69
AD-A266 371 Technical Report RENIH-CO17 !I ' 'II I~I 111 '11 II 11 April 1993 Ub Army Corps of Engineers 7c Waterways Experiment Station Repair, Evaluation, Maintenance, and Rehabilitation Research Program Use of a Rubble Berm for Reducing Runup, Overtopping, and Damage on a 1V to 2H Riprap Slope Experimental Model Investigation by Donald L. Ward, John P. Ahrens Coastal Engineering Research Center DT1C Approved For Public Release; Distribution Is Unlimited UL 0 199 93-14987 Prepared for Headquarters, U.S. Army Corps of Engineers

Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

AD-A266 371 Technical Report RENIH-CO17!I ' 'II I~I 111 '11 II 11 April 1993

Ub Army Corpsof Engineers 7cWaterways Experiment

Station

Repair, Evaluation, Maintenance, and Rehabilitation Research Program

Use of a Rubble Berm for ReducingRunup, Overtopping, and Damageon a 1V to 2H Riprap Slope

Experimental Model Investigation

by Donald L. Ward, John P. AhrensCoastal Engineering Research Center

DT1CApproved For Public Release; Distribution Is Unlimited UL 0 199

93-14987

Prepared for Headquarters, U.S. Army Corps of Engineers

Page 2: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

The following two letters used as part of the number designating technical reports of research publishedunder the Repair, Evaluation, Maintenance, and rehabilitation (REMR) Research Program identify thcproblem area under which the report was prepared:

Problem Area Problem Area

CS Concrete and Steel Structures EM Electrical and MechanicalGT Geotechnical El Environmental ImpactsHY Hydraulics OM Operations ManagementCO Coastal

The contents of this report are not to be used for advertising,publication, or promotional purposes. Citation of tradenames does not constitute an official endorsement or approval ofthe use of such commercial products.

W PRNTED ON RECYCLED PAPER

Page 3: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

Repair, Evaluation, Maintenance, and Technical Report REMR-CO-17Rehabilitation Research Program April 1993

Use of a Rubble Berm for ReducingRunup, Overtopping, and Damageon a 1V to 2H Riprap Slope

Experimental Model Investigation

by Donald L. Ward, John P. AhrensCoastal Engineering Research Center Acce-,ion For

U.S. Army Corps of Engineers NTWi CRA&iWaterways Experiment Station DlTIC IAB'/k3909 Halls Ferry Road U:am iou icedVicksburg, MS 39180-6199 Justification

ByDis;ti ib,,:tion I

Availability Codes

Final reportApproved for public release; distribution is unlimited

Prepared for U.S. Army Corps of Engineers

Washington, DC 20314-1000

Under Work Unit 32415

Page 4: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

/-

US Army Corpsof Engineers NWaterways Experiment •o ,• -• 'Station

ifllWt /"4SIi~~i • 1 II• /ll

•'VII•NENTJJ.PIJUUC AFFAIRS oFr•"CER yU S. ARMY ENGINEER

WATERWAYS EXPERIMENT STATLNH909 HALLS FERRY ROAD

YICIKSDURG, MIS.SISSPPI 29160-4199

' PIOE ;(601)634-25•02

MAIN. LAORT RESE•ARCH .C •M

Waterways Experiment Station Cataloging-in-Publication Data

Ward, Donald L.Use of a rubble berm for reducing runup, overtopping, and damage on

a lV to 2H riprap slope: experimental morsel investigation / by Donald L.Ward, John P. Ahrens, Coastal Engineering Research Center; preparedfor U.S. Army Corps of Engineers.

69 p.: ill.; 28 cm. -- (Technical report; REMR-CO-17)Includes bibliographical references.1. Embankments -- Models -- Testing. 2. Hydraulic models. 3. Shore

protection. 4. Ocean waves. I. Ahrens, John P. Il. United States.Army. Corps of Engineers. Ill. Coastal Engineering Research Center(U.S.) IV. U.S. Army Engineer Waterways Experiment Station. V. Re-pair, Evaluation, Maintenance, and Rehabilitation Research Program.VI. Title. VII. Series: Technical report (U.S. Army Engineer WaterwaysExperiment Station); REMR-CO-17.

Page 5: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

PREFACE

The work described in this report was authorized by Headquarters,

US Army Corps of Engineers (HQUSACE), as part of the Coastal Problem Area of

the Repair, Evaluation, Maintenance, and Rehabilitation (REMR) Research

Program. The work was performed under Work Unit 32415, "Experimental Testing

of Methods for Reducing Wave Runup and Overtopping on Structures," for which

Mr. John P. Ahrens was Principal Investigator. Mr. John H. Lockhart, Jr.

(CECW-EH), was the REMR Technical Monitor for this work.

Mr. William N. Rushing (CERD-C) was the REMR Coordinator at the Direc-

torate of Research and Development, HQUSACE; Mr. James E. Crews (CECW-O) and

Dr. Tony C. Liu (CECW-EG) served as the REMR Overview Committee;

Mr. William F. McCleese, US Army Engineer Waterways Experiment Station (WES),

was the REMR Program Manager. Mr. D. D. Davidson, Wave Dynamics Divi-

sion (WDD), Coastal Engineering Research Center (CERC), WES, was the Problem

Area Leader.

The work was performed at WES, and this report was prepared by

Mr. Donald L. Ward and Mr. Ahrens, WDD, CERC, under the general supervision of

Dr. James R. Houston, Director, CERC, and Mr. Charles C. Calhoun, Jr.,

Assistant Director, CERC; and under the direct supervision of Mr. C. E.

Chatham, Chief, WDD, and Mr. Davidson, Chief, Wave Research Branch, WDD. The

models were operated by Mr. Robert L. Tingle, Jr., Laboratory Technician, WDD.

During publication of this report, Dr. Robert W. Whalin was Director of

WES. COL Leonard G. Hassell, EN, was Commander.

Page 6: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

CONTENTS

Pap-e

PREFACE .......................... ................................. 1

CONVERSION FACTORS, NON-SI TO SI (METRIC) UNITS OF MEASUREMENT ... ..... 3

PART I: INTRODUCTION ......................... .......................... 4

Background ........................... ............................ 4Purpose .......................... ........................... 4

PART II: DEFINITION OF TEST lkRAMETERS .......................... 5

PART III: THE MODEL ................... .......................... 11

Test Facility .................... ........................... 11Test Structure . . . . . . . . . . . . . . . . . . . . . . . . . . 11

Sounding Equipment ................. ........................ 16Signal Generation .................. ......................... .. 16

PART IV: TEST PROCEDURES AND TEST RESULTS ......... ............... .. 18

Selection of Test Conditions ........... ................... 18Test Procedures .................. .......................... .. 18Test Results ..................... ........................... 19

PART V: DISCUSSION AND ANALYSIS ............. .................... 21

Runup ........................ ............................... 21Damage Level ..................... ........................... 27

PART VI: CONCLUSIONS AND RECOMMENDATIONS ........ ................ .. 42

REFERENCES ......................... ............................... 44

APPENDIX A: DATA TABLES ...................... ......................... Al

APPENDIX B: EXAMPLE PROBLEMS ................. ....................... Bi

APPENDIX C: NOTATION ........................... Cl

Page 7: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

CONVERSION FACTORS, NON-SI TO SI (METRIC)UNITS OF MEASUREMENT

Non-SI units of measurement used in this report can be converted to SI

(metric) units as follows:

Multiply- By To Obtain

cubic feet 0.02831685 cubic metres

feet 0.3048 metres

inches 2.54 centimetres

pounds (mass) 0.4535924 kilograms

pounds (mass) per 16.01846 kilograms percubic foot cubic metre

square inches 6.4516 square centimetres

3

Page 8: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

USE OF A RUBBLE BERM FOR REDUCING RUNUP. OVERTOPPING.

AND DAMAGE ON A 1V TO 2H RIPRAP SLOPE

Experimental Model Investigation

PART I: INTRODUCTION

Background

1. Erosion of exposed soil embankments by waves and currents is a

serious problem along coastal and inland shores. A protective revetment of

graded quarry stone or "riprap" is commonly used to provide shore protection

because of its relatively low cost, durability, and availability, and because

the roughness and porosity of the stone is effective in dissipating wave

energy and runup.

2. Rising water levels, larger boat wakes, and increasing values of

land protected by revetments may necessitate improvements to a revetment to

increase the prctection provided. One method of improving the performance of

a revetment is to add an attached berm in front of the revetment. Unfortu-

nately, there is very little design guidance on the use of revetments with

fronting berms.

Purpose

3. The purpose of this investigation was to develop design guidance on

methods of reducing runup and overtopping of revetments based on data col-

lected from laboratory tests of wave runup and overtopping on riprap revet-

ments with a slope of 1:2 (lV to 2H). Tests were conducted in a wave flume

with spectral capabilities at the Coastal Engineering Research Center (CERC)

of the US Army Engineers Waterways Experiment Station (WES) in Vicksburg, MS.

4

Page 9: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

PART II: DEFINITION OF TEST PARAMETERS

4. Inconsistencies among authors in notations, definitions of

parameters, and the methods by which a value for a parameter is obtained

greatly complicate the task of comparing results from different studies. In

this report, notations will follow guidelines published by the International

Association for Hydraulic Research in its "List of Sea State Parameters"

(1986). Additional parameters, definitions, and method used to determine the

value of certain parameters, are given below.

5. Wave heights used in this report are the heights of the zeroth

moment (H.o) and are obtained as four times the square root of the zeroth

moment of the potential energy spectrum. The H.o's of the incident spectra

are separated from the H1 o's of the reflected spectra by the method of Goda

and Suzuki (1976), using a three-gage array. Two arrays are used, one to

measure the Hmo's near the wave board (Array 1) and one near the structure

toe (Array 2).

6. Peak period (TP) is the wave period associated with the highest

energy density of the spectrum. This TP was obtained by dividing the

spectrum into 256 bands and taking the reciprocal of the midpoint frequency

causing the highest energy density over 11 adjacent bandwidths.

7. Wave heights and periods are frequently reported in other investiga-

tions in terms of significant wave height (H.) and average wave period (Tz),

where H. is the average of the one-third highest waves. Both P, and T.

are included in the data in this report to simpiiry comparison to other inves-

tigations. Average wave periods in this report were determined as

Tz= (1)

where mo and m2 are the zeroth and second moments of the potential energy

spectrum, respectively.

8. The spectral width or peakedness determined from the wave record is

given as QP , defined by Goda (1970) as

* For convenience, symbols and abbreviations are listed in the Notation

(Appendix C).

5

Page 10: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

2 )2 f f[S(f)12 df (2)

where f is frequency and S(f) is the wave spectral density function for

the given frequency.

9. The surf parameter, the ratio of structure slope to square root of

wave steepness, is frequently used as an indicator of wave conditions at the

structure (Battjes 1974) and as a means of nondimensionalizing the wave

period. The surf parameter is defined as

tan a2 7rI/2 3

or, equivalently,

tan a

(H)1/2 (4)LO]

where

- surf parameter

tan a - tangent of the angle of the revetment to the horizontal

g = acceleration of gravity

L, - deepwater wavelength determined from the wave period, T

The wave height (H) and period used to determine ý in this report are H.L

and TP . The physical rationale for this parameter is discussed in Battjes

(1974).

10. The reflection coefficient is commonly defined •s the ratio of

reflected wave height to incident wave height. This definition is clearly

inappropriate when reflected and incident wave neights are dcscribed by

different spectra. Reflection coefficients were therefore determined by the

energy of the respective spectra, following the method of Goda and Suzuki

(1976).

Kr 65)

Page 11: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

where Kr is the reflection coefficient and ER and El are the energy of

the reflected and incident spectra, respectively.

11. Reflected wav- aeight is obtained as the product of the reflection

coefficient and the i,-ident wave height.

Hr = KI HMo (6)

where 19 is the reflected wave height.

12. Runup (RP..) is defined as the vertical distance above the still-

water level (swl) that a wave surges up the revetment, or the upper limit of

"green" water since it does not include spash or spray. The elevation of

maximum runup was determined visually and then measured with a point gage.

13. The berm in front of the revetment is described by its height and

width. Berm width (WB) is defined as the distance along the horizontal top of

the berm. Height of the berm (hE) is defined as the vertical distance from

the toe of the revetment without the berm to the top of the berm.

14. Figure 1 illustrates a typical damage profile on a riprap slope.

An area of erosion (A2 ) is seen near the still-water level, with the stones

displaced from the area of erosion being deposited on the lower slope (A3 ) or,

particularly on very flat slopes, on the upper slope (A,). Damage to the

revetment was determined based on the area of erosion.

15. To obtain the respective areas, the six sounding points on each of

the horizontal sounding lines (paragraph 23) were averaged to give a single

cross-sectional profile of the slope. The points on the profile then were

connected by cubic splines, and the before- and after-testing profiles

compared. The area of erosion was determined as the area between the two

curves where the after-testing curve lay below the before-testing curve. The

area was calculated by integrating between the two lines. The damage profile

from TP - 2.25-sec, Hno - 0.50 ft wave conditions is shown in Figure 2.

16. Damage to the revetment was defined by two methods: maximum per-

pendiculat penetration of the erosion into the armor layer (emax) and S2

damage.

S A2 (7)

7

Page 12: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

cc EN wU

\c

LLJ

-4

Page 13: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

(IJ

w

cc 4

CE

N N 0

N~ zN N

Nl m

N. N. N -- a:

(ELI

N N 0co p o t T N ) a N NJu q c) \

0 0icCL

(4 Hl3 N:~o

9 i

Page 14: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

where (D,) 5 0 is the nominal diameter of the median armor stone size, defined

as

(Dý o50 ! ()

where W50 is the median armor stone weight and w, is the unit weight of

the armor stone.

10

Page 15: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

PART III: THE MODEL

Test Facility

17. All tests were conducted in a 3.0-ft-wide* by 150-ft-long by 3.0-

ft-deep wave flume (Figure 3). A 1:20 slope was installed in the bottom of

the flume starting 36.5 ft from the wave board and extending for 10 ft,

followed by a 1:100 slope extending to the test structure.

18. The flume was divided lengthwise into two 1.5-ft-wide channels

starting 100 ft from the wave board and extending past the structure. A wave

absorber was placed in one channel while the structure was placed in the otner

channel (113 ft from the wave board) thus minimizing the amount of reflection

in the flume. An array of three wave gages was centered 21.5 ft in front of

the wave board to monitor the generated signal. A similar array was placed in

the side of the flume with the test structure, centered 104.5 ft from the wave

board, to be used in separating the incident and reflected wave trains. Wire

resistance staff gages were read at 10 Hz to monitor the water surface

elevation.

19. The wave flume was equipped with a piston-type wave generator

powered by an electro-hydraulic pump and controlled by a computer-generated

signal.

Test Structure

20. The test structure modeled a 1:2 slope of an impervious substratum

protected by a filter layer and a layer of riprap (Figure 4). Sand was glued

to a plywood board to provide the necessary roughness, and the board installed

in the flume to represent the existing slope. A 0.07-ft-thick layer of

crushed stone averaging 0.04 oz/stone was used for the filter layer. The

armor layer was 0.26-ft-thick and constructed of a crushed limestone with a

specific gravity of 2.70, blocky to angular shape, and gradation of

A table of factors for converting non-SI units of measurement to SI

(metric) units is presented on page 3.

11

Page 16: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

0 0

LI-.

14-4

I 0

>1

I .

LU -J

,22 LU-o 0~ C)z LU (L

I- U)

a 0- F

C)C

>W 0

<n ,

c12

Page 17: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

-J 4J

UU -

z Q)0.0

0 0

0cr

wr

a:o U)

w (D CA

0 0

o 41(00

0j Or Cc 0n

U) UJ

um

U) CL

13,

Page 18: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

D85 = 1.79 (9)DIS

where D85 and D1 5 are the 85- and 15-percentile diameters, respectively, on

a grain size distribution curve, with all armor stones falling within the

range

1 (0-W 5 0 < W <4 W50 (10)

where W is the weight of an individual stone. Gradation of the armor stone

used in this test series is shown in Figure 5.

21. Riprap is commonly sized by either the W50 or the nominal

diameter, (Dn) 50 . The armor layer used in these tests had a W50 of 0.22 lb

and a (Dn) 50 of 0.11 ft. These dimensions correspond to a design section

based on Hudson's equation (Hudson and Jackson 1962) for a design wave height

of 0.30 ft. Hudson's equation is given as

W, H 3W50 =oý-K (SR-i) cotO

where

H - monochromatic wave height

KRR - stability coefficient

Sr - relative specific gravity defined as specific gravity of armorstone divided by specific gravity of water

cot 8 - is the cotangent of the revetment slope

The stability coefficient for graded angular quarrystone for breaking waves is

taken from the Shore Protection Manual (SPM) (1984) as 2.2. For irregular

wave tests, design is based on the average of the highest 10 percent of waves

(H1 0 ). The design H10 of 0.3 ft corresponds to a H.. of about 0.24 ft.

22. The filter and armor stone layers were placed by dumping from a

small shovel in a manner to simulate prototype construction with a bucket

loader. The toe of the structure was 113 ft from the wave board.

14

Page 19: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

CD~CD

CDC

00

CD41

CD

0)41V)LC

a,

CUU

- -4

0L 0

0)

(sql)W1 6 C8

1CD

Page 20: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

Sounding Equipment

23. After placement, the filter and armor layers were surveyed by

sounding. The sounding apparatus consisted of a row of six vertical rods

spaced across the half of the flume width containing the test structure, with

the outer rods located 0.36 ft from the edge of the flume section and the

center rods spaced at 0.15-ft intervals. Each of the rods had a flat circular

foot, 0.10 ft in diameter, attached to the rod by a ball and socket joint.

The rods were used to take a row of soundings across the test structure. A

row of soundings was taken at horizontal intervals of 0.10 ft down the entire

slope of the revetment. Soundings were taken before and after each test.

Signal Generation

24. Software was developed at CERC to generate a spectral signal to

control the wave board. A signal was generated to simulate a JONSWAP (JOint

North Sea WAve Project) spectrum for each peak period using high- and low-

frequency cutoffs of 3.0 percent of the energy spectrum, high-side decay

factor of 0.09, low-side decay factor of 0.07, peak enhancement factor of 3.3,

and a wave height (H.) at least as large as the largest H., in the test

series. Different H.o's for the tests were obtained by varying the gain to

the electro-hydraulic pump controlling the wave board. Computer limitations

dictated that 30 min was the maximum signal length that could be stored;

therefore a separate signal was generated for each 30 min of a test run, using

a different random seed for each signal. The design spectrum is compared with

the generated spectrum in Figure 6 for the first 30 min period of the Tp -

2.25-sec test series.

16

Page 21: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

36.0BOARD SPECTRUM 20.0 WATER SPECTRUM

SSIMULATED - SIMULATED32.0 DESIGN 18.0 - DESIGN

-% 28.0 '• 16.0

24.0 14.0

20.01 9 12.0

16.0 10.0

12.0

8.0 4.0

4.0 2.0

0.0 0.00.0 0.2 0.4 0.6 0.8 1.0 1.2 0.0 0.2 0.4 0.6 0.8 1.0 1.2

Frequency (Hz) Frequency (Hz)

WINDOW MODE - 1 (COSINE SQUARED) WINDOW FRACION - 0.10DETREND MODE - I (MEAN REMOVED) BANDS AVERAGED 10WAia..R DETREND FUNCTION - (0.2005E-03) + ( O.OOOOE+OO)*T + (O.OOOOE+00)e*(T*2)BOARD DETREND FUNCTION - (0.2325E-03) + ( O.OOOOE+OO)*T + (o.oooOE+00).C",,2)

UNIDIRECTIONAL WAVE TANK PISTON-TYPE GENERATOR DIGITAL DRIVER FiLE HEADER

OUTPUT FILE - OT2T225H6.DATGENERATOR TYPE - PISTONTRANSFER FUNCTION JOHN AHRENS CORRECTION - NOSPECTRUM - JONSWAP SPECTRUM 24.000 (INCHES) WATER DEPTH AT BOARD

2.250 (SEC) DESIGN PEAK PERIOD 0.030 XIOOPCT MO LOW FREQ. CUTOFF6.000 (INCHES) DESIGN HMO 0.970'XIOOPCT MO HIGH FREQ. CUTOFF3.30 GAMMA 1800 (SEC) TIME SERIES LENGTH

0.0700 SIGMA-LOW 10 (STEPS/SEC) UPDATE RATE0.0900 SIGMA-HIGH 256 UNES IN SOURCE SPECTRUM

0.00319 COMPUTED ALPHA 1989 - RAND. NO. GEN. SEED7.489 INCHES MAX. POS. BOARD STROKE 16.64 - (IN..2/HZ) DES. H20 SMAX

-8.228 INCHES MAX. NEG. BOARD STROKE 0.4444 - (HZ) DES. PEAK FREQ.0.3544 (HZ) LOW FREQ. CUTOFF1.0096 (HZ) HIGH FREQ. CUTOFF

Figure 6. Design and simulated spectra for first

30 min of 2.25-sec wave period tests

17

Page 22: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

PART IV: TEST PROCEDURES AND TEST RESULTS

Selection of Test Conditions

25. Tests were conducted for water depths at the toe of the revetment

of 0.66, 0.76, and 0.86 ft, with offshore water depths of 2.00, 2.10, and

2.20 ft, respectively. Peak wave periods tested included 1.25-, 2.25-, 3.0-,

and 3.5-sec waves, and wave heights of the zeroth moment for each period

included 0.10, 0.20, 0.30, 0.40, 0.50, 0.60, and 0.66 ft.

26. The length of each test run was 3,500 times the peak period of the

test, or until failure occurred, whichever came first. Failure was defined as

having the filter layer exposed. If failure was observed, tests with that

period were suspended and larger H.L's were not tested. All tests were con-

ducted with a JONSWAP spectrum (Hasselman et al. 1973).

Test Procedures

27. Each test was run in cycles of approximately 30 min each. For

example, the tests with a 2.25-sec peak wave period were run for 7,875 sec

(3,500 times 2.25 sec), or 131.25 min, in four cycles of about 30 min each

plus one short cycle to obtain the total time required. Wave data were

collected for approximately 500 waves near the beginning and end of each test.

A test was terminated if failure occurred.

28. Wave runup was observed for 256 sec near the middle of a test run.

The elevation of the maximum runup observed then was measured with reference

to a specified datum by use of a point gage.

29. Soundings were taken before and after each test, and the structure

was completely rebuilt whenever significant damage was observed. The pro-

cedure used for the tests is given below.

a. Place and survey the filter stone.

b. Place and survey the armor stone (including the berm, ifused).

c. Generate waves for 3,500 times the design peak period.

(1) Collect wave data for 500 waves near the start of thetest.

18

Page 23: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

(2) Measure the runup.

(3) Collect wave data for 500 waves near the end of the test.If failure is expected, collect data for 500 waves priorto the expected failure.

d. Survey the riprap layer and berm.

e. Measure the water in the overtopping catch basin.

f. Rebuild the structure.

30. If the damage was slight, only the riprap layer and berm were re-

built, and the procedure for testing the next wave height was begun at step b,

above. The structure was always torn down and rebuilt from the plywood board

before the next series of tests with a new wave period was conducted.

Test Results

31. Test results are given in Appendix A as Tables Al, A2, A3, A4, and

A5. Tables Al and A2 list data from the tests of the revetment without berm;

Tables A3 and A4 list the results from the revetment with berm, and Table A5

lists damage to the structure as determined by the soundings.

32. As discussed in paragraph 27, multiple cycles were required for

each test run. Each cycle was labeled consecutively a, b, c, etc., and data

were collected during the first and last cycle. For example, tests with a

2.25-sec peak wave period, which required four cycles, had data collected

during cycles a and d. The letter following the run number in Tables Al

through A4 refers to the cycle during which the data were collected. The

structure was surveyed only after the end of the test run. Therefore the

damage information in Table A5 refers only to the run number and does not

include the cycles. Because damage to the berm was not considered as damage

to the revetment, only damage values for the upper part of the revetment

(above the level of the berm) are used in this report and are referred to

simply as S2

33. Scale effects in hydraulic model investigations are an important

consideration, but one that is difficult to address due to conflicting results

from different studies. For the range of tests presented here, Hudson and

Davidson (1975) indicate that stability numbers in the model tests will be

conservative by about 10 percent compared with prototype results, Burcharth

and Frigaard (1988) report that scale effects will be negligible, and

19

Page 24: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

Broderick and Ahrens (1982) show that scale effects in the filter layer may

cause the runup values in the model tests to be greater than would be found at

prototype scales. Although scale effects are probably present in this data

set, it seems reasonable to assume that they are either negligible or

conservative.

20

Page 25: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

PART V: DISCUSSION AND ANALYSIS

34. Wave runup and overtopping data were collected from a typical

revetment design subjected to spectral wave attack. As a means of reducing

the runup and overtopping of the revetment, a berm has been added in front of

the revetment. Comparisons of results of the tests with and without the berm

will be used to develop design guidance for use by the field to reduce runup

and overtopping of rubble revetments. Structural stability and reflection

characteristics also are being documented.

Wave Runup

35. Ahrens and McCartney (1975) documented the influence of surf

conditions on runup, and an empirical model using the surf parameter to

predict maximum runup has been developed by Ahrens and Heimbaugh (1988). The

empirical model is given by

Rma __a (12)

HMO I.0 + b

where R. is maximum wave runup and a and b are dimensionless runup

coefficients determined from regression analysis. Values of a and b were

determined as 1.022 and 0.247, respectively.

36. Analysis of the data collected in this study indicates that two

additional terms are needed to account for the influence of a berm. These

additional terms account for the height and width of the berm. Through data

analysis, it was found that the most effective variables were relative berm

width, W,/(H•L,)'2 , and relative berm height, h8 /d, . Multivariable analysis

was used to determine the following equation to predict the relative runup,

R__/H.

em x[ + +C (HmoLo) 1/2 * I (13)

where C0 , C, , and C2 are dimensionless regression coefficients given by

21

Page 26: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

CO - 0. 669

C, = -10.4

C2 - -0.152

37. Equation 13 shows little or no systematic error in predicting R1,,

as shown by error analysis in Figures 7, 8, and 9. Figure 7 gives the ratio

of the predicted P,,ax to the observed Rmax as a function of the relative

berm width. Figure 8 has the same ordinate as Figure 7 plotted versus the

relative berm height. Figure 9 is an enlargement of the portion of Figure 8

for tests with berms so that the data point symbols can be more readily

identified. In Figures 7, 8, and 9, all data points are denoted by an integer

based on the relative wave size, Hmo/(Dn)50 . Since deterioration of the berm

increases with increasing wave size relative to the stone size, the purpose of

using the relative wave si7e in the figures is to see if berm derioration

affects che prediction of Rkax . Figures 7, 8, and 9 indicate there is

little systematic error in predicting Rmax for tests with a berm.

38. Figure 10 shows relative runup versus wave steepness, Hm./Lo , for

tests without a berm. On a planar riprap slope without a berm, wave steepness

is the most important variable influencing relative runup. Also shown in

Figure 10 is the portion of Equation 13 without the berm effects correction

factor, i.e.,

Rax = exp [Co + C1( ](14)

where C. and C, are the same as given with Equation 13. For tests without

berms, the berm effects term in Equation 13 drops out to leave Equation 14.

In Figure 10, it can be seen that the data scatter around Equation 14 appears

random, indicating a lack of systemic error associated with wave steepness

Figure 10 also shows the runup equation developed by Ahrens and Heimbaugh

(1988) for plane riprap slopes (Equation 12). In Figure 10 it can be seen

that Equation 12 overpredicts the relative runup but follows the data trend

well. It is believed that this difference is caused by systematic differences

in the visual readings of R.,, between ob--rvers.

39. The portion of Equation 13 containing the berm characteristics camT

be thought of as a runup reduction factor that can be defined by

22

Page 27: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

r r)

E

4-4

C~j 0

o

E

m -i -0 o

wm

-M (0 0)

N ~ N ~ w4.

-0

144

C~ 0~

'-4

(Pemuesqo)xuwu/(pe)')pejd)x~sw8

23

Page 28: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

0

t.'

-<f) (IM NC14 C)C'JN 4w cV)

4.4

0)

0

0 ~0

L4)

I>

cr 0w>

0

wa: 4j0

'44.0

0

-4041)

(0T f)cV) ('a - 01) OD t~-

(paAiesqo)xewH/(pejospe)d)x~w~u 'dflNf

24

Page 29: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

C)

-vw r) c)- C)Cw)@a<\

-4"4u

0

0,it 4-)

0Y)

ob

.-.

a) r=

LI-4.

(o 0

4.4

ci

C~j Cr~l M qT CTC* V( J

() C0 c

o -

(pe~~sqoXeWI(Peojped~xwb 'n~n

25)

Page 30: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

0 uU

OW CD to

nEl a 4

00

0 0 0

oo~ 0.V

El4

0'44

~ nO 0

-LJ

z 0o0a.w

w~-0 wc

W 4)

(4

4)

El 4)

El ~ 0 El '

0

060

$4

OWH/XBeWU 'dflNn8 3AVM 3AIIV13U

26

Page 31: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

r = ex C2( ( ) 1/2 *bd-15

Figure 11 shows lines of constant r as a function of the relative berm width

and relative berm height over the range of data collected in this study based

on the value of C2 - -0.152 . Figure 11 helps to visualize the joint

influence of berm width and berm height in reducing wave runup and also

demonstrates that Equation 15 has a logical functional form.

40. To further generalize the findings from this study, Equations 12

and 13 were combined in the following manner

-=a r Z (16)HMO I + bý

The "a" runup coefficient was dropped from Equation 12 since it is very

close to 1.0 and replaced with r , which has a limiting value of 1.0 for

plane slope revetments. Figure 12 is a scatter plot of R.. predicted using

Equation 16 versus observed R. . It is clear from Figure 12 that

Equation 16 follows the trend of the data well but provides conservative

estimates of R. . As noted in paragraph 38, systemic differences between

runup observations in this study and those in Ahrens and Heimbaugh (1988) may

account for the differences in observed and predicted runup in Figure 12.

Damage Level

41. In addition to reducing wave runup and overtopping, the rubble berm

also reduced damage levels on the revetment slope above the berm. Figures 13a

through 13d show the progressive deterioration of the berm with increasing

wave heights. The protection furnished to the revetment is obvious, as seen

when these figures are compared with Figures 14a through 14d. Figures 14a

through 14d show the progressive deterioration of a revetment without a berm

after being subjected to the same wave conditions used in Figures 13a through

13d.

42. Quantification of the improvement can be presented in a manner

similar to the method used for wave runup in Figure 11, i.e., by using a

reduction factor. Damage to the structure above the berm can be quantified

27

Page 32: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

coi

-j-

0Z0

o-.40 41)

(D 4

-4.

C4c 41)

-~0)

-,D

00

.4

0~( 0)COO

00

cr) C) r (D a) C) W (0ci i C 6 c6600

SPAN ~ ~ I '119 WII OAIIO

28 . . I.

Page 33: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

0

0 rrT~ 2

00Li4

Oaa)La)

00

0 -4

12104

CD t CV) cliE6 6 6 o

(14) eW8 OPPV

£1 29

Page 34: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

\ \Z

Li...cj) 441;> ca

44 44

p0 pI- CO 0w F*- zL - CC 440Ow a:U) cW LL >

a:

1 4)

0 I C

CD -4

:j

CR jfl.ý (q t Cý J C4 00 R f - to i O Kt cr) N m

(4) Hid3C]DNI(3Nflos

30

Page 35: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

N a:w

a:w

U-

CD

W /)w 44-SW C;"-

a: a:a:CLL F- w4)W U.. >- 02

a:00

00

r-~o ~ ~ - 00 0 0~ CD 0t 0 0~ CJ C- 0

N)O Hid3C]!DNI3Nflos

31

Page 36: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

w

cc.

W~~ (f w 4F-W 0 44

W- z 44

0 w M.LL I- (I) c, '

20 zcr)

N 0N

0 LA-

CV V

-[-4

~~~~-~~ 0- w. -0 0 0 0 -0 a~ -

(14) H.Ld3CI )NIJNflos

32

Page 37: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

w

I-o

Zc- - . -1

UJ 44~

W - z 0 .

LL I.- C.)

a::

(I,4

-E-

~~~~~~~~~r co U-1 u,~~~ 0 ~ ~ t) M N~ \J~

(14) Hl~d30 ONIINflos

33

Page 38: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

\cc

5a: rw '-4

a)

W 0 o

C> 0a: _! ý-4.

W LL )

a: c'mN c

<N N n4

C A j

a)

f-4

"-,4

N-(D Lt '' ')C% y 0) 0 - (0 0C '0 0' 0\ w 0

(1:4) Hld3G E)NI]Nflos

34

Page 39: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

'a:

'K.

U-

0 4

WI- z 8

LL I- (nLLI LL

0 <-

00

~C1

r-c U )CYJ . 0 M~ CO t- to) Lo 1; (n) CJ 0

(4) H-L~dBO ENIGNflQs

35

Page 40: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

a:

-, LU 0 4

LuN o

a::NW

NN r-

00ZcD K-N N

~ Z N W(I) ~ N4

Wej) N>.W 5

ul wt K' rýW I- 0 Z

('14)~ ~ Hi3 NN~o

LU >~ 36-

Page 41: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

LIJ

U-

cc

UJ w

0OwU- I-- wL UL co

0)

N0 0C-4,

C(0 0

2('2 Hi~d3C]!NI(aNnos

37

Page 42: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

either by defining the S2 damage for the region above the berm, or by the

depth of erosion into the armor layer, e... The following equations were

developed using multivariable analysis to predict damage levels.

S 2 = 1.0 (N,)C- expC4 W 3 B 2 h ) (17)

eaxt = CS (N.) 4 exp ( WH B 2 *h) (18)

taC-((H=L,)' 1 da

where N, is the stability number, defined below, t, is the armor layer

thickness, and C3 through C7 are dimensionless regression coefficients

given by

C3 - 2.96

C4 - -3.56

C5 - 0.104

C6 - 2.08

C7 - -2.73

The stability number is defined as

W1/3

NS = i (19)-s 3 (s• - 1)

43. Equations 17 and 18 were developed to show how the reduction factor

concept introduced for runup can also be applied to damage levels and are not

necessarily recommended for prediction purposes since data scatter is very

high in the damage variables. However, all terms in the equations are highly

significant and the equations seem to reflect the trends in the data.

44. Damage can be defined as follows:

is e C4( ( o 1/2 * )] (20)

(H-•oL) 1/

r. efC 7 ( WE * )1 (21)

38

Page 43: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

where r. and r. are the reduction factors for S 2 damage and emax

damage, respectively. Figures 15 and 16 show curves of constant reduction as

functions of relative berm width and relative berm height based on

Equations 20 and 21. These figures help visualize the influence of a berm in

reducing damage to a revetment.

39

Page 44: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

0

Ojf-) 0 lt)O0c

< (0-~0)

41C\!

00

E 04

CR E

00

CD.

* a:00

V:)

C))

0 r0

400

Page 45: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

0C\J

-4

42)

4-4.

0

'44

$4.

to

4-4

0

0 ) A

0

o 0o

41-

Page 46: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

PART VI: CONCLUSIONS AND RECOMMENDATIONS

45. This study developed an equation (Equation 16) to predict the upper

limit of irregular wave runup on planar riprap revetments or on riprap revet-

ments fronted by a rubble berm. The equation considers both the height and

width of the berm and provides a way to estimate the effectiveness of a berm

in reducing wave runup. Although the berm was only tested with a 1:2 slope,

the reduction factor is believed to be applicable to other slopes when used in

Equation 16. Since Equation 16 can be used to calculate the runup on both

bermed and plane riprap revetments, it is superior to the method proposed in

Repair, Evaluation, Maintenance, and Rehabilitation Research (REMR) Program

Technical Note CO-RR-l.3, Supplement 3, which provided only a reduction factor

for runup due to the influence of a berm. In addition, Equation 16 is based

on a larger data set and subsequent analysis beyond that given in REMR

Technical Note CO-RR-I.3. An updated version of REMR Technical Note CO-RR-l.3

will be available in Supplement 6 to reflect these changes.

46. A rubble berm not only reduces wave runup but also increases the

stability of the revetment. The berm's influence on stability is considerably

greater, as a percent, than the reduction in runup; i.e. a modest reduction in

runup corresponds to a substantial improvement in stability. Typical reduc-

tions in runup due to a berm observed during this study were in the range of 5

to 15 percent. It is also believed that a modest reduction in runup will

translate into a large reduction in overtopping rates. These intuitive con-

cepts can be supported by making a few logical assumptions and calculating the

consequences.

47. The reduction in overtopping can be estimated by using the method

shown in the SPM and discussed further by Weggel (1976). Assume that R.m -

1.15 * F; i.e. the potential maximum runup is 15 percent greater than the

freeboard of a plane slope riprap revetment. To reduce the overtopping rate,

a berm is added to the revetment that reduces the maximum runup 10 percent or

R. - (1.15 * 0.90) * F - 1.035 * F, where F is the structure freeboard.

This rather modest reduction in runup causes a reduction in the overtopping

volume by a factor of about 8.8 if a value of Weggel's overtopping parameter

alpha - 0.07 is used (see Example I, Appendix B). These reductions are in the

volume of water per unit length of structure for the maximum potential runup.

The average overtopping rates could be expected to be reduced more than the

42

Page 47: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

maximum rates since the berm would allow fewer waves to overtop. Values of

alpha selected are reasonable for a riprap revetment based on estimating over-

topping rates using the potential runup approach given by Weggel and the SPM.

48. Reductions in damage for modest reductions in runup are equally

impressive as the reductions in overtopping rates. Compare the reduction

factors for iunup and S, damnge gie-n by Equations 15 and 19 for a berm pro-

ducing a 10-percent reduction in runup. The S2 damage reduction factor cor-

responding to r - 0.90 is r, - 0.085 (see Example 2, Appendix B). This

comparison indicates that a 10-percent reduction in runup will reduce S2

damage by a factor of almost 12.

49. Although comparable reductions in runup and overtopping may be

obtained with a smaller volume by increasing the crest height of the revetment

rather than adding a berm, the use of a berm should prove of value in loca-

tions where an increased crest height is not possible or undesirable. The

advantages of increased protection provided by the berm should also be

considered.

50. Maximum runup elevations from this study are based on visual

observations. These observations appear to be consistently lower than similar

observations made during other studies (Ahrens and Heimbaugh 1988). For this

reason, data analysis was biased towards a conservative interpretation of the

findings from this study. Because of the difficulty in achieving consistent

results among different observers of maximum runup elevations, it is recom-

mended that an electronic runup gage be developed. A runup gage would not

only give consistent results from study to study, but could also provide more

information about irregular wave runup elevations on rough and porous slopes.

With a gage, it is anticipated that statistically stabler runup parameters

could be computed that would yield better insight into the ability of a berm

to improve the performance of a rubble structure. Using a maximum value

contributed to the considerable data scatter in this study and the difficulty

in interpreting results.

43

Page 48: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

REFERENCES

Ahrens, J. P., and Heimbaugh, M. S. 1986. "Irregular Wave Overtopping ofSeawalls," Conference Proceedings, IEEE Oceans '86, Washington DC, pp 96-103.

. 1988. "Approximate Upper Limit of Irregular Wave Runup on Rip-rap," Technical Report CERC-88-5, US Army Engineer Waterways Experiment Sta-tion, Coastal Engineering Research Center, Vicksburg, MS.

Ahrens, J. P., and McCartney, B. L. 1975. "Wave Period Effect on the Stabil-ity of Riprap," Proceedings Civil Engineering in the Oceans III, Newark, DE,pp 1019-1034.

Battjes, J. A. 1974. "Wave Runup and Overtopping," Report to the TechnicalAdvisory Committee on Protection Against Inundation, Rijkswaterstaat, TheHague, The Netherlands.

Broderick, L. L., and Ahrens, John P. 1982. "Riprap Stability ScaleEffects," Technical Paper TP 82-3, US Army Engineer Waterways Experiment Sta-tion, Coastal Engineering Research Center, Vicksburg, MS.

Burcharth, H. F., and Frigaard, P. 1988. "On 3-Dimensional Stability ofReshaping Breakwaters," Proceedings of the 21st International Conference onCoastal EngineerinD. Malawga, Spain, 20-25 June 1988, pp 2284-2298.

Goda, Y. 1970. "Numerical Experiments with Wave Statistics," Report of thePort and Harbor Research Institute, Ministry of Transportation, Japan, Vol 9,No. 3.

Goda, Y., and Suzuki, Y. 1976. "Estimation of Incident and Reflected Wavesin Random Wave Experiments," Proceedings of the 15th Coastal EngineeringConference, Honolulu, Hawaii, Vol I, pp 828-845.

Hasselmann, K., Barnett, T. P., Bouws, E., Carlso, H., Cartwright, D. C.,Enke, K., Ewing, J., Gienapp, H., Hasselmann, D. E., Sell, W., and Walden, H.1973. "Measurements of Wind-Wave Growth and Swell Decay During the Joint SeaWave Project (JONSWAP)," Deutshes Hydrographisches Institut, Hamburg.

Hudson, Y. H., and Davidson, D. D. 1975. "Reliability of Rubble-Mound Break-water Stability Models," in Symposium on Modeling Techniques, Symposium of theWaterways, Harbors and Coastal Engineering Division of American Society ofCivil Engineers, San Francisco, CA, 3-5 September 1975, pp 1603-1622.

Hudson, R. Y., and Jackson, R. A. 1962 "Design of Riprap Cover Layers forRailroad Relocation Fills, Ice Harbor and John Day Lock and Dam Projects;Hydraulic Model Investigation," Miscellaneous Paper 2-465, US Army EngineerWaterways Experiment Station, Vicksburg, MS.

International Association for Hydraulic Research. 1986. "List of Sea StateParameters," Supplement to Bulletin No. 52.

44

L

Page 49: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

Shore Protection Manual. 1984. 4th ed., 2 vols, US Army Engineer WaterwaysExperiment Station, Coastal Engineering ResearcL. Center, US GovernmentPrinting Office, Washington, DC.

Wegel, J. R. 1976. "Wave Overtopping Equation," Proceedings of the 15tbCoastal Engineering Conference. Honolulu. Hawaii, pp 2737-2755.

45

Page 50: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

APPENDIX A: DATA TABLES

Page 51: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

a 0= NI a 0 'r Nn NMMM M' t oNM * l A-i n t.tIA0 CD cm o nMM-

99 CL Q C a 0 000 0 0 CD ý 0ý 00 00 0 00 0 0 0 0 0 0 0 0 0 00 0. 0)

cc .. w .0 0. . . . . ." !. :l - ý

~ C 0 -- N i i 4- 4-tIAI 0 ON N) M n a M4 N LN in4 0 - M M M'T -*4

of >.- I.-

J. b w-'.N 0,0 un T- o 41- wN w-ýNM CD in!- 0% in 00.' oV44 Iin-NN-*4'Oc -m Wnin 'CM0

,4 :- LU em --- Cr- - -- -Ne e e N Ny - n err (Meeeeeeee i

-~~~~~~~~~ .. . .00 - 4t.~~ .U~0 .00 . . . . . .

LU( err 0.ee e e e e e e eMMrr r rNW N ND N It NN Neeeeeeeeeeeeeeeeeee

Z - ='C r- !A AA Mt M0 M ttI- M Ny. NM ~ ~ M0

gw >> ch = S

Zc=LU - ~00 N M N N O N M*.O e N M .t.

wu - t

NI-j ce 1 -- ;0 . M^' WMO t0 vM0 .

o0 o

00 -C 4 w

- - -. -ee -N N N N NM M ~ M -c r-- -r - ---

Cu C

(A Z UJ >

SN N N% N% N% N% N% N% N! N N% N% NN N N N% N% N! Ný N% N% Nr IA r% C% afl Vm mý N NNNN

2 .- =.(A z I.- C0

-I- =A

wow 0

6461 4606 W660 0 U 6 6

A2

Page 52: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

t~n co N 14 .t P-NOt l JlCP. '0 .0 0 Q r M-0M' .0 0 '0 P-- ~ * - NN.-~

r~i ox 000 ý M' PI- m N 0 , N i0r mOOU M O0N.- Oin 0 0.tt 'A

4u tl. .=ý

s mM tPdm 4- -A - - -~' .- - - - - N N- - -

-m z -c

oinr 0'E'0iC0I It '40.0 t-.21J094n"ST-VNmmn .- n- NF-imW. r4.0O0 C.QN co ~N~ go 000'0.--I CP 00'0

3.. W0. NN.00 Ln It i4wn rQ c uNNOn'M'-C gm 0

9w Gl P4 NA W fmNNC4N(4 CY t. .- r...- . 14N (4w >P-

It N ww; N ' 4 &n a t0 ya F.M - M W - t' Mn n r W::: M

0 )W ~- n!~

=Zo 24 40 0 00000000> 00 000000 : > ) ýCD00C, 00c0 0000 3,C00co00c00

ofr '?E'N 6 m02~E'0

CD M Q 4 - h M CNN,'IM ( 4N0MNNMIt N U-SW

0 oC .00CD-r 0 N.0t- 62C3 00-ON C.tOO0 0 D0000 DC =C DC

ix tj 4c I.-.' z 142

w b.-

I-I

0.LLJ 0. VLu a.-

1-0 I,- 00000 CIO000 0Go00Go000c00go

cc .-

EU U ) wU do EU O 0 'go u .6 ED4- to E ou t g 000 4c 0 U QU U 41 EU. m m4- (U'4- to

A3

Page 53: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

000m n0I 0 In 0^ an 00 10 0ý IOA O On In000n in I.- I.-.C 4C W W 004 0 IOnIn InVIn00000c

. .. .000000000 .0. 00000.0.00 000000.00000

0. of~ILl

4) -K 0000 00000 0 0 0 0 0 00000( 0 00cl0 C4C,0 00 00c00=nnnnnnn7771

I.- u) Ix -w-4

Lu U'a00

(A 0 4'J~noM M O),in0 -*log" SOL^, r 0- N- In.0 P- 0

-,4 m cw )I.-- N - - - 0 O

3.- 0N0N'rN.uu In0 .#0L0O.e.t NOln -(A4n EzK 1- IWu.NI .NN N N N NN~~~~ .*ý.*-t ,t i I n n n nNwNlr?.

4)

-.. - u. L'% r *i4o

U)r0s CD ?- .)0 - e aG ,c ,e i( D 0L -0r n ( 0r .f-G

.cI- e * -' . N.-'CC - O .4!t N-ý-o n 9um~# .,9 0. W: .00 0. t . t~- % .. .. tIn0w L % ^w a - ný nk %t n P NrnN ( j 0 0 . *J t At-f.-e ------ u a Nw A ',tN f%t 'T

cc iu : a

4))

of on In It~~~i~~~~~~~I m m 00000 Mýý L"M - t D w- C 2 -0I nnnnIt n Ln mn m~

b-J0 . . . . . . . . . . . ..0 .0'. .00' ' 0 '' N. . .. . . . . N. N. . . ..13cuJ CL I nI-nk f %W f nw %A f nmmmW no n "w Iw lw ~ mw ' r %L% M& nL Ma

414

intn&AL i & & ut n nLninLnL i L j ^ n g nu, i 0 M(D 0 Lum 0L nIn L Lf aunguur4 le Go z *U1E3UU ý ý m U C (r.1U ýc g % 04 A! 00 i 1 . N ^! ! .. t Ii n. 0.ON.N.(Arý ýn0ýr.00.o!.....NN cO.KN~~ *00 N( W * -" ---- ---- -- N m m m mr MMMM M--- ----

u Lu = a4

Page 54: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

0000R L U4 U' 0b- b.- b.- Un Ln tn 0 b-. - 0 C U' 00 u n 0 I- M 0D I- - LM 0a-I

0. Ln 0n ;wr o a vR v ooe vmZ % 5i0)( DaQC

LUU

aU-40'

3c U.0 m. 0 0 0 0 0 .- 0 0 0 0 0 0 0 0

.0 4c~~0 00 0 . 0.M 0- 0L. L 00 0000000000000000000000000000000, " pm

-3 LU - ný tý m1 AL nr ~ ; l rL nMi

3 .- ,)O 04 U' M ;; -,t , , c0 O .

ge L.. L (D 0S.Dt(Dt10lCDO.DW0D )IIL N -0-.-N- - -

r4 .'0' ",I0 0 0 0 0 0 0 00t0 000 '0 0 0 0 0 0 0U) 2* 0 nM I ?n '0 UWN l~ WN N-~.''' N' -- 's'o OýWa -ý. . .!! . 7 . 97 r0 Ci ý . 00 0 0 0 0 00 0 0 0 0 00 0 0 0 0

im LU CDC n D4 00C )Qa1 C ,- C ý0 ýQaC

C1 Li> -jgwC T0'-o gP tOo nmr , ý0P-: i"ý ý0

a. w O.-3

w 0.s w*I nP 0L %C -C ; m wP ^f-N C

us a

.0..

Goo

ui 0 m

a z 0N N N N N NN4N N N > ý

> L'i ) to

Page 55: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

S0- = "-I W .

AM w

at 0- ;Z -cmc

in0 "-@ M. u0 l0 . u MM FN P0.(> o6^ a P- l

MN 0- W k^ 10 O. 0 Q pFM10- c n pl 0NVP. '0 r-" NO ' 0 a P-M LU 0's 'r . 00 0l 0L 0.n On ZZ 00M'' m NN a ax aM W'00'00

00 -K

# .- M. W UN'0 0 0 '.0 .N. 0. C. . 4(--P0 u . l -c Nt fl, NM.l '' 'o 0' .g-U Pet MON(NNc'cl,0 N N P P

-> .4 0ý l000( Qa0000000 max0 Q00 0,0,0, s00000 001000000

W.- 1 ) -- N. M... (4N P N. 0 U0NJ v M -- - - - - -- -- 0-- - ---

CC >

riP b.- IV.-W . CU NNNN n.4.0- 00ýN . 4NNNN;:M( ln t,%Z N 'P l N N ri0 = I 0

> N ON.0 t tL N0 0 -0.NOfnON UaNa0.A.0.NO.001~ " 1NNr - pP NN 0. N '00.a =9 *omtcvl.4''0ý '0N'0N.(1010. Ulow.tN. ýcp t N'0N'Oý n l W4I VIIA1t 'r0y0

Mu>~ 9*0 0N N N N -M C O C 1aa QC QmCC QC NNC)CIx C

co 21- - 0. -0 0 C300 000o0 000M00M00 0U

0.

U)C -ý uoLlU 0 0 000000.) ~~~0 0.-0C .. 0: N N N N

04 - 0.a 0 .mg ca$ o 002

13) n K.r .. . !

u LU

>. UC4 10000lo 00 000 0 0 0 00 0 0 0 0 00 0 0 0 0

u~i

0u 0m0 0 Cm0 0mo 0'4 04 Q0'.- 0. 0 -0 0mC,00Q4D000 0 Ci 0 Qi 0 0)0 m I0c00 00.4zZI 0 0 N . 0 0 0 ~ . N ~ l . . ~ 000 - N~

>4 1 . t*.t-t. l w.oo0. 0

A6

Page 56: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

cUw-- ,f, w" r P. ' P0 O't N~ .OO~ Nm;W n'ON!0O.N'4ý i l'I a'4mw wlc- c 00i1 N~a ;Zeu' WNN I0N N N 1 t t

.. Z .. 4. .

- In) VM 0NC3~.N. -4D 00en pn.tn m -1 %r - 0'

K M)

Nt- 2 U) N U0 - - 0 -t - I' - Of.0O' -0 0- - -- -- -- -- N -- -- -- -- -- --

CK U >-5

L1- 0. 00 "EU'U) m' ~ m 0~ 0,

deU > I.-c z -IC

N I- - D 0 o co 00 U 'tO 0, ' ~ 'n PI W. (1 t--' >tU - ' ' N MS-. '0 0 - L^' P, 'Z.' ý -t-0 0 N O CDU -V-s~t -) -O '"?"1 ' C, WO. 00D

MMNCDQ ; C cC) CL3 m nMw

It1 ý1 !ýn lý1 ý !L!V il i .. W

1,4 1-00 0' NN0 o..0 co0 ot50 r-p o t r VDr0.0- :,o y 0coUn o r 0'N 0 v

o .-K 4D p C C 0000 0010 000000000 000040a000000 Q0000000000000a M C

-4'-4

-4j

E-' CLr u ANNNNNmV'n coNV coNNN NN NmNN r4 )

-~ 0. - -NN NN-NN-NNN-N-N - rgNsNN^Szuj

1-0 0 00 ý~ o, 0 0 != 0 00 00 000 0000 00 00 00 000 000 000-I NU)

: 'oN N

UW 5-

0. Ul > .-

0- -- - -MM(Zf ~

(A e b- 10 O O O * 'O '0.1 0. 0a 01 0 1 D .0 0.0 1 1 o1 0 .0 0 10 '

-jU 90. O ý94 qC qC ý ... ao 1

0 X im'L4'ue ~ ,U U U U6 u m m ~ ~ ~ m

ý--0 mC)CýCDCDCDQ C a(Dm D Qa aaa00m0a0aQaC )mC

Page 57: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

0, ='-4.It4.

LA UN -S =ý 4m

(a w'uO C, ~ iA-P 0.C r vN )C-0 Zr~ In~b~' UN C2N N~I N .- 4)~jMý ri

~CCY )* I.-w0 Mm000000co0in0= us-=

40 CL 10IN93 C! .N N . .--

Im o N M CP- Z - -N .4.

US 0. 0 09- -

M .Mf N M M a4 t I

-K40 WA N .

4) -0c,

M M ' 9 0 A^ -P..-' M~4> Oý w fn ~ 00 C~)P-M.(O )I-WLJ- n C M U)f' 00NNNNQ iM (V

K u. 0..-r.-*

01

cm UJ- acN 0%C oV-O )440 't 0 . 0 N0CC)C tI nI

4) 3 U4 I-~ 00 0' ' C 0 0 0 0-C -@ 2)).'O '0 - N '.*1

-w I- U))-4 ) 30 0 0 0

lz 8 0.eu

-36- =(n z *- '0 0 10 'O'O'1

iLl 0

@3 4J @3 Go cc di to 4- v '. 3 '4- to 3 as -

A8

Page 58: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

0, 0 -L 0 LM I~st n F004 0- N O PM-LU If 000 LM. 0-a61 m ^C-P4^L0Qai9L gt4; >ý ~ O " :.e - ,

I- LA S.aag 8000ý oaa22ý, gaAa....1 0ý00 000 00 00 0 000 0 000 00 00 000 000 000

In~

ý~ ~ 0005,C ý ý0 00 00 00 0 00 C0 00 00 00 0000 00 D 0 000

0c 41 m imf vmm N m m m N N r4 N

CL. U) .-C

0 00COO m4'TO C: (MN- 4m=.- 2' ` 0..g T.P- g~ 10 gm 'M 0.

CK.0..0- N 0 P.-.0 0 OPN--..O N'L.U W).s '0 00''' 0 1fU,.tt*U't.

co I.

Z LzCo o o AE- 0. ~ -.

CY I- N.W )ItC %cyI f!%M 0 ol0 C O'1 a0nP o 0 It , ý I&-tjD r)W% I4u. 2 LNN NN N~. NN ~ V M n NNu0L, 000 000 00 000 000 0000 NIp% lc nPlr mc o0 0000N j nI(i l100000000

.c is3ae L ;C 2C ;C mC ;o C ;: ;C 5 ,c D0c ,c Dc

W La U'.u'

-4 Wwt.4rr~j - (4.V)0ýO 0

CODo -j w ~ -?-~0 9 -0.9 9.9 .- . N0 ,0- 0--U.M -orU I . 6 r O0 C =co 00a NCt '0 0 .0 =Q0 CýQ0aC 0U0 Q aa ClC2,0 0 a C)0 C

at . MLLI .O ' M O . M . N - .c U o . 4NM I' & ~ M f I U

m w ~4a.a 0 M- l0 0 0ýI 0I % tww .2MCJ , t .L~ ' ,0

Cd4 C r U 5 )' n E 0 O Q " nO ýýE- 3- Ix 00 0 0 0 00 0 0 ' .0 0 0 0 0 0 0 ' 0 00

c b.. uJ=3, 9.i91cc ci 4 0 00000000000000000000000000000tin000-MMN0000000M V -

a: LU a-U

Ow -

2cL)

m --

a 04.1 0 0 CD 0 - 0a CD0 Qa 0 00C,000 mNNMMC) 0000.-- C, a m.

uiAn

Page 59: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

00n0 00 0 00 Inin0 0 -C0 0 tn0 0 I INI n0 n 0uLA WLA <c ~0ifLn

0 c . .= 'm - ow C Co o C;OOOC;o oi 0 0C C 00 0 C C 0C 0 00C C 0C o 0ý0 00 0ýC ýC;C ý

I- U) ccý49L W. -K.0

I.- LU U 00a0400000000 000 000000000000000000000000 Fnm ; ýs;;

004

ty 0- N.1! , oC or.; ,: 00 r.- Gol -fL0N m 0.N "'o M o t 0 m M.t

09 LU Qw

""4 N J UWUUW GoG Im imJ r ~ t UzC 0U o09 0 DgmU = -

P. zn

Ow

4- u. Z,1 C,"nW nC ' ,V

r. -1. 9 .C -9 9 00 U N 0- .t N... . .... .. .. .. .

0 0:U U. §!L wN 4 a010C 0 N 00040 C C C 000 F 3.4 0C CCý04000 ,CadJ Lu

N .s % nný ýO- n-o mlo NN narzN 10;:0 ruý;mr- 0 m ruF.-

CK U. 0. - - -N - -P-N-

Of LU 39 a

I- -j O~001QnMMinN c 0 0000 0 0 0 0 0 0 0'40 0 0

WZGJn.'. D SO - o o0N0 ý sCc U ý 4. P DO t QV C n tU 00000000000000000000000000000000000000Y

In

Z LU > Ua. w0.'

z maI.-Q

b'- )$4 m 0 0 0 00 0 0 0 00 0 000000000808aAa ooa4asss sIsssss100 1001sLU 0'4

m i ..-. . .

I.-0' Q0 P--P-P-P,=.ý=c.=Q=o(ýC ýC ý ;C ;C;C ;C ; ;C ;CýC ýC ý C ý

ujAlQ

Page 60: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

4-40. 0

I M

0 4c==Iz o4, 0000000000000000 ý m Z r c ý4I.- Wn CC -t

0 1. N Ln in"A'

000t 010000000001000

Cc Lfl U le-'

00

neLI -Coc cc

9K L- CL -'O t. - in -I--------

C -i Ir- N 4Z0 0NW(0 0trnNM 01

ccLJJ0 0 00AA . O L

ze I.-N "1-O '0L N '~

we v NOVID t'.'C I'-CD m CC N VI 0 C) 0 m

W0Js

4u

inW V% £rin M LA 0 0 0 m0 00a00 >.m

Z) LA .)x- (oLI . , 4,>

0 0 '4- >0a401 1

M 40 0 W M -W ' - M4- M 4- C > z

All

Page 61: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

Table 5

Damage Sustained by the Revetment During Test Runs

MAXIMUM MAXIMUMPERPEN- PERPEN-UPPER DICULAR UPPER DICULARS2 ARMOR S2 ARMORRUN # DAMAGE EROSION RUN # DAMAGE EROSION1 0.560 0.010 37 0.189 0.0062 0.883 0.024 38 16.858 0.1943 0.558 0.013 40 0.257 0.0084 1.323 0.053 42 0.495 0.0145 2.161 0.049 44 0.927 0.0186 6.517 0.112 47 0.244 0.0087 11.473 0.121 48 4.881 0.0768 0.514 0.008 49 2.479 0.0489 1.252 0.036 50 0.301 0.00410 5.538 0.090 51 6.491 0.08811 11.219 0.157 52 1.758 0.05812 21.797 0.215 53 0.283 0.00617 0.458 0.006 55 0.209 0.00418 0.458 0.006 57 0.086 0.00419 0.770 0.036 59 1.946 0.03620 1.220 0.030 60 6.944 0.12921 3.637 0.085 61 9.695 0.12522 9.358 0.126 63 0.624 0.01023 8.765 0.158 64 0.693 0.01524 0.338 0.007 65 1.510 0.04125 1.523 0.037 67 0.973 0.03626 12.590 0.137 68 1.306 0.05427 25.188 0.191 69 6.841 0.12328 0.486 0.017 70 9.876 0.10429 2.442 0.044 71 17.981 0.17530 12.220 0.171 85 2.152 0.04432 3.258 0.097 86 1.171 0.03033 12.191 0.146 88 0.890 0.02134 17.883 0.195 89 0.730 0.01735 1.240 0.030 90 0.538 0.01636 37.603 0.286 91 1.610 0.047

A12

Page 62: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

APPENDIX B: EXAMPLE PROBLEMS

BI

Page 63: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

EXAMPLE 1

GIVEN: Potential runup on a revetment is 15 percent higher than thefreeboard.

FIND: Reduction in overtopping rate if a berm reduces the runup by 10 percent.

SOLUTION: The current method given in the Shore Protection Manual (SPM)(1984)* to calculate overtopping rates is

Q (g0.1085 [R h + d - d s (BI)

where

Q - overtopping rate per unit structure lengthQt and a - empirically determined coefficients based on incident wave

conditions and structure geometry

H' - equivalent deep water wave height

R - maximum potential runup

h - height of structure crest along the bottom

ds - depth at the structure toe

This may be rewritten as (Ahrens and Heimbaugh 1986)

Q -((g Q* H;3)11 •2 R - F) 0.1085 (B2)

where F is the freeboard of the structure.

Given that the potential runup without a berm is 15 percent greater than

the freeboard, then

RNo Berm- 1.150F

If a berm reduces the runup by 10 percent, then

RBerm - 1.150F * 0.90 - 1.035F

The effect of the berm on the overtopping rate is given by

3cH') 1/2 .150F - F 0.1085QNo Berm- 0 o / tl50.150F +F)

3) H91/2 (1.035F - F~ 0.1085~Berm 0* (1.035F+ )o035Fj + (B3)

* See References at the end of the main text.

B2

Page 64: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

or,

0.1085ft .150F)QNoBerm - (2.150F (B4)

QBerm 0. 035F( 2. 035F-

For a - 0.07, the berm has reduced the overtopping rate by a factor of 8.8.

EXAMPLE 2

GIVEN: A given berm produces a 10-percent reduction in wave runup, i.e.

r - 0.90.

FIND: What is the damage reduction factor (rs)?

SOLUTION:

r = 0.90 = ex C2* (15 bis*)=

4~W (H ,LO) ,z ds)

I = ? = ex C C (H. Lo) 1/2 . --d j (20 bis**)

Since WB , HB , HMO, Lo , and d. are equal and C2 - -0.152 (pp 25 of

text) and C4 - -3.56 (pp 36 of text), the above reduces to:

I•_ =r eXP c2l (B6)

or

in 0.90 -0.152

In (1') -3.56

-0.105 -0.152in (r.) -3.56

* See p 27 in the main text.•** See p 38 in the main text.

B3

Page 65: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

in r = -2.459

= 0.085

B4

Page 66: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

APPENDIX C: NOTATION

Cl

Page 67: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

a Regression coefficient

A, Area of accretion above the still water level

A2 Area of erosion

A3 Area of accretion below the still water level

alpha Overtopping parameter

b Regression coefficient

Co Regression coefficient

CI Regression coefficient

C2 Regression coefficient

C3 Regression coefficient

C4 Regression coefficient

C5 Regression coefficient

C6 Regression coefficient

C7 Regression coefficient

D15 15-percentile diameter on a grain size distribution curve

085 85-percentile diameter on a grain size distribution curve

(Dn)50 Nominal diameter of the median stone size

ds Depth at structure toe

E1 Energy of the incident wave spectrum

emax Maximum perpendicular penetration of erosion into armor layer

ER Energy of the reflected wave spectrum

f Wave frequency

F Structure freeboard

g Gravitational acceleration

H Wave height

hB Berm height

Hmo Wave height of the zeroth moment

Hr Reflected wave height

HS Average wave height of the one-third highest waves

Kr Reflection coefficient

Krr Stability coefficient

Lo Deepwater wavelength

mo zeroth moment of the potential energy spectrum

C2

Page 68: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

m2 Second moment of the potential energy spectrum

Ns Stability number

Qp Spectral width or peakedness

r Runup reduction factor

re Erosion reduction factor

rs S2 damage reduction factor

Rmax Maximum vertical height above still water level of wave runup

S2 Damage relative to size of armor unitS(f) Spectral density function

Sr Relative specific gravity

T Wave period

Tp Wave period associated with the peak energy density

Tz Average wave period

W Weight of an individual armor unit

W50 Median armor stone weight

WB Berm width

wr Unit weight of armor stone

c Angle of the slope with the horizontal

Surf parameter

7r 3.141592654

C3

Page 69: Use of a Rubble Berm for Reducing Runup, Overtopping, and ...CS Concrete and Steel Structures EM Electrical and Mechanical ... 5. Wave heights used in this report are the heights of

REPORT DOCUMENTATION PAGE [ ormo Approved

Pu~~cr~pn~q brd fl or this cotiedllon, of inflormtion m estimated to srerage I hourf or, 'ei)nor',e n ud'ng I" Ine for rewwn ntIr on.wrctrign C.T.r"r dat s1*gaterngandinrttd~'.lgthe data. needed. and Oinp)IeIE1g and f.ewni-rg the C041t(1.O4 Of Mfri'ai~nhIOf S.end cormients ~inrqrrg tthsi burden estimateC or an other &MW1o f C th-

collectwo of ,nlOritiatIto. lncd dng ,ge t'onto reducing tirs burden, to Washington 04eaciouartefs Sermrces, Oireitorte ifornormation Ovierations and Aeprmns $2 IS jeffter*orOan, .hwway suite 1204. Arhngto. VA 2220243 . .d to the OflIce of Maflbsgerni t and fludget, Paperwork Aed•,ton Pro t e" (0704411M). WashingtOn. DC 2001

1. AGENCY USE ONLY (Leave blank) 12. REPORT DATE 3. REPORT TYPE AND DATES COVERED

April 1993 Final report4. TITLE AND SUBTITLE S. FUNDING NUMBERS

Use of a Rubble Berm for Reducing Runup, Overtopping, W

and Damage on a 1V to 2H Riprap Slope; ExperimentalModel Investigation

6. AUTHOR(S)

Donald L. WardJohn P. Ahrens

7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) S. PERFORMING ORGANIZATIONREPORT NUMBER

USAE Waterways Experiment Station

Coastal Engineering Research Center Technical Report3909 Halls Ferry Road REMR-CO-17

Vicksburg, MS 39180-6199

9. SPONSORING /MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSORING /MONITORINGAGENCY REPORT NUMBER

US Army Corps of EngineersWashington, DC 20314-1000

11. SUPPLEMENTARY NOTES

A report of the Coastal Problem Area of the Repair, Evaluation, Maintenance, andRehabilitation (REMR) Research Program. Available from National Technical

Information Service, 5285 Port Royal Road, Springfield, VA 2216112a. DISTRIBUTION / AVAILABILITY STATEMENT 12b. DISTRIBUTION CODE

Approved for public release.; distribution is unlimited

13. ABSTRACT (Maximum 200 words)

Laboratory tests with irregular waves to determine wave runup character-

istics and armor stability of riprap revetments are discussed. Tests includeconventional, plane, 1 on 2 slope revetments, and conventional revetmentsfronted by rubble berms. Rubble berms tested reduced the maximum runup byrather modest amounts, typically around 10 percent, but produced substantial

improvement in the armor stability. These effects are discussed and quantified.

"This study demonstrates the need for a reliable irregular wave run-up gage forlaboratory studies of rough, porous coastal structures.

14. SUBJECT TERMS 15. NUMBER OF PAGES

Berm Revetment 69

Damage Riprap stability 16. PRICE CODE

Overtopping Runup

17. SECURITY CLASSIFICATION 18. SECURITY CLASSIFICATION 19. SECURITY CLASSIFICATION 20. LIMITATION Of ABSTRACTOF REPORT OF THIS PAGE OF ABSTRACT

UNCLASSIFIED UNCLASSIFIED

NSN 7540-01-280-5500 Standard Form 298 (Rev 2-89)1`1-11,beOO h AN%. ý0a ji 'I