Usama Jadoon
BE Civil Engineer
Personal info:
Nationality: Pakistani
Passport no: AE8400331
T : +92-3239805292
Skype ID: jadoon9911
A: CB 337, St # 01 Lane # 04 Peshawar Road Rawalpindi Pakistan
Objective
My educational background is in Civil Engineering. I believe in hard work and consistent progress. Motivated
by full transfer of knowledge and development of maximum potential in the workplace. Seeking a challenging
position in order to utilize my skills in a best way and to work in a professional environment for developing
intelligent and innovative solutions.
Education
B.E Civil Engineering
2009- 2013
3.06/4.0
Key Skills
Proficient in vast array of programs, including:
Primavera 6 Slope/w
AutoCAD 2010
Xstabl Microsoft Office
Major Courses Taken:
National University of Sciences & Technology, Risalpur Campus
Transportation Engineering
Project Construction Management
Construction Safety & Risk Management
Geotechnical Engineering
Structual Engineering
Health & Safety Management System (NEBOSH)
Seep/w
2
Professional Experience
Project: Overlay and Modernization of the Lahore-Islamabad Motorway (M-2)
The Project for Overlay and Modernization of the Lahore-Islamabad Motorway (M-2) on a Build, Operate and Transfer
(BOT) basis. It is 367 km long, 6- lane and connects Lahore with Islamabad. The estimated cost of Rs. 37 Billion and
with a schedule of 24 months to complete.
Motorways of Pakistan are a network of multiple-lane, high-speed, controlled-access roads, which are owned, maintained
and operated federally by Pakistan's National Highway Authority. Frontier Worker Organization (FWO) is the
Concessionaire of the project, and Bin Nadeem Associates (BNA) is providing Project Management Consultancy to
FWO.
Roles & Responsibilities:
Preparation of Transportation Management Plan (TMP) for Motorway M-2
Preparation of Quality Management Plan for Motorway M-2
Preparation of Risk Management Plan
Preparation and Updating of Risk Register
Preparation of Operations & Maintenance Manual for Motorway M-2
Preparation of Health & Safety Plan For Motorway M-2
Preparation of Construction Methodologies
Preparation of Method Statements For Motorway Construction Activities
Preparation of Permit to Work Systems (PTWS)
Preparation of inspection test plans (ITPs)
Preparation of non-conformance reports (NCRs), incident reports (IRs), daily and weekly
progress reports
Coordinating with contractors representatives on safety issues
Attending meetings with contractor representatives and consultant representatives on
various issues and problems
Maintaining NCRs, IRs, ITPs and other relevant documents
Preparation of all relevant documents as advised by Senior Managers
Al Shujaa Building Contracting LLC. (Dec. 2013 – March 2014)
Project : Jalal Residential Complex Abbottabad
The project included construction of multi-storey R.C.C frame structure building with a covered area of 200,000 Sq. ft.,
works of worth about Rs. 2 billion has been procured in 36 month time.
Bin Nadeem Associates (Project Management Consultants) (May 2014 – to date)
Designation: Assistant Manager Transportation
Designation: Site Engineer
3
Roles & Responsibilities:
Supervision of all activities / construction on site.
Preparation of monthly progress reports.
Daily Progress Reporting.
Checking the BBS (Bar Bending Schedule) and its Successful implementation.
Monitoring of physical progress on site.
Preparation of Shop drawings for sub-surface utilities.
Working on Structural Shop drawings for submission to consultant.
Assisting with audits on site supervision, including materials and laboratories.
Supervision of all sampling and on site Laboratory testing.
Sub-contracting and Contract management documentation.
Professional Membership:
Member of Pakistan Engineering Council
Member (Student) of Engineers Australia
Member of Institute of Engineers, Pakistan
Member (Student) of American Society of Civil Engineers
Reference:
National Conference on Road Safety (Duration=1 Day) Earned Value Project Management (EVPM) (Duration= 1 month) Equipment Maintenance Management for Construction Projects (Duration= 1 month)
Training:
Mujaddad Afzal (Manager Transportation Bin Nadeem Associates) Email: [email protected]