SMA Use of RAP in SMA John D’Angelo D’Angelo Consulting, LLC [email protected]

Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

SMA

Use of RAP in SMA

John D’AngeloD’Angelo Consulting, LLC

[email protected]

Page 2: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

SMA

I-83 MD 1999

Completion Date: 1994

Traffic: AADT: 119,000, Trucks: 11%

SMA Premium Surface for High Volume Roadways

Page 3: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

SMA

Stone Matrix Asphalt is a coarse/gap gradedrut resistant hot mix asphalt surface layer.

It is composed of a strong aggregate skelton,and a binder mastic composed of a highasphalt cement content, a cellulose or mineralfiber and high percentage of mineral filler.

SMA

Page 4: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

SMA

Comparison

SMA - AC

Page 5: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

SMA

Aggregate Requirements

Test Property

Specification

Limits

L.A. Abrasion loss % max

30

Flat and Elongated Particles,

% retained on the No. 4 sieve, max

3:1

5:1

20

5

Sodium Sulfate Soundness Loss

5 cycles, T104

15% max

Crushed Aggregate

One fractured face

Two fractured face

100% min.

90% min.

(Same now in AASHTO MP8)

Page 6: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

SMA

100

0.075 .3 2.36 4.75 9.5 12.5 19.0

Sieve Size (mm) Raised to 0.45 Power

Initial Aggregate Gradation

SMA19 mm

50

25

75

Sieve Size Percent Passing

19 mm 100

12.5 mm 85 - 95

9.5 mm 75 % maximum

4.75 mm 20 - 28

2.36 mm 16 - 24

600 um 12 - 16

300 um 12 - 15

75 um 8 - 10

Page 7: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

Draindown

• 1200 + 200 gms

• 60 + 5 minutes

• Temperatures

– Plant

– and 15 C above

• Criteria - maximum

of 0.30%

AASHTO T 305-97

Page 8: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate
Page 9: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

SMA

SMA Aggregate Gradation

12.5 mm nominal size

Superpave Design Data

N design 100

VTM % 4

VMA % 18.0 min

AC % 6.5 min

Sieve Size mm

Master Band %

19.012.59.54.752.361.180.600.300.075

100.095.070.030.020.0

8.0

(MD DOT 1996)

Page 10: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

SMA

US 50 1999

PG 76-22 airblown w/

cellulose fibers

Production Data

Plant Type: Drum

Tonnage: 70,000

AC %: 6.4

VTM %: 3.5

VMA %: 17.1

% passing

4.75 mm: 22

75 um: 9.9

Density %: 95.6

Condition Survey:

General Appearance: Good to excellentRut measurement: 0 mmMinimal tightness in wheelpaths Very smooth ride

Completion Date: 1996

Traffic: AADT: 53,000Trucks: 13%

Page 11: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

SMA

AGGREGATE GRADATIONNominal Size: 12.5 mm SMA

& 12.5 mm Superpave

SMA

Superpave

100

0

.075 .3 2.36 4.75 9.5 12.5 19.0

Sieve Size (mm) Raised to 0.45 Power

SMA 12.5 mm

50

25

75

Page 12: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

SMA

AASHTO Specifications MP 8-04Standard Specification for Designing SMA

Sieve 12.5 mm

Lower Lower Upper

19.0 mm 100

12.5 mm 90 100

9.5 mm 50 80

4.75 mm 20 35

2.36 mm 16 24

1.18 mm — —

0.60 mm — —

0.30 mm — —

0.075 mm 8.0 11.0

SMA Gradation Specification BandNominal-Maximum Aggregate Size

Page 13: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

SMA

AASHTO Specifications MP 8-04Standard Specification for Designing SMA

SMA Mixture Specifications w/SGC

Property Requirement

Voids air % 4.0

VMA % 17.0 min.

Binder Content %

TSR % 70 min.

Drain down at Production Temperature

%

0.30 max.

6.0 min.

Page 14: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

SMA

14

What is RAP?• Reclaimed Asphalt Pavement

• Removed and/or reprocessed pavement materials containing: ~ binder (5%)~ aggregates (95%)

Page 15: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

SMA

RAP in SMA

• Aggregate Properties– RAP aggregated from high quality pavements

that originally met SMA specifications can be used.

– Gradation control critical to good SMA performance. NCAT studies show RAP variability typically as good or better than virgin aggregate.

Page 16: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

SMA

Fractionated vs. Unfractionated

16Source Randy West

Page 17: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

SMA

Keep millings from different projects in separate stockpiles.

Milled RAP can typically be used “as is” in HMA without further crushing.

Milled RAP

Source Randy West

Page 18: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

SMA

Multiple Source RAP

Small Jobs

also known as GOK piles

God Only Knows what’s in there

Source Randy West

Page 19: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

SMA

19

Fractionated RAP

-3/16” RAP+3/4” RAP

3/4 x 3/16” RAPIn back

• Screening RAP into two or more sizes• A huge advantage for mix design. Allows

RAP to be used in practically any mix typeSource Randy West

Page 20: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

SMA

Fractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate this is not a problem

Page 21: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

SMA

100

0.075 .3 2.36 4.75 9.5 12.5 19.0

Sieve Size (mm) Raised to 0.45 Power

50

25

75

RAP in SMA

• Use of one stockpile RAP will limit use.– Typically less than 10%

• Fractionated fine RAP can replace fines in SMA mix with higher percentages.– Higher percentages 15% to 20%

• With SMA you must control the gradation.

Page 22: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

SMA

22Source Randy West

Page 23: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

SMA

SMA and RAP mix design

• Follow standard mix design process for SMA design using RAP mix design procedures.

• RAP should be preheated before adding to mixing bowl.

• Coarse RAP has lower binder content and Fine RAP will have higher binder content.

• Know your fines content.

Page 24: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

SMA

Look at best practices to optimize the use of RAP.

Page 25: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

SMA

Screening to Remove Oversized RAP Particles

26Source Randy West

Page 26: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

SMA

Illinois Tollway

• Reconstruction of the I 90, I 39 section.– 1.4 million vehicles a day– Existing PCC pavement with AC overlay– Reconsrtuction designed to use 100% recycling

of all materials

Page 27: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

SMA

Tollway Mainline FRAP Allowances

50%

25%

15%

15%

12-in. “Aggregate Subgrade”

Rich Bottom Base (N50, 2% Air Voids)

Strong Binder (N90, 4% Air Voids)

SMA Binder

SMA Surface

40%Intermediate Binder (N70, 4% Air Voids)

Page 28: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

SMA

GTR modified SMA – Warm Mix

Page 29: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

SMA

GTR modified SMA – Warm Mix

• GTR SMA -– 310ºF typical mixing temperature – Compactable to 240ºF

• Evotherm modifier• Warm Mix

– Started mixing at 310ºF– Mixed down to 250ºF– Compactable to 190ºF

Page 30: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

SMA

Other RAP in SMA Projects

• I 95 Delaware 10% RAP used in SMA surface mix.

• I 270 Maryland 10% RA used in SMA surface mix.

• Georgia and Alabama running experimental mix designs with up to 25% RAP in SMA.

Page 31: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

SMA

RAP in SMA

• SMA mixes can be successfully designed with RAP.

• Good plant management practices are needed to achieve high quality product

• SMA with RAP has shown good performance in the field.

Page 32: Use of RAP in SMAFractionated RAP from GOK stockpile have to be checked very carefully for aggregate properties to assure SMA requirements are met. If region generally has good aggregate

SMA

Thanks for you Attention

Questions