCO S02 Abatement Project

Ellis Don LtdProject Manager Resident site manager accountable for the process coordinationof $500M GMSUZUKI (CAMI) grass roots automotive plant in Ingersoll ON

Directed 1800 unionized trades (peak workforce) and managed lump-sum projecton schedule and under budget Developed and maintained Oriental and NorthAmerican client trust relationships Surpassed project expectations in labourrelations and safety Profit and Loss accountability

1986-1988

1985-1986

1984-1985

1983-1984

1981-1983

1978-1981

1974-1978

1973-1974

1969-1973

EDUCATION

UMA SpantecGeneral SuperintendentDirected and supervised lump-sum contracts Interfaced with engineering andclient organizations to produce responsive quality services and safe profitablecontracts

Projects includedLabatts Brewers various capital projectsConsumers Glass hot amp cold end shut downsUnivofWaterloo construction management servicesDomtar paper board expansion

Glen Curtis Company Construction SuperintendentConstruction management of Canadian Occidentals 65m cfPdgrass roots sour gas plant in Mezeppa Alberta

Ennisteel Co Ltd Toronto ON Project SupervisorUltramars 1500 million barrel terminal

Self-employed OntarioShip yard construction amp generation facilities

Petrosar Inc Sarnia ON Area SuperintendentClient rep responsible for $650 Million HFOU project

Fluor Canada Corp Alberta Mechanical SupervisorAGCL 1200 tpd Methanol plantAquitaine Canada 650m cfPd sour gas plantEsso Canada Cold Lake Project amp Judy Creek

Arthur GMcKee Inc Nanticoke ON Area SupervisorTexaco 120000 bpd grass roots refinery

SteIco Inc Hamilton ON

JewittVallee Simcoe ONOntario Hydro 4000 MW Thermal generationStelco LEW steel plantDomtar Mill expansionTrent Valley Quarry modernization

MacMaster University 1976-77 (night school)Mohawk College 1971-72 (night school)

SELF DEVELOPMENT -project management-construction management-basic computers-industrial relations-WinWin strategies

-WHMIS-safety amp compensation-KT amp decisions-team management-personnel administration

PERSONAL

REFERENCES

DOB February 24 1950

On request

CITIZENSHIP Canadian

Cochrane Engineering Ltd

Statement of Qualifications

Power Generation Facilities

Cochrane Engineering Ltd200 - 1770 W7th Avenue

Vancouver Be V6J 4Y6Phone 604-736-5421 Fax 604-736-1519

Email receptioncochrane-groupca

COCHRAR

Cochrane Engineering LtdGeneral Qualifications

TABLE OF CONTENTS

Section

Section

Section

10 COMPANY BACKGROUND11 Multi-Disciplinary Design12 Quality Assurance

20 SUMMARY OF RECENT RELEVANT EXPERIENCE21 Recent Relevant Projects Completed22 Projects Currently in Progress23 Cochrane Group - Other Relevant Experience

30 ENGINEERINGmiddot TOOLS

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Sandhill Energy CenterAusti n Texas

Calpine Combined Cycle Power PlantGoldendale Washington

10 COMPANY BACKGROUND

The Cochrane Group of companies including Cochrane Engineeringprovides integrated engineering architecture planning and projectmanagement services for a wide variety of projects It was formed in1996 through the merger of Cochrane Engineering a Calgary firm inoperation since 1972 and the PBK Group which had providedarchitectural and engineering services in Vancouver since 1937 Ouraffiliation with the Cochrane Group affords us access to the expertiseof over 350 personnel consisting of project managers technicalpersonnel and administrative staff in six offices across Canada Italso lends access to other Cochrane Group firms including PBKArchitects Inc which has provided design services for many industrialprojects in Canada and abroad Cochrane Engineering and PBKArchitects have significant experience providing services for clients inthe power coal mining and process industries

Cochrane Engineerings power division has successfully exporteddesign services through out North and South America In the last twoyears this division has provided mechanical processinstrumentation architectural electrical civil and structural designservices for projects totaling over 1000 MW of power generationThe construction cost for these projects exceeds $1 billion

11 Multi-Disciplinary DesignCochrane Group is a fully integrated multi-disciplinary design groupservicing the power sector with in-house architectural capabilitiesGE7FA experience and combined cycle process experts enabling usto provide comprehensive one stop shopping The CochraneGroups multi-disciplinary design team includes

bull Cochrane Engineering Ltd andbull PBK Architects Inc

Cochrane Engineering Ltd is a multi-discipline engineering firmspecializing in the design of combined cycle power plants simplecycle power plants and industrial projects We also supplyengineering resources for PBK architects

PBK Architects Inc specializes in the design of industrial facilitiesoffices maintenance shops warehouses institutional buildings andrecreational sport facilities PBK provides the architectural servicesto Cochrane for our power projects Signature projects include BCPlace GM Place Horseshoe Bay Ferry Terminal upgrade and

1-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 22: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

1995-1998

1990

Legislation Analyst IRIS Environmental Systems Alberta Economic DevelopmentCalgary AB Review and analysis of Alberta Provincial and Canadian Federal legislation todetermine land use laws and identify areas within the province which may have potential forfuture tourism development This information was used in the development of maps illustratingcurrent land uses and areas of potential future tourism development in Alberta

University of Calgary Department of Geography Canada Instructor i) Taught introductorygeography Topics included climatology geomorphology soils and vegetation hydrology remotesensing and air photo interpretation ii) Taught a senior level course in introductory vascular plantidentification plant taxonomy introductory wildlife identification and habitat associations and plantand wildlife responses to disturbances specific to the Canadian Grasslands Aspen ParklandMontane Sub-Alpine Alpine and Boreal Forest Ecoregions

Petro Canada Resources Incorporated Calgary Canada Junior Land ManagementRepresentative Responsible for the review of land agreements governing the operation of oiland gas properties Conducted an economic evaluation and reconciliation of predicted gas pricesversus actual market prices Additional work included site inspections of reclaimed coal propertiesin northeastern British Columbia

International

1998- Cuba Climate Change Emissions Baseline and Monitoring Plan Department of ForeignPresent Affairs 2002 and IntI Trade (DFAIT) Canada Project Manager Suncurrent Industries Ltd

Responsible for managing a climate change emissions baseline study and monitoring planfocused on the implementation of renewable and energy efficient technologies (wind and solarenergy high efficiency micro-turbines) in Cuba Baseline study was in accordance with thoserequirements for a Clean Development Mechanism

Egypt Environment Theme Project - Canadian International Development Agency (CIDA)Environment and Performance Measurement Specialist IRIS Environmental SystemsMember of the Performance Measurement Advisory team for the bilateral CIDA-EgyptEnvironment Theme Project (7 year project) Responsibilities included the measurement ofenvironment project and environment theme results Results to be consistent with Government ofCanada - CIDA policy programming goals including contributing to sustainable development inEgypt and stakeholder involvement in development initiatives Results Based Management(RBM) used as a measurement tool

Zimbabwe Victoria Falls Environmental Planning and Capacity Enhancement Project -Canadian International Development Agency (CIDA) Environment and PerformanceMeasurement Specialist IRIS Environmental Systems An RBM facilitator in an iterativesustainable-development project in Victoria Falls to promote environmentally sustainablecommunities Project focused on improving the capacity of local partners to participate effectivelyin the preparation and implementation of the Victoria Falls Master Plan and Local DevelopmentPlans Specific responsibilities included the development and facilitation of an RBM stakeholderworkshop held in Victoria Falls Zimbabwe Workshop emphasized participatory approaches andthe inclusion of gender equality in the identification and measurement of results

Egypt Environment Theme Project Canadian International Development Agency (CIDA)PolicyProgram Analyst IRIS Environmental Systems Member of the policyprogramanalysis team conducting a trends analysis of CIDAs programming in Egypt This analysisserved as an input into CIDAs planning and design of the new Egypt Country DevelopmentProgram Framework (CDPF) Data was obtained by surveying identified stakeholders in Egyptand Canada Results of the trends analysis were then correlated with CIDAs Egypt CountryDevelopment Policy Framework to reconcile its effectiveness and provide input for its futuredirection

4

1996-1990

Governments of Chad and Cameroon - World Bank Panel Review of PipelineDevelopment Research Assistant IRIS Environmental Systems Research assistant to theManagerCoordinator of the Expert Panel for the review of literature pertaining to biodiversity andwildlands ecology in the African savannah tropical forests and marine ecosystems

St Vincent and the Grenadines Caribbean Soil Erosion Research on DeforestedWatershed Areas Environmental Scientist Project Manager and Principle investigator intothe loss of soil water and nutrients associated with banana cultivated areas Secondary focus ofthe research was aimed at developing a land use management plan incorporating conservationfarming practices and the use of social forestry in the conservation of soil on severely erodedsteep-land agricultural areas In consideration with the socio-economic status of the areaformulated recommendations for appropriate farming practices at the micro-scale level

St Vincent and the Grenadines Caribbean Man and the Biosphere ProjectUNESCOEnvironmental Scientist Assistant Project Supervisor and Liaison between the University ofCalgary and the St Vincent Forestry Department Responsible for the implementation of varioussoil erosion research studies aimed at the quantification of soil water and nutrient loss associatedwith agroforestry and forestry plantation areas

ENVIRONMENTAL POLICYChair of the Energy Recovery Generation (ERG) Subgroup Clean Air Strategic Alliance Alberta

Advisor Centre for EnergyERG Input Electricity and Alternative Energy Division BC Ministry of Energy and Mines

ERG Input Climate Change Offset System Environment CanadaERG Input Treatment of Clean Energy Natural Resources Canada

COUNTRIES WORK EXPERIENCECanada Egypt Zimbabwe St Vincent and the Grenadines Chad and Cameroon Cuba

5

Selected Permitting Reports

1 A Wetlands Monitoring Plan Foster Creek Area Cold Lake Air Weapons Range AB 2001 Reportprepared for Alberta Energy Company Ltd

2 A Strategic Assessment of The Banff Centre Area Redevelopment Plan Banff National Park AB2000 Environmental Screening Report prepared for The Banff Centre

3 Permit to Withdraw Water from the Pipestone River and Corral Creek for the Purposes ofSnowmaking Fire-Fighting and Domestic Water Use the Lake Louise Ski Area Banff National ParkAB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

4 Improvements to Water Intakes on the Pipestone River and Corral Creek the Lake Louise Ski AreaBanff National Park AB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

5 Proposed Development of a Chairliff and Ski Runs on Eagle Ridge the Marmot Basin Ski AreaJasper National Park AB 1999 Comprehensive Study Report prepared for Ski Marmot Basin

6 An Application for New Staff Accommodations at Skoki Lodge Banff National Park AB 2000Environmental Screening Report prepared for Skiing Louise Ltd

7 An Application for New Commercial Accommodations at the Lake Louise Inn Banff National ParkAB 2000 Report prepared for the Lake Louise Inn

8 Improvements to Surface Drainage at the Marmot Basin Ski Area Jasper National Park AB 1998Environmental Screening Report prepared for Ski Marmot Basin

9 Improvements to Subsurface Drainage at the Marmot Basin Ski Area Jasper National Park AB1998 Environmental Screening Report prepared for Ski Marmot Basin

10 Improvements to Sewage Treatment Facilities and Effluent Disposal at the Marmot Basin Ski AreaJasper National Park AB 1998 Environmental Screening Report prepared for Ski Marmot Basin

Other Reports

11 Legislative and Policy Factors Influencing Tourism Development in Alberta 2000 Report preparedfor Alberta Economic Development and Alberta Economic Development Authority TourismCommittee

12 Egypt Country Development Policy Framework (CDPF) Assessment 1999 Report prepared for theCanadian International Development Agency Hull Quebec

13 Egypt Country Development Policy Framework (CDPF) Assessment Presentation 1999Presentation prepared for the Canadian International Development Agency Hull Quebec

14 Monitoring Mission Reports Egypt Environment Theme Reports prepared for the CanadianInternational Development Agency Hull Quebec

15 A Pre-Disturbance Vegetation Classification for the Disturbed Portion of the Syncrude DevelopmentArea Mildred Lake AB 1998 Report prepared for Syncrude Canada Ltd

16 Characterization of Soil Erosion Processes and Nutrient Losses Associated with Previously ForestedAreas the Colonarie River Watershed St Vincent West Indies 1998 A Masters Thesis preparedfor the University of Calgary

6

Stakeholder Consultation

1 Zimbabwe-Canada Environmental Planning Exchange Mission 2001 Organized and coordinated anexchange mission held in Banff AB for the CIDA Zimbabwe Environmental Planning and CapacityEnhancement Project

2 Strategic Assessment of The Banff Centre Area Redevelopment Plan 2000 Conducted stakeholderconsultations via a public open house forum

3 Results Based Management as a Project Management Tool 1999 Conducted a workshop in VictoriaFalls Zimbabwe for the Environmental Planning and Capacity Enhancement Project

7

Neil StewartRR 3 SimcoeOntario CanadaN3Y 4K2

OBJECTIVE ProjectConstruction Management

emailphone

fax

nmsproj ectskwiccom519-426-2239519-426-2674

1991-Date

1990-1991

1988-1990

JPRomC1r amp CONsect1[RUCnON MIANAGEMJENT sectJERVJ[CJEsect

Project amp Construction Management services including Project DevelopmentProject strategy Contract negotiations Contract Management Industrial RelationsGovernment liaison Profit amp Loss accountability

Plans of execution project controls budgets planning evaluations safety labourrelations and business development Project amp Site management coordinationprocedures administration methods and site organization Managed andcoordinated information flow tofrom Client(s) Engineer(s) and Contractor(s)

Projects includeWestcoast Energy 55mw Whitby Cogen Bayside 280 mw RepowerEcodyne Ltd MOU contract management amp coordinationUnited Parcel Services Canada Hamilton Air Hub ProjectINCO Nickle Foam and Nickle Disc ProjectsBayer AG Nicklehydroxide and Tungsten Carbide ProjectsMacMillen Bloedel Secondary Fibre Recycling Project

Fluor Daniel Canada LtdResident Construction Manager Central Division

Provide support to Business Units for construction managementservicesresponsible for industrial relations safety quality personnel development andmethods Initiated and established field organizations roles and responsibilitiessite procedures fab shop contractorsupplier planning budgetsfinancial and clientrelations to support critical contract schedules

Projects includeProctor amp Gamble Ultra Project MFord Canada Winn 88 Paint PlantINCO S02 Abatement Project

Ellis Don LtdProject Manager Resident site manager accountable for the process coordinationof $500M GMSUZUKI (CAMI) grass roots automotive plant in Ingersoll ON

Directed 1800 unionized trades (peak workforce) and managed lump-sum projecton schedule and under budget Developed and maintained Oriental and NorthAmerican client trust relationships Surpassed project expectations in labourrelations and safety Profit and Loss accountability

1986-1988

1985-1986

1984-1985

1983-1984

1981-1983

1978-1981

1974-1978

1973-1974

1969-1973

EDUCATION

UMA SpantecGeneral SuperintendentDirected and supervised lump-sum contracts Interfaced with engineering andclient organizations to produce responsive quality services and safe profitablecontracts

Projects includedLabatts Brewers various capital projectsConsumers Glass hot amp cold end shut downsUnivofWaterloo construction management servicesDomtar paper board expansion

Glen Curtis Company Construction SuperintendentConstruction management of Canadian Occidentals 65m cfPdgrass roots sour gas plant in Mezeppa Alberta

Ennisteel Co Ltd Toronto ON Project SupervisorUltramars 1500 million barrel terminal

Self-employed OntarioShip yard construction amp generation facilities

Petrosar Inc Sarnia ON Area SuperintendentClient rep responsible for $650 Million HFOU project

Fluor Canada Corp Alberta Mechanical SupervisorAGCL 1200 tpd Methanol plantAquitaine Canada 650m cfPd sour gas plantEsso Canada Cold Lake Project amp Judy Creek

Arthur GMcKee Inc Nanticoke ON Area SupervisorTexaco 120000 bpd grass roots refinery

SteIco Inc Hamilton ON

JewittVallee Simcoe ONOntario Hydro 4000 MW Thermal generationStelco LEW steel plantDomtar Mill expansionTrent Valley Quarry modernization

MacMaster University 1976-77 (night school)Mohawk College 1971-72 (night school)

SELF DEVELOPMENT -project management-construction management-basic computers-industrial relations-WinWin strategies

-WHMIS-safety amp compensation-KT amp decisions-team management-personnel administration

PERSONAL

REFERENCES

DOB February 24 1950

On request

CITIZENSHIP Canadian

Cochrane Engineering Ltd

Statement of Qualifications

Power Generation Facilities

Cochrane Engineering Ltd200 - 1770 W7th Avenue

Vancouver Be V6J 4Y6Phone 604-736-5421 Fax 604-736-1519

Email receptioncochrane-groupca

COCHRAR

Cochrane Engineering LtdGeneral Qualifications

TABLE OF CONTENTS

Section

Section

Section

10 COMPANY BACKGROUND11 Multi-Disciplinary Design12 Quality Assurance

20 SUMMARY OF RECENT RELEVANT EXPERIENCE21 Recent Relevant Projects Completed22 Projects Currently in Progress23 Cochrane Group - Other Relevant Experience

30 ENGINEERINGmiddot TOOLS

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Sandhill Energy CenterAusti n Texas

Calpine Combined Cycle Power PlantGoldendale Washington

10 COMPANY BACKGROUND

The Cochrane Group of companies including Cochrane Engineeringprovides integrated engineering architecture planning and projectmanagement services for a wide variety of projects It was formed in1996 through the merger of Cochrane Engineering a Calgary firm inoperation since 1972 and the PBK Group which had providedarchitectural and engineering services in Vancouver since 1937 Ouraffiliation with the Cochrane Group affords us access to the expertiseof over 350 personnel consisting of project managers technicalpersonnel and administrative staff in six offices across Canada Italso lends access to other Cochrane Group firms including PBKArchitects Inc which has provided design services for many industrialprojects in Canada and abroad Cochrane Engineering and PBKArchitects have significant experience providing services for clients inthe power coal mining and process industries

Cochrane Engineerings power division has successfully exporteddesign services through out North and South America In the last twoyears this division has provided mechanical processinstrumentation architectural electrical civil and structural designservices for projects totaling over 1000 MW of power generationThe construction cost for these projects exceeds $1 billion

11 Multi-Disciplinary DesignCochrane Group is a fully integrated multi-disciplinary design groupservicing the power sector with in-house architectural capabilitiesGE7FA experience and combined cycle process experts enabling usto provide comprehensive one stop shopping The CochraneGroups multi-disciplinary design team includes

bull Cochrane Engineering Ltd andbull PBK Architects Inc

Cochrane Engineering Ltd is a multi-discipline engineering firmspecializing in the design of combined cycle power plants simplecycle power plants and industrial projects We also supplyengineering resources for PBK architects

PBK Architects Inc specializes in the design of industrial facilitiesoffices maintenance shops warehouses institutional buildings andrecreational sport facilities PBK provides the architectural servicesto Cochrane for our power projects Signature projects include BCPlace GM Place Horseshoe Bay Ferry Terminal upgrade and

1-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 23: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

1996-1990

Governments of Chad and Cameroon - World Bank Panel Review of PipelineDevelopment Research Assistant IRIS Environmental Systems Research assistant to theManagerCoordinator of the Expert Panel for the review of literature pertaining to biodiversity andwildlands ecology in the African savannah tropical forests and marine ecosystems

St Vincent and the Grenadines Caribbean Soil Erosion Research on DeforestedWatershed Areas Environmental Scientist Project Manager and Principle investigator intothe loss of soil water and nutrients associated with banana cultivated areas Secondary focus ofthe research was aimed at developing a land use management plan incorporating conservationfarming practices and the use of social forestry in the conservation of soil on severely erodedsteep-land agricultural areas In consideration with the socio-economic status of the areaformulated recommendations for appropriate farming practices at the micro-scale level

St Vincent and the Grenadines Caribbean Man and the Biosphere ProjectUNESCOEnvironmental Scientist Assistant Project Supervisor and Liaison between the University ofCalgary and the St Vincent Forestry Department Responsible for the implementation of varioussoil erosion research studies aimed at the quantification of soil water and nutrient loss associatedwith agroforestry and forestry plantation areas

ENVIRONMENTAL POLICYChair of the Energy Recovery Generation (ERG) Subgroup Clean Air Strategic Alliance Alberta

Advisor Centre for EnergyERG Input Electricity and Alternative Energy Division BC Ministry of Energy and Mines

ERG Input Climate Change Offset System Environment CanadaERG Input Treatment of Clean Energy Natural Resources Canada

COUNTRIES WORK EXPERIENCECanada Egypt Zimbabwe St Vincent and the Grenadines Chad and Cameroon Cuba

5

Selected Permitting Reports

1 A Wetlands Monitoring Plan Foster Creek Area Cold Lake Air Weapons Range AB 2001 Reportprepared for Alberta Energy Company Ltd

2 A Strategic Assessment of The Banff Centre Area Redevelopment Plan Banff National Park AB2000 Environmental Screening Report prepared for The Banff Centre

3 Permit to Withdraw Water from the Pipestone River and Corral Creek for the Purposes ofSnowmaking Fire-Fighting and Domestic Water Use the Lake Louise Ski Area Banff National ParkAB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

4 Improvements to Water Intakes on the Pipestone River and Corral Creek the Lake Louise Ski AreaBanff National Park AB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

5 Proposed Development of a Chairliff and Ski Runs on Eagle Ridge the Marmot Basin Ski AreaJasper National Park AB 1999 Comprehensive Study Report prepared for Ski Marmot Basin

6 An Application for New Staff Accommodations at Skoki Lodge Banff National Park AB 2000Environmental Screening Report prepared for Skiing Louise Ltd

7 An Application for New Commercial Accommodations at the Lake Louise Inn Banff National ParkAB 2000 Report prepared for the Lake Louise Inn

8 Improvements to Surface Drainage at the Marmot Basin Ski Area Jasper National Park AB 1998Environmental Screening Report prepared for Ski Marmot Basin

9 Improvements to Subsurface Drainage at the Marmot Basin Ski Area Jasper National Park AB1998 Environmental Screening Report prepared for Ski Marmot Basin

10 Improvements to Sewage Treatment Facilities and Effluent Disposal at the Marmot Basin Ski AreaJasper National Park AB 1998 Environmental Screening Report prepared for Ski Marmot Basin

Other Reports

11 Legislative and Policy Factors Influencing Tourism Development in Alberta 2000 Report preparedfor Alberta Economic Development and Alberta Economic Development Authority TourismCommittee

12 Egypt Country Development Policy Framework (CDPF) Assessment 1999 Report prepared for theCanadian International Development Agency Hull Quebec

13 Egypt Country Development Policy Framework (CDPF) Assessment Presentation 1999Presentation prepared for the Canadian International Development Agency Hull Quebec

14 Monitoring Mission Reports Egypt Environment Theme Reports prepared for the CanadianInternational Development Agency Hull Quebec

15 A Pre-Disturbance Vegetation Classification for the Disturbed Portion of the Syncrude DevelopmentArea Mildred Lake AB 1998 Report prepared for Syncrude Canada Ltd

16 Characterization of Soil Erosion Processes and Nutrient Losses Associated with Previously ForestedAreas the Colonarie River Watershed St Vincent West Indies 1998 A Masters Thesis preparedfor the University of Calgary

6

Stakeholder Consultation

1 Zimbabwe-Canada Environmental Planning Exchange Mission 2001 Organized and coordinated anexchange mission held in Banff AB for the CIDA Zimbabwe Environmental Planning and CapacityEnhancement Project

2 Strategic Assessment of The Banff Centre Area Redevelopment Plan 2000 Conducted stakeholderconsultations via a public open house forum

3 Results Based Management as a Project Management Tool 1999 Conducted a workshop in VictoriaFalls Zimbabwe for the Environmental Planning and Capacity Enhancement Project

7

Neil StewartRR 3 SimcoeOntario CanadaN3Y 4K2

OBJECTIVE ProjectConstruction Management

emailphone

fax

nmsproj ectskwiccom519-426-2239519-426-2674

1991-Date

1990-1991

1988-1990

JPRomC1r amp CONsect1[RUCnON MIANAGEMJENT sectJERVJ[CJEsect

Project amp Construction Management services including Project DevelopmentProject strategy Contract negotiations Contract Management Industrial RelationsGovernment liaison Profit amp Loss accountability

Plans of execution project controls budgets planning evaluations safety labourrelations and business development Project amp Site management coordinationprocedures administration methods and site organization Managed andcoordinated information flow tofrom Client(s) Engineer(s) and Contractor(s)

Projects includeWestcoast Energy 55mw Whitby Cogen Bayside 280 mw RepowerEcodyne Ltd MOU contract management amp coordinationUnited Parcel Services Canada Hamilton Air Hub ProjectINCO Nickle Foam and Nickle Disc ProjectsBayer AG Nicklehydroxide and Tungsten Carbide ProjectsMacMillen Bloedel Secondary Fibre Recycling Project

Fluor Daniel Canada LtdResident Construction Manager Central Division

Provide support to Business Units for construction managementservicesresponsible for industrial relations safety quality personnel development andmethods Initiated and established field organizations roles and responsibilitiessite procedures fab shop contractorsupplier planning budgetsfinancial and clientrelations to support critical contract schedules

Projects includeProctor amp Gamble Ultra Project MFord Canada Winn 88 Paint PlantINCO S02 Abatement Project

Ellis Don LtdProject Manager Resident site manager accountable for the process coordinationof $500M GMSUZUKI (CAMI) grass roots automotive plant in Ingersoll ON

Directed 1800 unionized trades (peak workforce) and managed lump-sum projecton schedule and under budget Developed and maintained Oriental and NorthAmerican client trust relationships Surpassed project expectations in labourrelations and safety Profit and Loss accountability

1986-1988

1985-1986

1984-1985

1983-1984

1981-1983

1978-1981

1974-1978

1973-1974

1969-1973

EDUCATION

UMA SpantecGeneral SuperintendentDirected and supervised lump-sum contracts Interfaced with engineering andclient organizations to produce responsive quality services and safe profitablecontracts

Projects includedLabatts Brewers various capital projectsConsumers Glass hot amp cold end shut downsUnivofWaterloo construction management servicesDomtar paper board expansion

Glen Curtis Company Construction SuperintendentConstruction management of Canadian Occidentals 65m cfPdgrass roots sour gas plant in Mezeppa Alberta

Ennisteel Co Ltd Toronto ON Project SupervisorUltramars 1500 million barrel terminal

Self-employed OntarioShip yard construction amp generation facilities

Petrosar Inc Sarnia ON Area SuperintendentClient rep responsible for $650 Million HFOU project

Fluor Canada Corp Alberta Mechanical SupervisorAGCL 1200 tpd Methanol plantAquitaine Canada 650m cfPd sour gas plantEsso Canada Cold Lake Project amp Judy Creek

Arthur GMcKee Inc Nanticoke ON Area SupervisorTexaco 120000 bpd grass roots refinery

SteIco Inc Hamilton ON

JewittVallee Simcoe ONOntario Hydro 4000 MW Thermal generationStelco LEW steel plantDomtar Mill expansionTrent Valley Quarry modernization

MacMaster University 1976-77 (night school)Mohawk College 1971-72 (night school)

SELF DEVELOPMENT -project management-construction management-basic computers-industrial relations-WinWin strategies

-WHMIS-safety amp compensation-KT amp decisions-team management-personnel administration

PERSONAL

REFERENCES

DOB February 24 1950

On request

CITIZENSHIP Canadian

Cochrane Engineering Ltd

Statement of Qualifications

Power Generation Facilities

Cochrane Engineering Ltd200 - 1770 W7th Avenue

Vancouver Be V6J 4Y6Phone 604-736-5421 Fax 604-736-1519

Email receptioncochrane-groupca

COCHRAR

Cochrane Engineering LtdGeneral Qualifications

TABLE OF CONTENTS

Section

Section

Section

10 COMPANY BACKGROUND11 Multi-Disciplinary Design12 Quality Assurance

20 SUMMARY OF RECENT RELEVANT EXPERIENCE21 Recent Relevant Projects Completed22 Projects Currently in Progress23 Cochrane Group - Other Relevant Experience

30 ENGINEERINGmiddot TOOLS

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Sandhill Energy CenterAusti n Texas

Calpine Combined Cycle Power PlantGoldendale Washington

10 COMPANY BACKGROUND

The Cochrane Group of companies including Cochrane Engineeringprovides integrated engineering architecture planning and projectmanagement services for a wide variety of projects It was formed in1996 through the merger of Cochrane Engineering a Calgary firm inoperation since 1972 and the PBK Group which had providedarchitectural and engineering services in Vancouver since 1937 Ouraffiliation with the Cochrane Group affords us access to the expertiseof over 350 personnel consisting of project managers technicalpersonnel and administrative staff in six offices across Canada Italso lends access to other Cochrane Group firms including PBKArchitects Inc which has provided design services for many industrialprojects in Canada and abroad Cochrane Engineering and PBKArchitects have significant experience providing services for clients inthe power coal mining and process industries

Cochrane Engineerings power division has successfully exporteddesign services through out North and South America In the last twoyears this division has provided mechanical processinstrumentation architectural electrical civil and structural designservices for projects totaling over 1000 MW of power generationThe construction cost for these projects exceeds $1 billion

11 Multi-Disciplinary DesignCochrane Group is a fully integrated multi-disciplinary design groupservicing the power sector with in-house architectural capabilitiesGE7FA experience and combined cycle process experts enabling usto provide comprehensive one stop shopping The CochraneGroups multi-disciplinary design team includes

bull Cochrane Engineering Ltd andbull PBK Architects Inc

Cochrane Engineering Ltd is a multi-discipline engineering firmspecializing in the design of combined cycle power plants simplecycle power plants and industrial projects We also supplyengineering resources for PBK architects

PBK Architects Inc specializes in the design of industrial facilitiesoffices maintenance shops warehouses institutional buildings andrecreational sport facilities PBK provides the architectural servicesto Cochrane for our power projects Signature projects include BCPlace GM Place Horseshoe Bay Ferry Terminal upgrade and

1-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 24: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

Selected Permitting Reports

1 A Wetlands Monitoring Plan Foster Creek Area Cold Lake Air Weapons Range AB 2001 Reportprepared for Alberta Energy Company Ltd

2 A Strategic Assessment of The Banff Centre Area Redevelopment Plan Banff National Park AB2000 Environmental Screening Report prepared for The Banff Centre

3 Permit to Withdraw Water from the Pipestone River and Corral Creek for the Purposes ofSnowmaking Fire-Fighting and Domestic Water Use the Lake Louise Ski Area Banff National ParkAB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

4 Improvements to Water Intakes on the Pipestone River and Corral Creek the Lake Louise Ski AreaBanff National Park AB 1999 Environmental Screening Report prepared for Skiing Louise Ltd

5 Proposed Development of a Chairliff and Ski Runs on Eagle Ridge the Marmot Basin Ski AreaJasper National Park AB 1999 Comprehensive Study Report prepared for Ski Marmot Basin

6 An Application for New Staff Accommodations at Skoki Lodge Banff National Park AB 2000Environmental Screening Report prepared for Skiing Louise Ltd

7 An Application for New Commercial Accommodations at the Lake Louise Inn Banff National ParkAB 2000 Report prepared for the Lake Louise Inn

8 Improvements to Surface Drainage at the Marmot Basin Ski Area Jasper National Park AB 1998Environmental Screening Report prepared for Ski Marmot Basin

9 Improvements to Subsurface Drainage at the Marmot Basin Ski Area Jasper National Park AB1998 Environmental Screening Report prepared for Ski Marmot Basin

10 Improvements to Sewage Treatment Facilities and Effluent Disposal at the Marmot Basin Ski AreaJasper National Park AB 1998 Environmental Screening Report prepared for Ski Marmot Basin

Other Reports

11 Legislative and Policy Factors Influencing Tourism Development in Alberta 2000 Report preparedfor Alberta Economic Development and Alberta Economic Development Authority TourismCommittee

12 Egypt Country Development Policy Framework (CDPF) Assessment 1999 Report prepared for theCanadian International Development Agency Hull Quebec

13 Egypt Country Development Policy Framework (CDPF) Assessment Presentation 1999Presentation prepared for the Canadian International Development Agency Hull Quebec

14 Monitoring Mission Reports Egypt Environment Theme Reports prepared for the CanadianInternational Development Agency Hull Quebec

15 A Pre-Disturbance Vegetation Classification for the Disturbed Portion of the Syncrude DevelopmentArea Mildred Lake AB 1998 Report prepared for Syncrude Canada Ltd

16 Characterization of Soil Erosion Processes and Nutrient Losses Associated with Previously ForestedAreas the Colonarie River Watershed St Vincent West Indies 1998 A Masters Thesis preparedfor the University of Calgary

6

Stakeholder Consultation

1 Zimbabwe-Canada Environmental Planning Exchange Mission 2001 Organized and coordinated anexchange mission held in Banff AB for the CIDA Zimbabwe Environmental Planning and CapacityEnhancement Project

2 Strategic Assessment of The Banff Centre Area Redevelopment Plan 2000 Conducted stakeholderconsultations via a public open house forum

3 Results Based Management as a Project Management Tool 1999 Conducted a workshop in VictoriaFalls Zimbabwe for the Environmental Planning and Capacity Enhancement Project

7

Neil StewartRR 3 SimcoeOntario CanadaN3Y 4K2

OBJECTIVE ProjectConstruction Management

emailphone

fax

nmsproj ectskwiccom519-426-2239519-426-2674

1991-Date

1990-1991

1988-1990

JPRomC1r amp CONsect1[RUCnON MIANAGEMJENT sectJERVJ[CJEsect

Project amp Construction Management services including Project DevelopmentProject strategy Contract negotiations Contract Management Industrial RelationsGovernment liaison Profit amp Loss accountability

Plans of execution project controls budgets planning evaluations safety labourrelations and business development Project amp Site management coordinationprocedures administration methods and site organization Managed andcoordinated information flow tofrom Client(s) Engineer(s) and Contractor(s)

Projects includeWestcoast Energy 55mw Whitby Cogen Bayside 280 mw RepowerEcodyne Ltd MOU contract management amp coordinationUnited Parcel Services Canada Hamilton Air Hub ProjectINCO Nickle Foam and Nickle Disc ProjectsBayer AG Nicklehydroxide and Tungsten Carbide ProjectsMacMillen Bloedel Secondary Fibre Recycling Project

Fluor Daniel Canada LtdResident Construction Manager Central Division

Provide support to Business Units for construction managementservicesresponsible for industrial relations safety quality personnel development andmethods Initiated and established field organizations roles and responsibilitiessite procedures fab shop contractorsupplier planning budgetsfinancial and clientrelations to support critical contract schedules

Projects includeProctor amp Gamble Ultra Project MFord Canada Winn 88 Paint PlantINCO S02 Abatement Project

Ellis Don LtdProject Manager Resident site manager accountable for the process coordinationof $500M GMSUZUKI (CAMI) grass roots automotive plant in Ingersoll ON

Directed 1800 unionized trades (peak workforce) and managed lump-sum projecton schedule and under budget Developed and maintained Oriental and NorthAmerican client trust relationships Surpassed project expectations in labourrelations and safety Profit and Loss accountability

1986-1988

1985-1986

1984-1985

1983-1984

1981-1983

1978-1981

1974-1978

1973-1974

1969-1973

EDUCATION

UMA SpantecGeneral SuperintendentDirected and supervised lump-sum contracts Interfaced with engineering andclient organizations to produce responsive quality services and safe profitablecontracts

Projects includedLabatts Brewers various capital projectsConsumers Glass hot amp cold end shut downsUnivofWaterloo construction management servicesDomtar paper board expansion

Glen Curtis Company Construction SuperintendentConstruction management of Canadian Occidentals 65m cfPdgrass roots sour gas plant in Mezeppa Alberta

Ennisteel Co Ltd Toronto ON Project SupervisorUltramars 1500 million barrel terminal

Self-employed OntarioShip yard construction amp generation facilities

Petrosar Inc Sarnia ON Area SuperintendentClient rep responsible for $650 Million HFOU project

Fluor Canada Corp Alberta Mechanical SupervisorAGCL 1200 tpd Methanol plantAquitaine Canada 650m cfPd sour gas plantEsso Canada Cold Lake Project amp Judy Creek

Arthur GMcKee Inc Nanticoke ON Area SupervisorTexaco 120000 bpd grass roots refinery

SteIco Inc Hamilton ON

JewittVallee Simcoe ONOntario Hydro 4000 MW Thermal generationStelco LEW steel plantDomtar Mill expansionTrent Valley Quarry modernization

MacMaster University 1976-77 (night school)Mohawk College 1971-72 (night school)

SELF DEVELOPMENT -project management-construction management-basic computers-industrial relations-WinWin strategies

-WHMIS-safety amp compensation-KT amp decisions-team management-personnel administration

PERSONAL

REFERENCES

DOB February 24 1950

On request

CITIZENSHIP Canadian

Cochrane Engineering Ltd

Statement of Qualifications

Power Generation Facilities

Cochrane Engineering Ltd200 - 1770 W7th Avenue

Vancouver Be V6J 4Y6Phone 604-736-5421 Fax 604-736-1519

Email receptioncochrane-groupca

COCHRAR

Cochrane Engineering LtdGeneral Qualifications

TABLE OF CONTENTS

Section

Section

Section

10 COMPANY BACKGROUND11 Multi-Disciplinary Design12 Quality Assurance

20 SUMMARY OF RECENT RELEVANT EXPERIENCE21 Recent Relevant Projects Completed22 Projects Currently in Progress23 Cochrane Group - Other Relevant Experience

30 ENGINEERINGmiddot TOOLS

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Sandhill Energy CenterAusti n Texas

Calpine Combined Cycle Power PlantGoldendale Washington

10 COMPANY BACKGROUND

The Cochrane Group of companies including Cochrane Engineeringprovides integrated engineering architecture planning and projectmanagement services for a wide variety of projects It was formed in1996 through the merger of Cochrane Engineering a Calgary firm inoperation since 1972 and the PBK Group which had providedarchitectural and engineering services in Vancouver since 1937 Ouraffiliation with the Cochrane Group affords us access to the expertiseof over 350 personnel consisting of project managers technicalpersonnel and administrative staff in six offices across Canada Italso lends access to other Cochrane Group firms including PBKArchitects Inc which has provided design services for many industrialprojects in Canada and abroad Cochrane Engineering and PBKArchitects have significant experience providing services for clients inthe power coal mining and process industries

Cochrane Engineerings power division has successfully exporteddesign services through out North and South America In the last twoyears this division has provided mechanical processinstrumentation architectural electrical civil and structural designservices for projects totaling over 1000 MW of power generationThe construction cost for these projects exceeds $1 billion

11 Multi-Disciplinary DesignCochrane Group is a fully integrated multi-disciplinary design groupservicing the power sector with in-house architectural capabilitiesGE7FA experience and combined cycle process experts enabling usto provide comprehensive one stop shopping The CochraneGroups multi-disciplinary design team includes

bull Cochrane Engineering Ltd andbull PBK Architects Inc

Cochrane Engineering Ltd is a multi-discipline engineering firmspecializing in the design of combined cycle power plants simplecycle power plants and industrial projects We also supplyengineering resources for PBK architects

PBK Architects Inc specializes in the design of industrial facilitiesoffices maintenance shops warehouses institutional buildings andrecreational sport facilities PBK provides the architectural servicesto Cochrane for our power projects Signature projects include BCPlace GM Place Horseshoe Bay Ferry Terminal upgrade and

1-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 25: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

Stakeholder Consultation

1 Zimbabwe-Canada Environmental Planning Exchange Mission 2001 Organized and coordinated anexchange mission held in Banff AB for the CIDA Zimbabwe Environmental Planning and CapacityEnhancement Project

2 Strategic Assessment of The Banff Centre Area Redevelopment Plan 2000 Conducted stakeholderconsultations via a public open house forum

3 Results Based Management as a Project Management Tool 1999 Conducted a workshop in VictoriaFalls Zimbabwe for the Environmental Planning and Capacity Enhancement Project

7

Neil StewartRR 3 SimcoeOntario CanadaN3Y 4K2

OBJECTIVE ProjectConstruction Management

emailphone

fax

nmsproj ectskwiccom519-426-2239519-426-2674

1991-Date

1990-1991

1988-1990

JPRomC1r amp CONsect1[RUCnON MIANAGEMJENT sectJERVJ[CJEsect

Project amp Construction Management services including Project DevelopmentProject strategy Contract negotiations Contract Management Industrial RelationsGovernment liaison Profit amp Loss accountability

Plans of execution project controls budgets planning evaluations safety labourrelations and business development Project amp Site management coordinationprocedures administration methods and site organization Managed andcoordinated information flow tofrom Client(s) Engineer(s) and Contractor(s)

Projects includeWestcoast Energy 55mw Whitby Cogen Bayside 280 mw RepowerEcodyne Ltd MOU contract management amp coordinationUnited Parcel Services Canada Hamilton Air Hub ProjectINCO Nickle Foam and Nickle Disc ProjectsBayer AG Nicklehydroxide and Tungsten Carbide ProjectsMacMillen Bloedel Secondary Fibre Recycling Project

Fluor Daniel Canada LtdResident Construction Manager Central Division

Provide support to Business Units for construction managementservicesresponsible for industrial relations safety quality personnel development andmethods Initiated and established field organizations roles and responsibilitiessite procedures fab shop contractorsupplier planning budgetsfinancial and clientrelations to support critical contract schedules

Projects includeProctor amp Gamble Ultra Project MFord Canada Winn 88 Paint PlantINCO S02 Abatement Project

Ellis Don LtdProject Manager Resident site manager accountable for the process coordinationof $500M GMSUZUKI (CAMI) grass roots automotive plant in Ingersoll ON

Directed 1800 unionized trades (peak workforce) and managed lump-sum projecton schedule and under budget Developed and maintained Oriental and NorthAmerican client trust relationships Surpassed project expectations in labourrelations and safety Profit and Loss accountability

1986-1988

1985-1986

1984-1985

1983-1984

1981-1983

1978-1981

1974-1978

1973-1974

1969-1973

EDUCATION

UMA SpantecGeneral SuperintendentDirected and supervised lump-sum contracts Interfaced with engineering andclient organizations to produce responsive quality services and safe profitablecontracts

Projects includedLabatts Brewers various capital projectsConsumers Glass hot amp cold end shut downsUnivofWaterloo construction management servicesDomtar paper board expansion

Glen Curtis Company Construction SuperintendentConstruction management of Canadian Occidentals 65m cfPdgrass roots sour gas plant in Mezeppa Alberta

Ennisteel Co Ltd Toronto ON Project SupervisorUltramars 1500 million barrel terminal

Self-employed OntarioShip yard construction amp generation facilities

Petrosar Inc Sarnia ON Area SuperintendentClient rep responsible for $650 Million HFOU project

Fluor Canada Corp Alberta Mechanical SupervisorAGCL 1200 tpd Methanol plantAquitaine Canada 650m cfPd sour gas plantEsso Canada Cold Lake Project amp Judy Creek

Arthur GMcKee Inc Nanticoke ON Area SupervisorTexaco 120000 bpd grass roots refinery

SteIco Inc Hamilton ON

JewittVallee Simcoe ONOntario Hydro 4000 MW Thermal generationStelco LEW steel plantDomtar Mill expansionTrent Valley Quarry modernization

MacMaster University 1976-77 (night school)Mohawk College 1971-72 (night school)

SELF DEVELOPMENT -project management-construction management-basic computers-industrial relations-WinWin strategies

-WHMIS-safety amp compensation-KT amp decisions-team management-personnel administration

PERSONAL

REFERENCES

DOB February 24 1950

On request

CITIZENSHIP Canadian

Cochrane Engineering Ltd

Statement of Qualifications

Power Generation Facilities

Cochrane Engineering Ltd200 - 1770 W7th Avenue

Vancouver Be V6J 4Y6Phone 604-736-5421 Fax 604-736-1519

Email receptioncochrane-groupca

COCHRAR

Cochrane Engineering LtdGeneral Qualifications

TABLE OF CONTENTS

Section

Section

Section

10 COMPANY BACKGROUND11 Multi-Disciplinary Design12 Quality Assurance

20 SUMMARY OF RECENT RELEVANT EXPERIENCE21 Recent Relevant Projects Completed22 Projects Currently in Progress23 Cochrane Group - Other Relevant Experience

30 ENGINEERINGmiddot TOOLS

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Sandhill Energy CenterAusti n Texas

Calpine Combined Cycle Power PlantGoldendale Washington

10 COMPANY BACKGROUND

The Cochrane Group of companies including Cochrane Engineeringprovides integrated engineering architecture planning and projectmanagement services for a wide variety of projects It was formed in1996 through the merger of Cochrane Engineering a Calgary firm inoperation since 1972 and the PBK Group which had providedarchitectural and engineering services in Vancouver since 1937 Ouraffiliation with the Cochrane Group affords us access to the expertiseof over 350 personnel consisting of project managers technicalpersonnel and administrative staff in six offices across Canada Italso lends access to other Cochrane Group firms including PBKArchitects Inc which has provided design services for many industrialprojects in Canada and abroad Cochrane Engineering and PBKArchitects have significant experience providing services for clients inthe power coal mining and process industries

Cochrane Engineerings power division has successfully exporteddesign services through out North and South America In the last twoyears this division has provided mechanical processinstrumentation architectural electrical civil and structural designservices for projects totaling over 1000 MW of power generationThe construction cost for these projects exceeds $1 billion

11 Multi-Disciplinary DesignCochrane Group is a fully integrated multi-disciplinary design groupservicing the power sector with in-house architectural capabilitiesGE7FA experience and combined cycle process experts enabling usto provide comprehensive one stop shopping The CochraneGroups multi-disciplinary design team includes

bull Cochrane Engineering Ltd andbull PBK Architects Inc

Cochrane Engineering Ltd is a multi-discipline engineering firmspecializing in the design of combined cycle power plants simplecycle power plants and industrial projects We also supplyengineering resources for PBK architects

PBK Architects Inc specializes in the design of industrial facilitiesoffices maintenance shops warehouses institutional buildings andrecreational sport facilities PBK provides the architectural servicesto Cochrane for our power projects Signature projects include BCPlace GM Place Horseshoe Bay Ferry Terminal upgrade and

1-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 26: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

Neil StewartRR 3 SimcoeOntario CanadaN3Y 4K2

OBJECTIVE ProjectConstruction Management

emailphone

fax

nmsproj ectskwiccom519-426-2239519-426-2674

1991-Date

1990-1991

1988-1990

JPRomC1r amp CONsect1[RUCnON MIANAGEMJENT sectJERVJ[CJEsect

Project amp Construction Management services including Project DevelopmentProject strategy Contract negotiations Contract Management Industrial RelationsGovernment liaison Profit amp Loss accountability

Plans of execution project controls budgets planning evaluations safety labourrelations and business development Project amp Site management coordinationprocedures administration methods and site organization Managed andcoordinated information flow tofrom Client(s) Engineer(s) and Contractor(s)

Projects includeWestcoast Energy 55mw Whitby Cogen Bayside 280 mw RepowerEcodyne Ltd MOU contract management amp coordinationUnited Parcel Services Canada Hamilton Air Hub ProjectINCO Nickle Foam and Nickle Disc ProjectsBayer AG Nicklehydroxide and Tungsten Carbide ProjectsMacMillen Bloedel Secondary Fibre Recycling Project

Fluor Daniel Canada LtdResident Construction Manager Central Division

Provide support to Business Units for construction managementservicesresponsible for industrial relations safety quality personnel development andmethods Initiated and established field organizations roles and responsibilitiessite procedures fab shop contractorsupplier planning budgetsfinancial and clientrelations to support critical contract schedules

Projects includeProctor amp Gamble Ultra Project MFord Canada Winn 88 Paint PlantINCO S02 Abatement Project

Ellis Don LtdProject Manager Resident site manager accountable for the process coordinationof $500M GMSUZUKI (CAMI) grass roots automotive plant in Ingersoll ON

Directed 1800 unionized trades (peak workforce) and managed lump-sum projecton schedule and under budget Developed and maintained Oriental and NorthAmerican client trust relationships Surpassed project expectations in labourrelations and safety Profit and Loss accountability

1986-1988

1985-1986

1984-1985

1983-1984

1981-1983

1978-1981

1974-1978

1973-1974

1969-1973

EDUCATION

UMA SpantecGeneral SuperintendentDirected and supervised lump-sum contracts Interfaced with engineering andclient organizations to produce responsive quality services and safe profitablecontracts

Projects includedLabatts Brewers various capital projectsConsumers Glass hot amp cold end shut downsUnivofWaterloo construction management servicesDomtar paper board expansion

Glen Curtis Company Construction SuperintendentConstruction management of Canadian Occidentals 65m cfPdgrass roots sour gas plant in Mezeppa Alberta

Ennisteel Co Ltd Toronto ON Project SupervisorUltramars 1500 million barrel terminal

Self-employed OntarioShip yard construction amp generation facilities

Petrosar Inc Sarnia ON Area SuperintendentClient rep responsible for $650 Million HFOU project

Fluor Canada Corp Alberta Mechanical SupervisorAGCL 1200 tpd Methanol plantAquitaine Canada 650m cfPd sour gas plantEsso Canada Cold Lake Project amp Judy Creek

Arthur GMcKee Inc Nanticoke ON Area SupervisorTexaco 120000 bpd grass roots refinery

SteIco Inc Hamilton ON

JewittVallee Simcoe ONOntario Hydro 4000 MW Thermal generationStelco LEW steel plantDomtar Mill expansionTrent Valley Quarry modernization

MacMaster University 1976-77 (night school)Mohawk College 1971-72 (night school)

SELF DEVELOPMENT -project management-construction management-basic computers-industrial relations-WinWin strategies

-WHMIS-safety amp compensation-KT amp decisions-team management-personnel administration

PERSONAL

REFERENCES

DOB February 24 1950

On request

CITIZENSHIP Canadian

Cochrane Engineering Ltd

Statement of Qualifications

Power Generation Facilities

Cochrane Engineering Ltd200 - 1770 W7th Avenue

Vancouver Be V6J 4Y6Phone 604-736-5421 Fax 604-736-1519

Email receptioncochrane-groupca

COCHRAR

Cochrane Engineering LtdGeneral Qualifications

TABLE OF CONTENTS

Section

Section

Section

10 COMPANY BACKGROUND11 Multi-Disciplinary Design12 Quality Assurance

20 SUMMARY OF RECENT RELEVANT EXPERIENCE21 Recent Relevant Projects Completed22 Projects Currently in Progress23 Cochrane Group - Other Relevant Experience

30 ENGINEERINGmiddot TOOLS

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Sandhill Energy CenterAusti n Texas

Calpine Combined Cycle Power PlantGoldendale Washington

10 COMPANY BACKGROUND

The Cochrane Group of companies including Cochrane Engineeringprovides integrated engineering architecture planning and projectmanagement services for a wide variety of projects It was formed in1996 through the merger of Cochrane Engineering a Calgary firm inoperation since 1972 and the PBK Group which had providedarchitectural and engineering services in Vancouver since 1937 Ouraffiliation with the Cochrane Group affords us access to the expertiseof over 350 personnel consisting of project managers technicalpersonnel and administrative staff in six offices across Canada Italso lends access to other Cochrane Group firms including PBKArchitects Inc which has provided design services for many industrialprojects in Canada and abroad Cochrane Engineering and PBKArchitects have significant experience providing services for clients inthe power coal mining and process industries

Cochrane Engineerings power division has successfully exporteddesign services through out North and South America In the last twoyears this division has provided mechanical processinstrumentation architectural electrical civil and structural designservices for projects totaling over 1000 MW of power generationThe construction cost for these projects exceeds $1 billion

11 Multi-Disciplinary DesignCochrane Group is a fully integrated multi-disciplinary design groupservicing the power sector with in-house architectural capabilitiesGE7FA experience and combined cycle process experts enabling usto provide comprehensive one stop shopping The CochraneGroups multi-disciplinary design team includes

bull Cochrane Engineering Ltd andbull PBK Architects Inc

Cochrane Engineering Ltd is a multi-discipline engineering firmspecializing in the design of combined cycle power plants simplecycle power plants and industrial projects We also supplyengineering resources for PBK architects

PBK Architects Inc specializes in the design of industrial facilitiesoffices maintenance shops warehouses institutional buildings andrecreational sport facilities PBK provides the architectural servicesto Cochrane for our power projects Signature projects include BCPlace GM Place Horseshoe Bay Ferry Terminal upgrade and

1-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 27: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

1986-1988

1985-1986

1984-1985

1983-1984

1981-1983

1978-1981

1974-1978

1973-1974

1969-1973

EDUCATION

UMA SpantecGeneral SuperintendentDirected and supervised lump-sum contracts Interfaced with engineering andclient organizations to produce responsive quality services and safe profitablecontracts

Projects includedLabatts Brewers various capital projectsConsumers Glass hot amp cold end shut downsUnivofWaterloo construction management servicesDomtar paper board expansion

Glen Curtis Company Construction SuperintendentConstruction management of Canadian Occidentals 65m cfPdgrass roots sour gas plant in Mezeppa Alberta

Ennisteel Co Ltd Toronto ON Project SupervisorUltramars 1500 million barrel terminal

Self-employed OntarioShip yard construction amp generation facilities

Petrosar Inc Sarnia ON Area SuperintendentClient rep responsible for $650 Million HFOU project

Fluor Canada Corp Alberta Mechanical SupervisorAGCL 1200 tpd Methanol plantAquitaine Canada 650m cfPd sour gas plantEsso Canada Cold Lake Project amp Judy Creek

Arthur GMcKee Inc Nanticoke ON Area SupervisorTexaco 120000 bpd grass roots refinery

SteIco Inc Hamilton ON

JewittVallee Simcoe ONOntario Hydro 4000 MW Thermal generationStelco LEW steel plantDomtar Mill expansionTrent Valley Quarry modernization

MacMaster University 1976-77 (night school)Mohawk College 1971-72 (night school)

SELF DEVELOPMENT -project management-construction management-basic computers-industrial relations-WinWin strategies

-WHMIS-safety amp compensation-KT amp decisions-team management-personnel administration

PERSONAL

REFERENCES

DOB February 24 1950

On request

CITIZENSHIP Canadian

Cochrane Engineering Ltd

Statement of Qualifications

Power Generation Facilities

Cochrane Engineering Ltd200 - 1770 W7th Avenue

Vancouver Be V6J 4Y6Phone 604-736-5421 Fax 604-736-1519

Email receptioncochrane-groupca

COCHRAR

Cochrane Engineering LtdGeneral Qualifications

TABLE OF CONTENTS

Section

Section

Section

10 COMPANY BACKGROUND11 Multi-Disciplinary Design12 Quality Assurance

20 SUMMARY OF RECENT RELEVANT EXPERIENCE21 Recent Relevant Projects Completed22 Projects Currently in Progress23 Cochrane Group - Other Relevant Experience

30 ENGINEERINGmiddot TOOLS

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Sandhill Energy CenterAusti n Texas

Calpine Combined Cycle Power PlantGoldendale Washington

10 COMPANY BACKGROUND

The Cochrane Group of companies including Cochrane Engineeringprovides integrated engineering architecture planning and projectmanagement services for a wide variety of projects It was formed in1996 through the merger of Cochrane Engineering a Calgary firm inoperation since 1972 and the PBK Group which had providedarchitectural and engineering services in Vancouver since 1937 Ouraffiliation with the Cochrane Group affords us access to the expertiseof over 350 personnel consisting of project managers technicalpersonnel and administrative staff in six offices across Canada Italso lends access to other Cochrane Group firms including PBKArchitects Inc which has provided design services for many industrialprojects in Canada and abroad Cochrane Engineering and PBKArchitects have significant experience providing services for clients inthe power coal mining and process industries

Cochrane Engineerings power division has successfully exporteddesign services through out North and South America In the last twoyears this division has provided mechanical processinstrumentation architectural electrical civil and structural designservices for projects totaling over 1000 MW of power generationThe construction cost for these projects exceeds $1 billion

11 Multi-Disciplinary DesignCochrane Group is a fully integrated multi-disciplinary design groupservicing the power sector with in-house architectural capabilitiesGE7FA experience and combined cycle process experts enabling usto provide comprehensive one stop shopping The CochraneGroups multi-disciplinary design team includes

bull Cochrane Engineering Ltd andbull PBK Architects Inc

Cochrane Engineering Ltd is a multi-discipline engineering firmspecializing in the design of combined cycle power plants simplecycle power plants and industrial projects We also supplyengineering resources for PBK architects

PBK Architects Inc specializes in the design of industrial facilitiesoffices maintenance shops warehouses institutional buildings andrecreational sport facilities PBK provides the architectural servicesto Cochrane for our power projects Signature projects include BCPlace GM Place Horseshoe Bay Ferry Terminal upgrade and

1-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 28: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

Cochrane Engineering Ltd

Statement of Qualifications

Power Generation Facilities

Cochrane Engineering Ltd200 - 1770 W7th Avenue

Vancouver Be V6J 4Y6Phone 604-736-5421 Fax 604-736-1519

Email receptioncochrane-groupca

COCHRAR

Cochrane Engineering LtdGeneral Qualifications

TABLE OF CONTENTS

Section

Section

Section

10 COMPANY BACKGROUND11 Multi-Disciplinary Design12 Quality Assurance

20 SUMMARY OF RECENT RELEVANT EXPERIENCE21 Recent Relevant Projects Completed22 Projects Currently in Progress23 Cochrane Group - Other Relevant Experience

30 ENGINEERINGmiddot TOOLS

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Sandhill Energy CenterAusti n Texas

Calpine Combined Cycle Power PlantGoldendale Washington

10 COMPANY BACKGROUND

The Cochrane Group of companies including Cochrane Engineeringprovides integrated engineering architecture planning and projectmanagement services for a wide variety of projects It was formed in1996 through the merger of Cochrane Engineering a Calgary firm inoperation since 1972 and the PBK Group which had providedarchitectural and engineering services in Vancouver since 1937 Ouraffiliation with the Cochrane Group affords us access to the expertiseof over 350 personnel consisting of project managers technicalpersonnel and administrative staff in six offices across Canada Italso lends access to other Cochrane Group firms including PBKArchitects Inc which has provided design services for many industrialprojects in Canada and abroad Cochrane Engineering and PBKArchitects have significant experience providing services for clients inthe power coal mining and process industries

Cochrane Engineerings power division has successfully exporteddesign services through out North and South America In the last twoyears this division has provided mechanical processinstrumentation architectural electrical civil and structural designservices for projects totaling over 1000 MW of power generationThe construction cost for these projects exceeds $1 billion

11 Multi-Disciplinary DesignCochrane Group is a fully integrated multi-disciplinary design groupservicing the power sector with in-house architectural capabilitiesGE7FA experience and combined cycle process experts enabling usto provide comprehensive one stop shopping The CochraneGroups multi-disciplinary design team includes

bull Cochrane Engineering Ltd andbull PBK Architects Inc

Cochrane Engineering Ltd is a multi-discipline engineering firmspecializing in the design of combined cycle power plants simplecycle power plants and industrial projects We also supplyengineering resources for PBK architects

PBK Architects Inc specializes in the design of industrial facilitiesoffices maintenance shops warehouses institutional buildings andrecreational sport facilities PBK provides the architectural servicesto Cochrane for our power projects Signature projects include BCPlace GM Place Horseshoe Bay Ferry Terminal upgrade and

1-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 29: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

Cochrane Engineering LtdGeneral Qualifications

TABLE OF CONTENTS

Section

Section

Section

10 COMPANY BACKGROUND11 Multi-Disciplinary Design12 Quality Assurance

20 SUMMARY OF RECENT RELEVANT EXPERIENCE21 Recent Relevant Projects Completed22 Projects Currently in Progress23 Cochrane Group - Other Relevant Experience

30 ENGINEERINGmiddot TOOLS

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Sandhill Energy CenterAusti n Texas

Calpine Combined Cycle Power PlantGoldendale Washington

10 COMPANY BACKGROUND

The Cochrane Group of companies including Cochrane Engineeringprovides integrated engineering architecture planning and projectmanagement services for a wide variety of projects It was formed in1996 through the merger of Cochrane Engineering a Calgary firm inoperation since 1972 and the PBK Group which had providedarchitectural and engineering services in Vancouver since 1937 Ouraffiliation with the Cochrane Group affords us access to the expertiseof over 350 personnel consisting of project managers technicalpersonnel and administrative staff in six offices across Canada Italso lends access to other Cochrane Group firms including PBKArchitects Inc which has provided design services for many industrialprojects in Canada and abroad Cochrane Engineering and PBKArchitects have significant experience providing services for clients inthe power coal mining and process industries

Cochrane Engineerings power division has successfully exporteddesign services through out North and South America In the last twoyears this division has provided mechanical processinstrumentation architectural electrical civil and structural designservices for projects totaling over 1000 MW of power generationThe construction cost for these projects exceeds $1 billion

11 Multi-Disciplinary DesignCochrane Group is a fully integrated multi-disciplinary design groupservicing the power sector with in-house architectural capabilitiesGE7FA experience and combined cycle process experts enabling usto provide comprehensive one stop shopping The CochraneGroups multi-disciplinary design team includes

bull Cochrane Engineering Ltd andbull PBK Architects Inc

Cochrane Engineering Ltd is a multi-discipline engineering firmspecializing in the design of combined cycle power plants simplecycle power plants and industrial projects We also supplyengineering resources for PBK architects

PBK Architects Inc specializes in the design of industrial facilitiesoffices maintenance shops warehouses institutional buildings andrecreational sport facilities PBK provides the architectural servicesto Cochrane for our power projects Signature projects include BCPlace GM Place Horseshoe Bay Ferry Terminal upgrade and

1-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 30: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Sandhill Energy CenterAusti n Texas

Calpine Combined Cycle Power PlantGoldendale Washington

10 COMPANY BACKGROUND

The Cochrane Group of companies including Cochrane Engineeringprovides integrated engineering architecture planning and projectmanagement services for a wide variety of projects It was formed in1996 through the merger of Cochrane Engineering a Calgary firm inoperation since 1972 and the PBK Group which had providedarchitectural and engineering services in Vancouver since 1937 Ouraffiliation with the Cochrane Group affords us access to the expertiseof over 350 personnel consisting of project managers technicalpersonnel and administrative staff in six offices across Canada Italso lends access to other Cochrane Group firms including PBKArchitects Inc which has provided design services for many industrialprojects in Canada and abroad Cochrane Engineering and PBKArchitects have significant experience providing services for clients inthe power coal mining and process industries

Cochrane Engineerings power division has successfully exporteddesign services through out North and South America In the last twoyears this division has provided mechanical processinstrumentation architectural electrical civil and structural designservices for projects totaling over 1000 MW of power generationThe construction cost for these projects exceeds $1 billion

11 Multi-Disciplinary DesignCochrane Group is a fully integrated multi-disciplinary design groupservicing the power sector with in-house architectural capabilitiesGE7FA experience and combined cycle process experts enabling usto provide comprehensive one stop shopping The CochraneGroups multi-disciplinary design team includes

bull Cochrane Engineering Ltd andbull PBK Architects Inc

Cochrane Engineering Ltd is a multi-discipline engineering firmspecializing in the design of combined cycle power plants simplecycle power plants and industrial projects We also supplyengineering resources for PBK architects

PBK Architects Inc specializes in the design of industrial facilitiesoffices maintenance shops warehouses institutional buildings andrecreational sport facilities PBK provides the architectural servicesto Cochrane for our power projects Signature projects include BCPlace GM Place Horseshoe Bay Ferry Terminal upgrade and

1-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 31: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Calpine Combined Cycle Power PlantGoldendale Washington

12

expansion of the nuclear accelerator at TRIUMF at the University ofBritish Columbia

Quality Assurance

Cochrane Engineering Ltd has engineering standards officeprocedures and quality control procedures that have evolved over our65 years of experience of providing quality engineering Our powerdivision has in-house procedures meeting ISO 9000 requirements

Our quality control and document control performance has beenevaluated by Calpine in regards to the Goldendale combined cycleproject We were advised that our evaluation was the mostfavourable ever given by Calpine to an engineering firm

On execution of a project Cochrane is capable of incorporatingOwner specifications and standards If an Owner specification doesnot exist we review our standard with the Owner to prepare anappropriate specification

In regards to engineering and design Cochrane Engineering uses twomanuals which outline our policies and procedures The first manualis specific to Project Management Procedures and the second isspecific to Engineering Procedures

A third Quality Assurance Manual assembles management of policiesto assure that client needs are met that applicable codes andstandards are complied with and that corporate and professionalgoals are satisfied

Proiect ManaQement Procedures Manual includes

bull Project Organization The function to organize project forces inaccordance with sound practices

bull Project Planning The function of preparing a plan to definecontrols work scope local codes permits environmental permitsetc

bull Project Opening Notice The function to prepare an internalcontrol document to initiate man-hour and cost budget for tracking

bull Project Procedures The function to define specific proceduresbetween Cochrane and the Owner

]-2

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 32: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

bull Project Criteria The function to prepare technical scopestandards and formal descriptive statement of a project DesignCriteria becomes a part of this document

bull Project Control Plan The function to define project controlactivities and the time frame for those activities plus define theresources to carry out the project

bull Service Revenue Estimating The function of progressmeasurement

bull Project Execution The function to develop standard reportingsystem current status progress project changes documentcontrol and invoicing

bull Project Completion The function to document that the facilityhas been installed in accordance with project and design criteriaand to archive the project

Enaineerina Procedures Manual includes

bull Design Planning The function of preparing a plan of sequentialtasks preparing discipline work plans in conformance with theProject Plan

bull Design Criteria The function of defining product and materialquality and performance criteria to be used on the project

bull Design Cost Control The function of having design costsmonitored reported and controlled on a regular basis

bull Design Change The function monitoring and approval of designchanges which affect cost schedule or quality

bull Engineering Calculations The function of clear written record ofall design calculations

bull Construction Specification Preparation The function ofassuring standardization of specifications whether they are theclients or Cochranes

bull Checking Engineering Documents The function of checkingdesign calculations drawings with the appropriate sign offapprovals

1-3

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 33: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

COCHRANEENGINEERING

Eletrobolt Power PlantRio de Janeiro Brazil

bull Professional Seals The function of applying professional seals inaccordance with the regulatory authority

bull Vendor Documents The function of logging in and out of allvendor documents and electronic storage with document control

Qualitv Assurance Manual includes

Policy and Managementbull Policy The function of company and project conformance with

the Quality Assurance Program

bull Quality Assurance Program The function of setting minimumacceptable activities policies guidelines and auditingconformance

bull Authority and Responsibility The function of definingresponsibility to all employees

bull Records and Registers The function of inspection reports testreports and audits

bull Control of Documents The function of defining documentsfundamental to the control of business quality design and policy

Sandhill Energy CenterAustin Texas

Project Quality Plansbull Engineering Design Activity

conformance with Design BasisQualifications and Design Changes

The function of assuringDesign Review Personnel

Sandhill Energy CenterAustin Texas

bull Procurement I Supplier Activity The function of assuringconformance with Procurement Documents Source SelectionSource Surveillance Certifications Packaging ShippingReceiving Inspection

bull Construction Activity The function of assuring conformancewith Construction Processes (welding testing etc) Control ofMaterial Inspection and Quality Control Test Control NonConforming Items

bull Standard Project Quality Plan The function of assuringconformance with Cochranes Project Management ManualsEngineering Procedure Manuals Field Operation ManualsDrafting Standards etc

These manuals are specific to engineering and EPCM projects

1-4

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 34: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

20 SUMMARY OF RECENT RELEVANT EXPERIENCE

Cochrane has been very active over the last two years designing fivemajor gas fired power facilities and providing design assistance to BCHydro and other clients plus providing specific design expertise to USfirms for their thermal power projects

Our power division is presently providing full service mult-disciplineengineering design for a 250 MW combined cycle power project forAES Lake Worth in Florida Design for this project is 60 percentcomplete Our engineering staff have recently completed detaileddesign of a 250 MW combined cycle plant for Calpine at GoldendaleWashington and have provided field construction supervision Threeof our major projects Linden 6 (170 MW) Austin (160 MW) andEletrobolt (320 MW) are already in commercial operation

Calpine Combined Cycle Power PlantGoldendale Washington

Calpine Combined Cycle Power PlantGoldendale Washington

21

In the last two years our power division has designed over 1000Megawatts of simple cycle and combined cycle projects We haveprovided detailed design services for mechanical structuralcivilpiping electrical and instrumentation amp controls for these projects

We have provided electrical instrumentation piping and residentengineering services on other combined cycle projects that total over3200 MW of capacity

Recent Relevant Projects Completed

Calpine Combined Cycle Power PlantGoldendale Washington

This 250 MW (nominal) combined cycle plant has one GE7FA gasturbine generator one Hitachi heat recovery steam generator (HRSG)with duct firing and one 80 MW Hitachi steam turbine Balance ofplant includes water demineralization and a hybrid airwater coolingsystem Services provided Process design detailed design (alldisciplines) procurement specificationsselection and fieldengineering Detailed design is complete Cochrane is currentlyproviding resident engineering services for construction completion

Project Capital Cost $205000000 approxContact Gary Turner (Calpine) (509) 773-0380Completion Date March 2003

2-]

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 35: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

COCHRANEENGINEERING

East Coast Power Linden Unit 6 ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Eletrobolt Power PlantRio de Janeiro Brazil

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

This 170 MW cogeneration plant has one GE7FA combustion turbinegenerator and one heat recovery steam generator with SCR NOxpermit guarantees are 2 PPM The main fuel for the turbine is naturalgas with low sulfur diesel as a back-up fuel The HRSG exports highpressure and low pressure steam to an existing contiguous powerplant for use in existing steam turbines and for export to aneighbouring refinery This project successfully started up in January2002 Services provided Process design detailed design (alldisciplines) procurement specifications vendor selection fieldengineering site electrical supervision performance testingcoordination start-up assistance

Project Capital Cost $200000000 approxContact Chuck Tubias (EI Paso) (908) 474-0800Completion Date January 2002

Eletrobolt Power PlantRio de Janeiro Brazil

This 320 MW simple cycle power plant has eight General Electric LM6000 PC gas turbine generators and inlet air refrigeration with coolingtowers The balance of plant includes water clarification waterdemineralization water cooling gas compression and outfall watercooling This project successfully started up in Nov 2001 Servicesprovided Permitting services process design detailed design (65complete - all disciplines) detailed design completed in Brazilprocurement specifications vendor selection field engineeringassistance

Project Capital Cost $270000000 approxContact Armando Lucio (870) 564-9020Completion Date November 2001

Austin Energy Sand Hills Energy CenterAustin Texas

This simple cycle power plant has four General Electric LM 6000 PCCombustion Turbine Generators The power block consists of fourCTGs (Sprint) an inlet air chiller system with cooling tower and fourselective catalyst reduction SCR modules NOx permit guaranteesare 2 PPM Total electrical power capacity is 170 MW This projectsuccessfully started up in May 2001

2-2

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 36: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

COCHRANEENGINEERING

Austin Energy Sandhill Energy CenterAustin Texas

AES I Tom G Smith Power PlantLake Worth Florida

22

Services provided Process design detailed design (all disciplines)procurement specifications vendor selection and field engineeringassistance during construction and start-up

Project Capital Cost $123000000 approxContact LA Williams (Austin)(512) 322-6325Completion Date May 2001

Projects Currently in Progress

AES I Tom G Smith Power PlantLake Worth Florida

This 240 MW (nominal) combined cycle plant has one GE7FAcombustion turbine generator one Foster Wheeler heat recoverysteam generator one new Mitsubishi steam turbine and a secondexisting steam turbine Services provided Process design detaileddesign (all disciplines) procurement specifications vendor selectionfield engineering for integration to an existing facility Detailed designis 60 complete

Project Capital Cost $190000000 approxContact Derald Wildharber (AES) (561) 586-7213Completion Date May 2003

BC Hydro Fort Nelson - LM6000 Facility UpgradeFort Nelson BC

Cochrane Engineering are retained to provide detailed structuralmechanical instrumentation and electrical design to winterize thepower plant upgrade electrical power distribution and upgradeequipment standards This thermal power plant facility has a nominal45 MW capacity It includes one GE LM6000 gas turbine one once-through steam generator and balance of plant equipment

Project Capital Cost $3500000Contact Tom Soltys (BC Hydro) (604) 528-2458Completion Date September 2003

2-3

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 37: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

COCHRANEENGINEERING

Calpine Combined Cycle Power PlantGoldendale Washington

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

BC Hydro Power Supply Engineering I Kootenay Canal HydroStation

We provided detailed engineering design services for replacing theprotection system for the 230 kV transmission line and GSUtransformer Services provided Electrical and protection designand drafting

Project Capital Cost NAContact Bob Stewart (BC Hydro) (604) 528-2175Completion Date June 2002

BC Hydro Transmission and Distribution I Seismic Upgrade ofVancouver Island Substations

Cochrane have recently been award two projects on Vancouver Islandto design and prepare construction documents for

bull BC Hydro substations at Gold River and Sahtlam (SeisimicZone 6)

bull BC Hydro substation at Malaspina

Services provided structural seismic design drafting

Project Capital Cost NAContact Anthony Lam (BC Hydro) (604) 528-1842Completion Date June 2002

Other Proiects

Cochrane has provided specific expertise for project design on otherrelated projects These services and projects include

Tate amp Lyle Redpath Sugars Toronto OntarioCochrane Engineering was selected by Redpath Sugars to providecomplete design and construction management services for theexpansion of their processing facility in Toronto

These services involved the following improvements

bull Flue gas recover system - Capital Cost $300000 approxbull Turbine generator installation -$3000000bull Affination expansion - $2000000bull FW Boiler installation - $600000bull Air System Upgrades $100000

2-4

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 38: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

COCHRANEENGINEERING

Sandhill Energy CenterAustin Texas

Tate amp Lyle Redpath SugarsToronto Ontario

Eletrobolt Power PlantRio de Janeiro Brazil

Since the completion of these improvements Cochrane Engineeringhas provided ongoing services to Redpath Sugars at their Torontoplant including

bull Carbonatation - $10000000bull Zebra Mussel control - $100000bull Sweetwater System Mods - $200000bull Bulk Loading (in process) - $4000000bull Evaporation (in process) - $3000000

Contact Colin Flock (416) 366-3561

Union Power Partner EI Dorado ArkansasCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 2222 MWcombined cycle merchant plant The plant has eight GE7FA gasturbines eight triple pressure HRSGs and four GE 250 MW steamturbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Southaven MississippiCochrane is currently contracted to supply personnel to augment theelectrical and instrumentation design team for this 820 MW combinedcycle merchant plant The plant has three GE7FA gas turbines threeAalborg triple pressure HRSGs and three GE steam turbines

Project Capital Cost $63000000000 (CON) approxContact Terry Hare (425) 415-3019

Cogentrix Energy Inc Caledonia MississippiCochrane is currently contracted to supply personnel to augment theelectrical design team for this 820 MW combined cycle merchantplant The plant has three GE7FA gas turbines three Aalborg triplepressure HRSGs and three GE steam turbinesProject Capital Cost $630000000 (CON) approxContact Terry Hare (425) 415-3019

Panda Energy I TECa Gila Bend ArizonaCochrane is currently contracted to supply personnel to augment theelectrical design team for this 2222 MW combined cycle merchantplant The plant has eight GE7FA gas turbines eight triple pressureHRSGs and four GE 250 MW steam turbines

Project Capital Cost $1600000000 (CON) approxContact Terry Hare (425) 415-3019

2-5

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 39: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Calpine Combined Cycle Power PlantGoldendale Washington

AES I Tom G Smith Power PlantLa ke Worth Flori da

TECO I Gen Power Power Plant Del Arkansas USACochrane Engineering is retained to provide piping design andresident engineering quality control assistance during constructionand start-up for a 580 MW combined cycle power plant The projectincludes two GE7FA gas turbines one HRSG turbine inlet chillingand one 240 MW steam turbine

Project Capital Cost $450000000 (CDN) approxContact Bob Powers (870) 564-9020

23 Relevant Staff Experience

Cochrane Engineerings power division engineers have extensiveexperience in other areas of thermal power generation

Gasbull Calpine - Sumas Cogeneration Company - 125 MW Cogeneration

Power Plant Sumas WAbull ABB 254 MW Island Cogeneration Project Campbell River BCbull City of Medicine Hat Combined Cycle Power Plant Medicine Hat

ABbull Electricity Corporation of Saudi Arabia 630 MW gasoil fired

turbines and high voltage power distributionbull Shell ATCO Power Muskeg River - 200 MW Cogeneration Fort

McMurray ABbull WESCUP McMahon -110 MW Cogeneration Plant Taylor BCbull Westcoast Power Inc - 50 MW Cogeneration Plant Whitby ON

Wood Residuebull Howe Sound Pulp and Paper - 100 MW Cogeneration Plant Port

Mellon BCbull Scott Paper - 50 MW Cogeneration Plant Everett Washington

Weyerhaeuser Canada - 50 MW Cogeneration Plant PrinceAlbert SK

bull Finlay Forest Products - 12 MW Cogeneration Plant MackenzieBC

bull MacMillan Bloedel - 600000 Ibshr Power Boiler No 19 PowellRiver BC

bull Harmac Pacific Inc Boiler and STG Nanaimo BC

Coalbull 600 MW Coal-Fired Power Plant Chinabull Battle River Power Station - 120 MW Battle River ABbull Genesee Generating Station - 400 MW EPCOR Edmonton AS

2-6

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 40: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

bull Manitoba Hydro - 105 MW Brandon MBbull Shand Coal-Fired Generating Station - 300 MW SKbull Boundary Dam Coal-Fired Generating Station - 875 MW SK

Waste Energybull Vancouver Sewerage - 5 MW Cogeneration Low Grade Digester

Gas Burnaby BC

2-7

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 41: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

COCHRANEENGINEERING

AES I Tom G Smith Power PlantLake Worth Florida

Calpine Combined Cycle Power PlantGoldendale Washington

Sandhill Energy CenterAusti n l Texas

30 ENGINEERING - TOOLS

Within our power division we utilize current software to generatecomprehensive design documents

bull Heat balance power estimate - GT Pro GT Master and Gatecyclebull P amp ID and instrument list - Live interactive database and

document production through Rebis AutoPlantbull Pressure drop calculations - Steam condensate water and air

systems using Water Flow Networkbull Pipe Stress Analysis - Caesar and Autopipebull Material Handling - CEMAbull 3D Pipe amp Equipment Modeling - Rebis AutoPlant

PDS-Intergraphbull CADD - AutoCad Microstationbull Scheduling - Primavera P3 Microsoft Projectbull Document Control - aCE

Document Control

Our power division has in-house procedures meeting ISO 9000requirements For a typical project we generate

bull Specification and Drawing Register listing drawing numberlatest revision latest revision date design change noticesdocument title drawing percent complete engineering estimateand specific comments The drawing register is also used tomonitor project progress where percent complete is measuredagainst the budget values thus calculating a weighted percentcomplete for specified disciplines areas plus the completeproject

bull Vendor Drawing Register listing project file number vendorname drawing number revision number drawing title POnumber date received code indication action required fordocument return code date to vendor indication whether thedocument is closed or open date to field and date to client

bull Document Storage utilizes an electronic storage systemdeveloped by aCE All documents are stored electronically in tifor pdf format utilizing attributes for easy sorting filing andsearch

3-1

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 42: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

Eletrobolt Power PlantRio de Janeiro Brazil

Process Desian and Pipina

Our power division utilizes a Windows-based plant design tool calledRebis The software piggybacks on AutoCad providing 3Dmodeling of equipment piping and structural elements electricalcable tray and underground conduit The system provides

bull Piping isometrics including bill of materialsbull Piping orthographic plans and sectionsbull Interference detection between pipe equipment structural

members and electrical cable tray

The Rebis system is also used for process design It containsprocess and data management modules to prepare PampIDsinstrument lists and data sheets that are all interlinked Information ismanaged by the smart system thereby reducing errors

Our 3D design has proven to reduce design error thereby reducingcostly re-work by construction craft

The power division is currently initiating a program to also useIntergraph and PDS for 3D design

Communication Tools

We utilize modern communications tools which assist projectexecution

Our Video Conferencing Facilities

bull

bull

Video Conferencing helps facilitate communication with theproject team We find it very useful for weekly project meetingsprocess design review with the Owner and project managementmeetings

aCE Document Management - OCE is a brand name for a printmanagement and document archive system It provides anefficient effective means for viewing and printing a large variety ofdocuments and image files Once images have been stored andcatalogued they can be easily searched for and retrieved forviewing andor printing from local network drives Moreover thesystem enables owners or the construction site direct access toelectronic drawings specifications and vendor drawings Remotesites are set up so they can search the project vault select thedocument they require and plot at their location

We have seen this system effectively shorten the turn-around timebetween construction and engineering and create significantconstruction savings

3-2

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 43: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

COCHRANEENGINEERING

Linden Cogeneration Plant 6 Unit ExpansionLinden New Jersey

AES I Tom G Smith Power PlantLake Worth Florida

bull Virtual Office - Cochrane are currently developing the IT systemto include FTP sites where clients and construction contractorhave access to all project documents (in addition to what iscurrently accessible through the aCE document control system)

Architectural

As discussed in Section 10 Cochrane Engineering is affiliated withPBK Architects and the two firms work seamlessly to providemultidisciplinary services where and when required PBK is capableof preparing renderings of plant facilities for permitting publicdiscussions and regulatory approvals Included below is a renderingPBK did for our recent Eletrobolt Project in Brazil It was part of apackage that was used for regulatory permitting and was developedelectronically from our 3D Model used for the design of the facility

PBK Architects also provided design services to layout the offices andmaintenance warehouse shop for a 1200 MW combined cycle plantin Arkansas

Having in-house architects enable our project team to have interactivediscussions between the Engineer Owner and the Architect so thatwe may be able to present a cost-effective structure meeting publicdemands and regulatory requirements

Eletrobolt Power Plant - Architectural RenderingRio de Janeiro Brazil

3-3

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 44: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

COCaRaNEGROUP

Client

Calpine Corporation

Services

Detailed design constructionengineering assistance amp stort-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTGoldendale Washington

The Goldendale Energy generating facility is a Greenfield 248 MW combinedcycle gas fired power plant constructed to meet the energy needs of GoldendaleAluminum Company Cochrane Engineering was responsible for all engineeringfunctions forthis EPC project

The plant features the following

bullbullbullbull

One GE 7FA Combustion Gas Turbine GeneratorOne Hitachi HRSG 3 pressure and reheatOne Hitachi Steam Turbine Sliding Pressure OperationOne Parallel Wet Dry Condenser

COCHRANE ENGINEERING

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 45: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

11118bullbull 1GRIIUP

ClientEast Coast Power

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE COGENERATION PLANTLinden New Jersey

The Linden Unit 5 Facility is an existing combined cycle cogeneration power facilitythat provides electric power to various clients around the New York New JerseyMetroplex while generating and distributing steam to a refinery The Unit 6 additionconsists of the installation of one GE7FA combustion gas turbine generator and onenew heat recovery steam generator Steam from the HRSG is piped to a commonheader for distribution to existing steam turbines

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration spanned twenty-one months from full notice to proceed to finalcommercial operation Construction was completed in late 2001

COCHRANE ENGINEERING

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 46: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

COCIIDNEGROUP

ClientSociedade Fluminense

de Energia Ltds

ServicesEnvironmental permitting and

detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

Electrical

SIMPLE CYCLE POWER PLANTRio deJaneiro Brazil

The Eletrobolt Power Project is a greenfield power plantlocated near Rio de JaneiroBrazil The project utilizes eight GE LM6000 enhanced Sprint gas turbine generators(GTGs) in simple cycle configuration The GTGs include water injection for NOxreduction and power augmentation and are fueled with natural gas only

This 380 MW power plant features the following

bullbullbullbullbull

Eight GE LM6000 Enhanced Sprint Gas Turbine GeneratorsRiver Water Intake StructureWater Clarification and TreatmentElectrical Step-up Transformers and Switch YardFuel Gas Compressors

The projects duration spanned ten months from full notice to proceed to finalcommercial operation with substantial completion in late 2001

COCHRANE ENGINEERING

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 47: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

GROUP

ClientAustin Energy

Services

Detailed design constructionengineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

StructuralProcess MechanicalPiping

ElectricalInstrumentation and Controls

SIMPLE CYCLE POWER PLANTAustin Texas

The Sandhill Power Project is a 170 MW simple cycle peaking power project basedon four General Electric LM6000PC Enhanced Sprint class gas turbine generatorsThe plantfeatures the following

bullbullbullbullbull

Four GE LM6000PC Enhanced Sprint Gas TurbineGeneratorsSelective Catalytic Reduction (SCR) EquipmentInlet Air ChillersGas CompressorsGenerator Step-up Transformers

The projects duration spanned just eleven months from full notice to proceed to finalcommercial operation Construction was completed in June 2001

COCHRANE ENGINEERING

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 48: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

GROUP

ClientAES Lake Worth Generation

ServicesDetailed design construction

engineering assistance amp start-up assistance for all disciplines

of engineering includingCivil

Structu ra IProcess MechanicalPiping

ElectricalInstrumentation and Controls

COMBINED CYCLE POWER PLANTlake Worth Florida

This project is for repowering the City of Lake Worth Floridas existing S-3 and 5-4steam turbine generators The S-4 will be replaced with a new steam turbinegenerator The project consists of a new gas fueled General Electric (GE) Frame 7FAthree-pressure HRSG 475 MW steam turbine generator (to replace the existing 5-4STG) and ancillary equipment Power generated by the gas turbine will be sold on amerchant basis

This 172 MW combined cycle cogeneration plant features the following

bullbullbullbull

One GE Frame 7FA Combustion Gas Turbine Generator SetOne Foster Wheeler Heat Recovery Steam GeneratorGenerator Step-up TransformersSynchronization Scheme

The projects duration will span twenty-four months from notice to proceed tocommercial operation Construction is scheduled to be completed in 2003

COCHRANE ENGINEERING

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 49: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

GROUP

Client

Be Hydro

Services

Structural EngineeringDesign and Drafting

SUBSTATION SEISMIC UPGRADEGold River BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode value for the particular area with the structure classed as Post Disaster

The building was a steel framed pre-engineered type structure Drawings wereprepared forthe upgrade ofthe roof diaphragm and vertical steel bracing

COCHRANE ENGINEERING

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 50: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

COCHRANEGROUP

ClientBe Hydro

ServicesStructural Engineering Drafting

SUBSTATION SEISMIC UPGRADEMalaspina BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their current earthquake loading requ irements

As part of this program Cochrane Engineering Ltd was retained to undertake thepreparation of construction drawings for strengthening of the building structuralcomponents which did not have adequate capacity for the current earthquake loadsThe earthquake loading considered was the current building code value for theparticular area with the structure classed as Post Disaster

The building was of steel framed construction with some reinforced concrete blockwalls Drawings were prepared for the upgrade of the roof diaphragm and verticalsteel bracing

COCHRANE ENGINEERING

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 51: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

GROUP

ClientBe Hydro

ServicesStructural Engineering

Design and Drafting

SUBSTATION SEISMIC UPGRADESahtlam BritishColumbia

BC Hydro had a program in place to upgrade their existing substations which werestructurally deficient with respect to their cu rrent earthquake loading requirements

As part of this program Cochrane Engineering Ltd was retained to undertake detaildesign and preparation of construction drawings for strengthening of the buildingstructural components which did not have adequate capacity for the currentearthquake loads The earthquake loading considered was the current buildingcode va lue for the particu lar area with the structure classed as Post Disaster

The building was constructed of steel roof deck on steel roof joints on reinforcedconcrete block walls Drawings were prepared for the upgrade of the roofdiaphragm and the concrete block shear walls

COCHRANE ENGINEERING

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested

Page 52: UTI! IT [S M! SSlD N Te/403.298.3100 Fax403.265.7219 ~'~'C ... › Documents › Proceedings › 2005 › ... · projects", and list by name, location, size, and actual COD those

- bullomint

a

Subject

IWtJ~bullbull_w _

Kerry Worton [WORTONKbennettjonesca]Monday January 17 2005 357 PMjohneaxionnet aliceJerreirabchydrocom supportbcpiaccom infobcseaorgcameronlusztigbctccom Commission Secretary BCUCEX Loyola Keough rbwbhtcomgfultonboughtonca grd lewiscablerocketcom csa ndersonCALGARYgwiaexecdirectorcitizensforpublicpowerca ebnetcomcastnet tberrycompassrmcomgsta pleduke-energycom sterilizersexcitecom ccs_ bchotmailcompierrelamarchehsppca XTAG JWSHCKISLANDNET AGIN nabbeylslandnetpgrignonlslandnet thackneylslandnet XTMalcolmson Sheila Islands Trust EAOINHunterMLA Mike LASSEX chuckmnational-energycomden nis fitzgera Idnorskecanadacom Iguenthernovuscomnet macrainpacificcoastnetma iripacificcoastnet ju lianpostcarbonorg hcampbellpristinepowercaTonyDugglebyseabreezepowercom bobmckshawca danpottsshawcajasparrshawca kgrootshawca moonbayhouseshawca ranyoungshawcashadybrookshawca weislawshawca wjandrewsshawca brenda-johntelusnetdnewlandstelusnet elroystelusnet erkiltelusnet hunterjohntelusnetregulatoryaffa irsterasengascom cjoh nsonvanfaskencompcoch ranewillisenergycom kwsteevesyahoocomBC Hydro - Call for Tenders - Project No 3698354 (Ex No C17-13)

Responses to Letter - Responses Jeff Myerspdf (48 HarvieBCUCDOC(53 KB) to the BCUC KB) ampbellpdf (63 KB

Ken Spinnerpdf Project Experience Julia(111 KB) Chart - res ccaglionepdf (66 KI

lei Stewartpdf(32 KB)

Cochrane Kiewit and Bibbperiencepdf (5 MB) Experience - r

Please find attached the cover letter Responses andattachments of DukePoint Power Limited Partnership to the BCUCs Information Requestsfiled as Exhibit No C17-13-Thank you

The contents of this message may contain confidential andor privilegedsubject matter If this message has been received in error please contactthe sender and delete all copies Like other forms of communicatione-mail communications may be vulnerable to interception by unauthorizedparties If you do not wish us to communicate with you bye-mail pleasenotify us at your earliest convenience In the absence of suchnotification your consent is assumed Should you choose to allow us tocommunicate bye-mail we will not take any additional security measures(such as encryption) unless specifically requested