    WHAT ARE PLASTIC ROADS????The roads constructed using waste plastic, popularly

    known

    as Plastic Roads,are found to perform bettercompared

    to those constructed with conventional bitumen

  • 8/10/2019 USE OF PLASTIC WASTE IN ROAD CONSTRUCTION.pptx

    3/25

    WHY WE NEED IT ???1)Disposal of waste plastic is a major problem.

    2)It is non-biodegradable.3)Because the recycled plastic is more dangerous than the originalTo dispose.

    .

  • 8/10/2019 USE OF PLASTIC WASTE IN ROAD CONSTRUCTION.pptx

    4/25

    4)Burning of these waste plastic bags causesenvironmental pollution.

    5)studies proved that waste plastic enhances theproperty of the mix.

  • 8/10/2019 USE OF PLASTIC WASTE IN ROAD CONSTRUCTION.pptx

    5/25

    BASIC PROCESSES1. Segregation .

    2. Cleaning process .

    3. Shredding process .

    4. Collection process

  • 8/10/2019 USE OF PLASTIC WASTE IN ROAD CONSTRUCTION.pptx

    6/25

    1.SEGREGATIONplastic waste collected from various sources must

    be separated from other waste.Maximum thickness of 60 microns.

    SEGREGATION PROCESS

  • 8/10/2019 USE OF PLASTIC WASTE IN ROAD CONSTRUCTION.pptx

    7/25

    2 cleaning process Plastic waste get cleaned and dried.

    cleaning process

  • 8/10/2019 USE OF PLASTIC WASTE IN ROAD CONSTRUCTION.pptx

    8/25

    3 Shredding processwill be shredded or cut into small piece.

    the different types of plastic wastes are mixedtogether

    shredding process

  • 8/10/2019 USE OF PLASTIC WASTE IN ROAD CONSTRUCTION.pptx

    9/25

    4 Collection process the plastic waste retaining in 2.36 mm is collected.

    collected plastic

  • 8/10/2019 USE OF PLASTIC WASTE IN ROAD CONSTRUCTION.pptx

    10/25

    On site executionThere are two type of execution

    1. WET PROCESS

    2. DRY PROCESS

  • 8/10/2019 USE OF PLASTIC WASTE IN ROAD CONSTRUCTION.pptx

    11/25

    WET PROCESS Blending of waste plastics by direct mixing

    of shredded plastics with hot bitumen at 160C

    Mechanical stirrer is needed as the mixing is

    difficult because of difference in viscosities ofmolten polymer and bitumen.

    Addition of stabilizers and proper cooling arerequired.

    Since the wet process require a lot of investmentand bigger plants

    Not commonly used..

  • 8/10/2019 USE OF PLASTIC WASTE IN ROAD CONSTRUCTION.pptx

    12/25

    Dry Process

    This process is developed by Dr. Vasudevan. The aggregate is heated to 170C in the Mini hot Mix

    Plant .

    MINI HOT MIX PLANT

    Th h dd d l i i

  • 8/10/2019 USE OF PLASTIC WASTE IN ROAD CONSTRUCTION.pptx

    13/25

    The shredded plastic waste is

    added in equal proportion.

    WASTE PLASTICS MIXED WITH THE

    HOT AGGREGATES

  • 8/10/2019 USE OF PLASTIC WASTE IN ROAD CONSTRUCTION.pptx

    14/25

    This plastics gets coated over the

    aggregate uniformly.

    THEN THE BITUMEN IS ADDED IN THE

  • 8/10/2019 USE OF PLASTIC WASTE IN ROAD CONSTRUCTION.pptx

    15/25

    THEN THE BITUMEN IS ADDED IN THE

    MIXTURE AT A TEMPERATURE AROUND

    155-163C

  • 8/10/2019 USE OF PLASTIC WASTE IN ROAD CONSTRUCTION.pptx

    16/25

    The mixture is transferred to the

    road and the road is laid.

    Road is being laid

  • 8/10/2019 USE OF PLASTIC WASTE IN ROAD CONSTRUCTION.pptx

    17/25

    COMPARISON BETWEEN ORDINARY BITUMINOUS ROADS AND WASTE PLASTIC BITUMINOUS

    ROADS:-

    S.No. Properties Plastic Road Ordinary Road

    1. MARSHALL STABILITY VALUE MORE LESS

    2. BINDING PROPERTY BETTER GOOD

    3. DURABILITY OF ROADS BETTER GOOD

    4. COST OF PAVEMENT LESS MORE

    5. TENSILE STRENGTH HIGH LESS

    6. MAINTENANCE COST ALMOST NILL LESS

    7. STRIPPING(POT HOLES) NO MORE

    8. ENVIRONMENT FRIENDLY YES NO

  • 8/10/2019 USE OF PLASTIC WASTE IN ROAD CONSTRUCTION.pptx

    18/25

    ADVANTAGES OF PLASTIC ROAD1) The strength of the road is increased .

    2) The load withstanding property increases. It helpsto satisfy todays need of increased road transport.

    3) For 1km road, 1 ton of plastic (10 lakh carry bags) isused and 1 ton of bitumen is saved.

    4)Value of waste plastics is increased.(cost perkilogram increases from Rs 4 to Rs12).

    5) The cost of road construction is also decreased.

  • 8/10/2019 USE OF PLASTIC WASTE IN ROAD CONSTRUCTION.pptx

    19/25

    ADVANTAGES OF PLASTIC ROAD 6) Reduce the cost to around Rs. 5000/Km. of single

    lane road.

    7)Generate jobs for rag pickers.

    8) The maintenance cost of road is almost nil.

    9)Disposal of waste plastic will no longer be a problem.

    10) The use of waste plastics on the road has helped to

    provide better place for burying the plastic waste withoutcausing disposal problem.

  • 8/10/2019 USE OF PLASTIC WASTE IN ROAD CONSTRUCTION.pptx

    20/25

    DISADVANTAGES OF PLASTIC ROAD

    1. Cleaning process -:Toxics present in the co-mingled plastic waste would

    start leaching.

    2. During the road laying process -:

    In the presence of chlorine will definitely releasenoxious

    HCL gas.

    3.After the road laying -:It is opinioned that the first rain will triggerleaching.

    As the plastics will merely form a sticky layer.

    WASTE PLASTIC ROADS

  • 8/10/2019 USE OF PLASTIC WASTE IN ROAD CONSTRUCTION.pptx

    21/25

    WASTE PLASTIC ROADS

    CONSTRUCTED:- The Bruhat Bengaluru Mahanagara Palike (BBMP) has used plastic on

    about 600 km of roads, including many thoroughfares and arterialroads.

    It uses the plastic blend in at least 25% of the road-laying works,including the present project to upgrade about 45 roads in the city.

    The plastic model was successful on major roads in Bangalore,including -:

    Shankar Mutt Road, K H Road, M G Road (towards Trinity Circle), J C Nagar Road , Miller's Road and Cunningham Road,

    inner ring road, Rajarajeshwari Junction, Mysore Bangalore state highway.

    Puttanna Chetty Town Hall

  • 8/10/2019 USE OF PLASTIC WASTE IN ROAD CONSTRUCTION.pptx

    22/25

    CONCLUSION:-

    Evidence of Better Performance of thePlastic Roads-:The performance studies carried out on the roads

    constructed in Tamil Nadu indicated satisfactoryperformance with good skid resistance, goodtexture value, stronger and less amount ofprogressive unevenness over a period of time.

    The experimentation carried out by CRRI alsoindicated better stability value, indicating higherstrength, less flow and more air voids.

  • 8/10/2019 USE OF PLASTIC WASTE IN ROAD CONSTRUCTION.pptx

    23/25

    The use of the innovative technology not onlystrengthened the road construction but also

    increased the road life as well as will help to improvethe environment and also creating a source ofincome.

    It is hoped that in near future we will have strong,

    durable and eco-friendly roads which will relieve theearth from all type of plastic-waste .

    Hence the use of waste plastics for pavement is one ofthe best methods for easy disposal of waste plastics.