12
USArray Year 10 IRIS CoCom Meeting Chicago April 9-10, 2012

USArray Year 10

  • Upload
    newman

  • View
    39

  • Download
    0

Embed Size (px)

DESCRIPTION

USArray Year 10. IRIS CoCom Meeting Chicago April 9-10, 2012. USArray Year 10 Basics. Final year of five year award Scope All originally scope will be complete Many activities above and beyond originally scope will be complete Schedule All field activities are on schedule - PowerPoint PPT Presentation

Citation preview

Page 1: USArray Year 10

USArray Year 10

IRIS CoCom MeetingChicago

April 9-10, 2012

Page 2: USArray Year 10

2

USArray Year 10 Basics

• Final year of five year award• Scope

• All originally scope will be complete• Many activities above and beyond originally scope will be

complete• Schedule

• All field activities are on schedule• Cost savings in early years has been replanned for last two years

• Budget• Funding

– FY12 reduced funded – at FY11 level– FY13: expectation is funding at FY11 level

Page 3: USArray Year 10

3

• FY09 fully funded• Last 20% via ARRA funds• FY10 fully funded• Supplement of $197,579 for EarthScope Science Plan Workshop

• Remainder applied to ESNM in 2011• Cascadia Initiative supplement• $2.5 M in ARRA funds• Covers all costs through FY13 (4 years)• FY11 fully funded• $163,639 supplement for 2011 ESNM

• FY12 funded at FY11 level• FY13 funding: funded at?• $811k received in forward funding

Funding Summary - EAR-0733069 - USArray O&M

Page 4: USArray Year 10

4

Current Activities

• Completed cost review with NSF in January• Will submit Change Order 34 to “re-baseline”– Propose to use revised spend plan through end of award

• Propose to submit CO35 for increased scope– Collaboration on integrated web services with COOPEUS /

EPOS European efforts• PBO submitting similar re-baseline CO, plus several

COs that add scope

Page 5: USArray Year 10

5

USArray Rebaseline

• CO34 proposes to rebaseline the remainder of Year 4 and Year 5, per table below

• Financials presented every quarter• Will use new, comprehensive CSSR format

– A view of things to come?

Page 6: USArray Year 10

6

USArray, by WBS Element

• Most tasks spend slightly less than originally planned

Page 7: USArray Year 10

Instrumentation Services: FY13-14

IRIS CoCom MeetingChicago

April 9-10, 2012

Page 8: USArray Year 10

Status

• Mostly: Salary for IS management team– Note: some are fractionally supported from other

awards (USArray, Polar, GLISN, etc.)• Small amounts for travel, M&S, Pubs & Printing• Revised downwards from previous projections– Mostly due to lower than expected salary for Fowler– Delayed hiring (all planned hiring now complete)

• Note that this will change substantially for FY14-18 due to inclusion of full salaries

Page 9: USArray Year 10

Instrumentation Services: FY14-18

IRIS CoCom MeetingChicago

April 9-10, 2012

Page 10: USArray Year 10

WBS 3.1 – IS Management

• Same structure as at present– Salaries, travel, M&S, Pubs and printing

• Salaries will include 100% of IS managers– Some fine tuning of this required

Page 11: USArray Year 10

11

WBS 3.1.7 - Magnetotellurics

• Scoped a slightly more ambitious plan than asked• Should achieve three significant “footprints”• Proposed structure and activities are essentially the

same as today– But – may need to trade some field work against buying

replacement equipment – No sensors replaced in nine years (running the same 20

instruments the whole time)

Page 12: USArray Year 10

12

WBS 3.1.7 – Magnetotellurics – New Initiatives

• Presented two concepts for new initiatives at last BoD meeting– Full-48

• Expanding the MT TA to cover the full 70 x 70 km grid in the lower 48• Cost: ~ double the base MT budget (additional ~$600-700K / year)

– Prototype Alaska transect• A road-based transect of up to MTsite in Alaska• Setting stage for post-2018 MT activities• Cost: ~$150-170K / year

• BoD meeting takeaways– These new initiatives are non-starters