26
“Using Lean Six Sigma To Improve a Risk Management Process” ASQ Temecula; June 17, 2010 http://www.asq-temecula.org/?page_id=308 Kim Niles, ASQ Fellow, MSQA, CSSMBB, CSSBB, CQE www.KimNiles.com ; [email protected] 1

“Using Lean Six Sigma To Improve a Risk Management Process” ASQ Temecula; June 17, 2010 Kim Niles, ASQ Fellow,

Embed Size (px)

Citation preview

Page 1: “Using Lean Six Sigma To Improve a Risk Management Process” ASQ Temecula; June 17, 2010  Kim Niles, ASQ Fellow,

“Using Lean Six Sigma To Improve a Risk Management Process”

ASQ Temecula; June 17, 2010 http://www.asq-temecula.org/?page_id=308

Kim Niles, ASQ Fellow, MSQA, CSSMBB, CSSBB, CQE

www.KimNiles.com ; [email protected]

1

Page 2: “Using Lean Six Sigma To Improve a Risk Management Process” ASQ Temecula; June 17, 2010  Kim Niles, ASQ Fellow,

Proposed Agenda

How do we narrow in on something meaningful?

1. Define what we mean by LSS and RM Process Lean (L), Six Sigma (SS), LSS, DFSS Risk Management

2. Define the scope of our project Efficacy, efficiency, accuracy, consistency Evolutionary vs. revolutionary

3. Simulate a project Typical steps, tasks, and reports

4. Lessons Learned + / -

2

Short Exercises:

1. NGT Survey – 3 min2. NGT Multi-vote

Project – 2min3. Open disc.;

Simulation – 30min4. Lessons Learned

Disc. – 5min

Page 3: “Using Lean Six Sigma To Improve a Risk Management Process” ASQ Temecula; June 17, 2010  Kim Niles, ASQ Fellow,

3

Nominal Group Techniques (NGT)

Affinity Diagram for Pizza

Product Category

Service Category

Cost Category

Features Category

Post-it Notes

Extra value

Delivered Hot

45 min max wait

Friendly Drivers

Lower price

More toppings

Deals available

Quick ordering

> Crust Types

Proper change

$0 Fee Delivery

3

• Affinity Diagrams, Multi-voting, Tree diagrams, Mind mapping, Un-inhibited group discuss, Café/town hall mtgs, Unusual settings, etc.

Page 4: “Using Lean Six Sigma To Improve a Risk Management Process” ASQ Temecula; June 17, 2010  Kim Niles, ASQ Fellow,

NGT Brainstorming – Sticky Notes

4

Rate 1 low to 10 high:1. Your dislike/pain for Six Sigma2. Your dislike/pain for Risk Management3. Rate your RM experience level (relative to?) 4. Years as a Quality Professional

1=52=93=1

4=10

3 minutes

TG N

Page 5: “Using Lean Six Sigma To Improve a Risk Management Process” ASQ Temecula; June 17, 2010  Kim Niles, ASQ Fellow,

What do we mean by “Lean Six Sigma”?Collections of best known methods: Models, methods, and tools

Process Improvement

Visibility Value Velocity

ProjectManagement

ChangeManagement

VariationManagement

The 3V’s and the 3M’s

5

TOC

Page 6: “Using Lean Six Sigma To Improve a Risk Management Process” ASQ Temecula; June 17, 2010  Kim Niles, ASQ Fellow,

What do we mean by “Risk Management Project”?

• Definition: A formal program used to assess, avoid/mitigate, and control all reasonable forms of business / safety risks– Contains elements listed above in some way, plus teams,

measurements (subjective), action triggers / specifications– Lifespan oriented: making, using, maintaining, & obsolescing– Prioritized cost to benefit efforts (RPN based)– Typically concerned with safety & efficacy

http://msdn.microsoft.com/en-us/library/cc500392.aspx

Page 7: “Using Lean Six Sigma To Improve a Risk Management Process” ASQ Temecula; June 17, 2010  Kim Niles, ASQ Fellow,

Scope of RM Application• The project can cover concept (market), customer needs,

design, intermediate use (i.e. labs, Drs., nurse), end user, mfg. process, equip., services, suppliers, project risks, etc.

• IVD Example from ISO14971:

Page 8: “Using Lean Six Sigma To Improve a Risk Management Process” ASQ Temecula; June 17, 2010  Kim Niles, ASQ Fellow,

http://www.fda.gov/RegulatoryInformatio

n/Guidances/ucm128050.htm#III

• ICH / FDA guidance from 2006

Page 9: “Using Lean Six Sigma To Improve a Risk Management Process” ASQ Temecula; June 17, 2010  Kim Niles, ASQ Fellow,

• ISPE GAMP5

Computerized systems

Page 10: “Using Lean Six Sigma To Improve a Risk Management Process” ASQ Temecula; June 17, 2010  Kim Niles, ASQ Fellow,

Kim’s DRAFT Grand RISK

Model

• The Acronym RISK can help us remember

• Missing:– SAE AS9100 – AIAG PPAP

Ris

k F

acto

r Id

entif

icat

ion

Haz

ard

Ass

ess

/ Ana

lysi

s

Ris

k E

valu

atio

n

Ris

k C

ontr

ol O

ptio

n A

naly

sis

Ris

k M

easu

res

Impl

emen

t

Res

idua

l Ris

k E

valu

atio

n

Ris

k / B

enef

it A

naly

sis

Eva

l of R

isks

Fro

m C

ontr

ols

Com

plet

e R

isk

Con

trol

Ove

rall

Ris

k A

ccep

tabi

lity

Ver

ifica

tion

Tes

ting

/ DO

E

Sta

tistic

s -

Oth

er

Ris

k M

anag

emen

t Rep

ort

On-

goin

g D

ata

Gat

herin

g

Ris

k R

evie

ws

/ Mon

itorin

g

IEC 60812 (Systems Reliability) x x x x x x x

ISO13485>> 14971 Risk Management x x x x x x x x x x x x x

ISPE Gamp 5; Computerized Systems x x x x x xICH Q9 Basic RM Facilitation: FlowCharts x

Basic RM Facilitation: Chk.Sht. x

Failure Mode Effects Analysis (FMEA) x x x x x x x x

FME& Criticality Analysis (FMECA) x x x x x x x x

Fault Tree Analysis (FTA) x x x x

Haz.Anal.& Critical Control Points (HACCP) x x x x

Hazard Operability Analysis (HAZOP) x

Preliminary Hazard Analysis (PHA) x

Risk ranking and filtering x

Supporting statistical tools x

HIPPA Loss Prevention

Loss Reduction

Risk Mitigation

Claims Management Unsure of focus for each functional area

Risk Financing

Regulatory Accredidation Compliance

Operations (Risk Management Dept.)

Bioethics

SSubstantiate

(Verify)

KKnow

(Report)(Plan)

R IRealize Instigate

(Assess)

Tools

Page 11: “Using Lean Six Sigma To Improve a Risk Management Process” ASQ Temecula; June 17, 2010  Kim Niles, ASQ Fellow,

KN Model: 4 Ways to ImproveAny Process Consistency

Efficiency

Effectiveness

Lean Six Sigma (LSS)Evolutionary Change

11

Design For Lean Six

Sigma (DFLSS);

Revolutionary Change

Accuracy

Discuss each area relative to a target & a RM project

• List muda, mura, muri; 17 signature story

Political bias > program fail

Delta customer centered RM story

QPFMEA criteria bias story

What is the scope of the project?

Page 12: “Using Lean Six Sigma To Improve a Risk Management Process” ASQ Temecula; June 17, 2010  Kim Niles, ASQ Fellow,

NGT Brainstorming- Multi-vote likelihood (3 votes)

12

What is a more reasonable improvement project?1. Evolutionary RM program efficiency (cost / benefit)?2. Revolutionary RM program efficiency (cost / benefit)?3. Evolutionary team accuracy (criteria or process)?4. Revolutionary team accuracy (criteria or process)?5. Evolutionary team consistently (following procedures)?6. Revolutionary team consistently (following procedures)?7. Evolutionary program effectiveness (end result)8. Revolutionary program effectiveness (end result)

2 minutes

TG N

Page 13: “Using Lean Six Sigma To Improve a Risk Management Process” ASQ Temecula; June 17, 2010  Kim Niles, ASQ Fellow,

Simulated Case Study

Basic Steps:1. Project pick lists2. Team selection3. Project kickoff4. Defining activities5. Measuring activities6. Analyzing activities7. Improving activities8. Controlling activities9. Phase gate reviews

and celebratory closing meeting

Page 14: “Using Lean Six Sigma To Improve a Risk Management Process” ASQ Temecula; June 17, 2010  Kim Niles, ASQ Fellow,

Spaghetti Map

Page 15: “Using Lean Six Sigma To Improve a Risk Management Process” ASQ Temecula; June 17, 2010  Kim Niles, ASQ Fellow,

Run Charts

Page 16: “Using Lean Six Sigma To Improve a Risk Management Process” ASQ Temecula; June 17, 2010  Kim Niles, ASQ Fellow,

Value Stream Map

Page 17: “Using Lean Six Sigma To Improve a Risk Management Process” ASQ Temecula; June 17, 2010  Kim Niles, ASQ Fellow,

C&E Cascade

Page 18: “Using Lean Six Sigma To Improve a Risk Management Process” ASQ Temecula; June 17, 2010  Kim Niles, ASQ Fellow,

CpK

Page 19: “Using Lean Six Sigma To Improve a Risk Management Process” ASQ Temecula; June 17, 2010  Kim Niles, ASQ Fellow,

Design Space OptimizationDOE Reports Here

Air Academy DARPA 2006

Page 20: “Using Lean Six Sigma To Improve a Risk Management Process” ASQ Temecula; June 17, 2010  Kim Niles, ASQ Fellow,

Three C’s to Inspire Creativity

Comparison

Consequence

Conflict

Component of DFSSSomeone somewhere has already solved your problem- Dr. Ellen Domb

20

Page 21: “Using Lean Six Sigma To Improve a Risk Management Process” ASQ Temecula; June 17, 2010  Kim Niles, ASQ Fellow,

Facilitate Risk Based Decision Making

Corrective Action

Containment Direction

Clarity

Operational Impact

Preventive Action

Identify Risks

Promote Dialog

Tighten Sample

Plans

Regulatory Compliance

Umbrella Risk Management

D/P/FMEA Flow Charts & Process Maps

Mitigate Collective

Risks

Justify Decisions Business

Efficiency

Reduce Sample

PlansAvoid Conflict

Becomes a Dashboard

Collection of Knowledge

Identify Strengths

Control Plan Purpose / Use

File: FTA_ControlPlan_v1_KN_061510 June 15, 2010 KN x 1209

Page 22: “Using Lean Six Sigma To Improve a Risk Management Process” ASQ Temecula; June 17, 2010  Kim Niles, ASQ Fellow,

Risk Mgmt.

Enablers• Jan 2010• 230 comps:

– 40 life sci. – 23% lg.

• Little s/w use

Page 23: “Using Lean Six Sigma To Improve a Risk Management Process” ASQ Temecula; June 17, 2010  Kim Niles, ASQ Fellow,

Quality Progress Poll May 2010

Page 24: “Using Lean Six Sigma To Improve a Risk Management Process” ASQ Temecula; June 17, 2010  Kim Niles, ASQ Fellow,

Risk Control Measures• ISO14971 suggests forming of a list of risk control measures• Also see the annex solutions• Reliasoft software contains a related database

Page 25: “Using Lean Six Sigma To Improve a Risk Management Process” ASQ Temecula; June 17, 2010  Kim Niles, ASQ Fellow,

Hazards per ISO14971

Page 26: “Using Lean Six Sigma To Improve a Risk Management Process” ASQ Temecula; June 17, 2010  Kim Niles, ASQ Fellow,

26

1. Risk management depends upon people– Focus on having fun

• Minimizing the pain (no long meetings)– Pre-prioritize (i.e. by area risks)

• Maximizing the value-add using NGT– To pre-prioritize & to select criteria

• Inspire creativity using the 3C’s model

2. Develop a control plan centric program– Many complimentary tools (i.e. FTA, Process

maps with threats, FMEA)

3. Remember all the components using RISK

Summary of Tips and Tricks